What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-09-30; filed 2025-11-06.
0001193125-25-269776
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-03-31; filed 2026-05-07.
0001193125-26-212193
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 161 previous paragraphs and 137 current paragraphs.
79 unchanged; 43 reworded; 15 added; 36 removed; 3 previous and 0 current paragraphs rearranged.
Tables are not compared: 9 previous and 6 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (15)
Current report
In March 2026, in connection with the conflict in the Middle East, we received a force majeure notice from QatarEnergy under our long-term LNG purchase agreement. We issued a corresponding force majeure notice to Petrobangla under our long-term LNG supply agreement. We currently cannot predict the timing of resumption of performance under these contracts.
Current report
In May 2026, we executed a nine-month time charter party agreement with Jordan’s National Electric Power Company, NEPCO, to deploy the Excelerate Acadia to the country’s existing LNG terminal in Aqaba. The Excelerate Acadia is expected to commence operations in mid-2026. The interim deployment enhances Jordan’s energy security by providing additional regasification capacity and generates incremental earnings for us while we continue to advance the Iraq integrated import terminal.
Current report
During the first quarter of 2026, global LNG markets were materially impacted by the armed conflicts in the Middle East, which disrupted supply availability and drove significant price volatility. The conflicts resulted in the effective closure of the Strait of Hormuz and damage to LNG infrastructure in the Middle East, constraining exports from the region and tightening near‑term market balances.
Current report
These disruptions led to sharp increases in spot LNG prices during the quarter, particularly in Asia. Elevated prices, increased shipping and insurance costs and logistical challenges contributed to volatile trading conditions and prompted demand curtailment in certain price sensitive markets. As a result, LNG market dynamics during the quarter were driven less by underlying demand fundamentals and more by geopolitical risk, security of supply considerations, and the reallocation of limited LNG volumes across regions.
Current report
Natural gas and LNG prices increased across European and Asian markets during the first quarter of 2026 as compared to the fourth quarter of 2025. Dutch Title Transfer Facility (“TTF”) and Japan Korea Marker (“JKM”) reported average first quarter prices of $13.69 per million British thermal units (“MMBtu”) and $13.25 per MMBtu, respectively, compared to $10.20 per MMBtu and $10.29 per MMBtu, respectively, in the fourth quarter of 2025. Separately, average Henry Hub futures settlement prices increased from $3.55 per MMBtu in the fourth quarter of 2025 to $5.04 per MMBtu in the first quarter of 2026.
Current report
Global LNG trade during the first quarter of 2026 decreased to 116 million tonnes (“MT”), compared to 119 MT in the fourth quarter of 2025. Approximately 20% of the world’s LNG trade flows through the Strait of Hormuz. The closure of this critical passage resulted a major disruption in global LNG trade. The disruption of flows impacted LNG export volumes, which fell to 35 MT in March 2026 as compared to 39 MT in March 2025. As a result of the decreased volumes, TTF and JKM traded at peaks of $24.99 per MMBtu and $22.35 per MMBtu, respectively, during the first quarter of 2026.
Current report
Overall, the Middle East conflict has placed significant constraints on the near-term LNG market, limiting supply flexibility and heightening price volatility as buyers prioritize security of supply. Over the longer term, however, the global LNG outlook remains constructive, with approximately 200 MT of incremental LNG supply expected to come online by 2030. As these new volumes are delivered, they are expected to improve market liquidity, enhance diversification of supply, and alleviate structural tightness, helping to rebalance global LNG markets over time.
Current report
LNG, gas and power sales agreements ($23.2 million) and additional short-term LNG, gas and power sales opportunities ($2.1 million), partially offset by a seasonal maintenance project ($4.1 million).
Current report
LNG, gas and power revenues were $275.2 million for the three months ended March 31, 2026, an increase of $108.5 million, as compared to $166.7 million for the three months ended March 31, 2025. The increase was primarily due to the Acquisition.
Current report
Terminal services revenues
Current report
Cost of LNG, gas and power was $243.0 million for the three months ended March 31, 2026, an increase of $82.2 million, as compared to $160.8 million for the three months ended March 31, 2025. The increase was primarily due to the Acquisition.
Current report
In December 2025, our board of directors approved a share repurchase program (the “Share Repurchase Program”) to purchase up to $75.0 million of our Class A Common Stock, par value $0.001 (“Class A Common Stock”). The Share Repurchase Program does not obligate us to acquire any specific number of shares, has no expiration date, and may be suspended, extended, modified or discontinued at any time at the discretion of the board of directors. During the three months ended March 31, 2026, we repurchased 147,699 shares of our outstanding Class A Common Stock at a weighted average price of $34.07 per share, for a total net cost, including commission fees and taxes, of approximately $5.0 million. For more information, see Part II – Other Information – Item 2. Unregistered Sales of Equity Securities and Use of Proceeds –Share Repurchase Program.
Current report
Excelerate Acadia (f/k/a Hull 3407)
Current report
Our LNG future purchase obligations are primarily based on monthly Henry Hub natural gas futures, Dutch Title Transfer Facility futures, or Brent Crude pricing times a fixed percentage or with a contractual spread where applicable. Some obligations depend on supplier LNG facilities becoming operational.
Current report
There have been no material changes to our critical accounting policies and estimates as compared to the critical accounting policies and estimates described in the 2025 Annual Report.
Removed paragraphs (36)
Previous report
Iraq
Previous report
Acquisition
Previous report
In May 2025, we closed the acquisition of 100% of the interests in New Fortress Energy Inc.’s business in Jamaica for approximately $1.055 billion in cash, which was subject to certain adjustments for cash, indebtedness, transaction expenses, working capital and liquefied natural gas and fuel inventory (the “Acquisition”). Under the terms of the purchase agreement, we acquired 100% of the operating interests in three facilities, as well as the operations, pipelines and infrastructure associated therewith: the Montego Bay LNG Terminal, the Old Harbour LNG Terminal and the Clarendon combined heat and power plant. The Acquisition was funded with the Debt Offering (as defined herein), the Equity Offering (as defined herein), and cash on hand.
Previous report
The Acquisition directly aligns with our strategies of (1) acquiring interests in LNG regasification terminals and integrated LNG infrastructure projects, which we believe will enhance long-term contract revenue and margins, and (2) diversifying the geographic mix of the LNG markets we serve and our customer base.
Previous report
We believe that the Acquisition is complementary to our existing assets and business strategy and establishes Excelerate as a provider of “last-mile” LNG infrastructure in Jamaica. Additionally, the Acquisition provides an attractive downstream natural gas market for Excelerate’s 20-year Venture Global LNG supply agreement and secures pull through demand and value-accretive offtake for our LNG supply. The Acquisition aligns with our investment thesis in the following ways:
Previous report
During the third quarter of 2025, Dutch Title Transfer Facility (“TTF”) prices remained steady at $11.70 per million British thermal units (“MMBtu”) compared to $11.76/MMBtu in the second quarter of 2025. Japan Korea Marker (JKM) reported average third quarter 2025 prices of $11.84/MMBtu, which decreased from second quarter 2025 prices of $13.11/MMBtu.
Previous report
Global LNG trade volumes reached approximately 104 million tons per annum (“MTPA”) in the third quarter of 2025, a modest increase from 101 MTPA in the second quarter. This uptick was driven by stronger seasonal demand in Europe and a rebound in Asian spot LNG imports, particularly in China and India, where heatwaves and infrastructure expansions boosted gas-for-power consumption. However, global economic uncertainty and relatively high prices continued to weigh on broader natural gas demand, especially in price-sensitive markets. Meanwhile, Europe’s LNG imports increased, supported by increased storage injections and lower pipeline flows from Russia.
Previous report
We believe the continued growth in global LNG supply will drive greater affordability for customers worldwide. Globally there is approximately 193 MTPA of new liquefaction capacity coming online by 2030. As new liquefaction capacity comes online, downward pressure on prices may unlock new opportunities for fuel switching, particularly in regions such as the Caribbean where diesel and heavy fuel oil remain prevalent. More affordable LNG could provide a catalyst for investments in regasification infrastructure and long-term LNG supply agreements. This reinforces our strategic focus on the downstream segment of the LNG value chain, where Excelerate is also well positioned to deliver flexible, scalable LNG solutions that connect emerging demand centers with reliable supply.
Previous report
Three and Nine Months Ended September 30, 2025 Compared to Three and Nine Months Ended September 30, 2024
Previous report
Three and Nine Months Ended September 30, 2025 Compared to Three and Nine Months Ended September 30, 2024
Previous report
Net income was $127.9 million for the nine months ended September 30, 2025, an increase of $20.9 million, as compared to $107.0 million for the nine months ended September 30, 2024. Net income was higher primarily due to the addition of Jamaica operating income ($32.4 million), the drydocking of Summit LNG and Excellence in the first three months of 2024 ($17.2 million), an increase in LNG, gas and power sales opportunities ($12.7 million), extended commissioning time for our power barge assets in Albania in 2024 ($10.2 million), and a decrease in personnel costs in Argentina ($7.6 million), partially offset by transition and transaction costs incurred as a result of the Acquisition ($33.6 million), an increase in interest expense due to our new 2030 Notes, net of the effects of the Term Loan Facility paydown ($23.1 million) and a decrease in interest income ($3.7 million).
Previous report
Gross Margin was $296.2 million for the nine months ended September 30, 2025, an increase of $70.7 million, as compared to $225.5 million for the nine months ended September 30, 2024. For the nine months ended September 30, 2025, Adjusted Gross Margin was $375.1 million, an increase of $73.3 million, as compared to $301.8 million for the nine months ended September 30, 2024. Gross Margin and Adjusted Gross Margin were higher primarily due to the Acquisition ($47.4 million), the drydocking of Summit LNG and Excellence in the first three months of 2024 ($17.2 million), an increase in LNG, gas and power sales opportunities ($12.7 million) and a decrease in personnel costs in Argentina ($7.6 million). Gross Margin was also higher due to extended commissioning time for our power barge assets in Albania in 2024 ($10.2 million), partially offset by the addition of depreciation and amortization in Jamaica ($15.0 million).
Previous report
Adjusted EBITDA was $336.9 million for the nine months ended September 30, 2025, an increase of $80.3 million, as compared to $256.6 million for the nine months ended September 30, 2024. Adjusted EBITDA was higher primarily due to the Acquisition ($47.8 million), the drydocking of Summit LNG and Excellence in the first three months of 2024 ($17.2 million), an increase in LNG, gas and power sales opportunities ($12.7 million), and a decrease in personnel costs in Argentina ($7.6 million), partially offset by a decrease in interest income ($3.7 million).
Previous report
Terminal services
Previous report
Terminal services revenues were $443.1 million for the nine months ended September 30, 2025, a decrease of $15.0 million as compared to $458.1 million for the nine months ended September 30, 2024. Terminal services revenues were lower primarily due lower reimbursable costs and to the recognition of deferred revenue for the drydocking of Summit LNGin the first quarter of 2024, which occurs when we drydock either of our two floating regasification terminals accounted for as a sales-type lease.
Previous report
LNG, gas and power revenues were $245.2 million for the three months ended September 30, 2025, an increase of $201.9 million, as compared to $43.3 million for the three months ended September 30, 2024. The increase was primarily due to the Acquisition and higher LNG, gas and power revenues in North America and Asia Pacific.
Previous report
LNG, gas and power revenues were $467.6 million for the nine months ended September 30, 2025, an increase of $348.9 million, as compared to $118.7 million for the nine months ended September 30, 2024. The increase was primarily due to higher LNG, gas and power revenues in North America, Asia Pacific and Europe and the Acquisition.
Previous report
Cost of LNG, gas and power was $201.9 million for the three months ended September 30, 2025, an increase of $160.5 million, as compared to $41.4 million for the three months ended September 30, 2025 and 2024. The increase was primarily due to the Acquisition, and increased LNG, gas and power sales opportunities in North America and Asia Pacific.
Previous report
Cost of LNG, gas and power was $403.1 million for the nine months ended September 30, 2025, an increase of $290.6 million, as compared to $112.5 million for the nine months ended September 30, 2024. The increase was primarily due to increased LNG, gas and power sales opportunities in North America, Asia Pacific and Europe and the Acquisition.
Previous report
Operating expenses were $132.5 million for the nine months ended September 30, 2025, a decrease of $30.1 million, as compared to $162.6 million for the nine months ended September 30, 2024. The decrease in operating expenses was primarily due to drydock costs on Summit LNGin the first quarter of 2024 and decreased personnel costs in Argentina.
Previous report
Depreciation and amortization expenses were $78.9 million for the nine months ended September 30, 2025, an increase of $2.6 million, as compared to $76.3 million for the nine months ended September 30, 2024. Depreciation and amortization increased primarily due to the Acquisition, partially offset by the extended commissioning time on our power barge assets in Albania during 2024.
Previous report
Selling, general and administrative expenses were $66.3 million for the nine months ended September 30, 2025, a decrease of $4.4 million, as compared to $70.7 million for the nine months ended September 30, 2024. Selling, general and administrative expenses decreased primarily due to lower business development expenses.
Previous report
Interest expense was $56.6 million for the nine months ended September 30, 2025, an increase of $20.7 million, as compared to $35.9 million for the nine months ended September 30, 2024. The increase was primarily due to our new 2030 Notes (as defined herein), partially offset by the effects of the Term Loan Facility (as defined herein) paydown during the second quarter of 2025, lower balances remaining on our finance leases and long-term debt and decreases in interest rates.
Previous report
Other income, net was $15.8 million for the nine months ended September 30, 2025, a decrease of $1.4 million, as compared to $17.2 million for the nine months ended September 30, 2024. Other income, net decreased primarily due to a decrease in interest income, partially offset by a decrease foreign exchange losses.
Previous report
We have international operations that are also subject to foreign income tax and U.S. corporate subsidiaries subject to U.S. federal tax. Therefore, its effective income tax rate is dependent on many factors, including the geographical distribution of income, a rate benefit attributable to the portion of our earnings not subject to corporate level taxes, and the impact of nondeductible items and foreign exchange impacts as well as varying tax regimes of jurisdictions. In one jurisdiction, our tax rate is significantly less than the applicable statutory rate as a result of a tax holiday that was granted. This tax holiday will expire in 2033 at the same time that our contract with and revenue from our customer ends.
Previous report
Net income attributable to non-controlling interest was $97.9 million for the nine months ended September 30, 2025, an increase of $12.9 million, as compared to $85.0 million for the nine months ended September 30, 2024. The increase in net income attributable to non-controlling interest was primarily due to higher net income attributable to owners of our Class B Common Stock, partially offset by a decrease in the Class B ownership as a result of the Equity Offering (as defined herein).
Previous report
During the year ended December 31, 2024, we repurchased 2,473,787 shares of our outstanding Class A Common Stock at a weighted average price of $20.41 per share, for a total net cost, including commission fees and taxes, of approximately $50.0 million. As indicated under the EELP Limited Partnership Agreement, for each Class A Common Stock we repurchased, EELP, immediately prior to the repurchase, redeemed an equal number of Class A interests held by us, upon the same terms and at the same price, as the shares of our Class A Common Stock were repurchased.
Previous report
Nine Months Ended September 30, 2025 Compared to Nine Months Ended September 30, 2024
Previous report
In December 2023, we paid off $55.2 million of the principal outstanding on our Term Loan Facility. We also terminated the same notional value of the interest rate swaps we had previously entered into to hedge the fluctuations in the SOFR rates associated with the variable interest rate on the loan.
Previous report
Newbuild Agreement
Previous report
In February 2023, we executed a 20-year LNG sale and purchase agreement (“SPA”) with Venture Global LNG. Under the agreement, we will purchase 0.7 MTPA of LNG on a free-on-board basis from the Plaquemines Phase 2 LNG facility in Plaquemines Parish, Louisiana. Our purchase commitment will be based on the final settlement price of monthly Henry Hub natural gas futures contracts plus a contractual spread. The start of this commitment, however, is dependent on the second phase of the LNG facility becoming operational, which is not expected in the next 12 months.
Previous report
In January 2024, we executed a 15-year SPA with QatarEnergy. Under the agreement, we have agreed to purchase LNG from QatarEnergy beginning in 2026. QatarEnergy will deliver 0.85 MTPA of LNG in 2026 and 2027 and 1.0 MTPA from 2028 to 2040. Our purchase commitment will be based on a three-month average of Brent Crude prices for the months immediately preceding each delivery, multiplied by a fixed percentage. These LNG volumes are intended to be used to supply sales under the SPA we have with Petrobangla.
Previous report
In the third quarter of 2024, we signed a medium-term agreement for LNG purchases in one of the Atlantic Basin regions in which we do business. Over the term of this agreement, we will purchase approximately 0.65 million tonnes of LNG, the pricing of which will be based on TTF. The first purchase under this agreement was made during the fourth quarter of 2024.
Previous report
In May 2025, as part of the Acquisition, we assumed an LNG SPA. Under the agreement, we will purchase approximately 0.14 million tonnes of LNG for the remainder of 2025 and approximately 0.55 MTPA throughout the remainder of the agreement, which ends in January 2030. Our purchase commitment is based on the final settlement price of monthly Henry Hub natural gas futures contracts plus a contractual spread and adjusted for inflation. These LNG volumes are expected to be used to supply customers in Jamaica.
Previous report
Business Combination
Previous report
We account for business combinations in accordance with the Financial Accounting Standards Board Accounting Standards Codification Topic 805, Business Combinations. Accordingly, we allocate the purchase price of an acquired business to its identifiable assets and liabilities based on estimated fair values. The fair values of identifiable assets acquired and liabilities assumed are determined based on various valuation techniques, including the cost approach, discounted cash flow analysis, and independent appraisals. Goodwill is calculated as the difference between the estimate of the fair value of the consideration transferred and the estimates of the fair value assigned to the assets acquired and liabilities assumed. The Company intends to finalize the purchase price allocation as soon as practicable within the measurement period, but in no event later than one year following the closing date of the combination. Transaction and integration costs associated with business combinations are expensed as incurred.
Reworded paragraphs (43)
Previous wording
Excelerate Energy, Inc. (“Excelerate” and together with its subsidiaries, “we,” “us,” “our” or the “Company”) owns and operates liquefied natural gas (“LNG”) and natural gas infrastructure assets. Once natural gas is liquefied, it needs an inlet into the countries where it will be consumed – and Excelerate provides that home for LNG. Our assets are the receiving point across the globe for LNG, which we convert back into natural gas through the process of regasification. That natural gas is then used by us, our customers, or other end users further downstream for lower carbon emitting power generation or direct energy consumption. At Excelerate, we believe that access to energy sources such as LNG is critical to assist countries in growing their economies, enhancing their energy security, and advancing their decarbonization efforts.
Current wording
Excelerate Energy, Inc. (“Excelerate” and together with its subsidiaries, “we,” “us,” “our” or the “Company”) owns and operates liquefied natural gas (“LNG”) and natural gas infrastructure assets. Once natural gas is liquefied, it needs an inlet into the countries where it will be consumed – Excelerate provides that home for LNG. Our assets are the receiving points across the globe for LNG, which we convert back into natural gas through the process of regasification. That natural gas is then used by us, our customers, or other end users further downstream for lower carbon emitting power generation or direct energy consumption. At Excelerate, we believe that access to energy sources such as LNG is critical to assist countries in growing their economies, enhancing their energy security, and advancing their decarbonization efforts.
Previous wording
Our business is substantially supported by long-term, take-or-pay agreements, which provide consistent revenue and cash flow from our high-quality customer base. Under these agreements, we either provide regasification services or utilize our assets to directly provide natural gas, LNG, power, or steam to our customers. As of September 30, 2025, we control or operate 11 floating regasification terminals, one onshore regasification terminal and a combined heat and power plant. We have one new floating regasifiation terminal currently being constructed by Hyundai Heavy Industries in South Korea, which we expect to bring online in 2026 to support our expansion plans and to meet the growing need for floating regasification capacity.
Current wording
Our business is substantially supported by long-term, take-or-pay agreements, which provide consistent revenue and cash flow from our high-quality customer base. Under these agreements, we either provide regasification services or utilize our assets to directly provide natural gas, LNG, power, or steam to our customers. As of March 31, 2026, we controlled or operated 11 floating regasification terminals, one onshore regasification terminal and a combined heat and power plant. We have one new floating regasification terminal that was constructed by Hyundai Heavy Industries in South Korea, which we took delivery of in the second quarter of 2026.
Previous wording
Our business spans the globe, with regional presences in 12 countries and an operational presence in Argentina, Bangladesh, Brazil, Finland, Germany, Jamaica, Pakistan, the United Arab Emirates (“UAE”), and the United States. As operators, we have completed more than 3,100 ship-to-ship transfers of LNG with over 50 LNG operators and have safely delivered more than 7,800 billion cubic feet of natural gas through 19 LNG regasification terminals. We are the largest provider of regasified LNG capacity in Argentina, Bangladesh, Finland, Jamaica and the UAE. We are also one of the largest providers of regasified LNG in Brazil as well as in Pakistan, where we have regasified more LNG than any other provider in the past 10 years.
Current wording
Our business spans the globe, with a regional presence in 14 countries and an operational presence in Argentina, Bangladesh, Brazil, Finland, Germany, Iraq, Jamaica, Pakistan, the United Arab Emirates (“UAE”), and the United States. As of March 31, 2026, we have completed more than 3,900 ship-to-ship transfers of LNG with over 50 LNG operators since we began operations and have safely delivered more than 8,100 billion cubic feet of natural gas through 19 LNG regasification terminals. We are the largest provider of regasified LNG capacity in Argentina, Bangladesh, Finland, Jamaica and the UAE. We are also one of the largest providers of regasified LNG capacity in Brazil as well as in Pakistan, where we have regasified more LNG than any other provider in the past 10 years.
Previous wording
For the three months ended September 30, 2025, we generated revenues of $391.0 million, net income of $55.0 million and adjusted earnings before income tax, depreciation and amortization (“Adjusted EBITDA”) of $129.3 million. For the three months ended September 30, 2024, we generated revenues of $193.4 million, net income of $45.5 million and Adjusted EBITDA of $92.3 million. For more information regarding our non-GAAP measure Adjusted EBITDA and a reconciliation to net income, the most comparable U.S. Generally Accepted Accounting Principles (“GAAP”) measure, see “How We Evaluate Our Operations.”
Current wording
For the three months ended March 31, 2026, we generated revenues of $433.4 million, net income of $50.0 million and adjusted earnings before income tax, depreciation and amortization (“Adjusted EBITDA”) of $122.2 million. For the three months ended March 31, 2025, we generated revenues of $315.1 million, net income of $52.1 million and Adjusted EBITDA of $100.4 million. For more information regarding our non-GAAP measure Adjusted EBITDA and a reconciliation to net income, the most comparable U.S. Generally Accepted Accounting Principles (“GAAP”) measure, see “How We Evaluate Our Operations.”
Previous wording
In October 2025, we executed a definitive commercial agreement with a subsidiary of Iraq’s Ministry of Electricity for the development of the country’s first LNG import terminal, which will be located at the Port of Khor Al Zubair. The integrated project includes a five-year agreement for regasification services and LNG supply with extension options, and a minimum contracted offtake of 250 million standard cubic feet per day (MMscf/d).
Current wording
In October 2025, we executed a definitive commercial agreement with a subsidiary of Iraq’s Ministry of Electricity for the development of the country’s first LNG import terminal. The integrated project includes a five-year agreement for regasification services and LNG supply with a customer extension option, and a minimum contracted offtake of 250 million standard cubic feet per day (“MMscf/d”). Jetty reinforcement and construction of the fixed terminal infrastructure have been delayed temporarily due to the conflict in the Middle East and the terminal is no longer expected to commence operations in the third quarter of 2026 as previously disclosed. While we continue to procure materials for and carry out limited pre-construction activities on the terminal, we are delaying on-site construction activities until such time as these can be safely undertaken.
Previous wording
Selling, general and administrative expenses consist primarily of compensation and other employee-related costs for personnel engaged in executive management, sales, finance, legal, tax and human resources. Selling, general and administrative expenses also consists of expenses associated with office facilities, information technology, external professional services, business development, legal costs and other administrative expenses.
Current wording
Selling, general and administrative expenses consist primarily of compensation and other employee-related costs for personnel engaged in executive management, sales, finance, legal, tax and human resources. Selling, general and administrative expenses also consist of expenses associated with office facilities, information technology, external professional services, business development, legal costs and other administrative expenses.
Previous wording
We incurred transition and transaction expenses related to consulting, legal and due diligence costs incurred as part of and in preparation for the Acquisition.
Current wording
We incurred transition and transaction expenses related to consulting, legal and due diligence costs incurred as part of and in preparation for the Acquisition (as defined herein).
Previous wording
We closed on the Acquisition in May 2025, therefore our results of operations for the three and nine months ended September 30, 2025 only contain a partial period of Jamaican operating results. Results of operations for the three and nine months ended September 30, 2024 do not contain the results of Jamaican operations.
Current wording
We closed the acquisition of New Fortress Energy Inc.’s business in Jamaica (the “Acquisition”) in May 2025. Therefore our results of operations for the three months ended March 31, 2025 do not contain the results of Jamaican operations.
Previous wording
We use Adjusted Gross Margin, a non-GAAP financial measure, which we define as revenues less cost of LNG, gas and power and operating expenses, excluding depreciation and amortization, to measure our operational financial performance. Management believes Adjusted Gross Margin is useful because it provides insight on profitability and true operating performance excluding the implications of the historical cost basis of our assets. Our computation of Adjusted Gross Margin may not be comparable to other similarly titled measures of other companies, and you are cautioned not to place undue reliance on this information.
Current wording
We use Adjusted Gross Margin, a non-GAAP financial measure, which we define as revenues less direct cost of sales and operating expenses, excluding depreciation and amortization, to measure our operational financial performance. Management believes Adjusted Gross Margin is useful because it provides insight on profitability and true operating performance excluding the implications of the historical cost basis of our assets. Our computation of Adjusted Gross Margin may not be comparable to other similarly titled measures of other companies, and you are cautioned not to place undue reliance on this information.
Previous wording
Adjusted EBITDA is a non-GAAP financial measure included as a supplemental disclosure because we believe it is a useful indicator of our operating performance. We define Adjusted EBITDA as net income before interest expense, income taxes, depreciation and amortization, accretion, non-cash long-term incentive compensation expense and items such as charges and non-recurring expenses that management does not consider as part of assessing ongoing operating performance.
Current wording
Adjusted EBITDA is a non-GAAP financial measure included as a supplemental disclosure because we believe it is a useful indicator of our operating performance. We define Adjusted EBITDA as net income before interest expense, income taxes, depreciation and amortization expense, accretion, non-cash long-term incentive compensation expense and items such as charges and non-recurring expenses that management does not consider as part of assessing ongoing operating performance.
Previous wording
Net income was $55.0 million for the three months ended September 30, 2025, an increase of $9.5 million, as compared to $45.5 million for the three months ended September 30, 2024. Net income was higher primarily due to the addition of Jamaica operating income ($22.0 million), and an increase in LNG, gas and power sales opportunities ($9.2 million), partially offset by an increase in interest expense due to our new 2030 Notes, net of the effects of the Term Loan Facility paydown ($13.4 million), a decrease in interest income ($3.4 million), and transition and transaction costs incurred as a result of the Acquisition ($2.2 million).
Current wording
Net income was $50.0 million for the three months ended March 31, 2026, a decrease of $2.1 million, as compared to $52.1 million for the three months ended March 31, 2025. Net income was lower primarily due to an increase in interest expense due to our new 2030 Notes (as defined herein) net of the effects of the Term Loan Facility (as defined herein) paydown ($13.2 million), the addition of depreciation and amortization in Jamaica ($9.7 million), a seasonal maintenance project ($4.1 million), and an increase in provision for income taxes ($3.4 million), as discussed below, partially offset by the addition of long-term LNG, gas and power sales agreements ($23.2 million), transition and transaction costs incurred in the first quarter of 2025 as a result of the Acquisition ($3.7 million), and additional short-term LNG, gas and power sales opportunities ($2.1 million).
Previous wording
Gross Margin was $112.9 million for the three months ended September 30, 2025, an increase of $29.3 million, as compared to $83.6 million for the three months ended September 30, 2024. For the three months ended September 30, 2025, Adjusted Gross Margin was $144.6 million, an increase of $38.0 million, as compared to $106.6 million for the three months ended September 30, 2024. Gross Margin and Adjusted Gross Margin were higher primarily due to the Acquisition ($32.2 million), and an increase in LNG, gas and power sales opportunities ($9.2 million). Gross Margin was partially offset by the addition of depreciation and amortization in Jamaica ($10.4 million).
Current wording
Gross Margin was $106.3 million for the three months ended March 31, 2026, an increase of $15.5 million, as compared to $90.8 million for the three months ended March 31, 2025. For the three months ended March 31, 2026, Adjusted Gross Margin was $137.3 million, an increase of $24.9 million, as compared to $112.4 million for the three months ended March 31, 2025. Gross Margin and Adjusted Gross Margin were higher primarily due to the addition of long-term LNG, gas and power sales agreements ($23.2 million) and additional short-term LNG, gas and power sales opportunities ($2.1 million), partially offset by a seasonal maintenance project ($4.1 million). Gross Margin was also impacted by the addition of depreciation and amortization in Jamaica ($9.7 million).
Previous wording
Adjusted EBITDA was $129.3 million for the three months ended September 30, 2025, an increase of $37.0 million, as compared to $92.3 million for the three months ended September 30, 2024. Adjusted EBITDA was higher primarily due to the Acquisition ($32.8 million) and an increase in LNG, gas and power sales opportunities ($9.2 million), partially offset by a decrease in interest income ($3.4 million).
Current wording
Adjusted EBITDA was $122.2 million for the three months ended March 31, 2026, an increase of $21.8 million, as compared to $100.4 million for the three months ended March 31, 2025. Adjusted EBITDA was higher primarily due to the addition of long-term
Previous wording
Terminal services revenues were $145.9 million for the three months ended September 30, 2025, a decrease of $4.2 million as compared to $150.1 million for the three months ended September 30, 2024. Terminal services revenues were lower primarily due to lower reimbursable costs.
Current wording
Terminal services revenues were $158.3 million for the three months ended March 31, 2026, an increase of $9.9 million as compared to $148.4 million for the three months ended March 31, 2025. Terminal services revenues were higher primarily due to increased contract rates and an additional subcharter opportunity in the first quarter of 2026.
Previous wording
Operating expenses were $44.5 million for the three months ended September 30, 2025, a decrease of $0.9 million, as compared to $45.4 million for the three months ended September 30, 2024. The decrease in operating expenses was primarily due to decreased personnel costs in Argentina
Current wording
Operating expenses were $53.1 million for the three months ended March 31, 2026, an increase of $11.2 million, as compared to $41.9 million for the three months ended March 31, 2025. The increase in operating expenses was primarily due to a seasonal maintenance project, increased personnel costs in Argentina and operating expenses related to a subcharter opportunity in the first quarter of 2026.
Previous wording
Depreciation and amortization expenses were $31.8 million for the three months ended September 30, 2025, an increase of $8.8 million, as compared to $23.0 million for the three months ended September 30, 2024. Depreciation and amortization increased primarily due to the Acquisition.
Current wording
Depreciation and amortization expenses were $31.0 million for the three months ended March 31, 2026, an increase of $9.4 million, as compared to $21.6 million for the three months ended March 31, 2025. Depreciation and amortization increased primarily due to the Acquisition.
Previous wording
Selling, general and administrative expenses were $23.4 million for the three months ended September 30, 2025, a decrease of $0.4 million, as compared to $23.8 million for the three months ended September 30, 2025 and 2024. Selling, general and administrative expenses were essentially flat.
Current wording
Selling, general and administrative expenses were $24.3 million for the three months ended March 31, 2026, an increase of $2.9 million, as compared to $21.4 million for the three months ended March 31, 2025. Selling, general and administrative expenses increased primarily due to higher personnel costs.
Previous wording
Transition and transaction expenses were $2.2 million for the three months ended September 30, 2025. Transition and transaction expenses relate to due diligence, legal, and integration costs for the Acquisition.
Current wording
Transition and transaction expenses were $3.7 million for the three months ended March 31, 2025. Transition and transaction expenses relate to due diligence, legal, and integration costs for the Acquisition. We did not incur any transition and transaction expenses in the three months ended March 31, 2026.
Previous wording
Interest expense was $24.9 million for the three months ended September 30, 2025, an increase of $13.2 million, as compared to $11.7 million for the three months ended September 30, 2024. The increase was primarily due to our new 2030 Notes (as defined herein), partially offset by the effects of the Term Loan Facility (as defined herein) paydown during the second quarter of 2025.
Current wording
Interest expense was $24.5 million for the three months ended March 31, 2026, an increase of $13.4 million, as compared to $11.1 million for the three months ended March 31, 2025. The increase was primarily due to our new 2030 Notes (as defined herein), partially offset by the effects of the Term Loan Facility (as defined herein) paydown during the second quarter of 2025.
Previous wording
Other income, net was $3.4 million for the three months ended September 30, 2025, a decrease of $3.1 million, as compared to $6.5 million for the three months ended September 30, 2024. Other income, net, decreased primarily due to a decrease in interest income.
Current wording
Other income, net was $4.5 million for the three months ended March 31, 2026, a decrease of $1.7 million, as compared to $6.2 million for the three months ended March 31, 2025. Other income, net decreased primarily due to a decrease in interest income.
Previous wording
The provision for income taxes for the three months ended September 30, 2025 and 2024 was $7.9 million and $6.2 million, respectively. The provision for income taxes for the nine months ended September 30, 2025 and 2024 was $19.5 million and $20.5 million, respectively. The change was primarily attributable to the year-over-year change in the geographical distribution of income.
Current wording
The provision for income taxes for the three months ended March 31, 2026 and 2025 was $9.5 million and $6.0 million, respectively. The change was primarily attributable to the year-over-year change in the geographical distribution of income.
Previous wording
The effective tax rate for the three months ended September 30, 2025 and 2024, was 12.6% and 11.9%, respectively. The effective tax rate for the nine months ended September 30, 2025 and 2024, was 13.2% and 16.1%, respectively. The change was primarily driven by the geographical distribution of income and the varying tax regimes of jurisdictions.
Current wording
The effective tax rate for the three months ended March 31, 2026 and 2025, was 15.9% and 10.4%, respectively. The change was primarily driven by the geographical distribution of income and the varying tax regimes of jurisdictions.
Previous wording
Net income attributable to non-controlling interest was $41.1 million for the three months ended September 30, 2025, an increase of $4.5 million, as compared to $36.6 million for the three months ended September 30, 2024. The increase in net income attributable to non-controlling interest was primarily due higher net income attributable to owners of our Class B Common Stock.
Current wording
Net income attributable to non-controlling interest was $37.7 million for the three months ended March 31, 2026, a decrease of $3.0 million, as compared to $40.7 million for the three months ended March 31, 2025. The decrease in net income attributable to non-controlling interest was primarily due to lower net income attributable to owners of our Class B Common Stock.
Previous wording
Based on our cash positions, cash flows from operating activities and borrowing capacity on our debt facilities, we believe we will have sufficient liquidity for the next 12 months for ongoing operations, planned capital expenditures, other investments, debt service obligations, payment of tax distributions and our announced and expected quarterly dividends and distributions, as described in Part II, Item 5 – Our Dividend and Distribution Policy in the 2024 Annual Report. For more information regarding our planned dividend payments, see Note 12 – Equity. As of September 30, 2025, we had $462.6 million in unrestricted cash and cash equivalents.
Current wording
Based on our cash positions, cash flows from operating activities and borrowing capacity under our debt facilities, we believe we will have sufficient liquidity for the next 12 months for ongoing operations, planned capital expenditures, other investments, debt service obligations, payment of tax distributions and our announced and expected quarterly dividends and distributions, as described in Part II, Item 5 – Our Dividend and Distribution Policy in the 2025 Annual Report. For more information regarding our planned dividend payments, see Note 12 – Equity. As of March 31, 2026, we had $540.1 million in unrestricted cash and cash equivalents.
Previous wording
We have historically funded our business, including meeting our day-to-day operational requirements, repaying our indebtedness and funding capital expenditures, through debt financing, capital contributions and our operating cash flows as discussed below. We expect that our future principal uses of cash will also include additional capital expenditures to fund our growth strategy, pay income taxes and make distributions from EELP to fund income taxes, fund our obligations under the Tax Receivable Agreement (“TRA”), and pay cash dividends and distributions. Any determination to pay dividends to holders of our common stock and distributions to holders of EELP’s Class B interests will be at the discretion of our board of directors and will depend upon many factors, including our financial condition, results of operations, projections, liquidity, earnings, legal requirements, covenant compliance, restrictions in our existing and any future debt and other factors that our board of directors deems relevant. In the future we may enter into arrangements to grow our business or acquire or invest in complementary businesses which could decrease our cash and cash equivalents and increase our cash requirements. As a result of these and other factors, we could use our available capital resources sooner than expected and may be required to seek additional equity or debt.
Current wording
We have historically funded our business, including meeting our day-to-day operational requirements, repaying our indebtedness and funding capital expenditures, through debt financing, equity offerings, capital contributions and our operating cash flows as discussed below. We expect that our future principal uses of cash will also include additional capital expenditures to fund our growth strategy, pay income taxes and make distributions from EELP to fund income taxes, fund our obligations under the Tax Receivable Agreement (“TRA”), and pay cash dividends and distributions. Any determination to pay dividends to holders of our common stock and distributions to holders of EELP’s Class B interests will be at the discretion of our board of directors and will depend upon many factors, including our financial condition, results of operations, projections, liquidity, earnings, legal requirements, covenant compliance, restrictions on our existing and any future debt and other factors that our board of directors deems relevant. In the future we may enter into arrangements to grow our business or acquire or invest in complementary businesses which could decrease our cash and cash equivalents and increase our cash requirements. As a result of these and other factors, we could use our available capital resources sooner than expected and may be required to seek additional equity or debt financing.
Previous wording
On March 31, 2025, the Company and EELP entered into an underwriting agreement (the “Underwriting Agreement”) relating to an underwritten public offering (the “Equity Offering”) of 6,956,522 shares (the “Shares”) of our Class A common stock, par value $0.001 per share (the “Class A Common Stock”). The offering price of the Shares to the public was $26.50 per share, and the underwriters agreed to purchase the Shares from us pursuant to the Underwriting Agreement at a price of $25.308 per share. Under the terms of the Underwriting Agreement, we granted the underwriters an option, exercisable for 30 days, to purchase up to an additional 1,043,478 shares of Class A Common Stock at the same price per share as the Shares. The Equity Offering closed on April 2, 2025. The underwriters’ option was fully exercised and subsequently closed on May 1, 2025. The net proceeds from the Equity Offering to us from the sale of the Shares, after deducting underwriting discounts and commissions and estimated offering expenses, were approximately $201.8 million.
Current wording
In March 2025, the Company and EELP entered into an underwriting agreement (the “Underwriting Agreement”) relating to an underwritten public offering (the “Equity Offering”) of 6,956,522 shares (the “Shares”) of our Class A Common Stock. The offering price of the Shares to the public was $26.50 per share, and the underwriters agreed to purchase the Shares from us pursuant to the Underwriting Agreement at a price of $25.308 per share. Under the terms of the Underwriting Agreement, we granted the underwriters an option, exercisable for 30 days, to purchase up to an additional 1,043,478 shares of Class A Common Stock at the same price per share as the Shares. The Equity Offering closed in April 2025. The underwriters’ option was fully exercised and subsequently closed in May 2025. The net proceeds from the Equity Offering to us from the sale of the Shares, after deducting underwriting discounts and commissions and estimated offering expenses, were approximately $201.8 million.
Previous wording
Cash flows provided by operating activities increased by $162.0 million for the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024, primarily due to differences in the timing of collections and payments related to LNG, gas and power purchases and sales, interest expense on the 2030 Notes, collections received after our power barge assets went into service, and drydock expenditures.
Current wording
Cash flows provided by operating activities decreased by $94.8 million for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025, primarily due to differences in the timing of collections and payments related to LNG, gas and power purchases and sales, and interest expense on the 2030 Notes (as defined herein).
Previous wording
Cash flows used in investing activities were primarily comprised of capital expenditures made for the purchases of property and equipment, which increased by $1,127.8 million for the nine months ended September 30, 2025, as compared to the same period in 2024. The increase was primarily due to the Acquisition, the 2025 milestone payments under the Newbuild Agreement (as defined herein), and the purchase of Shenandoah in the third quarter of 2025.
Current wording
Cash flows used in investing activities were primarily comprised of capital expenditures made for the purchases of property and equipment, which decreased by $17.8 million for the three months ended March 31, 2026, as compared to the same period in 2025. The decrease was primarily due to payments made in 2025 for Acadia, partially offset by payments made in 2026 related to our new project in Iraq.
Previous wording
Financing cash flows increased by $838.9 million for the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024, primarily due to $800.0 million in borrowings as a result of the Debt Offering (as defined herein), $201.8 million in proceeds from the Equity Offering and $27.2 million paid in 2024 to repurchase Class A Common Stock, partially offset by a $149.9 million increase in repayments on long-term debt and finance leases, payments of $20.3 million for debt issuance costs in 2025 and an increase of $17.8 million in dividends and distributions paid.
Current wording
Cash flows used in financing activities increased by $3.2 million for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025, primarily due to $4.5 million paid to repurchase stock in 2026 and a increase of $2.7 million in dividends and distributions paid, partially offset by a $4.5 million increase in repayments on long-term debt and finance leases.
Previous wording
The following table summarizes our cash outlays for capital projects for the three and nine months ended September 30, 2025 and 2024:
Current wording
The following table summarizes our cash outlays for capital projects for the three months ended March 31, 2026 and 2025:
Previous wording
On May 5, 2025, EELP closed on an offering (the “Debt Offering”) of $800 million in aggregate principal amount of 8.000% senior unsecured notes due 2030 (the “2030 Notes”). The 2030 Notes were issued pursuant to an Indenture, dated as of May 5, 2025, by and among EELP, the guarantors party thereto and U.S. Bank Trust Company, National Association, as trustee, paying agent and registrar, will mature on May 15, 2030 and were issued at par. Interest on the 2030 Notes is payable semi-annually in arrears on each May 15 and November 15, beginning on November 15, 2025. Excelerate intends to use the net proceeds from the Debt Offering, together with the net proceeds from the Equity Offering and cash on hand to (i) fund the consideration payable by the Company in the Acquisition, (ii) repay the outstanding borrowings under the Term Loan Facility, and (iii) pay related fees and expenses. The 2030 Notes are guaranteed by certain direct and indirect restricted subsidiaries of EELP.
Current wording
In May 2025, EELP closed on an offering (the “Debt Offering”) of $800 million in aggregate principal amount of 8.000% senior unsecured notes due 2030 (the “2030 Notes”). The 2030 Notes were issued pursuant to an Indenture, dated as of May 5, 2025, by and among EELP, the guarantors party thereto and U.S. Bank Trust Company, National Association, as trustee, paying agent and registrar, will mature in May 2030 and were issued at par. Interest on the 2030 Notes is payable semi-annually in arrears in each May and November, beginning in November 2025. The net proceeds from the Debt Offering, together with the net proceeds from the Equity Offering and cash on hand, were used to (i) fund the consideration payable by the Company for the Acquisition, (ii) repay the outstanding borrowings under the Term Loan Facility (as defined herein), and (iii) pay related fees and expenses. The 2030 Notes are guaranteed by certain direct and indirect restricted subsidiaries of EELP.
Previous wording
On April 18, 2022, EELP entered into a senior secured revolving credit agreement, by and among EELP, as borrower, Excelerate, as parent, the lenders party thereto, the issuing banks party thereto and JPMorgan Chase Bank, N.A., as administrative agent, pursuant to which the lenders and issuing banks thereunder made available a revolving credit facility (the “EE Revolver”), including a letter of credit sub-facility, to EELP. The EE Revolver enabled us to borrow up to $350.0 million over a three-year term originally set to expire in April 2025.
Current wording
In April 2022, EELP entered into a senior secured revolving credit agreement, by and among EELP, as borrower, Excelerate, as parent, the lenders party thereto, the issuing banks party thereto and JPMorgan Chase Bank, N.A., as administrative agent, pursuant to which the lenders and issuing banks thereunder made available a revolving credit facility (the “EE Revolver”), including a letter of credit sub-facility, to EELP. Proceeds from the EE Revolver may be used for working capital and other general corporate purposes. The EE Revolver originally enabled us to borrow up to $350.0 million over a three-year term originally set to expire in April 2025.
Previous wording
On March 17, 2023, EELP entered into an amended and restated senior secured credit agreement (“Amended Credit Agreement”), by and among EELP, as borrower, Excelerate, as parent, the lenders party thereto, the issuing banks party thereto and Wells Fargo Bank, N.A., as administrative agent. Under the Amended Credit Agreement, EELP obtained a new $250.0 million term loan facility (the “Term Loan Facility” and, together with the EE Revolver, as amended by the Amended Credit Agreement, the “EE Facilities”). In April 2023, we purchased Sequoia for $265.0 million using $250.0 million borrowed through our Term Loan Facility together with cash on hand.
Current wording
In March 2023, EELP entered into an amended and restated senior secured credit agreement (the “Amended Credit Agreement”), by and among EELP, as borrower, Excelerate, as parent, the lenders party thereto, the issuing banks party thereto and Wells Fargo Bank, N.A., as administrative agent. Under the Amended Credit Agreement, EELP obtained a new $250.0 million term loan facility (the “Term Loan Facility” and, together with the EE Revolver, as amended, the “EE Facilities”).
Previous wording
On March 26, 2025, EELP entered into an amendment to the Amended Credit Agreement, which provided for, among other things (i) additional covenant baskets to permit the Acquisition and the incurrence of debt in connection therewith, and (ii) replacement of the collateral vessel maintenance coverage covenant with a broader collateral maintenance coverage covenant, which includes the value of the assets acquired in the Acquisition.
Current wording
In March 2025, EELP entered into an amendment to the Amended Credit Agreement, which provided for, among other things (i) additional covenant baskets to permit the Acquisition and the incurrence of debt in connection therewith and (ii) replacement of the collateral vessel maintenance coverage covenant with a broader collateral maintenance coverage covenant, which includes the value of the assets acquired in the Acquisition.
Previous wording
On April 21, 2025, EELP and the Company entered into an amendment (the “Fifth Amendment”) to the Amended Credit Agreement. The Fifth Amendment provides for, among other things, (i) the extension of the maturity of the revolving facility thereunder to March 17, 2029 and (ii) an increase in the aggregate commitments under the revolving facility to $500.0 million. As per the conditions of the Fifth Amendment, the remaining outstanding balance on the existing Term Loan Facility was repaid in full using proceeds from the 2030 Notes (as defined herein). The Company also unwound the remaining interest rate swaps associated with the Term Loan Facility.
Current wording
In April 2025, EELP and the Company entered into an amendment (the “Fifth Amendment”) to the Amended Credit Agreement, which provided for, among other things, (i) the extension of the maturity of the revolving facility thereunder to March 2029 and (ii) an increase in the aggregate commitments under the EE Revolver to $500.0 million. In accordance with the conditions of the Fifth Amendment, the remaining outstanding balance on the existing Term Loan Facility was repaid in full using proceeds from the 2030 Notes. The Company also unwound the interest rate swaps associated with the Term Loan Facility.
Previous wording
As a result of the EE Revolver’s financial ratio covenants and after taking into account the outstanding letters of credit issued under the facility, all of the $500.0 million of undrawn capacity was available for additional borrowingsas of September 30, 2025.
Current wording
As of March 31, 2026, the Company had issued no letters of credit under the EE Revolver. As a result of the EE Revolver’s financial ratio covenants and after taking into account the outstanding letters of credit issued under the facility, all of the $500.0 million of undrawn capacity was available for additional borrowingsas of March 31, 2026 and up to $500.0 million of the EE Revolver may be used for letters of credit. We have $133.6 million in letters of credit outstanding as of March 31, 2026, under a bilateral facility.
Previous wording
As of September 30, 2025, we were in compliance with the covenants under our debt facilities.
Current wording
As of March 31, 2026, the Company was in compliance with the covenants under its debt facilities.
Previous wording
We are the lessee to one floating regasification terminal lease and one vessel lease. Additionally, we have operating leases for offices in various locations under noncancelable leases.1 As of December 31, 2024, we had future minimum lease payments totaling $5.6 million. As of September 30, 2025, we had future minimum lease payments totaling $220.3 million and are committed to $8.9 million in year one, $67.9 million for years two and three, $68.0 million for years four and five and $75.6 million thereafter.
Current wording
We are the lessee of one floating regasification terminal lease and one vessel lease. Additionally, we have operating leases for offices in various locations under noncancelable leases. As of December 31, 2025, we had future minimum lease payments totaling $212.0 million. As of March 31, 2026, we had future minimum lease payments totaling $205.1 million and are committed to $25.8 million in year one, $69.5 million for years two and three, $66.0 million for years four and five and $43.8 million thereafter.
Previous wording
Certain enforceable floating regasification terminal leases and pipeline capacity agreements are classified as finance leases, and the right-of-use assets are included in property and equipment. As of December 31, 2024, we had future minimum lease payments totaling $240.4 million. As of September 30, 2025, we had future minimum lease payments totaling $215.5 million and are committed to $8.3 million in payments in year one, $66.5 million for years two and three, $55.2 million for years four and five and $85.6 million thereafter.
Current wording
Certain enforceable floating regasification terminal leases and pipeline capacity agreements are classified as finance leases, and the right-of-use assets are included in property and equipment. As of December 31, 2025, we had future minimum lease payments totaling $207.2 million. As of March 31, 2026, we had future minimum lease payments totaling $198.9 million and are committed to $24.9 million in payments in year one, $60.8 million for years two and three, $55.2 million for years four and five and $58.0 million thereafter.
Previous wording
In October 2022, we signed a construction agreement (“the Newbuild Agreement”) with HD Hyundai Heavy Industries for a new floating regasification terminal to be delivered in 2026. We made milestone payments of approximately $50 million, $30 million and $20 million in the fourth quarter of 2024, first quarter of 2025 and second quarter of 2025, respectively, leaving approximately $210 million in remaining spend. The final installment is due concurrently with the delivery of the floating regasification terminal, which is expected in 2026.
Current wording
In October 2022, we signed a construction agreement with HD Hyundai Heavy Industries for a new floating regasification terminal. We made milestone payments of approximately $50 million, $30 million and $20 million in the fourth quarter of 2024, first quarter of 2025 and second quarter of 2025, respectively, leaving approximately $210 million in remaining spend. The final installment was made concurrently with the delivery of the terminal, which occurred in the second quarter of 2026.
Showing the first 40 of 43 pairs. Open the source sections for the rest.
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
Transition and transaction expenses were $33.6 million for the nine months ended September 30, 2025. Transition and transaction expenses relate to due diligence, legal, and integration costs for the Acquisition.
Previous report — wording carried elsewhere
Excelerate is a corporation for U.S. federal and state income tax purposes. EELP is treated as a pass-through entity for U.S. federal income tax purposes and, as such, has generally not been subject to U.S. federal income tax at the entity level.
Previous report — wording carried elsewhere
Proceeds from the EE Revolver may be used for working capital and other general corporate purposes. As of September 30, 2025, up to $469.0 million of the EE Revolver may be used for letters of credit, which has increased to up to $500.0 million as of October 31, 2025. As of September 30, 2025, we had issued no letters of credit under the EE Revolver.