PUBLIC SERVICE ELECTRIC & GAS CO
For the period ended Mar 31, 2026. Filed May 5, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2026 · Filed May 5, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-09-30; filed 2025-11-03.
0001193125-25-262643
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsExecutive Overview of 2025 and Future OutlookCurrent report: 10-Q
Period ended 2026-03-31; filed 2026-05-05.
0001193125-26-206545
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsExecutive Overview of 2026 and Future OutlookThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 88 previous paragraphs and 89 current paragraphs.
56 unchanged; 23 reworded; 6 added; 9 removed; 0 previous and 4 current paragraphs rearranged.
Tables are not compared: 2 previous and 2 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (6)
Current report
In November 2025, the BPU issued an Order approving PSE&G’s GSMP III program, authorizing $1.05 billion of capital investment to replace 525 miles of high pressure cast iron gas mains and unprotected steel mains, with cost recovery through three periodic rate adjustments as portions of the investment are put into service. In that Order, the BPU also authorized $360 million of investment to replace an additional 75 miles of gas main, with cost recovery to be requested in a future base rate case. Investment under the GSMP III program began in 2026 and will continue through December 2028, plus trailing services replacement and paving costs into 2029.
Current report
We remain guided by our vision to power a future where people use energy more efficiently, and it’s safer and delivered more reliably than ever. Our investments remain focused on infrastructure modernization, energy efficiency, and supporting growing customer demand, as well as New Jersey's long-term energy goals.
Current report
PSEG LI has been operating LIPA’s electric T&D system in Long Island, New York since 2014 under a 12-year OSA with LIPA that expired on December 31, 2025. In 2025, a five year extension of the contract was approved. A competitor in the contract bidding process filed litigation against LIPA challenging the process. LIPA filed a motion to dismiss the competitor’s claim as untimely, which was granted by the New York Supreme Court in December 2025. The competitor filed an appeal in January 2026.
Current report
In January 2026, the New Jersey Governor issued executive orders directing the BPU within its legal authority to mitigate electric rate increases through state funding during 2026 as well as other actions, and to advance resource adequacy solutions, in New Jersey. It is not clear how these orders might influence New Jersey’s energy policy.
Current report
investments in generation and battery storage through BPU or other similar solicitations;
Current report
investments in competitive, regulated transmission through PJM and other RTO/ISO processes; and
Removed paragraphs (9)
Previous report
In 2023, the BPU approved a two-year extension of our current GSMP II program to replace at least 400 miles of cast iron and unprotected steel mains and services in our gas system. The GSMP II program extension provides for main replacement through December 2025 plus trailing services replacement and paving costs into 2026 and totals approximately $900 million of investment. Of the $900 million, $750 million is recovered through three periodic rate updates with the balance recovered through a future distribution base rate case. PSE&G has re-started discussions regarding the GSMP III program with the objective of beginning the new program in 2026.
Previous report
In October 2024, the BPU issued an Order approving the settlement of PSE&G's distribution rate case with new rates effective October 15, 2024. The Order provided for a $17.8 billion rate base, a 9.6% return on equity for PSE&G’s distribution business and a 55% equity component of its capitalization structure. In addition, the Order approved mechanisms beginning January 1, 2025 associated with the recovery of future storm costs as well as the recovery of annual pension and OPEB expenses.
Previous report
For more than a century, our purpose has been to provide safe access to an around-the-clock supply of reliable, affordable energy. Today, our vision is to power a future where people use less energy, and it is cleaner, safer and delivered more reliably than ever. We have established a net zero greenhouse gas (GHG) emissions by 2030 goal that includes direct GHG emissions
Previous report
(Scope 1) and indirect GHG emissions from operations (Scope 2) across our business operations, assuming advances in technology, public policy and customer behavior, which goal supports New Jersey's clean energy and climate goals.
Previous report
PSEG's current contract as operations service provider for LIPA's electric transmission and distribution system runs through December 31, 2025. In September 2025, the LIPA board of trustees approved a five-year extension of the contract, which was approved by the New York State Attorney General in October 2025. The contract extension will also need to be approved by the New York State Comptroller. A competitor in the RFP process has filed litigation against LIPA challenging the contract bidding process. The outcome of this litigation is uncertain.
Previous report
There has been increased New Jersey state legislative activity and political dialogue during 2025 regarding energy affordability, resource adequacy and regulatory topics. While it is uncertain at this time whether any legislation or other executive or regulatory measures relating to these matters will be advanced, when they may take effect, or what form they may ultimately take, if such measures are implemented, they could have a material impact on our business, cash flows, results of operations and financial condition.
Previous report
In July 2025, “An Act to Provide for Reconciliation Pursuant to Title II of H. Con. Res. 14” (the Act) was signed into law. The Act made no material changes to the PTC for existing qualified nuclear generation facilities. The Act permanently extends 100% bonus depreciation to qualified business property retroactive to January 19, 2025. The impact of the Act on PSEG’s and PSE&G’s financial statements is subject to continued evaluation.
Previous report
In April 2023, the U.S. Treasury issued Revenue Procedure 2023-15 that provides a safe harbor method of accounting to determine the annual repair tax deduction for gas T&D property. The impact, if any, that this may have on PSEG and PSE&G’s financial statements has not yet been determined.
Previous report
investments in competitive, regulated transmission and the potential enabling of investments in generation through PJM processes and BPU solicitations that provide revenue predictability and reasonable risk-adjusted returns; and
Reworded paragraphs (23)
Previous wording
PSE&G—which is a public utility engaged principally in the transmission of electricity and distribution of electricity and natural gas in certain areas of New Jersey. PSE&G is subject to regulation by the New Jersey Board of Public Utilities (BPU), the Federal Energy Regulatory Commission (FERC), and other federal and New Jersey state regulators. PSE&G also invests in regulated solar generation projects and energy efficiency (EE) and related programs in New Jersey, which are regulated by the BPU, and
Current wording
PSE&G—which is a public utility engaged principally in the transmission of electricity and distribution of electricity and natural gas in certain areas of New Jersey. PSE&G is subject to regulation by the New Jersey Board of Public Utilities (BPU), the Federal Energy Regulatory Commission (FERC), and other federal and New Jersey state regulators. PSE&G also invests in regulated solar generation projects and regulated energy efficiency (EE) and related programs in New Jersey, which are regulated by the BPU, and
Previous wording
PSEG Power—which is an energy supply company that is comprised of the operations of merchant nuclear generating assets and fuel supply functions engaged in competitive energy sales via its principal direct wholly owned subsidiaries. PSEG Power’s subsidiaries are subject to regulation by FERC, the Nuclear Regulatory Commission (NRC) and other federal regulators and state regulators in the states in which they operate.
Current wording
PSEG Power—which is an energy supply company that consists of the operations of merchant nuclear generating assets and fuel supply functions engaged in competitive energy sales via its principal direct wholly owned subsidiaries. PSEG Power’s subsidiaries are subject to regulation by FERC, the Nuclear Regulatory Commission (NRC) and other federal regulators and state regulators in the states in which they operate.
Previous wording
We are a public utility holding company that, acting through our wholly owned subsidiaries, is a predominantly regulated electric and gas utility and a nuclear generation business. Our business plan focuses on achieving growth by allocating capital primarily toward regulated investments in an effort to continue to improve the sustainability and predictability of our business and realizing the value of the consistent and reliable carbon free generation from our nuclear units. We are focused on investing to meet growing energy demand, modernize our energy infrastructure, improve reliability and resilience, increase EE and deliver clean energy to meet customer expectations and be well aligned with public policy objectives. With these investments and higher working capital recovery approved in the distribution rate case, our regulated rate base increased from approximately $30 billion as of December 31, 2023 to approximately $34 billion as of December 31, 2024. In addition, our nuclear facilities retain the downside price protection of a production tax credit (PTC) from 2024 through 2032.
Current wording
We are a public utility holding company that, acting through our wholly owned subsidiaries, is a predominantly regulated electric and gas utility and a nuclear generation business. Our business plan focuses on achieving growth by allocating capital primarily toward regulated investments in an effort to continue to improve the sustainability and predictability of our business and realizing the value of the consistent and reliable carbon-free generation from our nuclear units. We are focused on investing to meet growing energy demand, modernize our energy infrastructure, improve reliability and resilience, increase EE to meet customer expectations and be well aligned with public policy objectives. With these investments and higher working capital recovery approved in the distribution rate case, our regulated rate base increased from approximately $34 billion as of December 31, 2024 to approximately $36 billion as of December 31, 2025. In addition, our nuclear facilities retain the downside price protection of a production tax credit (PTC) from 2024 through 2032.
Previous wording
For the years 2025-2029, our regulated capital investment program is estimated to be in a range of $21 billion to $24 billion. We expect these capital investments to result in a compound annual growth rate in our regulated rate base in a range of 6% to 7.5%. The regulated capital investments represent the majority of PSEG’s total capital investment program of $22.5 billion to $26 billion. The low end of the range includes an extension of our Gas System Modernization Program (GSMP) and Clean Energy Future (CEF)-EE program at their current average annual investment levels plus inflation, as these programs are expected to continue beyond their currently approved timeframes. The upper end of our capital investment range includes potential incremental investments to address continued demand growth and other investments to meet infrastructure needs and support New Jersey's clean energy goals.
Current wording
For the years 2026-2030, our regulated capital investment program is estimated to be in a range of $22.5 billion to $25.5 billion. We expect these capital investments to result in a compound annual growth rate in our regulated rate base in a range of 6.0% to 7.5% from year-end 2025 to year-end 2030. The regulated capital investments represent the majority of PSEG’s total capital investment program of $24 billion to $28 billion. The low end of the range includes an extension of our Gas System
Previous wording
In October 2024, the BPU approved our CEF-EE II filing authorizing approximately $2.9 billion for energy efficiency projects committed between January 1, 2025 through June 30, 2027, and completed over an expected six-year period. The Order approved a program investment budget of approximately $1.9 billion, net of administrative expenses, and approximately $1 billion to continue our customer on-bill repayment program. This EE filing is a significant increase from our prior filings, driven by an increase in the savings targets required under the BPU Energy Efficiency Framework and higher costs to achieve those targeted savings.
Current wording
In 2024, the BPU approved our CEF-EE II filing authorizing approximately $2.9 billion for energy efficiency projects committed between January 1, 2025 through June 30, 2027, to be completed over an expected six-year period. The Order approved a program investment budget of approximately $1.9 billion, net of administrative expenses, and approximately $1 billion to continue our customer on-bill repayment program.
Previous wording
At PSEG Power, we seek to produce low-cost electricity by efficiently operating our nuclear generation assets, mitigate earnings volatility through the PTC mechanism and hedging, and support public policies that preserve these existing carbon-free base load nuclear generating plants. During the first nine months of 2025, our nuclear units generated approximately 23.8 terawatt hours and operated at a capacity factor of 93.7%. Effective April 2025, PSEG Power revised the estimated useful lives for the Salem 1, Salem 2 and Hope Creek nuclear plants due to our expectation that a 20-year license extension will be approved for these facilities. In October 2025, we completed work to extend the refueling cycle at our Hope Creek facility from 18 months to 24 months.
Current wording
At PSEG Power, we seek to produce low-cost electricity by efficiently operating our nuclear generation assets, mitigate earnings volatility through hedging and the PTC mechanism, and support public policies that preserve these existing carbon-free base load nuclear generating plants. During the first three months of 2026, our nuclear units generated approximately 8 terawatt hours and operated at a capacity factor of 95.5%. Effective April 2025, PSEG Power revised the estimated useful lives for the Salem 1, Salem 2 and Hope Creek nuclear plants due to our expectation that a 20-year license extension will be approved for these facilities. In 2025, we also completed work to extend the refueling cycle at our Hope Creek facility from 18 months to 24 months. In addition, we are planning power uprates at Salem Units 1 and 2 that will increase generation capacity and reliability and support long-term operation of these units, including through a potential subsequent license renewal.
Previous wording
Our hedging strategy continues to incorporate an estimated range of risk reduction impacts from the PTCs on our nuclear generation portfolio while retaining the ability to benefit when market pricing exceeds the phase out threshold. As of September 30, 2025, we expect that our hedged position for 2025 in conjunction with the PTC and market price variability will result in the realized value of our nuclear generation output being at, or above, the PTC phase out. Our strategy will continue to evolve given PTC guidance uncertainty, and potential incremental changes upon final U.S. Treasury guidance. In addition, we are exploring opportunities for the potential sale of power and/or emission credits from our nuclear facilities pursuant to long-term agreements.
Current wording
Our hedging strategy continues to incorporate an estimated range of risk reduction impacts from the PTCs on our nuclear generation portfolio while retaining the ability to benefit when market pricing exceeds the level at which we would receive PTCs. As of December 31, 2025, we expect that our current portfolio position for 2026 will result in the realized value of our nuclear generation output being above the level at which we would receive PTCs. Our strategy will continue to evolve taking into account energy market conditions, PTC guidance uncertainty, and potential incremental changes upon receiving U.S. Treasury guidance. In addition, we continue to explore opportunities for the potential sale of power, capacity and/or emission credits from our nuclear facilities pursuant to long-term agreements.
Previous wording
We continue to assess physical risks of climate change and adapt our capital investment program to improve the reliability and resiliency of our system in an environment of increasing frequency and severity of weather events. PSE&G is committed to the safe and reliable delivery of natural gas to approximately 1.9 million customers throughout New Jersey and we are equally committed to reducing GHG emissions associated with such operations. The GSMP is designed to improve safety and reliability and significantly reduce natural gas leaks in our distribution system, which would reduce the release of methane, a potent GHG, into the air. Through GSMP II, from 2018 through 2024 we reduced reported methane emissions by over 30% system wide.
Current wording
We continue to assess physical risks of climate change and adapt our capital investment program to improve the reliability and resiliency of our system in an environment of increasing frequency and severity of weather events. PSE&G is committed to the safe and reliable delivery of natural gas to approximately 1.9 million customers throughout New Jersey and we are equally committed to reducing GHG emissions associated with such operations. The GSMP is designed to improve safety and reliability and significantly reduce natural gas leaks in our distribution system, which would reduce the release of methane, a potent GHG, into the air. From 2018 through 2025 we reduced reported methane emissions by over 34% system wide.
Previous wording
We also continue to focus on providing cleaner energy for our customers by working to preserve the economic viability of our nuclear units, which provide over 85% of the carbon-free energy in New Jersey. These efforts include reducing market risk by advocating for state and federal policies, such as the PTC established by the IRA, and capacity market reform and related generator interconnection policies at PJM Interconnection, L.L.C. (PJM) that recognize the value of our nuclear fleet’s carbon-free generation and its contribution to grid reliability and resource adequacy, and potential long-term contracts that recognize the value of its consistent and reliable carbon-free energy.
Current wording
We also continue to focus on working to preserve the economic viability of our nuclear units, which provide over 80% of the carbon-free energy in New Jersey. These efforts include reducing market risk by advocating for state and federal policies, such as the PTC established by the IRA, and capacity market reform and related generator interconnection policies at PJM Interconnection, L.L.C. (PJM) that recognize the value of our nuclear fleet’s carbon-free generation and its contribution to grid reliability and resource adequacy, and potential long-term contracts that recognize the value of its consistent and reliable carbon-free energy.
Previous wording
The results for PSEG, PSE&G and PSEG Power & Other for the three and nine months ended September 30, 2025 and 2024 are presented as follows:
Current wording
The results for PSEG, PSE&G and PSEG Power & Other for the three months ended March 31, 2026 and 2025 are presented as follows:
Previous wording
Net of tax (expense) benefit of $(28) million and $(36) million for the three months and $(77) million and $(79) million for the nine months ended September 30, 2025 and 2024, respectively.
Current wording
Net of tax expense of $1 million and $6 million for the three months ended March 31, 2026 and 2025, respectively.
Previous wording
Net of tax (expense) benefit of $(5) million and $(6) million for the three months and $(6) million and $21 million for the nine months ended September 30, 2025 and 2024, respectively.
Current wording
Net of tax benefit of $11 million and $53 million for the three months ended March 31, 2026 and 2025, respectively.
Previous wording
Our Net Income variance for the three and nine months ended September 30, 2025 versus the comparable period in 2024 was driven primarily by higher earnings due to settlement of the distribution base rate case in October 2024 and continued investments in T&D at PSE&G, combined with MTM gains for the nine months ended September 30, 2025 compared to losses in the nine months ended September 30, 2024, as shown above.
Current wording
Our increase in Net Income for the three months ended March 31, 2026 versus the comparable period in 2025 was driven primarily by continued investment in T&D clause programs at PSE&G and higher gas sales and capacity revenues at PSEG Power, combined with MTM and NDT activity, as shown in the table above.
Previous wording
In February 2023, the governor of New Jersey issued executive orders (EOs) that establish or accelerate previously established 2050 targets for clean-sourced energy, building decarbonization, and EV adoption goals, with new target dates of 2030 or 2035, as applicable. The EOs direct the BPU and other state agencies to collaborate with stakeholders to develop plans to reach the targets and the BPU has convened a stakeholder proceeding to develop a plan for gas distribution utilities to reach the target of 50% natural gas emissions reductions over 2006 levels by 2030. The BPU commenced proceedings to update the State’s EMP in 2024 that are continuing. We are unable to predict the outcome of this proceeding, but it could have a material impact on our business, results of operations and cash flows.
Current wording
In February 2023, the previous governor of New Jersey issued executive orders (EOs) that establish or accelerate previously established 2050 targets for clean-sourced energy, building decarbonization, and EV adoption goals, with new target dates of 2030 or 2035, as applicable. In November 2025 the BPU released the updated Energy Master Plan (EMP) that presents potential pathways toward meeting New Jersey’s clean energy and decarbonization goals. Given the new administration took office in January 2026, it is not clear how the EMP might influence New Jersey’s energy policy and we cannot predict the impact on our business that might result.
Previous wording
We are subject to liability under environmental laws for the costs and penalties of remediating contamination of property now or formerly owned by us and of property contaminated by hazardous substances that we generated. In particular, the historic operations of PSEG companies and the operations of numerous other companies along the Passaic and Hackensack Rivers are alleged by federal and state agencies to have discharged substantial contamination into the Passaic River/Newark Bay Complex in violation of various statutes. In addition, PSEG Power has retained ownership of certain liabilities excluded from the sale of its fossil generation portfolio, primarily related to obligations under New Jersey and Connecticut state laws to investigate and remediate the sites. We are also currently involved in a number of proceedings relating to sites where other hazardous substances may have been discharged and may be subject to additional proceedings in the future, and the costs and penalties of any such remediation efforts could be material.
Current wording
In addition, PSEG Power has retained ownership of certain liabilities excluded from the sale of its fossil generation portfolio, primarily related to obligations under New Jersey and Connecticut state laws to investigate and remediate the sites. We are also currently involved in a number of proceedings relating to sites where other hazardous substances may have been discharged and may be subject to additional proceedings in the future, and the costs and penalties of any such remediation efforts could be material.
Previous wording
In May 2025, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants zero emission certificate (ZEC) sales concluded. Pursuant to a process established by the BPU, ZECs were purchased from these nuclear plants by the electric distribution companies (EDCs) in New Jersey. As previously noted, the Federal government established a PTC for electricity generated using existing nuclear energy, which began January 2024 and continues through 2032 and impacted PSEG Power's decision not to apply for the next ZEC three-year eligibility period starting June 2025. The expected PTC rate is up to $15/MWh subject to adjustment based upon a facility’s gross receipts. The PTC rate and the gross receipts threshold are subject to annual inflation adjustments. ZEC revenue recorded has been reduced by the estimated PTCs generated from these nuclear plants. The PTC amounts recorded to date are subject to change based on several factors, including but not limited to, adjustments to estimated market prices and generation and the issuance of authoritative guidance by Treasury/the Internal Revenue Service, including clarification of the definition of “gross receipts” used to determine the phase out. Any adjustments to amounts previously recorded could be material. We continue to analyze the impact of the PTC, including any future guidance from the U.S. Treasury to assess any impact of PTCs on expected ZEC payments and/or any future ZEC application periods.
Current wording
In May 2025, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants zero emission certificate (ZEC) sales concluded. Pursuant to a process established by the BPU, ZECs were purchased from these nuclear plants by the electric distribution companies (EDCs) in New Jersey. As previously noted, the Federal government established a PTC for electricity generated using existing nuclear energy, which began January 2024 and continues through 2032 and impacted PSEG Power's decision not to apply for the ZEC three-year eligibility period which began June 2025. The expected PTC rate is up to $15/MWh subject to adjustment based upon a facility’s gross receipts. The PTC rate and the gross receipts threshold are subject to annual inflation adjustments. ZEC revenue recorded has been reduced by the estimated PTCs generated from these nuclear plants. The PTC amounts recorded to date are subject to change based on several factors, including but not limited to, adjustments to estimated market prices and generation and the issuance of authoritative guidance by the U.S. Treasury/the Internal Revenue Service, including clarification of the definition of “gross receipts” used to determine the phase out. Any adjustments to amounts previously recorded could be material. We continue to analyze the impact of the PTC, including any future guidance from the U.S. Treasury to assess any impact of PTCs on expected ZEC payments and/or any future ZEC application periods. For additional information, see Item 1. Note 2. Revenues.
Previous wording
An increasing demand for power and a lack of sufficient new generation resources in PJM and in New Jersey, has raised resource adequacy concerns and is resulting in higher electricity costs for our customers this year. Prices from the July 2024 PJM annual capacity market auction, which were approximately 10 times higher than prices from the 2023 auction and which are impacting customer bills, provoked concern from state regulators and legislators and have created regulatory uncertainty. Prices from the July 2025 capacity market auction were higher than those produced by the July 2024 auction and PJM indicated that the prices would have been even higher if not for the existence of a FERC-approved ceiling, which remains in effect for the December 2025 auction but will then sunset. PJM is currently exploring reforms to its market that are currently anticipated to be filed at FERC by the end of the year.
Current wording
An increasing demand for power and a lack of sufficient new generation resources in PJM and in New Jersey, has raised resource adequacy concerns and resulted in higher electricity costs for our customers in 2025. Prices from the July 2024 PJM annual capacity market auction, which were approximately 10 times higher than prices from the 2023 auction and which impacted customer bills, provoked concern from state regulators and legislators and have created regulatory uncertainty. Prices from the July 2025 capacity market auction were higher than those produced by the July 2024 auction and PJM indicated that the prices would have been even higher if not for the existence of a FERC-approved ceiling, which remained in effect for the December 2025 auction. In February 2026, PJM filed with FERC a proposal to extend the price cap for another two delivery years (2028/29 and 2029/30) and, in April 2026, FERC issued an order accepting PJM’s proposal. In January 2026, the White House’s National Energy Dominance Council signed an agreement with the governors of all 13 states in the PJM region that memorializes a “statement of principles” intended to prompt PJM to make major changes to its capacity market, including running a “reliability backstop auction” to procure new generation capacity to provide up to 15-year “price certainty”. PJM has committed to run this backstop auction and is targeting a September 2026 date following FERC approval of all needed rule changes. There are outstanding questions associated with this auction, including around the role to be played by electric utilities in both setting the procurement target and purchasing the capacity from PJM during the auction, which could create collection risk for both PSE&G and its customers. In addition, in 2025, FERC both issued an order that will encourage optionality for “large load” customers by facilitating co-location with generation, and initiated a rulemaking to establish definitive rules for future large customer connections intended to ensure reliability and address resource adequacy concerns. We cannot predict the outcome of these proceedings and their impact on our business.
Previous wording
Federal Executive Orders and State Legislative and Other Activity
Current wording
Federal and State Executive Orders and State Legislative and Other Activity
Previous wording
There have been a number of federal executive orders over the recent months, including but not limited to orders addressing power generation in the energy industry and orders imposing widespread and substantial tariffs on imports. We are continuing to monitor the federal executive orders, certain of which will require the enactment of regulations to implement, and their impacts on our supply chain, business, cash flow, results of operations and financial condition.
Current wording
There have been a number of federal executive orders during the past year, including but not limited to orders requiring retiring generating units to stay on-line beyond their retirement date to mitigate system reliability risk and orders imposing widespread and substantial tariffs on imports.
Previous wording
As a result of the capacity market price increases, the costs of which are flowed through to customers, and per direction to EDCs from the BPU, PSE&G filed a petition in May 2025 that provided proposals to mitigate bill impacts to customers. In June 2025, the BPU approved a settlement under which PSE&G applied a credit to each residential electric customer’s monthly bill for July 2025 and August 2025, with the offset being charged on monthly bills for September 2025 through February 2026. PSE&G agreed to waive carrying costs on the outstanding credit amount. In addition, PSE&G agreed to: extend protections precluding the shut-off of eligible residential customers, normally available during the winter months, to the period from July 1, 2025 through September 30, 2025; offer residential customers deferred payment arrangements with terms of up to twenty-four months for the payment of overdue billed amounts; and waive all reconnection fees for residential customers during the period from July 1, 2025 through September 30, 2025. In September 2025, the New Jersey Legislature enacted a law prohibiting disconnection for non-payment during the period June 15 through August 31, beginning in 2026, and for such period annually thereafter, for certain qualified electric and gas customers. This new requirement for a summer shutoff moratorium and the extended deferred payment arrangements are likely to increase our Accounts Receivable and bad debt expense in the future.
Current wording
There has been increased New Jersey state legislative activity and executive orders regarding energy affordability, resource adequacy and regulatory topics. In 2025, per direction to EDCs from the BPU, PSE&G took steps to mitigate the impacts of increasing electricity costs resulting from capacity market price increases, including the implementation of extended deferred payment arrangements. Further, the New Jersey legislature enacted a law prohibiting disconnection for non-payment during the period June 15 through August 31, beginning in 2026, and for such period annually thereafter, for certain qualified electric and gas customers. Both of these actions increased our bad debt expense in 2025, with potential additional increases in the future.
Previous wording
In August 2022, the IRA enacted a 15% corporate alternative minimum tax (CAMT), which is based on adjusted financial statement income, and a PTC for existing qualified nuclear facilities. These provisions remain unclear; therefore, the issuance of authoritative guidance can materially impact PSEG’s and PSE&G’s results of operations, financial condition and cash flows.
Current wording
In August 2022, the IRA enacted a 15% corporate alternative minimum tax (CAMT), which is based on adjusted financial statement income, and established a PTC for existing qualified nuclear facilities. However, aspects of the IRA provisions for CAMT and PTCs remain unclear; therefore, the issuance of future authoritative guidance could materially impact PSEG’s and PSE&G’s results of operations, financial condition and cash flows.
Previous wording
investments in PSE&G, including T&D facilities to enhance reliability, resiliency and modernize the system to meet the growing needs and increasingly higher expectations of customers, and clean energy investments, particularly our EE programs;
Current wording
investments in PSE&G, including T&D facilities to enhance reliability, resiliency and modernize the system to meet the growing needs and increasingly higher expectations of customers, and clean energy investments, including our EE programs;
Previous wording
continued operation of our nuclear generation facilities that are expected to be supported by the PTC through 2032, nuclear capacity uprates, such as our planned Salem power uprate supported by a clean energy PTC, as well as obtaining license extensions and energy and/or emission credit sales with potential customers seeking consistent and reliable carbon-free power, as well as opportunities that may arise from our enabling of new nuclear projects, including providing services for these projects;
Current wording
continued operation of our nuclear generation facilities that are expected to be supported by the PTC through 2032, nuclear capacity uprates, such as our planned Salem power uprate supported by a clean energy PTC, as well as obtaining license extensions and energy, capacity and/or emission credit sales with potential customers seeking consistent and reliable carbon-free power;
Rearranged current paragraphs (4)
Current report — wording carried from elsewhere
Modernization Program (GSMP) and Clean Energy Future (CEF)-EE program, as these programs are expected to continue beyond their currently approved time frames. The upper end of our capital investment range includes potential incremental investments to address continued demand growth and other investments to meet infrastructure needs and support New Jersey's clean energy goals.
Current report — wording carried from elsewhere
We are subject to liability under environmental laws for the costs and penalties of remediating contamination of property now or formerly owned by us and of property contaminated by hazardous substances that we generated. In particular, the historic operations of PSEG companies and the operations of numerous other companies within the Newark Bay Complex are alleged by federal and state agencies to have discharged substantial contamination into the Newark Bay Complex in violation of various statutes. The Newark Bay Complex is a tidal estuary in northern New Jersey that includes Newark Bay, as well as portions of the Passaic River, the Hackensack River and other surrounding waterways. The U.S. Environmental Protection Agency (EPA) has designated various portions of the Newark Bay Complex as federal Superfund sites that must be investigated and remediated under the Comprehensive Environmental Response, Compensation and Liability Act of 1980.
Current report — wording carried from elsewhere
We cannot predict the impacts on our supply chain, business, cash flow, results of operations and financial condition from the federal and state legislative activity and executive orders, certain of which may require regulatory actions to implement.
Current report — wording carried from elsewhere
opportunities that may arise from our enabling of or involvement in new nuclear projects;