Skip to main content

FTC Solar, Inc.

For the period ended Mar 31, 2026. Filed May 5, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2026 · Filed May 5, 2026

FTCI$1.56+21.9%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-09-30; filed 2025-11-12.

0001193125-25-276228

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2026-03-31; filed 2026-05-05.

0001193125-26-205290

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 181 previous paragraphs and 165 current paragraphs.

83 unchanged; 47 reworded; 32 added; 47 removed; 4 previous and 3 current paragraphs rearranged.

Tables are not compared: 28 previous and 14 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (32)

Current report

On June 6, 2022, President Biden issued an Executive Order allowing U.S. solar deployers to import solar modules and cells from Cambodia, Malaysia, Thailand and Vietnam free from certain duties for 24 months, along with other incentives designed to accelerate U.S. domestic production of clean energy technologies. This moratorium ended in June 2024. The U.S. International Trade Administration and the U.S. International Trade Commission completed a sunset review in October 2024 and decided to continue existing AD/CVD orders on CSPV cells/modules from China resulting in longstanding China tariffs remaining in force. In April 2025, the U.S. Department of Commerce issued final determinations concluding that producers and exporters in Cambodia, Malaysia, Thailand and Vietnam were dumping and/or receiving countervailing subsidies resulting in high tariff rates now applying to many Chinese-owned manufacturers operating in these countries. In addition, in August 2025, the U.S. International Trade Commission issued an affirmative preliminary injury determination on imports of CSPV cells and modules from Laos, Indonesia and India. The U.S. Department of Commerce is currently assessing whether the imports at issue are being dumped or unfairly subsidized.

Current report

The decrease in cost of revenue for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025, was primarily driven by a decrease of 52% in MW produced and lower shipping and warehousing costs. This was partially offset by (i) additional costs related to the inclusion of Alpha Steel, (ii) higher tariffs, and (iii) an increase of 56% in logistics activity levels.

Current report

We had negative gross margin for the three months ended March 31, 2026 due mainly to the impact of the low levels of product revenues which were not sufficient to fully cover our indirect costs.

Current report

The increase in general and administrative expenses for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025, was primarily attributable to (i) higher stock-based compensation expense of $2.5 million as a result of new award grants, (ii) higher professional service costs of $1.0 million, largely attributable to increased legal fees and (iii) increased travel and facility costs. These increases were partially offset by lower payroll expense of $0.7 million, due mainly to lower headcount levels and lower bonus and severance costs. General and administrative expenses as a percentage of revenue were 46.3% for the three months ended March 31, 2026, compared to 24.3% for the three months ended March 31, 2025.

Current report

Interest expense is related mainly to our outstanding short- and long-term debt and consisted of the following:

Current report

On November 11, 2025, we entered into a Membership Interest Purchase Agreement with the other equity holders of Alpha Steel pursuant to which we acquired 100% of the membership interests in Alpha Steel, effective November 12, 2025. As a result, Alpha Steel is now our wholly owned subsidiary and the financial results of Alpha Steel since November 12, 2025 have been included in our consolidated results. Prior to November 12, 2025, we held a 45% interest in Alpha Steel, which we accounted for under the equity method of accounting. The loss from unconsolidated subsidiary for the three months ended March 31, 2025 represented our share of the net operating results incurred by Alpha Steel during that period.

Current report

As described further in Note 11, "Debt" in Part I, Item 1 of this Quarterly Report, on March 23, 2026, we entered into a Second Amendment and Limited Waiver to our Credit Agreement (the “Second Amendment”) pursuant to which the Lenders: (i) provided a waiver relating to our breach of the purchase order covenant in our Credit Agreement for the fiscal quarter ended December 31, 2025; (ii) agreed that a purchase order covenant will not apply to us until the fiscal quarter ending March 31, 2027; and (iii) agreed to further amend certain other existing financial covenants under the Credit Agreement, including the elimination of the minimum revenue and cash covenants for the quarter ended March 31, 2026. Additionally, in connection with the Second Amendment, we agreed to repay a portion of the principal amount outstanding under the Credit Agreement as follows: (x) $2.5 million of principal was repaid on March 23, 2026; (y) $2.5 million of principal will be repaid on May 22, 2026; and (z) $5.0 million of principal will be repaid on September 30, 2026.

Current report

On November 11, 2025, we entered into a Membership Interest Purchase Agreement with the other equity holders (the "Selling Members") of Alpha Steel LLC ("Alpha Steel") pursuant to which we agreed to acquire all of their membership interests for a purchase price of approximately $2.7 million, which was evidenced by promissory notes payable in various installments during 2026 (the "Acquisition Notes"). As of March 31, 2026, we had made a required payment of approximately $0.5 million to the Selling Members, with remaining installments, plus accrued interest, due by no later than July 2026. The Acquisition Notes are secured by all of Alpha Steel's assets, provided, however, the security interests granted to each of the Selling Members under the Acquisition Notes are subordinate and junior to the security interests in favor of the Lenders under the Credit Agreement.

Current report

In connection with our acquisition of 100% of the Membership Interests in Alpha Steel in November 2025, we agreed to pay approximately $2.7 million in various installments during 2026, which was evidenced by Acquisition Notes. During the quarter ended March 31, 2026, we made a required principal payment of approximately $0.5 million to the Selling Members. The Acquisition Notes bear interest on any unpaid balance at a rate of 3.64% per annum and were discounted upon issuance at a market-participant discount rate resulting in an effective interest rate of approximately 12% until maturity. At March 31, 2026, the outstanding balance of our Acquisition

Current report

Notes totaled approximately $2.2 million. We made a principal reduction of $1.1 million in April 2026 and the remaining balance, plus accrued interest, is required to be paid upon maturity no later than five business days after July 1, 2026.

Current report

The remainder of our short-term debt at March 31, 2026 consists of $7.5 million of required principal payments during the next twelve months on our Term Loans, as described further below

Current report

We entered into the Original Credit Agreement, effective July 2, 2025, with various lenders (the "Lenders") and Acquiom Agency Services LLC, as Administrative Agent. On November 1, 2025 we entered into a First Amendment to Credit Agreement to amend certain of the financial covenants applicable to us and in connection with our agreement to acquire 100% of the membership interests in Alpha Steel. On March 23, 2026, we entered into the Second Amendment pursuant to which: (i) the Lenders provided a waiver relating to our breach of the purchase order covenant for the fiscal quarter ended December 31, 2025; (ii) the Lenders agreed that a purchase order covenant will not apply to us until the fiscal quarter ending March 31, 2027; and (iii) we and the Lenders agreed to further amend the financial covenants under the Credit Agreement. The amended financial covenants applicable under the Credit Agreement are summarized below. Additionally, in connection with the Second Amendment, we agreed to repay a portion of the principal amount outstanding under the Credit Agreement as follows: (x) $2.5 million of principal was repaid on March 23, 2026; (y) $2.5 million of principal will be repaid on May 22, 2026; and (z) $5.0 million of principal will be repaid on September 30, 2026. The amount of each of the foregoing principal repayments is referred to as an "ECF Repayment Amount". The Original Credit Agreement, as amended, is referred to below as the "Credit Agreement".

Current report

As a result of the principal payments required in 2026 under the terms of the Second Amendment, we now estimate an Exit Fee of approximately $2.6 million will be owed upon maturity of the debt, in addition to the repayment at maturity of any outstanding principal under the Term Loans, plus accrued and unpaid interest. We are accreting each period, as additional interest expense using the interest method, an amount for the expected exit fee obligation that we estimate will be due on July 2, 2029. The amount accrued as of March 31, 2026 for the exit fee obligation is reflected as a component of our total debt balance as shown in Note 11, "Debt", included in Part I, Item 1 of this Quarterly Report.

Current report

As amended by the Second Amendment, the Credit Agreement includes the following covenants.

Current report

Unrestricted Cash Amount. The Company is required to have unrestricted cash balances as of the last day of the fiscal quarter ending June 30, 2026 equal to the greater of (i) $15.0 million and (ii) $20.0 million minus the total ECR Repayment Amounts paid by the Company pursuant to the Credit Agreement on or prior to June 30, 2026. The Company currently anticipates that this covenant will require the Company to have at least $15.0 million in unrestricted cash as of June 30, 2026. The Company is further required to have unrestricted cash balances as of the last day of the fiscal quarter ending September 30, 2026 and each fiscal quarter thereafter equal to the greater of (i) $10.0 million and (ii) $20.0 million minus the total ECF Repayment Amounts actually paid by the Company to the Lenders pursuant to the Credit Agreement prior to such date. The Company currently anticipates that this financial covenant will require the Company to have at least $10.0 million of unrestricted cash as of September 30, 2026 and each fiscal quarter thereafter.

Current report

Quarterly Revenue. The Company is required to have consolidated quarterly revenue of at least: (i) $25.0 million for the fiscal quarter ending June 30, 2026; (ii) $50.0 million for the fiscal quarter ending September 30, 2026; and (iii) $75.0 million for the fiscal quarter ending December 31, 2026 and the last day of each fiscal quarter thereafter.

Current report

Consolidated EBITDA. For the 12-month period ending December 31, 2026, the Company’s consolidated EBITDA may not be less than $10.0 million, and for the 12-month period ending December 31, 2027 and the last day of each fiscal year thereafter, the Company’s consolidated EBITDA may not be less than $25.0 million.

Current report

Pursuant to the terms of the Senior Notes, we elected to increase the outstanding principal amount of the Senior Notes by an amount of interest at a rate of 13% per annum ("paid-in-kind" interest) capitalized semiannually on the final business day in June and December of each year. As a result, our outstanding principal balance of the Senior Notes was approximately $16.1 million as of July 2, 2025. The Senior Notes were initially secured by substantially all of our assets.

Current report

Changes in the number and value of our Original and New Warrants were as follows:

Current report

At March 31, 2026, the outstanding principal balance of our Term Loans and the A&R Promissory Note totaled approximately $53.6 million, including accrued paid-in-kind interest to date. As noted above, $7.5 million of principal with respect to the Term Loans is required to be paid during the remainder of 2026 and has been classified as short-term debt at March 31, 2026. The remaining outstanding Term Loan and A&R Promissory principal, plus accrued paid-in-kind interest and any applicable Exit Fee, will be due upon maturity, as indicated above.

Current report

Our working capital decreased by approximately $9.2 million from $29.5 million at December 31, 2025 to $20.4 million at March 31, 2026. The decrease was largely attributable to the use of cash described above, partially offset by changes in other working capital balances due to activity levels.

Current report

During the three months ended March 31, 2025, we received $3.2 million of contingent earnout payments from our investment in Dimension that we sold in 2021. We also had capital expenditures of nearly $0.1 million, primarily for tooling.

Current report

During the three months ended March 31, 2026, we made (i) principal payments of $3.0 million relating to required payments on our outstanding Term Loan and Acquisition Note debt, and (ii) payments for legal fees totaling $0.2 million incurred in connection with entering into the Second Amendment to our Credit Agreement. We also sold 168,700 new shares of our common stock under our ATM program receiving proceeds of approximately $0.8 million. Proceeds received from stock option exercises were minimal during the three months ended March 31, 2025.
Removed paragraphs (47)

Previous report

The increase in cost of revenue for the three months ended September 30, 2025, as compared to the three months ended September 30, 2024, was primarily driven by (i) an increase of 320% in MW produced, (ii) additional costs associated with tariffs, and (iii) an increase of 82% in logistics activity levels. Costs associated with these increases in activity levels were partially offset by lower (i) remediation costs, (ii) personnel costs, and (iii) other indirect expenses.

Previous report

We had positive gross margin for the three months ended September 30, 2025 due mainly to higher product revenues associated with higher activity levels and the impact of lower remediation, personnel and other indirect costs.

Previous report

The decrease in general and administrative expenses for the three months ended September 30, 2025, as compared to the three months ended September 30, 2024, was primarily attributable to (i) lower payroll expense of $0.4 million, due mainly to lower headcount levels, (ii) lower insurance costs of $0.2 million, and (iii) lower intangible asset amortization expense of $0.1 million as such assets became fully amortized as of December 31, 2024. This was partially offset by higher professional services fees, primarily for audit and tax services, of $0.3 million. General and administrative expenses as a percentage of revenue were 24.6% for the three months ended September 30, 2025, compared to 67.1% for the three months ended September 30, 2024. The decrease in the percentage was largely attributable to the increased level of revenue during the three months ended September 30, 2025.

Previous report

Interest expense incurred during the three months ended September 30, 2025 was primarily related to cash interest paid, paid-in-kind interest added to the principal amount of our Term Loans, and amortization of the discount and deferred loan costs on the Term Loans. Interest expense during the three months ended September 30, 2024, primarily related to certain short-term vendor financing arrangements.

Previous report

We sold our Atlas web-based software platform on December 2, 2024. In connection with the sale, the purchaser agreed to future potential earnout payments based on annual license renewals during 2025 by certain existing customers. During 2025, we have received such earnout payments from the purchaser. In accordance with our existing accounting policy, we recognize a gain from these contingent earnout payments upon receipt.

Previous report

As described further in Note 12, "Debt" in our Condensed Consolidated Financial Statements included in Part I, Item 1 of this Quarterly Report, the impact of the revised terms in the Subordination Agreement and the A&R Promissory Note, including the fair value of New Warrants issued in connection with those agreements, resulted in the previously existing Senior Notes, originally issued on December 4, 2024, being deemed to be extinguished on July 2, 2025 for accounting purposes pursuant to Accounting Standards Codification 470-50, Modifications and Extinguishment. This resulted in a non-cash charge during the three months ended September 30, 2025, of $0.2 million, for the required write off of the remaining unamortized debt discount and debt issue costs associated with the Senior Notes, and in consideration of the estimated fair value of the A&R Promissory Note as of July 2, 2025.

Previous report

The income (loss) from unconsolidated subsidiary for the three months ended September 30, 2025 and 2024 represents our share of the net operating results incurred by Alpha Steel during each period. The change in amounts recognized is largely related to the recognition of income by Alpha Steel in connection with the minimum purchase obligation owed by us as described further in Note 16, "Related party transactions" in Part I, Item 1 of this Quarterly Report.

Previous report

Results of Operations - Nine Months Ended September 30, 2025 Compared to Nine Months Ended September 30, 2024

Previous report

The increase in product revenue for the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024, was primarily due to an increase of 185% in the amount of MW produced as activity has been positively impacted by recent project wins mainly associated with our 1P solar tracker solution. This impact has been partially offset by a decrease of 30% in ASP for the nine months ended September 30, 2025, as a result of project mix changes as compared to the nine months ended September 30, 2024.

Previous report

The increase in service revenue for the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024, primarily resulted from (i) an increase of 71% in logistics activity levels, (ii) an increase of 5% in ASP as compared to the nine months ended September 30, 2024, as a result of project size and pricing, and (iii) higher engineering consulting revenue associated with new project activity during the nine months ended September 30, 2025.

Previous report

The increase in cost of revenue for the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024, was primarily driven by (i) an increase of 185% in MW produced, (ii) additional costs associated with tariffs and specified minimum purchase commitments with Alpha Steel, a related party, and (iii) an increase of 71% in logistics activity levels. Costs associated with these increases in activity levels were partially offset by lower personnel costs from headcount reductions and lower warranty and remediation expenses.

Previous report

Our gross margin percentage of revenue for the nine months ended September 30, 2025 was a negative 8.6%, compared to negative 25.6% for the nine months ended September 30, 2024.

Previous report

The negative gross margin for the nine months ended September 30, 2025 was largely attributable to the recognition of a specified minimum purchase commitment with Alpha Steel, as well as revenue levels that were not sufficient to fully cover tariffs and certain other indirect costs.

Previous report

We had negative gross margin for the nine months ended September 30, 2024 as (i) production volumes were not sufficient to cover certain overhead costs and (ii) our service revenue was not sufficient to fully cover our warehousing and certain other costs.

Previous report

The decrease in research and development expenses for the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024, was primarily attributable to (i) lower payroll costs of 0.8 million, largely due to changes in the location of headcount and lower bonus expense, (ii) lower professional service costs of $0.2 million resulting from cost reduction initiatives and (iii) lower office costs of $0.2 million, primarily associated with reduced software and other license fees. Research and development expenses as a percentage of revenue were 4.9% for the nine months ended September 30, 2025, as compared to 13.0% for the nine months ended September 30, 2024.

Previous report

The decrease in selling and marketing expenses for the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024, was primarily attributable to (i) lower payroll costs of $1.1 million, due mainly to lower headcount and commission costs, (ii) lower provisions for credit losses of $0.8 million, mainly related to charges associated with specific individual customer accounts during 2024, and (iii) lower travel, marketing, recruiting fees and other professional service costs of $0.6 million. Lower stock-based compensation costs accounted for much of the remaining decrease. Selling and marketing costs as a percentage of revenue were 6.1% for the nine months ended September 30, 2025, compared to 20.0% for the nine months ended September 30, 2024.

Previous report

The decrease in general and administrative expenses for the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024, was primarily attributable to (i) lower stock-based compensation totaling $1.7 million, largely associated with certain executive award forfeitures during the nine months ended September 30, 2025, (ii) lower professional service costs of $0.5 million largely resulting from our cost reduction initiatives to reduce the use of outside consulting services, (iii) lower insurance costs of $0.5 million, and (iv) lower intangible asset amortization expense of $0.4 million as such assets became fully amortized as of December 31, 2024. This was partially offset by (a) higher payroll costs of $0.2 million largely due to higher executive bonus expense and (b) higher rent and other office expenses. General and administrative expenses as a percentage of revenue were 24.9% for the nine months ended September 30, 2025, compared to 56.7% for the nine months ended September 30, 2024. The decrease in the percentage was largely attributable to the increased level of revenue during the nine months ended September 30, 2025.

Previous report

Interest expense incurred during the nine months ended September 30, 2025 was primarily related to cash interest on our Term Loans and paid-in-kind interest added to the principal amount of our Term Loans and original Senior Notes, as well as amortization of the discount and deferred loan costs on the Term Loans and original Senior Notes. Interest expense during the nine months ended September 30, 2024, primarily consisted of letter of credit and commitment fees on our Credit Facility that expired unused in April 2024, along with associated debt issue cost amortization.

Previous report

We sold our Atlas web-based software platform on December 2, 2024. In connection with the sale, the purchaser agreed to future potential earnout payments based on annual license renewals during 2025 by certain existing customers. During 2025, we have received such earnout payments from the purchaser. In accordance with our existing accounting policy, we recognize a gain from these contingent earnout payments upon receipt.

Previous report

Gain from disposal of investment in unconsolidated subsidiary

Previous report

We sold our 23% equity interest in our unconsolidated subsidiary, Dimension Energy LLC ("Dimension"), on June 24, 2021. Dimension is a community solar developer based in Atlanta, Georgia that provides renewable energy solutions for local communities in the United States.

Previous report

The sales agreement with Dimension included an earnout provision which provided for the potential to receive additional contingent consideration earned through December 2024, based on Dimension achieving certain performance milestones. The sales agreement also included additional contingent consideration in the form of a projects escrow release based on Dimension’s completion of certain construction projects in progress at the time of the sale.

Previous report

During the nine months ended September 30, 2025 and 2024, we received earnout payments of $3.2 million and $4.1 million, respectively, that were recognized in accordance with our policy election of recording such gains when realized.

Previous report

The New Warrants issued in connection with the Credit Agreement and the Original Warrants issued in connection with the Offering, both as described further in Note 12, "Debt" in our Condensed Consolidated Financial Statements included in Part I, Item 1 of this Quarterly Report, were classified as long-term liabilities. Due largely to changes in the price of our common stock during the nine months ended September 30, 2025, the fair value of the Original Warrants decreased from $9.5 million at December 31, 2024 to approximately $7.8 million when they were exercised in full on June 30, 2025, and the New Warrants increased in value from $32.1 million at July 2, 2025, to $48.1 million at September 30, 2025, resulting in recognition of a non-cash loss for the net increase in value during the nine months ended September 30, 2025.

Previous report

As described further in Note 12, "Debt" in our Condensed Consolidated Financial Statements included in Part I, Item 1 of this Quarterly Report, the impact of the revised terms in the Subordination Agreement and the A&R Promissory Note, including the fair value of New Warrants issued in connection with those agreements, resulted in the previously existing Senior Notes, originally issued on December 4, 2024, being deemed to be extinguished on July 2, 2025 for accounting purposes pursuant to Accounting Standards Codification 470-50, Modifications and Extinguishment. This resulted in a non-cash charge during the three months ended September 30, 2025, of $0.2 million, for the required write off of the remaining unamortized debt discount and debt issue costs of the Senior Notes, and in consideration of the estimated fair value of the A&R Promissory Note as of July 2, 2025.

Previous report

The income (loss) from unconsolidated subsidiary for the nine months ended September 30, 2025 and 2024 represents our share of the net operating results incurred by Alpha Steel during each period. The change in amounts recognized is largely related to the recognition of income by Alpha Steel in connection with the minimum purchase obligation owed by us as described further in Note 16, "Related party transactions" in Part I, Item 1 of this Quarterly Report.

Showing the first 40 of 47 passages. Open the source sections for the rest.

Reworded paragraphs (47)

Previous wording

CBP. There continues to be some uncertainty in the market around achieving full compliance with UFLPA, whether related to sufficient traceability of materials or other factors. Escalating trade tensions, particularly between the United States and China, have led to increased tariffs and trade restrictions, including tariffs applicable to certain raw materials and components for our products. We have taken measures with the intention of mitigating the effect of tariffs and the impact of AD/CVD and UFLPA on our business by reducing our reliance on China and enhancing our U.S.-based supply chain, including through our investment in Alpha Steel, as described further in Note 9, "Equity method investment" in Part I, Item 1 of this Form 10-Q. In 2019, 90% of our supply chain was sourced from China. As of September 30, 2025, we have qualified suppliers outside of China for certain of our commodities and we continue to work to have second-source capability for all Chinese-manufactured components to help reduce the extent to which our supply chain for U.S.-based projects is subject to existing tariffs and to be able to quickly address potential future regulatory and governmental policy changes. We have entered into partnerships with manufacturers based in the United States, India, South Africa, Spain, Turkey, Thailand and Vietnam to diversify our supply chain and optimize costs. On June 6, 2022, then-President Biden issued an Executive Order allowing U.S. solar deployers to import solar modules and cells from Cambodia, Malaysia, Thailand and Vietnam free from certain duties for 24 months, along with other incentives designed to accelerate U.S. domestic production of clean energy technologies. This moratorium ended in June 2024 and anti-dumping and countervailing duties on solar products linked to China are now well in excess of 200% for certain countries where Chinese firms have relocated production. Additionally, on December 29, 2023, Auxin and Concept Clean Energy, Inc. filed suit in the U.S. Court of International Trade challenging the legal basis for the moratorium and implementing regulations. Several motions have been filed to date, including a motion to dismiss by the U.S. government, which the court rejected. If the suit proves successful, solar module importers could owe retroactive duties on goods that have already cleared customs.

Current wording

CBP. There continues to be challenges in achieving full compliance with UFLPA, whether related to sufficient traceability of materials or other factors. Escalating trade tensions, particularly between the United States and China, have led to increased tariffs and trade restrictions, including tariffs applicable to certain raw materials and components for our products. We have taken measures with the intention of mitigating the effect of tariffs and the impact of AD/CVD and UFLPA on our business by reducing our reliance on China and enhancing our U.S.-based supply chain, including through our acquisition of Alpha Steel.

Previous wording

Effective April 5, 2025, the United States imposed a universal 10% tariff on most imports into the United States, excluding certain trade agreements. Tariff rates continue to change and fluctuate as negotiations continue between the United States and various countries. As an example, the United States previously imposed a 145% tariff on goods imported from China, and China imposed a retaliatory 125% tariff on goods imported from the United States. In May 2025, the U.S. and China agreed to a 90-day rollback whereby the United States cut the Chinese levies from 145% to 30% and China lowered the duties on U.S. goods from 125% to 10%, effective May 14, 2025. In August 2025, the 90-day rollback was further extended through November 9, 2025. Also, in May 2025, the Trump administration announced the doubling of steel and aluminum tariffs to 50%. New reciprocal tariffs have also been announced on selected countries that are well above the universal 10% tariff rate. As of the filing of this Quarterly Report, matters involving tariffs continue to evolve and change, including a review which is underway by the U.S. Supreme Court, following an adverse ruling by the U.S. Court of International Trade, regarding the Trump Administration's use of the International Emergency Economic Powers Act to justify the imposition of tariffs without approval by the U.S. Congress and, in some cases, implementation of new temporary pauses on certain announced tariffs as negotiations on final trade deals occur. Depending on the terms of our existing contracts with customers, we may not in all cases be able to fully recover the increased cost for delivery of tracker systems currently being manufactured for our customers by our international vendors due to higher tariffs currently in place, which has and may continue to impact our expected profitability under certain contracts. Imposition of new or higher tariffs could also adversely affect the amount or timing of our future revenue, results of operations or cash flows.

Current wording

On April 5, 2025, the United States imposed a universal 10% "reciprocal" tariff on most imports into the United States, excluding certain products and certain qualifying imports from Canada and Mexico. Throughout 2025, tariff rates continued to change and fluctuate as negotiations continued between the United States and various countries. As an example, the United States increased the reciprocal tariff rate on China from 10% to 125%, in addition to other tariffs of 20% imposed on China earlier in 2025 and the Section 301 tariffs imposed on many Chinese-origin products during the first Trump Administration, and China imposed a retaliatory 125% tariff on goods imported from the United States in response. In May 2025, the U.S. and China agreed to a 90-day rollback whereby the United States cut the Chinese levies from 145% to 30% and China lowered the duties on U.S. goods from 125% to 10%, effective May 14, 2025. This rollback period was subsequently extended through November 10, 2026. New reciprocal tariffs were also announced on selected countries that were well above the universal 10% tariff rate. On February 20, 2026, the U.S. Supreme Court rejected the Trump Administration's use of the International Emergency Economic Powers Act as a basis for the imposition of tariffs and, as a result of that ruling, on March 6, 2026, CBP outlined plans to establish a system for tariff refunds in 45 days following an order on March 4, 2026, by the Court of International Trade for CBP to progress with a tariff refund process. Following the ruling by the U.S. Supreme Court, the Trump Administration announced it would utilize authority under Section 122 of the Trade Act of 1974 to implement tariffs of up to 15% for a limited period of time without U.S. Congressional approval and may ultimately replace such tariffs with longer-lasting authority under Section 301 of the Trade Act. As of the filing of this Quarterly Report, matters involving tariffs continue to evolve and change. Depending on the terms of our existing contracts with customers, we may not in all cases be able to fully recover the increased cost for delivery of tracker systems currently being manufactured for our customers by our international vendors due to higher tariffs currently in place or that may be imposed in the future, which has and may continue to impact our expected profitability under certain contracts. Imposition of new or higher tariffs could also adversely affect the amount or timing of our future revenue, results of operations or cash flows.

Previous wording

The most notable incentive program impacting our U.S. business has historically been the ITC for solar energy projects, which allows taxpayers to offset their U.S. federal income tax liability by a certain percentage of their cost basis in solar energy systems placed in service for commercial use. The Inflation Reduction Act of 2022 ("IRA"), passed by the U.S. Congress and signed into law by then-President Biden on August 16, 2022, expanded and extended the tax credits and other tax benefits available to solar energy projects and the solar energy supply chain. U.S. manufacturers of specific solar components also became eligible to claim production tax credits under Section 45X of the Internal Revenue Code of 1986, as amended, which was established as part of the IRA and is a per-unit tax credit earned for each clean energy component manufactured domestically and sold by a manufacturer. Our investment in, and commitments made to Alpha Steel allow us to obtain benefits of lower product costs from Alpha Steel as a result of the production tax credit program, subject to our level of purchases from Alpha Steel.

Current wording

The most notable incentive program impacting our U.S. business has historically been the ITC for solar energy projects, which allows taxpayers to offset their U.S. federal income tax liability by a certain percentage of their cost basis in solar energy systems placed in service for commercial use, subject to compliance with applicable prevailing wage and apprenticeship requirements. The Inflation Reduction Act of 2022 ("IRA"), passed by the U.S. Congress and signed into law by then-President Biden on August 16, 2022, expanded and extended the tax credits and other tax benefits available to solar energy projects and the solar energy supply chain. U.S. manufacturers of specific solar components also became eligible to claim production tax credits under Section 45X of the Internal Revenue Code of 1986, as amended, which was established as part of the IRA and is a per-unit tax credit earned for each clean energy component manufactured domestically and sold by a manufacturer. Our acquisition of Alpha Steel allows us to continue for a longer period of time to obtain benefits of lower product costs as a result of the production tax credit program.

Previous wording

On July 4, 2025, President Trump signed into law the One Big Beautiful Bill Act, which accelerates the phase-outs and terminations of various eligible tax credits enacted as part of the IRA and places restrictions on continued receipt of tax credits by specified foreign entities and foreign influenced entities. The reduction, elimination or expiration of government incentives for, or regulations mandating the use of, as well as corporate commitments to the use of renewable energy and solar energy specifically could reduce demand for solar energy systems and harm our business, financial condition and results of operations.

Current wording

The reduction, elimination or expiration of government incentives for, or regulations mandating the use of, as well as corporate commitments to the use of renewable energy and solar energy specifically, could reduce demand for solar energy systems and harm our business, financial condition and results of operations.

Previous wording

Disruptions in Transportation and Supply Chain. Our costs are affected by the costs of certain components and materials, such as steel, motors and microchips, as well as tariffs and transportation costs. Current market conditions and international conflicts that constrain the supply of materials and disrupt the flow of materials from international vendors can impact the cost of our products and services, along with overall rates of inflation in the global economy and currently imposed tariff rates. We do not believe inflation has had a material impact on our results as presented in this report. However, such cost increases and decreases could impact our future operating margins, if material.

Current wording

Disruptions in Transportation and Supply Chain. Our costs are affected by the costs of certain components and materials, such as steel, motors and micro-chips, as well as transportation costs. Capacity constraints, particularly with regard to U.S. manufactured steel output, current market conditions, extreme adverse weather events and international conflicts may constrain the supply of materials and disrupt the flow of materials from international vendors, which could impact the cost of our products and services, along with overall rates of inflation in the global economy. For example, the war with Iran has led to recent increases in the price of oil which can affect transportation costs we are required to pay for delivery of materials to our customers that we may not be able to recover under the terms of our contracts. While inflation rates and certain costs have moderated recently, the overall level of various other costs, including fuel costs, continues to be elevated. Although we don't believe inflation has had a material impact on our results as presented in this report, such cost increases and decreases could impact our future operating margins, if material.

Previous wording

Megawatts ("MW") Produced and MW Shipped and Average Selling Price ("ASP"). The primary operating metrics we use to evaluate our sales performance and to track market acceptance of our products are the change in quantity of MW produced and MW shipped from period to period. MW are measured for each individual project and are calculated based on the expected output of that project once installed and fully operational. We also utilize metrics related to price and cost of goods sold per watt, including the change in ASP from period to period and cost per watt. ASP is calculated by dividing product and service revenue by total watts produced or shipped and product and service cost per watt is calculated by dividing product or service costs of revenue by total watts produced or shipped. These metrics enable us to evaluate trends in pricing, manufacturing and logistics costs and profitability. Events such as the COVID-19 pandemic, global inflation rates, tariffs, high interest rates and international conflicts have in the past impacted and may continue to impact the U.S. economy, global supply chains, and our business. These impacts can cause significant project development and shipping delays and cost increases, as well as offsetting ASP increases, and also raise the price of inputs like steel and logistics, affecting our cost per watt. Competitive tracker pricing pressures can also impact our ASP, and thus our profitability, by limiting our ability to raise prices to offset cost increases.

Current wording

Megawatts ("MW") Produced and MW Shipped and Average Selling Price ("ASP"). The primary operating metrics we use to evaluate our sales performance and to track market acceptance of our products are the change in quantity of MW produced and MW shipped from period to period. MW are measured for each individual project and are calculated based on the expected output of that project once installed and fully operational. We also utilize metrics related to price and cost of goods sold per watt, including the change in ASP from period to period and cost per watt. ASP is calculated by dividing product and service revenue by total watts produced or shipped and product and service cost per watt is calculated by dividing product or service costs of revenue by total watts produced or shipped. These metrics enable us to evaluate trends in pricing, manufacturing and logistics costs and profitability. Events such as the COVID-19 pandemic, global inflation rates, high interest rates and international conflicts have in the past impacted and may continue to impact the U.S. economy, global supply chains, and our business. These impacts can cause significant project development and shipping delays and cost increases, as well as offsetting ASP increases, and also raise the price of inputs like steel and logistics, affecting our cost per watt. Competitive tracker pricing pressures can also impact our ASP, and thus our profitability, by limiting our ability to raise prices to offset cost increases.

Previous wording

Investment in Technology and Personnel. We invest in both the people and technology behind our products. We intend to continue making investments in the technology for our products and expansion of our patent portfolio to attract and retain customers, expand the capabilities and scope of our products, and enhance user experience. As an example, in August 2023, we introduced SUNOPS, a cloud-based solar asset monitoring solution, allowing asset owners and managers to evaluate the operation and performance of their solar deployments. Additionally, in May 2024, we announced the launch of our Automated Hail Stow Solution, aimed at minimizing solar panel damage caused by hailstorms. This solution integrates advanced technology with meteorological data to automatically adjust the positioning of solar panels, reducing the risk of hail-related damage. In April 2025, we unveiled dual-row configuration for our Pioneer tracker that allows for higher East-West slope tolerance, increased power density and installation on more challenging terrains while minimizing site preparation expense and environmental impact and, more recently, we released our Pioneer+ High Wind tracker, engineered to withstand wind speeds up to 150 miles per hour and launched an automated 80° high angle stow capability for our 1P Pioneer tracker.

Current wording

Investment in Technology and Personnel. We invest in both the people and technology behind our products. We intend to continue making investments in the technology for our products and expansion of our patent portfolio to attract and retain customers, expand the capabilities and scope of our products, and enhance user experience. As an example, during 2025, we (i) introduced a dual row configuration for our 1P Pioneer tracker for improved slope tolerance and working with complex project landscapes, (ii) released our Pioneer+ High Wind tracker, which is engineered to withstand wind speeds up to 150 miles per hour, and (iii) launched an automated 80° high angle stow capability in our Pioneer trackers to provide improved protection in hail-prone regions.

Previous wording

Impact of Climate Change. Climate change has primarily impacted our business operations by increasing demand for solar power generation and, as a result, for use of our products. The U.S. Energy Information Administration, in its October 2025 Short-Term Energy Outlook, estimates that solar generation of electricity in 2026 will increase by 17% compared to 2025 and that renewables will account for 26% of U.S. electricity generation in 2026, compared to 24% in 2025.

Current wording

Impact of Climate Change. Climate change has primarily impacted our business operations by increasing demand for solar power generation and, as a result, for use of our products. The U.S. Energy Information Administration, in its January 2026 Short-Term Energy Outlook, estimates that solar generation will lead total electricity generation growth in 2026 and 2027, by increasing more than 20% each year, after increasing 33% in 2025.

Previous wording

While climate change has not resulted in any material negative impact to our operations to date, we recognize the risk of disruptions to our supply chain due to extreme weather events. This, among other things, has led us to expand the diversity of our supplier base and to partner with more local suppliers to reduce shipping and transportation needs. We are also increasingly partnering with larger-scale steel producers rather than smaller suppliers to facilitate scaling of our operations while remaining conscious of the environmental impacts of steel manufacturing as the regulatory landscape around these high-emitting industries evolves. An example of this strategy is our investment in Alpha Steel, a U.S.-based manufacturing partnership with a leading steel fabricator.

Current wording

While climate change has not resulted in any material negative impact to our operations to date, we recognize the risk of disruptions to our supply chain due to extreme weather events. This, among other things, has led us to expand the diversity of our supplier base and to partner with more local suppliers to reduce shipping and transportation needs. We are also increasingly partnering with larger scale steel producers rather than smaller suppliers to facilitate scaling of our operations while remaining conscious of the environmental impacts of steel manufacturing as the regulatory landscape around these high-emitting industries evolves. An example of this strategy is our acquisition of Alpha Steel.

Previous wording

The following discussion describes certain line items in our Condensed Consolidated Statements of Comprehensive Loss.

Current wording

The following discussion describes certain line items in our Condensed Consolidated Statements of Comprehensive Results of Operations.

Previous wording

We subcontract with third-party manufacturers to manufacture and deliver our products directly to our customers. Our product costs are affected by the underlying cost of raw materials procured by these contract manufacturers, including steel and aluminum; component costs, including electric motors and gearboxes; technological innovation in manufacturing processes; and our ability to achieve economies of scale resulting in lower component costs. We do not currently hedge against changes in the price of raw materials, but we continue to explore opportunities to mitigate the risks of foreign currency and commodity fluctuations through the use of hedges and foreign exchange lines of credit. Some of these costs, primarily for personnel, are not directly affected by sales volume.

Current wording

In certain cases, we subcontract with third-party manufacturers to manufacture and deliver our products directly to our customers, although with our acquisition of Alpha Steel, we now have the ability to manufacture and deliver certain products to our domestic customers seeking U.S.-based content. Our product costs are affected by the underlying cost of raw materials procured by Alpha Steel and our other contract manufacturing partners, including steel and aluminum; component costs, including electric motors and gearboxes; technological innovation in manufacturing processes; and our ability to achieve economies of scale resulting in lower component costs. We do not currently hedge against changes in the price of raw materials, but we continue to explore opportunities to mitigate the risks of foreign currency and commodity fluctuations through the use of hedges and foreign exchange lines of credit. Some of these costs, primarily personnel, are not directly affected by sales volume.

Previous wording

Although we continue to add new employees in certain areas, we have reduced our total headcount since the end of the third quarter of 2024, in response to project activity levels and process efficiencies we have gained due to our design-to-value and cost reduction efforts. Certain headcount changes also reflect a shift of our employee base to more cost-effective markets with exceptional talent. Our gross profit may vary period-to-period due to changes in our headcount, ASP, product costs, product versus service mix, customer mix, geographical mix, shipping methods, warranty costs and due to seasonal factors.

Current wording

During 2025, and for the three months ended March 31, 2026 and 2025, we added new employees in certain areas in response to current project activity levels. Certain of our headcount changes also reflect a shift of our employee base to more cost-effective markets with exceptional talent. Our gross profit may vary period-to-period due to changes in our headcount, ASP, product costs, product versus service mix, customer mix, geographical mix, shipping methods, warranty costs and seasonality.

Previous wording

The increase in product revenue for the three months ended September 30, 2025, as compared to the three months ended September 30, 2024, was primarily due to an increase of 320% in the amount of MW produced as activity has been positively impacted by recent project wins mainly associated with our 1P solar tracker solution. This was partially offset by a decrease of 36% in ASP for the three months ended September 30, 2025, resulting from project mix changes as compared to the three months ended September 30, 2024.

Current wording

The decrease in product revenue for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025, was primarily due to a decrease of 52% in the amount of MW produced due mainly to project size and timing. This was partially offset by an increase of 34% in ASP for the three months ended March 31, 2026, resulting from project mix changes as compared to the three months ended March 31, 2025.

Previous wording

The increase in service revenue for the three months ended September 30, 2025, as compared to the three months ended September 30, 2024, primarily resulted from (i) an increase of 82% in logistics activity levels and (ii) an increase of 20% in ASP as compared to the three months ended September 30, 2024 as a result of project size and pricing. This was partially offset by lower engineering consulting and software revenue during the three months ended September 30, 2025.

Current wording

The increase in service revenue for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025, primarily resulted from (i) an increase of 56% in logistics activity levels and (ii) an increase of 35% in ASP as compared to the three months ended March 31, 2025 as a result of project size and pricing.

Previous wording

Our gross margin percentage of revenue for the three months ended September 30, 2025 was a positive 6.1%, compared to a negative 42.5% for the three months ended September 30, 2024.

Current wording

Our gross margin percentage of revenue for the three months ended March 31, 2026 was a negative 7.1%, compared to a negative 16.6% for the three months ended March 31, 2025.

Previous wording

We had negative gross margin for the three months ended September 30, 2024 due to (i) the impact of lower revenue levels on our ability to cover certain overhead costs and (ii) insufficient service revenue to fully cover our warehousing costs.

Current wording

We had negative gross margin for the three months ended March 31, 2025 due to (i) the impact of low product revenue levels which were not sufficient to cover our direct costs and (ii) insufficient service revenue to fully cover our warehousing costs.

Previous wording

The decrease in research and development expenses for the three months ended September 30, 2025, as compared to the three months ended September 30, 2024, was primarily attributable to (i) lower payroll costs of $0.3 million, and (ii) lower facility rental and office costs of $0.1 million. This was partially offset by higher spending on lab and other research activities totaling $0.2 million. Research and development expenses as a percentage of revenue were 4.7% for the three months ended September 30, 2025, as compared to 14.5% for the three months ended September 30, 2024.

Current wording

The increase in research and development expenses for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025, was primarily attributable to (i) higher spending on lab and other research activities totaling $0.1 million. and (ii) higher stock-based compensation costs of $0.1 million due to recent grants of new awards. Research and development expenses as a percentage of revenue were 6.5% for the three months ended March 31, 2026, as compared to 4.4% for the three months ended March 31, 2025.

Previous wording

The decrease in selling and marketing expenses for the three months ended September 30, 2025, as compared to the three months ended September 30, 2024, was primarily attributable to (i) lower credit loss provisions of $0.4 million, associated primarily with charges for certain specific customer accounts recognized during the three months ended September 30, 2024, (ii) lower payroll costs of $0.2 million due to lower headcount levels, and (iii) lower professional services and stock-based compensation expense of $0.2 million. Selling and marketing costs as a percentage of revenue were 6.4% for the three months ended September 30, 2025, compared to 23.7% for the three months ended September 30, 2024.

Current wording

The increase in selling and marketing expenses for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025, was primarily attributable to (i) higher payroll costs of $0.2 million due to higher headcount levels, (ii) higher professional services and stock-based compensation expense of $0.2 million, (iii) higher credit loss provisions of $0.1 million, and (iv) increased travel. Selling and marketing costs as a percentage of revenue were 9.9% for the three months ended March 31, 2026, compared to 5.5% for the three months ended March 31, 2025.

Previous wording

The New Warrants (as defined below under "Outstanding debt and warrants") issued in connection with the Credit Agreement described further in Note 12, "Debt" in our Condensed Consolidated Financial Statements included in Part I, Item 1 of this Quarterly Report, were classified as a long-term liability. Due largely to an increase in the price of our common stock during the three months ended September 30, 2025, the fair value of the New Warrants increased from nearly $32.1 million at July 2, 2025 to more than $48.1 million as of September 30, 2025, resulting in recognition of a non-cash loss for the increase in value during the three months ended September 30, 2025.

Current wording

The New Warrants issued in connection with the Credit Agreement, as described further in Note 11, "Debt" in our Condensed Consolidated Financial Statements included in Part I, Item 1 of this Quarterly Report, are classified as a long-term liability. Due largely to a decrease in the price of our common stock during the three months ended March 31, 2026, the fair value of the New Warrants decreased from $74.5 million at December 31, 2025 to $25.8 million as of March 31, 2026, resulting in recognition of a non-cash gain during the three months ended March 31, 2026.

Previous wording

We have incurred cumulative losses since inception and have a history of cash outflows from operations, inclusive of $25.4 million in cash utilized in our operating activities during the nine months ended September 30, 2025. As of September 30, 2025, we had cash on hand of $24.4 million, $38.5 million of working capital and a stockholders' deficit of $13.7 million.

Current wording

We have incurred cumulative operating losses since inception and have a history of cash outflows from operations, inclusive of $12.8 million in cash utilized in our operating activities during the three months ended March 31, 2026. As of March 31, 2026, we had cash on hand of $5.6 million, $20.4 million of working capital and a stockholders' deficit of $6.1 million.

Previous wording

As of September 30, 2025, in addition to our cash on hand and working capital, we had approximately $13.75 million of capacity available for future sales of our common stock under our ATM program as defined and described further in Note 14, "ATM Program" in Part I, Item 1 of this Quarterly Report. There can be no assurance regarding the price at which we will be able to sell such shares, and any sales of our common stock under the ATM program may be at prices that result in additional dilution to our existing stockholders.

Current wording

As of March 31, 2026, in addition to our cash on hand and working capital, we had approximately $8.24 million of remaining capacity available for future sales of our common stock under an effective prospectus supplement to our at the market facility under the At the Market Offering Agreement dated May 1, 2025 (the "Sale Agreement") with H.C. Wainwright & Co. LLC, and the related prospectus covering the offering, issuance and sale of up to a maximum aggregate offering price of approximately $13.75 million of our common stock that may be sold under such At the Market Offering Agreement in at the market offerings (the "ATM program"), described further in Note 13, "ATM program" below. There can be no assurance regarding the price at which we will be able to sell such shares in the future, whether under the

Previous wording

Based on our cash position at September 30, 2025, and in view of our recent operating losses and financial performance, which could impact our ability to meet financial covenant requirements during the twelve months following issuance of this Quarterly Report, as well as the availability of additional financing provided by the Credit Agreement in the form of Second Delayed Draw Term Loans not being completely within our control, we have concluded that substantial doubt exists as to our ability to continue as a going concern within the next year.

Current wording

In view of the requirements for quarterly cash interest payments and certain specified principal payments under the Credit Agreement (including the required prepayments summarized above) and principal and interest payments for the Acquisition Notes, as well as our history of operating losses and cash outflows, and considering that the availability of additional financing provided by the Credit Agreement in the form of Second Delayed Draw Term Loans is not completely within our control, we believe these factors create uncertainty as to our ability to fully meet the financial covenant requirements under the Credit Agreement during the twelve months following issuance of this Quarterly Report. Therefore, we have concluded that substantial doubt exists as to our ability to continue as a going concern within the next year.

Previous wording

Our ability to meet our liquidity needs over the next year is dependent upon (i) our cash on hand (subject to a $20.0 million minimum unrestricted cash covenant under the Credit Agreement effective for the quarter ended December 31, 2025) and our compliance with the other financial covenants under the Credit Agreement (such minimum cash covenant and the other financial covenants under the Credit Agreement as described further in Note 12, "Debt" in Part I, Item 1 of this Quarterly Report)), (ii) our expectations of increased project activity and cash flow during the twelve-month period following issuance of these Condensed Consolidated Financial Statements, (iii) the availability of additional proceeds in the form of Second Delayed Draw Term Loans that may be requested by the Company and approved by the Lenders in their sole discretion, and (iv) utilization, as appropriate, of the capacity available for future sales of our common stock under the ATM program. In addition, we continue to remain focused on implementing additional cost savings steps, which could impact, among other things, the location of our headcount and the level of services currently provided by third parties.

Current wording

Our ability to meet our liquidity needs over the next year is dependent upon (i) our cash on hand (subject to (x) required principal repayments of $2.5 million and $5.0 million during May 2026 and September 2026, respectively, under the Credit Agreement, as well as principal and interest payments due for the Acquisition Notes, and (y) a $15.0 million minimum unrestricted cash covenant under the Credit Agreement effective for the quarter ending June 30, 2026 and as further reduced by required principal repayments under the Credit Agreement thereafter) and our compliance with the financial covenants under the Credit Agreement, (ii) our current expectations of increased project activity and cash flow during the twelve-month period following issuance of our consolidated financial statements, (iii) the availability of additional proceeds in the form of Second Delayed Draw Term Loans that may be requested by the Company, subject to approval by the Lenders in their sole discretion, (iv) utilization, as appropriate, of the capacity available for future sales of our common stock under the ATM program, and (v) if we determine necessary, our ability to raise additional capital through other securities offerings. In addition, we continue to remain focused on implementing additional cost savings steps, which could impact, among other things, the location of our headcount and the level of services currently provided by third parties.

Previous wording

Original Credit Agreement as amended by the First Amendment, the "Credit Agreement") to amend certain of the financial covenants applicable to us and in connection with our agreement to acquire 100% of the membership interests of Alpha Steel. The Credit Agreement provides for a senior secured term facility of up to $75 million, consisting of (i) $14.3 million principal amount of Initial Term Loans that were funded on the Closing Date, (ii) $23.2 million principal amount of First Delayed Draw Term Loans that were funded on September 19, 2025, and (iii) up to $37.5 million principal amount of Second Delayed Draw Term Loans that may be requested by the Company and approved by the Lenders in their sole discretion (collectively, with the Initial Term Loans and the First Delayed Draw Term Loans, the "Term Loans"). The Term Loans currently outstanding mature on July 2, 2029.

Current wording

The Credit Agreement provides for a senior secured term facility of up to $75 million, consisting of (i) Initial Term Loans and First Delayed Draw Term Loans (both as defined in the Credit Agreement) that were funded during 2025 in an aggregate principal amount of $37.5 million, and (ii) up to $37.5 million principal amount of Second Delayed Draw Term Loans (as defined in the Credit Agreement) that may be requested by the Company and approved by the Lenders in their sole discretion (collectively, with the Initial Term Loans and the First Delayed Draw Term Loans, the "Term Loans"). The Term Loans currently outstanding mature on July 2, 2029.

Previous wording

The funding of the First Delayed Draw Term Loans occurred following the approval by the Company's stockholders on September 4, 2025, in accordance with Nasdaq Listing Rule 5635(d), of the issuance of an aggregate 6,836,237 shares of our common stock issuable upon exercise of certain warrants (the "New Warrants") granted to the Lenders on the Closing Date, in excess of certain caps that were applicable to the exercise of New Warrants in the absence of such Company stockholder approval. The New Warrants are (i) exercisable at any time through July 2, 2035, at an exercise price of $0.01 per share, (ii) accounted for as a long-term liability, based on terms that could require cash settlement upon the occurrence of a contingent change in control event, and (iii) were valued at approximately $32.1 million in aggregate on the grant date.

Current wording

Upon entering into the Credit Agreement, we also issued warrants (the "New Warrants") to the Lenders for an aggregate 6,836,237 shares of our common stock. The New Warrants are (i) exercisable at any time through July 2, 2035, at an exercise price of $0.01 per share, and (ii) accounted for as a long-term liability, based on terms that could require cash settlement upon the occurrence of a contingent change in control event.

Previous wording

The Term Loans bear interest at 12.00% per annum. A portion of the interest equal to 7.00% per annum is being capitalized and added as paid-in-kind interest and will increase the outstanding principal amount of the Term Loans. The remainder of the interest will be paid in cash at the end of each fiscal quarter. Upon the occurrence and during the continuation of certain events of default under the Credit Agreement ("Events of Default") or upon the election of certain required Lenders during the occurrence and continuation of any Event of

Current wording

The Term Loans bear interest at 12.00% per annum. A portion of the interest equal to 7.00% per annum is being capitalized and added as paid-in-kind interest and will increase the outstanding principal amount of the Term Loans. The remainder of the interest will be paid in cash at the end of each fiscal quarter. Upon the occurrence and during the continuation of certain events of default under the Credit Agreement ("Events of Default") or upon the election of certain required Lenders during the occurrence and continuation of any Event of Default, the interest rate applicable to the Term Loans will be increased by a 7.00% default interest rate, which would be capitalized and added to the principal amount of the debt.

Previous wording

The Credit Agreement provides for the mandatory prepayment of the indebtedness and other obligations outstanding under the Credit Agreement and other applicable loan documents upon the occurrence of certain events (including in connection with a change in control of the Company) and upon acceleration following an Event of Default (an "Exit Fee Event"). If an Exit Fee Event occurs, the Company shall pay an exit fee (the "Exit Fee") equal to (x) the aggregate amount of all Term Loans extended by the Lenders under the Credit Agreement, multiplied by (y) the Exit Fee Percentage, minus (z) the amount of interest paid in cash by the Company prior to the Exit Fee Event, where the "Exit Fee Percentage" equals 25% in connection with a change of control transaction, or otherwise equals 50%.

Current wording

In addition to the required principal payments under the Second Amendment, the Credit Agreement also provides for the mandatory prepayment of the indebtedness and other obligations outstanding under the Credit Agreement and other applicable loan documents upon the occurrence of certain events (including in connection with a change in control of the Company) and upon acceleration following an Event of Default (an "Exit Fee Event"). If an Exit Fee Event occurs, the Company shall pay an exit fee (the "Exit Fee") equal to (x) the aggregate amount of all Term Loans extended by the Lenders under the Credit Agreement, multiplied by (y) the Exit Fee Percentage, minus (z) the amount of interest paid in cash by the Company prior to the Exit Fee Event, where the "Exit Fee Percentage" equals 25% in connection with a change of control transaction, or otherwise equals 50%.

Previous wording

The Credit Agreement contains a minimum unrestricted cash covenant and financial covenants relating to minimum revenue-, product margin-, EBITDA- and purchase order-related targets. The minimum unrestricted cash covenant first applied to the Company for the quarter ending September 30, 2025, and was successfully met. The Company is further required to have an aggregate balance of unrestricted cash of $20.0 million as of December 31, 2025, March 31, 2026, June 30, 2026 and the last day of each quarter thereafter. Additionally, the Company is required to comply with a minimum quarterly revenue target for each three-month period beginning with the quarter ending December 31, 2025, with a $30.0 million quarterly revenue target for the quarter ending December 31, 2025, a $40.0 million quarterly revenue target for the quarter ending March 31, 2026, a $60.0 million quarterly revenue target for the quarter ending June 30, 2026, a $70.0 million quarterly revenue target for the quarter ending September 30, 2026, and an $80.0 million quarterly revenue target for the quarter ending December 31, 2026, and for each fiscal quarter thereafter. Commencing with the fiscal quarter ending March 31, 2026, the Company’s direct tracker margin must exceed certain thresholds for each fiscal quarter. The Company’s consolidated EBITDA also is required to be at least $25.0 million for each twelve consecutive months ending on the last day of the fiscal year, beginning on December 31, 2026. Lastly, the financial covenants include a requirement that the amounts due to the Company under new purchase orders meet certain thresholds.

Current wording

Additionally, the Company’s direct tracker margin must exceed certain thresholds for each fiscal quarter, beginning with the fiscal quarter ended March 31, 2026, and the financial covenants also include a requirement that the amounts due to the Company under new purchase orders must meet certain thresholds beginning with the fiscal quarter ending March 31, 2027.

Previous wording

At September 30, 2025, the Company was in compliance with all financial covenants under the Credit Agreement applicable to the Company as of September 30, 2025.

Current wording

At March 31, 2026, the Company was in compliance with all applicable financial covenants under the Credit Agreement.

Previous wording

On December 4, 2024, we entered into a Securities Purchase Agreement (the “Purchase Agreement”) with an institutional investor as the purchaser under the Purchase Agreement (the “Investor”). Pursuant to the Purchase Agreement, we sold, and the Investor purchased, $15.0 million in principal amount of senior secured promissory notes (the “Senior Notes”) and warrants exercisable for 1,750,000 shares of our common stock (the “ Original Warrants”) (the “Offering”). After inclusion of paid-in-kind interest, the principal balance of the Senior Notes was $16.1 million as of July 2, 2025, and these notes were secured by substantially all of our assets.

Current wording

On December 4, 2024, we entered into a Securities Purchase Agreement (the “Purchase Agreement”) with an institutional investor as the purchaser under the Purchase Agreement (the “Investor”). Pursuant to the Purchase Agreement, we sold, and the Investor purchased, $15.0 million in principal amount of senior secured promissory notes (the “Senior Notes”) and warrants exercisable for 1,750,000 shares of our common stock (the “ Original Warrants”) (the “Offering”).

Previous wording

The Original Warrants issued in the Offering were exercised on June 30, 2025 at an exercise price of $0.10 per share, in return for the issuance of 1,750,000 shares of our common stock. We had previously determined liability classification for the Original Warrants was required based on terms that could require cash settlement upon the occurrence of a contingent change in control event. As a result, the Original Warrants were revalued to current fair value at the date of exercise with the offsetting amount reported in our Condensed Consolidated Statements of Comprehensive Loss.

Current wording

The Original Warrants issued in the Offering were exercised on June 30, 2025 at an exercise price of $0.10 per share, in return for the issuance of 1,750,000 shares of our common stock. We had previously determined liability classification for the Original Warrants was required based on terms that could require cash settlement upon the occurrence of a contingent change in control event.

Previous wording

Also, in connection with the Credit Agreement and the Subordination Agreement, the Company and Investor entered into an Amended and Restated Promissory Note, dated July 2, 2025 (the “A&R Promissory Note”). The A&R Promissory Note amends and restates the original Senior Notes to remove the seniority terms of those notes, conform the original Senior Notes to the terms of the Credit Agreement and the Subordination Agreement, amend certain prepayment and make-whole terms under the original Senior Notes, delete certain covenants and event of default terms, reduce the interest rate under the original Senior Notes to 5% per annum paid in cash and 7% per annum paid in kind, both on the final business day of June and December in each year, and to delete the financial covenants set forth in the original Senior Notes. As a result of an amendment to the Purchase Agreement entered into on July 2, 2025 (the "Purchase Agreement

Current wording

Also, in connection with the Credit Agreement and the Subordination Agreement, the Company and Investor entered into an Amended and Restated Promissory Note, dated July 2, 2025 (the “A&R Promissory Note”). The A&R Promissory Note amends and restates the original Senior Notes to remove the seniority terms of those notes, conform the original Senior Notes to the terms of the Credit Agreement and the Subordination Agreement, amend certain prepayment and make-whole terms under the original Senior Notes, delete certain covenants and event of default terms, reduce the interest rate under the original Senior Notes to 5% per annum paid in cash and 7% per annum paid in kind, both on the final business day of June and December in each year, and to delete the financial covenants set forth in the original Senior Notes. As a result of an amendment to the Purchase Agreement entered into on July 2, 2025 (the "Purchase Agreement Amendment"), among other things, the Investor agreed to release all liens and guarantees securing the obligations under the Senior Notes, the Purchase Agreement, and the A&R Promissory Note. The A&R Promissory Note also (i) provides for additional interest to be capitalized and added to the principal amount of the debt at a rate of 5% per annum upon the occurrence and continuation of certain events of default and (ii) matures on January 2, 2030.

Previous wording

During the nine months ended September 30, 2025, we used approximately $19.0 million of cash to fund a portion of our current period expenditures for personnel and facilities, legal and professional fees, insurance, research and development and various other operating activities. This compares to approximately $26.3 million used during the nine months ended September 30, 2024, also to fund a portion of our prior period expenditures for various operating activities as described above.

Current wording

During the three months ended March 31, 2026, we used approximately $8.1 million of cash to fund a portion of our current period expenditures for personnel and facilities, legal and professional fees, insurance, research and development and various other operating activities. This compares to approximately $8.4 million used during the three months ended March 31, 2025, also to fund a portion of our prior period expenditures for various operating activities as described above.

Previous wording

During the nine months ended September 30, 2025 and 2024, we used approximately $6.4 million and generated $8.3 million of cash, respectively, primarily from changes in working capital, mainly related to timing of customer receipts and vendor payments and changes in activity levels.

Current wording

During the three months ended March 31, 2026, we used approximately $4.7 million primarily from changes in working capital, mainly related to timing of customer receipts and vendor payments and changes in activity levels.

Previous wording

During the nine months ended September 30, 2025, we received a $3.2 million contingent earnout payment in connection with the June 2021 sale of our equity interest in Dimension, as well as a small earnout payment from the sale of our Atlas software platform in 2024. We also had capital expenditures of approximately $0.8 million, primarily for tooling, new computer and IT equipment and capitalized software costs.

Current wording

During the three months ended March 31, 2026, we had capital expenditures of approximately $0.3 million, primarily for tooling and new computer and IT equipment.

Previous wording

Preparation of condensed consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities at the date of the financial statements, and the reported revenue and expenses during the period. Estimates are used for calculating the measure of progress of our solar tracker projects and deriving the standalone selling prices of the individual performance obligations when determining amounts to recognize for revenue, estimating allowances for credit losses and slow-moving and obsolete inventory, determining useful lives of long-lived assets and the estimated fair value of those assets for impairment assessments, and estimating the fair value of investments, warrants, stock compensation awards, warranty liabilities and federal and state taxes, including tax valuation allowances, as well as other contingencies. We base our estimates on historical experience and anticipated results, trends, and various other assumptions that we believe are reasonable under the circumstances, including assumptions as to future events. Actual results could differ from those estimates due to risks and uncertainties.

Current wording

Preparation of consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities at the date of the financial statements, and the reported revenue and expenses during the period. Estimates are used for calculating the measure of progress of our solar tracker projects and deriving the standalone selling prices of the individual performance obligations when determining amounts to recognize for revenue, estimating allowances for credit losses and slow-moving and obsolete inventory, determining useful lives of long-lived assets and the estimated fair value of those assets for impairment assessments, and estimating the fair value of assets and liabilities acquired in business combinations, investments, warrants, stock compensation awards, warranty liabilities and federal and state taxes, including tax valuation allowances, as well as other contingencies. We base our estimates on historical experience and anticipated results, trends, and various other assumptions that we believe are reasonable under the circumstances, including assumptions as to future events. Actual results could differ from those estimates due to risks and uncertainties.

Previous wording

The timing and amounts of revenue and cost of revenue recognition, as well as recording of related receivables and deferred revenue, is highly dependent on our identification of performance obligations in each contract and our estimates by contract of total project cost and our progress toward project completion as of each period end. Certain estimates are subject to factors outside of our control that may impact our suppliers and the global supply chain. As an example, we began to experience increases in steel prices and shipping and logistics costs, as well as delays in delivery of our products to customers during 2021, which negatively impacted our results of operations as we were not able to recover all of the additional costs under certain of our fixed fee contracts. In addition, regulatory, tariff and import concerns such as those caused by the UFLPA and an AD/CVD investigation begun in April 2022 by the U.S. Department of Commerce in response to a petition by Auxin Solar, Inc. have in the past, and may continue to, affect our ability to obtain project materials and may delay the timing of customer project activity which has had in the past, and may continue to have, an adverse impact on our results of operations, including the expected timing of the recognition of revenue needed to cover our relatively fixed overhead costs. Further information on recent developments with tariffs may be found under "Key Factors Affecting Our Performance" above. We base our estimates on the best information available at each period end, but future events and their effects cannot be determined with certainty, and actual results could differ materially from our assumptions and estimates.

Current wording

The timing and amounts of revenue and cost of revenue recognition, as well as recording of related receivables and deferred revenue, is highly dependent on our identification of performance obligations in each contract and our estimates by contract of total project cost and our progress toward project completion as of each period end. Certain estimates are subject to factors outside of our control that may impact our suppliers, our costs and the global supply chain. As an example, as described further in "Key Factors Affecting Our Performance" above, we are impacted by (i) changes in project timing by customers, (ii) government regulations, (iii) increases in tariffs, and (iv) disruptions in transportation and supply chains, including the impact of changes in the cost of transportation due to changes in fuel prices as a result of international conflicts or other market disruptions. We base our estimates on the best information available at each period end, but future events and their effects cannot be determined with certainty, and actual results could differ materially from our assumptions and estimates.

Previous wording

Adjustments to the allowance are largely dependent on historical experience involving amounts previously collected from our customers in recent years or based on specific changes in a customer's ability to pay. As an example, during the nine months ended September 30, 2025, we recognized additional credit loss provisions of $0.6 million compared to $1.3 million recognized during the nine months ended September 30, 2024, with the change primarily related to our assessments in both 2025 and 2024 as to the ability by certain specific customers to fully pay contractual amounts owed us. Historical experience, when used in making such adjustments, may not reflect current actual experience.

Current wording

Adjustments to the allowance are largely dependent on historical experience involving amounts previously collected from our customers in recent years or based on specific changes in a customer's ability to pay. As an example, during the years ended December 31, 2025 and 2024, we recognized additional credit loss provisions of nearly $1.4 million and $2.1 million, respectively, related to our assessments in each year as to the ability by certain specific customers to fully pay contractual amounts owed us. Historical experience, when used in making such adjustments, may not reflect current actual experience.

Previous wording

Expected Term: The expected term represents the period that the Company’s stock-based awards and Warrants are expected to be outstanding and is calculated for option grants as the average of the option vesting and contractual terms, based on the simplified method, as we do not have sufficient historical exercise data to provide a reasonable basis upon which to estimate the expected term for options granted. The simplified method deems the term to be the average of the time-to-vesting and the contractual life of the options. The contractual life of an option may be up to 10 years. Monte Carlo simulations, as described below, estimate the derived service period of awards with market conditions.

Current wording

Expected Term: The expected term represents the period that the Company’s stock-based awards and warrants are expected to be outstanding and is calculated for option grants as the average of the option vesting and contractual terms, based on the simplified method, when we did not have sufficient historical exercise data to provide a reasonable basis upon which to estimate the expected term for options at the dates granted. The simplified method deems the term to be the average of the time-to-vesting and the contractual life of the options. The contractual life of an option may be up to 10 years. Monte Carlo simulations, as described below, estimate the derived service period of awards with market conditions.

Showing the first 40 of 47 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

In 2019, 90% of our supply chain was sourced from China. As of March 31, 2026, we have qualified suppliers outside of China for certain of our commodities and we continue to work to have second-source capability for all Chinese-manufactured components to help reduce the extent to which our supply chain for U.S.-based projects is subject to existing tariffs and to be able to quickly address potential future regulatory and governmental policy changes. We have entered into partnerships with manufacturers based in the United States, India, South Africa, Spain, Turkey, Thailand and Vietnam to diversify our supply chain and optimize costs.

Current report — wording carried from elsewhere

On July 4, 2025, President Trump signed into law the One Big Beautiful Bill Act, which accelerates the phase-outs and terminations of various eligible federal tax credits enacted as part of the IRA.

Current report — wording carried from elsewhere

ATM program or other securities offerings, and any sales of our common stock under the ATM program or other securities offerings may be at prices that result in additional dilution to our existing stockholders.
Rearranged previous paragraphs (4)

Previous report — wording carried elsewhere

Loss from change in fair value of warrant liability

Previous report — wording carried elsewhere

On July 2, 2025, we entered into the Credit Agreement which provides for a senior secured term facility of up to $75 million, consisting of (i) $14.3 million principal amount of Initial Term Loans that were funded on the Closing Date, (ii) $23.2 million principal amount of First Delayed Draw Term Loans that were funded on September 19, 2025, and (iii) up to $37.5 million principal amount of Second Delayed Draw Term Loans that may be requested by the Company and approved by the Lenders in their sole discretion. The Term Loans currently outstanding mature on July 2, 2029.

Previous report — wording carried elsewhere

Default, the interest rate applicable to the Term Loans will be increased by a 7.00% default interest rate, which would be capitalized and added to the principal amount of the debt.

Previous report — wording carried elsewhere

Amendment"), among other things, the Investor agreed to release all liens and guarantees securing the obligations under the Senior Notes, the Purchase Agreement, and the A&R Promissory Note. The A&R Promissory Note also (i) provides for additional interest to be capitalized and added to the principal amount of the debt at a rate of 5% per annum upon the occurrence and continuation of certain events of default and (ii) matures on January 2, 2030.