PORTLAND GENERAL ELECTRIC CO /OR/
For the period ended Mar 31, 2026. Filed May 1, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2026 · Filed May 1, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-09-30; filed 2025-10-31.
0000784977-25-000172
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-03-31; filed 2026-05-01.
0001193125-26-197978
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 272 previous paragraphs and 265 current paragraphs.
90 unchanged; 122 reworded; 46 added; 48 removed; 12 previous and 7 current paragraphs rearranged.
Tables are not compared: 21 previous and 20 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (46)
Current report
demand uncertainty and changing customer preferences and choices that may reduce demand for PGE's services or alter usage patterns, including variability in demand driven by weather variations, reduced consumption or load shifting resulting from energy efficiency measures or other changes in customer behavior, increased adoption of distributed and renewable generation, and an increased likelihood that customers procure electricity from alternative service providers such as registered Electricity Service Suppliers (ESSs) or through community choice aggregation programs;
Current report
uncertainties associated with the proposed Acquisition, including but not limited to, the expected closing of the proposed transaction and the timing thereof, the financing of the proposed transaction, strategies and plans, opportunities and anticipated future performance and capital structure, and expected accretion to earnings per share and free cash flow.
Current report
PGE's corporate strategy places customers at the center of everything the Company does. PGE supports energizing lives, strengthening communities, and driving advancement in energy to promote social, economic, and environmental progress. With a focus on affordability, the Company continuously innovates, streamlines, and manages costs to deliver exceptional experiences for its customers. The Company is committed to delivering steady growth and returns to shareholders. The Company is building an increasingly smart, integrated, and interconnected grid that spans from residential customers to other utilities within the region.
Current report
Decarbonize Power—make progress toward customer-driven clean energy goals by continuing to add new renewable resources and products to the Company's energy mix;
Current report
Electrify the Economy—power the lives of approximately two million residents in its service territory by supporting the region’s economic growth industries and capturing the benefits of new technologies while serving approximately two-thirds of Oregon’s commercial and industrial activity; and
Current report
Advance Performance—continue to build a safer and more reliable grid by accelerating cost-effective grid investments and modernizing transmission.
Current report
Pending Acquisition
Current report
On February 15, 2026, PGE, through a newly formed, wholly-owned subsidiary, entered into an agreement (the “Agreement”) with PacifiCorp, an indirect subsidiary of Berkshire Hathaway Energy Company, to acquire select Washington state generation, transmission, and electric utility operations for $1.9 billion. The Acquisition would enable PGE to extend its service to approximately 140,000 Washington customers.
Current report
Under the Agreement, if the Acquisition is completed, PGE will acquire three generation facilities: the Chehalis thermal plant (477 MW), the Goodnoe Hills wind facility (94 MW), and the Marengo I and II wind facilities (234 MW). The Acquisition would also include 4,500 miles of transmission and distribution lines, and local utility operations across approximately 2,700 square miles.
Current report
PGE intends to manage the Washington operations as a separate company through a newly created subsidiary to be regulated by the Washington Utilities and Transportation Commission. PGE intends to retain current Washington employees and honor existing labor agreements. PGE corporate functions are expected to provide shared support for both Washington and Oregon companies.
Current report
The Acquisition is designed with the goal that Washington and Oregon customers would not be impacted by costs associated with executing the acquisition and transaction financing. PGE expects the Acquisition and state and federal regulatory reviews to close in approximately twelve months following the submission of regulatory applications. Regulatory applications were submitted to the WUTC and the OPUC on March 30, 2026 and April 2, 2026, respectively.
Current report
Central to this Acquisition is PGE’s plan to enter into a joint venture with Manulife Infrastructure Fund III, L.P. and its affiliates, including John Hancock Life Insurance Company (U.S.A.), which will collectively be a minority owner of the
Current report
Washington utility business. PGE would remain majority owner and sole operator.
Current report
For more information regarding PGE’s plans to fund its future capital requirements, including this proposed Acquisition, see “Liquidity” in the Liquidity and Capital Resources section of this Item 2. See"Pending Acquisition" in Note 1, Basis of Presentation, in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements” for additional information on the pending acquisition.
Current report
After a robust and competitive bidding, repricing, and negotiating process as part of the 2023 RFP, PGE has entered into agreements to construct two solar and battery hybrid projects for a total of 615 MW:
Current report
Biglow Optimization—PGE entered into an agreement to construct a 125 MW solar facility and a 125 MW BESS in Sherman County, Oregon. PGE will own the resource with an investment of approximately $540 million, excluding AFUDC. The project has an estimated commercial operation date at the end of 2027.
Current report
Wheatridge Expansion—PGE and NextEra Energy, Inc. entered into agreements to construct a 240 MW solar facility and a 125 MW BESS facility, located in Morrow County, Oregon. PGE will own 110 MW of solar and 65 MW of BESS production capacity with an investment of approximately $490 million, excluding AFUDC. NextEra Energy, Inc. will operate the facility, own the remaining 130 MW of solar and 60 MW of BESS production capacity and sell their portion of the output to PGE under a 30-year PPA. The project has an estimated commercial operation date at the end of 2027.
Current report
Additional Procurement Activities
Current report
PGE has entered into the following agreements in addition to the Company’s 2023 RFP:
Current report
Meadowlark BESS—a 20-year storage capacity agreement for a 200 MW BESS located in Washington County, Oregon. This project will be owned by Copenhagen Infrastructure Partners, LLC and has an estimated commercial operation date at the end of 2027.
Current report
Nottingham BESS—a 20-year storage capacity agreement for a 200 MW BESS located in Washington County, Oregon. This project has an estimated commercial operation date in 2028, pending OPUC approval of the requested waiver of the competitive bidding rules.
Current report
The proposals for renewable resources provide various combinations of wind, solar and battery storage options that include storage capacity and PPAs along with Company-owned resources via Build Transfer Agreements (BTA). The proposals for non-emitting dispatchable capacity resources provide battery storage options that include PPAs along with Company-owned resources via BTAs.
Current report
PGE is proceeding to commercial negotiations with projects on the final shortlist, prioritizing those that include renewable generation and that have a viable pathway to achieve commercial operations earlier in the 2028 - 2030 eligibility period. The ultimate outcome of the RFP process may involve the selection of multiple projects for both renewable and non-emitting dispatchable capacity resources, which PGE expects will be approximately 2,500 MWs in total.
Current report
Grid Enhancing Technologies (GETs)—Limited network upgrades or non-wires solutions are important strategies that offer incremental improvements and can unlock capacity on existing transmission paths in the region. GETs include advanced conductors and coatings, topological optimization, and dynamic line ratings. PGE is actively incorporating GETs across its system to further increase the performance of new and existing transmission assets. These efforts, when deployed across a number of areas and assets, have the potential to add incremental capacity to the grid at lower costs.
Current report
The Company has a 20% ownership share in Colstrip and has fully depreciated it as of December 31, 2025. Any capital spending after 2025 is expected to be fully depreciated within the year of spending. The forecasted annual revenue requirement for Colstrip, including depreciation, is updated annually in a separate, supplemental tariff and recovery of power cost related items is sought annually under the AUT. In order to meet PGE’s regulatory, legislative, and reliability requirements, the Company continues to evaluate its ongoing ownership in Colstrip. See Note 8, Contingencies, in the
Current report
PGE believes it met the RPS threshold for 2025 and is on track to meet the threshold during 2026. The Company plans to submit its RPS report for 2025 by June 1, 2026.
Current report
As of the date of this filing, the OPUC proceeding remains in the evidentiary phase. Written testimony has been submitted, and the OPUC is continuing to compile additional filings and public input. Based on the current procedural schedule, a hearing is set for June 2026 and the OPUC is targeting an Order date of August 25, 2026.
Current report
After application of adjustments per the final order, PGE's deferred balance as of March 31, 2026, related to RCEs was $80 million, which includes $78 million related to RCEs deferred in 2024 and $2 million related to RCEs deferred in 2025. The Company expects to file the PCAM for 2025 no later than July 1, 2026. PGE believes the deferred amounts as of March 31, 2026 are probable of recovery.
Current report
Distribution System Plan recovery mechanism—On December 23, 2025, PGE and certain intervening parties submitted a stipulation to the OPUC reflecting an agreement that resolves all issues, with the exception of the application of an earnings test as proposed by intervening parties, in PGE's request for recovery in UE 459 related to the Company’s DSP Alternative Recovery Mechanism (ARM). The settlement and submitted stipulation were supported by an MOU entered into between PGE and key regulatory stakeholders. The MOU limited the scope of the ARM to specific capital investments included in the DSP docket (UM 2362) filed in December 2024, which enable network modernization, reliable customer service, and integration of clean energy and distributed energy resources.
Current report
Primary components of the stipulation include:
Current report
9.34% ROE per the MOU reflecting PGE's latest rate case;
Current report
Of the $15 million of revenue requirement adjustments, approximately 87% are temporary in nature, allowing PGE to seek recovery of associated investments as applicable in its next GRC. These adjustments are driven primarily by non-distribution investments and are not attributable to specific assets. Per the previously noted MOU reached with stakeholders, the earliest possible rate effective date of PGE's next GRC would be May 1, 2027.
Current report
The OPUC's final order in Docket UE 459, issued on March 11, 2026, approved the terms of the stipulation, which were reflected in customer prices effective April 1, 2026. The Company has contested the applicability of an earnings test and in addition has not accrued any refunds, as it currently does not forecast to over earn for the period covered by the test.
Current report
Residential Exchange Program—The Pacific Northwest Electric Power Planning and Conservation Act, passed by Congress in 1980 (Northwest Power Act), established the Residential Exchange Program to ensure that residential and small farm electric customers of investor-owned utilities (IOUs) in the Pacific Northwest benefit from low-cost, federally-owned power marketed by the Bonneville Power Administration (BPA). Customers of both investor-owned and customer-owned utilities have received those benefits for over 40 years. In 2012, BPA approved a settlement agreement that established fixed customer benefits through October 2028. BPA's recent modeling indicates that these benefits for IOUs could be substantially reduced after the current settlement agreement expires. The modeling suggests a potential reduction of approximately 55%. Because IOUs pass these benefits directly to eligible customers as bill credits, such a reduction would increase residential and small farm customers' bills by an estimated average of 4%. On April 24, 2026, PGE joined several other utilities in filing a petition for review in the Ninth Circuit Court of Appeals against BPA, seeking to prevent BPA from violating the Northwest Power Act and depriving eligible IOU customers of the benefits of low-cost BPA hydropower to which they are entitled.
Current report
The estimated impact of weather is based on various model assumptions related to temperature and customer response. Weather-adjusted estimates may not fully reflect the impacts of extreme weather variations and deviations in customer behavior to such extremes.
Current report
Total retail energy deliveries for the three months ended March 31, 2026 were similar to the three months ended March 31, 2025. While industrial deliveries increased, declines occurred in both the residential and commercial categories.
Current report
Generation, transmission and distribution remained materially unchanged for the three months ended March 31, 2026 compared to the same period in 2025 (in millions):
Current report
Administrative and other increased $10 million or 10% for the three months ended March 31, 2026 compared to the same period in 2025 (in millions):
Current report
Interest expense, net increased $4 million or 7% in the three months ended March 31, 2026 compared to the same period in 2025. The increase was primarily due to $3 million related to business transformation and optimization.
Current report
Income tax expense decreased $13 million or 59% in the three months ended March 31, 2026 compared to the same period in 2025, primarily driven by lower pre-tax income offset by lower PTC benefits.
Showing the first 40 of 46 passages. Open the source sections for the rest.
Removed paragraphs (48)
Previous report
•changing customer expectations and choices that may reduce customer demand for PGE’s services may impact the Company’s ability to make and recover its investments through prices and earn its authorized return on equity, including the impact of growing distributed and renewable generation resources, changing customer demand for enhanced electric services, and an increasing risk that customers procure electricity from Electricity Service Suppliers (ESSs) or the adoption of community choice aggregation;
Previous report
•Decarbonize Power—Reduce GHG emissions associated with electricity served to retail customers by at least 80% by 2030 and 100% by 2040;
Previous report
•Electrify the Economy—Increase beneficial electricity use to capture the benefits of new technologies while building an increasingly clean, flexible, and reliable grid; and
Previous report
•Advance Performance—Improve safety, efficiency, and system and equipment reliability while maintaining affordable energy service and growing earnings per share 5% to 7% annually.
Previous report
Throughout the remainder of 2023, PGE refreshed its forecasts, first in an Addendum filed in July 2023, in OPUC Docket LC 80, then several times in subsequent comments provided to the OPUC. On January 25, 2024, the OPUC acknowledged PGE’s IRP, subject to certain conditions, providing regulatory support for the Company to pursue the near-term resource additions articulated in the Action Plan. The OPUC declined to acknowledge the CEP, directing the Company in Order 24-096 to revise and resubmit certain elements of the CEP with its next CEP/IRP Update.
Previous report
On June 18, 2025, PGE submitted a CEP/IRP Update to the OPUC. The Update addresses specific inputs that may have changed since the most recent IRP was acknowledged, without attempting to fully revise the IRP. This CEP/IRP Update refreshes the analysis filed with the 2023 CEP/IRP and provides status reports on actions and requirements from Order 24-096.
Previous report
Pursuant to the 2021 All-Source RFP process, which sought approximately 1,000 MW of renewable resources and non-emitting dispatchable capacity, PGE entered into agreements to acquire resources as follows:
Previous report
•Clearwater—PGE owns 208 MW of production capacity of the wind facility, located in Eastern Montana. Subsidiaries of NextEra Energy Resources, LLC, which operates the facility, owns the remaining 103 MW of production capacity and sells their portion of the output to PGE under a 30-year PPA.
Previous report
•Seaside Grid—The 200 MW Battery Energy Storage System (BESS) facility, located in Portland, Oregon was placed in service on July 8, 2025 and is owned by PGE.
Previous report
•Constable BESS (formerly Evergreen)—The 75 MW BESS facility, located in Hillsboro, Oregon was placed in service on December 20, 2024 and is owned by PGE.
Previous report
•Sundial BESS (formerly Troutdale Grid)—The 200 MW BESS facility, located in Troutdale, Oregon reached commercial operations on December 20, 2024. NextEra Energy Resources, LLC owns the resource and sells the capacity to PGE under a 20-year agreement.
Previous report
The BESS facilities qualify for federal investment tax credits (ITCs). The agreements related to Clearwater qualify for production tax credits (PTCs) and are eligible under Oregon’s Renewable Portfolio Standard (RPS). These projects are estimated to produce approximately $262 million in combined ITC and PTC benefits over time on behalf of customers.
Previous report
Following passage of House Resolution 1, the One Big Beautiful Bill Act (OBBB), on July 4, 2025, PGE provided an opportunity for all conforming 2023 RFP bidders to refresh their pricing to capture the impacts of the new legislation and recent trade tariffs. Evaluation of refreshed bids, including updates to bid scoring and ranking, was performed in collaboration with an OPUC-selected third-party independent evaluator.
Previous report
On October 1, 2025, PGE submitted a regulatory filing to the OPUC requesting acknowledgement of an updated final shortlist of bidders for the 2023 RFP to meet PGE’s articulated resource needs, as shown in the table below:
Previous report
(1) Hybrid commercial structure includes a PPA portion and a Company-owned portion via a build transfer agreement (BTA) for project resources
Previous report
The Company has requested acknowledgement of the updated final shortlist by the end of the year to enable PGE to finalize contract negotiations, keep project costs as low as possible, make continued progress towards Oregon’s decarbonization goals and support system reliability needs as identified in the 2023 Integrated Resource Plan and Clean Energy Plan update. PGE is proceeding to commercial negotiations with bidders for projects on the updated final shortlist and expects finalization of contracts for projects that meet selection criteria by the end of 2025 or in the first quarter of 2026, with projects in service by the end of 2027.
Previous report
The updated RFP final shortlist projects were evaluated and selected based on conditions as of the updated final shortlist date and are subject to risks and uncertainties, including, but not limited to, regulatory processes, inflationary impacts, supply chain constraints, supply cost increases (including the application of trade tariffs), securing of federal tax incentives and legislative uncertainty.
Previous report
2025 All-Source RFP
Previous report
Following the enactment of the OBBB and related executive orders in July 2025, PGE continues to evaluate the potential impact of these federal tax credit changes on project economics and overall portfolio cost. Loss of tax credit availability could increase renewable project costs and corresponding customer prices. In response, PGE incorporated additional information requirements into the RFP to better assess tax credit eligibility, supply chain risks, and cost implications. Further detail on the federal policy changes and associated risks is provided in"The One Big Beautiful Bill Act” in the Laws and Regulations section of this Overview.
Previous report
Legal Challenges to the RFP Process
Previous report
Various regulatory and legal challenges directed at the OPUC have been initiated by NewSun Energy LLC, related to PGE’s RFP process. PGE has joined the proceedings as an intervenor, and the challenges are in various stages of litigation or regulatory review. PGE cannot predict the outcome of these proceedings or potential impact, if any.
Previous report
NewSun was an intervenor in the Clearwater RAC proceeding in Docket UE 427, in which the OPUC rejected NewSun’s proposals to change the RFP oversight process, but adopted conditions on how PGE should recognize Clearwater’s capacity factor and transmission assumptions in its Annual Power Cost Update Tariff (AUT) and power cost adjustment mechanism (PCAM) beginning in 2025. PGE sought and received clarification of the OPUC’s February 21, 2025 order (Order 25-075) adopting the conditions, in Order 25-223, which granted certain of PGE’s requests and denied others. Both PGE and NewSun have Petitions for Judicial Review of Order 25-075 pending at the Oregon Court of Appeals. PGE cannot predict the outcome or potential impact, if any, on future RFP, AUT, or PCAM proceedings.
Previous report
On July 25, 2025, PGE filed with the OPUC its draft 2026-2028 TE plan, which represents a continuation of the approach and strategy found within PGE’s 2023-2025 TE plan. In the 2026-2028 period covered by the 2026-2028 TE Plan, capital expenditures are expected to be approximately $11 million, pending regulatory approval. PGE anticipates OPUC acceptance of the 2026-2028 TE plan in the fourth quarter of 2025.
Previous report
PGE expects to meet the 2025 RPS threshold.
Previous report
PGE believes that the deferral is probable of recovery and submitted a request for recovery early in the third quarter of 2025, with price changes to be effective over a two-year period beginning April 1, 2026. The OPUC has adopted a procedural schedule in Docket UE 458 for the regulatory review process that expects an order in March 2026. The OPUC has significant discretion in making the final determination of recovery based on its assessment of prudency and interpretation of the earnings test application, either of which could result in all, or a portion of, the deferral being disallowed. As of December 31, 2024, PGE's preliminary return on equity, based on actual results, did not exceed the OPUC's authorized rate of return. Any disallowance would be a charge to earnings, which could be material to the Company’s financial condition, results of operations, or cash flows. For further information, see “January 2024 storm and damage”in the Regulatory Assets and Liabilities section of Note 3, Balance Sheet Components in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements.”
Previous report
PGE is requesting the OPUC authorize recovery of the principal amount of the January 2024 Storm deferral, totaling $44 million plus relevant accrued interest at the cost of capital through and until the time the OPUC issues a decision in this case. PGE estimates this total to be $51 million on April 1, 2026.
Previous report
The Company requested an extension of the RCE mechanism for one year to extend it through 2026, as market conditions that led to the need for an RCE mechanism have persisted and, in some cases, intensified since the OPUC’s approval of the RCE at the end of 2023. The ongoing volatility in energy markets, increasing frequency of severe weather, and the continued transition to intermittent renewable energy sources, underscores the importance of maintaining this protective measure for both the Company and its customers.
Previous report
The Order calls for the following:
Previous report
•a 9.34% return on equity (ROE); and
Previous report
The Order also results in $6 million revenue requirement increase for the remainder of 2025, inclusive of NVPC customer benefits. Seaside’s NVPC is included in PGE’s AUT filings for 2026 (OPUC docket UE 452) and onward.
Previous report
The Seaside revenue requirement will be included in customer prices effective October 31, 2025.
Previous report
Distribution System Plan recovery mechanism—On July 25, 2025, PGE submitted to the OPUC a request for recovery of costs associated with the Company’s DSP. The regulatory filing allows PGE the opportunity to recover its revenue requirement for these capital investments outside of a general rate case while balancing the interests of customers and PGE.
Previous report
As a part of the filing, PGE requested that the DSP Alternative Recovery Mechanism be authorized for inclusion in customer prices by April 1, 2026. PGE’s request for recovery includes an annualized revenue requirement increase of $72 million, which includes a 9.34% return on equity as approved in UE 435, and a rate base increase of $317 million.
Previous report
PGE and parties will work through the regulatory review process for the DSP Alternative Recovery Mechanism during the coming months. The OPUC has adopted a procedural schedule for the regulatory review process in Docket UE 459 that expects an order in March 2026. PGE cannot predict the ultimate outcome of the regulatory process.
Previous report
Given significant uncertainties in key elements of the Western Resource Adequacy Program (WRAP)—including program structure, reliability metrics, and technological readiness—planning for the first binding season has become more challenging. As a result, PGE has notified the Western Power Pool of its intent to withdraw from the WRAP.
Previous report
Total retail energy deliveries for the nine months ended September 30, 2025 increased 5.0% compared with the nine months ended September 30, 2024, driven by an increase in industrial deliveries. The first nine months of 2025 contained one fewer delivery day due to leap year in 2024.
Previous report
Net income for the nine months ended September 30, 2025 decreased $10 million, or 4%, compared to the same period of 2024. Retail revenues increased primarily due to price changes to cover anticipated higher NVPC and general cost increases, as authorized by the OPUC. Wholesale revenues have decreased, driven by a decline in the average price of wholesale deliveries, although lower sales volumes also contributed to the decline. The reduction in Purchased power and fuel reflects lower average variable power costs per MWh and lower overall system load being mostly offset by the reduced costs in 2024 due to the deferral under the RCE mechanism that did not recur. Generation, transmission and distribution expenses were relatively unchanged in total although 2024 included the recognition of an earnings test deferral release recorded in the comparative period in 2024 that is not recurring. While total Administrative and General expense remained fairly flat compared to 2024, a total of $25 million business transformation and optimization expenses was recorded in 2025 of which $21 million was in Administration and General Expense and was slightly more than offset by savings, with the balance being in Generation, transmission and distribution expense and Depreciation and amortization expense. Increases in Depreciation and amortization expense, driven by higher depreciable asset balances, and Interest expense, net, due to higher long-term debt balances, were largely anticipated and somewhat offset in net income by increased revenues. Income tax expense was up due primarily to lower PTC benefits.
Previous report
For the nine months ended September 30, 2025, Wholesale revenues decreased $143 million, or 31%, from the nine months ended September 30, 2024 as the Company experienced a $79 million reduction in revenues due to a decline in average sales prices resulting from market volatility around specific regional weather events in January 2024 and milder overall weather in 2025. In addition, the sale of environmental credits produced $34 million less revenue and the reduction in Wholesale sales volume produced $30 million less revenue in 2025 than during the same period of 2024.
Previous report
Generation, transmission and distribution decreased as follows for the three and nine months ended September 30, 2025 compared to the same periods in 2024 (in millions):
Previous report
Administrative and other is as follows for the three and nine months ended September 30, 2025 compared to the same periods in 2024 (in millions):
Showing the first 40 of 48 passages. Open the source sections for the rest.
Reworded paragraphs (122)
Previous wording
The information in this report includes statements that are forward-looking within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements include, but are not limited to, statements that relate to expectations, beliefs, plans, assumptions, and objectives concerning future results of operations, business prospects, loads, outcome of litigation and regulatory proceedings, capital expenditures, market conditions, events or performance, and other matters. Words or phrases such as “anticipates,” “believes,”
Current wording
The information in this report includes statements that are forward-looking within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements include, but are not limited to, statements that relate to expectations, beliefs, plans, assumptions, and objectives concerning future results of operations, business prospects, loads, outcome of litigation and regulatory proceedings, capital expenditures, market conditions, events or performance, and other matters. Words or phrases such as “anticipates,” “believes,” “estimates,” “expects,” “intends,” “plans,” “predicts,” “projects,” “will likely result,” “will continue,” “should,” “based on,” “conditioned upon,” “considers,” “could,” “expected,” “forecast,” “goals,” “needs,” “promises,” “subject to,” “targets,” or similar expressions are intended to identify such forward-looking statements.
Previous wording
•new or revised governmental policies, executive orders, legislative action, and regulatory audits, investigations, and actions, including those of the Federal Energy Regulatory Commission (FERC), the Public Utility Commission of Oregon (OPUC), and the Internal Revenue Service, with respect to allowed rates of return, financings, electricity pricing and price structures, acquisition and disposal of facilities and other assets, construction and operation of plant facilities, transmission of electricity, recovery of power costs, operating expenses, deferrals, timely recovery of costs and capital investments, energy trading activities, tax credits, and current or prospective wholesale and retail competition;
Current wording
new or revised governmental policies, executive orders, legislative actions, and regulatory audits, investigations, and actions, including those of the Federal Energy Regulatory Commission (FERC), the Public Utility Commission of Oregon (OPUC), and the Internal Revenue Service, with respect to allowed rates of return, financings, electricity pricing and price structures, acquisition and disposal of facilities and other assets, construction and operation of plant facilities, transmission of electricity, recovery of power costs, operating expenses, deferrals, timely recovery of costs and capital investments, energy trading activities, tax credits, and current or prospective wholesale and retail competition;
Previous wording
•the impacts of changes in the tax code, including tax rates, minimum tax rates, adjustments made to deferred tax assets and liabilities, and changes impacting the availability of and ability to transfer renewable tax credits;
Current wording
the impacts of changes in the tax code, including tax rates, minimum tax rates, adjustments made to deferred tax assets and liabilities, and changes impacting the availability of and ability to transfer tax credits;
Previous wording
•the timing or outcome of legal and regulatory proceedings and issues including, but not limited to, the matters described in Regulatory Matters of the “Overview” in this Item 2, along with “Regulatory Assets and Liabilities” in Note 3, Balance Sheet Components and Note 8, Contingencies in the Notes to the Condensed Consolidated Financial Statements in Item 1.—“Financial Statements” of this Quarterly Report on Form 10-Q;
Current wording
the timing or outcome of legal and regulatory proceedings and issues including, but not limited to, the matters described in Regulatory Matters of the “Overview” in this Item 2, along with “Regulatory Assets and Liabilities”
Previous wording
•severe weather and other natural phenomena, such as the greater size and prevalence of wildfires in Oregon in recent years, which could affect public safety, customers’ demand for power, and PGE’s financial health and ability and cost to procure adequate power and fuel supplies to serve its customers, access the wholesale energy market, or operate its generating facilities and transmission and distribution systems, and the Company’s costs to maintain, repair, and replace such facilities and systems, and recovery of such costs;
Current wording
severe weather and other natural phenomena, such as the greater prevalence of wildfires in Oregon, which could affect public safety, customers’ demand for power, and PGE’s financial health and ability and cost to procure adequate power and fuel supplies to serve its customers, access the wholesale energy market, or operate its generating facilities and transmission and distribution systems, and the Company’s costs to maintain, repair, and replace such facilities and systems, and recovery of such costs;
Previous wording
•impacts from the lack of legislation limiting wildfire-related liability or providing a wildfire relief fund, such as negative effects on PGE’s credit rating, which could limit PGE’s ability to access capital on terms similar to past transactions or at all and could impact PGE’s liquidity, cash flows, and capital expenditure plans;
Current wording
impacts from legislation limiting wildfire-related liability or providing a wildfire relief fund, such as negative effects on PGE’s credit rating, which could limit PGE’s ability to access capital on terms similar to past transactions or at all and could impact PGE’s liquidity, cash flows, and capital expenditure plans;
Previous wording
•complications arising from PGE’s jointly-owned plant, including changes in ownership, adverse regulatory outcomes or legislative actions, or operational failures that result in legal or environmental liabilities or unanticipated costs related to replacement power, repair costs, or abandoned costs;
Current wording
complications arising from PGE’s jointly-owned plant, including changes in ownership, change in regulatory requirements, adverse regulatory outcomes or legislative actions, or operational failures that result in legal or environmental liabilities or unanticipated costs related to replacement power, capital improvements, repair costs, or abandoned costs;
Previous wording
•volatility in wholesale power and natural gas prices, including but not limited to volatility caused by macroeconomic and international issues, that could require PGE to post additional collateral or issue additional letters of credit pursuant to power and natural gas purchase agreements;
Current wording
volatility in wholesale power and natural gas prices, including but not limited to volatility caused by macroeconomic and international issues, such as the war involving the United States, Iran and Israel, that could require PGE to post additional collateral or issue additional letters of credit pursuant to power and natural gas purchase agreements;
Previous wording
•changes in the availability and price of wholesale power and fuels, including natural gas and coal, and the impact of such changes, including the potential impact of trade tariffs, on the Company’s power costs;
Current wording
changes in the availability and price of wholesale power and fuels, including natural gas and coal, and the impact of such changes, including the potential impact of trade tariffs and the war involving the United States, Iran and Israel, on the Company’s power costs;
Previous wording
•cybersecurity attacks, data security breaches, physical attacks and security breaches, or other malicious acts, internally or to third parties, that cause damage to the Company’s generation, transmission, or distribution facilities, information technology systems, or employees, or inhibit the capability of equipment or systems to function as designed or expected, or result in the release of confidential customer, vendor, employee, or Company information;
Current wording
cybersecurity attacks, data security breaches, physical attacks and security breaches, or other malicious acts, internally or to third parties, that cause damage to the Company’s generation, transmission, or distribution facilities, impact information technology systems, inhibit the capability of equipment or systems to function as designed or expected, or result in the release of confidential customer, vendor, employee, or Company information;
Previous wording
•changes in financial or regulatory accounting principles or policies imposed by governing bodies; and
Current wording
changes in financial or regulatory accounting principles or policies imposed by governing bodies,
Previous wording
•acts of war, terrorism, or civil disruption.
Current wording
acts of war, terrorism, or civil disruption, including the escalation of US operations in the Middle East, which could amplify the effects of any of the above risk factors and contribute to volatility in capital market conditions, interest rates and inflation; and
Previous wording
performance to differ from the statements made in this report are discussed in Part I, Item 1A. “Risk Factors” of the
Current wording
Additional disclosures regarding risks, uncertainties and important factors that could cause PGE’s results or performance to differ from the statements made in this report are discussed in Part I, Item 1A. “Risk Factors” of the Company’s Annual Report on Form 10-K for the year ended December 31, 2025, filed with the SEC on February 17, 2026, and in Part II, Item 1A. “Risk Factors” of this Quarterly Report on Form 10-Q.
Previous wording
The Company exists to power the advancement of society. PGE energizes lives, strengthens communities, and fosters energy solutions that promote social, economic, and environmental progress. The Company is committed to our customers’ clean energy goals and delivering steady growth and returns to shareholders. PGE is focused on working with customers, communities, policy makers, and other stakeholders to deliver affordable, safe, reliable electricity service to all, while increasing opportunities to deliver clean and renewable energy, reducing greenhouse gas (GHG) emissions, and responding to evolving customer expectations. At the same time, the Company is building an increasingly smart, integrated, and interconnected grid that spans from residential customers to other utilities within the region. PGE is transforming all aspects of its business to empower its workforce to be even more results oriented to serve customers well. To create a clean energy future, PGE is focused on the following strategic imperatives:
Current wording
PGE is focused on the following strategic imperatives:
Previous wording
Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 228 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100% clean and renewable electricity by
Current wording
Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 217 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100% clean and renewable electricity by 2035 and 100% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.
Previous wording
Severe weather—In recent years, PGE’s service territory has experienced unprecedented heat, historic ice and snowstorms, and wildfires. In January 2024, the Company’s service territory encountered a severe winter weather event, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather event, see “Declared States of Emergency” within this Overview section. In August 2023 the region experienced a record-breaking heat wave with temperatures reaching all-time recorded highs for the month. This resulted in a peak load demand of 4,498 MW, exceeding the Company’s previous all-time peak load demand, and surpassing the prior summer peak load by nearly 6%. The increase and severity of weather events highlights the importance of combating the effects of climate change through decarbonizing the power supply and investing in a more reliable and resilient grid.
Current wording
Severe weather—In recent years, PGE’s service territory has experienced unprecedented heat, historic ice and snowstorms, and wildfires. In December 2025, Portland, Oregon experienced the warmest December on record, averaging six degrees above normal temperatures for the region. In January 2024, the Company’s service territory encountered a severe winter weather event, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather event, see “Declared States of Emergency” within this Overview section. In August 2023 the region experienced a record-breaking heat wave with temperatures reaching all-time recorded highs for the month. This resulted in a peak load demand of 4,498 MW, exceeding the Company’s previous all-time peak load demand, and surpassing the prior summer peak load by nearly six percent. The increase and severity of weather events highlights the importance of combating the effects of climate change through decarbonizing the power supply and investing in a more reliable and resilient grid.
Previous wording
The Resource Planning Process—PGE’s resource planning process includes working with customers, stakeholders, and regulators to chart the course toward a clean, affordable, and reliable energy future. With the passage of HB 2021, PGE created a Clean Energy Plan (CEP), which articulates the Company’s strategy to make continued progress towards the 2030, 2035, and 2040 emission reduction targets through an equitable transition to a decarbonized grid. The CEP is based on, and was submitted to the OPUC in connection with, the Company’s 2023 Integrated Resource Plan (IRP) in March 2023, the first combined IRP and CEP. That filing projected PGE’s resource and capacity needs over the next 20 years and proposed an Action Plan to meet near-term needs, subject to the new HB 2021 emissions reduction requirements.
Current wording
The Resource Planning Process—PGE’s resource planning process includes working with customers, stakeholders, and regulators to chart the course toward a clean, affordable, and reliable energy future. With the passage of HB 2021, PGE created a Clean Energy Plan (CEP), which articulates the Company’s strategy to make continued progress towards the 2030, 2035, and 2040 emission reduction targets through an equitable transition to a decarbonized grid. The CEP is based on, and was submitted to the OPUC in connection with, the Company’s 2023 Integrated Resource Plan (IRP) in March
Previous wording
The CEP/IRP Update identified a new Preferred Portfolio as a result of the refreshed analysis. PGE is not proposing any changes to the Action Plan that was acknowledged within the 2023 CEP/IRP, which supports the Company's progress toward emissions targets and Preferred Portfolio resource need procurement through the 2025 All-Source RFP. This approach represents the best combination of cost, risk, community benefit, and decarbonization.
Current wording
On June 18, 2025, PGE submitted a CEP/IRP Update to the OPUC. The CEP/IRP Update identified a new Preferred Portfolio as a result of the refreshed analysis. PGE did not propose any changes to the Action Plan that was acknowledged within the 2023 CEP/IRP, which supports the Company's progress toward emissions targets and Preferred Portfolio resource need procurement through the 2025 All-Source RFP. This approach represents the best combination of cost, risk, community benefit, and decarbonization.
Previous wording
To better distinguish resource needs, the CEP/IRP Update reports the capacity from hybrid solar and battery storage resources by individual technology. This reporting change increased the stated need of the 2023 CEP/IRP Action Plan from a range of 2,700 to 3,700 MW, to an updated range of 3,500 to 4,500 MW of renewable energy and non-emitting capacity, inclusive of 2023 RFP projects, which remain under negotiation.
Current wording
To better distinguish resource needs, the CEP/IRP Update reports the capacity from hybrid solar and battery storage resources by individual technology. The capacity need is 3,500 to 4,500 MW of renewable energy and non-emitting capacity, inclusive of 2023 and 2025 RFP projects.
Previous wording
The actions summarized in the CEP/IRP Update will also serve as an important tool in furthering conversations with all stakeholders, and the OPUC, on PGE’s path forward to making continued progress towards emission targets while continuing to serve customers safely, reliably, and at the lowest cost possible. PGE and parties will work through the regulatory review process for the CEP/IRP Update filing (OPUC Docket LC 80) during the coming months. PGE cannot predict the ultimate outcome of the regulatory process.
Current wording
The actions summarized in the CEP/IRP Update will also serve as an important tool in furthering conversations with all stakeholders, and the OPUC, on PGE’s path forward to making continued progress towards emission targets while continuing to serve customers safely, reliably, and at the lowest cost possible.
Previous wording
The 2023 RFP is a component of PGE’s multi-pronged procurement approach focused on customer affordability, system reliability, and decarbonization. In parallel with the 2023 RFP, the Company is seeking additional renewable energy and non-emitting capacity through PPAs, including a bilateral all-call for PPAs, community-based renewable energy procurement, and the ongoing 2025 RFP process.
Current wording
These agreements represent the final procurement from the 2023 All-Source RFP. The 2023 RFP is a component of PGE’s multi-pronged procurement approach focused on customer affordability, system reliability, and decarbonization. Both the 2023 RFP reprice and the 2025 RFP disclosed below were designed to capture expiring tax credits to support customer affordability. Additional resources are anticipated to be procured through future acquisition processes, including, but not limited to, PPAs, including a bilateral all-call for PPAs, community-based renewable energy procurement, the ongoing 2025 RFP, and future RFPs.
Previous wording
PGE filed notice with the OPUC in November 2024 that an RFP in 2025 was needed to procure resources to meet a forecasted 2029 capacity shortfall and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan and CEP Update. PGE filed the draft 2025 All-Source RFP on April 17, 2025.
Current wording
PGE filed notice with the OPUC in November 2024 that an RFP in 2025 was needed to procure resources to meet a forecasted 2029 capacity shortfall and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan and CEP Update. PGE filed the draft 2025 All-Source RFP on
Previous wording
PGE received regulatory approval of the 2025 All Source RFP from the OPUC on July 22, 2025. The Company issued the RFP to market on July 31, 2025, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation. Bids were submitted in October 2025 and are currently being evaluated based on the OPUC-approved scoring methodology. PGE plans to file for acknowledgement of a proposed final shortlist in the first quarter of 2026, allowing PGE to begin negotiations with shortlisted bids.
Current wording
April 17, 2025, and regulatory approval was granted on July 22, 2025. The Company issued the RFP to market on July 31, 2025, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation.
Previous wording
After a robust and competitive bidding process performed in accordance with Oregon's competitive bidding rules, and with the active participation of, and oversight by, an OPUC-selected third-party independent evaluator, on September 17, 2024, PGE submitted a request for acknowledgement of the final shortlist of bidders to the OPUC. The final shortlist was acknowledged by the OPUC, with conditions, on November 19, 2024.
Current wording
After a robust and competitive bidding process performed in accordance with Oregon's competitive bidding rules, and with the active participation of, and oversight by, an OPUC-selected third-party independent evaluator, PGE submitted a request for acknowledgement of the final shortlist of bidders to the OPUC on February 17, 2026. The final shortlist is made up of both renewables and non-emitting capacity projects, as shown in the table below:
Previous wording
Additional details of the 2023 RFP (OPUC Docket UM 2274) are available on the OPUC website at www.oregon.gov/puc.
Current wording
PGE anticipates the OPUC to consider acknowledgement of the RFP final shortlist in May 2026. Additional details of the 2025 RFP (OPUC Docket UM 2371) are available on the OPUC website at www.oregon.gov/puc.
Previous wording
In May 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties entered negotiations with the United States Department of Energy (U.S. DOE) to finalize the project objectives, terms, and conditions, including the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project. In August 2024, the project was awarded a $700 million grant from the U.S. DOE’s Grid Resilience and Innovation Partnerships (GRIP) program to further support its development and would reduce the overall total investment of the project. A portion of the GRIP funding is allocated to assess upgrades to the Colstrip Transmission System. See “Federal Grants” in the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants and effect of Presidential executive orders.
Current wording
In May 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties entered negotiations with the United States Department of Energy (U.S. DOE) to finalize the project objectives, terms, and conditions, including the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project. In August 2024, the project was awarded a $700 million grant from the U.S. DOE’s Grid Resilience and Innovation Partnerships (GRIP) program to further support its development and would reduce the overall total investment of the project. A portion of the GRIP funding is also allocated to assess upgrades to the Colstrip Transmission System.
Previous wording
The U.S. DOE selected the Confederated Tribes of Warm Springs (CTWS), with PGE as a subrecipient under the grant, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The project will accelerate the development of transmission capacity, enabling new generation in Central and Eastern Oregon to reach customer demand loads in Western Oregon. The added capacity and associated upgrades will also increase resiliency of the transmission system as well as resiliency of the CTWS communities by increasing resources available to the CTWS to support economic growth opportunities. See“Federal Grants” the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants.
Current wording
The U.S. DOE selected the Confederated Tribes of Warm Springs (CTWS), with PGE as a subrecipient under the grant, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The project (Warm Springs Power Pathway) will accelerate the development of transmission capacity, enabling new generation in Central and Eastern Oregon to reach customer demand loads in Western Oregon. The added capacity and associated upgrades will also increase resiliency of the transmission system as well as resiliency of the CTWS communities by increasing resources available to the CTWS to support economic growth opportunities. See“Federal Grants” the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants.
Previous wording
•Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan (WMP) is developed and submitted to the OPUC, as required by State law, to coordinate activities across the Company and with State-wide stakeholders. The 2025 WMP Update forecasts $46 to $49 million in operations and maintenance costs and an additional $57 to $78 million in capital investments, for the year ending 2025, to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by mitigating the risk that PGE’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. In the nine months ended September 30, 2025, PGE invested $45 million in capital projects related to wildfire mitigation and resiliency and utility asset management, consistent with the 2025 WMP Update.
Current wording
Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan (WMP) is developed and submitted to the OPUC, as required by State law, to coordinate activities across the Company and with State-wide stakeholders. On December 31, 2025, PGE filed its 2026-2028 Wildfire Mitigation Plan, which forecasts $47 to $50 million annually in operations and maintenance costs and an additional $70 to $84 million annually in capital investments, for the 2026-2028 period, to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by mitigating the risk that PGE’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. In the three months ended March 31, 2026, PGE invested $14 million in capital projects related to wildfire mitigation and resiliency and utility asset management.
Previous wording
•Virtual Power Plant (VPP)—PGE’s VPP is comprised of Distributed Energy Resources and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to flexible load programs, rooftop solar, battery storage, and electric vehicle (EV) charging solutions support grid reliability and increase portfolio flexibility and resource diversity. These Distributed Energy Resources and flexible loads are the foundation of PGE’s VPP that increasingly provides a growing suite of grid and system services over time. When coordinated through the Company’s Distributed Energy Resources Management Systems, Distributed Energy Resource and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. As customer participation in PGE’s VPP grows, their actions provide increasing benefit and help avoid customer service interruptions and reduce exposure to scarcity pricing in energy markets.
Current wording
Virtual Power Plant (VPP)—PGE’s VPP is comprised of Distributed Energy Resources and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to flexible load programs, rooftop solar, battery storage, and electric vehicle (EV) charging solutions support grid reliability and increase portfolio flexibility and resource diversity. When coordinated through the Company’s Distributed Energy Resources Management Systems, Distributed Energy Resource and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. As customer participation in PGE’s VPP grows, their actions provide increasing benefit and help avoid customer service interruptions and reduce exposure to scarcity pricing in energy markets.
Previous wording
•Distribution System Plan (DSP)—In 2021 and 2022, PGE filed its inaugural DSP in two parts, which were accepted by the OPUC in March 2022 and February 2023, respectively. The OPUC Staff finalized their review of modifications to the current DSP guidelines in the fourth quarter of 2024 and PGE filed its next DSP in December 2024, fully compliant with the updated requirements. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as EVs and rooftop solar installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in demonstrating continual progress towards PGE’s clean energy goals. For further information on recovery of costs related to the DSP, see“Distribution System Plan recovery mechanism”in the Regulatory Matters section of this Overview.
Current wording
Distribution System Plan (DSP)—In 2021 and 2022, PGE filed its inaugural DSP in two parts, which were accepted by the OPUC in March 2022 and February 2023, respectively. The OPUC Staff finalized their review of modifications to the current DSP guidelines in the fourth quarter of 2024 and PGE filed its next DSP in December 2024, fully compliant with the updated requirement. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as EVs and rooftop solar installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in demonstrating continual progress towards PGE’s clean energy goals. For further information on recovery of costs related to the DSP, see“Distribution System Plan recovery mechanism”in the Regulatory Matters section of this Overview.
Previous wording
In October 2023, the OPUC accepted PGE’s second TE plan, which covers the 2023 to 2025 time period and considers current and planned activities, along with forecasted EV loads. To date, PGE has incurred $14 million in capital expenditures under the current TE plan.
Current wording
On December 9, 2025, the OPUC accepted PGE's 2026-2028 TE Plan. The plan considers current and planned activities, along with forecasted EV loads for the 2026-2028 period, with expected capital expenditures to be approximately $11 million.
Previous wording
Trade Tariffs—Recently, trade tariffs were imposed through presidential executive orders. While some tariffs scheduled to take effect were temporarily suspended, broad tariffs remain in effect. Trade tariffs may increase the cost of imported materials and equipment, disrupt supply chains, drive economic volatility, and create adverse capital and credit market conditions. The cost of steel utility poles, meters, transformers, and specialized electrical equipment, among other items, may increase materials and supplies balances and elevate the cost of capital projects. Similarly, prices may rise and lead times may lengthen for necessary components in resources considered for acquisition in PGE’s All-Source RFPs. For further information on the Company’s RFPs, see “The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview. While PGE’s Canadian natural gas imports are not expected to be impacted by the current state of trade tariffs due to the imports being U.S.-Mexico-Canada Agreement compliant, the future of trade tariff impacts on such imports is uncertain. The Company is unable to reasonably estimate the effects of the rapidly evolving trade tariff landscape, as those effects could include project delays and cost increases, and present obstacles to PGE’s strategic plan execution. PGE is closely monitoring the impacts of trade tariffs and the potential effect they may have on the Company’s financial position, results of operations, or cash flows.
Current wording
Trade Tariffs—Recently, the trade landscape shifted following a Supreme Court ruling that struck down broad executive-ordered tariffs, leading the administration to pivot toward targeted actions under Section 122 of the Trade Act of 1974 and Section 232 of the Trade Expansion Act of 1962. While some universal tariffs were rolled back, significant duties have been imposed on steel, aluminum, and copper derivatives, with a temporary rate reduction for specific electrical grid equipment through 2027. These evolving measures continue to drive potential increases in the cost of raw materials and equipment, disrupt global supply chains, and contribute to the volatility of capital and credit markets. The cost of steel utility poles, meters, transformers, and specialized electrical equipment, among other items, may increase materials and supplies balances and elevate the cost of capital projects. Similarly, prices may rise and lead times may lengthen for necessary components in resources considered for acquisition in PGE’s All-Source RFPs. For further information on the Company’s RFPs, see “The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview. While PGE’s Canadian natural gas imports are not expected to be impacted by the current state of trade tariffs due to the imports being U.S.-Mexico-Canada Agreement compliant, the future of trade tariff impacts on such imports is uncertain. The Company is unable to reasonably estimate the effects of the rapidly evolving trade tariff landscape, as those effects could include project delays and cost increases, and present obstacles to PGE’s strategic plan execution. PGE is closely monitoring the impacts of trade tariffs and the potential effect they may have on the Company’s financial position, results of operations, or cash flows.
Previous wording
Federal Grants—PGE continues to monitor and pursue opportunities on behalf of customers to leverage state, federal, and private foundation funding programs to offset the cost of projects. These projects target improvements in electrical system reliability and resiliency, wildfire situational awareness and mitigation, greater communications capabilities, advancements in customer usage analytics using artificial intelligence, renewable resources and advanced electrical grid support, hydro generation operations, and regional transmission capacity constraints.
Current wording
Federal Grants—PGE continues to evaluate opportunities on behalf of customers to leverage state, federal, and private foundation funding programs to offset the cost of projects. These projects target improvements in electrical system reliability and resiliency, wildfire situational awareness and mitigation, greater communications capabilities, advancements in customer usage analytics using artificial intelligence, renewable resources and advanced electrical grid support, hydro generation operations, and regional transmission capacity constraints.
Previous wording
PGE has been awarded six additional grants totaling approximately $252 million, either as a direct recipient or subrecipient. These grants remain in various stages of execution, with the largest being the CTWS and PGE Regional 500kV Transmission Innovative Project. PGE continues to monitor these grants for potential modification or termination but has not received any formal notice of termination. To date, PGE has incurred only immaterial costs related to these grants. See“Transmission Upgrades” in the Investing in a Clean Energy Future section of this Overview for further discussion on the transmission line upgrade grant. The Company cannot predict the ultimate timing and success of securing funding from federal programs or predict the outcome of existing grants.
Current wording
PGE has been awarded five additional grants totaling approximately $252 million, either as a direct recipient or subrecipient. These grants remain in various stages of execution, with the largest being the Warm Springs Power Pathway. PGE continues to monitor these grants for potential modification or termination but has not received any formal notice of termination. To date, PGE has incurred only immaterial costs related to these grants. See“Transmission Upgrades” in the Investing in a Clean Energy Future section of this Overview for further discussion on the Warm Springs Power Pathway grant. The Company cannot predict the ultimate timing and success of securing funding from federal programs or predict the outcome of existing grants.
Previous wording
The United States Treasury and the Internal Revenue Service released extensive rules addressing credit transfer eligibility and application, including but not limited to, required registration, filing, and documentation for transferors and transferees to elect and claim a credit transfer. In December 2023, PGE received approval from the OPUC to transfer 2023 PTCs and record any difference in the full value and the discounted value in a property balancing account. Consistent with options available under the IRA, the Company transferred 2023 credits with the final transfer occurring in the first quarter of 2024. On April 17, 2024, PGE received approval from the OPUC to transfer 2024 and 2025 PTCs and record any difference between the full value and the discounted value in a property balancing account. On December 11, 2024, PGE received approval from the OPUC to transfer 2024 ITCs and return the net proceeds from the sale to PGE customers.
Current wording
Inflation Reduction Act of 2022 (IRA)—The IRA was signed into law in August 2022. The United States Treasury and the Internal Revenue Service released extensive rules addressing credit transfer eligibility and application, including but not limited to, required registration, filing, and documentation for transferors and transferees to elect and claim a credit transfer.
Previous wording
PGE has entered into agreements to transfer 2023 through 2025 tax credits and transferred $153 million and $112 million, net of discounts, for cash proceeds in the first nine months of 2025 and in 2024, respectively. The Company expects to generate and transfer approximately $183 million in tax credits in 2025.
Current wording
PGE has entered into agreements to transfer 2024 through 2025 tax credits and transferred $3 million, net of discounts, for cash proceeds in both the first three months of 2026 and 2025. PGE transferred tax credits, net of discounts, of $179 million in 2025. The Company has also entered into agreements to transfer 2026 through 2027 tax credits and forecasts the generation and transfer of approximately $32 million in additional tax credits, net of discounts, in 2026.
Previous wording
The One Big Beautiful Bill Act—The OBBB significantly amends or repeals several renewable-energy tax incentives originally enacted under the IRA. Projects currently under construction and expected to be placed in service during 2025 remain eligible for PTC or ITC benefits; accordingly, no adjustments were recorded in the quarter ended September 30, 2025. The transferability of tax credits, as provided under the IRA, also remains in effect. Following the July 7, 2025 executive order that added uncertainty with respect to the specific actions necessary to demonstrate a project’s start of construction, on August 15, 2025, the Treasury Department issued a notice for establishing the beginning of construction for wind and solar projects. The notice requires large projects to satisfy a physical-work test after September 2, 2025, eliminates certain inventory-procurement safe harbors, and accelerates the placed in service deadline to December 31, 2027.
Current wording
The One Big Beautiful Bill Act—The OBBB significantly amended or repealed several renewable-energy tax incentives originally enacted under the IRA. Projects previously placed in service that met applicable tax credit qualification requirements received PTC or ITC benefits, which are reflected in the Company’s consolidated financial statements. The transferability of tax credits, as provided under the IRA, also remains in effect. In August 2025, the U.S. Treasury issued a notice for establishing the beginning of construction for wind and solar projects. The notice required large projects to satisfy a physical-work test after September 2, 2025, eliminated certain inventory-procurement safe harbors, and accelerated the placed in service deadline to December 31, 2027.
Previous wording
These changes, together with the repeal of the permanent ten percent ITC, as outlined in the OBBB, are expected to reduce or eliminate the availability of renewable-energy credits on future projects. The Company cannot yet reasonably estimate the impact on PGE’s results of operations, financial position, and cash flows or on future capital expenditures, deferred tax assets, current and future All-Source RFPs, and customer prices.
Current wording
These changes, together with the repeal of the permanent ten percent ITC, as outlined in the OBBB, are expected to reduce or eliminate the availability of renewable energy tax incentives on future projects.
Previous wording
HB 2021—Among other things, HB 2021 requires retail electricity providers to reduce GHG emissions associated with serving Oregon retail electricity consumers to certain targets: 80% reduction by 2030; 90% by 2035; and 100% by 2040, compared to a baseline emission level. The baseline emission level is calculated for each provider by using average annual emissions associated with power generated and purchased for retail load for the years 2010 through 2012, which provide a representative sample of various hydroelectric production years.
Current wording
HB 2021—Among other things, HB 2021 requires retail electricity providers to reduce GHG emissions associated with serving Oregon retail electricity consumers to certain targets: 80% reduction by 2030; 90% by 2035; and 100% by 2040, compared to a baseline emission level. The baseline emission level is calculated for each provider by using average annual emissions associated with power generated and purchased for retail load for the years 2010 through 2012.
Previous wording
HB 2021 requires utilities to develop a CEP for meeting the reduction targets, concurrent with each IRP. In reviewing a CEP, the OPUC must ensure that utilities take action as soon as practicable that facilitates rapid reduction of GHG emissions, demonstrate continual progress toward meeting the targets, and create a plan that is in the public interest. Further, the CEP must result in an affordable, reliable, and clean electric system. The law does not require particular GHG percentage reductions be attained until 2030. The law contains a cost cap and reliability related provisions that can slow or pause compliance with the GHG targets, if implicated. The OPUC has a current open docket, UM 2273, in which provisions regarding the cost cap are being investigated.
Current wording
HB 2021 requires utilities to develop a CEP for meeting the reduction targets, concurrent with each IRP. In reviewing a CEP, the OPUC must ensure that utilities take actions as soon as practicable that facilitate rapid reduction of GHG emissions, demonstrate continual progress toward meeting the targets, and create a plan that is in the public interest. Further, the CEP must result in an affordable, reliable, and clean electric system. The law does not require particular GHG percentage reductions be attained until 2030. The law contains affordability and reliability related provisions that can slow or pause compliance with the GHG targets, if implicated. The OPUC has a current open docket, UM 2273, in which provisions regarding the cost cap are being investigated. In addition, a rulemaking docket, AR 685, seeks to develop a framework around the components and calculation of the cost cap, including costs already incurred in compliance.
Showing the first 40 of 122 pairs. Open the source sections for the rest.
Rearranged current paragraphs (7)
Current report — wording carried from elsewhere
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
Current report — wording carried from elsewhere
in Note 3, Balance Sheet Components and Note 8, Contingencies in the Notes to the Condensed Consolidated Financial Statements in Item 1.—“Financial Statements” of this Quarterly Report on Form 10-Q;
Current report — wording carried from elsewhere
2023, the first combined IRP and CEP. That filing projected PGE’s resource and capacity needs over the next 20 years and proposed an Action Plan to meet near-term needs, subject to HB 2021 emissions reduction requirements.
Current report — wording carried from elsewhere
See “Federal Grants” in the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants and effect of Presidential executive orders.
Current report — wording carried from elsewhere
On April 17, 2024, PGE received approval from the OPUC to transfer 2024 and 2025 PTCs and record any difference between the full value and the discounted value in a property balancing account. On April 15, 2026, PGE received approval from the OPUC to transfer 2026 and 2027 PTCs and record any difference between the full value and the discounted value in a property balancing account.
Current report — wording carried from elsewhere
In February 2026, PGE entered into an agreement under which it could sell up to $500 million of its common stock through the ATM program. No forward sale agreements were entered into pursuant to the 2026 ATM program as of March 31, 2026. Any proceeds from the issuances of common stock will be used for general corporate purposes and investments in renewables and non-emitting dispatchable capacity.
Current report — wording carried from elsewhere
As of March 31. 2026, the Company could have physically settled the EFSA by delivering 10,848,125 shares in exchange for cash for $530 million.
Rearranged previous paragraphs (12)
Previous report — wording carried elsewhere
“estimates,” “expects,” “intends,” “plans,” “predicts,” “projects,” “will likely result,” “will continue,” “should,” “based on,” “conditioned upon,” “considers,” “could,” “expected,” “forecast,” “goals,” “needs,” “promises,” “subject to,” “targets,” or similar expressions are intended to identify such forward-looking statements.
Previous report — wording carried elsewhere
Additional disclosures regarding risks, uncertainties and important factors that could cause PGE’s results or
Previous report — wording carried elsewhere
Company’s Annual Report on Form 10-K for the year ended December 31, 2024, filed with the SEC on February
Previous report — wording carried elsewhere
14, 2025, and in Part II, Item 1A. “Risk Factors” of this Quarterly Report on Form 10-Q.
Previous report — wording carried elsewhere
2035 and 100% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.
Previous report — wording carried elsewhere
The agreements related to Clearwater and all BESS agreements represent the final procurement from the 2021 All-Source RFP. Resources required to meet the remaining 2030 need are anticipated to be procured through future acquisition processes, including, but not limited to, the 2023 and 2025 All-Source RFPs and future RFPs.
Previous report — wording carried elsewhere
PGE filed notice with the OPUC in January 2023 that an RFP was needed to procure resources to meet forecasted capacity shortfalls and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan. PGE filed the draft 2023 All-Source RFP with the OPUC in May 2023 and regulatory approval was granted in January 2024. The Company issued the 2023 All-Source RFP to market in February 2024, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation.
Previous report — wording carried elsewhere
Inflation Reduction Act of 2022 (IRA)—The IRA was signed into law in August 2022 with a majority of the provisions effective for tax years beginning after December 31, 2022.
Previous report — wording carried elsewhere
Other key items in the Order include the adoption of an earnings test at PGE’s authorized ROE, implemented via a deferral to track Seaside revenues and refund excess earnings, if applicable.
Previous report — wording carried elsewhere
Portland Harbor Environmental Remediation Account (PHERA) mechanism—The EPA has listed PGE as one of over one hundred Potentially Responsible Parties (PRPs) related to the remediation of the Portland Harbor Superfund site. As of September 30, 2025, significant uncertainties still remained concerning the precise boundaries for clean-up, the assignment of responsibility for clean-up costs, the final selection of a proposed remedy by the EPA, and the method of allocation of costs amongst PRPs. It is probable that PGE will share in a portion of these costs. In a Record of Decision (ROD) issued in 2017, the EPA outlined its selected remediation plan for clean-up of the Portland Harbor site, which had an estimated total cost of $1.7 billion. Stakeholders have raised concerns that
Previous report — wording carried elsewhere
Under the PCAM, the Company may share with customers a portion of cost variances associated with NVPC. Customer prices can be adjusted annually to absorb a portion of the difference between the forecasted NVPC included in customer prices (baseline NVPC) and actual NVPC for the year, if such differences exceed a prescribed “deadband” limit, which ranges from $15 million below to $30 million above baseline NVPC. To the extent actual
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025, the $64 million decrease related to the change in average variable power cost per MWh was driven by a 8% decrease in the average cost of purchased power and a 1% decrease in the average cost for the Company’s own generation. The $41 million decrease related to total system load was comprised of a 7% decrease of energy obtained from purchased power, offset by a 4% increase in the Company’s own generation.