Skip to main content

PermRock Royalty Trust

For the period ended Dec 31, 2025. Filed Mar 27, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Mar 27, 2026

PRT$1.42+5.2%Stored close · as of Nov 6, 2026

What changed in Risk Factors?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-03-28.

0000950170-25-046884

Item 1A.

Current report: 10-K

Period ended 2025-12-31; filed 2026-03-27.

0001193125-26-128868

Item 1A.

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 204 previous paragraphs and 210 current paragraphs.

129 unchanged; 75 reworded; 5 added; 0 removed; 0 previous and 1 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (5)

Current report

Recent and potential changes in federal tax law may affect the tax treatment of an investment in the Trust units.

Current report

The Trustee determined that an impairment in the amount of $39.9 million occurred for the year ended December 31, 2025, after reviewing the undiscounted and discounted cash flow that had been revised to reflect future crude oil and natural gas commodity prices published by third-party industry experts (adjusted for base differentials) and a risk-adjusted discount rate. The Net Profits Interest was written down to its fair value of $26.6 million and the impairment is charged directly to the Trust corpus, which does not affect distributable income. For more information on impairment, see Note 3 to the financial statements included in Part II, Item 8 of this Annual Report. Impairments recorded for book purposes will not result in a loss for tax purposes for the unitholders until the loss is recognized.

Current report

Recent and potential changes in federal tax law may affect the tax treatment of an investment in the Trust units.

Current report

The Tax Cuts and Jobs Act (“TCJA”), enacted on December 22, 2017, made significant changes to the federal income tax rules applicable to individuals and entities, including changes that may affect the effective tax rate on a Trust unitholder’s allocable share of certain income from the Trust. Many provisions of the TCJA were modified, extended, or otherwise affected by the One, Big, Beautiful Bill Act (“OBBBA”), signed into law on July 4, 2025. Trust unitholders should consult their tax advisors regarding the TCJA, OBBBA, and the potential impact of these laws on an investment in the Trust units.

Current report

Any additional changes to U.S. federal income tax laws or to the interpretation of existing laws (including administrative guidance relating to the TCJA or OBBBA) may be applied retroactively and could adversely affect the Operator’s or the Trust’s business, financial condition, or results of operations. The Trust cannot predict whether any such changes or interpretations will be adopted or how they might be applied. Any such developments could adversely affect the value of an investment in the Trust units
Reworded paragraphs (75)

Previous wording

The risk factors summarized and detailed below could materially harm production from the Underlying Properties, operating results and/or the Trust’s financial condition, adversely affect proceeds to the Trust and cash distributions to Trust unitholders, and/or cause the price of the Trust units to decline. These are not all the risks the Trust faces, and other factors not presently known to the Trust or that the Trust currently believes are immaterial may also affect the Trust if they occur. Where the risk factors refer to Boaz Energy, any successor to Boaz Energy, or third-party operator if applicable, is included. These risks and uncertainties include, but are not limited to, the following:

Current wording

The risk factors summarized and detailed below could materially harm production from the Underlying Properties, operating results and/or the Trust’s financial condition, adversely affect proceeds to the Trust and cash distributions to Trust unitholders, and/or cause the price of the Trust units to decline. These are not all the risks the Trust faces, and other factors not presently known to the Trust or that the Trust currently believes are immaterial may also affect the Trust if they occur. Where the risk factors refer to T2S, any affiliate of T2S, any successor to T2S, or any third-party operator if applicable, is included. These risks and uncertainties include, but are not limited to, the following:

Previous wording

Boaz Energy, any successor to Boaz Energy, or any third-party operator of any Underlying Property may abandon the property, thereby terminating the related Net Profits Interest payable to the Trust that is attributable to the abandoned property.

Current wording

T2S, any successor to T2S, or any third-party operator of any Underlying Property may abandon the property, thereby terminating the related Net Profits Interest payable to the Trust that is attributable to the abandoned property.

Previous wording

A bankruptcy of Boaz Energy, any successor to Boaz Energy, or any third-party operator could adversely affect the operation of the wells and the development of the proved undeveloped reserves and interrupt or decrease distributions to Trust unitholders.

Current wording

A bankruptcy of T2S, any successor to T2S, or any third-party operator could adversely affect the operation of the wells and the development of the proved undeveloped reserves and interrupt or decrease distributions to Trust unitholders.

Previous wording

An increase in the differential between the price realized by Boaz Energy or any successor to Boaz Energy for oil or natural gas produced from the Underlying Properties and the NYMEX or other benchmark price of oil or natural gas could reduce the profits to the Trust and, therefore, the cash distributions by the Trust and the value of Trust units.

Current wording

An increase in the differential between the price realized by T2S or any successor to T2S for oil or natural gas produced from the Underlying Properties and the NYMEX or other benchmark price of oil or natural gas could reduce the profits to the Trust and, therefore, the cash distributions by the Trust and the value of Trust units.

Previous wording

The Trust is passive in nature and neither the Trust nor the Trust unitholders have any ability to influence Boaz Energy and other third-party operators or control the operation or development of the Underlying Properties.

Current wording

The Trust is passive in nature and neither the Trust nor the Trust unitholders have any ability to influence T2S or other third-party operators or control the operation or development of the Underlying Properties.

Previous wording

Boaz Energy may transfer all or a portion of the Underlying Properties at any time without Trust unitholder consent, subject to specified limitations.

Current wording

T2S may transfer all or a portion of the Underlying Properties at any time without Trust unitholder consent, subject to specified limitations.

Previous wording

Conflicts of interest could arise between Boaz Energy or any successor to Boaz Energy, on the one hand, and the Trust and the Trust unitholders, on the other hand.

Current wording

Conflicts of interest could arise between T2S or any successor to T2S, on the one hand, and the Trust and the Trust unitholders, on the other hand.

Previous wording

Boaz Energy’s or its successor’s ability to perform its obligations to the Trust could be limited by restrictions under its debt agreements.

Current wording

T2S’s or any successor's ability to perform its obligations to the Trust could be limited by restrictions under its debt agreements.

Previous wording

Trust unitholders have limited ability to enforce provisions of the Conveyance creating the Net Profits Interest, and Boaz Energy’s liability to the Trust (as well as the liability to the Trust of any successor to Boaz Energy) is limited.

Current wording

Trust unitholders have limited ability to enforce provisions of the Conveyance creating the Net Profits Interest, and T2S's liability to the Trust (as well as the liability to the Trust of any successor to T2S) is limited.

Previous wording

Boaz Energy (or any future owner of the units currently held by Boaz Energy) may sell Trust units in the public or private markets, and such sales could have an adverse impact on the trading price of the Trust units.

Current wording

Ustx, LLC (or any future owner of the units currently held by Ustx, LLC) may sell Trust units in the public or private markets, and such sales could have an adverse impact on the trading price of the Trust units.

Previous wording

Federal and state legislative and regulatory initiatives relating to hydraulic fracturing could result in Boaz Energy incurring increased costs, additional operating restrictions or delays and fewer potential drilling locations.

Current wording

Federal and state legislative and regulatory initiatives relating to hydraulic fracturing could result in T2S incurring increased costs, additional operating restrictions or delays and fewer potential drilling locations.

Previous wording

The adoption and implementation of international, federal or state climate change legislation or regulations could result in increased operating costs for Boaz Energy (or any successor to Boaz Energy) and reduced demand for the oil, natural gas and NGLs that Boaz Energy (or any successor to Boaz Energy) produces.

Current wording

The adoption and implementation of international, federal or state climate change legislation or regulations could result in increased operating costs for T2S (or any successor to T2S) and reduced demand for the oil, natural gas and NGLs that T2S (or any successor to T2S) produces.

Previous wording

The potential physical effects of climate change could disrupt production on the Underlying Properties and cause Boaz Energy, any successor to Boaz Energy, or any other third-party operators to incur significant costs, thereby reducing cash distributable to Trust unitholders.

Current wording

The potential physical effects of climate change could disrupt production on the Underlying Properties and cause T2S, any successor to T2S, or any other third-party operators to incur significant costs, thereby reducing cash distributable to Trust unitholders.

Previous wording

Additional restrictions on drilling activities intended to protect certain species of wildlife may adversely affect Boaz Energy’s and other 'operators' ability to conduct drilling activities.

Current wording

Additional restrictions on drilling activities intended to protect certain species of wildlife may adversely affect T2S’s and other operators' ability to conduct drilling activities.

Previous wording

The business of Boaz Energy or any successor to Boaz Energy could be negatively affected by various security threats, including cybersecurity threats, and other disruptions.

Current wording

The business of T2S or any successor to T2S could be negatively affected by various security threats, including cybersecurity threats, and other disruptions.

Previous wording

political conditions in major oil producing regions, especially in the Middle East and Russia, including the conflicts between Russia and Ukraine and Israel and Hamas;

Current wording

political conditions in major oil producing regions, especially in the Middle East and Russia, including the conflicts between Russia and Ukraine, the U.S. and Iran, and Israel and Iran;

Previous wording

In the event of a resurgence of COVID-19, the emergence of new strains or variants of COVID-19, or the occurrence of other pandemics or public health concerns, it is not possible to predict the impact such public health concern may have on global demand for oil and gas. If prices are negatively impacted in the future, it is possible Boaz Energy or any third-party operator of the Underlying Properties could shut in or curtail production from wells on the Underlying Properties or plug and abandon marginal wells that otherwise may have been allowed to continue to produce for a longer period under conditions of higher prices, without the consent of the Trust or the Trust unitholders. Substantial declines in and extended periods of decreased economic activity and depressed oil, natural gas and natural gas liquids prices have previously resulted in and may in future periods result in reductions in the amount of oil and natural gas that is economic to produce from the Underlying Properties, reduced net proceeds to which the Trust is entitled, and elimination of cash available for distribution to Trust unitholders for an unknown period of time.

Current wording

In the event of a resurgence of COVID-19, the emergence of new strains or variants of COVID-19, or the occurrence of other pandemics or public health concerns, it is not possible to predict the impact such public health concern may have on global demand for oil and gas. If prices are negatively impacted in the future, it is possible T2S, or any third-party operator of the Underlying Properties could shut in or curtail production from wells on the Underlying Properties or plug and abandon marginal wells that otherwise may have been allowed to continue to produce for a longer period under conditions of higher prices, without the consent of the Trust or the Trust unitholders. Substantial declines in and extended periods of decreased economic activity and depressed oil, natural gas and natural gas liquids prices have previously resulted in and may in future periods result in reductions in the amount of oil and natural gas that is economic to produce from the Underlying Properties, reduced net proceeds to which the Trust is entitled, and elimination of cash available for distribution to Trust unitholders for an unknown period of time.

Previous wording

Recovery of proved undeveloped reserves and the development of proved developed non-producing reserves requires capital expenditures and successful drilling operations by Boaz Energy (including any successor to Boaz Energy) and other third-party operators of the Underlying Properties. The reserve data included in the reserve report of Boaz Energy’s independent petroleum engineer assumes a certain amount of capital expenditures will be made to develop such reserves. The Net Profits Interest bears its proportionate share of these capital expenditures. However, the development of such reserves has in the past and may in the future take longer and may require higher levels of capital expenditures than anticipated. Delays in the development of the reserves, increases in drilling and development costs (including expenses related to secondary and tertiary recovery techniques) of such reserves or decreases or continued volatility in commodity prices will reduce the future net revenues of the estimated proved undeveloped reserves and may result in some projects becoming uneconomic. In addition, delays in the development of reserves could force Boaz Energy (or any successor to Boaz Energy) to reclassify certain of the proved reserves as unproved reserves.

Current wording

Recovery of proved undeveloped reserves and the development of proved developed non-producing reserves requires capital expenditures and successful drilling operations by T2S and other third-party operators of the Underlying Properties. The reserve data included in the reserve report of T2S's independent petroleum engineer assumes a certain amount of capital expenditures will be made to develop such reserves. The Net Profits Interest bears its proportionate share of these capital expenditures. However, the development of such reserves has in the past and may in the future take longer and may require higher levels of capital expenditures than anticipated. Delays in the development of the reserves, increases in drilling and development costs (including expenses related to secondary and tertiary recovery techniques) of such reserves or decreases or continued volatility in commodity prices will reduce the future net revenues of the estimated proved undeveloped reserves and may result in some projects becoming uneconomic. In addition, delays in the development of reserves have caused, and could further cause, T2S (or any successor to T2S) to reclassify certain of the proved reserves as unproved reserves. T2S has no plans for any capital projects in 2026 and may continue to delay any capital projects beyond 2026.

Previous wording

In addition, the process of developing oil and natural gas wells and producing oil and natural gas on the Underlying Properties is subject to numerous risks beyond Boaz Energy’s control, (or the control of any successor to Boaz Energy), including risks that could delay Boaz Energy’s, any successor to Boaz Energy’s, or any third-party operators’ current drilling or production schedule and the risk that drilling will not result in commercially viable oil or natural gas production. The ability of the operators to carry out operations or to finance planned development expenses could be materially and adversely affected by any factor that may curtail, delay, reduce or cancel development and production, including:

Current wording

In addition, the process of developing oil and natural gas wells and producing oil and natural gas on the Underlying Properties is subject to numerous risks beyond T2S’s control, (or the control of any successor to T2S), including risks that could delay T2S’s, any successor to T2S’s, or any third-party operators’ current drilling or production schedule and the risk that drilling will not result in commercially viable oil or natural gas production. The ability of the operators to carry out operations or to finance planned development expenses could be materially and adversely affected by any factor that may curtail, delay, reduce or cancel development and production, including:

Previous wording

In the event that planned operations by Boaz Energy or other operators, including drilling of development wells, are delayed or cancelled, or existing wells or development wells have lower than anticipated production due to one or more of the factors above or for any other reason, estimated future distributions to Trust unitholders may be reduced. In the event an operator incurs increased costs due to one or more of the above factors or for any other reason and is not able to recover such costs from insurance, the estimated future distributions to Trust unitholders may be reduced.

Current wording

In the event that planned operations by T2S or other operators, including drilling of development wells, are delayed or cancelled, or existing wells or development wells have lower than anticipated production due to one or more of the factors above or for any other reason, estimated future distributions to Trust unitholders may be reduced. In the event an operator incurs increased costs due to one or more of the above factors or for any other reason and is not able to recover such costs from insurance, the estimated future distributions to Trust unitholders may be reduced.

Previous wording

The marketing of oil and natural gas production depends in large part on the capacity and availability of gathering systems and other pipelines, trucks, storage facilities and other transportation, processing and refining facilities. If these facilities are unavailable on commercially reasonable terms or otherwise, production from the Underlying Properties could be shut in or Boaz Energy or the third-party operators could be required to delay or discontinue drilling plans and commercial production. Boaz Energy relies (and expects to rely in the future) on facilities developed and owned by third parties in order to transport, store, process and sell the oil and natural gas production from the Underlying Properties. Boaz Energy’s (or any successor to Boaz Energy's) plan to develop and sell its oil and natural gas could be materially and adversely affected by the inability or unwillingness of third parties to provide sufficient facilities and services to Boaz Energy on commercially reasonable terms, or otherwise. Further, any successor to Boaz Energy could significantly revise the plans of Boaz Energy with respect to the development and sales of oil and natural gas.

Current wording

The marketing of oil and natural gas production depends in large part on the capacity and availability of gathering systems and other pipelines, trucks, storage facilities and other transportation, processing and refining facilities. If these facilities are unavailable on commercially reasonable terms or otherwise, production from the Underlying Properties could be shut in or T2S or the third-party operators could be required to delay or discontinue drilling plans and commercial production. T2S relies (and expects to rely in the future) on facilities developed and owned by third parties in order to transport, store, process and sell the oil and natural gas production from the Underlying Properties. T2S's (or any successor to T2S's) plan to develop and sell its oil and natural gas could be materially and adversely affected by the inability or unwillingness of third parties to provide sufficient facilities and services to T2S on commercially reasonable terms, or otherwise.

Previous wording

The amount of oil and natural gas that can be produced and sold from a well is subject to limitation in certain circumstances, such as pipeline interruptions due to scheduled and unscheduled maintenance, failure of tendered oil and natural gas to meet quality specifications of gathering lines or downstream transporters, excessive pressure, damage to the gathering, transportation, refining or processing facilities or lack of capacity at such facilities. Increases in activity in the Permian Basin could, in the future, contribute to bottlenecks in processing and transportation that could negatively affect the production, transportation and sale of oil and natural gas from the Underlying Properties, and these adverse effects could be disproportionately severe compared to more geographically diverse operations. If Boaz Energy, any successor to Boaz Energy, or the third-party operators are forced to reduce production due to such a curtailment, the revenues of the Trust and the amount of cash distributions to the Trust unitholders would similarly be reduced due to the reduction of profits from the sale of production.

Current wording

The amount of oil and natural gas that can be produced and sold from a well is subject to limitation in certain circumstances, such as pipeline interruptions due to scheduled and unscheduled maintenance, failure of tendered oil and natural gas to meet quality specifications of gathering lines or downstream transporters, excessive pressure, damage to the gathering, transportation, refining or processing facilities or lack of capacity at such facilities. Increases in activity in the Permian Basin could, in the future, contribute to bottlenecks in processing and transportation that could negatively affect the production, transportation and sale of oil and natural gas from the Underlying Properties, and these adverse effects could be disproportionately severe compared to more geographically diverse operations. If T2S, any successor to T2S, or the third-party operators are forced to reduce production due to such a curtailment, the revenues of the Trust and the amount of cash distributions to the Trust unitholders would similarly be reduced due to the reduction of profits from the sale of production.

Previous wording

Boaz Energy, any successor to Boaz Energy, or any third-party operator of any Underlying Property may abandon the property, thereby terminating the related Net Profits Interest payable to the Trust that is attributable to the abandoned property.

Current wording

T2S, any successor to T2S, or any third-party operator of any Underlying Property may abandon the property, thereby terminating the related Net Profits Interest payable to the Trust that is attributable to the abandoned property.

Previous wording

Boaz Energy, any successor to Boaz Energy, or any third-party operator of the Underlying Properties could determine during periods of low commodity prices to shut in or curtail production from wells on the Underlying Properties or plug and abandon marginal wells that otherwise may have been allowed to continue to produce for a longer period under conditions of higher prices. Boaz Energy or any other operator may abandon any well or property without the consent of the Trust or the Trust unitholders if it reasonably believes that the well or property can no longer produce oil or natural gas in commercially paying quantities. This could result in termination of the Net Profits Interest relating to the abandoned well or property. The Underlying Properties are sensitive to decreasing commodity prices. The commodity price sensitivity is due to a variety of factors that vary from well to well, including the costs associated with water handling and disposal, chemicals, surface equipment maintenance, downhole casing repairs and reservoir pressure maintenance activities that are necessary to maintain production. As a result, the volatility of commodity prices may cause the expenses of certain wells to exceed the well’s revenue. If this scenario occurs, Boaz Energy, its successor, or any third-party operator may decide to shut-in the well or plug and abandon the well. This could reduce future cash distributions to Trust unitholders.

Current wording

T2S, any successor to T2S, or any third-party operator of the Underlying Properties could determine during periods of low commodity prices to shut in or curtail production from wells on the Underlying Properties or plug and abandon marginal wells that otherwise may have been allowed to continue to produce for a longer period under conditions of higher prices. T2S or any other operator may abandon any well or property without the consent of the Trust or the Trust unitholders if it reasonably believes that the well or property can no longer produce oil or natural gas in commercially paying quantities. This could result in termination of the Net Profits Interest relating to the abandoned well or property. The Underlying Properties are sensitive to decreasing commodity prices. The commodity price sensitivity is due to a variety of factors that vary from well to well, including the costs associated with water handling and disposal, chemicals, surface equipment maintenance, downhole casing repairs and reservoir pressure maintenance activities that are necessary to maintain production. As a result, the volatility of commodity prices may cause the expenses of certain wells to exceed the well’s revenue. If this scenario occurs, T2S, its successor, or any third-party operator may decide to shut-in the well or plug and abandon the well. This could reduce future cash distributions to Trust unitholders.

Previous wording

Similarly, the concentration of the Underlying Properties within the Permian Basin exposes the Trust to risks, which could adversely affect development activities or production relating to such formations. In addition, in areas where exploration and production activities are increasing, Boaz Energy and any successor to Boaz Energy could be subject to increasing competition for drilling rigs, equipment, services, supplies and qualified personnel, which may lead to periodic shortages or delays. The curtailments arising from these and similar circumstances may last from a few days to several months, and in many cases, Boaz Energy and any successor to Boaz Energy may be provided only limited, if any, notice as to when such circumstances will arise and their duration.

Current wording

Similarly, the concentration of the Underlying Properties within the Permian Basin exposes the Trust to risks, which could adversely affect development activities or production relating to such formations. In addition, in areas where exploration and production activities are increasing, T2S and any successor to T2S could be subject to increasing competition for drilling rigs, equipment, services, supplies and qualified personnel, which may lead to periodic shortages or delays. The curtailments arising from these and similar circumstances may last from a few days to several months, and in many cases, T2S and any successor to T2S may be provided only limited, if any, notice as to when such circumstances will arise and their duration.

Previous wording

A bankruptcy of Boaz Energy, any successor to Boaz Energy, or any third-party operator could adversely affect the operation of the wells and the development of the proved undeveloped reserves and interrupt or decrease distributions to Trust unitholders.

Current wording

A bankruptcy of T2S , any successor to T2S, or any third-party operator could adversely affect the operation of the wells and the development of the proved undeveloped reserves and interrupt or decrease distributions to Trust unitholders.

Previous wording

The value of the Net Profits Interest and the Trust’s ultimate cash available for distribution are highly dependent on Boaz Energy’s financial condition, (and the financial condition of any successor to Boaz Energy). Neither Boaz Energy nor any other operator of the Underlying Properties has agreed with the Trust to maintain a certain net worth or to be restricted by other similar covenants. In addition, Boaz Energy is not required to retain ownership of its Trust units and may sell such units or distribute such units, or the proceeds from the sale thereof, to its owners. The ability to develop and operate the Underlying Properties depends on Boaz Energy’s or any successor’s future financial condition and economic performance and access to capital, which in turn will depend upon the supply of and demand for oil and natural gas, prevailing economic conditions and financial, business and other factors, many of which are beyond the control of Boaz Energy.

Current wording

The value of the Net Profits Interest and the Trust’s ultimate cash available for distribution are highly dependent on T2S’s financial condition, (and the financial condition of any successor to T2S). Neither T2S nor any other operator of the Underlying Properties has agreed with the Trust to maintain a certain net worth or to be restricted by other similar covenants. In addition, T2S's affiliate, Ustx LLC, is not required to retain ownership of its Trust units and may sell such units or distribute such units, or the proceeds from the sale thereof, to its owners. The ability to develop and operate the Underlying Properties depends on T2S’s or any successor’s future financial condition and economic performance and access to capital, which in turn will depend upon the supply of and demand for oil and natural gas, prevailing economic conditions and financial, business and other factors, many of which are beyond the control of T2S.

Previous wording

The bankruptcy of Boaz Energy, any successor to Boaz Energy or any third-party operator of the Underlying Properties could impede the operation of the wells and the development of the proved undeveloped reserves and decrease distributions to the Trust unitholders. For example:

Current wording

The bankruptcy of T2S, any successor to T2S or any third-party operator of the Underlying Properties could impede the operation of the wells and the development of the proved undeveloped reserves and decrease distributions to the Trust unitholders. For example:

Previous wording

The working interest owners in the affected properties may have to seek a new party to perform the development and the operations of the affected wells. The right to replace an operator would be subject to the terms of any joint operating agreement, and the exercise thereof could be subject to the automatic stay in the operator’s bankruptcy case. Boaz Energy or any successor to Boaz Energy or the other working interest owners may not be able to find a replacement operator, and they may not be able to enter into a new agreement with such replacement party on favorable terms within a reasonable period of time.

Current wording

The working interest owners in the affected properties may have to seek a new party to perform the development and the operations of the affected wells. The right to replace an operator would be subject to the terms of any joint operating agreement, and the exercise thereof could be subject to the automatic stay in the operator’s bankruptcy case. T2S or any successor to T2S or the other working interest owners may not be able to find a replacement operator, and they may not be able to enter into a new agreement with such replacement party on favorable terms within a reasonable period of time.

Previous wording

The payment of any accrued but unpaid oil and natural gas revenues payable on the Net Profits Interest at the time of a bankruptcy case filing by Boaz Energy, any successor to Boaz Energy, or another operator could be delayed or such amounts may be misapplied or not paid to the Trust at all, which would result in a general unsecured claim in favor the Trust against Boaz Energy’s (or the applicable operator’s) bankruptcy estate. There is no certainty that such unsecured claim would receive a distribution from the bankruptcy estate.

Current wording

The payment of any accrued but unpaid oil and natural gas revenues payable on the Net Profits Interest at the time of a bankruptcy case filing by T2S, any successor to T2S, or another operator could be delayed or such amounts may be misapplied or not paid to the Trust at all, which would result in a general unsecured claim in favor the Trust against T2S’s (or the applicable operator’s) bankruptcy estate. There is no certainty that such unsecured claim would receive a distribution from the bankruptcy estate.

Previous wording

Executory contracts to which Boaz Energy, any successor to Boaz Energy or another operator is party (including midstream and transportation contracts) would be subject to possible rejection in the bankruptcy case, which would result in a loss of access to the service provided by the counterparty to such contracts.

Current wording

Executory contracts to which T2S, any successor to T2S or another operator is party (including midstream and transportation contracts) would be subject to possible rejection in the bankruptcy case, which would result in a loss of access to the service provided by the counterparty to such contracts.

Previous wording

Boaz Energy is not a reporting company and is not required to file periodic reports with the SEC pursuant to the Exchange Act. Therefore, Trust unitholders do not have access to financial information about Boaz Energy.

Current wording

T2S is not a reporting company and is not required to file periodic reports with the SEC pursuant to the Exchange Act. Therefore, Trust unitholders do not have access to financial information about T2S.

Previous wording

Maintenance projects on the Underlying Properties have affected and will likely continue to affect the quantity of proved reserves that can be economically produced from wells on the Underlying Properties. The timing and size of these maintenance projects will depend on, among other factors, the market prices of oil and natural gas. Neither Boaz Energy nor any successor to Boaz Energy is under contractual obligation to develop or otherwise pay maintenance or other development expenses on the Underlying Properties in the future. Furthermore, with respect to properties for which Boaz Energy or any successor to Boaz Energy is not designated as the operator, Boaz Energy has (and any successor will have) limited control over the timing or amount of those maintenance projects and other development expenses. Boaz Energy also has (and any successor will have) the right to non-consent and not participate in maintenance projects and other development activities on properties for which it is not the operator, in which case Boaz Energy and the Trust will not receive the production resulting from such maintenance projects and other development expenses until after payout occurs pursuant to the applicable joint operating agreement. If Boaz Energy, any successor to Boaz Energy, or any third-party operator does not implement maintenance projects when warranted, the future rate of production decline of proved reserves may be higher than the rate currently expected by Boaz Energy or estimated in reserve reports. Furthermore, the Trust is not permitted to acquire other oil and natural gas properties or net profits interests to replace the depleting assets and production attributable to the Net Profits Interest.

Current wording

Maintenance projects on the Underlying Properties have affected and will likely continue to affect the quantity of proved reserves that can be economically produced from wells on the Underlying Properties. The timing and size of these maintenance projects will depend on, among other factors, the market prices of oil and natural gas. Neither T2S nor any successor to T2S is under contractual obligation to develop or otherwise pay maintenance or other development expenses on the Underlying Properties in the future. Furthermore, with respect to properties for which T2S or any successor to T2S is not designated as the operator, T2S has (and any successor will have) limited control over the timing or amount of those maintenance projects and other development expenses. Boaz Energy had prior to March 31, 2025, and T2S has on and after March 31, 2025, the right to non-consent and not participate in maintenance projects and other development activities on properties for which it is not the operator, in which case T2S and the Trust will not receive the production resulting from such maintenance projects and other development expenses until after payout occurs pursuant to the applicable joint operating agreement. If T2S, any successor to T2S, or any third-party operator does not implement maintenance projects when warranted, the future rate of production decline of proved reserves may be higher than the rate currently expected by T2S or estimated in reserve reports. Furthermore, the Trust is not permitted to acquire other oil and natural gas properties or net profits interests to replace the depleting assets and production attributable to the Net Profits Interest.

Previous wording

The Trustee reviews the Trust’s Net Profits Interest in oil and natural gas properties for impairment annually and whenever events or circumstances indicate that the carrying value of the Net Profits Interest may not be recoverable. In the event of material revisions, the Trustee reviews the impact of these revisions on the amortization of Trust Units and impairment estimates. During 2024, a material revision was made to reserves resulting in the additional recognition of amortization of Trust Units. The Trust recognized $3,496,231 of amortization of Trust Units for the year ended December 31, 2024. There was no impairment present for the year ended December 31, 2024, after revisions to undiscounted cash flows. In general, neither the Trustee nor Boaz Energy view temporarily low prices as an indication of impairment. The markets for crude oil and natural gas have a history of significant price volatility and though prices will occasionally drop significantly, industry prices over the long term will continue to be driven by market supply and demand. If events and circumstances indicate that the carrying value may not be recoverable, the Trustee would use the estimated undiscounted future net cash flows from the Net Profits Interest to evaluate the recoverability of the Trust assets. If the undiscounted future net cash flows from the Net Profits Interest are less than the Net Profits Interest carrying value, the Trust would recognize an impairment loss for the difference between the Net Profits Interest carrying value and the estimated fair value of the Net Profits Interest. The determination as to whether the Net Profits Interest is impaired is based on the best information available to the Trustee at the time of the evaluation, including information provided by Boaz Energy such as estimates of future production and development and operating expenses.

Current wording

In general, neither the Trustee nor T2S view temporarily low prices as an indication of impairment. The markets for crude oil and natural gas have a history of significant price volatility and though prices will occasionally drop significantly, industry prices over the long term will continue to be driven by market supply and demand. When events and circumstances indicate that the carrying value may not be recoverable, the Trustee uses the estimated undiscounted future net cash flows from the Net Profits Interest to evaluate the recoverability of the Trust assets. When the undiscounted future net cash flows from the Net Profits Interest are less than the Net Profits Interest carrying value, the Trust recognizes an impairment loss for the difference between the Net Profits Interest carrying value and the estimated fair value of the Net Profits Interest. The determination as to whether the Net Profits Interest is impaired is based on the best information available to the Trustee at the time of the evaluation, including information provided by T2S such as estimates of future production and development and operating expenses.

Previous wording

An increase in the differential between the price realized by Boaz Energy or any successor to Boaz Energy for oil or natural gas produced from the Underlying Properties and the NYMEX or other benchmark price of oil or natural gas could reduce the profits to the Trust and, therefore, the cash distributions by the Trust and the value of Trust units.

Current wording

An increase in the differential between the price realized by T2S or any successor to T2S for oil or natural gas produced from the Underlying Properties and the NYMEX or other benchmark price of oil or natural gas could reduce the profits to the Trust and, therefore, the cash distributions by the Trust and the value of Trust units.

Previous wording

The prices received for Boaz Energy’s oil and natural gas production have generally been lower than the relevant benchmark prices, such as NYMEX. The difference between the price received and the benchmark price is called a basis differential. The differential may vary significantly due to market conditions, the quality and location of production and other factors, including a regional oversupply of oil in the Permian Basin due to take-away constraints. Boaz Energy cannot accurately predict oil or natural gas differentials in the future. Increases in the differential between the realized price of oil and natural gas and the benchmark price for oil and natural gas could reduce the profits to the Trust, the cash distributions by the Trust and the value of the Trust units.

Current wording

The prices received by Boaz Energy or T2S, as applicable, for their respective oil and natural gas production have generally been lower than the relevant benchmark prices, such as NYMEX. The difference between the price received and the benchmark price is called a basis differential. The differential may vary significantly due to market conditions, the quality and location of production and other factors, including a regional oversupply of oil in the Permian Basin due to take-away constraints. T2S cannot accurately predict oil or natural gas differentials in the future. Increases in the differential between the realized price of oil and natural gas and the benchmark price for oil and natural gas could reduce the profits to the Trust, the cash distributions by the Trust and the value of the Trust units.

Previous wording

A significant portion of the future production from the Underlying Properties will be associated with secondary recovery projects that are in the early or intermediate stage of implementation. As a result, there can be no assurance that these operations will perform as expected or consistently with the analogous secondary recovery operations used by Boaz Energy or any successor to Boaz Energy in establishing its reserve and production estimates. As secondary recovery techniques such as waterflooding are used, the amount of oil recovered is expected to first increase as a result of such techniques and then will begin to decline over the long term. Risks associated with secondary recovery techniques include, but are not limited to, the following:

Current wording

A significant portion of the future production from the Underlying Properties will be associated with secondary recovery projects that are in the early or intermediate stage of implementation. As a result, there can be no assurance that these operations will perform as expected or consistently with the analogous secondary recovery operations used by T2S or any successor to T2S in establishing its reserve and production estimates. As secondary recovery techniques such as waterflooding are used, the amount of oil recovered is expected to first increase as a result of such techniques and then will begin to decline over the long term. Risks associated with secondary recovery techniques include, but are not limited to, the following:

Previous wording

Boaz Energy acquired the Underlying Properties through various acquisitions since October 2013. The existence of a material title deficiency with respect to the Underlying Properties could reduce the value of a property or render it worthless, thus adversely affecting the Net Profits Interest and the distributions to Trust unitholders. Boaz Energy does not obtain title insurance covering mineral leaseholds, and Boaz Energy’s, or any successor to Boaz Energy’s, failure to cure any title defects may cause Boaz Energy or any successor to Boaz Energy to lose its rights to production from the Underlying Properties. In the event of any such material title problem, profits available for distribution to Trust unitholders and the value of the Trust units may be reduced.

Current wording

Boaz Energy acquired the Underlying Properties through various acquisitions since October 2013. T2S acquired the underlying Properties from Boaz Energy on March 31,2025. The existence of a material title deficiency with respect to the Underlying Properties could reduce the value of a property or render it worthless, thus adversely affecting the Net Profits Interest and the distributions to Trust unitholders. Neither Boaz Energy nor T2S obtained title insurance covering mineral leaseholds, and Boaz Energy’s, T2S's, or any successor to T2S’s, failure to cure any title defects may cause T2S or any successor to T2S to lose its rights to production from the Underlying Properties. In the event of any such material title problem, profits available for distribution to Trust unitholders and the value of the Trust units may be reduced.

Previous wording

Boaz Energy maintains insurance coverage against potential losses that it believes is customary in its industry. Boaz Energy is not required to maintain any minimum levels of insurance and its ability to maintain any such coverages will depend on conditions in the insurance markets among other factors beyond Boaz Energy’s control. In addition, Boaz Energy’s general liability insurance and excess liability policies do not provide coverage with respect to legal and contractual liabilities of the Trust, and the Trust does not maintain such coverage since it is passive in nature and does not have any ability to influence Boaz Energy or control the operations or development of the Underlying Properties. Boaz Energy does not currently have any insurance policies in effect that are intended to provide coverage for losses solely related to waterflooding or other completion operations. These policies may not cover fines, penalties or costs and expenses related to government-mandated remediation of pollution. In addition, these policies do not provide coverage for all liabilities, and Boaz Energy cannot assure you that the insurance coverage will be adequate to cover claims that may arise, including due to potential effects of climate change, or that Boaz Energy will be able to maintain adequate insurance at rates it considers reasonable. The occurrence of an event not fully covered by insurance could result in a significant decrease in the amount of cash available for distribution by the Trust. The Trust does not know whether any successor to Boaz Energy will maintain insurance coverage against potential losses.

Current wording

T2S maintains insurance coverage against potential losses that it believes is customary in its industry. T2S is not required to maintain any minimum levels of insurance and its ability to maintain any such coverages will depend on conditions in the insurance markets among other factors beyond T2S’s control. In addition, T2S's general liability insurance and excess liability policies do not provide coverage with respect to legal and contractual liabilities of the Trust, and the Trust does not maintain such coverage since it is passive in nature and does not have any ability to influence T2S or control the operations or development of the Underlying Properties. T2S does not currently have any insurance policies in effect that are intended to provide coverage for losses solely related to waterflooding or other completion operations. These policies may not cover fines, penalties or costs and expenses related to government-mandated remediation of pollution. In addition, these policies do not provide coverage for all liabilities, and T2S cannot assure you that the insurance coverage will be adequate to cover claims that may arise, including due to potential effects of climate change, or that T2S will be able to maintain adequate insurance at rates it considers reasonable. The occurrence of an event not fully covered by insurance could result in a significant decrease in the amount of cash available for distribution by the Trust.

Previous wording

The Trust is passive in nature and neither the Trust nor the Trust unitholders have any ability to influence Boaz Energy and other third-party operators or control the operation or development of the Underlying Properties.

Current wording

The Trust is passive in nature and neither the Trust nor the Trust unitholders have any ability to influence T2S and other third-party operators or control the operation or development of the Underlying Properties.

Showing the first 40 of 75 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

The Trustee reviews the Trust’s Net Profits Interest in oil and natural gas properties for impairment annually and whenever events or circumstances indicate that the carrying value of the Net Profits Interest may not be recoverable. In the event of material revisions, the Trustee reviews the impact of these revisions on the amortization of Trust Units and impairment estimates. During 2025, a material revision was made to reserves resulting in the additional recognition of amortization of Trust Units. The Trust recognized $5,905,119 of amortization of Trust Units for the year ended December 31, 2025.