Item 2. : Properties

The information on the Company’s primary asset, Thacker Pass, contained in this Form 10-K Item 2: Properties section has been derived from the Reports, is subject to certain assumptions, qualifications and procedures described in the Reports, some of which are not fully described herein, and is qualified in its entirety by the full text of the Reports.

Reference should be made to the full text of the Reports, effective December 31, 2024, which is filed as Exhibit 96.1 to this Annual Report and incorporated by reference herein. The S-K 1300 Technical Report is also available for viewing on the Company’s profile on EDGAR at www.sec.gov. The NI 43-101 Technical Report is also available for viewing on the Company’s profile on SEDAR+ at www.sedarplus.ca. All capitalized terms used in the disclosure below that are not otherwise defined shall have the meanings ascribed thereto in the Reports, as applicable.

The following description is taken from the Reports, and also includes certain information updated from the time of the filing of the Reports in accordance with the requirements of S-K 1300. For developments subsequent to December 31, 2025, refer to Part I – Item 1: Business – Organizational History and Recent Developments in this Form 10-K.

Thacker Pass Summary

In April 2025, the final investment decision was declared and Thacker Pass proceeded with major construction of the processing plant. For an overview and update on construction progress, refer to Part I – Item 1: Business – Thacker Pass Overview in this Form 10-K. As of December 31, 2025, approximately 150 acres have been disturbed at Thacker Pass in connection with construction activities. Among other things, construction is focused on the lithium processing facility and sulfuric acid plant, in addition to the development of permanent roads and entryways.

Thacker Pass is currently owned by a JV between LAC, which has a 62% ownership, and GM, which has a 38% ownership (in each case, subject to the exercise of the JV Warrant). On January 30, 2026, the Company issued the JV Warrant to the DOE, which have not been exercised as of the date of this Form 10-K. For more information on the JV, refer to Part I – Item 1: Business – Organizational History and Recent Developments in this Form 10-K.

Refer to Item 1A: Risk Factors for risks related to Thacker Pass.

Technical Report

The primary purpose of the Reports was to provide an update of the Mineral Resource and Mineral Reserve estimates to incorporate data from 97 drills completed in 2023. The updated Mineral Reserve supported an expansion plan across five phases for total designed nominal capacity rate of approximately 160,000 t/y of lithium carbonate over an 85 year mine life. The Reports also included estimated capital costs, operating costs, reclamation and closure costs, royalties, taxes and economic analysis, as well as current status of the permits.

Property Description and Location

Thacker Pass is located in Humboldt County in northern Nevada, approximately 100 km north-northwest of Winnemucca, approximately 33 km west-northwest of Orovada, Nevada, and 33 km south of the Oregon border. It is situated within Township 44 North (T44N), Range 34 East (R34E), and within portions of Sections 1 and 12; T44N, R35E within portions of Sections 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, and 17; and T44N, R36E, within portions of Sections 7, 8, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, and 29. The Project area is located on the United States Geological Survey (USGS) Thacker Pass 7.5-minute quadrangle at an approximate elevation of 1,500 m. Entrance to the Project can be found at 41o 41’ 40.6” N 118o 02’ 4.3” W.

The Thacker Pass area encompasses approximately 7,900 ha and lies within and is surrounded by public lands administered by the BLM. The Thacker Pass mineral claims include the anticipated lithium claystone mining at the Thacker Pass deposit along with certain ancillary surface rights; the claims encompass an area previously referred to as the Stage I area of the Kings Valley Lithium Project. The surrounding area is sparsely populated and used primarily for ranching and farming.

Access to Thacker Pass is via the paved US Highway 95 and paved State Route 293; travel north on US-95 from Winnemucca, Nevada, for approximately 70 km to Orovada, Nevada and then travel west-northwest on State

Route 293 for 33 km toward Thacker Pass to the Thacker Pass site entrance. Driving time is approximately one hour from Winnemucca, and 3.5 hours from Reno. On-site access is via several gravel and dirt roads off of State Route 293. The closest international airport is located in Reno, Nevada, approximately 370 km southwest of Thacker Pass. The nearest railroad access is in Winnemucca, Nevada.

As at December 31, 2025, the net book value for the Thacker Pass property was $1,328.6 million.

Mineral Tenure

Thacker Pass is comprised of 2,829 unpatented mining claims and 39 mill site claims (together, the “Thacker Mining Claims”) owned or controlled by LN. LAC also owns 64.75 ha of private property in the Project area. LN and its affiliate KV Project LLC are the record owners of the Thacker Mining Claims and LAC’s unpatented mineral claims in the Montana Mountains.

Unpatented mining claims provide the holder with the rights to all locatable minerals on the relevant property, including lithium. The rights include the ability to use the claims for prospecting, mining or processing operations, and uses reasonably incident thereto, along with the right to use so much of the surface as may be necessary for such purposes or for access to adjacent land. This interest in the Thacker Mining Claims remains subject to the paramount title of the U.S. federal government. The holder of an unpatented mining claim maintains a perpetual entitlement to the claim, provided it meets the obligations for maintenance thereof as required by the Mining Act of the United States of America (the “Mining Act”) and associated regulations. The holder of unpatented mining claims maintains the right to extract and sell locatable minerals, which includes lithium, subject to regulatory approvals required under Federal, State and local law. In Nevada, such approvals and permits include approval of a plan of operations by the BLM and environmental approvals.

At this time, the principal obligation imposed on LN in connection with holding the Thacker Mining Claims is to pay an annual maintenance fee, which represents payment in lieu of the assessment work required under the Mining Act, along with associated administrative filings. All obligations for the Thacker Mining Claims in Nevada, including annual fees for 2025-26 to the BLM and Humboldt County, have been fulfilled.

Royalties

Certain of the Thacker Mining Claims are subject to a 20% royalty payable to Cameco Global Exploration II Ltd. solely in respect of uranium (the “Uranium Royalty”). In addition to the Uranium Royalty, Thacker Pass is subject to a royalty on net revenue produced directly from ore, subject to a buy-down right. This royalty was granted to MF2, LLC (“MF2”), a subsidiary of Orion Mine Fine Finance (Master) Fund I LP (f/k/a RK Mine Finance (Master) Fund II L.P.) in 2013. MF2 subsequently transferred 60% of the royalty to Alnitak Holdings, LLC. This royalty has been included in the economic model on the assumption that the Thacker Pass owner will exercise its buy-down right to reduce the royalty from 8.0% to 1.75% by making an upfront payment of $22 million in or prior to the first year of operations. Under the current lithium carbonate pricing assumption the ongoing annual royalty payments will average $422/t lithium carbonate sold over the 85-year LOM (base case).

In April 2025, Orion entered into a PPA with the Company. Under the terms of the PPA, Orion will receive (i) fixed payments of $0.128 per tonne ($0.152 per tonne if the Delayed Draw Notes (as defined below) have been drawn) of the total lithium processed each year at Thacker Pass for a period of 72 quarters after first production, and (ii) variable payments of 0.96% (1.14% if the Delayed Draw Notes have been drawn) of total gross revenue in perpetuity, with the fixed and variable portions both applying to the first 41,500 tonnes of lithium processed each year, subject to certain adjustments relating to Thacker Pass total Phase 1 project costs. The production payments are subject to certain adjustments relating to the tonnage of battery-grade lithium carbonate equivalent sold. The variable payments are also subject to certain adjustments related to the future price of lithium. The PPA has not been included in the economic model of the Reports.

Permitting and Reclamation Obligations

In 2021, BLM approved a reclamation cost estimate for the Thacker Pass plan of operations of $47.6 million. Financial assurance in the amount of $13.7 million for the initial work plan was placed with the agency in February 2023 prior to initiating construction with the remaining amount to be placed as construction activities progress. The NDEP-BMRR approved the PoO with the issuance of draft Reclamation Permit 0415. On February 25, 2022, the NDEP-BMRR and then issued the final Reclamation Permit 0415. On June 25, 2024, the BLM approved a modification to the PoO, which included an updated facility layout and the addition of the countercurrent decantation circuits. A modified Reclamation Permit was issued by NDEP-BMRR in Q4 2024. The BLM requires the placement of a financial guarantee (reclamation bond) to ensure that all disturbances from the mine and process site are reclaimed once mining concludes. The financial guarantee was placed in February 2025 and approved by the BLM in March 2025.

Thacker Pass is located on public lands administered by the U.S. Department of the Interior, BLM. Construction of Thacker Pass requires permits and approvals from various Federal, State, and local government agencies. All major federal, state and local permits and authorizations for Phase 1 have been achieved and there are no identified issues that would prevent LAC from achieving all permits and authorizations for Phase 1 and 2 of Thacker Pass. Additional analysis would be needed to determine any potential Federal, State or local regulatory or permitting issues for future phases of Thacker Pass.

History

In 1975, Chevron USA (“Chevron”) began an exploration program for uranium in the sediments located throughout the McDermitt Caldera (“McDermitt Caldera”), a 40km x 30km geological formation straddling the Oregon-Nevada border, which includes Thacker Pass. Early in Chevron’s program, the USGS (who had been investigating lithium sources) alerted Chevron to the presence of anomalous concentrations of lithium associated with the caldera. Though uranium remained the primary focus of exploration, Chevron added lithium to its assays in 1978 and 1979, began a clay analysis program and obtained samples for engineering work. Results supported the high lithium concentrations contained in clays. From 1980 to 1987, Chevron began a drilling program that focused on lithium targets and conducted extensive metallurgical testing of the clays to determine the viability of lithium extraction.

In 1991, Chevron sold its interest in the claims to Cyprus Gold Exploration Corporation who allowed the claims to lapse. Jim LaBret, a claim owner who received exploration data from Cypress Gold Exploration Corporation, leased his claims in 2005 to Western Energy Development Corporation (“WEDC”).

In 2007, WEDC leased the mining claims to Western Lithium Corporation (“WLC”) for the purpose of lithium exploration and exploitation.

In 2016, WLC changed its name to Lithium Nevada Corp, a U.S. subsidiary of Lithium Americas.

In Q4 2024, LAC and GM established a joint venture for ownership of the Project. GM acquired a 38% asset-level ownership in Thacker Pass, with LAC retaining a 62% interest.

On January 30, 2026, in accordance with the terms of the OWCA, the Company issued to the DOE: (i) the LAC Warrant and (ii) JV Warrant. Each of the LAC Warrant and the JV Warrant shall be automatically exercised in full on a cashless basis immediately prior to expiration, and the LAC Warrant shall additionally be exercised in full via cashless exercise on the 12-month anniversary of the Issuance Date and on each one-year anniversary of such date thereafter if the VWAP of the Common Shares over the 15 Trading Days ending immediately prior to such date exceeds $30.00 per share (as adjusted). As of the date of this Form 10-K, the DOE has not exercised the JV Warrant.

Prior owners and operators of the property did not conduct any commercial lithium production from Thacker Pass.

Quality Control Measures and Data Verification Procedures

In 2010-2011, for every 34 half core samples, the Company randomly inserted two standard samples (3,000 ppm grade and 4,000 ppm Li grade), one duplicate sample and one blank sample. The 2017-2018 quality program was slightly modified to include a random blank or standard sample within every 30.5 m interval and taking a duplicate split of the core (1⁄4 core) every 30.5 m.

In 2023, LAC re-certified the 3,000 ppm grade standard, 4,000 ppm grade standard and purchased the OREAS 173 standard (1,000 ppm standard) for use in 2023 QA/QC program. In addition to the three standards, a blank standard and duplicates were also included in the 2023 QAQC program. Like the 2017-2018 program, a random blank or standard sample was included every 30.5 m interval and a duplicate split of the core (1⁄4 core) was taken every 30.5 m.

The total number of LAC blank, duplicate and standard samples analyzed by the laboratory during the Company’s Thacker Pass drilling campaign from 2010-2011 was 9.5% of the total samples assayed. The Company’s 2017-2018 drilling campaign averaged 11.1% quality control samples out of the total samples assayed. The Company’s 2023 drilling campaign averaged 10.5% quality control samples out of the total samples assayed. Assaying for all drilling averaged 10.5% check samples. This does not include ALS Global of Reno, Nevada internal check and duplicate samples.

Mineral Resource and Mineral Reserve Estimates

Following are the Mineral Resource and Mineral Reserve Estimates for Thacker Pass as of December 31, 2025, reported in accordance with S-K 1300 and NI 43-101.

Changes of Mineral Estimates from 2024 and 2025

There were no changes in reported Mineral Resources and Mineral Reserves for Thacker Pass for the years ended December 31, 2025 and 2024. At December 31, 2024 and December 31, 2025, LAC owned a 62% interest in Thacker Pass, including this mineral resource estimate, with GM owning the remaining 38%. Rene LeBlanc, PhD, SME, Vice President, Commercial and Product Strategy, a qualified person (“QP”) and an employee of the Company, has reviewed the mineral reserves and mineral resources and material assumptions included in this Form 10-K and confirmed that they remain current as of December 31, 2025.

Mineral Resource Estimates

The statement of Mineral Resources for Thacker Pass reported in accordance with S-K 1300 as of December 31, 2025 are presented in the table below. Mineral Resources are reported exclusive of Mineral Reserves in accordance with S-K 1300.

Mineral Resources Estimate as of December 31, 2025 as Reported under S-K 1300
Classification / Geological Domain · Density(g/cc) · Lithium(ppm) · 100% Project Basis · 62% LAC ControlBasis · MetallurgicalRecovery (%)
In SituDry(MillionMetricTonnes) · In SituLCE Dry(MillionMetricTonnes) · In SituDry(MillionMetricTonnes) · In SituLCE Dry(MillionMetricTonnes)
Measured
Smectite 21.741,16059.00.436.60.274%
Smectite 11.772,380169.42.1105.11.363%
Subtotal - Smectite1.762,060228.42.5141.61.666%
Illite 31.862,7605.20.13.20.083%
Illite 21.904,9202.90.11.80.083%
Illite 11.832,53040.60.625.20.384%
Subtotal - Illite1.842,70048.70.730.20.484%
Subtotal - Measured1.772,180277.13.2171.82.069%
Indicated
Smectite 21.741,210551.13.6341.72.267%
Smectite 11.772,2001,277.215.0791.99.362%
Subtotal - Smectite1.761,9101,828.318.51,133.611.563%
Illite 31.862,81090.01.355.80.885%
Illite 21.905,04073.62.045.61.281%
Illite 11.832,050404.74.4250.92.782%
Subtotal - Illite1.842,560568.37.7352.44.882%
Subtotal - Indicated1.782,0602,396.626.31,485.916.368%
Measured + Indicated
Smectite 21.741,210610.13.9378.32.467%
Smectite 11.772,2201,446.617.1896.910.662%
Subtotal - Smectite1.761,9202,056.721.11,275.213.164%
Illite 31.862,81095.21.459.00.985%
Illite 21.905,04076.42.147.41.381%
Illite 11.832,100445.45.0276.13.182%
Subtotal - Illite1.842,570617.08.4382.55.282%
Subtotal - Measured + Indicated1.782,0702,673.729.51,657.718.368%
Inferred
Smectite 21.731,130186.51.1115.60.762%
Smectite 11.781,9901,145.112.1710.07.573%
Subtotal - Smectite1.771,8701,331.613.2825.68.271%
Illite 31.872,970108.11.767.01.184%
Illite 21.894,75086.12.253.41.481%
Illite 11.801,830455.74.4282.52.880%
Subtotal - Illite1.832,470649.98.3402.95.281%
Subtotal - Inferred1.792,0701,981.521.61,228.513.475%

Notes:

Mineral Resource Estimate were prepared by a QP employed by Sawtooth Mining, LLC as of December 31, 2024 and remain current as of December 31, 2025.

The Mineral Resource model has been generated using Imperial units. Metric tonnages shown in table are conversions from the Imperial Block Model.

Mineral Resources are in situ and are reported exclusive of 1,056.7 million metric tonnes (Mt) of Mineral Reserves and the 14.3 Mt of LCE.

Mineral Resources are reported using an economic break-even formula: “Operating Cost per Resource Short Ton”/“Price per Recovered Short Ton Lithium” * 10^6 = ppm Li Cutoff. “Operating Cost per Resource Short Ton” = US$86.76, “Price per Recovered Short Ton Lithium” is estimated: “Lithium Carbonate Equivalent (LCE) Price” * 5.3228 *(1 – “Royalties”) * “Metallurgical Recovery”. Variables are “LCE Price” = US$26,308/Short Ton ($29,000/tonne) Li 2 CO 3, “GRR” = 1.75% and “Metallurgical Recovery” = 73.5%. For more information regarding the material assumptions underlying the mineral resources estimate, see Section 11 of the S-K 1300 Technical Report.

Presented at a cutoff grade of 858 ppm Li. and a maximum ash content of 85%.

A mineral resource constraining pit shell has been derived from performing a pit optimization estimation using Vulcan software and the same economic inputs as what was used to calculate the cutoff grade.

The conversion factor for lithium to LCE is 5.3228.

Applied density for the mineralization is weighted in the block model based on clay and ash percentages in each block and the average density for each lithology.

Measured Mineral Resources are in blocks estimated using at least 3 drill holes and 10 samples where the closest sample during estimation is less than or equal to 900 ft. Indicated Mineral Resources are in blocks estimated using at least 2 drill holes and 10 samples where the closest sample during estimation is less than or equal to 1,500 ft. Inferred Mineral Resources are in blocks estimated using at least 2 drill holes and 9 samples where the closest sample during estimation is less than or equal to 2,500 ft.

Prior to the exercise of the JV Warrant, LAC owns a 62% interest of the Project, including this mineral resource estimate, with GM owning the remaining 38%.

The statement of Mineral Resources for Thacker Pass as of December 31, 2025 reported in accordance with NI 43-101 are presented in the table below. Mineral Resources are reported inclusive of Mineral Reserves in accordance with NI 43-101.

Mineral Resources Estimate as of December 31, 2025 as reported under NI 43-101
ClassificationDensity(g/cc)Lithium(ppm)In Situ Dry(Million MetricTonnes)In Situ LCE Dry(Million MetricTonnes)MetallurgicalRecovery (%)
Measured
Smectite 21.741,16059.50.474%
Smectite 11.772,390188.12.464%
Subtotal - Smectite1.762,090247.62.866%
Illite 31.862,98074.21.284%
Illite 21.905,02064.81.781%
Illite 11.812,510174.22.383%
Subtotal - Illite1.843,140313.25.283%
Subtotal - Measured1.812,680560.88.076%
Indicated
Smectite 21.741,240577.83.867%
Smectite 11.772,2201,328.515.762%
Subtotal - Smectite1.761,9201,906.319.564%
Illite 31.862,970197.43.184%
Illite 21.884,860154.64.081%
Illite 11.801,930966.99.981%
Subtotal - Illite1.822,4901,318.917.181%
Subtotal - Indicated1.792,1503,225.236.571%
Measured + Indicated
Smectite 21.741,230637.34.268%
Smectite 11.772,2401,516.618.162%
Subtotal - Smectite1.761,9402,153.822.264%
Mineral Resources Estimate as of December 31, 2025 as reported under NI 43-101
ClassificationDensity(g/cc)Lithium(ppm)In Situ Dry(Million MetricTonnes)In Situ LCE Dry(Million MetricTonnes)MetallurgicalRecovery (%)
Illite 31.862,980271.74.384%
Illite 21.894,900219.45.781%
Illite 11.802,0201,141.112.381%
Subtotal - Illite1.822,6201,632.222.382%
Subtotal - Measured + Indicated1.792,2303,786.044.572%
Inferred
Smectite 21.731,130186.51.162%
Smectite 11.781,9901,145.112.173%
Subtotal - Smectite1.771,8701,331.613.271%
Illite 31.872,970108.11.784%
Illite 21.894,75086.12.281%
Illite 11.801,830455.74.480%
Subtotal - Illite1.832,470649.98.381%
Subtotal - Inferred1.792,0701,981.521.675%

Notes:

The QP who supervised the preparation of and approved disclosure for the Mineral Resources estimate is Benson Chow, P.G., SME-RM.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

The Mineral Resource model has been generated using Imperial units. Metric tonnages shown in table are conversions from the Imperial Block Model.

Mineral Resources are in situ and are reported inclusive of 1,056.7 million metric tonnes (Mt) of Mineral Reserves and 14.3 Mt of LCE.

Mineral Resources are reported using an economic break-even formula: “Operating Cost per Resource Short Ton”/“Price per Recovered Short Ton Lithium” * 10^6 = ppm Li Cutoff. “Operating Cost per Resource Short Ton” = US$86.76, “Price per Recovered Short Ton Lithium” is estimated: “Lithium Carbonate Equivalent (LCE) Price” * 5.3228 *(1 – “Royalties”) * “Metallurgical Recovery”. Variables are “LCE Price” = US$26,308/Short Ton ($29,000/tonne) Li 2 CO 3, “GRR” = 1.75% and “Metallurgical Recovery” = 73.5%.

Presented at a cutoff grade of 858 ppm Li. and a maximum ash content of 85%.

A mineral resource constraining pit shell has been derived from performing a pit optimization estimation using Vulcan software and the same economic inputs as what was used to calculate the cutoff grade.

The conversion factor for lithium to LCE is 5.3228.

Applied density for the mineralization is weighted in the block model based on clay and ash percentages in each block and the average density for each lithology.

Measured Mineral Resources are in blocks estimated using at least 3 drill holes and 10 samples where the closest sample during estimation is less than or equal to 900 ft. Indicated Mineral Resources are in blocks estimated using at least 2 drill holes and 10 samples where the closest sample during estimation is less than or equal to 1,500 ft. Inferred Mineral Resources are in blocks estimated using at least 2 drill holes and 9 samples where the closest sample during estimation is less than or equal to 2,500 ft.

Prior to the exercise of the JV Warrant, LAC owns a 62% interest of Thacker Pass, including this mineral resource estimate, with GM owning the remaining 38%.

Potential risk factors that could affect the Mineral Resource estimates include but are not limited to large changes in the market pricing, commodity price assumptions, material density factor assumptions, material ash estimations, fault mapping, future geotechnical evaluations, metallurgical recovery assumptions, mining and processing cost assumptions and other cost estimates could affect the pit optimization parameters and therefore the cut-off grades and Mineral Resource estimates.

The Mineral Resource Estimate is based on a cutoff grade analysis, an optimized pit shell and drill hole spacing based on geostatistical analysis. The Mineral Resource was also assessed where it was estimated under major infrastructure such as waste piles and the plant.

Mineral Reserve Estimates

The statement of Mineral Reserves for Thacker Pass as of December 31, 2025, reported in accordance with S-K 1300 and NI 43-101, are presented in the tables below.

Mineral Reserves Estimate as of December 31, 2025 as Reported under S-K 1300
Classification / Geological Domain · Density(g/cc) · Lithium(ppm) · 100% Project Basis · 62% LAC ControlBasis · MetallurgicalRecovery (%)
ROM Dry(MillionMetricTonnes) · ROMLCE Dry(MillionMetricTonnes) · ROM Dry(MillionMetricTonnes) · ROM LCEDry(MillionMetricTonnes)
Proven
Smectite 21.711,1100.50.00.30.073%
Smectite 11.772,46017.70.211.00.166%
Subtotal - Smectite1.772,42018.20.211.30.166%
Illite 31.863,00065.61.140.70.784%
Illite 21.95,02058.81.636.51.081%
Illite 11.82,510126.91.778.71.083%
Subtotal - Illite1.843,230251.34.3155.82.782%
Subtotal - Proven1.833,180269.54.5167.12.882%
Probable
Smectite 21.731,73025.30.215.70.176%
Smectite 11.772,55048.70.730.20.464%
Subtotal - Smectite1.762,27074.10.945.90.667%
Illite 31.853,110102.01.763.21.083%
Illite 21.874,69077.01.947.71.281%
Illite 11.781,840534.05.2331.13.280%
Subtotal - Illite1.82,330713.18.8442.15.581%
Subtotal - Probable1.82,320787.19.7488.06.080%
Proven + Probable
Smectite 21.731,72025.80.216.00.176%
Smectite 11.772,53066.40.941.20.664%
Subtotal - Smectite1.762,30092.21.157.20.767%
Illite 31.853,070167.72.7104.01.783%
Illite 21.884,830135.93.584.32.281%
Illite 11.791,970660.96.9409.84.381%
Subtotal - Illite1.812,560964.413.2597.98.282%
Total - Proven + Probable1.812,5401,056.714.3655.28.980%

Notes:

Mineral Reserves Estimate were prepared by a QP employed by Sawtooth Mining, LLC as of December 31, 2024 and remain current as of December 31, 2025.

Mineral Reserves have been converted from measured and indicated Mineral Resources within the pre-feasibility study and have demonstrated economic viability.

Reserves presented in an optimized pit at an 85% maximum ash content, cutoff grade of 858 ppm Li, and an average cut-off factor of 13.3 kg of LCE recovered per tonne of leach ore tonne (ranged from 7.5-26 kg of LCE recovered per tonne of leach ore tonne).

A sales price of $29,000 US$/tonne of Li 2 CO 3 was utilized in the pit optimization resulting in the generation of the reserve pit shell in 2024. An overall slope of 27 degrees was applied. For bedrock material pit slope was set at 52 degrees. Mining and processing costs of $95.40 per tonne of ROM feed, a processing recovery factor based on the block model, and a GRR cost of 1.75% were additional inputs into the pit optimization. For more information regarding the material assumptions underlying the mineral reserve estimate, see Section 12 of the S-K 1300 Technical Report.

A LOM plan was developed based on equipment selection, equipment rates, labor rates, and plant feed and reagent parameters. All Mineral Reserves are within the LOM plan. The LOM plan is the basis for the economic assessment within the TRS, which is used to show the economic viability of the Mineral Reserves.

Applied density for the ore is varied by clay type.

Lithium Carbonate Equivalent is based on in-situ LCE tonnes with a 95% mine recovery factor.

The reference point at which the Mineral Reserves are defined is at the point where the ore is delivered to the run-of-mine feeder.

Prior to the exercise of the JV Warrant, LAC owns a 62% interest of the Project, including this mineral reserve estimate, with GM owning the remaining 38%.

Mineral Reserve Estimate as of December 31, 2025 as reported under NI 43-101
ClassificationDensity(g/cc)Lithium(ppm)ROM Dry (Million MetricTonnes)ROM LCE Dry(Million MetricTonnes)MetallurgicalRecovery (%)
Proven
Smectite 21.711,1100.50.073%
Smectite 11.772,46017.70.266%
Subtotal - Smectite1.772,42018.20.266%
Illite 31.863,00065.61.184%
Illite 21.905,02058.81.681%
Illite 11.802,510126.91.783%
Subtotal - Illite1.843,230251.34.382%
Subtotal - Proven1.833,180269.54.582%
Probable
Smectite 21.731,73025.30.276%
Smectite 11.772,55048.70.764%
Subtotal - Smectite1.762,27074.10.967%
Illite 31.853,110102.01.783%
Illite 21.874,69077.01.981%
Illite 11.781,840534.05.280%
Subtotal - Illite1.802,330713.18.881%
Subtotal - Probable1.802,320787.19.780%
Proven + Probable
Smectite 21.731,72025.80.276%
Smectite 11.772,53066.40.964%
Subtotal - Smectite1.762,30092.21.167%
Illite 31.853,070167.72.783%
Illite 21.884,830135.93.581%
Illite 11.791,970660.96.981%
Subtotal - Illite1.812,560964.413.282%
Total - Proven + Probable1.812,5401,056.714.380%

Notes:

Mineral Reserves Estimate has been prepared by Kevin Bahe, P.E.

Mineral Reserves have been converted from measured and indicated Mineral Resources within the feasibility study and have demonstrated economic viability.

Reserves presented in an optimized pit at an 85% maximum ash content, cutoff grade of 858 ppm Li, and an average cut-off factor of 13.3 kg of LCE recovered per tonne of leach ore tonne (ranged from 7.5-26 kg of LCE recovered per tonne of leach ore tonne).

A sales price of $29,000 US$/tonne of Li 2 CO 3 was utilized in the pit optimization resulting in the generation of the reserve pit shell in 2024. An overall slope of 27 degrees was applied. For bedrock material pit slope was set at 52 degrees. Mining and processing costs of $95.40 per tonne of ROM feed, a processing recovery factor based on the block model, and a GRR cost of 1.75% were additional inputs into the pit optimization.

A LOM plan was developed based on equipment selection, equipment rates, labor rates, and plant feed and reagent parameters. All Mineral Reserves are within the LOM plan. The LOM plan is the basis for the economic assessment within the Technical Report, which is used to show the economic viability of the Mineral Reserves.

Applied density for the ore is varied by clay type.

Lithium Carbonate Equivalent is based on in-situ LCE tonnes with a 95% mine recovery factor.

The reference point at which the Mineral Reserves are defined is at the point where the ore is delivered to the run-of-mine feeder.

Prior to the exercise of the JV Warrant, LAC owns a 62% interest of Thacker Pass, including this mineral reserve estimate, with GM owning the remaining 38%.

The Mineral Reserves estimate is based on current knowledge, engineering constraints and land status. Large changes in the market pricing, commodity price assumptions, material density factor assumptions, future geotechnical evaluations, cost estimates or metallurgical recovery could affect the pit optimization parameters and therefore the cut-off grades and estimates of Mineral Reserves.

Mining Methods

Thacker Pass is designed to be a surface mine, as the shallow and massive nature of the deposit makes it amenable to open-pit mining methods. The mining method assumes hydraulic excavators loading a fleet of end dump trucks. This truck/excavator fleet will develop several offset benches to maintain geotechnically stable highwall slopes. These benches will also enable the mine to have multiple grades of ore exposed at any given time, allowing flexibility to deliver and blend ore as needed.

Processing and Recovery Methods

The Mineral Reserves are comprised of two main types of lithium-bearing clay, smectite and illite, with volcanic ash and other gangue minerals mixed throughout. Feed to the process plant is determined by a cutoff factor of extractable lithium per tonne clay. The extractable recoverable lithium is calculated based on correlations developed by LAC. Though both types of clay will be processed, most of the feed is illite clay type, averaging 96.6% over the life of mine (“LOM”). Run-of-mine ore will be delivered to the plants from stockpiles which have dedicated comminution and conveyor systems.

The Report plans for developing four expansion phases at Thacker Pass after the current initial Phase 1. Lithium carbonate production from Phases 1 through 4 is designed for a nominal 40,000 t/y capacity per phase for a total nominal capacity of 160,000 t/y. Phase 5 expansion would be introduced at the time of Phase 4 expansion when mined ore grade decreases resulting in available capacity in the lithium carbonate crystallization circuits constructed during the initial four Phases. With full buildout, the process plant would operate 24 hours/day, 365 days/year with an overall availability of 88% and a mine life of 85 years. The total amount of ore processed from the mine plan is 1,057 Mt (dry).

The recovery process consists of the following primary circuits: (i) Beneficiation, including Comminution, Attrition Scrubbing, Classification, and Solid-Liquid Separation (Thickening and Dewatering); (ii) Leaching; (iii) Neutralization; (iv) Counter Current Decantation and Filtration; (v) Magnesium and Calcium Removal; (vi) Lithium Carbonate (Li 2 CO 3) production, including 1 st Stage Lithium Carbonate Crystallization, Bicarbonation, 2 nd Stage Lithium Carbonate Crystallization, and Sodium Sulfate and Potassium Sulfate Crystallization (Zero Liquid Discharge (“ZLD”)).

In beneficiation, ROM ore is crushed then mixed with water and fed to unit operations designed to liberate lithium bearing clay from gangue material. The clay is separated from coarse gangue in classification, with coarse gangue being stockpiled and eventually used as pit backfill material. The clay fines are then sent to the first dewatering stage (thickening) followed by decanter centrifuging.

The centrifuge discharge cake is repulped in recycled process solution then mixed with sulfuric acid (“H 2 SO 4”) from the acid plant, leaching lithium and other constituents into solution. Acid availability determines leach feed rates, which in turn determines ore mining rates. The free acid contained in the resultant leached residue is neutralized with both a slurry of ground limestone and a magnesium hydroxide slurry from the downstream magnesium precipitation circuit. The neutralized slurry is sent to a countercurrent decantation (“CCD”) circuit to recover the lithium bearing solution from the solids with the washed solids then being fed to recessed chamber filter presses. The filter cake is then conveyed to the clay tailings filter stack (“CTFS”) as waste material for storage while the filtrate is returned to the CCD circuit.

The lithium bearing solution recovered in CCD is sent to magnesium and calcium removal circuits where first the bulk of the magnesium is crystallized as hydrated magnesium sulfate (“MgSO 4”) salts, removed via centrifugation, and conveyed to the CTFS. Any remaining magnesium in the brine is then precipitated with milk-of-lime and separated by recessed chamber filter presses. The precipitated solids are repulped and recycled back to neutralization (as stated above), eventually leaving the process with neutralized filter cake. The calcium in the liquor is removed via soda ash addition, and an ion exchange polishing step brings the divalent cation concentration to very low levels.

The second stage Li 2 CO 3 crystal product is separated via centrifugation then sent to drying, cooling and packaging. Mother liquor from the Li 2 CO 3 crystallizers is sent to the ZLD crystallizer to remove Na and K as sulfate salts. The salts are sent to the CTFS while lithium remaining in the concentrate is recycled back to the front of the Li 2 CO 3 circuit and recovered.

Process design criteria were developed by LAC’s process engineering group based on in-house and vendor test results that were incorporated into the process modelling software Aspen Plus® to generate a steady-state material and energy balance. The design basis for the beneficiation facility is to process an average ROM throughput rate for each Phase expansion of about 2.7 M dry tonnes per year, or 7,522 dry tonnes per day (“t/d”) of feed, including an 88% plant annual overall availability. Throughput from the mine to the crushing plant is targeted based on an average coarse gangue rejection rate of about 42% of the ROM material. The design basis results in an estimated production rate of approximately 125 t/d (42,196 t/y) of battery grade lithium carbonate. For the purposes of this report each expansion from Phases 1 – 4 equates to a nominal production rate of 40,000 t/y lithium carbonate per phase.

Recovery of lithium carbonate equivalent from ore mined and processed to produce lithium carbonate, ranges from 75.2% to 83.7%. The weighted average recovery of lithium carbonate from lithium carbonate equivalent mined for the first 25 years and the 85-year life-of-mine plan is 82.1% and 80.4% respectively. The recovery ranges are realized from an average mined lithium grade of 2,538 ppm contained within an ore blend consisting of 96.6% illite and 3.4% smectite.

Infrastructure, Permitting and Compliance Activities

Infrastructure and Logistics

Thacker Pass has the potential to be constructed in five phases. Each expansion, if approved as planned, would occur four years apart from each other with Phases 1, 2, 3 and 4 designed to produce a nominal 40,000 t/y of lithium carbonate from acid plants producing a nominal 2,250 t/d sulfuric acid. Phase 5 would occur at the same time as Phase 4 and is designed to include a 3,000 t/d sulfuric acid plant and a process plant to support higher leach feed rates through brine production only. Mined material and tailings will be moved by conveyors and trucks.

Process Plant General Arrangement

Lithium-rich clays are mined and transported via haul truck to the mineral beneficiation equipment at the processing plant. Raw water is sourced via aquifer-fed wells and pumped 7 miles east of the process area to dedicated raw water tanks located in the process plant areas. The processing plants are east of the mine open pit.

Generally, Phase 2 is a mirror of Phase 1. Phase 4 would be a mirror of Phase 3, and Phase 5 expansion would be a standalone development.

Reagents, Consumables and Shipping

Limestone, quicklime, flocculant, and soda ash reagents are delivered to each processing plant in solid form while liquid sulfur, propane, ferric sulfate, caustic soda, and hydrochloric acid are delivered as liquids. Based on current projections, over-highway trucking would be used during Phases 1 through 3; during Phase 4, a short-line railroad to the project would deliver most bulk raw materials directly to the project site for the duration of the LOM.

Delivery routes and offloading locations for raw materials are designed to limit potential incidents with other traffic, operations, and maintenance activities.

Ancillary Buildings

Ancillary buildings to support each phase of the project include: (i) Site security buildings and entrances; (ii) Administration office buildings; (iii) Plant maintenance and warehouse buildings; (iv) Packaging Warehouse building; (v) Laboratory and control room buildings; and (vi) Mine facilities area holding fuel, lubrication, wash bay, and maintenance workshop.

Roads

The planned traffic flow to the Project will primarily come from Winnemucca, Nevada along Highway 95 then onto State Route 293 (“SR-293”). Access improvements along SR-293 adjacent to the Project site were completed in 2023 with Nevada Department of Transportation (“NDOT”) oversight. Improvements included the development of three turn/deceleration lanes at the Phase 1 and 2 Process Plant Entrance, Construction Entrance and Mine Entrance along with cattle guard improvements on the BLM Pole Creek Road. These entrances will support the construction and operations during Phase 1 and 2 developments. By year 40 of the mine plan, it is anticipated that a portion of SR-293 will need to be relocated outside of the open pit extents.

SR-293 passes adjacent to the Project and connects the Kings River Valley to U.S. Highway 95 in Orovada, Nevada. During years 39 and 40, SR-293 would be rerouted outside of the proposed open pit limits to accommodate the later phases.

Additionally, an intersection in the town of Orovada, NV at US-95/ SR-293 junction was improved in 2023 with NDOT oversight to accommodate additional traffic to the Thacker Pass site. Construction and operations traffic to the site will generally travel northbound on US-95 and turn west onto SR-293. The highway improvements included a deceleration lane for traffic to turn onto SR-293.

Power Supply

Electrical power for Thacker Pass will be supplied by on-site power generation and via hydroelectric grid power from the local electric utility cooperative, Harney Electric Cooperative (“HEC”). A 115 kV transmission network line crosses the project site. Thacker Pass will generate a portion of the steady-state power demand via Steam Turbine Generators driven by steam produced by the sulfuric acid plant. The rest of the steady-state loads and any peaks will be serviced by power purchased from HEC.

The 115 kV transmission line and fiber optic cable line pass through Thacker Pass proposed open pit mine and connects the Kings River Valley Substation. During the years 39 and 40 highway realignment, the overhead 115 kV transmission and fiber optic communication line to the Kings River Substation will also be relocated.

As part of the Project, the Company is upgrading six regional substations and switching stations to enhance reliability for grid power from the local electric utility cooperative. This work is expected to be completed to energize the Project in Q4 2026.

Sulfuric Acid Production

The sulfuric acid plants for Thacker Pass are Double Contact Double Absorption (“DCDA”) sulfur burning sulfuric acid plants. Phase 1 through Phase 4 will each have a single sulfuric acid (“H 2 SO 4”) plant capable of producing nominal 2,250 t/d while Phase 5 will be 3,000 t/d (100 weight % H 2 SO 4 basis) of sulfuric acid by burning liquid elemental sulfur. Sulfur is delivered to site and is unloaded by gravity into a Sulfur Unloading Pit which provides sulfur to the sulfuric acid plants. The sulfuric acid generated from each plant is used in the process plant for the chemical production of lithium carbonate. The total annual operating days are based upon expected scheduled and unscheduled maintenance. Acid production is a function of the plant’s nominal capacity and production over Design Capacity with production efficiency of the equipment decreasing over a three-year period until scheduled maintenance occurs. Each sulfuric acid plant has two Liquid Sulfur Storage Tanks with a combined total storage capacity of 28 days (about 4 weeks). The sulfur is transferred from the tanks to the Sulfur Feed Pit and from there to the Sulfur Furnace.

Water Source

The existing Quinn Raw Water Well QRPW18-01 (Quinn Well 1) was drilled in September 2018 to a depth of 172.2 meters (about 564.96 ft) below the ground surface (bgs). The well has been tested and is able to sustain 908 m3/h (4,000 gpm), which satisfies the expected average demand servicing all potable, mining and process flow streams for Phase 1 of 380 m3/h and 760 m 3/h for Phase 2. Quinn Well 2 (QRPW23-01) is a backup well located 1.6 km (1 mile) west of QRPW18-01 that was drilled to a depth of 173.7 meters (bgs) in February 2023.

The hydraulic capacity of the pump and piping system from the production wells to the plant site is 908 m3/h (4,000 gpm). The Process Plant Raw/Fire Water Tank (35 m diameter) capacity is 7,059 m 3 (1.86 M gallons), storing 5,016 m3 (1.32 M gallons) for 6 hours make up water, above the fire water reserve.

Phases 3, 4 and 5 would require an additional raw water supply system to include production wells and raw water supply line. Two additional wells and a pipeline would be anticipated to be installed to provide an additional 908 m 3/h (4,000 gpm) per well.

Environmental Studies and Permitting

Refer to Part I – Item 1: Business – Regulatory and Permitting in this Form 10-K for a summary of permits required and a permitting history.

Capital and Operating Costs

Capital Cost Estimate

Development capital costs are divided across the five construction phases with additional LOM capital required to relocate state route and power line infrastructure. Though Phase 1 has been optimized to exclude most of Phase 2 pre-investment where possible, it inherently includes the majority of civil earth works and site infrastructure to support Phase 2. If approved, Phase 2, 3 and 4 would include the addition of acid plants and construction of mineral and chemical processing facilities to produce an additional nominal 40,000 t of lithium carbonate per year from each phase. Phase 5 expansion is contemplated to occur at the same time as the Phase 4 expansion and would include the addition of an acid plant capable of producing 3,000 t/d sulfuric acid. Phase 5 processing circuits would include beneficiation through magnesium sulfate. Due to excess capacity available in the purification circuits constructed from Phases 1 through 4 the lithium extracted from Phase 5 would be introduced into the Phase 1-4 purification plants.

The total development capital includes a 15% contingency. Total development capital cost for Phase 1 through 5 plus additional LOM capital is $12,441 million, which includes Phase 1 at $2,930 million; Phase 2 at $2,328 million; Phase 3 at $2,754 million; Phase 4 and 5 at $4,315 million and an additional $114 million over the LOM. Due to rounding, some totals may not correspond with the sum of the separate figures.

As of December 31, 2025, a total of $982.8 million of construction capital costs and other project-related costs have been capitalized.

The Company is targeting a Capex range of $1.3 billion to $1.6 billion for Thacker Pass Phase 1 for fiscal year 2026, as shown in the table below:

(US$)2026 Capex Guidance
Thacker Pass Phase 1 construction costs(1)(2)$1.2 - $1.5 billion
Other capitalized development costs for Thacker Pass(3)$30 - $40 million
Capitalized interest on the DOE loan$45 - $55 million
Total$ 1.3 - $1.6 billion

Notes:

(1)

Thacker Pass Phase 1 construction costs do not include $8.0 million of community contributions that are required to be expensed under US GAAP, though these were included in the $2.93 billion Capex estimate per the Company’s Reports.

(2)

Thacker Pass Phase 1 construction costs include estimated tariff exposure for equipment and construction material sourced from Canada, China, India, UAE, Turkey and the European Union. The Company has been working toward limiting the effect of any potential tariffs on the Company’s construction supply chain, with approximately 75% of the total capital project cost structure related to labor, contractors and other services not expected to be directly affected by any potential tariffs. The Company continues to monitor closely potential tariff exposure; however, changes in tariffs and trade restrictions can be announced with little or no advance notice. The estimates provided are based on known information as of the date of this news release.

(3)

Other capitalized development costs are required to be capitalized under US GAAP, though these were not included in $2.93 billion Capex estimate per the Company’s Reports.

Sustaining Capital Costs

Sustaining capital costs for the base case totaling $6,921 million have been estimated over the 85-year LOM. Capital costs are not included in sustaining costs but includes third party capital recovery for transload, mining and limestone quarry repayments.

Closure Costs

Closure costs are estimated based upon necessary reclamation, remediation and closure of the 85-year facility. These closure costs of $462 million will be updated as operations continue, and concurrent reclamation takes place. Site overhead during closure will be a corporate cost.

Operating Cost Estimate

The estimated average annual operating expenditures (“OPEX”) over the 85-year mine life is $1,086 million, or $8,039/t of lithium carbonate produced, and for Years 1-25 of the 85 year mine life, estimated average annual OPEX is $779 million, or $6,238/t of lithium carbonate produced.

Economic Analysis

The only revenue stream is sales of lithium carbonate. Cost inputs into the model are based primarily on Q3 2024 pricing, and the discount period commences Q3 2023. Two scenarios were prepared: i) for the 85-year LOM (“Base Case”) and ii) for Years 1-25 of the 85-year LOM (“Production Scenario”).

Production and Revenues

Phases 1 through 4 are each designed for a nominal production rate of 40,000 t/y of lithium carbonate. If approved as planned, the Phases would come online in years 1, 5, 9, and 13 respectively. A fifth phase would be constructed to produce brine only to feed the four previous phases. Actual production varies with the grade of ore mined and process chemistries in each year of the expected mine life of 85 years.

Product selling price has been forecasted over the study period at $24,000/t lithium carbonate. The annual average lithium carbonate production for the Base Case is 135,132 t/y (LOM total of 11,486,261 t/y) and the annual average revenue is $3.2 billion per year (LOM total of $275,670 million). The annual average lithium carbonate production for the Production Scenario is 124,867 t/y (Years 1-25 total of 3,121,685 t/y) and the annual average revenue is $3.0 billion per year (Years 1-25 total of $74,921 million).

Financial Model Results

Thacker Pass financial performance is measured through Net Present Value (“NPV”), Internal Rate of Return (“IRR”) and Payback Period (“Payback”).

The Project’s estimated after-tax NPV at an 8% discount rate for the Production Scenario is $5.9 billion and for the Base Case is $8.7 billion. The Project’s after-tax IRR for the Production Scenario is 19.6% and for the Base Case is 20.0%. The undiscounted Payback for both the Production Scenario and the Base Case is 8.7 years.

Sensitivity Analysis

A sensitivity analysis was performed on NPV at an 8% discount and IRR at a range of discount rates for three lithium carbonate product selling price cases for three scenarios -25% (downside), 0% (base-fixed) and +25% (high).

At the base-fixed scenario (average selling price of $24,000/t), NPV is $8.7 billion and IRR is 20.0%. In the downside scenario (-25% average selling price of $18,000/t), NPV is $3.4 billion and IRR is 12.8%. In the high scenario (+25% average price of $30,000/t), NPV is $13.6 billion and IRR is 26.5%.

A sensitivity analysis was performed on NPV at different discount rates for both the Base Case and Production Scenario. For the Base Case, the discount rates resulted in an NPV of $134.5 billion at 0% (undiscounted cash flow); $15.1 billion at 6%; $8.7 billion at 8%; $5.2 billion at 10%; $3.1 billion at 12%; and $0.9 billion at 16%. For the Production Scenario, the discount rates resulted in an NPV of $32.6 billion at 0% (undiscounted cash flow); $9.0 billion at 6%; $5.9 billion at 8%; $3.8 billion at 10%; $2.4 billion at 12%; and $0.7 billion at 16%.

Commercial Agreements

On February 16, 2023, as part of closing GM’s Tranche 1 Investment, Old LAC entered into the Phase 1 Offtake Agreement with GM pursuant to which Old LAC agreed to supply GM with lithium carbonate production from Phase 1 of Thacker Pass. As part of the Arrangement, the Phase 1 Offtake Agreement was assigned by Old LAC to the Company. Concurrently with closing of the DOE Loan in October 2024, the Phase 1 Offtake Agreement was extended to 20 years. As part of closing the JV Transaction in December 2024, GM also entered into an additional 20-year offtake agreement for up to 38% of production volumes from Phase 2 of Thacker Pass and will retain its right of first offer on the remaining balance of Phase 2 volumes. In October 2025, in addition to the OWCA, the Company and GM entered into an amendment to GM’s lithium offtake agreement to provide additional support to the Project. The amendment permits the JV to enter into additional third-party offtake agreements for certain remaining production volumes not forecasted to be purchased by GM for the first five years of Phase 1. The price under each Offtake Agreement is based on an agreed upon price formula linked to prevailing market prices. For additional details on the GM Transaction, see Part I – Item 1: Business – Organizational History and Recent Developmentsand Part I – Item 1: Business – GM Offtake.

In 2019, LN entered into a mine design, consulting and mining operations agreement with Sawtooth Mining, LLC (“Sawtooth Mining”), a subsidiary of NACCO Industries Inc. and North American Coal. Sawtooth Mining has exclusive responsibility for the design, construction, operation, maintenance, and mining and mine closure services for Thacker Pass, which will supply all of LN’s lithium-bearing ore requirements. Sawtooth Mining agreed to provide LN with the following (i) $3.5 million in seven consecutive equal quarterly instalments, with the final payment received in October 2020; and (ii) engineering services related primarily to mine design and permitting. During construction, Sawtooth Mining has agreed to provide initial funding for up to $50 million to procure all mobile mining equipment required for Phase 1 operations. Excluding these Sawtooth Mining investments, LN bears all costs of mining and mine closure. A one-time “success fee” payment milestone triggered on October 31, 2023 obligates LN to pay to Sawtooth Mining $4.7 million upon achieving commercial production, or accrue an 8% monthly interest on the “success fee” obligation thereafter if not paid in full. LN entered into master services agreements with EXP U.S. Services Inc. (“EXP”), ITAC Engineers, P.C. (“ITAC”), M3 Engineering & Technology Corp. (“M3”) and EDG, Inc. (“EDG"). EXP was contracted to develop the design and costing of the acid plant. In 2020, LN entered into master services agreements with M3 and ITAC to work with Sawtooth Mining and LN personnel to advance analysis and engineering of Thacker Pass. Subsequently, in 2021, LN entered into a master services agreement with EDG to act as an owner's engineer and evaluate the quality and coordination of work among the various engineering firms. EDG's team augmented LN's staffing and supported M3 and ITAC to support and guide interfaces between the engineering teams, equipment vendors and validate quality of work against their extensive catalog of project work.

In 2021, Aquatech International, LLC (“Aquatech") was contracted through a master services agreement to provide confirmation test work, equipment engineering, equipment manufacture and supply for purification and final product crystallization systems for the lithium carbonate production plant. Furthermore, and after a long and robust tender process, in November 2022, LN entered into an EPCM agreement with Bechtel for the construction of Phase 1. The EPCM agreement operates on a cost reimbursable basis.

In 2023, LN entered into a License Agreement with MECS, Inc. (“MECS”) for the use of certain intellectual property relating to the design, operation and performance of MECS proprietary equipment relating to the acid plant. The agreement provides for a technology license in relation to the plant based on a one-time fully paid-up license fee (payable in four parts), as well as technical services to be provided by MECS.

In 2025, the Company entered into both an interconnection agreement and a power purchase agreement, with Harney Electric Cooperative. These agreements are, respectively, for the construction of power infrastructure to the project, and to secure 35 megawatts of hydropower administered by the Bonneville Power Administration for Phase 1 operations of Thacker Pass.

In 2025, the Company entered into an agreement with Target Hospitality Corp. for the design, installation, maintenance and operation of Company’s WFH located in Winnemucca, Nevada. The WFH houses employees engaged in the construction of Thacker Pass. The agreement between the Company and Target Hospitality Corp. operates on a cost reimbursable basis.