What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2024-12-31; filed 2025-02-25.
0000950170-25-026262
Item 7. Management's Discussion and Analysis of Financial Condition and Results of OperationsLiquidity and Capital ResourcesCapital ExpendituresCredit FacilitiesOther MattersCurrent report: 10-K
Period ended 2025-12-31; filed 2026-02-24.
0001193125-26-067036
Item 7. Management's Discussion and Analysis of Financial Condition and Results of OperationsLiquidity and Capital ResourcesCapital ExpendituresCredit FacilitiesOther MattersThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 247 previous paragraphs and 229 current paragraphs.
141 unchanged; 64 reworded; 21 added; 39 removed; 3 previous and 3 current paragraphs rearranged.
Tables are not compared: 21 previous and 20 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (21)
Current report
Earnings for 2025 increased year-over-year, primarily driven by a rise in the rate base due to increased electric investments approved in the 2024/2025 rate case. Additionally, higher electric residential sales contributed to the increase, partially due to growth in residential customers. Favorable weather conditions further contributed to increased residential sales in 2025.
Current report
Tax Update: On July 4, 2025, the One Big Beautiful Bill Act (OBBBA) was signed into law, introducing significant changes to tax credits and compliance requirements. See "Other Matters" below for additional information on the OBBBA.
Current report
2026/2027 Rate Settlement Agreement: In December 2025, the PSCW approved a unanimous settlement agreement that MGE reached with intervening parties in its 2026/2027 rate case. As part of the settlement agreement, the PSCW approved a 0.15% increase for electric rates and a 2.77% increase to gas rates for 2026 and a 3.63% increase for electric rates and a 2.04% increase to gas rates for 2027. See "Other Matters" below for additional information on the 2026/2027 rate case settlement.
Current report
Columbia: Operational, regulatory, and environmental regulation considerations have impacted and continue to impact Columbia's generation planning. MGE, as a minority owner, and Columbia's other co-owners continue to evaluate transitioning away from coal and continue to evaluate replacing the generation from Columbia while maintaining electric service reliability. MGE and Columbia's co-owners are exploring converting Columbia to natural gas.
Current report
Large-Load Growth: Management is seeing growing interest from large‑load customers, including data‑intensive and technology‑focused operations, seeking reliable and scalable electric service in our service territory. Our favorable location, strong regional transmission access, and proximity to major economic and research institutions support this interest. MGE engages early with prospective customers to evaluate load needs, interconnection requirements, and potential system impacts. Although the timing and size of individual projects remain uncertain, these inquiries represent a potential source of incremental and durable load growth.
Current report
Residential Volume. During 2025, residential sales increased by approximately 5% compared to 2024. This increase was driven by favorable weather conditions and an increase in customers during 2025, compared to the same period in the prior year.
Current report
Commercial, industrial, and other-retail/municipal volume. During 2025, there was an approximately 2% increase in commercial sales compared to the same period in the prior year. This increase was driven by more favorable weather conditions and increased use per customer in the current year.
Current report
The principal (decreases) increases in cash flows from investing activities during 2025, compared to 2024, were as follows:
Current report
In October 2025, MGE and other co-owners filed a joint application with the PSCW for upgrades to the non-regulated Elm Road Units. The project would convert existing coal-fired boilers to natural gas. MGE holds an 8.33% ownership interest in the facility. MGE's estimated cost is approximately $11 million. If approved, the project is expected to be placed in service in 2028.
Current report
In February 2026, MGE executed an asset purchase agreement to acquire 33.4% ownership interest in the RockGen Energy Center, an existing natural gas-fired generating plant near Cambridge, Wisconsin. MGE's estimated cost is approximately $203 million. If approved, the project is expected to be placed in service in 2027.
Current report
Construction obligations consist of solar, wind, and storage projects approved.
Current report
In January 2026, MGE entered into a private placement Note Purchase Agreement in which it issued $90 million of senior unsecured notes. In January 2026, MGE completed a redemption of all $1.2 million of its outstanding first mortgage bonds, which were the last remaining series of first mortgage bonds outstanding under the Indenture. See Footnote 14 of the Notes to Consolidated Financial Statements in Part II, Item 8 of this Report for information on the senior note issuance and redemption of the first mortgage bonds.
Current report
In December 2025, the PSCW approved a settlement agreement for MGE's 2026/2027 rate case. As part of that settlement agreement, the PSCW approved a 0.15% increase for electric rates and a 2.77% increase to gas rates for 2026 and a 3.63% increase for electric rates and a 2.04% increase to gas rates for 2027.
Current report
In January 2025, several more Chinese companies, including five solar supply chain providers, were banned under the UFLPA. MGE continues to ensure its compliance with the UFLPA.
Current report
U.S. and international trade policies, including tariffs, port fees, trade sanctions, and other import/export regulations, continue to evolve, influenced by geopolitical developments and economic priorities. MGE is proactively evaluating the potential effects of these changes on operating costs and capital investments, particularly for renewable energy and battery storage initiatives. Such policy shifts could lead to higher costs or delays in project timelines.
Current report
On July 4, 2025, the One Big Beautiful Bill Act (OBBBA) was signed into law, introducing significant changes to tax credits and compliance requirements. The OBBBA accelerates the termination of the Clean Electricity Production Tax Credit (PTC) and Clean Electricity Investment Tax Credit (ITC) for wind and solar projects placed in service after December 31, 2027, unless construction begins by July 4, 2026. The phase out of PTCs and ITCs does not apply to energy storage, hydroelectric facilities, nuclear, or any other zero emission technology. The OBBBA imposes stringent restrictions on tax credit eligibility, disallowing credits, and other provisions for projects involving material assistance from specified foreign entities or foreign-influenced entities for projects that begin construction after December 31, 2025. The Treasury Department issued new beginning of construction guidance in August 2025. The bill also increases domestic content requirements. On February 12, 2026, the Treasury Department and the IRS issued Notice 2026-15, providing interim guidance on these restrictions, including the establishment of the Material Assistance Cost Ratio (MACR) and related safe harbors to determine the impact of foreign-sourced components on credit eligibility. MGE has evaluated the impact of the OBBBA and will continue monitoring Treasury Department updates and engaging with industry groups to ensure compliance.
Removed paragraphs (39)
Previous report
reducing the proportion that coal generation represents in its generation mix, as evidenced by its announcements of the retirement of Columbia (a coal generation plant) and the planned change in the Elm Road Units fuel source from coal to natural gas, and
Previous report
An increase in electric investments, as part of the 2024 rate case, contributed to earnings for 2024. Unfavorable weather contributed to lower electric residential sales during 2024, compared to the same period in the prior year.
Previous report
Nonregulated Energy
Previous report
An increase in electric generation lease revenue from the Elm Road Units and WCCF assets contributed to earnings during 2024, compared to the same period in the prior year.
Previous report
Transmission Investments
Previous report
In 2024, our share of ATC's earnings reflected an increase in net income for the reduction of estimated possible loss of approximately $0.8 million inclusive of interest and net of tax, related to the October 2024 developments in the MISO transmission owners complaints on authorized return on equity. See additional information in "Other Matters" below.
Previous report
All Other
Previous report
Excluding AFUDC.
Previous report
Estimated date of commercial operation.
Previous report
West Riverside. In June 2024, MGE purchased an additional 25 MW of capacity of West Riverside for approximately $25 million. After purchase, MGE owns 50 MW of capacity of West Riverside. West Riverside is a natural gas-fired generating plant.
Previous report
Future Generation - 80% carbon reduction target by 2030 (from 2005 levels): MGE has outlined initiatives to achieve our target.
Previous report
Transitioning away from coal. Columbia: MGE, along with the other plant co-owners, announced plans to retire Columbia Unit 1 and Unit 2 by the end of 2029. Final timing and retirement dates for Units 1 and 2 are subject to change depending on operational, regulatory, capacity needs, and other factors impacting one or more of the Columbia co-owners. MGE has a plan, which it continues to evaluate, to replace the generation from Columbia while maintaining electric service reliability. In December 2024, MGE and Columbia's co-owners announced plans to explore converting at least one unit of Columbia to natural gas before the end of 2029.
Previous report
Volume. During 2024, residential sales decreased by approximately 1% compared to 2023. The decrease was driven by unfavorable weather.
Previous report
Increased customer accounts costs are primarily related to collection of deferred bad debt expense from prior years. MGE has received approval to recover deferred bad debt expense from 2020 through 2023 over a two-year period beginning in 2024. Bad debt expense is generally offset by electric revenue and does not have a significant impact on net income.
Previous report
Increased electric distribution expenses in 2024 are primarily related to the May 2024 storm response costs.
Previous report
Decreased administrative and general costs are primarily related to a decrease in pension and other postretirement service costs. These costs are generally offset by electric revenue and do not have a significant impact on net income.
Previous report
Electric interest expense increased $2.2 million and gas interest expense increased $0.8 million during 2024, compared to 2023, primarily related to new long-term debt issuances. See Footnote 14 of the Notes to Consolidated Financial Statements in Part II, Item 8 of this Report for additional information on the new debt issuances.
Previous report
MGE Energy's cash used for investing activities increased $11.5 million for 2024 when compared to 2023.
Previous report
Capital expenditures for 2024 were $236.9 million. This amount represents an increase of $14.9 million from the expenditures made in 2023. This increase primarily reflects an increase in electric and gas utility expenditures.
Previous report
Proceeds from the sale of investments increased $1.6 million during 2024, when compared to 2023.
Previous report
Capital contributions in ATC and other investments decreased $2.2 million for 2024 when compared to 2023.
Previous report
MGE's cash used for investing activities increased $15.0 million for 2024 when compared to 2023.
Previous report
Capital expenditures for 2024 were $236.9 million. This amount represents an increase of $14.9 million from the expenditures made in 2023. This increase primarily reflects an increase in electric and gas utility expenditures.
Previous report
The following table provides further detail of MGE Energy's forecasted capital expenditures, separating spending into capital project categories for 2025 through 2029:
Previous report
Includes solar and wind generation and battery storage.
Previous report
West Riverside: In June 2024, MGE purchased an additional 25 MW of capacity of West Riverside for approximately $25 million. After purchase, MGE owns 50 MW of capacity of West Riverside. West Riverside is a natural gas-fired generating plant.
Previous report
Electric and Gas Distribution: In 2025 through 2029, electric and gas capital expenditures include investment in enhanced metering solutions to provide customers with more timely and detailed energy use information. Investments in advanced metering infrastructure will provide additional benefits including outage and demand response and automated meter reading capabilities. Forecasted total capital expenditures for those years is approximately $52 million.
Previous report
Construction obligations consist primarily of Paris, Darien, and other renewable projects.
Previous report
MISO transmission owners, including ATC, are involved in two complaints filed at FERC by several parties challenging that the base ROE in effect for MISO transmission owners, including ATC, was no longer just and reasonable. Each complaint provided for a 15-month statutory refund period: November 12, 2013 through February 11, 2015 (the "First Complaint Period") and February 12, 2015 through May 11, 2016 (the "Second Complaint Period").
Previous report
In May 2020, FERC issued an order further refining the methodology for setting authorized ROE. This refined methodology increased the authorized ROE from 9.88% to 10.02%. This base ROE is effective for the First Complaint Period and for all periods following September 2016. This order also dismissed the second complaint. Accordingly, no refunds were ordered for the Second Complaint Period.
Previous report
On February 1, 2025, President Trump issued an executive order implementing a 25% additional tariff on imports from Canada and Mexico and a 10% additional tariff on imports from China. Energy resources from Canada will have a lower 10% tariff. On February 3, 2025, the Canada and Mexico tariff was immediately paused for one month. MGE continues to assess the potential impact of these tariffs to MGE's cost of operations and on current and future capital expenditures including solar or battery storage projects. These tariffs may cause an increase in costs or delays in construction timelines.
Reworded paragraphs (64)
Previous wording
Regulated electric utility operations, conducted through MGE, which generate and distribute electricity to approximately 167,000 customers in Dane County, Wisconsin,
Current wording
Regulated electric utility operations, conducted through MGE, which generate and distribute electricity to approximately 170,000 customers in Dane County, Wisconsin,
Previous wording
Regulated gas utility operations, conducted through MGE, which distribute natural gas to approximately 178,000 customers in seven south-central and western Wisconsin counties,
Current wording
Regulated gas utility operations, conducted through MGE, which distribute natural gas to approximately 180,000 customers in seven south-central and western Wisconsin counties,
Previous wording
Our primary focus is our core utility customers, which are served by MGE as well as creating long-term value for our shareholders. MGE seeks to meet its customers' expectations for reasonably priced, reliable electric and gas service provided in a responsible manner. That responsibility is manifested in actions MGE has taken, and will continue to take, to achieve its goals of 80% carbon reduction by 2030 (from 2005 levels) and net-zero carbon by 2050, including:
Current wording
Our primary focus is our core utility customers, which are served by MGE as well as creating long-term value for our shareholders. MGE seeks to meet its customers' expectations for reasonably priced, reliable electric and gas service provided in a responsible manner. That responsibility is manifested in actions MGE has taken, and will continue to take, to achieve its goal of net-zero carbon by 2050.
Previous wording
growing ownership of renewable generation sources.
Current wording
As part of this long‑term transition, MGE continues to evaluate the role of coal‑fired generation in its portfolio, including previously announced plans regarding the Columbia Energy Center and the planned fuel transition at the Elm Road Units. MGE remains focused on reducing reliance on coal over time and expanding ownership of renewable generation to support a cleaner, reliable energy future.
Previous wording
During the year ended December 31, 2024, MGE Energy's earnings were $120.6 million or $3.33 per share compared to $117.7 million or $3.25 per share for the same period in the prior year. MGE's earnings for the year ended December 31, 2024, were $89.4 million compared to $90.5 million for the same period in the prior year.
Current wording
During the year ended December 31, 2025, MGE Energy's earnings were $135.9 million or $3.72 per share compared to $120.6 million or $3.33 per share for the same period in the prior year. MGE's earnings for the year ended December 31, 2025, were $104.1 million compared to $89.4 million for the same period in the prior year.
Previous wording
Lower gas retail sales resulting from warmer than normal weather in the first quarter of 2024 contributed to lower gas earnings in 2024. Gas retail sales decreased approximately 4% and heating degree days (a measure for determining the impact of weather during the heating season) decreased by approximately 6% in 2024 compared to the same period in the prior year.
Current wording
Higher gas retail sales in 2025 contributed to higher gas earnings for 2025, compared to the same period in the prior year. Gas retail sales increased approximately 14% for 2025, compared to the prior year period. Heating degree days (a measure for determining the impact of weather during the heating season) increased by approximately 18% in 2025 compared to the same period in the prior year.
Previous wording
2024/2025 Rate Proceeding: In December 2023, the PSCW approved a 1.54% increase to electric rates and 2.44% increase to gas rates for 2024. The PSCW also approved a 4.17% increase to electric rates and 1.32% increase to gas rates in 2025. The PSCW approved a 2025 Fuel Cost Plan in December 2024. The plan lowered the 2025 increase in electric rates to 2.63%, reflecting lower expected fuel costs. See "Other Matters" below for additional information on the 2024/2025 rate proceeding.
Current wording
2024/2025 Rate Proceeding: In December 2023, the PSCW approved a 4.17% increase to electric rates and 1.32% increase to gas rates for 2025. The PSCW approved a 2025 Fuel Cost Plan in December 2024. The plan lowered the 2025 increase in electric rates to 2.63%. See "Other Matters" below for additional information on the 2024/2025 rate proceeding.
Previous wording
The 2024/2025 rate order includes an earnings sharing mechanism, under which, if MGE earns above the 9.7% ROE authorized in the rate order: (i) MGE will retain 100% of earnings for the first 15 basis points above the authorized ROE; (ii) 50% of the next 60 basis points will be required to be deferred and returned to customers; and (iii) 100% of any remaining excess earnings will be required to be refunded to customers. The earnings calculation excludes fuel rules adjustments.
Current wording
The 2024/2025 rate order included an earnings sharing mechanism, under which, if MGE earns above the 9.7% ROE authorized in the rate order: (i) MGE will retain 100% of earnings for the first 15 basis points above the authorized ROE; (ii) 50% of the next 60 basis points will be required to be deferred and returned to customers; and (iii) 100% of any remaining excess earnings will be required to be refunded to customers. The earnings calculation excludes fuel rules adjustments.
Previous wording
Large Scale Utility Projects: Large scale generation projects recently completed or under construction, are shown in the following table. Incurred costs are reflected in "Property, plant, and equipment, net" for projects placed in service, or "Construction work in progress" for projects under construction on the consolidated balance sheets.
Current wording
Large Scale Utility Projects: Large scale generation projects recently completed or under construction, are summarized in the following table. Incurred costs are reflected in "Property, plant, and equipment, net" for projects placed in service, or "Construction work in progress" for projects under construction on the consolidated balance sheets. See "Capital Expenditures" below for additional information on projects.
Previous wording
MGE received specific approval to recover 100% AFUDC on Paris, Darien, and Koshkonong. After tax, MGE recognized $4.8 million, $2.7 million, and $0.2 million of AFUDC equity earnings through December 31, 2024, on Paris, Darien, and Koshkonong, respectively, during construction. AFUDC has been excluded from the costs incurred in the table above.
Current wording
MGE received specific approval to recover 100% AFUDC. After tax, MGE recognized $5.4 million, $3.2 million, $2.3 million, $1.4 million, $0.6 million of AFUDC equity earnings through December 31, 2025, on Paris, Darien, Koshkonong, High Noon, and other projects, respectively, during construction. AFUDC has been excluded from the costs incurred in the table above.
Previous wording
Deferred Fuel Costs - Subject to Refund: As of December 31, 2024, MGE had deferred $3.0 million of 2024 fuel savings. These costs will be subject to the PSCW's annual review of 2024 fuel costs, expected to be completed during 2025. See Footnote 9.b. of the Notes to Consolidated Financial Statements in Part II, Item 8 of this Report for further information regarding fuel proceedings.
Current wording
Deferred Fuel Savings: As of December 31, 2025, MGE deferred $7.1 million of 2025 fuel savings. These costs will be subject to the PSCW's annual review of 2025 fuel costs, expected to be completed during 2026. See Footnote 9.b. of the Notes to Consolidated Financial Statements in Part II, Item 8 of this Report for further information regarding fuel proceedings.
Previous wording
2023 Annual Fuel Proceeding: MGE had fuel savings in 2023. As of December 31, 2023, MGE had deferred $7.2 million of 2023 fuel costs. The PSCW has completed the annual review of 2023 fuel costs and approved MGE's return of these savings over a three-month period from October 2024 through December 2024. There was no change to the costs to be refunded as a result of the fuel rules proceedings from the amount MGE deferred in 2023.
Current wording
2024 Annual Fuel Proceeding: MGE had fuel savings in 2024. As of December 31, 2024, MGE deferred $3.0 million of 2024 fuel savings. The PSCW has completed their review of 2024 fuel costs and approved MGE's return of these savings in October 2025. There was no change to the costs to be refunded as a result of the fuel rules proceedings from the amount MGE deferred in 2024.
Previous wording
ATC Return on Equity: As discussed in "Other Matters" below, ATC's authorized ROE, which is used in calculating its rates and revenues, was the subject of a challenge before FERC. A decrease in ATC's ROE could result in lower equity earnings and distributions from ATC in the future. MGE Energy derived approximately 7.4% and 6.4% of net income for 2024 and 2023, respectively, from the investment in ATC.
Current wording
ATC Return on Equity: As discussed in "Other Matters" below, ATC's authorized ROE, which is used in calculating its rates and revenues, was the subject of a challenge before FERC. A decrease in ATC's ROE could result in lower equity earnings and distributions from ATC in the future. MGE Energy derived approximately 6.6% and 7.4% of net income for 2025 and 2024, respectively, from the investment in ATC.
Previous wording
MGE is targeting at least 80% carbon reduction from electric generation by 2030 (from 2005 levels) and net-zero carbon electricity by 2050. Solar, wind, and battery storage projects are a major step toward deep decarbonization and greater use of clean energy sources in pursuit of our goal. In addition, natural gas generation projects help enable MGE's clean energy transition and ensure reliability for customers as the energy supply is decarbonized. MGE continues to evaluate solar, wind, battery storage, and natural gas generation projects that align with its goals as legacy fossil fuel-fired facilities are retired.
Current wording
Future Generation - MGE continues to work toward its goal of net-zero carbon electricity by 2050. Solar, wind, and battery storage projects are a major step toward deep decarbonization and greater use of clean energy sources in pursuit of our goal.
Previous wording
Growing renewable generation. MGE is seeking to acquire a joint interest in several renewable generation projects. See our 2025-2029 capital expenditures forecast included under "Liquidity and Capital Resources" below for information on these projects.
Current wording
Growing renewable generation and storage. MGE is seeking to acquire, or has acquired, joint interests in several renewable generation and storage projects. The forecasted capital expenditures include approximately 252 MW of solar, 18 MW of wind, and 125 MW of storage, which include projects approved or pending PSCW approval. See the 2026-2030 capital expenditures forecast included under "Liquidity and Capital Resources" below for information on those projects.
Previous wording
Elm Road Units: MGE, along with the plant co-owner, announced plans to end the use of coal as a primary fuel at the Elm Road Units and transition the plant to natural gas. Transition plans and costs will be subject to PSCW approval. MGE's remaining use of coal is expected to be further reduced as the Elm Road Units transition to natural gas. By the end of 2030, coal is expected to be used only as a backup fuel at the Elm Road Units. This transition will help MGE meet its 2030 carbon reduction goals. By the end of 2032, MGE expects that the Elm Road Units will be fully transitioned away from coal, which will eliminate coal as an internal generation source for MGE.
Current wording
Transitioning away from coal. Elm Road Units: In October 2025, MGE, along with the plant co-owners, filed a joint application with the PSCW to end the use of coal as a primary fuel at the Elm Road Units and transition the plant to natural gas. See the
Previous wording
Environmental Initiatives – Natural gas distribution: Building upon our long-standing commitment to providing affordable, sustainable energy, MGE has set a goal to achieve net-zero methane emissions from its natural gas distribution system by 2035. If MGE can accelerate plans to achieve net-zero methane emissions from its natural gas system—through the evolution of new technologies, such as renewable natural gas—it will. MGE is working to reduce overall emissions from its natural gas distribution system in a quick and cost-effective manner. For customers who want to reduce their environmental footprint further, MGE introduced a renewable natural gas program in May 2024, after approval by the PSCW. MGE purchases renewable thermal credits on behalf of customers who voluntarily elect in the program to offset the emissions associated with the customer's monthly natural gas usage.
Current wording
Environmental Initiatives – Natural gas distribution: Building upon our long-standing commitment to providing affordable, sustainable energy, MGE has set a goal to achieve net-zero methane emissions from its natural gas distribution system by 2035. If MGE can accelerate plans to achieve net-zero methane emissions from its natural gas system—through the evolution of new technologies, such as renewable natural gas—it will. MGE is working to reduce overall emissions from its natural gas distribution system in a quick and cost-effective manner. MGE offers two voluntary renewable natural gas programs. The initial program, launched in May 2024, enables customers to offset emissions associated with their natural gas consumption through a mechanism in which MGE purchases renewable thermal credits and retires them on behalf of participating customers. The second program, launched in January 2026, enables customers to inject renewable natural gas produced on the customer's premise into MGE's distribution system; customers may sell the natural gas to MGE or another third party and may retain or sell to MGE or another third party the associated environmental attributes.
Previous wording
Solar Procurement Disruptions: MGE is monitoring import regulations under the Uyghur Forced Labor Protection Act and the U.S. Department of Commerce new solar tariffs. These disruptions have a potential to impact current and future solar projects which may result in an increase in costs or delays in construction timelines. In the event that such disruptions cause costs to exceed the levels approved for specific projects, we have filed, and expect to continue to file, notifications with the PSCW and expect to request recovery of any increases in MGE's future rate proceedings. See "Other Matters" below for additional information on the solar procurement disruptions.
Current wording
Solar Procurement Disruptions: MGE is monitoring import regulations under the Uyghur Forced Labor Prevention Act and the U.S. Department of Commerce's new solar tariffs. These disruptions have a potential to impact current and future solar projects which may result in an increase in costs or delays in construction timelines. In the event that such disruptions cause costs to exceed the levels approved for specific projects, we have filed, and expect to continue to file, notifications with the PSCW and expect to request recovery of any increases in MGE's future rate proceedings. See "Other Matters" below for additional information on the solar procurement disruptions.
Previous wording
Executive Order – Tariffs: MGE is monitoring the actions of the Trump Administration with respect to certain proposed import tariffs on foreign goods, including those from Canada, Mexico, and/or China. These tariffs have a potential impact on cost of operations and on current and future capital projects. See "Other Matters" below for additional information on the executive orders on Tariffs.
Current wording
Tariffs: MGE is monitoring the actions of the Trump Administration with respect to certain proposed or recently implemented import tariffs on foreign goods. These tariffs have a potential impact on cost of operations and on current and future capital projects. See "Other Matters" below for additional information on the executive orders on Tariffs.
Previous wording
Equity Issuance Plans: In September 2024, MGE Energy began issuing new shares of common stock to participants in our Direct Stock Purchase and Dividend Reinvestment Plan.
Current wording
Financing and Equity Issuance Plans: As of December 31, 2025, MGE has $230 million of remaining regulatory authority from the PSCW to issue long-term debt to finance authorized utility capital expenditures. In January 2026, MGE issued $90 million of long-term debt. See "Liquidity and Capital Resources" below for additional information. MGE expects to use a portion of the remaining authority during 2026 to finance authorized utility capital expenditures. In 2026, MGE Energy expects to begin issuing new shares of common stock to participants in our Direct Stock Purchase and Dividend Reinvestment Plan. The amount and timing of any financings will be primarily driven by capital investments and cash requirements and will depend upon market conditions, regulatory approvals, and other factors.
Previous wording
Electric revenue increased $7.9 million during 2024 compared to 2023, due to the following:
Current wording
Electric revenue increased $33.9 million during 2025 compared to 2024, due to the following:
Previous wording
Sales to the market. Sales to the market typically occur when MGE has more generation and purchases in the MISO market than are needed for its customer demand. The excess electricity is then sold to other utilities or power marketers in the MISO market. During 2024, market volumes increased compared to 2023, reflecting increase in sales. However, the cost of capacity sold decreased offsetting the revenue generated from increased sales to the market from excess generation and purchases. The revenue generated from these sales is included in fuel rules costs. See fuel rules discussion in Footnote 9 of the Notes to Consolidated Financial Statements in Part II, Item 8 of this Report.
Current wording
Sales to the market. Sales to the market typically occur when MGE has more generation in the MISO market than are needed for its customer demand. The excess electricity is then sold to other utilities or power marketers in the MISO market. During 2025, market volumes increased compared to 2024, reflecting increase in sales. Additionally, the cost of capacity sold increased, contributing to the revenue generated from increased sales to the market from excess generation and purchases. The revenue generated from these sales is largely offset by fuel rules costs, and do not have a significant impact on net income. See fuel rules discussion in Footnote 9 of the Notes to Consolidated Financial Statements in Part II, Item 8 of this Report.
Previous wording
Rate changes. In December 2023, the PSCW authorized MGE to increase 2024 rates for retail electric customers by approximately 1.54%. Rates charged to retail customers during 2024 were $6.5 million higher than those charged during 2023. See Footnote 9 of the Notes to Consolidated Financial Statements in Part II, Item 8 of this Report for further information on the rate increase. Any increase in rates associated with fuel or purchase power costs are generally offset in fuel and purchased power costs and do not have a significant impact on net income.
Current wording
Rate changes. In December 2024, the PSCW authorized MGE to increase 2025 rates for retail electric customers by approximately 2.63%. Rates charged to retail customers during 2025 were $10.0 million higher than those charged during 2024. See Footnote 9 of the Notes to Consolidated Financial Statements in Part II, Item 8 of this Report for further information on the rate increase. Any increase in rates associated with fuel or purchase power costs are generally offset in fuel and purchased power costs and do not have a significant impact on net income.
Previous wording
Customer fixed and demand charges. During 2024, fixed and demand charges increased $2.6 million primarily attributable to the increase in demand charges for commercial customers.
Current wording
Customer fixed and demand charges. During 2025, fixed and demand charges increased $4.9 million primarily attributable to the increase in demand charges for commercial customers.
Previous wording
The $3.6 million decrease in fuel for electric generation was due to an approximately 17% decrease in the average cost, partially offset by an approximately 13% increase in internal generation. Renewable generation increased approximately 26% driven by new generation sources including Badger Hollow II.
Current wording
The $16.8 million increase in fuel for electric generation was due to an approximately 16% increase in internal generation as well as an approximately 13% increase in the average cost.
Previous wording
Excluding deferred fuel costs, purchased power decreased $9.7 million. The decrease in purchased power was due to an approximately 30% decrease in market purchases as a result of increased internal generation. Furthermore, there was an approximately 4% increase in average cost partially offsetting the decrease in market purchases. Deferred fuel cost recovered in 2024 is $6.7 million compared to $5.4 million in 2023.
Current wording
Excluding deferred fuel costs, purchased power decreased $6.2 million. The decrease in purchased power was due to an approximately 39% decrease in market purchases as a result of increased internal generation. Furthermore, there was an approximately 1% increase in average cost partially offsetting the decrease in market purchases. Deferred fuel cost recovered in 2024 was $6.7 million. There were no deferred fuel costs recovered during 2025.
Previous wording
Gas revenue decreased $21.4 million during 2024 compared to 2023, due to the following:
Current wording
Gas revenue increased $32.8 million during 2025 compared to 2024, due to the following:
Previous wording
Rate changes. In December 2023, the PSCW authorized MGE to increase 2024 rates for retail gas customers by 2.44%.
Current wording
Rate changes. In December 2023, the PSCW authorized MGE to increase 2025 rates for retail gas customers by approximately 1.32%.
Previous wording
MGE recovers the cost of natural gas in its gas segment through the purchased gas adjustment clause (PGA). Under the PGA, MGE is able to pass through to its gas customers the cost of gas. Changes in PGA recoveries affect revenues but do not change net income in view of the pass-through treatment of the costs. Payments for natural gas decreased driving lower rates during 2024.
Current wording
MGE recovers the cost of natural gas in its gas segment through the purchased gas adjustment clause (PGA). Under the PGA, MGE is able to pass through to its gas customers the cost of gas. Changes in PGA recoveries affect revenues but do not change net income in view of the pass-through treatment of the costs. Payments for natural gas increased, driving higher rates during 2025.
Previous wording
The average retail rate per therm excluding customer fixed charges for 2024, decreased approximately 7% compared to 2023, reflecting a decrease in natural gas commodity costs (recovered through the PGA).
Current wording
The average retail rate per therm excluding customer fixed charges for 2025, increased approximately 4% compared to 2024, reflecting an increase in natural gas commodity costs (recovered through the PGA).
Previous wording
Volume. For 2024, retail gas deliveries decreased approximately 4% compared to 2023 primarily attributable to unfavorable weather conditions in the first half of 2024.
Current wording
Volume. For 2025, retail gas deliveries increased approximately 14% compared to 2024 primarily attributable to unfavorable weather conditions in 2024.
Previous wording
Cost of gas sold decreased $24.0 million in 2024 compared to 2023. Cost per therm decreased approximately 19% and therms delivered decreased approximately 4%. MGE recovers the cost of natural gas in its gas segment through the PGA as described under "Gas deliveries and revenues" above.
Current wording
Cost of gas sold increased $24.3 million in 2025 compared to 2024. Therms delivered increased approximately 14% primarily driven by weather and cost per therm increased approximately 14%. MGE recovers the cost of natural gas in its gas segment through the PGA as described under gas deliveries and revenues above.
Previous wording
For 2024, operations and maintenance expenses increased $12.7 million, compared to 2023. The following contributed to the net change:
Current wording
For 2025, operations and maintenance expenses increased $8.0 million, compared to 2024. The following contributed to the net change:
Previous wording
Increased transmission costs are primarily a result of an increase in transmission rate and collection of deferred costs from prior years. Transmission costs represent ATC and MISO network transmission expenses authorized to collect in rates. The PSCW has approved MGE to defer as a regulatory asset or liability, the difference between actual costs included in rates and to be recovered or refunded in a future rate proceeding. Transmission cost is generally offset by electric revenue and does not have a significant impact on net income.
Current wording
Increased transmission costs are primarily a result of an increase in transmission rate. Transmission costs represent ATC and MISO network transmission expenses authorized to collect in rates. The PSCW has approved MGE to defer as a regulatory asset or liability, the difference between actual costs included in rates and to be recovered or refunded in a future rate proceeding. Transmission cost is generally offset by electric revenue and does not have a significant impact on net income.
Previous wording
Increased electric production expenses are primarily related to operating and maintenance costs for Columbia and renewable generating facilities. MGE continues to add new renewable generation sites including the second phase of Badger Hollow which went online in December 2023.
Current wording
Increased electric production expenses are primarily related to operating and maintenance costs for the Elm Road Units and renewable generating facilities.
Previous wording
Electric depreciation expense increased $6.8 million and gas depreciation expense increased $1.2 million for 2024, compared to 2023. MGE purchased West Riverside in March 2023 and Badger Hollow II was placed in service in December 2023. The timing of the in-service dates contributed to the increase in electric depreciation expense.
Current wording
Electric depreciation expense increased $4.9 million and gas depreciation expense increased $0.6 million for 2025, compared to 2024. Paris solar was placed in service in December 2024, Darien solar was placed in service in March 2025, and Paris battery was placed in service in June 2025. The timing of the in-service dates contributed to the increase in electric depreciation expense.
Previous wording
Electric and gas other income and interest expense
Current wording
Electric and gas other income
Previous wording
The nonregulated energy operations are conducted through certain of MGE Energy's subsidiaries: MGE Power Elm Road (the Elm Road Units) and MGE Power West Campus (WCCF), which have been formed to own and lease electric generating capacity to assist MGE. For 2024 and 2023, net income at the nonregulated energy operations segment was $24.1 million and $22.4 million, respectively.
Current wording
The nonregulated energy operations are conducted through certain of MGE Energy's subsidiaries: MGE Power Elm Road (the Elm Road Units) and MGE Power West Campus (WCCF), which have been formed to own and lease electric generating capacity to assist MGE. For 2025 and 2024, net income at the nonregulated energy operations segment was $24.8 million and $24.1 million, respectively.
Previous wording
The transmission investment segment holds our interest in ATC and ATC Holdco, and its income reflects our equity in the earnings of those investments. ATC Holdco was formed in December 2016 to pursue transmission development opportunities that typically have long development and investment lead times before becoming operational. During 2024 and 2023, other income from the transmission investment segment primarily reflected ATC's operations and was $12.3 million and $10.6 million, respectively. In October 2024, FERC issued a ruling eliminating the risk premium in the ROE calculation resulting in a 4-basis point reduction in the base ROE from 10.02% to 9.98%. See Footnote 7 of the Notes to Consolidated Financial Statements in Part II, Item 8 of this Report and "Other Matters" below for additional information concerning ATC and summarized financial information regarding ATC.
Current wording
The transmission investment segment holds our interest in ATC and ATC Holdco, and its income reflects our equity in the earnings of those investments. ATC Holdco was formed in December 2016 to pursue transmission development opportunities that typically have long development and investment lead times before becoming operational. During 2025 and 2024, other income from the transmission investment segment primarily reflected ATC's operations and was $13.0 million and $12.3 million, respectively. See Footnote 7 of the Notes to Consolidated Financial Statements in Part II, Item 8 of this Report and "Other Matters" below for summarized financial information regarding ATC.
Previous wording
The decrease in net loss for all other operations during 2024 compared to 2023, is primarily related to a $1.5 million (pre-tax) voluntary contribution to the Madison Gas and Electric Foundation in 2023.
Current wording
The increase of $0.6 million in other income from all other operations during 2025 compared to 2024, primarily reflects results from investment gains recognized in the current year, from venture capital funds. These venture capital investments support early-stage companies working to advance smart technologies, the customer experience, distributed energy resources, electrification, cybersecurity and other priorities for utility companies, such as greater sustainability. This increase was partially offset by a $2.5 million (pre-tax) voluntary contribution to the Madison Gas and Electric Foundation, MGE's philanthropic arm, in 2025.
Showing the first 40 of 64 pairs. Open the source sections for the rest.
Rearranged current paragraphs (3)
Current report — wording carried from elsewhere
2026-2030 capital expenditures forecast included under "Liquidity and Capital Resources" below for additional information. By the end of 2030, coal is expected to be used only as a backup fuel at the Elm Road Units. By the end of 2032, MGE expects that the Elm Road Units will be fully transitioned away from coal.
Current report — wording carried from elsewhere
Revenue subject to refund. For cost recovery mechanisms, any over-collection of revenues resulting from costs authorized to be collected from customers in rates exceeding actual costs is recorded as a reduction of revenue in the period incurred, as the over-collection is expected to be refunded to customers in a subsequent period. In the year the over-collection is refunded, rates are reduced and offset as revenue subject to refund. There is no net income impact in the year the costs are refunded.
Current report — wording carried from elsewhere
Electric other income increased $1.0 million and gas other income decreased $0.4 million during 2025, compared to 2024, primarily related to pension and other postretirement costs, excluding service costs. The PSCW has approved MGE to defer as a regulatory asset or liability, the difference between actual pension and other postretirement costs included in rates and to be recovered or refunded in a future rate proceeding. Pension and other postretirement cost is generally offset by electric and gas revenue and does not have a significant impact on net income.
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
Estimated costs are expected to exceed PSCW previously approved CA levels. Notifications are provided to the PSCW when costs increase above CA levels. MGE has requested, and will continue to request, recovery of the updated estimated costs in its rate case proceedings.
Previous report — wording carried elsewhere
Electric other income decreased $9.8 million and gas other income decreased $5.7 million during 2024, compared to 2023, primarily related to pension and other postretirement other than service costs.
Previous report — wording carried elsewhere
The increase of $2.1 million in other income from all other operations during 2024 compared to 2023, is primarily related to a $1.5 million (pre-tax) voluntary contribution to the Madison Gas and Electric Foundation, MGE's philanthropic arm, in 2023.