What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2024-12-31; filed 2025-02-19.
0000950170-25-022560
Item 7. Management's Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2025-12-31; filed 2026-02-18.
0001193125-26-055414
Item 7. Management's Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 170 previous paragraphs and 177 current paragraphs.
92 unchanged; 56 reworded; 28 added; 21 removed; 1 previous and 1 current paragraphs rearranged.
Tables are not compared: 13 previous and 13 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (28)
Current report
Legislative Matters
Current report
Federal
Current report
On July 4, 2025, the legislation known as the “One Big Beautiful Bill” was signed into law, which includes significant changes to federal tax law and other regulatory provisions that may impact the Registrants. The Registrants will consider the legislation’s provisions, such as changes to tax credits for renewables, and the potential impact on future investment decisions.
Current report
In May 2025, SB 998 was passed into law and became effective August 29, 2025. This legislation allows rate-regulated retail electric service providers, such as OG&E, to receive CWIP recovery of new natural gas generation capacity, if those proposed generation sources are approved by the OCC under existing statutory review procedures, and sets specific timelines for the OCC to review proposed projects. SB 998 also allows utilities to establish a regulatory asset to defer 90 percent of depreciation expense and return associated with qualified plant investments, that are not classified as transmission or new generation, for recovery over an allowed 20-year period in a future rate review filing. OG&E began deferring such costs to a regulatory asset in September 2025, as further discussed in Note 1 within "Item 8. Financial Statements and Supplementary Data."
Current report
In March 2025, Act 373 was signed into law by the Governor of Arkansas. Act 373 enables rate-regulated retail electric providers, such as OG&E, to receive CWIP recovery of "strategic investments," including (i) new electric generating facilities, including transportation and storage facilities for associated fuel, (ii) upgrades, expansions, or fuel conversions of electric generating facilities, including transportation and storage facilities for associated fuel, and (iii) new or upgraded electric transmission facilities, including substations. All projects are subject to review and approval by the APSC. Act 373 further authorizes use of a rider to recover approved strategic investments that are not being recovered through previously approved rates, upon approval of the project by the APSC.
Current report
Decreased primarily due to a decrease of 11 percent in cooling degree days.
Current report
Other operation and maintenance expense increased $16.9 million, or 3.3 percent, primarily due to an increase in vegetation management activities, resulting from approvals in OG&E's most recent Oklahoma rate review, energy efficiency program activities and uncollectible accounts, partially offset by lower contract technical and construction services driven by the timing of certain projects.
Current report
Fuel Inventories decreased $36.3 million, or 24.5 percent, primarily due to net withdrawals of coal and natural gas, as well as a decrease in coal prices.
Current report
Other Current Assets decreased $17.2 million, or 19.3 percent, primarily due to SPP security deposit refunds received during 2025, as well as a decrease in the SPP transmission formula rate true-up.
Current report
Short-term debt decreased $177.3 million, or 37.8 percent, primarily due to proceeds from OG&E's $350.0 million senior notes issuance in April 2025 and OGE Energy's equity issuance in November 2025, which proceeds were used to pay down short-term debt, partially offset by increased borrowings for general operating needs. The Registrants borrow on a short-term basis, as necessary, through the issuance of commercial paper.
Current report
Customer Deposits increased $16.1 million, or 14.5 percent, primarily due to an increase in large commercial customers.
Current report
In addition, OGE Energy's liquidity was further enhanced in 2025 by FSAs, entered into in conjunction with OGE Energy's November 2025 public equity offering, which as of December 31, 2025 could have been physically settled with common shares in exchange for cash of $193.0 million. For more information concerning the FSAs, see Note 8 within "Item 8. Financial Statements and Supplementary Data."
Current report
Transmission includes the Fort Smith to Muskogee transmission project discussed in Note 14 within "Item 8. Financial Statements and Supplementary Data," with projected capital expenditures of approximately $70 million in 2026, $80 million in 2027, $65 million in 2028, and $35 million in 2029.
Current report
(B)
Current report
Capital expenditures associated with the SPP's 2025 Integrated Transmission Plan, including the Seminole to Shreveport Transmission Line that is discussed in Note 14 within "Item 8. Financial Statements and Supplementary Data," will be included in OG&E's capital plan upon final notice to construct acceptances.
Current report
Generation capacity projects include the Tinker Air Force Base, Horseshoe Lake Units 11 and 12, and Horseshoe Lake Units 13 and 14 generation projects. Additional generation capacity projects will be included in OG&E's capital plan when final preapproval orders are received.
Current report
On April 14, 2025, Moody's Investors Service revised their ratings outlook on both OGE Energy and OG&E from stable to negative. Moody's Investors Service indicated that the revised outlook reflects pressure related to OG&E's capital expenditure plan and higher debt levels at the holding company.
Current report
On November 18, 2025, S&P's Global Ratings revised their ratings outlook on OG&E from stable to negative and affirmed their stable ratings outlook on OGE Energy. S&P's Global Ratings indicated the revised outlook for OG&E reflects the elevated wildfire exposure and the mitigation efforts needed to reduce such risks.
Current report
In November 2025, OGE Energy entered into a public offering of approximately $397 million (9,226,744 shares) of its common stock, which included 4,613,372 common shares that were issued and sold by OGE Energy to the underwriters and 4,613,372 common shares that are subject to FSAs. Total cash proceeds received in November 2025 related to the public offering was $192.4 million. Settlement of the FSAs, which is at OGE Energy's discretion, is expected to occur no later than 18 months following the completion of the offering.
Current report
In 2015, the EPA updated the ambient air standards for ozone. Although Oklahoma meets these standards, the Clean Air Act requires states to submit implementation plans to the EPA to ensure their emissions do not affect other states. Oklahoma submitted its SIP in 2018. However, in January 2023, the EPA disapproved the SIPs of 19 states, including Oklahoma. In response, the Oklahoma Attorney General, the ODEQ and OG&E filed petitions for review in March 2023. A stay on the EPA's disapproval was granted in July 2023. The timing of further action is currently unknown.
Current report
In a related matter, in April 2022, the EPA published a proposed FIP related to the "Good Neighbor" requirements intended to reduce interstate NOx emissions. OG&E commented on this proposed FIP in June 2022. By June 2023, the EPA finalized this plan for 23 states, including Oklahoma. This final Good Neighbor FIP would revise Oklahoma's NOx emissions budget for electric generating units, including OG&E's, starting in 2023. The emissions budget would decrease over time based on achievable reductions. OG&E estimated a 34.5 percent reduction by 2026 from 2023 levels and a 50 percent reduction by 2027 from 2021 levels. Following the FIP issuance, OG&E has been considering options to cut emissions at its generating units, including buying emission allowances, installing selective catalytic reduction systems, switching coal units to gas, or retiring and replacing capacity. OG&E submitted its final 2024 IRP to the OCC and APSC on March 29, 2024, which evaluates various compliance options related to the EPA's Good Neighbor FIP. Due to the uncertainty surrounding the SIP disapproval and FIP implementation, OG&E cannot determine the exact cost of compliance. The costs depend on the litigation outcome, chosen control strategies, regulatory approvals, and project timelines. However, OG&E estimated in mid-2023 that compliance costs could range from $2.4 billion to $2.8 billion, including $100 million to $300 million over the first 12 to 18 months following the FIP's effectiveness. OG&E plans to seek recovery of necessary environmental expenditures but cannot guarantee approval or timely recovery of all such expenditures. In October 2023, several petitioners sought a stay of the final FIP from the U.S. Supreme Court, pending review of the challenges in the U.S. Court of Appeals for the District of Columbia. The U.S. Supreme Court granted the stay in June 2024. The EPA requested a delay in the case in February 2025, which was denied. In March 2025, the EPA sought to reconsider the rule without vacating it. The D.C. Circuit Court agreed to hold the case in abeyance in April 2025, requiring status reports every 90 days. The timing of further action is unknown.
Current report
The EPA has indicated that it intends to reconsider both the SIP disapprovals and the final FIP in a two-phase reconsideration rulemaking. In January 2026, the EPA proposed its "Phase 1" reconsideration of SIP disapprovals for several states. The EPA did not include the disapproved Oklahoma SIP in "Phase 1" but indicated that it intends to address the remaining states, including Oklahoma, in a separate action. The timing of further action is unknown.
Current report
OG&E monitors developments in federal greenhouse gas (“GHG”) emissions regulations applicable to fossil fuel-fired electric generating units. Changes in legal standards, including the implementation of rules for the power sector finalized by the EPA in 2024 or the adoption of new regulations, could require significant capital investment and compliance expenditures. If such costs are not recoverable through regulated rates, OG&E’s financial position, results of operations, and cashflows could be materially affected.
Current report
In May 2024, the EPA issued final rules establishing (i) emission guidelines under Section 111(d) of the Clean Air Act for existing fossil fuel-fired steam generating units and (ii) revised standards of performance under Section 111(b) for new natural gas-fired combustion turbines. Under these rules, existing coal-fired units that intend to operate beyond 2039 must achieve 90 percent carbon capture by 2032. Units that plan to operate until 2039 must co-fire with natural gas at 40 percent by 2030. Units that retire by 2032 are exempt from these requirements. State compliance plans reflecting affected unit owners’ compliance decisions are required to be submitted to the EPA by May 2026.
Current report
Significant litigation related to these 2024 GHG rules is ongoing. In February 2025, the D.C. Circuit placed the litigation in abeyance at the EPA’s request while the agency reconsiders the 2024 GHG rules.
Current report
In June 2025, the EPA proposed to repeal the 2024 GHG rules for both existing and new units or, alternatively, to repeal the 2024 GHG rules for existing units and rescind the carbon capture requirements applicable to new combustion turbines. OG&E submitted comments on the 2025 proposed rules individually and through trade associations. Although the EPA has initiated reconsideration and proposed repeal, the 2024 power sector GHG rules have not been stayed, and future compliance timelines remain in effect. If the new emission standards and guidelines are implemented, compliance costs could be significant. OG&E continues to monitor these developments and plan for compliance with 2024 GHG rules standards currently in effect.
Current report
Separately, in February 2026, the EPA released a final rule that rescinds the agency’s 2009 Endangerment Finding, which determined that GHG emissions endanger public health and welfare. While rescinding the Endangerment Finding would not directly alter the 2024 GHG regulations, it may result in increased regulatory uncertainty for the power sector as future generation needs are considered.
Current report
OG&E cannot predict the outcome of the EPA’s reconsideration process, the proposed repeal, or the pending litigation. However, the 2024 GHG rules remain in effect and could result in material compliance obligations and associated costs. OG&E continues to monitor these regulatory developments and evaluate potential impacts on its operations.
Removed paragraphs (21)
Previous report
Increased primarily due to initiating new customer service that includes a demand component.
Previous report
Increased primarily due to capacity agreements in order for OG&E to meet generation requirements.
Previous report
Other operation and maintenance expense increased $9.1 million, or 1.8 percent, primarily due to an increase in various costs such as software expense, contract technical and construction services, and payroll and benefits, net of capitalized labor.
Previous report
Allowance for equity funds used during construction increased $6.1 million, or 31.4 percent, primarily due to higher construction work in progress balances resulting from increased spending on new generation and information technology projects.
Previous report
Other Current Assets increased $30.1 million, or 51.2 percent, primarily due to an increase in SPP deposits, the SPP transmission formula rate true-up and under-recovered riders. At December 31, 2024, other current assets is primarily comprised of $46.6 million in SPP-related activities and under-recovered riders.
Previous report
Accrued Taxes increased $11.2 million, or 23.5 percent, primarily resulting from an increase in tax accruals related to ad valorem and income taxes.
Previous report
OG&E expects to continually evaluate the capital prioritization for transmission, distribution, technology, and generation investments based on the evolving capacity, reliability, and economic growth needs of the electrical power system.
Previous report
On May 9, 2024, OGE Energy issued $350.0 million of 5.45 percent senior notes due May 15, 2029. The proceeds from this issuance were added to OGE Energy's general funds to be used for general corporate purposes and to repay short-term debt.
Previous report
Refinance of Industrial Authority Bonds
Previous report
On October 2, 2024, OG&E caused the refinancing of its Garfield industrial authority bonds, series due January 1, 2025. The $47.0 million in bonds are now due October 1, 2039, and will continue to be remarketed on a weekly basis.
Previous report
The EPA revised the NAAQS for ozone in 2015. Although Oklahoma complies with the revised standard, the Federal Clean Air Act of 1970, as amended, requires states to submit to the EPA for approval a SIP to prohibit in-state sources from contributing significantly to nonattainment of the NAAQS in another state. On October 28, 2018, Oklahoma submitted its SIP to the EPA related to these "Good Neighbor" requirements. On January 31, 2023, the EPA disapproved the SIPs of 19 states, including Oklahoma. On March 2, 2023, the Oklahoma Attorney General and the ODEQ jointly filed a Petition for Review of the SIP disapproval in the Tenth Circuit. On March 16, 2023, OG&E filed a Petition for Review of the SIP disapproval in the Tenth Circuit. On June 6, 2023, OG&E, together with the Oklahoma Attorney General and other parties, jointly filed a motion with the Tenth Circuit requesting a stay of the EPA’s disapproval of the Oklahoma SIP; the stay was granted on July 27, 2023. On February 27, 2024, the Tenth Circuit issued a decision to transfer venue to the U.S. Court of Appeals for the District of Columbia and vacated oral argument originally scheduled for March 21, 2024 but did not vacate the stay it granted. On March 28, 2024, the Oklahoma Attorney General, on behalf of the parties noted above, petitioned the U.S. Supreme Court to review the Tenth Circuit’s decision to transfer the SIP disapproval cases to the D.C. Circuit, and on April 24, 2024, the D.C. Circuit ordered that the cases be held in abeyance pending action by the U.S. Supreme Court. On October 21, 2024, the U.S. Supreme Court granted review of the Tenth Circuit’s venue decision. On November 6, 2024, the D.C. Circuit ordered that the cases remain in abeyance pending the U.S. Supreme Court’s review of the Clean Air Act’s venue provision. Briefing is ongoing at the U.S. Supreme Court. On January 24, 2025, the EPA asked the U.S. Supreme Court to hold the briefing schedule in abeyance because the EPA’s acting administrator has determined that the agency should reassess the basis for and soundness of the underlying disapproval action. However, on February 6, 2025, the U.S. Supreme Court denied the EPA's motion to hold the case in abeyance. Oral argument at the U.S. Supreme Court is set to be scheduled for March 2025. The timing of a U.S. Supreme Court decision or further action at the D.C. Circuit is unknown.
Previous report
In a separate but related matter, on April 6, 2022, the EPA also published a proposed FIP related to the "Good Neighbor" requirements intended to reduce interstate NOX emissions contributions. OG&E filed comments to the proposed FIP with the EPA on June 21, 2022. On June 5, 2023, the EPA published a final FIP for 23 states, including Oklahoma. The issuance of the FIP resulted from the EPA's aforementioned SIP disapprovals. Among other changes, the EPA finalized a revision of the current Oklahoma NOX emissions budget for electric generating units, including OG&E's units, which began in 2023. Under the terms of the FIP, the emissions budget will decline over time based on the level of reductions that the EPA has determined is achievable through particular emissions controls. OG&E’s analysis indicates that Oklahoma’s state budget for 2026 will be reduced by 34.5 percent from 2023 levels and that for 2027 it will be reduced by 50 percent from 2021 levels. In October 2023, several state and industry petitioners filed emergency applications for a stay of the EPA’s Good Neighbor FIP in the U.S. Supreme Court. On June 27, 2024, the U.S. Supreme Court granted the emergency applications and stayed the EPA's final FIP, pending review of petitioners' challenges in the D.C. Circuit Court. On February 6, 2025, the EPA requested that the D.C. Circuit Court not issue an opinion and place the case in abeyance for 60 days in order for the new EPA leadership to determine how they want to proceed in the litigation.
Previous report
In light of the issuance of the FIP, OG&E has been evaluating various control strategies to reduce emissions at its generating units, which can range from some combination of purchase of emission allowances, installation of selective catalytic reduction controls, conversion of coal-fired units to gas-fired units or retirement and replacement of capacity. OG&E submitted its final 2024 IRP to the OCC and APSC on March 29, 2024. The IRP evaluates various potential compliance options related to the EPA's Good Neighbor FIP. Due to the uncertainty relating to the disapproval of the SIP and implementation of the FIP, OG&E cannot determine the cost to comply with certainty, as such costs are dependent upon the timing and outcome of the litigation discussed above, the particular control strategies ultimately selected for each unit, the terms and timing of regulatory approvals required from the OCC and APSC and the time period necessary to complete the projects. However, OG&E preliminarily estimates that the cost of compliance with the FIP as issued could be approximately $2.4 billion to $2.8 billion in total, including $100 million to $300 million over the 12- to 18-month period following effectiveness of the FIP. OG&E expects that it would seek recovery of any necessary environmental expenditures to address state and federally mandated environmental upgrades, but there is no guarantee that all of such expenditures will be approved for recovery or will be approved for recovery on a timely basis.
Previous report
OG&E monitors possible changes in legal standards for emissions of greenhouse gases, including CO 2, sulfur hexafluoride and methane. As discussed below, recently promulgated federal rules under the Biden Administration will potentially impose requirements on fossil fuel assets, but the Trump Administration is evaluating energy-related regulations impacting reliability and affordability. If these recently promulgated rules are implemented and enforced as currently written or if legislation or regulations are passed at the federal or state levels in the future requiring mandatory reductions of CO 2 and other greenhouse gases at OG&E's facilities, this could result in significant additional compliance costs that would affect OG&E's future financial position, results of operations and cash flows if such costs are not recovered through regulated rates.
Previous report
On May 9, 2024, the EPA published its final rule addressing emission guidelines under Section 111(d) for existing fossil fuel fired steam units, including both coal-fired and oil/gas-fired steam units, and revising performance standards under Section 111(b) for new gas turbines. Unlike the proposed rules, the final rules do not address existing simple and combined-cycle combustion turbine units which are now addressed in a separate rulemaking with proposed rules expected later in the first quarter of 2025.
Previous report
Under Section 111(d), existing coal units will be required to use carbon capture covering 90 percent of emissions by 2032 if they plan to operate beyond 2039. If the coal units plan to operate until 2039, they must co-fire with natural gas at 40 percent by 2030. Coal plants that commit to retire by 2032 are exempt and may continue to operate as is. Subject to litigation, compliance decisions must be submitted to the state for inclusion in the SIP, which is due to the EPA in May 2026.
Previous report
The EPA also addressed existing natural gas-fired boilers under Section 111(d) with emissions rates based on a unit’s annual capacity factor. OG&E’s existing gas boilers currently meet the new requirements and therefore no additional compliance steps beyond reporting are expected.
Previous report
Significant litigation is underway, including a challenge by OG&E and a multi-state challenge joined by Oklahoma. Briefing in this challenge has begun in the D.C. Circuit.
Previous report
On May 24, 2024, several groups of petitioners, including OG&E, which joined with Edison Electric Institute and three other declarants, filed motions for stay of the rule at the D.C. Circuit. The Court consolidated these motions and on July 19, 2024, denied all stay requests. On July 29, 2024, OG&E, jointly with Edison Electric Institute and another applicant, appealed the stay denial to the U.S. Supreme Court. Other industry and state petitioners, including Oklahoma, appealed the D.C. Circuit's stay denial to the U.S. Supreme Court as well. On October 16, 2024, the U.S. Supreme Court denied the stay request. Petitioners can seek another stay from the U.S. Supreme Court in the event the D.C. Circuit rules against them. Oral argument was held before the D.C. Circuit on December 6, 2024; the timing of a decision is not known at this time. However, on February 5, 2025, the EPA requested that the D.C. Court not issue an opinion and place the case in abeyance for 60 days in order for the new EPA leadership to determine how they want to proceed in the litigation. It is unknown what the outcome of the litigation will be, or potential material impacts, if any, it will have on these new emission standards and guidelines, but the Registrants continue to plan for compliance and, if the new emission standards and guidelines are implemented as adopted, such compliance costs would be material.
Previous report
As a member of the SPP Integrated Marketplace, OG&E customers have access to clean energy resources while maintaining reliability and affordability. With respect to its calendar year 2024 direct emissions, compared to 2005 levels, OG&E has reduced CO 2 emissions by approximately 60 percent, emissions of ozone-forming NOx have been reduced by approximately 80 percent, and emissions of SO 2 have been reduced by approximately 95 percent. Direct emission reductions are due to factors such as OG&E’s conversion of certain coal units to natural gas units, its participation in the SPP integrated market, and its active engagement with customers in OG&E’s SmartHours and Load Reduction Programs which helps reduce the amount of generation required to serve peak demand. OG&E is also planning to deploy more renewable energy sources that do not emit greenhouse gases. OG&E has leveraged its geographic position to develop and access renewable energy resources and completed transmission investments to deliver the renewable energy.
Previous report
In September 2022, the USFWS published a proposal to list the Tricolored Bat as endangered under the Endangered Species Act. According to the proposal, the current known range of the Tricolored Bat extends to 36 states, including Oklahoma and Arkansas. A listing decision was expected by September 2024, however, to date no listing decision has been issued. OG&E is closely monitoring this issue due to possible future impacts; however, it is unknown at this time what, if any, material impacts will result from the USFWS action.
Reworded paragraphs (56)
Previous wording
On November 26, 2024, the OCC issued an interim order approving the settlement agreement in OG&E's most recent rate review. The settlement included a base rate revenue increase of $126.7 million, effective July 1, 2024. OG&E also submitted its final 2024 IRP for Oklahoma and Arkansas in March 2024 and is currently reviewing proposals submitted in this process. These matters, as well as other regulatory matters, are discussed in Note 14 within "Item 8. Financial Statements and Supplementary Data."
Current wording
On March 27, 2025, the OCC issued a final order approving the settlement agreement relating to OG&E's 2023 general rate review and approved the ALJ report on the remaining one MW issue with one exception. OG&E also issued its 2025 IRP to the OCC and APSC and has filed for and/or received preapproval, in both Oklahoma and Arkansas, of certain generation and capacity investments identified by OG&E's IRP and related request for proposals process. These matters, as well as other regulatory matters, are discussed in Note 14 within "Item 8. Financial Statements and Supplementary Data."
Previous wording
OGE Energy's net income was $441.5 million, or $2.19 per diluted share, in 2024 as compared to $416.8 million, or $2.07 per diluted share, in 2023. The increase in net income of $24.7 million, or $0.12 per diluted share, in 2024 as compared to 2023 is further discussed below.
Current wording
OGE Energy's net income was $470.7 million, or $2.32 per diluted share, in 2025 as compared to $441.5 million, or $2.19 per diluted share, in 2024. The increase in net income of $29.2 million, or $0.13 per diluted share, in 2025 as compared to 2024 is further discussed below.
Previous wording
An increase in net income at OG&E of $43.5 million, or $0.21 per diluted share of OGE Energy's common stock, was primarily due to higher operating revenues (excluding the impact of recoverable fuel, purchased power and direct transmission expense not impacting earnings) driven primarily by load growth and recovery of capital investments, partially offset by higher depreciation and amortization expense driven by additional assets being placed into service, higher income tax expense, higher interest expense driven by borrowings under OG&E's revolving credit agreement and senior notes issuances in August 2024 and April 2023, and lower other income.
Current wording
An increase in net income at OG&E of $29.9 million, or $0.14 per diluted share of OGE Energy's common stock, was primarily due to higher operating revenues (excluding the impact of recoverable fuel, purchased power and direct transmission expense not impacting earnings) driven by the recovery of capital investments, which offset the impact of milder weather, partially offset by higher depreciation and amortization expense driven by additional assets being placed into service, operation and maintenance expense, income tax expense, and interest expense driven by OG&E's senior notes issuances in August 2024 and April 2025.
Previous wording
An increase in net loss of other operations (holding company) of $18.8 million, or $0.09 per diluted share of OGE Energy's common stock, was primarily due to higher interest expense driven by borrowings under OGE Energy's revolving credit agreement and OGE Energy's senior notes issuance in May 2024, as well as lower net other income.
Current wording
An increase in net loss of other operations of $0.7 million, or $0.01 per diluted share of OGE Energy's common stock, was primarily due to higher interest expense, partially offset by higher net other income driven by a one-time benefit related to activity at OGE Energy's legacy midstream operations and a higher income tax benefit.
Previous wording
A more detailed discussion regarding the financial performance for the year ended December 31, 2024 as compared to December 31, 2023 can be found under "Results of Operations" below. A discussion of the financial performance for the year ended December 31, 2023 compared to December 31, 2022 for OGE Energy and OG&E can be found within "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" of the Registrants'2023 Form 10-K.
Current wording
A more detailed discussion regarding the financial performance for the year ended December 31, 2025 as compared to December 31, 2024 can be found under "Results of Operations" below. A discussion of the financial performance for the year ended December 31, 2024 compared to December 31, 2023 for OGE Energy and OG&E can be found within "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" of the Registrants'2024 Form 10-K.
Previous wording
OGE Energy is projected to earn approximately $447 million to $471 million, or $2.21 to $2.33 per average diluted share, with a midpoint of $459 million, or $2.27 per average diluted share in 2025 and is based off the following assumptions:
Current wording
OGE Energy is projected to earn approximately $494 million to $514 million, or $2.38 to $2.48 per average diluted share, with a midpoint of approximately $504 million, or $2.43 per average diluted share in 2026 and is based off the following assumptions:
Previous wording
OGE Energy forecasts earnings for OG&E of $491 million, or $2.43 per average diluted share;
Current wording
OGE Energy forecasts earnings for OG&E of approximately $533 million, or $2.57 per average diluted share;
Previous wording
OGE Energy forecasts a loss of $32 million for other operations (primarily the holding company), or a loss of $0.16 per average diluted share;
Current wording
OGE Energy forecasts a loss of approximately $30 million for other operations (primarily the holding company), or a loss of $0.14 per average diluted share;
Previous wording
total retail load growth of approximately 7.5 percent to 9.5 percent;
Current wording
total retail load growth of approximately 4 to 6 percent;
Previous wording
operating expenses of approximately $1.205 billion to $1.217 billion, with operation and maintenance expenses comprising approximately 44 percent of the total;
Current wording
operating expenses of approximately $1.228 billion to $1.238 billion, with operation and maintenance expenses comprising approximately 45 percent of the total;
Previous wording
net interest expense of approximately $281 million to $284 million which assumes a $15 million allowance for borrowed funds used during construction reduction to interest expense, and assumes a debt issuance at OG&E of $300 million to $350 million;
Current wording
net interest expense of approximately $256 million to $261 million which assumes a $14 million allowance for borrowed funds used during construction reduction to interest expense, and assumes a debt issuance at OG&E of approximately $300 million;
Previous wording
other income of approximately $16 million including $18 million of allowance for equity funds used during construction;
Current wording
other income of approximately $24 million including $26 million of allowance for equity funds used during construction;
Previous wording
an effective consolidated tax rate of approximately 16.5 percent; and
Current wording
an effective consolidated tax rate of approximately 16.8 percent; and
Previous wording
approximately 202.1 million average diluted shares outstanding.
Current wording
approximately 207.3 million average diluted shares outstanding.
Previous wording
Degree days are calculated as follows: The high and low degrees of a particular day are added together and then averaged. If the calculated average is above 65 degrees, then the difference between the calculated average and 65 is expressed as cooling degree days, with each degree of difference equaling one cooling degree day. If the calculated average is below 65 degrees, then the difference between the calculated average and 65 is expressed as heating degree days, with each degree of difference equaling one heating degree day. The daily calculations are then totaled for the particular reporting period. The calculation of heating and cooling degree normal days is based on a 30-year average and updated every ten years.
Current wording
Degree days are calculated as follows: The high and low degrees of a particular day are added together and then averaged. If the calculated average is above 65 degrees, then the difference between the calculated average and 65 is expressed as cooling degree days, with each degree of difference equaling one cooling degree day. If the calculated average is below 65 degrees, then the difference between the calculated average and 65 is expressed as heating degree days, with each degree of difference equaling one heating degree day. The daily calculations are then totaled for the particular reporting period. The calculation of heating and cooling degree normal days is based on a 30-year average and weighted on a jurisdictional split.
Previous wording
OG&E's net income increased $43.5 million, or 10.2 percent, in 2024 as compared to 2023. The following section discusses the primary drivers for the increase in net income in 2024 as compared to 2023.
Current wording
OG&E's net income increased $29.9 million, or 6.4 percent, in 2025 as compared to 2024. The following section discusses the primary drivers for the increase in net income in 2025 as compared to 2024.
Previous wording
Operating revenues increased $311.0 million, or 11.6 percent, primarily driven by the below factors.
Current wording
Operating revenues increased $274.8 million, or 9.2 percent, primarily driven by the below factors.
Previous wording
Increased primarily due to new rates effective July 1, 2024 resulting from the Oklahoma general rate review interim order received in November 2024 and increased recovery through rider mechanisms, such as the Storm Cost Recovery Rider.
Current wording
Increased primarily due to new rates effective July 1, 2024 resulting from the Oklahoma general rate review interim order received in November 2024 and finalized in March 2025.
Previous wording
Fuel, purchased power and direct transmission expense for OG&E consists of fuel used in electric generation, purchased power and transmission related charges. As described above, the actual cost of fuel used in electric generation and certain purchased power costs are generally recoverable from OG&E's customers through fuel adjustment clauses. The fuel adjustment clauses are subject to periodic review by the OCC and the APSC. OG&E's fuel, purchased power and direct transmission expense increased $164.7 million, or 18.1 percent, primarily driven by the below factors.
Current wording
Fuel, purchased power and direct transmission expense for OG&E consists of fuel used in electric generation, purchased power and transmission related charges. As described above, the actual cost of fuel used in electric generation and certain purchased power costs are generally recoverable from OG&E's customers through fuel adjustment clauses. The fuel adjustment clauses are subject to periodic review by the OCC and the APSC. OG&E's fuel, purchased power and direct transmission expense increased $183.5 million, or 17.0 percent, primarily driven by the below factors.
Previous wording
Decreased primarily due to lower fuel costs related to the generating assets utilized during 2024.
Current wording
Increased primarily due to higher fuel costs related to the generating assets utilized during 2025.
Previous wording
Depreciation and amortization expense increased $32.9 million, or 6.5 percent, primarily due to additional assets being placed into service and increased amortization of certain regulatory assets, partially offset by a decrease in depreciation expense due to new depreciation rates effective as of July 1, 2024 resulting from the Oklahoma general rate review interim order received in November 2024.
Current wording
Depreciation and amortization expense increased $20.3 million, or 3.8 percent, primarily due to additional assets being placed into service and increased amortization of certain regulatory assets, partially offset by deferrals of allowable depreciation and amortization expense of $12.7 million to a regulatory asset in accordance with SB 998 as further discussed in Note 1 within "Item 8. Financial Statements and Supplementary Data."
Previous wording
Other net periodic benefit expense changed $8.1 million, primarily due to higher pension expense driven by changes to the level of pension expense included in base rates, effective July 1, 2024, as approved in the Oklahoma general rate review interim order received in November 2024.
Current wording
Net other income decreased $1.5 million, or 4.7 percent, primarily due to higher other net periodic benefit cost driven by changes to the level of pension expense included in base rates as a result of OG&E's most recent Oklahoma rate review, partially offset by increased interest income related to the carrying charge for the higher fuel under recovery balance in early 2025.
Previous wording
Interest expense increased $14.5 million, or 7.3 percent, primarily due to the $200.0 million in borrowings under OG&E's revolving credit agreement during the second and third quarters of 2024, the $350.0 million senior notes issuance in August 2024, and the $350.0 million senior notes issuance in April 2023. These borrowings were used to support OG&E's growing asset base. The increase in interest expense was partially offset by an increase in allowance for borrowed funds used during construction primarily due to higher construction work in progress balances resulting from increased spending on new generation and information technology projects.
Current wording
Interest expense increased $11.1 million, or 5.2 percent, primarily due to the $350.0 million in senior notes issuance in April 2025 and the full year effect of the issuance of $350.0 million in senior notes in August 2024, partially offset by a decrease in other interest expense related to borrowings under OG&E's revolving credit agreement during the second and third quarters of 2024, as well as the deferral of certain interest expense to a regulatory asset in accordance with SB 998.
Previous wording
Income tax expense increased $24.4 million, or 35.5 percent, primarily due to higher pretax income and a decrease in state tax credits generated.
Current wording
Income tax expense increased $11.9 million, or 12.8 percent, primarily due to higher pretax income combined with an increase in other nondeductible items.
Previous wording
Changed primarily due to decreased cash received from customers, including cash related to fuel recoveries, and increased interest payments from recent debt issuances, partially offset by decreased vendor payments, including payments for fuel.
Current wording
Changed primarily due to increased cash received from customers, including cash related to fuel recoveries, partially offset by increased payments for fuel and purchased power.
Previous wording
Changed primarily due to timing of power supply and power delivery projects.
Current wording
Changed primarily due to timing of power delivery, power supply and enterprise services projects.
Previous wording
Changed primarily due to OGE Energy's $350.0 million senior notes issuance in May 2024 and OG&E's $350.0 million senior notes issuance in August 2024, partially offset by a decrease in commercial paper borrowings.
Current wording
Changed primarily due to a decrease in senior notes issuances in 2025 compared to 2024 and a decrease in commercial paper borrowings, partially offset by the equity issuance in November 2025.
Previous wording
Accounts Receivable and Accrued Unbilled Revenues increased $33.7 million, or 12.0 percent, primarily due to an increase in billings to OG&E's retail customers reflecting higher usage in 2024 and new rates as approved in the Oklahoma general rate review interim order received in November 2024.
Current wording
Accounts Receivable and Accrued Unbilled Revenues increased $108.8 million, or 34.5 percent, primarily due to an increase in billings to OG&E's retail customers reflecting higher usage in 2025 compared to 2024 and receivables related to customer connections.
Previous wording
Fuel Clause Under Recoveries increased $112.7 million and Fuel Clause Over Recoveries decreased $11.2 million, or 54.6 percent, primarily due to lower recoveries from OG&E retail customers as compared to the actual cost of fuel and purchased power.
Current wording
Fuel Clause Recoveries changed $130.5 million from an under recovery to an over recovery, primarily due to higher recoveries from OG&E retail customers as compared to the actual cost of fuel and purchased power.
Previous wording
Accounts Payable increased $29.3 million, or 10.6 percent, primarily due to timing of vendor payments and an increase in purchased power payables.
Current wording
Accounts Payable increased $44.9 million, or 14.7 percent, primarily due to timing of vendor payments, partially offset by a decrease in purchased power payables.
Previous wording
Long-Term Debt Due Within One Year increased $32.4 million, due to the reclassification of the Muskogee industrial authority bonds which matured in January 2025.
Current wording
Long-Term Debt Due Within One Year decreased $32.4 million, or 100.0 percent, due to the repayment of the Muskogee industrial authority bonds that matured in January 2025.
Previous wording
In 2024, OGE Energy's primary sources of capital were cash generated from operations and the proceeds from the issuance of long- and short-term debt. Changes in working capital reflect the seasonal nature of OGE Energy's business, the revenue lag between billing and collection from customers and fuel inventories. See "Working Capital" for a discussion of significant changes in net working capital requirements as it pertains to operating cash flow and liquidity.
Current wording
In 2025, OGE Energy's primary sources of capital were cash generated from operations, the proceeds from the issuance of long- and short-term debt and proceeds from the issuance of common stock. Changes in working capital reflect the seasonal nature of OGE Energy's business, the revenue lag between billing and collection from customers and fuel inventories. See "Working Capital" for a discussion of significant changes in net working capital requirements as it pertains to operating cash flow and liquidity.
Previous wording
OGE Energy's primary material cash requirements are related to acquiring or constructing new facilities and replacing or expanding existing facilities at OG&E. Other working capital requirements are expected to be primarily related to maturing debt, operating lease obligations, fuel clause under recoveries and other general corporate purposes. Further, working capital requirements can be seasonal. OGE Energy generally meets its cash needs through a combination of cash generated from operations, short-term borrowings (through a combination of bank borrowings and commercial paper) and permanent financings. We believe our cash flows from operations, existing borrowing capacity, and access to debt and equity capital markets as needed, should be sufficient to satisfy our material cash requirements over the short-term and long-term.
Current wording
OGE Energy's primary material cash requirements are related to acquiring or constructing new facilities and replacing or expanding existing facilities at OG&E. Other working capital requirements include items such as maturing debt, operating lease obligations, fuel clause under recoveries and other general corporate purposes. Further, working capital requirements can be seasonal. OGE Energy generally meets its cash needs through a combination of cash generated from operations, short-term borrowings (through a combination of bank borrowings and commercial paper) and permanent financings. OGE Energy believes its cash flows from operations, existing borrowing capacity, and access to debt and equity capital markets as needed, should be sufficient to satisfy our material cash requirements over the short-term and long-term.
Previous wording
The following table presents OGE Energy's estimates of capital expenditures for the years 2025 through 2029. These capital investments are customer-focused and targeted to maintain and improve the safety, resiliency and reliability of OG&E's distribution and transmission grid and generation fleet, enhance the ability of OG&E's system to perform during extreme weather events and to serve OG&E's growing customer base.
Current wording
OGE Energy's estimates of capital expenditures, which represent base maintenance capital expenditures plus capital expenditures for known and committed projects, for the years 2026 through 2030 are presented in the following table. The capital investments are customer-focused and targeted to maintain and improve the safety, resiliency and reliability of OG&E's distribution and transmission grid and generation fleet, enhance the ability of OG&E's system to perform during extreme weather events and to serve OG&E's growing customer base.
Previous wording
Additional capital expenditures beyond those identified in the table above, including additional incremental growth opportunities, will be evaluated based upon the requirements of OG&E's power supply, transmission and distribution operational teams and the expected resultant customer benefits. In May 2024, OG&E issued requests for proposals for resources to meet the capacity needs identified in its 2024 IRP and is currently reviewing the proposals submitted in the process. OG&E intends to file for approval of additional generation capacity investments and would expect to update its capital plan based on final orders received by state regulators. The annual level of investments in the transmission and distribution system could vary depending on the amount and timing of incremental generation capacity investments.
Current wording
Additional capital expenditures beyond those identified in the table above, including additional incremental growth opportunities, will be evaluated based upon the requirements of OG&E's power supply, transmission and distribution operational teams and the expected resultant customer benefits. The annual level of investments in the transmission and distribution system could vary depending on the amount and timing of incremental generation capacity investments.
Previous wording
At December 31, 2024, 22.6 percent of the Pension Plan investments were in listed common stocks with the balance primarily invested in corporate fixed income and other securities, U.S. Treasury notes and bonds and mutual funds, as presented in Note 11 within "Item 8. Financial Statements and Supplementary Data." During 2024, the actual return on the Pension Plan was $11.8 million, compared to an expected return on plan assets of $16.5 million. During the same time, corporate bond yields, which are used in determining the discount rate for future pension obligations, increased. Funding levels are dependent on returns on plan assets and future discount rates. OGE Energy made a contribution to its Pension Plan of $10.0 million in 2024 and did not make a contribution to its Pension Plan in 2023. OGE Energy expects to contribute $10.0 million to the Pension Plan in 2025, of which $5.0 million was contributed in January 2025. OGE Energy could be required to make additional contributions if the value of its pension trust and postretirement benefit plan trust assets are adversely impacted by a major market disruption in the future.
Current wording
At December 31, 2025, 14.5 percent of the Pension Plan investments were in listed common stocks with the balance primarily invested in corporate fixed income and other securities, U.S. Treasury notes and bonds and mutual funds, as presented in Note 11 within "Item 8. Financial Statements and Supplementary Data." During 2025, the actual return on the Pension Plan was $23.3 million, compared to an expected return on plan assets of $16.5 million. During the same time, corporate bond yields, which are used in determining the discount rate for future pension obligations, decreased. Funding levels are dependent on returns on plan assets and future discount rates. OGE Energy made contributions to its Pension Plan of $13.5 million in 2025 and $10.0 million in 2024. OGE Energy expects to contribute $15.0 million to the Pension Plan in 2026. OGE Energy could be required to make additional contributions if the value of its pension trust and postretirement benefit plan trust assets are adversely impacted by a major market disruption in the future.
Previous wording
OGE Energy's dividend policy is reviewed by the Board of Directors at least annually and is based on numerous factors, including management's estimation of the long-term earnings power of its businesses. In 2024, the Board of Directors reviewed a recommendation from management of an increase in the quarterly dividend to $0.42125 per share from $0.41820 per share and subsequently approved the recommendation to become effective with the dividend payment in October 2024.
Current wording
OGE Energy's dividend policy is reviewed by the Board of Directors at least annually and is based on numerous factors, including management's estimation of the long-term earnings power of its businesses. In 2025, the Board of Directors reviewed a recommendation from management of an increase in the quarterly dividend to $0.425 per share from $0.42125 per share and subsequently approved the recommendation to become effective with the dividend payment in October 2025.
Previous wording
Management expects that cash generated from operations, proceeds from the issuance of long- and short-term debt, proceeds from the sales of common stock to the public through OGE Energy's Automatic Dividend Reinvestment and Stock Purchase Plan, or other offerings will be adequate over the next three years to meet anticipated cash needs and to fund future growth opportunities. OGE Energy utilizes short-term borrowings (through a combination of bank borrowings and commercial paper) to satisfy temporary working capital needs and as an interim source of financing capital expenditures until permanent financing is arranged.
Current wording
Management expects that cash generated from operations, proceeds from the issuance of long- and short-term debt, proceeds from the settlement of the FSAs, sales of common stock to the public through public offerings and OGE Energy's Automatic Dividend Reinvestment and Stock Purchase Plan, or other offerings will be adequate over the next three years to meet anticipated cash needs and to fund future growth opportunities. OGE Energy utilizes short-term borrowings (through a combination of bank borrowings and commercial paper) to satisfy temporary working capital needs and as an interim source of financing capital expenditures until permanent financing is arranged.
Previous wording
On August 15, 2024, OG&E issued $350.0 million of 5.60 percent senior notes due April 1, 2053, bringing the aggregate total principal amount of this series of senior notes to $700.0 million. The proceeds from this issuance were added to OG&E's general funds to be used for repayment of short-term debt and borrowings under OG&E's revolving credit agreement, and to fund OG&E's capital investment program and working capital needs.
Current wording
On April 1, 2025, OG&E issued $350.0 million of 5.80 percent senior notes due April 1, 2055. The proceeds from this issuance were added to OG&E's general funds and used for the repayment of short-term debt and borrowings under its revolving credit facility, and to fund OG&E's capital investment program and working capital needs.
Previous wording
In 2025, OG&E expects to issue $300 million to $350 million in long-term debt to help fund general operating needs.
Current wording
In 2026, OG&E expects to issue approximately $300 million in long-term debt to help fund general operating needs.
Showing the first 40 of 56 pairs. Open the source sections for the rest.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
See Note 8 within "Item 8. Financial Statements and Supplementary Data" for a discussion of OGE Energy's common stock activity.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
Other income decreased $11.4 million, or 47.7 percent, primarily due to the carrying charge for the higher fuel under recovery balance in 2023.