PORTLAND GENERAL ELECTRIC CO /OR/

For the period ended Dec 31, 2025. Filed Feb 17, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 17, 2026

POR$45.95-0.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-02-14.

0000784977-25-000012

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-17.

0001193125-26-052750

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 284 previous paragraphs and 292 current paragraphs.

96 unchanged; 115 reworded; 76 added; 67 removed; 6 previous and 5 current paragraphs rearranged.

Tables are not compared: 22 previous and 21 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (76)

Current report

the impacts of changes in the tax code, including tax rates, minimum tax rates, adjustments made to deferred tax assets and liabilities, and changes impacting the availability of and ability to transfer tax credits;

Current report

impacts from legislative action limiting wildfire-related liability or providing a wildfire relief fund, such as negative effects on PGE’s credit rating, which could limit PGE’s ability to access capital on terms similar to past transactions or at all and could impact PGE’s liquidity, cash flows, and capital expenditure plans;

Current report

reputational damage from negative publicity, protests, fines, penalties and other negative consequences resulting in regulatory or legal actions;

Current report

uncertainties associated with the proposed Acquisition, including but not limited to, the expected closing of the proposed transaction and the timing thereof, the financing of the proposed transaction, strategies and plans, opportunities and anticipated future performance and capital structure, and expected accretion to earnings per share and free cash flow.

Current report

PGE's corporate strategy places customers at the center of everything the Company does. PGE supports energizing lives, strengthening communities, and driving advancement in energy to promote social, economic, and environmental progress. With a focus on affordability, the Company continuously innovates, streamlines, and manages costs to deliver exceptional experiences for its customers. The Company is committed to delivering steady growth and returns to shareholders. The Company is building an increasingly smart, integrated, and interconnected grid that spans from residential customers to other utilities within the region.

Current report

Decarbonize Power—make progress toward customer-driven clean energy goals by continuing to add new renewable resources and products to the Company's energy mix;

Current report

Electrify the Economy—power the lives of approximately two million residents in its service territory by supporting the region’s economic growth industries and capturing the benefits of new technologies while serving approximately two-thirds of Oregon’s commercial and industrial activity; and

Current report

Advance Performance—build a safer and more reliable grid by accelerating cost-effective grid investments and modernizing transmission.

Current report

On February 15, 2026, PGE, through a newly formed, wholly-owned subsidiary, entered into an agreement (the “Agreement”) with PacifiCorp, an indirect subsidiary of Berkshire Hathaway Energy Company, to acquire select Washington state generation, transmission, and electric utility operations for $1.9 billion. The Acquisition would enable PGE to extend its service to approximately 140,000 Washington customers.

Current report

Under the Agreement, if the Acquisition is completed, PGE will acquire three generation facilities: the Chehalis thermal plant (477 MW), the Goodnoe Hills wind facility (94 MW), and the Marengo I and II wind facilities (234 MW). The Acquisition would also include 4,500 miles of transmission and distribution lines, and local utility operations across approximately 2,700 square miles.

Current report

PGE intends to manage the Washington operations as a separate company through a newly created subsidiary regulated by the Washington Utilities and Transportation Commission. PGE intends to retain current Washington employees and honor existing labor agreements. PGE corporate functions are expected to provide shared support for both Washington and Oregon companies.

Current report

The Acquisition is designed with the goal that Washington and Oregon customers would not be impacted by costs associated with executing the acquisition and transaction financing. PGE expects the Acquisition and state and federal regulatory reviews to close in approximately twelve months following the submission of regulatory applications.

Current report

Central to this Acquisition is PGE’s plan to enter into a joint venture with Manulife Infrastructure Fund III, L.P. and its affiliates, including John Hancock Life Insurance Company (U.S.A.), which will collectively be a minority owner of the Washington utility business. PGE would remain majority owner and sole operator.

Current report

For a more information regarding PGE’s plans to fund its future capital requirements, including this proposed Acquisition, see “Liquidity” in the Liquidity and Capital Resources section of this Item 7. See Note 21, Subsequent Events, in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data” for additional information on the pending acquisition.

Current report

On June 18, 2025, PGE submitted a CEP/IRP Update to the OPUC. The CEP/IRP Update identified a new Preferred Portfolio as a result of the refreshed analysis. PGE did not propose any changes to the Action Plan that was acknowledged within the 2023 CEP/IRP, which supports the Company's progress toward emissions targets and Preferred Portfolio resource need procurement through the 2025 All-Source RFP. This approach represents the best combination of cost, risk, community benefit, and decarbonization.

Current report

To better distinguish resource needs, the CEP/IRP Update reports the capacity from hybrid solar and battery storage resources by individual technology. The capacity need is 3,500 to 4,500 MW of renewable energy and non-emitting capacity, inclusive of 2023 RFP projects, which remain under negotiation.

Current report

The actions summarized in the CEP/IRP Update will also serve as an important tool in furthering conversations with all stakeholders, and the OPUC, on PGE’s path forward to making continued progress towards emission targets while continuing to serve customers safely, reliably, and at the lowest cost possible. PGE and parties will work through the regulatory review process for the CEP/IRP Update filing (OPUC Docket LC 80) during the coming months. PGE cannot predict the ultimate outcome of the regulatory process.

Current report

After a robust and competitive bidding, repricing, and negotiating process as part of the 2023 RFP, PGE has entered into agreements to construct two solar and battery hybrid projects for a total of 615 MW:

Current report

Biglow Optimization—PGE entered into an agreement to construct a 125 MW solar facility and a 125 MW BESS in Sherman County, Oregon. PGE will own the resource with an investment of approximately $540 million, excluding AFUDC. The project has an estimated commercial operation date at the end of 2027.

Current report

Wheatridge Expansion—PGE and NextEra Energy, Inc. entered into agreements to construct a 240 MW solar facility and a 125 MW BESS facility, located in Morrow County, Oregon. PGE will own 110 MW of solar and 65 MW of BESS production capacity with an investment of approximately $490 million, excluding AFUDC. NextEra Energy, Inc. will operate the facility, own the remaining 130 MW of solar and 60 MW of BESS production capacity and sell their portion of the output to PGE under a 30-year PPA. The project has an estimated commercial operation date at the end of 2027.

Current report

PGE has entered into the following agreements outside of the Company’s 2023 RFP and for each has requested the OPUC to grant a waiver to Oregon’s competitive bidding rules:

Current report

Meadowlark BESS—a 20-year storage capacity agreement for a 200 MW BESS located in Washington County, Oregon. This project will be owned by Copenhagen Infrastructure Partners, LLC and has an estimated commercial operation date at the end of 2027, pending OPUC approval of the requested waiver of the competitive bidding rules.

Current report

Nottingham BESS—a 20-year storage capacity agreement for a 200 MW BESS located in Washington County, Oregon. This project has an estimated commercial operation date in 2028, pending OPUC approval of the requested waiver of the competitive bidding rules.

Current report

PGE is proceeding to commercial negotiations with projects on the final shortlist, prioritizing those that include renewable generation and that have a viable pathway to achieve commercial operations earlier in the 2028 - 2030 eligibility period. The ultimate outcome of the RFP process may involve the selection of multiple projects for both renewable and non-emitting dispatchable capacity resources, which PGE expects will be approximately 2,500 MWs in total.

Current report

Grid Enhancing Technologies (GETs)—Limited network upgrades or non-wires solutions are important strategies that offer incremental improvements and can unlock capacity on existing transmission paths in the region. GETs include advanced conductors and coatings, topological optimization, and dynamic line ratings. PGE is actively incorporating GETs across its system to further increase the performance of new and existing transmission assets. These efforts, when deployed across a number of areas and assets, have the potential to add incremental capacity to the grid at lower costs.

Current report

In October 2023, the OPUC accepted PGE’s second TE plan, which covers the 2023 to 2025 time period and considers current and planned activities, along with forecasted EV loads. To date, PGE has incurred $14 million in capital expenditures under the 2023-2025 TE plan.

Current report

On October 2, 2025, PGE received notice from the U.S. DOE of the termination of four federal grants that originally planned to provide $61 million in federal reimbursement over the life of the grants. PGE has incurred an immaterial amount of costs associated with the terminated grants and does not expect the termination process to result in a material impact on the Company’s financial position and results of operations.

Current report

PGE has been awarded five additional grants totaling approximately $252 million, either as a direct recipient or subrecipient. These grants remain in various stages of execution, with the largest being the Warm Springs Power Pathway. PGE continues to monitor these grants for potential modification or termination but has not received any formal notice of termination. To date, PGE has incurred only immaterial costs related to these grants. See “Transmission Upgrades” in the Investing in a Clean Energy Future section of this Overview for further discussion on the Warm Springs Power Pathway grant. The Company cannot predict the ultimate timing and success of securing funding from federal programs or predict the outcome of existing grants.

Current report

The One Big Beautiful Bill Act—The OBBB significantly amends or repeals several renewable-energy tax incentives originally enacted under the IRA. Projects placed in service during 2025 that met applicable tax credit qualification requirements received PTC or ITC benefits, which are reflected in the Company’s consolidated financial statements. The transferability of tax credits, as provided under the IRA, also remains in effect. Following the July 7, 2025 executive order that added uncertainty with respect to the specific actions necessary to demonstrate a project’s start of construction, on August 15, 2025, the Treasury Department issued a notice for establishing the beginning of construction for wind and solar projects. The notice requires large projects to satisfy a physical-work test after September 2, 2025, eliminates certain inventory-procurement safe harbors, and accelerates the placed in service deadline to December 31, 2027.

Current report

These changes, together with the repeal of the permanent ten percent ITC, as outlined in the OBBB, are expected to reduce or eliminate the availability of RECs on future projects. The Company cannot yet reasonably estimate the impact on PGE’s results of operations, financial position, and cash flows or on future capital expenditures, deferred tax assets, current and future All-Source RFPs, and customer prices.

Current report

See “The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview for information regarding the impact of the OBBB on the RFP process.

Current report

HB 3179—In response to increasing utility bills and concerns about affordability, the Oregon Legislature in 2025 passed HB 3179. Under the provisions of the legislation, which will require a significant amount of rulemaking to implement, the OPUC shall balance the interests of the utility investor and the consumer by considering the cumulative economic impact of the proposed price or schedule of prices on the electric or natural gas company’s residential customers. Electric or natural gas companies are required to file a multiyear rate plan on a regular interval that is no less than three and no more than seven years long. The OPUC shall require each electric and natural gas company to, at least annually, file with the OPUC, and make publicly available, a report on any price adjustments that the electric or natural gas company expects within the next twelve months. Such report, the first of which would be due at the end of 2026 at the earliest, must identify all price adjustment requests that an electric or natural gas company has filed or reasonably knows or anticipates to file. Any increase in residential prices may not take effect from November 1 to March 31.

Current report

On April 8, 2025, the President issued a proclamation, Regulatory Relief for Certain Stationary Sources to Promote American Energy, granting a two-year compliance exemption pursuant to the CAA Section 112(i)(4) for the EPA’s MATS rule. The EPA subsequently notified companies whether their sources had been granted the exemption. Colstrip was granted an exemption until July 8, 2029. Environmental groups have filed court challenges to the MATS exemptions.

Current report

On June 11, 2025, to advance the goals of the President’s Unleashing American Energy executive order, the EPA proposed to repeal the 2024 GHG emissions standards for fossil fuel-fired power plants promulgated under Section 111 of the CAA. The EPA also proposed to repeal specific amendments to the updated MATS, that were promulgated in 2024, including the revised filterable particulate matter emissions standard. Additionally, on June 30, 2025, the EPA proposed to update the 2024 ELG Rule to extend compliance deadlines and explore flexibilities to promote reliable and affordable power generation. On February 12, 2026, the EPA revoked the 2009 endangerment finding, thus removing the EPA’s authority to regulate GHGs.

Current report

PGE continues to evaluate each of these rules to assess the impact it may have on the Company’s continuing investment in Colstrip, which could be material. Compliance with the 2024 rules could require material upgrades at Colstrip with proposed compliance dates that may not be achievable or require the use of unproven technology, resulting in significant impacts to costs related to Colstrip. If upheld, or not modified by the EPA, the 2024 MATS and GHG Rules would require compliance as early as 2027 and 2032, respectively.

Current report

Corporate structure—On July 25, 2025, the Company submitted a formal application to the OPUC seeking approval of a holding company reorganization. PGE believes it to be in the best interests of its customers and shareholders to update its corporate structure into a holding company structure. The structure currently contemplated involves placing a non-operating corporate entity over the Company’s existing structure.

Showing the first 40 of 76 passages. Open the source sections for the rest.

Removed paragraphs (67)

Previous report

•new federal, state, and local laws that could have adverse effects on operating results;

Previous report

•social attitudes regarding the electric utility and power industries;

Previous report

•Decarbonize Power—Reduce GHG emissions associated with electricity served to retail customers by at least 80% by 2030 and 100% by 2040;

Previous report

•Electrify the Economy—Increase beneficial electricity use to capture the benefits of new technologies while building an increasingly clean, flexible and reliable grid; and

Previous report

•Advance Performance—Improve safety, efficiency, and system and equipment reliability while maintaining affordable energy service and growing earnings per share 5% to 7% annually.

Previous report

The Climate Pledge—In 2021, PGE joined The Climate Pledge, a commitment to be net-zero annual carbon emissions by 2040, which is a decade ahead of the Paris Agreement’s goal of 2050. As a signatory to The Climate Pledge, PGE agrees to: i) measure and report GHG emissions on a regular basis; ii) implement decarbonization strategies in line with the Paris Agreement through real business changes and innovations, including efficiency improvements, renewable energy, materials reductions, and other carbon emission elimination strategies; and iii) neutralize any remaining emissions with additional, quantifiable, real, permanent, and socially-beneficial offsets.

Previous report

Throughout the remainder of 2023, PGE refreshed its forecasts, first in an Addendum filed in July 2023 then several times in subsequent comments in the CEP and IRP docket with the OPUC (LC 80). PGE currently estimates a total resource need of approximately 3,500 to 4,500 MW of renewable energy and non-emitting capacity in order to make continual progress towards meeting the Company’s clean energy targets. Through the 2021 All-Source RFP, PGE procured 311 MW of wind resources and 475 MW of capacity, leaving a remaining need to procure approximately 2,700 to 3,700 MW.

Previous report

On January 25, 2024, the OPUC acknowledged PGE’s IRP, subject to certain conditions, providing regulatory support for the Company to pursue the near-term resource additions articulated in the Action Plan. However, the OPUC declined to acknowledge the CEP, directing the Company to provide additional forecast of its emission reductions based on new analysis in the CEP/IRP Update to be filed in April 2025. PGE will continue to pursue its 2023 All-Source RFP while revising forecasts of emissions in the CEP.

Previous report

Pursuant to the 2021 All-Source RFP process, which sought approximately 1,000 MW of renewable resources and non-emitting dispatchable capacity, PGE entered into agreements to acquire resources as follows:

Previous report

•Clearwater Wind Development—The 311 MW wind energy facility is part of the larger Clearwater Wind Development in Eastern Montana. PGE owns 208 MW of production capacity of the facility. Subsidiaries of NextEra Energy Resources, LLC, which operates the facility, owns the remaining 103 MW of production capacity and sells their portion of the output to PGE under a 30-year PPA. The Company owned portion of the facility was placed in-service during the first quarter of 2024. As of December 31, 2024, the Company has recorded $414 million in Electric Utility Plant, net, including Allowance for funds used during construction (AFUDC).

Previous report

•Seaside Grid—The 200 MW Battery Energy Storage System (BESS) facility, located in Portland, Oregon has an estimated commercial operation date of June 30, 2025 and will be owned by PGE. As of December 31, 2024, the Company has recorded $225 million, including AFUDC, in construction work-in-progress (CWIP) for the Seaside Grid.

Previous report

•Constable BESS (formerly Evergreen)—The 75 MW BESS facility, located in Hillsboro, Oregon was placed in-service on December 20, 2024 and is owned by PGE. As of December 31, 2024, the Company has recorded $156 million in Electric Utility Plant, net, including AFUDC.

Previous report

•Sundial BESS (formerly Troutdale Grid)—The 200 MW BESS facility, located in Troutdale, Oregon, reached commercial operations on December 20, 2024. NextEra Energy Resources, LLC owns the resource and sells the capacity to PGE under a 20-year agreement.

Previous report

All BESS projects will be directly interconnected to PGE’s transmission and distribution system. In the event emissions are associated with energy obtained to charge the BESS, they are accounted for when they are emitted from the generating facility. As such, BESS projects do not add incremental emissions to the grid, and therefore, are considered non-emitting dispatchable capacity resources. The BESS facilities qualify for ITCs. The agreements related to the Clearwater Wind Development qualify for PTCs and are eligible under Oregon’s RPS. The agreements will be subject to prudency review by the OPUC.

Previous report

PGE constructed the final short list to provide optionality and address the Company’s future capacity need. The Company ranked the final shortlist in two groups, prioritized based on performance in the RFP price scoring evaluation, representing the optimal intersection of value to customers at the least-cost and the least-risk. These two groups together represented the final shortlist of projects recommended for regulatory acknowledgement. On November 19, 2024, the OPUC acknowledged, with conditions, PGE’s final shortlist of resources as follows:

Previous report

•Group A, as shown below, consisted of three bids that are top performing and PGE expected to enter commercial negotiation for all of these projects. Group A included 375 megawatts (MW) nameplate of renewable resources and 400 MW nameplate of battery storage; and

Previous report

•Group B, as shown below, consisted of five bids, all of which represent capacity options via BESS facilities. These projects are also high performing and PGE may enter commercial negotiations with some or all of these projects, allowing flexibility to address any remaining capacity need. Group B includes 885 MW nameplate of battery storage.

Previous report

(1) MW values do not include nameplate capacity of paired energy storage of 250 MW for project 1 and 125 MW for project 3.

Previous report

(2) Hybrid commercial structure includes a PPA portion and a Company-owned portion of project resources.

Previous report

On December 12, 2024, Project 1 in Group A notified PGE that it was withdrawing from commercial negotiations. PGE continues to negotiate with the remaining Group A projects and aims to finalize contracts over the course of 2025.

Previous report

RFP final shortlist projects were evaluated and selected based on conditions as of the final shortlist date and are subject to risks and uncertainties, including, but not limited to, regulatory processes, inflationary impacts, supply chain constraints, supply cost increases (including the application of trade tariffs), and legislative uncertainty.

Previous report

In 2021, the Oregon legislature enacted HB 2165, ensuring the OPUC has clear and broad authority to allow electric company investments in infrastructure to support TE.

Previous report

Executive Orders—A series of Presidential executive orders were recently issued that relate to changes in energy and environmental policies. These orders aim to accelerate fossil fuel development, reverse climate change and environmental justice initiatives, and halt wind farm construction on federal lands and waters. Key actions include potential tariffs on natural gas imports, reviewing agency actions that burden domestic energy resources, pausing disbursement of federal funding, streamlining permitting processes, and declaring a national emergency to expedite energy projects, particularly on the West Coast.

Previous report

PGE is analyzing these executive orders to understand their potential impact on grant funding, which include Diversity, Equity, and Inclusion and Community Benefits Plans, and potential supply tariffs, including natural gas used as fuel that is imported from Canada. PGE plans to collaborate with industry groups to engage with the administration when appropriate, while closely monitoring the implementation and legal challenges arising from these executive orders. The Company is unable to predict the outcome of executive orders or the impact they may have on its financial position, results of operations, or cash flows.

Previous report

As of December 31, 2024, PGE has been associated with the submission of 42 grant applications as the Prime or Sub-recipient/Supporter and has been awarded 10 grants totaling $315 million, including the following:

Previous report

•U.S. DOE Grid Edge Devices—The U.S. DOE selected and subsequently entered into an agreement on October 1, 2024 with PGE leading a consortium for a $50 million grant for the Grid Edge Devices project. The project will enable real-time information at each meter to improve the visibility of the electrical system to grid operators, providing detection of potential operational problems and shorten outage times, ultimately helping to anticipate and mitigate the impacts of extreme weather on grid resiliency.

Previous report

As of December 31, 2024, PGE has incurred an immaterial amount of costs associated with its Federal grants, and continues to assess the impacts of these federal grants on the Company’s financial position and results of operations, including the effects of the Presidential executive orders noted above. Although PGE continues to apply for additional grants, the Company cannot predict the ultimate timing and success of securing funding from federal programs.

Previous report

The Company believes the tax incentives in the IRA provide additional investment opportunities for PGE and provide benefits to customers. Increased capital expenditures in such investment opportunities would likely result in additional financing needs through debt and equity instruments. PGE continues to monitor for potential impacts to its business due to executive orders that may change tax incentives under IRA programs. See“Executive Orders” in this Overview section, for further information.

Previous report

In addition, the regulations included Disposal of Coal Combustion Residuals (CCR) from Electric Utilities – Legacy CCR Surface Impoundments. This rule builds on 2015 regulations, which apply to active power plants that dispose of coal combustion residuals in surface impoundments or landfills, by regulating inactive surface impoundments at inactive power plants, and CCR management units at active and inactive power plants. PGE has assessed the potential impact of the CCR regulation changes and believes it will not have a material impact on the Company’s current Asset Retirement Obligations.

Previous report

General Rate Case—On December 20, 2024, the OPUC issued a Final order (Order 24-454) in the 2025 GRC requested by PGE on February 29, 2024 that calls for the following:

Previous report

The Final order results in an annual revenue requirement increase of $100 million, as required by the OPUC. The changes in revenue requirement from PGE’s originally filed 2025 GRC to the Final order consist of the following (in millions):

Previous report

(1) Excluding $17 million related to NVPC and other Supplemental filings.

Previous report

(2) Consists of adjustments related to load, capital forecast updates, ROE adjustments, and other revenue requirement items updated during the rate review process.

Showing the first 40 of 67 passages. Open the source sections for the rest.

Reworded paragraphs (115)

Previous wording

The information in this report includes statements that are forward-looking within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements include, but are not limited to, statements that relate to expectations, beliefs, plans, assumptions and objectives concerning future results of operations, business prospects, loads, outcome of litigation and regulatory proceedings, capital expenditures, market conditions, events or performance, and other matters. Words or phrases such as “anticipates,” “believes,” “estimates,” “expects,” “intends,” “plans,” “predicts,” “projects,” “will likely result,” “will continue,” “should,” “based on,” “conditioned upon,” “considers,” “could,” “expected,” “forecast,” “goals,” “needs,” “promises,” “subject to,” “targets,” or similar expressions are intended to identify such forward-looking statements.

Current wording

The information in this report includes statements that are forward-looking within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements include, but are not limited to, statements that relate to expectations, beliefs, plans, assumptions and objectives concerning future results of operations, business prospects, loads, outcome of litigation and regulatory proceedings, capital expenditures, market conditions, events or performance, and other matters. Words or phrases such as “anticipates,” “believes,” “estimates,” “expects,” “intends,” “may,” “plans,” “predicts,” “projects,” “will,” “continue,” “should,” “based on,” “considers,” “could,” “expected,” “forecast,” “goals,” “needs,” “promises,” “subject to,” “strategic imperatives,” “targets,” or similar expressions are intended to identify such forward-looking statements.

Previous wording

In addition to any assumptions and other factors and matters referred to specifically in connection with forward-looking statements, factors that could cause actual results or outcomes for PGE to differ materially from those discussed in such forward-looking statements include:

Current wording

In addition to any assumptions and other factors and matters referred to specifically in connection with forward-looking statements, risks, uncertainties and other important factors that could cause actual results or outcomes for PGE to differ materially from those discussed in such forward-looking statements include:

Previous wording

•governmental policies, legislative action, and regulatory audits, investigations and actions, including those of the FERC, the OPUC, the SEC, the Division of Enforcement of the Commodity Futures Trading Commission, the EPA, and the ODEQ with respect to allowed rates of return, financings, electricity pricing and price structures, acquisition and disposal of facilities and other assets, construction and operation of plant facilities, transmission of electricity, recovery of power costs, operating expenses, deferrals, timely recovery of costs, and capital investments, energy trading activities, and current or prospective wholesale and retail competition;

Current wording

New or revised governmental policies, executive orders, legislative actions, and regulatory audits, investigations and actions, including those of the FERC, the OPUC, and the Internal Revenue Service with respect to allowed rates of return, financings, electricity pricing and price structures, acquisition and disposal of facilities and other assets, construction and operation of plant facilities, transmission of electricity, recovery of power costs, operating expenses, deferrals, timely recovery of costs, and capital investments, energy trading activities, tax credits, and current or prospective wholesale and retail competition;

Current wording

increases to operating costs that could result from changes to trade tariffs, rising inflation and volatility in interest rates;

Previous wording

•risks and uncertainties related to current or future All-Source RFP projects, including, but not limited to regulatory processes, transmission capabilities, system interconnections, inflationary impacts, supply chain constraints, supply cost increases (including application of tariffs), permitting and construction delays, and legislative uncertainty; and

Current wording

risks and uncertainties related to current or future All-Source Request for Proposals (RFP) projects, including, but not limited to regulatory processes, transmission capabilities, system interconnections, inflationary impacts, supply chain constraints, supply cost increases (including application of trade tariffs), permitting and construction delays, available tax credits, counterparty credit risk, and legislative uncertainty;

Previous wording

•changing customer expectations and choices that may reduce customer demand for PGE’s services may impact the Company’s ability to make and recover its investments through rates and earn its authorized return on equity, including the impact of growing distributed and renewable generation resources, changing customer demand for enhanced electric services, and an increasing risk that customers procure electricity from registered ESSs or the adoption of community choice aggregation;

Current wording

changing customer expectations and choices that may reduce customer demand for PGE’s services may impact the Company’s ability to make and recover its investments through prices and earn its authorized return on equity, including the impact of growing distributed and renewable generation resources, changing customer demand for enhanced electric services, and an increasing risk that customers procure electricity from registered ESSs or the adoption of community choice aggregation;

Previous wording

•unseasonable or severe weather and other natural phenomena, such as the greater size and prevalence of wildfires in Oregon in recent years, which could affect public safety, customers’ demand for power and PGE’s financial health and ability and cost to procure adequate power and fuel supplies to serve its customers, access the wholesale energy market, or operate its generating facilities and transmission and distribution systems, and the Company’s costs to maintain, repair, and replace such facilities and systems, and recovery of costs;

Current wording

severe weather and other natural phenomena, such as the greater size and prevalence of wildfires in Oregon in recent years, which could affect public safety, customers’ demand for power, and PGE’s financial health and ability and cost to procure adequate power and fuel supplies to serve its customers, access the wholesale energy market, or operate its generating facilities and transmission and distribution systems, and the Company’s costs to maintain, repair, and replace such facilities and systems, and recovery of such costs;

Previous wording

•ignitions caused by PGE assets or PGE’s ability to effectively implement a PSPS and de-energize its system in the event of heightened wildfire risk or implement effective system hardening programs, the inability of which could lead to potential liability if energized systems are involved in wildfires that cause harm, as well as the risk that damages from wildfires may not be recoverable through prices or insurance, resulting in impact to the financial condition or reputation of the Company;

Current wording

ignitions caused by PGE assets or PGE’s ability to effectively implement a PSPS and de-energize its system in the event of heightened wildfire risk or implement effective system hardening programs, the inability of which could lead to potential liability if energized systems were involved in wildfires that cause harm, as well as the risk that damages from wildfires may not be recoverable through prices or insurance, resulting in impact to the financial condition or reputation of the Company;

Previous wording

•default or nonperformance on the part of any parties from whom PGE purchases fuel, capacity, or energy, which may cause the Company to incur costs to purchase replacement power and related renewable attributes at increased costs;

Current wording

default or nonperformance on the part of any parties from whom PGE purchases fuel, capacity, or energy, that may cause the Company to incur costs to purchase replacement power and related renewable attributes at increased costs;

Previous wording

•complications arising from PGE’s jointly-owned plant, including changes in ownership, adverse regulatory outcomes or legislative actions, or operational failures that result in legal or environmental liabilities or unanticipated costs related to replacement power, repair costs, or abandoned costs;

Current wording

complications arising from PGE’s jointly-owned plant, including changes in ownership, change in regulatory requirements, adverse regulatory outcomes or legislative actions, or operational failures that result in legal or environmental liabilities or unanticipated costs related to replacement power, capital improvements, repair costs, or abandoned costs;

Previous wording

•changes in the availability and price of wholesale power and fuels, including natural gas and coal, and the impact of such changes on the Company’s power costs;

Current wording

changes in the availability and price of wholesale power and fuels, including natural gas and coal, and the impact of such changes, including the potential impact of trade tariffs, on the Company’s power costs;

Previous wording

•changes in, and compliance with, environmental laws and policies, including those related to threatened and endangered species, fish, and wildlife;

Current wording

changes in, compliance with, and general uncertainty around environmental laws and policies, including those related to threatened and endangered species, fish, and wildlife;

Previous wording

•cybersecurity attacks, data security breaches, physical attacks and security breaches, or other malicious acts, internally or to third parties, that cause damage to the Company’s generation, transmission, or distribution facilities, information technology systems, inhibit the capability of equipment or systems to function as designed or expected, or result in the release of confidential customer, vendor, employee, or Company information;

Current wording

cybersecurity attacks, data security breaches, physical attacks and security breaches, or other malicious acts, internally or to third parties, that cause damage to the Company’s generation, transmission, or distribution facilities, impact information technology systems, inhibit the capability of equipment or systems to function as designed or expected, or result in the release of confidential customer, vendor, employee, or Company information;

Previous wording

•employee workforce factors, including potential strikes, work stoppages, transitions in senior management, the ability to recruit and retain key employees and other talent, and turnover due to macroeconomic trends such as voluntary resignation of large numbers of employees similar to that experienced by other employers and industries during the COVID-19 pandemic;

Current wording

employee workforce factors, including potential strikes, work stoppages, transitions in senior management, the ability to recruit and retain key employees and other talent, and turnover due to macroeconomic trends such as voluntary resignation of large numbers of employees;

Previous wording

The Company exists to power the advancement of society. PGE energizes lives, strengthens communities, and fosters energy solutions that promote social, economic, and environmental progress. The Company is committed to being a clean energy leader and delivering steady growth and returns to shareholders. PGE is focused on working with customers, communities, policy makers, and other stakeholders to deliver affordable, safe, reliable electricity service to all, while increasing opportunities to deliver clean and renewable energy, reducing GHG emissions, and responding to evolving customer expectations. At the same time, the Company is building an increasingly smart, integrated, and interconnected grid that spans from residential customers to other utilities within the region. PGE is transforming all aspects of its business to empower its workforce to be even more results oriented to serve customers well. To create a clean energy future, PGE is focused on the following strategic imperatives:

Previous wording

Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 230 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100% clean and renewable electricity by 2035 and 100% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.

Current wording

Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 221 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100% clean and renewable electricity by 2035 and 100% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.

Previous wording

The Company implemented a customer subscription option, the Green Future Impact Program, which is a renewable energy program that allows large business and municipality customers to have a choice in how they source their electricity. Under the Green Future Impact Program, customers can enroll in a Customer-Supplied Option (CSO) or PGE-Supplied Option (PSO). Under the CSO, participants are responsible for finding a renewable energy facility that meets established requirements and bringing those resources to PGE. Under the PSO, customers who enrolled in Phase I can receive energy from PGE-provided PPAs for renewable resources and customers who enroll in Phase II can receive energy either from PGE-provided PPAs for renewable resources or energy from renewable resources that are PGE owned, under certain conditions.

Current wording

The Company implemented a customer subscription option, the Green Future Impact Program, which is a renewable energy program that allows large business and municipal customers to have a choice in how they source their electricity. Under the Green Future Impact Program, customers can enroll in a Customer-Supplied Option (CSO) or PGE-Supplied Option (PSO). Under the CSO, participants are responsible for finding a renewable energy facility that meets established requirements and bringing those resources to PGE. Under the PSO, customers who enrolled in Phase I can receive energy from PGE-provided PPAs for renewable resources and customers who enroll in Phase II can receive energy either from PGE-provided PPAs for renewable resources or energy from renewable resources that are PGE owned, under certain conditions.

Previous wording

As of December 31, 2024, the Green Future Impact Program has an approved capacity of 750 MW nameplate, of which 482 MW have been subscribed. Through this voluntary program, the Company seeks to support the customers’ clean energy acceleration.

Current wording

As of December 31, 2025, the Green Future Impact Program has an approved capacity of 750 MW nameplate, of which 482 MW have been subscribed. Through this voluntary program, the Company seeks to support customers’ clean energy acceleration.

Previous wording

Severe weather—In recent years, PGE’s territory has experienced unprecedented heat, historic ice and snowstorms, and wildfires. In August 2023 the region experienced a record-breaking heat wave with temperatures reaching all-time recorded highs for the month. This resulted in a peak load demand of 4,498 MW, exceeding the Company’s previous all-time peak load demand. Beginning January 13, 2024, the Company’s service territory encountered the first of a series of severe winter weather events, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather events, see“Declared States of Emergency” and “RCE” within the Regulatory Matters section of this Overview. The increase and impact of severe weather events highlights the importance of combating the effects of climate change through decarbonizing the power supply and investing in a more reliable and resilient grid.

Current wording

Severe weather—In recent years, PGE’s service territory has experienced unprecedented heat, historic ice and snowstorms, and wildfires. In December 2025, Portland, Oregon experienced the warmest December on record, averaging six degrees above normal temperatures for the region. In January 2024, the Company’s service territory encountered a severe winter weather event, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather event, see “Declared States of Emergency” within this Overview section. In August 2023 the region experienced a record-breaking heat wave with temperatures reaching all-time recorded highs for the month. This resulted in a peak load demand of 4,498 MW, exceeding the Company’s previous all-time peak load demand, and surpassing the prior summer peak load by nearly six percent. The increase and severity of weather events highlights the importance of combating the effects of climate change through decarbonizing the power supply and investing in a more reliable and resilient grid.

Previous wording

2030, 2035, and 2040 emission reduction targets through an equitable transition to a decarbonized grid. The CEP is based on, and was filed in connection with, the Company’s 2023 Integrated Resource Plan (IRP). PGE filed its first combined IRP and CEP with the OPUC in March 2023. That filing projected PGE’s resource and capacity needs over the next 20 years and proposed an Action Plan to meet near-term needs, subject to the new HB 2021 emissions reduction requirements.

Current wording

The Resource Planning Process—PGE’s resource planning process includes working with customers, stakeholders, and regulators to chart the course toward a clean, affordable, and reliable energy future. With the passage of HB 2021, PGE created a Clean Energy Plan (CEP), which articulates the Company’s strategy to make continued progress towards the 2030, 2035, and 2040 emission reduction targets through an equitable transition to a decarbonized grid. The CEP is based on, and was submitted to the OPUC in connection with, the Company’s 2023 Integrated Resource Plan (IRP) in March 2023, the first combined IRP and CEP. That filing projected PGE’s resource and capacity needs over the next 20 years and proposed an Action Plan to meet near-term needs, subject to HB 2021 emissions reduction requirements.

Previous wording

The agreements related to the Clearwater Wind Development and all BESS agreements represent the final procurement from the 2021 All-Source RFP. Resources required to meet the remaining 2030 need are anticipated to be procured through future acquisition processes, including, but not limited to, the 2023 All-Source RFP and future RFPs.

Current wording

These agreements represent the final procurement from the 2023 All-Source RFP. The 2023 RFP is a component of PGE’s multi-pronged procurement approach focused on customer affordability, system reliability, and decarbonization. Both the 2023 RFP reprice and the 2025 RFP disclosed below were designed to capture expiring tax credits to support customer affordability. Additional resources are anticipated to be procured through future acquisition processes, including, but not limited to, PPAs, including a bilateral all-call for PPAs, community-based renewable energy procurement, the ongoing 2025 RFP, and future RFPs.

Previous wording

PGE filed notice with the OPUC in January 2023 that an RFP was needed to procure resources to meet forecasted capacity shortfalls and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan. PGE filed the draft 2023 All-Source RFP with the OPUC in May 2023 and regulatory approval was granted in January 2024. The Company issued the 2023 All-Source RFP to market in February 2024, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation.

Current wording

PGE filed notice with the OPUC in November 2024 that an RFP in 2025 was needed to procure resources to meet a forecasted 2029 capacity shortfall and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan and CEP Update. PGE filed the draft 2025 All-Source RFP on April 17, 2025, and regulatory approval was granted on July 22, 2025. The Company issued the RFP to market on July 31, 2025, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation.

Previous wording

After a robust and competitive bidding process performed in accordance with Oregon's competitive bidding rules, and with the active participation of, and oversight by, an OPUC-selected third-party independent evaluator, on September 17, 2024, PGE submitted a request for acknowledgement of the final shortlist of bidders to the OPUC. On October 7, 2024, the Company filed notification that one project on the final shortlist was no longer available.

Current wording

After a robust and competitive bidding process performed in accordance with Oregon's competitive bidding rules, and with the active participation of, and oversight by, an OPUC-selected third-party independent evaluator, PGE plans to submit a request for acknowledgement of the final shortlist of bidders to the OPUC. The final shortlist is made up of both renewables and non-emitting capacity projects, as shown in the table below:

Previous wording

The proposals for renewable resources provide various combinations of solar and battery storage options that include PPAs along with Company-owned resources via Build Transfer Agreements (BTA). The proposals for non-emitting dispatchable capacity resources provide battery storage options that include PPAs along with Company-owned resources via BTAs.

Current wording

The proposals for renewable resources provide various combinations of wind, solar and battery storage options that include storage capacity and PPAs along with Company-owned resources via Build Transfer Agreements (BTA). The proposals for non-emitting dispatchable capacity resources provide battery storage options that include PPAs along with Company-owned resources via BTAs.

Previous wording

Additional details of the 2023 RFP (OPUC Docket UM 2274) are available on the OPUC website at www.oregon.gov/puc.

Current wording

PGE anticipates the OPUC to consider acknowledgement of the RFP final shortlist in May 2026. Additional details of the 2025 RFP (OPUC Docket UM 2371) are available on the OPUC website at www.oregon.gov/puc.

Previous wording

Both the 2021 and 2023 RFPs were the subject of regulatory and legal challenges initiated by NewSun Energy LLC, focused on the scoring methodology of the RFPs and OPUC acknowledgement of the final shortlists. However, two of NewSun’s challenges to the 2021 RFP were dismissed as moot in recent court decisions. PGE has joined the proceedings as an intervenor, and the remaining challenges are in various stages of litigation or regulatory review. PGE cannot predict the outcome of these proceedings or potential impact, if any, on its 2021 and 2023 All-Source RFP process.

Current wording

Various regulatory and legal challenges directed at the OPUC have been initiated by NewSun Energy LLC, related to PGE’s RFP process. PGE has joined the proceedings as an intervenor, and the challenges are in various stages of litigation or regulatory review. PGE cannot predict the outcome of these proceedings or potential impact, if any.

Previous wording

In alignment with local and regional transmission plans, the 2023 IRP Action Plan, and CEP, PGE is evaluating and implementing upgrades to existing transmission resources and expansions of current transmission networks. Transmission resource actions are intended to alleviate congestion, improve regional adequacy and reliability, enable decarbonization goals, and address growing customer demand.

Current wording

In alignment with local and regional transmission plans, the 2023 IRP Action Plan, and CEP Update, PGE is evaluating and implementing upgrades to existing transmission resources and expansions of current transmission networks. Transmission resource actions are intended to alleviate congestion, improve regional adequacy and reliability, enable decarbonization goals, and address growing customer demand.

Previous wording

On May 28, 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties have entered negotiations with the U.S. DOE to finalize the project objectives, terms, and conditions, including the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project. On August 6, 2024, the project was awarded a $700 million grant from the U.S. Department of Energy’s Grid Resilience and Innovation Partnerships program to further support its development and would reduce the overall total investment of the project.

Current wording

In May 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties entered negotiations with the United States Department of Energy (U.S. DOE) to finalize the project objectives, terms, and conditions, including the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project. In August 2024, the project was awarded a $700 million grant from the U.S. DOE’s Grid Resilience and Innovation Partnerships program to further support its development and would reduce the overall total investment of the project. A portion of the GRIP funding is also allocated to assess upgrades to the Colstrip Transmission System. See “Federal Grants” in the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants and effect of Presidential executive orders.

Previous wording

The North Plains Connector would be the nation’s first HVDC transmission connection among three regional U.S. electric energy markets, providing additional flexibility and the sharing of resources across multiple time zones. PGE's resource planning process indicates the need for transmission to provide additional transfer capacity, access to diverse energy resources, access to enhanced wholesale markets, and to ease congestion on the existing western transmission system. PGE continues to explore the North Plains Connector as a resource to meet those load-service needs.

Current wording

The North Plains Connector would be the nation’s first HVDC transmission connection among three regional U.S. electric energy markets, providing additional flexibility and the sharing of resources across multiple time zones. PGE's resource planning process indicates the need for transmission to provide additional transfer capacity, access to diverse energy resources, and enhanced wholesale markets, and ease congestion on the existing western transmission system. PGE continues to explore the North Plains Connector as a resource to meet those load-service needs.

Previous wording

The United States Department of Energy (U.S. DOE) selected the Confederated Tribes of Warm Springs (CTWS), with PGE as a subrecipient under the grant, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The project will accelerate the development of transmission capacity, enabling new carbon-free generation in Central and Eastern Oregon to reach customer demand loads in Western Oregon. The added capacity and associated upgrades will also increase resiliency of the transmission system as well as resiliency of the CTWS communities by increasing resources available to CTWS to support adaptation and response strategies. See “Federal Grants” in this Overview for further discussion.

Current wording

The U.S. DOE selected the CTWS, with PGE as a subrecipient under the grant, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The project (Warm Springs Power Pathway) will accelerate the development of transmission capacity, enabling new generation in Central and Eastern Oregon to reach customer demand loads in Western Oregon. The added capacity and associated upgrades will also increase resiliency of the transmission system as well as resiliency of the CTWS communities by increasing resources available to the CTWS to support economic growth opportunities. See “Federal Grants” in the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants.

Previous wording

•Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan (WMP) is developed and submitted to the OPUC, as required by State law, to coordinate activities across the Company and with State-wide stakeholders. The 2025 WMP Update forecasts $53 to $57 million in operations and maintenance costs and an additional $57 to $78 million in capital investments, for the year ending 2025, to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by reducing the risk that PGE’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. During 2024, PGE invested $40 million in capital projects related to wildfire mitigation and resiliency and utility asset management, consistent with the 2024 WMP. See the “Wildfire Mitigation” section in Note 7, Regulatory Assets and Liabilities, in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data, for further discussion.

Current wording

Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan is developed and submitted to the OPUC, as required by State law, to coordinate activities across the Company and with State-wide stakeholders. On December 31, 2025, PGE filed its 2026-2028 Wildfire Mitigation Plan, which forecasts $47 to $50 million annually in operations and maintenance costs and an additional $70 to $84 million annually in capital investments, for the 2026-2028 period, to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by mitigating the risk that PGE’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. During 2025, PGE invested $56 million in capital projects related to wildfire mitigation and resiliency and utility asset management.

Previous wording

•Virtual Power Plant (VPP)—PGE’s VPP is comprised of Distributed Energy Resources and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to flexible load programs, rooftop solar, battery storage, and electric vehicle (EV) charging solutions support grid reliability and increase portfolio flexibility and resource diversity. These Distributed Energy Resources and flexible loads are the foundation of PGE’s VPP that increasingly provides a growing suite of grid and system services over time. When coordinated through the Company’s Distributed Energy Resources Management Systems, Distributed Energy Resource and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. Customer participation in the VPP helps avoid customer service interruptions and reduces exposure to scarcity pricing in energy markets. On July 8, 2024, customer actions, orchestrated through the VPP, reduced load by more than 100 MW. As their participation in PGE’s VPP grows, customer actions provide increasing benefit and help avoid customer service interruptions and reduce exposure to scarcity pricing in energy markets.

Current wording

Virtual Power Plant (VPP)—PGE’s VPP is comprised of Distributed Energy Resources and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to flexible load programs, rooftop solar, battery storage, and electric vehicle (EV) charging solutions support grid reliability and increase portfolio flexibility and resource diversity. When coordinated through the Company’s Distributed Energy Resources Management Systems, Distributed Energy Resource and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. As customer participation in PGE’s VPP grows, their actions provide increasing benefit and help avoid customer service interruptions and reduce exposure to scarcity pricing in energy markets.

Previous wording

•Distribution System Plan (DSP)—In 2021 and 2022, PGE filed its inaugural DSP in two parts, which were accepted by the OPUC in March 2022 and February 2023, respectively. The OPUC Staff finalized their review of modifications to the current DSP guidelines in the fourth quarter of 2024 and PGE filed its next DSP in December 2024, fully compliant with the updated requirement. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as EVs and Solar Photovoltaic installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in meeting PGE’s clean energy goals.

Current wording

Distribution System Plan (DSP)—In 2021 and 2022, PGE filed its inaugural DSP in two parts, which were accepted by the OPUC in March 2022 and February 2023, respectively. The OPUC Staff finalized their review of modifications to the current DSP guidelines in the fourth quarter of 2024 and PGE filed its next DSP in December 2024, fully compliant with the updated requirement. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as EVs and rooftop solar installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in demonstrating continual progress towards PGE’s clean energy goals. For further information on recovery of costs related to the DSP, see “Distribution System Plan recovery mechanism” in the Regulatory Matters section of this Overview.

Previous wording

Electrify the economy—To help Oregon reach its decarbonization goals, PGE is working to build a safe, reliable, and affordable, economy-wide, clean energy future. The Company is committed to increasing electrification of buildings and supporting vehicle electrification for customers, as well as its own vehicle fleet.

Current wording

Electrify the economy—To help Oregon reach its decarbonization goals, PGE is committed to increasing electrification of buildings and supporting vehicle electrification for customers.

Previous wording

Transportation electrification (TE) is one of the most significant ways to reduce GHG emissions in Oregon. PGE is engaged with customers and communities to manage EV charging load, develop infrastructure projects aimed at improving accessibility to EV charging stations, build electric fleet partnerships, and offer programs to supporting customers’ transitions to TE.

Current wording

Transportation electrification (TE) is one of the most significant ways to reduce GHG emissions in Oregon. PGE is engaged with customers and communities to manage EV charging load, develop infrastructure projects aimed at improving accessibility to EV charging stations, build electric fleet partnerships, and offer programs to support customers’ transitions to TE.

Previous wording

In 2023, PGE’s second TE plan was filed and accepted by the OPUC in October 2023. The TE plan considers current and planned activities, along with forecasted EV loads and potential system impacts. The 2023 TE plan represents a continuation of the approach and programmatic efforts found within PGE’s 2019 TE plan while also outlining the Company’s current strategy to integrate TE into utility business in order to plan, service, and manage EV load.

Current wording

On July 25, 2025, PGE filed with the OPUC its draft 2026-2028 TE plan, which represents a continuation of the approach and strategy found within PGE’s 2023-2025 TE plan.

Previous wording

In the 2023 to 2025 period covered by the 2023 TE plan, capital expenditures are expected to be approximately

Current wording

On December 9, 2025, the OPUC accepted PGE's 2026-2028 TE plan. In the 2026-2028 period covered by the 2026-2028 TE Plan, capital expenditures are expected to be approximately $11 million.

Previous wording

Businesses and families continue to turn to electricity to serve their home and workplace needs. PGE continues to pursue advanced technologies to enhance the grid, pursue distributed generation and energy storage, and develop microgrids and the use of data and analytics to better predict demand and support energy-saving customer programs.

Current wording

PGE continues to pursue advanced technologies to enhance the grid, pursue energy storage, and develop microgrids and the use of data and analytics to better predict demand and support energy-saving customer programs.

Current wording

Trade Tariffs—Recently, trade tariffs were imposed through presidential executive orders. While some tariffs scheduled to take effect were temporarily suspended, broad tariffs remain in effect. Trade tariffs may increase the cost of imported materials and equipment, disrupt supply chains, drive economic volatility, and create adverse capital and credit market conditions. The cost of steel utility poles, meters, transformers, and specialized electrical equipment, among other items, may increase materials and supplies balances and elevate the cost of capital projects. Similarly, prices may rise and lead times may lengthen for necessary components in resources considered for acquisition in PGE’s All-Source RFPs. For further information on the Company’s RFPs, see “The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview. While PGE’s Canadian natural gas imports are not expected to be impacted by the current state of trade tariffs due to the imports being U.S.-Mexico-Canada Agreement compliant, the future of trade tariff impacts on such imports is uncertain. The Company is unable to reasonably estimate the effects of the rapidly evolving trade tariff landscape, as those effects could include project delays and cost increases, and present obstacles to PGE’s strategic plan execution. PGE is closely monitoring the impacts of trade tariffs and the potential effect they may have on the Company’s financial position, results of operations, or cash flows.

Showing the first 40 of 115 pairs. Open the source sections for the rest.

Rearranged current paragraphs (5)

Current report — wording carried from elsewhere

PGE has entered into agreements to transfer 2023 through 2025 tax credits and transferred $179 million and $112 million, net of discounts, for cash proceeds in 2025 and 2024, respectively.

Current report — wording carried from elsewhere

Retail customer price changes and customer usage patterns, which can be affected by the economy, also have an effect on revenues. Wholesale power availability and price, hydro and wind generation, and fuel costs for thermal plants can also affect income from operations. PGE has taken measures to enhance the availability of supply chain-constrained items that are needed to serve new and existing customers, such as securing inventory of critical materials to improve reliability, reserving manufacturing capacity with strategic partners, and evaluating availability with established and new suppliers. The Company's materials and supplies forecasting process is designed to secure materials availability as well as help mitigate cost increases through long-term agreements, supplier engagement, and expanding the supply base. PGE is monitoring the fluid situation around tariffs and trade policies and continues to evaluate any potential impact to its operations and the need to implement applicable mitigation strategies.

Current report — wording carried from elsewhere

For 2024, actual NVPC was below baseline NVPC by $78 million, which was outside the established deadband range. Pursuant to the PCAM and related earnings test, because PGE’s preliminary regulatory ROE was below 10.5%, there was no estimated refund to customers under the PCAM for 2024.

Current report — wording carried from elsewhere

a series, due in 2055, in the amount of $200 million that will bear interest from its issuance date at an annual rate of 5.84%.

Current report — wording carried from elsewhere

PGE anticipates entering into a new at-the-market offering program in the first quarter of 2026. Any proceeds from the issuances of common stock will be used for general corporate purposes and investments in renewables and non-emitting dispatchable capacity.
Rearranged previous paragraphs (6)

Previous report — wording carried elsewhere

The Resource Planning Process—PGE’s resource planning process includes working with customers, stakeholders, and regulators to chart the course toward a clean, affordable, and reliable energy future. With the passage of HB 2021, PGE created a Clean Energy Plan (CEP), which articulates the Company’s strategy to meet the

Previous report — wording carried elsewhere

PGE filed notice with the OPUC in November 2024 that an RFP in 2025 was needed to procure resources to meet a forecasted 2029 capacity shortfall and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan and CEP. PGE plans to file the draft 2025 All-Source RFP in the first half of 2025.

Previous report — wording carried elsewhere

•U.S. DOE Bethel-Round Butte Transmission Line Upgrade—The U.S. DOE selected the CTWS, with PGE as a subrecipient under the grant, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The US DOE and CTWS, as the prime recipient, entered into a Cooperative Agreement on August 13, 2024. Subsequently CTWS entered into a subrecipient agreement with PGE on December 1, 2024. These agreements memorialize the funding and scope for the multiyear line upgrade. See “Transmission Upgrades” in this Overview for further discussion.

Previous report — wording carried elsewhere

OPUC by the end of the year of filing, with any resulting refund or collection impacting customer prices effective January 1 of the following year. RCE costs incurred in 2024 will be included in the PCAM for 2024, which the Company expects to file no later than July 1, 2025. PGE believes the deferred amounts as of December 31, 2024 are probable of recovery. The OPUC has significant discretion in making the final determination of recovery. The OPUC’s conclusion of overall prudence could result in a portion, or all, of PGE’s deferrals being disallowed for recovery. Such disallowance would be recognized as a charge to earnings.

Previous report — wording carried elsewhere

New Large Load Direct Access program in 2020, as much as 17% of the Company’s 2024 energy deliveries could have been supplied by ESSs.

Previous report — wording carried elsewhere

•For 2023, actual NVPC was above baseline NVPC by $5 million, which was within the established deadband range. Accordingly, no estimated collection from customers was recorded as of December 31, 2023.