NIOCORP DEVELOPMENTS LTD
For the period ended Dec 31, 2025. Filed Feb 6, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Dec 31, 2025 · Filed Feb 6, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-09-30; filed 2025-11-13.
0001539497-25-002940
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSCurrent report: 10-Q
Period ended 2025-12-31; filed 2026-02-06.
0001193125-26-041285
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 84 previous paragraphs and 103 current paragraphs.
43 unchanged; 30 reworded; 28 added; 7 removed; 4 previous and 2 current paragraphs rearranged.
Tables are not compared: 6 previous and 3 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (28)
Current report
On November 21, 2025, the Company adopted a limited-duration shareholder rights plan (the “Rights Plan”). One right (a “Right”) was issued for each Common Share outstanding as of December 4, 2025, and a Right automatically attaches to each subsequently issued Common Share until the expiration of the Rights Plan. The Rights generally become exercisable only if a person or group acquires or announces the current intention of commencing a take-over bid to acquire beneficial ownership of 20% or more of the Company’s outstanding Common Shares other than through a permitted bid made in compliance with applicable Canadian take-over bid rules. If the Rights become exercisable, each holder of a Right, other than the acquiring person, would be entitled to purchase additional Common Shares at a discount to the then-current market price.
Current report
The Board adopted the Rights Plan to help ensure that all shareholders of the Company are treated equally and fairly in the event of any unsolicited take-over bid or other attempt to acquire control of the Company (including by way of a "creeping take-over bid"). In respect of such transactions, the Rights Plan is intended to, among other things:
Current report
encourage potential bidders to treat the Company's shareholders fairly and equally and preserve control premiums and value for shareholders; and
Current report
provide the Board and shareholders adequate time to appropriately respond on an informed basis.
Current report
The Rights Plan was not adopted in response to any specific take-over proposal. The Plan expires on May 21, 2026, or earlier as provided by the terms of the agreement governing the Rights Plan.
Current report
On December 4, 2025, the Company, through its newly-formed subsidiary, NioCorp Advanced Metals and Alloys, LLC, completed the acquisition of the manufacturing assets and intellectual property of FEA Materials LLC for $8.4 million in cash. The acquired assets include equipment and proprietary technology used to produce Al-Sc master alloy through an innovative process that converts scandium oxide directly into Al-Sc master alloy, eliminating the need to first manufacture scandium metal. This technology is expected to meaningfully reduce processing complexity and cost relative to traditional methods. The acquisition strengthens the Company’s downstream commercialization strategy by potentially enabling the future production of Al-Sc master alloy in the United States, subject to completion and financing of the Elk Creek Project.
Current report
On December 22, 2025, the Board approved the Company’s Mine Portal Project (the “Portal Project”), at the Elk Creek Project site. The Portal Project will establish the main entrances to the Elk Creek Project underground mine, which will serve as the primary access points for personnel, equipment, and materials for the Company’s planned underground mining operations. The Board-approved scope also includes excavating to bedrock, drilling and blasting to establish the twin mine ramps, on-site access road construction, as well as on-site supporting infrastructure. Work with respect to the Portal Project is expected to begin in the first quarter of calendar year 2026. The current estimated capital cost for the project is approximately $44.6 million; however, there can be no assurance that the actual capital cost of the Portal Project will not be materially greater than such estimate.
Current report
Continued evaluation of the potential to produce rare earth products and sell such products under offtake agreements;
Current report
Negotiation and completion of offtake agreements for the remaining uncommitted production of niobium, scandium, and titanium from the Elk Creek Project, including the potential sale of titanium as titanium tetrachloride, as well as potential rare earth element production;
Current report
Negotiation and completion of engineering, procurement, and construction agreements;
Current report
Hiring of personnel to manage the Company’s responsibilities for construction and operations;
Current report
Completion of the final detailed engineering for the underground portion of the Elk Creek Project;
Current report
Completion of the final detailed engineering for surface project facilities;
Current report
Construction of natural gas and electrical infrastructure to serve the Elk Creek Project site;
Current report
Completion of water supply agreements and related infrastructure to deliver fresh water to the Elk Creek Project site;
Current report
Completion of mine groundwater investigation and control activities;
Current report
Initiation of long-lead equipment procurement activities;
Current report
Continuation of the Company’s efforts to secure additional federal, state, and local operating permits;
Current report
Completion of the characterization and testing of waste materials to support tailings impoundment and paste backfill plant designs; and
Current report
Initiation of road improvements near the junction of Nebraska state highways 50 and 62, which are intended to facilitate access to the Elk Creek Project site and manage prospective increased traffic in the project vicinity.
Current report
Exploration expenditures increased for the three-month period in 2025 as compared to 2024, primarily due to costs associated with the Company's current efforts to update the Elk Creek Project feasibility study.
Current report
Adjusted net loss increased for the three-month period in 2025, as compared to 2024, primarily due to the increase in exploration expenditures, as noted above, incurred by ECRC. Adjusted net loss per share declined slightly due to the impact of additional Common Share issuances in 2025.
Current report
Except as noted below, the discussion of significant variances for the three-month period also explains the majority of changes for the six-month period, including with respect to net loss and net loss per share for the six-month period ended December 31, 2025:
Current report
Exploration expenditures increased for the six-month period in 2025 as compared to 2024, primarily due to field-based costs associated with the 2025 Drilling Program, which was substantially completed by September 30, 2025, as well as expenses related to the Company’s ongoing efforts to update the Elk Creek Project feasibility study.
Current report
Change in fair value of earnout shares liability and change in fair value of warrant liabilities both increased for the six-month period ended December 31, 2025, as compared to 2024, reflecting the effect of an increase in the Company’s Common Share price on the financial modeling results for each of these liabilities.
Current report
Each exchangeable into one Common Share at any time, and from time to time, until March 17, 2033.
Current report
Each exercisable into one Common Share.
Current report
Includes 15,666,526 NioCorp Assumed Warrants that are each exercisable into 1.11829212 Common Shares and 3,441,511 Warrants that are each exercisable into one Common Share.
Removed paragraphs (7)
Previous report
On July 18, 2025, the Company issued and sold 13,850,000 Common Shares, at an offering price of $3.25 per Common Share, in a registered offering (the “July 2025 Offering”) under the Company’s registration statement on Form S-3 (Registration No. 333-280176), pursuant to the Placement Agency Agreement between the Company and Maxim Group LLC (“Maxim”), dated July 17, 2025. The Company received net proceeds from the July 2025 Offering, after deducting placement agent fees and other offering expenses payable by the Company, of approximately $41.2 million.
Previous report
On August 5, 2025, the Company announced that we entered into a Project Sub-Agreement (the “DoD Agreement”) with Advanced Technology International (“ATI”), an entity acting on behalf of the Defense Industrial Base Consortium under the authority of the U.S. Department of Defense (“DoD”). Subject to the terms and conditions of the DoD
Previous report
Agreement, ECRC is entitled to receive up to an aggregate of approximately $10.0 million of reimbursement payments from the DoD upon the achievement of certain project milestones. These milestones include, among other matters, the completion of new drilling operations at the Elk Creek Project to support the conversion of a portion of the current indicated mineral resources into measured mineral resources and the subsequent conversion of a portion of the current probable mineral reserves into proven mineral reserves, the production of samples of scandium metal and scandium-aluminum master alloys, and the completion of a new feasibility study for the Elk Creek Project..
Previous report
On September 19, 2025, the Company issued and sold 10,000,000 Common Shares, at an offering price of $5.00 per Common Share, in a registered direct offering (the “September 2025 Registered Direct Offering”) under the Company’s registration statement on Form S-3 (Registration No. 333-280176), pursuant to the Placement Agency Agreement between the Company and Maxim, dated September 17, 2025. The Company received net proceeds from the September 2025 Registered Direct Offering, after deducting placement agent fees and other offering expenses payable by the Company, of approximately $46.0 million.
Previous report
On September 29, 2025, the Company issued and sold (a) 7,004,740 Common Shares at a public offering price of $6.15 per Common Share and (b) 2,755,260 pre-funded Warrants to purchase an aggregate of 2,755,260 Common Shares (the “September Pre-Funded Warrants”) at a public offering price of $6.1499 per September Pre-Funded Warrant in a confidentially marketed public offering (the “September 2025 Public Offering”) under the Company’s registration statement on Form S-3 (Registration No. 333-280176), pursuant to the Placement Agency Agreement between the Company and Maxim, dated September 26, 2025. On September 30, 2025, the Company issued 2,755,218 Common Shares in connection with the cashless exercise of all of the outstanding September Pre-Funded Warrants. The Company received net proceeds from the September 2025 Public Offering, after deducting placement agent fees and other offering expenses payable by the Company, of approximately $55.3 million.
Previous report
Exploration expenditures increased for the three-month period in 2025 as compared to 2024, primarily due to expenditures associated with the 2025 Drilling Program.
Previous report
Common Shares (“Options”) issued to board members and advisors in 2025 and increases in investor-facing services and stipend payments provided to board members.
Reworded paragraphs (30)
Previous wording
All currency amounts are stated in U.S. dollars unless noted otherwise.
Current wording
All currency amounts are stated in thousands of U.S. dollars, except for share data ,unless noted otherwise.
Previous wording
Forward-looking statements have been based upon our current business and operating plans, as approved by the Board, and may include statements regarding, among other matters, the financial and business performance of NioCorp; NioCorp’s anticipated results and developments in the operations of NioCorp in future periods; NioCorp’s planned exploration activities; the adequacy of NioCorp’s financial resources; NioCorp’s ability to secure sufficient project financing to complete construction and commence operation of the Company’s niobium, scandium, and titanium project (the “Elk Creek Project”) located in southeastern Nebraska; NioCorp’s ability to receive a final commitment of financing from the Export-Import Bank of the United States (“EXIM”); the estimated total upfront capital expenditure for the Elk Creek Project; NioCorp’s expectation and ability to produce niobium, scandium, and titanium and the potential to produce rare earth elements at the Elk Creek Project; NioCorp’s plans to produce and supply specific products and market demand for those products; NioCorp’s ability to access the full amount of the expected net proceeds of the Standby Equity Purchase Agreement, dated January 26, 2023 (the “Yorkville Equity Facility Financing Agreement”) between the Company and YA II PN, Ltd., an investment fund managed by Yorkville Advisors Global, LP (“Yorkville”); NioCorp’s expectation that it will receive the full $10 million in reimbursement under the DoD Agreement (as defined below); the intended use of our cash balance as of September 30, 2025 as well as the proceeds from the October 2025 Offering (as defined below), the proceeds from the exercise of Common Share purchase warrants (“Warrants”) and the reimbursement payments pursuant to the DoD Agreement; the expected results of the 2025 Drilling Program (as defined below) at the Elk Creek Project; the expectation that the results of the 2025 Drilling Program will be used to update the feasibility study for the Elk Creek Project; the Elk Creek Project’s ability to produce multiple critical metals; the Elk Creek Project’s projected ore production and mining operations over its expected mine life; the completion of technical and economic analyses on the potential addition of magnetic rare earth oxides to NioCorp’s planned product suite; statements with respect to the estimation of mineral resources and mineral reserves; the exercise of options to purchase additional land parcels; the execution of contracts with engineering, procurement and construction companies; NioCorp’s ongoing evaluation of the impact of inflation, supply chain issues, tariffs, and geopolitical unrest on the Elk Creek Project’s economic model; and the creation of full time and contract construction jobs over the construction period of the Elk Creek Project.
Current wording
Forward-looking statements have been based upon our current business and operating plans, as approved by the Board, and may include statements regarding, among other matters, the financial and business performance of NioCorp; NioCorp’s anticipated results and developments in the operations of NioCorp in future periods; NioCorp’s planned exploration activities; the adequacy of NioCorp’s financial resources; NioCorp’s ability to secure sufficient project financing to complete construction and commence operation of the Company’s niobium, scandium, and titanium project (the “Elk Creek Project”) located in southeastern Nebraska; NioCorp’s ability to receive a final commitment of financing from the Export-Import Bank of the United States (“EXIM”); the estimated timing and capital costs of the Portal Project (as defined below); the estimated total upfront capital expenditure for the Elk Creek Project; NioCorp’s expectation and ability to produce niobium, scandium, and titanium and the potential to produce rare earth elements at the Elk Creek Project; NioCorp’s plans to produce and supply specific products and market demand for those products; NioCorp’s ability to access the full amount of the expected net proceeds of the Standby Equity Purchase Agreement, dated January 26, 2023 (the “Yorkville Equity Facility Financing Agreement”) between the Company and YA II PN, Ltd., an investment fund managed by Yorkville Advisors Global, LP (“Yorkville”); NioCorp’s expectation that it will receive the full $10.0 million in reimbursement under the DoD Agreement (as defined below); the intended use of our cash balance as of December 31, 2025 as well as the proceeds from the October 2025 Offering (as defined below), the proceeds from the exercise of Common Share purchase warrants (“Warrants”) and the reimbursement payments pursuant to the DoD Agreement; the expected results of the 2025 Drilling Program (as defined below) at the Elk Creek Project; the expectation that the results of the 2025 Drilling Program will be used to update the feasibility study for the Elk Creek Project; the Elk Creek Project’s ability to produce multiple critical metals; the Elk Creek Project’s projected ore production and mining operations over its expected mine life; the completion of technical and economic analyses on the potential addition of magnetic rare earth oxides to NioCorp’s planned product suite; statements with respect to the estimation of mineral resources and mineral reserves; the exercise of options to purchase additional land parcels; the execution of contracts with engineering, procurement and construction companies; the duration and anticipated benefits of the Rights Plan (as defined below); NioCorp’s ongoing evaluation of the impact of inflation, supply chain issues, tariffs, and geopolitical unrest on the Elk Creek Project’s economic model; and the creation of full-time and contract construction jobs over the construction period of the Elk Creek Project.
Previous wording
Forward-looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements that events, conditions, or results “will,” “may,” “could,” or “should” (or the negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates,” or “intends,” or stating that certain actions, events, or results “may,” “could,” “would,” “might,” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements reflect material expectations and assumptions, including, without limitation, expectations and assumptions relating to: NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; the future price of metals; the stability of the financial and capital markets; and current estimates and assumptions regarding the Yorkville Equity Facility Financing Agreement and its benefits. Such forward-looking statements reflect the Company’s current views with respect to future events and are subject to certain known and unknown risks, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to be materially different from any future results, performance, or achievements that may be expressed or implied by such forward-looking statements, including, among others, risks related to the following: NioCorp’s requirement of significant additional capital; NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; NioCorp’s ability to achieve the required milestones and receive the full $10.0 million in reimbursement under the DoD Agreement; NioCorp’s ability to receive a final commitment of financing from EXIM or other debt financing or financial support on acceptable timelines, on acceptable terms, or at all; NioCorp’s ability to access the full amount of the expected net proceeds under the Yorkville Equity Facility Financing Agreement; NioCorp’s ability to continue to meet Nasdaq listing standards; risks relating to the common shares, no par value, of the Company (“Common Shares”), including price volatility, lack of dividend payments and dilution or the perception of the likelihood of any of the foregoing; the extent to which NioCorp’s level of indebtedness and/or the terms contained in agreements governing NioCorp’s indebtedness, if any, the Yorkville Equity Facility Financing Agreement or other agreements may impair NioCor…
Excerpt shortened here; the source contains the full paragraph.
Current wording
“may,” “could,” or “should” (or the negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates,” or “intends,” or stating that certain actions, events, or results “may,” “could,” “would,” “might,” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements reflect material expectations and assumptions, including, without limitation, expectations and assumptions relating to: NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; the future price of and demand for metals, including aluminum-scandium("Al-Sc") alloy; and the stability of the financial and capital markets. Such forward-looking statements reflect the Company’s current views with respect to future events and are subject to certain known and unknown risks, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to be materially different from any future results, performance, or achievements that may be expressed or implied by such forward-looking statements, including, among others, risks related to the following: NioCorp’s requirement of significant additional capital; NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; NioCorp’s ability to achieve the required milestones and receive the full $10.0 million in reimbursement under the DoD Agreement; NioCorp’s ability to receive a final commitment of financing from EXIM or other debt financing or financial support on acceptable timelines, on acceptable terms, or at all; NioCorp’s ability to access the full amount of the expected net proceeds under the Yorkville Equity Facility Financing Agreement; NioCorp’s ability to continue to meet Nasdaq listing standards; risks relating to the common shares, no par value, of the Company (“Common Shares”), including price volatility, lack of dividend payments and dilution or the perception of the likelihood of any of the foregoing; the extent to which NioCorp’s level of indebtedness and/or the terms contained in agreements governing NioCorp’s indebtedness, if any, the Yorkville Equity Facility Financing Agreement or other agreements may impair NioCorp’s ability to obtain additional financing, on acceptable terms, or at all; covenants contained in agreements with NioCorp’s secured creditors that may affect its assets; NioCorp’s limited operating history; NioCorp’s history of losses; the material weaknesses in NioCorp’s internal control over financial repo…
Excerpt shortened here; the source contains the full paragraph.
Previous wording
NioCorp is developing the Elk Creek Project, located in southeast Nebraska. The Elk Creek Project is a development-stage property that has disclosed niobium, scandium, and titanium reserves and resources and disclosed rare earth mineral resources. The Company is continuing technical and economic studies around the rare earths contained in the Elk Creek Project’s mineral resources in order to determine whether extraction of rare earth elements can be reasonably justified and economically viable after taking into account all relevant factors. Niobium has developing applications in the formulation of solid-state lithium-ion batteries, which may reduce charging times and increase battery safety. Niobium is used to produce various superalloys that are extensively used in high performance aircraft and jet turbines. It also is used in High-Strength, Low-Alloy steel, a stronger steel used in automobiles, bridges, structural systems, buildings, pipelines, and other applications that generally increases strength and/or reduces weight, which can result in environmental benefits, including reduced fuel consumption and material usage and fewer air emissions. Scandium can be combined with aluminum to make high-performance alloys with increased strength and improved corrosion resistance. Scandium also is a critical component of advanced solid oxide fuel cells, an environmentally preferred technology for high-reliability, distributed electricity generation. Titanium is a component of various superalloys and other applications that are used for aerospace applications, weapons systems, protective armor, medical implants, and many others. It also is used in pigments for paper, paint, and plastics. Rare earths are critical to electrification and decarbonization initiatives and can be used to manufacture the strongest permanent magnets commercially available.
Current wording
NioCorp is developing the Elk Creek Project, located in southeast Nebraska. The Elk Creek Project is a development-stage property that has disclosed niobium, scandium, and titanium reserves and resources and disclosed rare earth mineral resources. The Company is continuing technical and economic studies around the rare earths contained in the Elk Creek Project’s mineral resources in order to determine whether extraction of rare earth elements can be reasonably justified and economically viable after taking into account all relevant factors. Niobium has developing applications in the formulation of solid-state lithium-ion batteries, which may reduce charging times and increase battery safety. Niobium is used to produce various superalloys that are extensively used in high performance aircraft and jet turbines. It also is used in High-Strength, Low-Alloy steel, a stronger steel used in automobiles, bridges, structural systems, buildings, pipelines, and other applications that generally increases strength and/or reduces weight, which can result in environmental benefits, including reduced fuel consumption and material usage and fewer air emissions. Scandium can be combined with aluminum to make high-performance alloys with increased strength and improved corrosion resistance. Scandium also is a critical component of advanced solid oxide fuel cells, an environmentally preferred technology for high-reliability, distributed electricity generation. Titanium is a component of various superalloys and other applications that are used for aerospace applications, weapons systems, protective armor, medical implants, and many others. It also is used in pigments for paper, paint, and plastics. Rare earths are critical to electrification and decarbonization initiatives and can be used to manufacture the strongest permanent magnets commercially available. In December 2025, the Company acquired certain manufacturing assets and intellectual property related to Al-Sc alloy production, which are intended to support a potential future domestic scandium supply chain, subject to financing and development
Previous wording
On October 15, 2025, the Company issued and sold (a) 10,152,175 Common shares at an offering price of $9.34 per Common Share and (b) 5,925,000 pre-funded Warrants (the “October Pre-Funded Warrants”) to purchase up to an additional 5,925,000 Common Shares at an offering price of $9.3399 per October Pre-Funded Warrant in a registered offering (the “October 2025 Offering”) under the Company's registration statement on Form S-3 (Registration No. 333-290837), pursuant to the Placement Agency Agreement between the Company and Maxim, dated October 13, 2025. On October 17, 2025, the Company issued 5,924,942 Common Shares in connection with the cashless exercise of all of the outstanding October Pre-Funded Warrants. The Company received net proceeds from the October 2025 Offering, after deducting placement agent fees and other offering expenses payable by the Company, of approximately $139.1 million.
Current wording
On October 15, 2025, the Company issued and sold (a) 10,152,175 Common shares at an offering price of $9.34 per Common Share and (b) 5,925,000 pre-funded Warrants (the “October Pre-Funded Warrants”) to purchase up to an additional 5,925,000 Common Shares at an offering price of $9.3399 per October Pre-Funded Warrant in a registered offering (the “October 2025 Offering”) under the Company's registration statement on Form S-3 (Registration No. 333-290837), pursuant to the Placement Agency Agreement between the Company and Maxim, dated October 13, 2025. On October 17, 2025, the Company issued 5,924,942 Common Shares in connection with the cashless exercise of all of the outstanding October Pre-Funded Warrants. The Company received net proceeds from the October 2025 Offering, after deducting placement agent fees and other offering expenses payable by the Company, of approximately $139.1 million. The Company intends to use the net proceeds from the October 2025 Offering for working capital and general corporate purposes, including to advance its efforts to launch construction of the Elk Creek Project and move it to commercial operation.
Previous wording
On August 1, 2025, Elk Creek Resources Corp. (“ECRC”), an indirect, majority-owned subsidiary of the Company, closed on its option to purchase three parcels of land in Johnson County, Nebraska (the “August Properties”), pursuant to the terms of the Option to Purchase, dated as of December 4, 2009, as amended (the “2009 Option Agreement”), and the Option to Purchase, dated December 4, 2014, as amended (the “2014 Option Agreement” and together with the 2009 Option Agreement, the “August Option Agreements”), each between Roger and Nancy Woltemath and ECRC. Pursuant to the terms of the August Option Agreements, Roger and Nancy Woltemath sold, transferred, conveyed and assigned to ECRC all of their rights, privileges, title and interest in and to the surface rights with respect to one of the parcels (consisting of the property known as Woltemath80S) and to the surface rights and associated mineral rights with respect to a 1.66-acre parcel. The purchase price was approximately $2.7 million, including indirect costs of $35,000.
Current wording
On August 1, 2025, Elk Creek Resources Corp. (“ECRC”), an indirect, majority-owned subsidiary of the Company, closed on its option to purchase three parcels of land in Johnson County, Nebraska, pursuant to the terms of an Option to Purchase dated December 4, 2009, as amended (the “2009 Option Agreement”), and an Option to Purchase dated December 4, 2014, as amended (together with the 2009 Option Agreement, the “August Option Agreements”). Pursuant to the terms of the August Option Agreements, ECRC acquired all surface rights with respect to an approximately 80-acre parcel and both surface and associated mineral rights with respect two additional parcels totaling approximately 1.66 acres. The aggregate purchase price was approximately $2.7 million, including indirect costs of $35.
Previous wording
The 2025 Drilling Program and associated technical work is designed to support the conversion of a portion of the Elk Creek Project's Indicated Mineral Resources into Measured Mineral Resources and the subsequent conversion of a portion of its Probable Mineral Reserves into Proven Mineral Reserves. The 2025 Drilling Program was designed to help meet Mineral Resource and Mineral Reserve classification requirements associated with the ongoing review of the Company's application for up to $800 million in potential debt financing by EXIM, as further discussed under “—Liquidity and Capital Resources.”
Current wording
The 2025 Drilling Program and associated technical work was designed to support the conversion of a portion of the Elk Creek Project's Indicated Mineral Resources into Measured Mineral Resources and the subsequent conversion of a portion of its Probable Mineral Reserves into Proven Mineral Reserves and to help meet Mineral Resource and Mineral Reserve classification requirements associated with the ongoing review of the Company's application for up to $800 million in potential debt financing by EXIM, as further discussed under “—Liquidity and Capital Resources.”
Previous wording
On September 30, 2025, ECRC closed on its options to purchase two parcels of land in Johnson County, Nebraska, which include: (i) a portion of the property known as Woltemath002, consisting of approximately 105.77 acres of land (the “Woltemath002 Property”), pursuant to the terms of the 2009 Option Agreement and (ii) the property known as Woltemath003J, consisting of approximately 220 acres of land (the “Woltemath003J Property” and, together with the Woltemath002 Property, the “ September Properties”), pursuant to the terms of the Amended and Restated Option to Purchase, dated January 4, 2017, as amended, between Victor and Juanita Woltemath (together with Roger and Nancy Woltemath, the “Owners”) and ECRC (the “2017 Option Agreement” and, together with the 2009 Option Agreement, the “September Option Agreements”). Pursuant to the terms of the September Option Agreements, the Owners sold, transferred, conveyed and assigned to ECRC all of their respective rights, privileges, title and interest in and to the surface rights and associated mineral rights, which consisted of approximately 325.77 acres of the property. The aggregate purchase price was approximately $11.3 million, including indirect costs of $29,000. This acquisition provides NioCorp with ownership of all land that hosts the Elk Creek Project’s Mineral Resource and Mineral Reserve and all acreage necessary to commence construction once project financing is obtained.
Current wording
On September 30, 2025, ECRC closed on its options to purchase two additional parcels of land in Johnson County, Nebraska (the “September Properties”), pursuant to the terms of the 2009 Option Agreement and an Amended and Restated Option to Purchase dated January 4, 2017, as amended (together with the 2009 Option Agreement, the “September Option Agreements”). The September Properties consisted of approximately 325.77 acres of land. Pursuant to the terms of the September Option Agreements, ECRC acquired all surface rights and associated mineral rights relating to the September Properties. The aggregate purchase price was approximately $11.3 million, including indirect costs of $29.
Previous wording
The Company continues to execute a work plan to further advance the development of the Elk Creek Project. In addition to the expected updates to Mineral Resources and Mineral Reserves, noted above, the Company expects to finalize engineering and costing of its new and more efficient production process which incorporates the potential addition of light and heavy magnetic rare earth oxides, the planned production of titanium in the form of titanium tetrachloride, and the potential to produce both ferroniobium and niobium oxide as commercial products. In addition, the Company is advancing engineering to potentially modify the design of the mine to incorporate a twin ramp for access along with a Railveyor system for material movement instead of utilizing vertical mining shafts. The updated mine design is expected to also incorporate updated costing. This work is expected to be summarized in an updated feasibility study for the Elk Creek Project.
Current wording
The Company continues to execute a work plan to further advance the development of the Elk Creek Project. In addition to the expected updates to Mineral Resources and Mineral Reserves, noted above, the Company expects to finalize engineering and costing of its new and more efficient production process which incorporates the potential addition of magnetic rare earth products and the planned production of titanium in the form of titanium tetrachloride. In addition, the Company is advancing engineering to modify the design of the mine to incorporate a twin ramp for access along with a Railveyor system for material movement instead of utilizing vertical mining shafts. The updated mine design will also incorporate updated costing. This work is expected to be summarized in an updated feasibility study for the Elk Creek Project.
Previous wording
Employee-related expenditures increased for the three-month period in 2025 as compared to 2024 primarily due to the timing of options issued to employees in 2025.
Current wording
Employee-related expenditures increased for the three-month period in 2025 as compared to 2024 primarily due to the timing of grants of options to purchase Common Shares ("Options") issued to employees in 2025 and the hiring of additional corporate staffing.
Previous wording
Professional fees increased for the three-month period in 2025 as compared to 2024, primarily due to higher costs incurred in 2025 related to the timing of legal services associated with the preparation of the Company’s SEC registration statements filed in October 2025.
Current wording
Professional fees increased for the three-month period in 2025 as compared to 2024 primarily due to higher legal costs incurred in connection with the preparation of the Company’s SEC registration statements filed in October 2025.
Previous wording
Other operating expensesinclude costs related to investor relations, general office expenditures, shareholder services and proxy expenditures, board-related expenditures, and other miscellaneous costs. These costs increased for the three-month period in 2025 as compared to 2024 primarily due to the timing of fully vested options to purchase
Current wording
Other operating expenses include costs related to investor relations, general office expenses, shareholder services and proxy related activities, board-related expenditures, and other miscellaneous items. These costs increased for the three-month period in 2025 as compared to 2024 primarily due the timing of Option grants issued to board members and advisors, as well as higher investor-facing service costs.
Previous wording
Change in fair value of Earnout Shares liabilityrepresents the changes in fair value related to the shares of Class B common stock of ECRC, the rights of the holders of which to exchange such shares into Common Shares are subject to certain vesting conditions (such shares of ECRC Class B common stock, the “Earnout Shares”). The 2025 expense represents the impact of an increase in the Company’s Common Share price on the financial modeling used to determine the period end fair values, whereas the 2024 gain represents the impact of a lower share price on the financial modeling results.
Current wording
Change in fair value of earnout shares liability represents the impact of changes in fair value related to shares of Class B common stock of ECRC, the rights of the holders of which to exchange such shares into Common Shares are subject to certain vesting conditions (such shares of ECRC Class B common stock, the "Earnout Shares"). The decline in fair value for the three-month period in 2025 as compared to 2024 primarily reflect the decrease in the Company’s Common Share price in the financial modeling used to determine the period end fair value.
Previous wording
Change in fair value of warrant liabilitiesrepresents the changes in fair value of Warrants that are carried as liabilities in the condensed consolidated balance sheet. Expense for the three-month period ending September 30, 2025, reflects the impact of an increase in the Company’s Common Share price on the Black-Scholes modeling results for our outstanding Warrant liabilities, whereas the 2024 gain primarily represents the impact of a lower share price on the modeling at period end.
Current wording
Change in fair value of warrant liabilities represents the impact of changes in fair value of Warrants recorded as liabilities in the condensed consolidated balance sheet. The declines in fair value for the three-month period in 2025 as compared to 2024 primarily reflect decreases in the Company’s Common Share price used in the Black-Scholes valuation of outstanding Warrant liabilities. In addition, the 2025 decline was partially offset by additional fair value expense recognized in connection with Warrants exercised during the period.
Previous wording
Interest income represents earnings from the investment of excess cash balances in a commercial money market account. The increase for the three-month period in 2025 as compared to 2024 is due to an increase in our cash balance resulting from our successful financing efforts during calendar year 2025.
Current wording
Interest income represents earnings from the investment of excess cash balances in a commercial money market account. The increase for the three-month period in 2025 as compared to 2024 is attributable to our higher cash balance resulting from our successful financing efforts during calendar year 2025.
Previous wording
Adjusted net loss and adjusted net loss per share both increased for the three-month period in 2025, as compared to 2024, primarily due to the increase in exploration expenditures, as noted above, incurred by ECRC.
Current wording
Adjusted net loss andadjusted net loss per share both increased for the six-month period in 2025, as compared to 2024, primarily due to the increase in exploration expenditures, as noted above, incurred by ECRC.
Previous wording
As discussed above under “—Recent Corporate Events”, the Company closed four equity offering transactions between July 18, 2025 and October 15, 2025. The combined net proceeds from these offerings were approximately $194.4 million, after deducting placement agency fees and other offering expenses payable by the Company. In addition, during the three-month period ended September 30, 2025, the Company issued an aggregate of 10,975,634 Common Shares through the exercise of Warrants and Options by their holders, for which the Company received proceeds totaling approximately $15.2 million. The Company expects to use these net proceeds for working capital and general corporate purposes, including to advance efforts to launch construction of the Elk Creek Project and move it to commercial operation.
Current wording
As discussed above under “—Recent Corporate Events”, the Company closed the October 2025 Offering with net proceeds of approximately $139.1 million, after deducting placement agency fees and other offering expenses payable by the Company. In addition, during the three-month period ended December 31, 2025, the Company issued an aggregate of 3,957,822 Common Shares through the exercise of Warrants and Options by their holders and advances under the Yorkville Equity Facility Financing Agreement, for which the Company received proceeds totaling approximately $14.6 million. During the period from January 1, 2026 to February 6, 2026, the Company issued an aggregate of 4,527,662 Common Shares through advances under the Yorkville Equity Facility Financing Agreement, for which the Company received proceeds totaling approximately $31.1 million. The Company expects to use these net proceeds for working capital and general corporate purposes, including to advance efforts to launch construction of the Elk Creek Project and move it to commercial operation.
Previous wording
As of September 30, 2025, the Company had cash of $162.8 million and working capital of $159.6 million, compared to cash of $25.6 million and working capital of $24.8 million on June 30, 2025.
Current wording
As of December 31, 2025, the Company had cash of $306.4 million and working capital of $297.9 million, compared to cash of $25.6 million and working capital of $24.8 million on June 30, 2025.
Previous wording
We expect that the Company will operate at a loss for the foreseeable future. The Company’s current planned cash outflows are approximately $40.0 million to $50.0 million for the next twelve months. Our planned cash outflows over the next twelve months are expected to consist of expenditures relating to limited, incremental activities to advance certain aspects of the Elk Creek Project by NioCorp’s majority owned subsidiary, ECRC, corporate overhead costs, and estimated costs related to securing financing necessary for advancement of the Elk Creek Project. These planned expenditures include expenditures relating to the anticipated completion of an updated resource and reserve estimate
Current wording
We expect that the Company will operate at a loss for the foreseeable future. The Company’s current planned cash outflows are approximately $70.0 million to $85.0 million for the next twelve months. Our planned cash outflows over the next twelve months are expected to consist of expenditures relating to limited, incremental activities to advance certain aspects of the Elk Creek Project by ECRC, corporate overhead costs, and estimated costs related to securing financing necessary for advancement of the Elk Creek Project. These planned expenditures include expenditures relating to the anticipated completion of an updated resource and reserve estimate and associated mine plan and an updated capital cost estimate in connection with the EXIM application process, infrastructure development, ongoing engineering and metallurgical test work, environmental and permitting activities, community and stakeholder engagement programs, corporate and administrative overhead, and advisory costs related to securing project financing.
Previous wording
The Company will need to secure additional capital to finance construction and achieve commercial production to support its long-term business objectives. Until sufficient funding for construction is secured, the Company expects to limit activities to modest, value-preserving work and project readiness efforts. The Company also intends to evaluate strategies and potential investment opportunities that could reduce overall project costs, capital requirements, or execution risk.
Current wording
The Company will need to secure additional capital to finance construction and achieve commercial production to support its long-term business objectives. Until sufficient funding for construction is secured, the Company expects to continue advancement activities related to the Elk Creek Project, including incremental engineering and limited underground portal-related work, while maintaining project readiness efforts. The Company also intends to evaluate strategies and potential investment opportunities that could reduce overall project costs, capital requirements, or execution risk.
Previous wording
The planned corporate overhead costs over the next twelve months are approximately $11.0 million, including Elk Creek property lease commitments, which are $65,000 through June 30, 2026, and the settlement of outstanding accounts payable as of September 30, 2025.
Current wording
The planned corporate overhead costs over the next twelve months are approximately $12.0 million, including Elk Creek property lease commitments, which are $54 through June 30, 2026, and the settlement of outstanding accounts payable as of December 31, 2025.
Previous wording
The estimated financing costs associated with the Elk Creek Project over the next twelve months include, but are not limited to, costs relating to the EXIM application process, the scope of which remains under discussion with EXIM. On June 6, 2023, the Company announced that it had submitted an application to EXIM for up to $800 million in debt financing (the “EXIM Financing”) to fund the project costs for the Elk Creek Project, under EXIM’s “Make More in America” initiative. The EXIM Financing is subject to, among other matters, the satisfactory completion of due diligence, the negotiation and settlement of final terms, and the negotiation of definitive documentation. The Company was informed that its application received approval by the first of three reviews by the EXIM Transaction Review Committee (the “TRC”) on October 2, 2023. In April 2024, EXIM provided the Company with a preliminary, non-binding indicative term sheet as part of a Preliminary Project Letter (the “PPL”), which also conveyed EXIM’s initial due diligence findings on the Company’s application for the EXIM Financing. The PPL identified additional project activities to be undertaken by the Company as part of EXIM’s due diligence process. These included, among other things, an updated mine plan and updated Elk Creek Project capital costs on a final or close-to-final basis reflecting updated process flows. The 2025 Drilling Program, which started in April 2025, was designed to help meet mineral resource and mineral reserve classification requirements necessary to complete certain of the additional project activities identified by the PPL. In addition, as previously disclosed, the Company took an additional step in the process by executing a professional services agreement with SLR Consulting to conduct an independent environmental and social review as part of EXIM’s ongoing project due diligence.
Current wording
The estimated financing costs associated with the Elk Creek Project over the next twelve months include, but are not limited to, costs relating to the EXIM application process, the scope of which remains under discussion with EXIM. On June 6, 2023, the Company announced that it had submitted an application to EXIM for up to $800 million in debt financing (the “EXIM Financing”) to fund the project costs for the Elk Creek Project, under EXIM’s “Make More in America” initiative. The EXIM Financing is subject to, among other matters, the satisfactory completion of due diligence, the negotiation and settlement of final terms, and the negotiation of definitive documentation. The Company was informed that its application received approval by the first of three reviews by the EXIM Transaction Review Committee (the “TRC”) on October 2, 2023. In April 2024, EXIM provided the Company with a preliminary, non-binding indicative term sheet as part of a Preliminary Project Letter (the “PPL”), which also conveyed EXIM’s initial due diligence findings on the Company’s application for the EXIM Financing. The PPL identified additional project activities to be undertaken by the Company as part of EXIM’s due diligence process. These included, among other things, an updated mine plan and updated Elk Creek Project capital costs on a final or close-to-final basis reflecting updated process flows. The 2025 Drilling Program, which started in April 2025 and completed in September 2025, was designed to help meet mineral resource and mineral reserve classification requirements necessary to complete certain of the additional project activities identified by the PPL. In addition, as previously disclosed, the Company took an additional step in the process by executing a professional services agreement with SLR Consulting to conduct an independent environmental and social review as part of EXIM’s ongoing project due diligence.
Previous wording
We expect our cash balance as of September 30, 2025, as well as the net proceeds from the October 2025 Offering, the proceeds from Warrant and Option exercises that occurred since September 30, 2025, and the reimbursement payments pursuant to the DoD Agreement, to be sufficient to fund our planned expenditures for the next twelve months. However, additional work is required in order to advance the Elk Creek Project to construction, requiring additional financing. The technical report summary for the Elk Creek Project prepared in accordance with subpart 1300 of Regulation S-K (“S-K 1300”) and filed as Exhibit 96.1 to the Company’s Annual Report on Form 10-K for the fiscal year ended June 30, 2025, includes an estimated total upfront capital expenditure for the Elk Creek Project of approximately $1,141.0 million. The actual amount of capital expenditure required to successfully achieve commercial production at the Elk Creek Project is subject to, among other factors, the timing and actual cost of further exploration, preparing feasibility studies, permitting, engineering and the construction of infrastructure, mining and processing facilities. In addition, to the extent that EXIM requests further project activities to be undertaken in connection with the diligence process, the Company would require additional funding to complete such activities. As noted above, the Company’s ability to continue operations, fund our current work plan, and construct and operate the Elk Creek Project is dependent on management’s ability to secure additional financing. When available, the Yorkville Equity Facility Financing Agreement provides an opportunity for opportunistic share sales to help fund our current work plan. However, the Yorkville Equity Facility Financing Agreement will expire by its terms on April 1, 2026.
Current wording
We expect our cash balance as of December 31, 2025, as well as the proceeds from Warrant and Option exercises and advances under the Yorkville Equity Facility Financing Agreement that occurred since December 31, 2025, and the reimbursement payments pursuant to the DoD Agreement, to be sufficient to fund our planned expenditures for the next twelve months. However, additional work is required in order to advance the Elk Creek Project to construction, requiring additional financing. The technical report summary for the Elk Creek Project prepared in accordance with subpart 1300 of Regulation S-K (“S-K 1300”) and filed as Exhibit 96.1 to the Company’s Annual Report on Form 10-K for the fiscal year ended June 30, 2025, includes an estimated total upfront capital expenditure for the Elk Creek Project of approximately $1,141.0 million. The actual amount of capital expenditure required to successfully achieve commercial production at the Elk Creek Project is subject to, among other factors, the timing and actual cost of further exploration, preparing feasibility studies, permitting, engineering and the construction of infrastructure, mining and processing facilities. In addition, to the extent that EXIM requests further project activities to be undertaken in connection with the diligence process, the Company would require additional funding to complete such activities. As noted above, the Company’s ability to continue operations, fund our current work plan, and construct and operate the Elk Creek Project is dependent on management’s ability to secure additional financing. When available, the Yorkville Equity Facility Financing Agreement provides an opportunity for opportunistic share sales to help fund our current work plan. However, the Yorkville Equity Facility Financing Agreement will expire by its terms on April 1, 2026.
Previous wording
Except for the potential funding from advances under the Yorkville Equity Facility Financing Agreement, as discussed above, and the potential exercise of Options and Warrants, we currently have no further funding commitments or arrangements for additional financing at this time. Management currently anticipates that it will fund the upfront capital expenditure amount for the Elk Creek Project through a combination of debt and equity financing, with approximately two-thirds of such amount being funded from the net proceeds of debt financing, including the amount of debt that would be represented by the EXIM Financing, if any. Management is actively pursuing additional sources of debt and equity financing to meet its long-term funding requirements, and while it has been successful in doing so in the past, there is no assurance that we will be able to obtain any such additional financing on acceptable terms, if at all. Pursuant to the Exchange Agreement, dated as of March 17, 2023 (as amended, supplemented or otherwise modified, the “Exchange Agreement”), by and among NioCorp, ECRC and GX Sponsor II LLC, NioCorp is restricted from issuing equity or equity-linked securities (other than Common Shares) or any preferred equity or non-voting equity if such issuance would adversely impact the rights of the holders of the shares of Class B common stock of ECRC, without the consent of the holders of a majority of the shares of Class B common stock of ECRC. The various placement agency agreements entered into with Maxim in connection with the equity offerings described above under “—Recent Corporate Events,” including the October 2025 Placement Agency Agreement, also contain certain covenants that, among other things, limit NioCorp’s ability to enter into any variable rate transaction on or before November 28, 2025, including issuances of equity or debt securities that are convertible into Common Shares at variable rates and any equity line of credit, at-the-market offering agreement, or other continuous offering of Common Shares, other than with Maxim, subject to certain exceptions. Notwithstanding the restrictions set forth in the Exchange Agreement, as well as the various placement agency agreements, there is significant uncertainty that we would be able to secure any additional financing in the current equity or debt markets. The quantity of funds to be raised and the terms of any proposed equity or debt financing that may be undertaken will be negotiated by management as opportunities to raise funds arise. Management may pursue funding sources of both debt and equity financing, including but not limited to the issuance of equity securities in the form of Common Shares, Warrants, subscription receipts, or any combination thereof in units of the Company pursuant to private placements to accredited investors or pursuant to public offerings in the form of underwritten/brokered offerings, registered direct offerings, or other forms of equity financing and pu…
Excerpt shortened here; the source contains the full paragraph.
Current wording
Except for the potential funding from advances under the Yorkville Equity Facility Financing Agreement, as discussed above, and the potential exercise of Options and Warrants, we currently have no further funding commitments or arrangements for additional financing at this time. Management currently anticipates that it will fund the upfront capital expenditure amount for the Elk Creek Project through a combination of debt and equity financing, with approximately two-thirds of such amount being funded from the net proceeds of debt financing, including the amount of debt that would be represented by the EXIM Financing, if any. Management is actively pursuing additional sources of debt and equity financing to meet its long-term funding requirements, and while it has been successful in doing so in the past, there is no assurance that we will be able to obtain any such additional financing on acceptable terms, if at all. Pursuant to the Exchange Agreement, dated as of March 17, 2023 (as amended, supplemented or otherwise modified, the “Exchange Agreement”), by and among NioCorp, ECRC and GX Sponsor II LLC, NioCorp is restricted from issuing equity or equity-linked securities (other than Common Shares) or any preferred equity or non-voting equity if such issuance would adversely impact the rights of the holders of the shares of Class B common stock of ECRC, without the consent of the holders of a majority of the shares of Class B common stock of ECRC. Notwithstanding the restrictions set forth in the Exchange Agreement, there is significant uncertainty that we would be able to secure any additional financing in the current equity or debt markets. The quantity of funds to be raised and the terms of any proposed equity or debt financing that may be undertaken will be negotiated by management as opportunities to raise funds arise. Management may pursue funding sources of both debt and equity financing, including but not limited to the issuance of equity securities in the form of Common Shares, Warrants, subscription receipts, or any combination thereof in units of the Company pursuant to private placements to accredited investors or pursuant to public offerings in the form of underwritten/brokered offerings, registered direct offerings, or other forms of equity financing and public or private issuances of debt securities, including secured and unsecured convertible debt instruments, or secured debt project financing. Management does not currently know the terms pursuant to which such financings may be completed in the future, but any such financings will be negotiated at arm’s-length. Future financings involving the issuance of equity securities or derivatives thereof will likely be completed at a discount to the then-current market price of the Company’s securities and will likely be dilutive to current shareholders. In addition, we could raise funds through the sale of interests in our mineral properties, although current market conditions and other rec…
Excerpt shortened here; the source contains the full paragraph.
Previous wording
Shares and Warrant liabilities, share-based compensation, and other non-cash transactions. Overall, operational outflows during the three months ended September 30, 2025, increased from the corresponding period of 2024 due to costs and expenditures incurred in connection with the 2025 Drilling Program. Going forward, the Company’s working capital requirements are expected to increase substantially in connection with the development of the Elk Creek Project.
Current wording
During the six months ended December 31, 2025, the Company’s operating activities consumed $7.6 million of cash (2024: $2.0 million). The cash used in operating activities for the six months ended December 31, 2025, reflects the Company’s funding of losses of $44.7 million, primarily resulting from increased fair value related to the Earnout Shares and Warrant liabilities, share-based compensation, and other non-cash transactions. Overall, operational outflows during the six months ended December 31, 2025, increased from the corresponding period of 2024 due to costs and expenditures incurred in connection with the 2025 Drilling Program and the Company's current efforts to update the Elk Creek Project feasibility study. Going forward, the Company’s working capital requirements are expected to increase substantially in connection with the development of the Elk Creek Project.
Previous wording
During the three months ended September 30, 2025, the Company’s investing activities consumed $14.1 million of cash (2024: $0). The cash used in investing activities for the three months ended September 30, 2025, reflects the acquisition of additional land and mineral rights for the Elk Creek Project.
Current wording
During the six months ended December 31, 2025, the Company’s investing activities consumed $23.0 million of cash (2024: $0). The cash used in investing activities for the six months ended December 31, 2025, reflects the acquisition of additional land and mineral rights for the Elk Creek Project as well as the acquisition of the manufacturing assets and intellectual property of FEA Materials LLC.
Previous wording
Financing inflows were $158.0 million during the three months ended September 30, 2025 (2024 outflows: $1.2 million), with 2025 inflows reflecting the gross receipts of $155.0 million from the equity offerings, and $15.3 million from Warrant exercises, offset by $12.3 million of share issuance costs.
Current wording
Financing inflows were $311.3 million during the six months ended December 31, 2025 (2024: $0.5 million), with 2025 inflows reflecting the gross receipts of $305.2 million from the equity offerings, and $29.6 million from Warrant and Option exercises and advances under the Yorkville Equity Facility Financing Agreement, offset by $23.5 million of share issuance costs.
Previous wording
The Company has historically relied upon debt and equity financings to finance its activities. Subject to the restrictions set forth in the Exchange Agreement and the various placement agency agreements with Maxim, the Company may pursue additional debt and/or equity financing in the medium term; however, there can be no assurance the Company will be able to obtain any required financing in the future on acceptable terms, or at all.
Current wording
The Company has historically relied upon debt and equity financings to finance its activities. Subject to the restrictions set forth in the Exchange Agreement, the Company may pursue additional debt and/or equity financing in the medium term; however, there can be no assurance the Company will be able to obtain any required financing in the future on acceptable terms, or at all.
Previous wording
There have been no material changes in our critical accounting estimates discussed in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” under the heading “Critical Accounting Estimates and Recent Accounting Pronouncements” as of June 30, 2025, in the Annual Report on Form 10-K.
Current wording
There have been no material changes in our critical accounting estimates discussed in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” under the heading “Critical Accounting Estimates and Recent Accounting Pronouncements” as of June 30, 2025, in the Annual Report on Form 10-K, other than the addition of critical accounting estimates related to the valuation and impairment assessment of goodwill and identifiable intangible assets recognized in the current period.
Previous wording
The Company has included certain non-GAAP financial measures in this Quarterly Report on Form 10-Q such as adjusted net loss and adjusted net loss per share. Adjusted net loss for presentation purposes is our net loss attributable to the Company plus non-cash items plus (gain)/loss on non-recurring items plus tax adjustments. Adjusted net loss per share is the impact of these adjustments on the per share net losses incurred. These non-GAAP measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance U.S. GAAP. Because these non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. The Company’s management believes that presenting adjusted net loss and adjusted net loss per share provides
Current wording
The Company has included certain non-GAAP financial measures in this Quarterly Report on Form 10-Q such as adjusted net loss and adjusted net loss per share. Adjusted net loss for presentation purposes is our net loss attributable to the Company plus non-cash items plus (gain)/loss on non-recurring items. Adjusted net loss per share is the impact of these adjustments on the per share net losses incurred. These non-GAAP measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance U.S. GAAP. Because these non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. The Company’s management believes that presenting adjusted net loss and adjusted net loss per share provides investors with additional insight into underlying operating performance by excluding the non-cash gains and losses noted above. Our presentation of certain non-GAAP financial measures should not be construed to imply that our future results will be unaffected by the types of items excluded from the calculations of non-GAAP measures. These non-GAAP measures are not presented in accordance with U.S. GAAP and the use of these terms vary from others in our industry.
Rearranged current paragraphs (2)
Current report — wording carried from elsewhere
Forward-looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements that events, conditions, or results “will,”
Current report — wording carried from elsewhere
Six-month period ended December 31, 2025 compared to the six-month period ended December 31, 2024
Rearranged previous paragraphs (4)
Previous report — wording carried elsewhere
The Company intends to use the net proceeds from the July 2025 Offering, September 2025 Registered Direct Offering, September 2025 Public Offering, and October 2025 Offering for working capital and general corporate purposes, including to advance its efforts to launch construction of the Elk Creek Project and move it to commercial operation.
Previous report — wording carried elsewhere
and associated mine plan and an updated capital cost estimate in connection with the EXIM application process, ongoing engineering and metallurgical test work, environmental and permitting activities, community and stakeholder engagement programs, corporate and administrative overhead, and advisory costs related to securing project financing.
Previous report — wording carried elsewhere
During the three months ended September 30, 2025, the Company’s operating activities consumed $6.7 million of cash (2024: $0.6 million). The cash used in operating activities for the three months ended September 30, 2025, reflects the Company’s funding of losses of $43.5 million, primarily resulting from increased fair value related to the Earnout
Previous report — wording carried elsewhere
investors with additional insight into underlying operating performance by excluding the non-cash losses noted above. Our presentation of certain non-GAAP financial measures should not be construed to imply that our future results will be unaffected by the types of items excluded from the calculations of non-GAAP measures. These non-GAAP measures are not presented in accordance with U.S. GAAP and the use of these terms vary from others in our industry.