Skip to main content

BARRICK GOLD CORP

For the period ended Dec 31, 2023. Filed Mar 15, 2024.

View on SEC.gov

About this filing

The yearly report of certain Canadian companies, filed under a joint US and Canadian system. It is the main yearly account these companies give US investors, largely as filed in Canada.

FY2023 · Filed Mar 15, 2024

Use the contents to explore the available documents and sections.

B$40.56+0.5%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · Open Pit

Open Pit

The Carlin Complex has four major open pit operations including Goldstrike, Gold Quarry, Goldstar (part of the Genesis/Tri-Star pits), and South Arturo (which returned to production in December 2022). All of these are truck and shovel operations. Blasting is required and blast patterns are laid out according to material type, using rock type designations of hard, average, soft or a combination of the three. The pit design varies between 6.1-meter to 12.2-meter (20 to 40 foot) benches and, where possible, up to 18.3-meter (60 foot) benches in the ore, though mined in 6.1-meter (20 foot) cuts. Slopes vary based on location.

The mine equipment fleet will be used throughout the mine life and is shared with the other mines at the Carlin Complex. The number of loading and hauling units allocated to each deposit varies depending on the operational needs from the mine plans. The equipment list also includes the auxiliary equipment needed to support mining and there-handling of the ore from the stockpile pad into the mill feeders.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.