TRX GOLD Corp
For the period ended Feb 28, 2026. Filed Apr 15, 2026.
View on SEC.govAbout this filing
What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.
Feb 28, 2026 · Filed Apr 15, 2026
Use the contents to explore the available documents and sections.
Contents
EX-99.2 · Endnotes
Endnotes
1 Refer to “Non-IFRS Performance Measures” section.
2 Notes Regarding Sample Protocol QA/QC: The sample chain of custody is managed by the Buckreef Gold geology team on site. Reported results are from diamond drilled core samples. Intervals of core to be analyzed are split into half using a mechanized core cutter, with one half sent to the Laboratory for geochemical analysis and the remaining half kept in storage for future reference and uses. Diamond drilled core has been HQ size and recoveries are consistently 100% across all drill hole intercepts reported.
Sampling and analytical procedures are subject to a comprehensive quality assurance and quality control program. The QA/QC program involves insertion of duplicate samples, blanks and certified reference materials in the sample stream. Gold analyses were performed by standard fire assaying protocols using a 50-gram charge with atomic absorption (AAS) finish and a gravimetric finish performed for assays greater than 10 grams per tonne.
Sample Preparation and analysis were performed by independent SGS Laboratory in Mwanza, Tanzania. SGS Laboratory is ISO17025 accredited and employs a Laboratory Information Management System for sample tracking, quality control and reporting.
The results summarized in this MD&A from the “Buckreef Main Zone NEE” prospect is an extension of the known Buckreef Main Zone. The intercepts confirm a continuity of over 200 m of known Buckreef main deposit to the Northeast. The intersections reported here are a down-hole length and may not represent true width, however the true width is estimated to be between 50% - 60% of the length.
The results summarized in this MD&A from the “Stamford Bridge” target show intercepts that confirm an interpreted mineralized shear zone trending 070 degrees (ENE) that is over a km long. The intersections reported only cover the first 100 m strike length, they are a down-hole length and may not represent true width, however the true width is estimated to be between 50% - 60% of the length.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.