NOVAGOLD RESOURCES INC
For the period ended Feb 28, 2026. Filed Apr 1, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Feb 28, 2026 · Filed Apr 1, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-08-31; filed 2025-10-01.
0001171843-25-006209
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-02-28; filed 2026-04-01.
0001171843-26-002142
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 61 previous paragraphs and 56 current paragraphs.
12 unchanged; 19 reworded; 25 added; 29 removed; 1 previous and 0 current paragraphs rearranged.
Tables are not compared: 19 previous and 18 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (25)
Current report
During the first quarter of 2026, NOVAGOLD closed an underwritten bought deal private placement issuing approximately 31 million common shares at a price of $10.00 per share for gross proceeds of approximately $310.2 million, including the partial exercise of the underwriters’ overallotment option. The Company intends to use the net proceeds of the private placement for expenditures associated with Donlin Gold activities, exercise of the Company’s prepayment option on the promissory note with Barrick, and general corporate purposes.
Current report
On January 8, 2026, NOVAGOLD and Paulson and their affiliates, as part of Donlin Gold’s infrastructure and energy strategy, announced that a non-binding Letter of Intent (LOI) was signed with Glenfarne Alaska LNG, LLC, majority owner and developer of the Alaska LNG project, to explore the potential supply of natural gas for Donlin Gold’s on-site power generation.
Current report
On February 9, 2026, NOVAGOLD and Paulson and their affiliates announced that Fluor Corporation (“Fluor”) was selected as the lead engineering firm for the Donlin Gold Bankable Feasibility Study (BFS) as the project advances toward construction. The BFS is expected to be completed in 2027.
Current report
Following the end of the first fiscal quarter of 2026, NOVAGOLD and Paulson and their affiliates announced on March 12, 2026, the award of specialized contracts to three engineering firms — WSP USA, Inc. (WSP), Worley Alaska, Inc., and Hatch Ltd. (the “Specialist Contractors”) — to advance critical infrastructure and processing components, including the on-site power plant, natural gas pipeline, and the pressure oxidation circuit and oxygen plant, as part of the Donlin Gold BFS.
Current report
Fluor and the Specialist Contractors have commenced work on the BFS, under the leadership of the newly appointed Project Director Frank Arcese (see release dated January 13, 2026), who has extensive experience in delivering large-scale mining projects. With major contractors now on board and ongoing progress on the BFS workstreams, the Company expects to review the schedule and budget for the next phase of development by mid-2026 and provide any update to guidance as required.
Current report
In the first quarter of 2026, Donlin Gold continued to prioritize meaningful engagement with local communities, stakeholders, and government representatives in the Yukon-Kuskokwim (Y-K) region, Alaska, and Washington, D.C., in support of project development and permitting. Decades of consistent outreach across 62 communities have fostered strong relationships, facilitated knowledge exchange, and reinforced the project’s social license while building lasting trust. Key activities in the first quarter included:
Current report
NOVAGOLD is committed to education, community wellness, cultural preservation, ecological stewardship, and best practices that enhance the economic, health, and social well-being of our employees, the people of the Y-K region, and surrounding communities. Donlin Gold supports these efforts through a wide range of programs and community events, supporting cultural preservation, strengthening stakeholder relationships, advancing economic and social well-being, and promoting youth engagement. In the first quarter of 2026, Donlin Gold carried out the following key activities and projects:
Current report
These various efforts are also aligned with Donlin Gold’s long-term objectives to support workforce development and regional economic participation as the project advances.
Current report
Our share of funding for the Donlin Gold project in the first quarter of 2026 was $15.5 million. We continue to expect our total annual Donlin Gold funding to be $78.8 million during fiscal 2026 to continue to advance the Donlin Gold BFS, in line with our previously issued guidance.
Current report
Permitting
Current report
Donlin Gold is a federally permitted project on private land designated for mining activities by Calista, owner of the mineral rights, and TKC owner of the surface estate. Permitting in Alaska is a substantial undertaking supported by a diligent, thorough, transparent, and inclusive process for all involved, including stakeholders from the Y-K region.
Current report
Comments from Alaska Department of Natural Resources’ (“ADNR”) on the preliminary dam safety design packages are anticipated in 2026. BGC Engineering has been appointed as the contractor for the Detailed Design Packages. Completion of the Detailed Design Packages continues to be anticipated by the end of 2026/early 2027, with potential issuance of the Dam Safety Certificates in 2028.
Current report
NOVAGOLD continues to support the State of Alaska in defending the Department of Environmental Conservation’s (ADEC) Clean Water Act Section 401 Water Quality Certification (the “401 Certification”), which is the only remaining challenge to Donlin Gold’s permits in state court. On May 6, 2025, the Alaska Superior Court upheld ADEC’s issuance of the 401 Certification. Earthjustice filed an appeal in the Alaska Supreme Court and filed their opening brief on September 16, 2025. Donlin Gold’s and the State of Alaska’s briefs were filed on November 25, 2025, and Earthjustice’s reply brief was filed on January 9, 2026. Oral argument is scheduled for April 8, 2026.
Current report
Financing Activities During First Quarter of 2026
Current report
The Company completed a private placement offering on February 5, 2026 of 31,020,000 common shares at a price of $10.00 per share for aggregate gross proceeds of $310.2 million less $16.2 million of issuance costs. The Company intends to use the net proceeds of the private placement for expenditures associated with Donlin Gold activities, exercise of the Company’s prepayment option on the promissory note with Barrick, and general corporate purposes.
Current report
The Backstop Agreement further provided the Investors with registration rights, pursuant to which the Company had agreed to, among other things, file a registration statement with the SEC registering the resale of the Warrant Shares and to cause such registration statement to remain effective until the earlier of (a) three years from the issuance of the Subscribed Shares (which were not issued), (b) the date on which all of the Subscribed Shares and Warrant Shares shall have been sold, or (c) on the first date on which each Investor can sell all of its Subscribed Shares and/or Warrant Shares (or shares received in exchange therefor) under Rule 144 of the Securities Act without limitation as to the manner of sale or the amount of such securities that may be sold. The Backstop Agreement also contained customary indemnification and other provisions customary for registration rights of this type. Pursuant to discussions with the Investors and the Placement Investors (as defined below), the Company may file a resale registration statement in the future upon request of such investors with respect to the Warrant Shares or common shares issued pursuant to the Subscription Agreement (as defined below).
Current report
First Quarter 2026 Financial Results
Current report
Net loss and loss per share in the first quarter of 2026 were $15.4 million and $0.04, respectively, compared to net loss and loss per share of $9.6 million and $0.03, respectively, in the first quarter of 2025. NOVAGOLD’s net loss during the first quarter of 2026 increased by $6.3 million from the comparable prior year period primarily due to higher expenditures at Donlin Gold following the commencement of BFS related activities including hiring for key roles on the Donlin Gold project team and higher general and administrative expenses at NOVAGOLD.
Current report
The Company’s share of Donlin Gold expenses in the first quarter of 2026 was $3.9 million higher than the comparative prior year period due to camp remaining open this winter, increased project activity following Fluor being awarded the lead engineering role for the Donlin Gold BFS in early February 2026 and the Company’s share of Donlin Gold expenditures increasing by 10% to 60% starting in the third quarter of 2025. General and administrative expenses increased in the first quarter of 2026 by $3.9 million from the comparable prior year period primarily due to higher professional fees and share-based compensation. Professional fees were elevated during the first quarter but remained in line with quarterly cadence expectations and are expected to decline from first quarter levels during the remainder of the year and remain within previously issued 2026 guidance. Share-based compensation expense in the first quarter increased by $0.9 million versus the comparative 2025 period primarily due to the issuance of two annual share award grants during the last twelve-month period contributing to a disproportionately larger share-based compensation expense during the quarter.
Current report
The Company monitors its liquidity and capital resources on a regular basis to ensure it has sufficient liquidity and capital resources to meet its current operating and capital requirements. As of February 28, 2026, the Company had cash resources comprising cash and cash equivalents, term deposits, and marketable securities totaling approximately $394.2 million, which are sufficient to cover the anticipated funding costs in respect of the Donlin Gold project and corporate general and administrative costs for at least the next twelve months.
Current report
With the commencement of the Donlin Gold BFS during the first quarter of 2026, NOVAGOLD’s pro-rata share of Donlin Gold expenditures is expected to increase over the next 18 to 24 months from fiscal 2025 levels. The Company believes it is fully funded to complete the Donlin Gold BFS and to exercise its option to prepay the Barrick promissory note. The Company expects to raise additional capital at some point to support additional future activities, including the commencement of detailed engineering. As a result of a delinquent filing of a Form 8-K in June 2025, NOVAGOLD will not be eligible to use a Form S-3 registration statement to register its securities with the SEC until July 2026. This may adversely impact the Company’s ability to raise additional capital prior to that time.
Current report
NOVAGOLD’s anticipated operating expenditures during fiscal year 2026 are unchanged from previously issued guidance of approximately $98.5 million, including $78.8 million to fund the Donlin Gold project, and $19.7 million for corporate general and administrative costs.
Current report
In the first quarter of 2026, cash and cash equivalents increased by $7.4 million, primarily due to $310.2 million in proceeds from a private placement offering less $16.2 million of issuance costs and $4.1 million in proceeds from the sale of marketable securities partially offset by $270.0 million in net purchases of term deposits, $15.5 million in Donlin Gold funding and corporate general and administrative costs.
Current report
Cash used in operating activities during the first quarter of 2026 was $0.2 million lower than the comparative prior year period. Cash used in investing activities during the first quarter of 2026 increased by $278.7 million from the comparative prior year period primarily due to $270.0 million in net purchases of term deposits and $11.9 million in incremental Donlin Gold funding partially offset by $3.2 million in proceeds from the sale of marketable securities. Funding of Donlin Gold was higher in the first quarter of 2026 compared to the same period in 2025 due to increased activity following the commencement of the Donlin Gold BFS in early February 2026 and due to the Company’s share of Donlin Gold funding increasing by 10% to 60% starting in the third quarter for 2025.
Current report
Cash provided by financing activities during the first quarter of 2026 increased by $294.1 million from the comparative prior year period primarily due to $310.2 million in proceeds from a private placement offering less $16.2 million of issuance costs.
Removed paragraphs (29)
Previous report
NOVAGOLD closed a $195.2 million underwritten public offering (issuing approximately 48 million common shares in the second quarter and approximately 7.2 million common shares as part of the exercise of the overallotment option early in the third quarter), and a $64.4 million private placement (issuing approximately 17.2 million common shares in the second quarter), representing a total of $260.4 million (an aggregate of approximately 72.2 million common shares). NOVAGOLD purchased the additional 10% interest in Donlin Gold LLC with proceeds from the offerings and will use the balance of the funds from the offerings for general corporate purposes, including its share of expenses associated with advancing the Donlin Gold Bankable Feasibility Study (the “BFS”).
Previous report
Public Offering
Previous report
In the third quarter of 2025, Donlin Gold achieved a number of milestones including:
Previous report
During the third quarter, the Company conducted two Donlin Gold site tours. In June, market analysts and NOVAGOLD shareholders traveled to the project site for a visit that included meetings with Calista Corporation ("Calista"), project staff, and stakeholders. In July, a collaborative visit took place in Alaska involving the Donlin Gold team, senior representatives from NOVAGOLD and Paulson, including two prominent NOVAGOLD shareholders — Mr. John Paulson and Dr. Thomas S. Kaplan. During the visit, participants met with Calista and The Kuskokwim Corporation (TKC) in Anchorage and in the Yukon-Kuskokwim (Y-K) region, respectively, which provided an excellent opportunity for NOVAGOLD’s new partner in Donlin Gold, Paulson, to interact with and gain direct insight from local stakeholders as well as discuss the path forward. The group travelled by boat on the Y-K river to engage with locals and develop an even greater appreciation for the region and its customs.
Previous report
As part of the tour with Paulson, meetings were held with leading Alaska government representatives —including Governor Mike Dunleavy, Department of Natural Resources Commissioner John Boyle, and former Department of Revenue Commissioner Adam Crum among others — to formally introduce the new Donlin Gold ownership and to discuss shared priorities between the State of Alaska, the second-largest gold-producing state in the U.S., and the project. Alaska offers strong opportunities for responsible development of employment-generating projects like Donlin Gold. In addition, a series of discussions with natural gas pipeline developers explored potential opportunities to deliver natural gas to Southcentral Alaska, which could also benefit Donlin Gold and its stakeholders.
Previous report
Following the July Alaska visit by senior representatives from NOVAGOLD and Paulson, a re-examination of the 2025 Donlin Gold budget was completed by the current owners of the project. Some activities that were originally planned for 2025 were redirected to support BFS work, with no material impact expected on Donlin Gold’s previously announced $43.0 million budgeted expenditures for 2025. As such, NOVAGOLD’s pro-rata share of Donlin Gold’s $43.0 million budget and expected funding for 2025 has increased to $24.0 million in light of the Company’s incremental 10% funding obligation following the June 3, 2025 closing of the Donlin Gold Transaction. Our share of funding for the Donlin Gold project in the first nine months of 2025 was $18.5 million, in line with the revised 2025 guidance.
Previous report
Additional achievements at Donlin Gold in the third quarter of 2025 comprised:
Previous report
Steady Project Advancement Through Exploration and RFPs to Select the BFS Lead by Year-End
Previous report
The completion of the 18,454-meter drill program, which was expanded to support a new resource model and the advancement of the BFS, reinforces the project’s long-term development strategy. This year’s program, with initial drill results confirming consistent mineralization across multiple zones, including the top five standout intervals ranging from 3.77 g/t gold up to 23.49 g/t gold, primarily focused on three activities: (1) grid drilling to further develop the modifying factors and input parameters and assumptions for future mine planning — 19 grid infill holes in the East ACMA grid totaling 5,079 meters, aimed at verifying short scale continuity of mineralization and improving resource confidence; (2) in-pit exploration drilling focused on enhancing geological modelling and supporting resource conversion — 24 holes totaling 10,370 meters, targeting areas of the pit containing Inferred Resources with the potential to be converted to Indicated Resources; and (3) geotechnical drilling, which was added subsequent to the transaction announcement, for pit wall stability analysis and mine design — four holes totaling 2,607 meters, including drilling on the material sites for construction of the access road from the Jungjuk port on the Kuskokwim River to Donlin Gold — 26 holes totaling 399 meters. Reclamation of all excavations from the 2025 drill campaign has been completed.
Previous report
This year, the Donlin Gold program deployed a dedicated team of more than 80 people on site. Locals from 22 Y-K villages were hired to support drilling activities, logistics, and environmental monitoring, underscoring the project’s role as a central economic driver in the region, as well as external contractors.
Previous report
Furthermore, during the third quarter, an RFP for the BFS was issued to top-tier engineering firms with extensive expertise and experience to successfully deliver a major commission of this scale and effectively embark on an Engineering Procurement, and Construction Management contract. Firm selection is anticipated to occur by year-end.
Previous report
Engagement and Support for Environmental, Cultural, and Social Initiatives in the Y-K Region Strengthens Ties with Communities
Previous report
In the third quarter of 2025, Donlin Gold expanded its outreach efforts in Alaska, including the following events:
Previous report
In July, Donlin Gold hosted the Crooked Creek Traditional Council — the closest community to the project site — for a project site visit, followed by a separate project site tour in August for State of Alaska representatives and U.S. delegation staff. Attendees included State Representatives Jimmie and Kopp, State Senator Giessel, Adam Trombley (representing U.S. Senator Sullivan), Rick Whitbeck (representing U.S. Representative Begich), and Deputy Commissioner Nelson San Juan from the Alaska Department of Labor & Workforce Development. In August, Donlin Gold also hosted a trip with members of the U.S. delegation, including staff from the offices of Senator Lisa Murkowski, Senator Dan Sullivan, and former Senator Mark Begich, along with a Calista intern and Resource Development Council staff.
Previous report
Over the course of the third quarter, Donlin Gold supported and participated in a wide variety of community events that celebrated cultural preservation, strengthened stakeholder relationships, and promoted the economic and social well-being of the people in the Y-K region. Those activities included, among others: Calista’s Shareholder Relations Committee meetings in both Palmer and Anchorage; the village of Napaimute’s annual gathering; the annual Bluegrass Festival in McGrath; Alaska Native Heritage Center’s 2025 Garden Party in Anchorage; the Aniak Traditional Council Annual Fair; Kalskag’s Culture Camp; Calista’s Golf Tournament; the Kwethluk Church Event; and the Napaskiak Summer Festival.
Previous report
Donlin Gold supported various educational programs, including Crooked Creek’s Traditional Council Summer Youth Employment Program which also assists Elders, and Covenant House Alaska’s Bethel Jobs for American Graduates program — a nonprofit organization dedicated to helping high school graduates successfully transition to postsecondary education and access employment opportunities.
Previous report
Donlin Gold also continued to build on the progress of its aquatic habitat restoration project, which began in 2021 and seeks to improve access and habitat for resident fish in areas affected by historic placer mining. Further development and restoration of the inlet channel at Snow Gulch was carried out in the third quarter to restore natural habitat conditions in support of aquatic life.
Previous report
On June 28, 2021, Earthjustice representing Orutsararmiut Native Council (“ONC”) filed an appeal of the Alaska Department of Environmental Conservation (“ADEC”) Commissioner’s decision upholding the ADEC’s Clean Water Act Section 401 water quality certification in Alaska Superior Court. In December 2021, at the request of the State of Alaska and Donlin Gold, the Alaska Superior Court suspended the case and remanded it to ADEC to allow for consideration of additional technical materials on mercury and temperature. After an administrative process, the Commissioner reaffirmed ADEC’s issuance of the 401 Certification on August 18, 2023. The suspension of the previously filed Alaska Superior Court case was then lifted and Earthjustice filed its opening brief with the Alaska Superior Court in January 2024. On May 6, 2025, the Alaska Superior Court issued a decision rejecting plaintiff’s arguments and upholding the Alaska Department of Environmental Conservation’s water quality certification for the Donlin Gold project. Earthjustice filed a notice of appeal to the Alaska Supreme Court on May 28, 2025, and the Alaska Supreme Court established a briefing schedule for the case on August 6, 2025. Briefing is anticipated to be completed in late 2025 or early 2026.
Previous report
On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three Y-K villages, filed an appeal of the State pipeline ROW authorization in Alaska Superior Court. On April 12, 2023, the Alaska Superior Court affirmed the Alaska Department of Natural Resources’ (“ADNR”) issuance of the ROW lease in the Earthjustice case. Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. On May 25, 2022, Earthjustice, representing ONC and five Y-K villages, filed an appeal of ADNR’s issuance of certain water rights permits to Donlin Gold in Alaska Superior Court. After briefing and oral argument, on September 1, 2023, the Alaska Superior Court affirmed ADNR’s decision on Donlin Gold’s water rights permits. On October 2, 2023, Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. Earthjustice’s opening brief was submitted to the Alaska Supreme Court on January 4, 2024. Response briefs from the State of Alaska and Donlin Gold were completed in April 2024, and Earthjustice subsequently filed their reply brief in May 2024. Briefing on Earthjustice’s appeal of the Alaska Superior Court affirmation of ADNR’s issuance of the State pipeline ROW lease to the Alaska Supreme Court was completed in February 2024. Oral arguments for both the water rights permits and the State pipeline ROW were held November 12, 2024, and a decision is anticipated in 2025.
Previous report
Consolidated Financial Results
Previous report
In the third quarter, net loss increased by $4.9 million from the comparable prior year period primarily due to higher field expenses at Donlin Gold and higher general and administrative expenses. In the first nine months of 2025, net loss increased by $44.3 million from the comparable prior year period primarily due to a $39.6 million non-cash, non-recurring charge related to warrants issued under a backstop commitment agreement signed during the second quarter concurrent with the announcement of the Donlin Gold Transaction as well as higher field expenses at Donlin Gold partially offset by lower general and administrative expenses.
Previous report
Donlin Gold expenses in the third quarter and the first nine months of 2025 were higher as the Company’s share of Donlin Gold expenses has increased by 10% to 60% during the third quarter and with increased site activity in 2025 compared to 2024 when field work activities were minimal. General and administrative expenses increased in the third quarter from the comparable prior year period primarily due to higher share-based compensation partially offset by lower professional fees and salaries and benefits. For the first nine months of 2025 general and administrative expenses decreased compared to the prior year period primarily due to lower share-based compensation, professional fees and salaries and benefits. Salaries and benefits in the third quarter and the first nine months of 2025 decreased versus the comparative 2024 periods primarily due to a lower headcount.
Previous report
Costs of $9.1 million incurred during the second and third quarter mainly for investment banking and legal fees related to the Donlin Gold Transaction have been capitalized to the Company’sInvestment in Donlin Gold along with $201.0 million of consideration and working capital adjustments paid to Barrick for the acquisition of an additional 10% interest in Donlin Gold.
Previous report
Revised 2025 Guidance
Previous report
As discussed above, while the 2025 Donlin Gold budget of $43.0 million remains unchanged following recent project meetings held by the current Donlin Gold project owners, we expect NOVAGOLD’s share of Donlin Gold 2025 funding to increase to $24.0 million due to NOVAGOLD’s incremental 10% funding obligation following the June 3, 2025 closing of the Donlin Gold Transaction. Also, as a result of the closing of the Donlin Gold Transaction, we expect to incur higher professional fees for the year resulting in an increase of NOVAGOLD’s 2025 corporate general and administrative costs to $18.0 million from our previous guidance of $16.0 million.
Previous report
This updated 2025 guidance excludes transaction costs of $9.1 million incurred during the second and third quarter of 2025 related to the Donlin Gold Transaction and a working capital adjustment of $1.0 million paid to Barrick on closing, which have both been capitalized to the Company’sInvestment in Donlin Gold along with $200.0 million of consideration paid.
Previous report
Cash used in operating activities in the third quarter and first nine months of 2025 was $3.1 million and $2.6 million lower, respectively, than the comparative prior year periods. Funding of Donlin Gold was $5.2 million and $8.3 million higher in the third quarter and first nine months of 2025, respectively, due to increased site activity in 2025 than the comparative prior year periods when field work activities were minimal and due to the Company’s 10% increased Donlin Gold funding obligation starting in the third quarter.
Previous report
Previous Financing Activities
Previous report
Private Placement
Reworded paragraphs (19)
Previous wording
In Management’s Discussion and Analysis of Financial Condition and Results of Operations,“NOVAGOLD”, the“Company”,“we,”* “us” and*“our”* refer to NOVAGOLD RESOURCES INC. and its consolidated subsidiaries. The following discussion and analysis of our financial condition and results of operations constitutes management*’s review of the factors that affected our financial and operating performance for the three- and nine-month periods ended August 31, 2025 and August 31, 2024. This discussion should be read in conjunction with the condensed consolidated financial statements and notes thereto contained elsewhere in this report and our Annual Report on Form 10-K for the year ended November 30, 2024, as well as other information we file with the Securities and Exchange Commission on EDGAR at www.sec.gov and with Canadian Securities Administrators on SEDAR+ at www.sedarplus.ca. References herein to $ refer to United States dollars and C$ to Canadian dollars, except as otherwise specified.
Current wording
In Management’s Discussion and Analysis of Financial Condition and Results of Operations,“NOVAGOLD”, the“Company”,“we,”* “us” and*“our”* refer to NOVAGOLD RESOURCES INC. and its consolidated subsidiaries. The following discussion and analysis of our financial condition and results of operations constitutes management*’s review of the factors that affected our financial and operating performance for the three-month periods ended February 28, 2026 and February 28, 2025. This discussion should be read in conjunction with the condensed consolidated interim financial statements and notes thereto contained elsewhere in this report and our Annual Report on Form 10-K, as well as other information we file with the Securities and Exchange Commission on EDGAR at www.sec.gov and with Canadian Securities Administrators on SEDAR+ at www.sedarplus.ca. References herein to $ refer to United States dollars and C$ to Canadian dollars, except as otherwise specified.
Previous wording
Paulson Advantage Plus Master Ltd. and Paulson Partners LP (together,“Paulson”) are investment funds managed by Paulson Advisers LLC.
Current wording
Paulson are investment funds managed by Paulson Advisers LLC.
Previous wording
Paul Chilson, P.E., who is the Manager, Mine Engineering for NOVAGOLD and a“qualified person”* under National Instrument 43-101*–* Standards of Disclosure for Mineral Projects and SEC*’s current mining disclosure rules has approved the scientific and technical information contained herein.
Current wording
Paul Chilson, P.E., who is the Manager, Mine Engineering for NOVAGOLD and a“qualified person”* under National Instrument 43-101*–* Standards of Disclosure for Mineral Projects and the Securities and Exchange Commission*’s (SEC) current mining disclosure rules has approved the scientific and technical information contained herein.
Previous wording
We operate in the gold mining industry, primarily focused on advancing the Donlin Gold project in Alaska. The Donlin Gold project is held by Donlin Gold, a limited liability company which, following the closing of the Donlin Gold Transaction on June 3, 2025, is owned 60% by a wholly-owned subsidiary of NOVAGOLD and 40% by a wholly-owned subsidiary of Paulson. While NOVAGOLD has a 60% economic interest in Donlin Gold, governance of Donlin Gold is shared equally by NOVAGOLD and Paulson.
Current wording
We operate in the gold mining industry, primarily focused on advancing the Donlin Gold project in Alaska. The Donlin Gold project is held by Donlin Gold, a limited liability company which, following the closing of the Donlin Gold Transaction on June 3, 2025, is owned 60% by a wholly-owned subsidiary of NOVAGOLD and 40% by a wholly-owned subsidiary of Paulson. While NOVAGOLD has a 60% economic interest in Donlin Gold, governance of Donlin Gold is shared equally by NOVAGOLD and Paulson. We account for our interest in the Donlin Gold project using the equity method, which results in our 60% share of Donlin Gold’s expenses being recorded as a single line item in the income statement as an operating loss.
Previous wording
Our corporate goals include completing the BFS and moving to a subsequent construction decision; maintaining a favorable reputation of NOVAGOLD and the Donlin Gold project among shareholders; promoting strong community outreach and a sustainability culture; maintaining strong safety and environmental performance; and managing the Company’s treasury effectively and efficiently. Our operations primarily relate to the delivery of project milestones, including the achievement of various technical, environmental, sustainable development, economic and legal objectives, obtaining necessary permits and maintaining those received in good standing, advancement to a BFS, preparation of engineering designs and maintaining sufficient capital resources to fund these objectives.
Current wording
Our corporate goals include completing the BFS and moving to a subsequent construction decision; maintaining a favorable reputation of NOVAGOLD and the Donlin Gold project among shareholders and stakeholders; promoting strong community outreach and a sustainability culture; maintaining strong safety and environmental performance; and managing the Company’s treasury effectively and efficiently. Our operations primarily relate to the delivery of project milestones, including the achievement of various technical, environmental, sustainable development, economic and legal objectives, obtaining necessary permits and maintaining those received in good standing, advancement of the BFS, preparation of engineering designs and maintaining sufficient capital resources to fund these objectives.
Previous wording
Donlin Gold continued to support the state and federal agencies defending their permits in litigation.
Current wording
Donlin Gold continued to support the state and federal agencies defending their permits in the litigation described below.
Previous wording
On April 5, 2023, Earthjustice representing ONC and six Y-K villages filed suit against the U.S. government in the U.S. District Court for Alaska (the “Federal District Court”) asking the Federal District Court to invalidate the Donlin Gold JROD, which included the Corps’ issuance of the 404 permit and the Department of Interior, Bureau of Land Management’s issuance of the ROW lease for the portions of the pipeline on Federal lands. The U.S. Department of Justice (“DOJ”) is defending the issuance of the permits by those Federal agencies. The State of Alaska, Donlin Gold, and Calista were granted intervenor status in this case. The DOJ filed their brief supporting the issuance of the JROD and the sufficiency of the environmental analysis in the Final Environmental Impact Statement on April 2, 2024. Amicus briefs supporting the project were filed by the village of Crooked Creek and the Alaska federal Congressional delegation. Oral arguments were held on June 24, 2024, and the Federal District Court issued a decision on September 30, 2024. The decision rejected the plaintiffs’ arguments on two of the three issues raised in the litigation but agreed with plaintiffs that the federal agencies took too narrow of a view in analyzing the impact of a theoretical release from the tailings storage facility. The Federal District Court requested supplemental briefing on the appropriate remedy for addressing this issue. On October 7, 2024, the plaintiffs filed a request for reconsideration on one of the issues on which the Federal District Court had ruled against the plaintiffs and, at DOJ’s request, the Federal District Court suspended the schedule for briefing on the appropriate remedy until after the Federal District Court ruled on plaintiffs’ motion for reconsideration. On December 23, 2024, the Federal District Court denied plaintiffs’ request for reconsideration. Remedy briefing was completed in March 2025 and oral argument on remedy was held May 9, 2025. On June 10, 2025, the Federal District Court issued an order denying Earthjustice’s request to vacate the permits and remanding the case to the agencies to supplement the NEPA analysis on the narrow issue regarding the analysis of a release from the tailings storage facility. The Court retained jurisdiction over the case during the remand and ordered the agencies to file periodic status updates with the court.
Current wording
On April 5, 2023, Earthjustice representing the Orutsararmiut Traditional Native Council (ONC) and six Y-K villages filed suit against the U.S. government in the U.S. District Court for Alaska (the “Federal District Court”) asking the Federal District Court to invalidate the Donlin Gold Joint Record of Decision (JROD), which included the U.S. Army Corps of Engineer’s (“Corps”) issuance of the 404 permit and the Department of Interior, Bureau of Land Management (BLM)’s issuance of the ROW lease for the portions of the pipeline on Federal lands. The U.S. Department of Justice (DOJ) is defending the issuance of the permits by those Federal agencies. The State of Alaska, Donlin Gold, and Calista were granted intervenor status in this case. The DOJ filed their brief supporting the issuance of the JROD and the sufficiency of the environmental analysis in the Final Environmental Impact Statement on April 2, 2024. Amicus briefs supporting the project were filed by the village of Crooked Creek and the Alaska federal Congressional delegation. Oral arguments were held on June 24, 2024, and the Federal District Court issued a decision on September 30, 2024. The decision rejected the plaintiffs’ arguments on two of the three issues raised in the litigation but agreed with plaintiffs that the federal agencies took too narrow of a view in analyzing the impact of a theoretical release from the tailings’ storage facility. The Federal District Court requested supplemental briefing on the appropriate remedy for addressing this issue. On October 7, 2024, the plaintiffs filed a request for reconsideration on one of the issues on which the Federal District Court had ruled against the plaintiffs and, at DOJ’s request, the Federal District Court suspended the schedule for briefing on the appropriate remedy until after the Federal District Court ruled on plaintiffs’ motion for reconsideration. On December 23, 2024, the Federal District Court denied plaintiffs’ request for reconsideration. Remedy briefing was completed in March 2025 and oral argument on remedy was held May 9, 2025. On June 10, 2025, the Federal District Court issued an order denying Earthjustice’s request to vacate the permits and remanding the case to the agencies to supplement the National Environmental Policy Act analysis on the narrow issue regarding the analysis of a potential larger release from the tailings storage facility. The Court retained jurisdiction over the case during the remand and ordered the agencies to file periodic status updates with the court. The Corps, in consultation with BLM and other federal agencies, will be the lead agency for this Supplemental Environmental Impact Statement (SEIS) process to ensure a transparent, science-based review that provides the public and decision-makers with complete and accurate information. On October 27, 2025, Donlin Gold was also formally accepted into the Fixing America’s Transportation Act (FAST-41) program and coordinated by the Federal Permit…
Excerpt shortened here; the source contains the full paragraph.
Previous wording
To date, all permits and approvals granted to Donlin Gold by federal and state agencies remain in place while the legal challenges described above proceed. We recognize the importance of preparedness and organization in these matters. Donlin Gold and its owners continue their unwavering support of the state and federal agencies in defending their thorough and diligent permitting processes, including working with the federal agencies and all stakeholders on an appropriate remedy to address the Federal District Court’s remand decision.
Current wording
To date, all permits and approvals granted to Donlin Gold by federal and state agencies remain in place while the legal challenges described above proceed. We recognize the importance of preparedness and organization on these matters. Donlin Gold and its owners continue their unwavering support of the state and federal agencies in defending their thorough and diligent permitting processes, including working with the federal agencies and all stakeholders on an appropriate remedy to address the Federal District Court’s remand decision.
Previous wording
Overview of Donlin Gold Transaction and Financing Activities in the Third Quarter
Current wording
Overview of Donlin Gold Transaction and Financing Activities During 2025
Previous wording
On June 3, 2025, NOVAGOLD and Paulson, through wholly-owned subsidiaries, completed the $1 billion acquisition of Barrick’s 50% interest in Donlin Gold (“Donlin Gold Transaction”), increasing NOVAGOLD’s economic stake in Donlin Gold LLC (“Donlin Gold”) to 60%. Paulson’s subsidiary acquired the remaining 40% of Donlin Gold. Both owners have equal governance rights in Donlin Gold. The Donlin Gold Transaction marks a significant milestone in a long-term strategy to advance Donlin Gold. NOVAGOLD’s portion of the acquisition was funded through a combination of a public equity offering and a concurrent private placement.
Current wording
On June 3, 2025, NOVAGOLD and Paulson, through wholly-owned subsidiaries, completed a $1 billion acquisition of Barrick’s 50% interest in Donlin Gold (the “Donlin Gold Transaction”) pursuant to the terms of a membership interest purchase agreement dated April 22, 2025 (the “MIPA”) among Barrick Gold U.S. Inc. (“Barrick Gold”), Barrick, Paulson, Donlin Gold Holdings LLC (DGH), a subsidiary of Paulson, and NGRA, a subsidiary of the Company. NOVAGOLD, through NGRA, acquired an additional 10% interest in Donlin Gold for $200 million, increasing its stake to 60% of Donlin Gold, while Paulson, through DGH, acquired the remaining 40% interest for $800 million. Both owners have equal governance rights in Donlin Gold. The Donlin Gold Transaction marks a significant milestone in a long-term strategy to advance the Donlin Gold project. NOVAGOLD’s portion of the acquisition was funded through a combination of a public equity offering and a concurrent private placement.
Previous wording
In connection with the closing of the Donlin Gold Transaction, NGRA, Donlin Holdings and Donlin Gold entered into an amended and restated limited liability company agreement (the “A&R LLC Agreement”) governing Donlin Gold, pursuant to which the Company and Paulson have equal governance rights. NGRA had previously entered into a limited liability company agreement with Barrick Gold and Donlin Gold (the “Prior LLC Agreement”) dated December 1, 2007, as amended from time to time. Pursuant to the terms of the A&R LLC Agreement, the primary amendments to the Prior LLC Agreement consist of the following:
Current wording
In connection with the closing of the Donlin Gold Transaction, NGRA, DGH and Donlin Gold entered into an amended and restated limited liability company agreement (the “A&R LLC Agreement”) governing Donlin Gold, pursuant to which the Company and Paulson have equal governance rights. NGRA had previously entered into a limited liability company agreement with Barrick Gold and Donlin Gold (the “Prior LLC Agreement”) dated December 1, 2007, as amended from time to time. Pursuant to the terms of the A&R LLC Agreement, the primary amendments to the Prior LLC Agreement consist of the following:
Previous wording
Pursuant to the Prior LLC Agreement for Donlin Gold, the Company issued a promissory note in favor of Barrick Gold to repay Barrick out of future mine production cash flow for a portion of Barrick’s prior expenditures on the Donlin Gold project. In connection with the closing of the Donlin Gold Transaction, on June 3, 2025 NGRA and Barrick Gold amended and restated the promissory note primarily to (i) modify the security package in order to exclude any property held by Donlin Gold or membership interest in Donlin Gold held by NGRA, but ensure it remains secured by NGRA’s right, title and interest to proceeds from Donlin Gold and (ii) provide the ability for NGRA to prepay and retire the promissory note for an aggregate of $100 million until December 3, 2026. In connection with the amended and restated promissory note, NGRA has made an irrevocable direction to Donlin Gold whereby Donlin Gold shall distribute to Barrick Gold, until the promissory note is fully repaid, 85% of distributed processed products, cash and other assets; and payments of 5% of certain net proceeds specified in the promissory note. As per the amended and restated promissory note, the principal amount owed is $158.9 million.
Current wording
Pursuant to the Prior LLC Agreement for Donlin Gold, the Company issued a promissory note to Barrick Gold to repay Barrick out of future mine production cash flow for a portion of Barrick’s prior expenditures on the Donlin Gold project. Concurrent with the Donlin Gold Transaction announcement on April 22, 2025, NOVAGOLD entered into a prepayment option agreement with Barrick, which provided the Company with an option to prepay the promissory note in full for $90 million prior to the closing of the Donlin Gold Transaction. The $90 million prepayment option was not exercised prior to closing. In connection with the closing of the Donlin Gold Transaction, on June 3, 2025 NGRA and Barrick Gold amended and restated the promissory note primarily to (i) modify the security package in order to exclude any property held by Donlin Gold or membership interest in Donlin Gold held by NGRA, but ensure it remains secured by NGRA’s right, title and interest to proceeds from Donlin Gold and (ii) provide the ability for NGRA to prepay and retire the promissory note for an aggregate of $100 million until December 3, 2026. In connection with the amended and restated promissory note, NGRA has made an irrevocable direction to Donlin Gold whereby Donlin Gold shall distribute to Barrick Gold, until the promissory note is fully repaid, 85% of distributed processed products, cash and other assets, and payments of 5% of certain net proceeds specified in the promissory note. As per the amended and restated promissory note, the principal amount owed is $158.9 million.
Previous wording
In order to ensure available financing for the Company’s $200 million obligation under the MIPA, funding commitments of up to $170 million were obtained from Electrum Strategic Resources L.P. (“Electrum”), Paulson, and Kopernik Global Investors, LLC, on behalf of investment funds and accounts managed by it (“Kopernik”, together with Electrum and the Paulson, the “Investors”) pursuant to a backstop agreement dated April 22, 2025 (“Backstop Agreement”). Pursuant to the Backstop Agreement, the Investors agreed to purchase, on a non-brokered, private placement basis, up to $170 million in the Company’s common shares at $3.00 per share, representing up to 56,666,667 common shares in the aggregate.
Current wording
In order to ensure available financing for the Company’s $200 million obligation under the MIPA, funding commitments of up to $170 million were obtained from Electrum, Paulson, and Kopernik Global Investors, LLC, on behalf of investment funds and accounts managed by them (“Kopernik”, together with Electrum and Paulson, the “Investors”) pursuant to a backstop agreement dated April 22, 2025 (“Backstop Agreement”). Pursuant to the Backstop Agreement, the Investors agreed to purchase, on a non-brokered, private placement basis, up to $170 million in the Company’s common shares at $3.00 per share, representing up to 56,666,667 common shares in the aggregate.
Previous wording
While the Company did not exercise its rights provided by the Backstop Agreement, in consideration for entering into the Backstop Agreement, the Company issued an aggregate of 25,500,000 warrants to purchase the Company’s common shares (the “Warrants”), with each Warrant entitling the holder thereof to purchase one common share (a “Warrant Share”) at an exercise price of $3.00 per Warrant Share for a period of five years from the date of issuance. The Warrants contain a “cashless exercise” feature, such that, in lieu of making the cash payment otherwise contemplated to be made to us upon such exercise of the Warrant, the holder may elect instead to receive upon such exercise (either in whole or in part) the net number of common shares determined according to a formula set forth in the Warrants. The Warrants were issued in the following amounts: (i) 12,750,000 Warrants to Paulson; (ii) 6,375,000 Warrants to Electrum; and (iii) 6,375,000 Warrants to Kopernik.
Current wording
While the Company did not exercise its rights provided by the Backstop Agreement, in consideration for entering into the Backstop Agreement, the Company issued an aggregate of 25,500,000 warrants to purchase the Company’s common shares (the “Warrants”), with each Warrant entitling the holder thereof to purchase one common share (a “Warrant Share”) at an exercise price of $3.00 per Warrant Share for a period of five years from the date of issuance. The Warrants contain a “cashless exercise” feature, such that, in lieu of making the cash payment otherwise contemplated to be made upon such exercise of the Warrant, the holder may elect instead to receive upon such exercise (either in whole or in part) the net number of common shares determined according to a formula set forth in the Warrants. The Warrants were issued in the following amounts: (i) 12,750,000 Warrants to Paulson; (ii) 6,375,000 Warrants to Electrum; and (iii) 6,375,000 Warrants to Kopernik. During the three months ended February 28, 2026, 796,875 Warrants were exercised by way of the cashless exercise feature, resulting in the issuance of 569,333 NOVAGOLD shares and the cancellation of 227,542 Warrants to cover the exercise price. As at February 28, 2026, 24,703,125 Backstop Warrants remained outstanding.
Previous wording
In the third quarter of 2025, cash equivalents decreased by $235.6 million, primarily due to $210.1 million paid to complete the Donlin Gold Transaction, $42.0 million in net purchase of term deposits, $8.1 million in Donlin Gold funding partially offset by $26.9 million in proceeds from the exercise of an underwriter’s overallotment option on the May 2025 equity offering, net of $1.4 million of issuance costs. During the first nine months of 2025, cash equivalents increased by $15.9 million primarily due to $270.8 million in proceeds from a public equity offering and concurrent private placement, net of $11.2 million of issuance costs partially offset by $210.1 million paid to complete the Donlin Gold Transaction, $18.5 million in Donlin Gold funding and $8.0 million in net purchase of term deposits and corporate general and administrative costs.
Current wording
Public Offering and Concurrent Private Placement
Previous wording
Concurrently with the public offering announced in May 2025, the Company completed a private placement offering on May 9, 2025 of 17,173,853 common shares at a price equal to the public offering price for aggregate gross proceeds of approximately $64.4 million with Electrum and investment funds and accounts managed by Kopernik Global Investors, LLC.
Current wording
Concurrently with the public offering announced in May 2025, the Company completed a private placement offering on May 9, 2025 of 17,173,853 common shares at a price equal to the public offering price for aggregate gross proceeds of approximately $64.4 million with Electrum and investments funds and accounts managed by Kopernik Global Investors, LLC (each a “Placement Investor”). The Company entered into a Subscription Agreement dated May 7, 2025 (the “Subscription Agreement”) with each of the Placement Investors setting out the terms of the concurrent private placement, which included similar resale registration rights as contained in the Backstop Agreement. The concurrent private placement closed on May 9, 2025.
Previous wording
With total cash and term deposits of $125.2 million as of August 31, 2025, the Company has sufficient working capital to cover anticipated funding of the Donlin Gold project and corporate general and administrative costs for at least the next two and a half years at current spending levels. In August 2025, Donlin Gold issued a request for proposals to complete a BFS over a two year period. Upon awarding the contract, the capital required to fund NOVAGOLD’s pro-rata share of Donlin Gold expenditures is expected to increase over the coming two years. Depending on the ultimate timing and cost of completing a BFS and commencing detailed engineering and construction, and the Company’s decision in connection with its option to prepay the Barrick promissory note, the Company may need to raise additional capital over the next two years. Future funding to support fully developing the Donlin Gold project is anticipated to include, among of things, a combination of corporate debt and equity, project specific debt, and potentially a royalty, stream and government support. Our continued operations, in the longer term, are dependent on our ability to generate future cash flows and maintain sufficient capital resources. There is no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all. For further information, see sectionItem 1A, Risk Factors–* Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing*.
Current wording
Future funding to support developing the Donlin Gold project is anticipated to include, among other things, a combination of corporate debt and equity, project specific debt, and potentially a royalty, stream and government support. NOVAGOLD’s continued operations, in the longer term, are dependent on its ability to generate future cash flows and maintain sufficient capital resources. There is no assurance that the Company will be successful in its efforts to raise additional capital on favorable terms, or at all. For further information, refer to the section titledItem 1A. Risk Factors–* Our ability to continue the exploration, permitting and development of the Donlin Gold project, to complete the Bankable Feasibility Study for the Donlin Gold project, to fund construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing* in our Annual Report on Form 10-K*.*
Previous wording
Our financial position includes the following as of August 31, 2025:
Current wording
The Company’s financial position includes the following as of February 28, 2026:
Previous wording
As of September 26, 2025, the Company had 406,926,988 common shares issued and outstanding. Also, as of September 26, 2025, the Company had: i) a total of 25,500,000 warrants outstanding with an exercise price of $3.00 per share; ii) a total of 9,812,434 stock options outstanding; 8,545,434 with a weighted-average exercise price of $5.45 per share and the remaining 1,267,000 of those stock options with a weighted-average exercise price of C$6.97 per share; and iii) 2,074,300 PSUs; and iv) 308,245 deferred share units outstanding. Upon exercise or pay out, as applicable, of the foregoing convertible securities, the Company would be required to issue a maximum of 38,732,129 common shares.
Current wording
As of March 27, 2026, the Company had 438,780,614 common shares issued and outstanding. Also, as of March 27, 2026, the Company had: i) a total of 24,703,125 warrants outstanding with an exercise price of $3.00 per share; ii) a total of 9,606,600 stock options outstanding; 8,249,100 with a weighted-average exercise price of $5.41 per share and the remaining 1,357,500 of those stock options with a weighted-average exercise price of C$7.24 per share; and iii) 1,979,800 PSUs; and iv) 321,573 deferred share units outstanding. Upon exercise or pay out, as applicable, of the foregoing convertible securities, the Company would be required to issue a maximum of 37,600,998 common shares.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
As noted above, on June 3, 2025, the Company and Paulson, through wholly-owned subsidiaries, completed the Donlin Gold Transaction pursuant to the terms of the membership interest purchase agreement dated April 22, 2025 (the “MIPA”) among Barrick Gold U.S. Inc. (“Barrick Gold”), Barrick, Paulson, Donlin Gold Holdings LLC, a subsidiary of Paulson (“Donlin Holdings”), and NovaGold Resources Alaska, Inc. (“NGRA”), a subsidiary of the Company. NOVAGOLD, through NGRA, acquired an additional 10% interest in Donlin Gold for $200 million, increasing its stake to 60% of Donlin Gold, while Paulson, through Donlin Holdings, acquired the remaining 40% interest for $800 million.