NOVAGOLD RESOURCES INC
For the period ended Feb 28, 2025. Filed Apr 1, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Feb 28, 2025 · Filed Apr 1, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-08-31; filed 2024-10-02.
0001171843-24-005458
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-02-28; filed 2025-04-01.
0001171843-25-001907
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 42 previous paragraphs and 31 current paragraphs.
9 unchanged; 9 reworded; 13 added; 24 removed; 0 previous and 0 current paragraphs rearranged.
Tables are not compared: 4 previous and 4 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (13)
Current report
In the first quarter of 2025, Donlin Gold achieved a number of milestones. The 2025 field program commenced with camp opening in February, followed by the start of drilling in March after quarter end. A total of 15,000 meters of drilling is planned, primarily focused on grid drilling to further develop the modifying factors (which are considerations used to convert mineral resources to mineral reserves) and mine planning input parameters.
Current report
Also during the first quarter of 2025, the Company collaborated with Donlin Gold, Calista Corporation (“Calista”), and The Kuskokwim Corporation on key ecological, educational and cultural awareness initiatives – including continued government affairs engagement with state representatives, information sharing about the project, and emphasis on its importance to Alaska and the Yukon-Kuskokwim (“Y-K”) region.
Current report
Strengthening partnerships and supporting the Y-K region’s environmental and social initiatives
Current report
In the first quarter of 2025, NOVAGOLD and Donlin Gold staff travelled to Juneau to meet with members of the Alaska State Legislature and to Washington, D.C., joined by Barrick staff, to meet with Alaska’s congressional delegations to share information about Donlin Gold and to reinforce the project’s importance to Alaska and the Y-K region. Donlin Gold also presented to the Alaska House of Representatives’ Energy Committee, as well as to the Resources committees of both the House and Senate, to describe the Donlin Gold project’s energy requirements and to discuss Alaska’s environmental standards.
Current report
In January, meaningful collaboration was deepened with the Native Village of Napaimute, with Donlin Gold extending financial assistance to maintain the Kuskokwim River Ice Road – a critical winter infrastructure that ensures the safe transport of residents to community events and serves as a conduit of economic activity for the Kuskokwim River communities. Additionally, Donlin Gold continued its support of and participation in the Alaska Safe Riders initiative, which promotes the secure use of snowmachines, all-terrain vehicles, and recreational off-road vehicles.
Current report
Financial assistance was also provided to Camp Fire Alaska, an organization dedicated to offering summer camps and programs to youth in rural communities across Alaska. Activities included music, sports, science, field trips, and numerous outdoor recreation opportunities.
Current report
Throughout the first quarter, Donlin Gold maintained its dedication to backing local community sports initiatives, exemplified by its sponsorship of the Donlin Gold Basketball Tournament held at the Bethel Regional High School, and Y-K mushers Isaac Underwood, Mike Williams Jr., and Pete Kaiser, the 2019 Iditarod champion and a Donlin Gold employee. Mr. Kaiser, who hails from Bethel, is the first Yup’ik musher and fifth Alaska Native to win an Iditarod championship. Additionally, he recently won his ninth Kuskokwim 300 – a point of tremendous pride for NOVAGOLD.
Current report
Upholding current permits and working to secure key state approvals
Current report
Donlin Gold continued to support the state and federal agencies defending their permits in litigation. The 401 Water Quality Certification, water rights permits and state pipeline ROW in state court have been fully briefed and argued, and decisions are anticipated in 2025.
Current report
To date, all permits and approvals granted to Donlin Gold by federal and state agencies remain issued and in place while the legal challenges described above proceed. We recognize the importance of preparedness and organization in these matters. With the unwavering support of Donlin Gold and its owners, we will continue to back the state and federal agencies in defending their thorough and diligent permitting processes and are committed to working with the federal agencies and all stakeholders on an appropriate remedy to address the Federal District Court’s decision.
Current report
Net loss decreased in the first quarter of 2025 by $1,202 from the comparative 2024 period, primarily due to lower stock-based compensation expense and lower Donlin Gold expenditures. Donlin Gold expenses in the first quarter of 2025 were below the quarterly run rate based on our 2025 guidance as Donlin Gold site activities commenced in February 2025 with the kick-off of this year’s field program. Other than stock-based compensation expense, which declined by $1,426 in the first quarter of 2025, general and administrative costs during the quarter were in line with the comparative 2024 period.
Current report
In the first quarter of 2025 cash and cash equivalents decreased by $8,255, primarily to fund our share of Donlin Gold and for corporate administrative expenses.
Current report
Cash used in operating activities and funding of Donlin Gold in the first quarter of 2025 were generally unchanged from the comparable prior year period. During the first quarter of 2025, the Company received $952 in cash proceeds from the disposal of a marketable security investment previously held by the Company, following its acquisition.
Removed paragraphs (24)
Previous report
In the third quarter of 2024, principal activities included the advancement of metallurgical test work at a pilot plant in Ontario, Canada to confirm proposed optimizations to the flowsheet (with completion expected by year-end), as well as updated resource modelling by the Donlin team and a third-party consultant that is also nearing completion. In addition, recent Donlin Gold field data was used to update groundwater and surface water models, while geochemical data collection continues and will be used to update closure planning. Our work on the Dam Safety Certification continues to progress with the majority of the preliminary design packages submitted to the ADNR on June 17, 2024, with final documents expected to be submitted by year-end. Comments from the ADNR on the Dam Safety Certification preliminary design packages are anticipated in 2025.
Previous report
These comprehensive efforts have delivered highly valuable insights for the Donlin Gold Board and its owners. Guiding our strategy for the Donlin Gold project and its 2025 initiatives, these activities were reviewed at our latest workshop in Alaska with Barrick and will contribute critical data for advancing Donlin Gold. NOVAGOLD is committed to advancing the project with a focus on financial prudence, engineering excellence, environmental responsibility, and a strong safety culture.
Previous report
Our outreach in Alaska, particularly in the Yukon-Kuskokwim (Y-K) region, and in Washington, D.C., has strengthened community engagement and reinforces the project’s social license. The Company appreciates the diligent contributions of the Donlin Gold team, partners, and stakeholders, and remains dedicated to developing the project to its full potential. With $105.6 million in cash and term deposits as of August 31, 2024, NOVAGOLD is well-positioned to support this effort.
Previous report
We were very pleased to announce Peter Adamek’s appointment as the Company’s new Vice President and Chief Financial Officer in the third quarter. Peter is a seasoned financial executive with over 20 years of experience, most recently with Hudbay Minerals Inc. He joins a leadership team that has consistently demonstrated diligence and responsible capital stewardship while enhancing value and upholding strong shareholder engagement.
Previous report
The Donlin Gold board must approve an updated feasibility study, construction program and construction budget before the Donlin Gold project can be developed. The timing of the required engineering work and the Donlin Gold board’s approval of an updated feasibility study, construction program and budget, the receipt of all required governmental permits and approvals, and the availability of financing, commodity price fluctuations, risks related to market events and general economic conditions among other factors, will affect the timing of and whether to develop the Donlin Gold project. Among other reasons, project delays could occur due to public opposition, litigation challenging permit decisions, requests for additional information or analysis, limitations in agency staff resources during regulatory review and permitting, or project changes made by Donlin Gold.
Previous report
Stakeholder and government engagement
Previous report
In collaboration with Calista Corporation (“Calista”) and The Kuskokwim Corporation (“TKC”), the mineral and surface rights holders, Donlin Gold has made significant strides in local community and government engagement across the Y-K region, Alaska, and Washington, D.C. Strategically located on private land designated by law for mineral development under the Alaska Native Claims Settlement Act of 1971, the Donlin Gold project enjoys deep involvement with Native Corporations, strengthening our connections with people from the region and local government bodies.
Previous report
Our enduring partnerships with Calista and TKC have been crucial in advancing the project’s development and permitting efforts. Over decades, our commitment to engaging with the 62 stakeholder communities in the Y-K region has built meaningful relationships, enhanced investment, and reinforced our social license. This longstanding dedication underscores the approach of the Donlin Gold project and its partners, Calista and TKC, to foster robust relationships with both local communities and governmental entities built on trust, transparency, respect and partnership.
Previous report
In July, Donlin Gold hosted a project site tour for a group of residents from Crooked Creek and the Native Village of Georgetown.
Previous report
In August, Calista, TKC, and Donlin Gold hosted a public Open House in Anchorage, providing Alaskans with the opportunity to learn more about the project and to engage in open and transparent discussions. NOVAGOLD was in attendance to participate, interact, and engage with key stakeholders.
Previous report
These are just two examples of the many engagements Donlin Gold prioritizes to raise awareness and maintain transparency around the project.
Previous report
Environment, education, and social investments
Previous report
NOVAGOLD remains deeply committed to community and social responsibility, upholding shared values at the Donlin Gold project site and within the Y-K region. Through initiatives spanning education, community wellness, cultural preservation, and environmental stewardship, we support fisheries studies, environmental activities, subsistence, cultural preservation efforts, and various grants. Our collaboration with Calista and TKC has driven a range of activities and projects over the past quarter.
Previous report
Since mid-2023, NOVAGOLD and Donlin Gold have intensified efforts with our Alaska Native Corporation partners to monitor, survey and engage in the dialogue on salmon fisheries in the Kuskokwim and Yukon River watersheds. In the third quarter, we focused on identifying opportunities to monitor, evaluate, and strengthen salmon populations. Notably, we launched a salmon smolt monitoring program on the George River, a tributary of the Kuskokwim River, in partnership with the Village of Napaimute to assess smolt health and migration patterns.
Previous report
In addition, Donlin Gold and NOVAGOLD have supported the “In It for The Long Haul” backhaul program for seven years now, collecting and safely disposing of household hazardous and electronic waste from Y-K villages. This year alone, approximately 140,000 pounds of material were recycled, for an impressive total of approximately 803,000 pounds of hazardous materials removed from the Y-K region since the program began in 2018.
Previous report
Donlin Gold’s partnership with the Crooked Creek Traditional Council has supported the Summer Youth Employment program, providing local youth with hands-on experience in various work environments while also assisting Elders. In the third quarter, Donlin Gold continued sponsoring the RurAL CAP Elder Mentor Program, which connects youth with Elders to foster intergenerational knowledge and support academic engagement and school readiness across the State. Donlin Gold also shipped dictionaries to all school districts in the Y-K region for third graders as part of The Dictionary Project, a national effort to promote literacy and creative thinkers, a project they have participated in annually since 2012.
Previous report
Donlin Gold has also reaffirmed its commitment to the Alaska School Activities Association, supporting high school-level athletic, academic, and fine arts programs statewide. Donlin Gold’s ongoing financial contributions highlight our steadfast dedication to enhancing educational and extracurricular opportunities for students throughout Alaska.
Previous report
NOVAGOLD remains committed to stakeholder engagement and community development working closely with Tribal communities and Alaska Native Corporations to identify needs and collaboratively develop solutions that enhance and uplift communities, fostering sustainable growth and shared prosperity for future generations.
Previous report
Permitting
Previous report
Donlin Gold, in collaboration with Calista, actively supports Federal and State agencies in defending the project’s permits against legal challenges — a strategy that has proven highly effective in maintaining permit approvals to date. The intricate permitting process in the United States and Alaska demands years of dedicated, transparent, and inclusive efforts to engage all stakeholders, including those from the Y-K region. With a profound understanding of the regulatory landscape, Donlin Gold and its partners are committed to supporting Federal and State agencies through any challenges to the project’s permits and are now concentrating on securing the remaining State-level permits and certificates needed for the project’s advancement. While maintaining jurisdictional safety presents challenges, particularly as regulations vary across regions, the State of Alaska stands out as a stable and reliable investment environment. As the second-largest gold-producing state in one of the world’s safest countries for free enterprise 1, Alaska offers investors stability and certainty that their assets will remain secure. This makes the rigorous permitting process a worthwhile endeavor in an increasingly complex world.
Previous report
Litigation
Previous report
In the third quarter of 2024, net loss decreased by $331 from the comparable prior year period. The decrease was primarily due to lower stock-based compensation expense related to forfeiture of options and performance share units and lower field expenses at Donlin Gold partially offset by higher general and administrative costs, increased interest expense on the promissory note and lower interest income on cash and term deposits. Donlin Gold expenses were lower with reduced site activity in 2024, compared to fieldwork and geotechnical drilling for the Alaska Dam Safety certificates and hydrological drilling to support mine planning and design in 2023. General and administrative expenses increased primarily due to higher professional fees and employee compensation. Professional fees increased due to consulting fees primarily related to ongoing efforts to enhance the value of the Donlin Gold project by evaluating alternatives to further advance the project. Salaries and benefits increased primarily due to hiring of additional staff. Income tax expense relates to passive income taxable in Canada on a portion of interest income earned by U.S. subsidiaries, and for withholding taxes on the sale of the San Roque project in Argentina during the first quarter of 2024.
Previous report
1 Per the 2024 Mineral Commodity Summaries Report – https://pubs.usgs.gov/periodicals/mcs2024/mcs2024-gold.pdf.
Previous report
In the third quarter and first nine months of 2024, cash equivalents decreased by $6,996 and $177, respectively, primarily due to Donlin Gold funding and corporate general and administrative costs, partially offset by interest income on cash and proceeds from term deposits. The increase in cash used in operating activities in the third quarter and first nine months of 2024 from the comparable prior year periods was primarily due to increased corporate general and administrative costs and a net change in working capital. Funding requirements for Donlin Gold were substantially lower in the first nine months of 2024 than the comparable prior year period.
Reworded paragraphs (9)
Previous wording
In Management’s Discussion and Analysis of Financial Condition and Results of Operations,“NOVAGOLD”, the“Company”,“we,”* “us” and*“our”* refer to NOVAGOLD RESOURCES INC. and its consolidated subsidiaries. The following discussion and analysis of our financial condition and results of operations constitutes management*’s review of the factors that affected our financial and operating performance for the three- and nine-month periods ended August 31, 2024 and August 31, 2023. This discussion should be read in conjunction with the condensed consolidated financial statements and notes thereto contained elsewhere in this report and our Annual Report on Form 10-K for the year ended November 30, 2023, as well as other information we file with the Securities and Exchange Commission on EDGAR at www.sec.gov and with Canadian Securities Administrators on SEDAR+ at www.sedarplus.ca. References herein to $ refer to United States dollars and C$ to Canadian dollars, in thousands, except for per share amounts.
Current wording
In Management’s Discussion and Analysis of Financial Condition and Results of Operations,“NOVAGOLD”, the“Company”,“we,”* “us” and*“our”* refer to NOVAGOLD RESOURCES INC. and its consolidated subsidiaries. The following discussion and analysis of our financial condition and results of operations constitutes management*’s review of the factors that affected our financial and operating performance for the three-month period ended February 28, 2025 and February 29, 2024. This discussion should be read in conjunction with the condensed consolidated financial statements and notes thereto contained elsewhere in this report and our Annual Report on Form 10-K for the year ended November 30, 2024, as well as other information we file with the Securities and Exchange Commission on EDGAR at www.sec.gov and with Canadian Securities Administrators on SEDAR+ at www.sedarplus.ca. References herein to $ refer to United States dollars and C$ to Canadian dollars, in thousands, except for per share amounts.
Previous wording
Our corporate goals include continuing to advance the Donlin Gold project toward a construction decision; maintaining support for Donlin Gold among the project’s stakeholders; promoting a strong safety, sustainability, and environmental culture; maintaining a favorable reputation of NOVAGOLD; and preserving a healthy balance sheet. Our operations primarily relate to the delivery of project milestones, including the achievement of various technical, environmental, sustainable development, economic and legal objectives, obtaining necessary permits, completion of pre-feasibility and feasibility studies, preparation of engineering designs and the financing to fund these objectives.
Current wording
Our corporate goals include continuing to advance Donlin Gold toward a feasibility study and a subsequent construction decision; maintain a favorable reputation of NOVAGOLD and its Donlin Gold project among shareholders; promote strong community outreach and sustainability culture; maintain strong safety and environmental performance; and manage the Company treasury effectively and efficiently. Our operations primarily relate to the delivery of project milestones, including the achievement of various technical, environmental, sustainable development, economic and legal objectives, obtaining necessary permits and maintaining those received in good standing, advancement to a feasibility study, preparation of engineering designs and the financing to fund these objectives.
Previous wording
Our share of funding for the Donlin Gold project in the third quarter and the first nine months of 2024 was $2,864 and $10,198, respectively. In 2024, we continue to expect our share of Donlin Gold funding to be $14,250, for project planning and fieldwork, external affairs, permitting, environmental, land, and legal activities. We record our interest in the Donlin Gold project as an equity investment, which results in our 50% share of Donlin Gold’s expenses being recorded in the income statement as an operating loss. The investment amount recorded on the balance sheet primarily represents unused funds advanced to Donlin Gold.
Current wording
Our share of funding for the Donlin Gold project in the first quarter of 2025 was $3,614. In 2025, we continue to expect our annual share of Donlin Gold funding to be $21,500.
Previous wording
On June 28, 2021, Earthjustice representing Orutsararmiut Native Council (“ONC”) filed an appeal of the Alaska Department of Environmental Conservation (“ADEC”) Commissioner’s decision upholding the ADEC’s Clean Water Act Section 401 water quality certification in Alaska Superior Court. In December 2021, at the request of the State of Alaska and Donlin Gold, the Superior Court suspended the case and remanded it to ADEC to allow for consideration of additional technical materials on mercury and temperature. After an administrative process, the Commissioner reaffirmed ADEC’s issuance of the 401 Certification on August 18, 2023. The suspension of the previously filed Alaska Superior Court case was then lifted and Earthjustice filed its opening brief with the Alaska Superior Court in January 2024. The briefing is complete and oral arguments were held on August 30, 2024. A decision is anticipated from the Alaska Superior Court by 2025.
Current wording
On June 28, 2021, Earthjustice representing Orutsararmiut Native Council (“ONC”) filed an appeal of the Alaska Department of Environmental Conservation (“ADEC”) Commissioner’s decision upholding the ADEC’s Clean Water Act Section 401 water quality certification in Alaska Superior Court. In December 2021, at the request of the State of Alaska and Donlin Gold, the Alaska Superior Court suspended the case and remanded it to ADEC to allow for consideration of additional technical materials on mercury and temperature. After an administrative process, the Commissioner reaffirmed ADEC’s issuance of the 401 Certification on August 18, 2023. The suspension of the previously filed Alaska Superior Court case was then lifted and Earthjustice filed its opening brief with the Alaska Superior Court in January 2024. Briefing is complete and oral arguments were held on August 30, 2024. A decision is anticipated from the Alaska Superior Court in 2025.
Previous wording
On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three Y-K villages, filed an appeal of the State pipeline Right-of-Way (“ROW”) authorization in Alaska Superior Court. On April 12, 2023, the Alaska Superior Court affirmed ADNR’s issuance of the ROW lease in the Earthjustice case. Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. On May 25, 2022, Earthjustice, representing ONC and five Y-K villages, filed an appeal of ADNR’s issuance of certain water rights permits to Donlin Gold in Alaska Superior Court. After briefing and oral argument, on September 1, 2023, the Alaska Superior Court affirmed ADNR’s decision on Donlin Gold’s water rights permits. On October 2, 2023, Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. Earthjustice’s opening brief was submitted to the Alaska Supreme Court on January 4, 2024. Response briefs from the State of Alaska and Donlin Gold were completed in April 2024, and Earthjustice subsequently filed their reply brief in May 2024. Briefing on Earthjustice’s appeal of the Alaska Superior Court affirmation of ADNR’s issuance of the State pipeline ROW lease to the Alaska Supreme Court was completed in February 2024. Oral arguments for both the water rights permits and the State pipeline ROW are scheduled for November 12, 2024.
Current wording
On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three Y-K villages, filed an appeal of the State pipeline ROW authorization in Alaska Superior Court. On April 12, 2023, the Alaska Superior Court affirmed the Alaska Department of Natural Resources’ (“ADNR”) issuance of the ROW lease in the Earthjustice case. Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. On May 25, 2022, Earthjustice, representing ONC and five Y-K villages, filed an appeal of ADNR’s issuance of certain water rights permits to Donlin Gold in Alaska Superior Court. After briefing and oral argument, on September 1, 2023, the Alaska Superior Court affirmed ADNR’s decision on Donlin Gold’s water rights permits. On October 2, 2023, Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. Earthjustice’s opening brief was submitted to the Alaska Supreme Court on January 4, 2024. Response briefs from the State of Alaska and Donlin Gold were completed in April 2024, and Earthjustice subsequently filed their reply brief in May 2024. Briefing on Earthjustice’s appeal of the Alaska Superior Court affirmation of ADNR’s issuance of the State pipeline ROW lease to the Alaska Supreme Court was completed in February 2024. Oral arguments for both the water rights permits and the State pipeline ROW were held November 12, 2024, and a decision is anticipated in 2025.
Previous wording
On April 5, 2023, Earthjustice representing ONC and six Y-K villages filed suit against the U.S. government in Anchorage Federal District Court asking the Court to invalidate the Donlin Gold Joint Record of Decision (“JROD”), which included the U.S. Army Corps’ of Engineers’ issuance of the 404 permit and the Department of Interior, Bureau of Land Management’s issuance of the ROW lease for the portions of the pipeline on Federal lands. The U.S. Department of Justice (“DOJ”) is defending the issuance of the permits by those Federal agencies. The State of Alaska, Donlin Gold, and Calista were granted intervenor status in this case. The DOJ filed their brief supporting the issuance of the JROD and the sufficiency of the environmental analysis in the Final Environmental Impact Statement on April 2, 2024. Amicus briefs supporting the project were filed by the village of Crooked Creek and the Alaska federal Congressional delegation. Oral arguments were held on June 24, 2024, and the Court issued a decision on September 30, 2024. The decision upheld the federal agencies analysis on two of the three issues raised in the litigation, but agreed with plaintiffs that the federal agencies took too narrow a view in analyzing the impact of a theoretical release from the tailing storage facility. The Court requested supplemental briefing on the appropriate remedy for addressing this issue, which is due October 21, 2024, and response briefing is due November 4, 2024. Donlin Gold is committed to working with the federal agencies and all stakeholders on an appropriate remedy to address the Court’s decision.
Current wording
On April 5, 2023, Earthjustice representing ONC and six Y-K villages filed suit against the U.S. government in Anchorage Federal District Court (the “Federal District Court”) asking the Federal District Court to invalidate the Donlin Gold JROD, which included the Corps’ issuance of the 404 permit and the Department of Interior, Bureau of Land Management’s issuance of the ROW lease for the portions of the pipeline on Federal lands. The U.S. Department of Justice (“DOJ”) is defending the issuance of the permits by those Federal agencies. The State of Alaska, Donlin Gold, and Calista were granted intervenor status in this case. The DOJ filed their brief supporting the issuance of the JROD and the sufficiency of the environmental analysis in the Final Environmental Impact Statement on April 2, 2024. Amicus briefs supporting the project were filed by the village of Crooked Creek and the Alaska federal Congressional delegation. Oral arguments were held on June 24, 2024, and the Federal District Court issued a decision on September 30, 2024. The decision rejected the plaintiffs’ arguments on two of the three issues raised in the litigation but agreed with plaintiffs that the federal agencies took too narrow of a view in analyzing the impact of a theoretical release from the tailings storage facility. The Federal District Court requested supplemental briefing on the appropriate remedy for addressing this issue. On October 7, 2024, the plaintiffs filed a request for reconsideration on one of the issues on which the Federal District Court had ruled against the plaintiffs and, at DOJ’s request, the Federal District Court suspended the schedule for briefing on the appropriate remedy until after the Federal District Court ruled on plaintiffs’ motion for reconsideration. On December 23, 2024, the Federal District Court denied plaintiffs’ request for reconsideration. Remedy briefing was completed in March 2025 and oral argument on remedy has been scheduled for April 14, 2025.
Previous wording
With total cash and term deposits of $105.6, the Company has sufficient working capital available to cover anticipated funding of the Donlin Gold project and corporate general and administrative costs for at least the next three years at current spending levels. Additional capital may be required to complete an updated Donlin Gold feasibility study. Considerable additional capital will be required if a decision to commence engineering and construction is reached by Donlin Gold. Future financing to fund construction is anticipated through debt and equity offerings, project specific debt, and/or other means. Our continued operations are dependent on our ability to obtain additional funding or to generate future cash flows. However, there is no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all. For further information, see our Annual Report on Form 10-K for the year ended November 30, 2023, sectionItem 1A, Risk Factors–* Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing*.
Current wording
With total cash and term deposits of $92,969, the Company has sufficient working capital available to cover anticipated funding of the Donlin Gold project and corporate general and administrative costs for at least the next two years at current spending levels. Additional capital may be required to complete an updated Donlin Gold feasibility study. Considerable additional capital will be required if a decision to commence engineering and construction is reached by Donlin Gold. Future financing to fund construction is anticipated through debt and equity offerings, project specific debt, and/or other means. Our continued operations, in the longer term, are dependent on our ability to obtain additional financing or to generate future cash flows. However, there is no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all. For further information, see sectionItem 1A, Risk Factors–* Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing*.
Previous wording
Our anticipated cash expenditures in fiscal year 2024 continue to be approximately $31,200, including $14,250 to fund the Donlin Gold project, and $16,950 for general and administrative costs.
Current wording
Our budgeted cash expenditures in fiscal year 2025 are approximately $37,500, including $21,500 to fund the Donlin Gold project, and $16,000 for corporate general and administrative costs.
Previous wording
As of September 25, 2024, the Company had 334,567,187 common shares issued and outstanding. Also, as of September 25, 2024, the Company had: i) a total of 9,039,437 stock options outstanding; 7,867,835 with a weighted-average exercise price of $6.22 and the remaining 1,171,602 of those stock options with a weighted-average exercise price of C$7.90; and ii) 1,633,500 PSUs and 314,714 deferred share units outstanding. Upon exercise or pay out, as applicable, of the foregoing convertible securities, the Company would be required to issue a maximum of 11,804,401 common shares.
Current wording
As of March 26, 2025, the Company had 334,646,571 common shares issued and outstanding. Also, as of March 26, 2025, the Company had: i) a total of 8,258,700 stock options outstanding; 7,261,300 with a weighted-average exercise price of $6.11 and the remaining 997,400 of those stock options with a weighted-average exercise price of C$7.56; and ii) 1,225,100 PSUs and 307,555 deferred share units outstanding. Upon exercise or pay out, as applicable, of the foregoing convertible securities, the Company would be required to issue a maximum of 10,403,905 common shares.