Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations (US dollars in thousands, except per share amounts)Current report: 10-K
Period ended 2024-11-30; filed 2025-01-23.
0001171843-25-000387
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations (U.S. dollars in thousands, except per share amounts)The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 69 previous paragraphs and 61 current paragraphs.
27 unchanged; 20 reworded; 14 added; 22 removed; 0 previous and 0 current paragraphs rearranged.
Tables are not compared: 4 previous and 4 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (14)
Current report
Donlin Gold advanced key activities in 2024 to position the project to update technical work and cost estimates. Principal activities included the substantial completion of metallurgical test work at a pilot plant in Ontario, Canada to confirm proposed optimizations to the flowsheet, field and geochemical data collection to continue updating source characteristics for groundwater and surface water models for both operational and closure planning, as well as advancement of the Donlin Gold resource model. Results derived from the considerable technical work performed over these past twelve months will serve as inputs into updated feasibility work.
Current report
Our outreach in Alaska, particularly in the Y-K region, and in Washington, D.C., has strengthened community engagement and reinforces the project’s social license. The Company appreciates the diligent contributions of the Donlin Gold team, partners, and stakeholders, and remains dedicated to developing the project to its full potential. In collaboration with Calista and TKC, the mineral and surface rights holders, Donlin Gold LLC has made significant strides in local community and government engagement across the Y-K region, Alaska, and Washington, D.C., including advancing the project’s development and permitting efforts. Over decades, our commitment to engaging with the 62 stakeholder communities in the Y-K region has built meaningful relationships, enhanced investment, and reinforced our social license. This longstanding dedication underscores the approach of the Donlin Gold project and its partners, Calista and TKC, to foster robust relationships with both local communities and governmental entities built on trust, transparency, respect and partnership.
Current report
To that end, Donlin Gold led numerous projects and activities in 2024. Calista, TKC, and Donlin Gold hosted public Open Houses in Anchorage, Bethel, and Crooked Creek providing Alaskans and local residents with the opportunity to learn more about the project and to engage in open and transparent discussions. Donlin Gold hosted a project site tour for a group of residents from Crooked Creek and Georgetown which are the project’s closest neighboring villages.
Current report
Donlin Gold, Calista, and TKC held two Subsistence Community Advisory Committee ("SCAC") meetings in 2024, the first in Aniak and second in Anchorage. This committee, which is composed of people from the Y-K region, reflects the ongoing commitment to establishing a structured process for communication, dialogue, problem-solving, and gathering input from the broader community on subsistence matters throughout the life of the project. The SCAC committee provides a forum for sharing information, questions and ideas from the communities in the Y-K region with Donlin Gold, Calista and TKC, as well as bringing information about the project back to their respective communities.
Current report
Recognizing the importance of ecological stewardship in the Y-K region, since mid-2023, Donlin Gold has intensified efforts with our Alaska Native Corporation partners to monitor, survey and engage in the dialogue on salmon fisheries in the Kuskokwim and Yukon River watersheds. In 2024, Donlin Gold launched a salmon smolt monitoring program on the George River, a tributary of the Kuskokwim River, in partnership with the Native Village of Napaimute to assess smolt health and migration patterns — an initiative that will continue into 2025. Restoration of a portion of the historic Lyman placer site, which included significant stream and pond habitat creation, including aquatic life access and use, was completed in 2024. Aquatic restoration work on a reach of Snow Gulch previously disturbed by historic mining will start in 2025.
Current report
In addition, Donlin Gold’s “In It for The Long Haul” Backhaul Program, a long-standing initiative to collect and safely dispose of hazardous household electronic waste, including appliances, from Y-K villages, recycled approximately 140,000 pounds of material in 2024, for an impressive total of approximately 803,000 pounds of hazardous materials removed from the Y-K region since the program began in 2018.
Current report
Donlin Gold’s partnership with the Crooked Creek Traditional Council has supported the Summer Youth Employment program, providing local youth with hands-on experience in various work environments while also assisting Elders. The Donlin Gold project continued sponsoring the RurAL CAP Elder Mentor Program, which connects youth with Elders to foster intergenerational knowledge and support academic engagement and school readiness across the State. Donlin Gold also shipped dictionaries to all school districts in the Y-K region for third graders as part of The Dictionary Project, a national effort to promote literacy and creative thinkers, a project they have participated in annually since 2012.
Current report
Donlin Gold has also reaffirmed its commitment to the Alaska School Activities Association, supporting high school-level athletic, academic, and fine arts programs statewide. Donlin Gold’s ongoing financial contributions highlight our steadfast dedication to enhancing educational and extracurricular opportunities for students throughout Alaska.
Current report
The preliminary design packages for Dam Safety Certification were submitted to the ADNR in 2024. Comments from the ADNR on the Dam Safety Certification preliminary design packages are anticipated in 2025 with potential issuance of the Certification in 2026/2027.
Current report
Donlin Gold applied for and received an 18-month extension of the construction deadline on its air quality permit through July 2026.
Current report
On June 28, 2021, Earthjustice representing Orutsararmiut Native Council (“ONC”) filed an appeal of the ADEC Commissioner’s decision upholding the ADEC’s Clean Water Act Section 401 water quality certification in Alaska Superior Court. In December 2021, at the request of the State of Alaska and Donlin Gold, the Alaska Superior Court suspended the case and remanded it to ADEC to allow for consideration of additional technical materials on mercury and temperature. After an administrative process, the Commissioner reaffirmed ADEC’s issuance of the 401 Certification on August 18, 2023. The suspension of the previously filed Alaska Superior Court case was then lifted and Earthjustice filed its opening brief with the Alaska Superior Court in January 2024. Briefing is complete and oral arguments were held on August 30, 2024. A decision is anticipated from the Alaska Superior Court in 2025.
Current report
Professional fees increased due to consulting fees primarily related to ongoing efforts to enhance the value of the Donlin Gold project by evaluating alternatives to further advance the project. Salaries and benefits increased primarily due to hiring of additional staff. Income tax expense relates to passive income taxable in Canada on a portion of interest income earned by U.S. subsidiaries, and for withholding taxes on the sale proceeds received during the first quarter of 2024 related to the 2021 sale of the Company’s interest in the San Roque mineral property in Argentina.
Current report
Spending on operating activities in 2024 increased by $4,856 compared to the prior year primarily due to increased corporate general and administrative expenses, lower interest income on cash and term deposits and higher income tax withholding related to passive income taxable in Canada on a portion of interest income earned by U.S. subsidiaries. Cash provided from investing activities in 2024 increased by $19,683 compared to the prior year primarily due to a net reduction of term deposits held in 2024 and lower Donlin Gold funding requirements. Financing activities reflect $174 of withholding tax on PSUs (as defined below) that vested at 100% during the year and settled with the issuance of net common shares. The PSU awards that matured and vested in December 2024 at 25% of the grant amount were also settled with the issuance of net common shares.
Current report
In 2024, we incurred $7,237 in share-based compensation costs, a decrease of $1,494 over the prior year primarily due to the forfeiture of options and performance share units following the departure of the former Chief Financial Officer and other personnel during the year.
Removed paragraphs (22)
Previous report
The continued focus at Donlin Gold is to update the geologic and resource models with the data derived from the extensive drill programs that took place over the last several years; reviewing key project assumptions, inputs, and design components for optimization (mine engineering, metallurgy, hydrology, and infrastructure); advancing remaining permits through the regulatory process and supporting the State in maintaining the existing permits; and, through continued engagement, sustaining and expanding project support in the Y-K region.
Previous report
The Donlin Gold field program commenced in February with a total workforce of 44 direct hire employees with 63% from the Y-K region. The field program was safely completed on schedule in July and encompassed comprehensive fieldwork and geotechnical drilling required to complete the Alaska Dam Safety certificate applications. This involved data collection at the locations earmarked for water retention structures, including the proposed Tailings Storage Facility (TSF). The fieldwork included 1,840 meters of geotechnical drilling, 74 test pits in the locations of the planned water retention structures, 25 kilometers of seismic survey, and TSF test plot liner installation. Fieldwork to further define groundwater at the site included 1,279 meters of hydrogeologic drilling with instrumentation and pump tests, providing essential information for mine planning and design.
Previous report
At the historic Lyman placer site, restoration work included significant stream and pond habitat creation. Final work including anticipated aquatic life access and use is planned for the 2024 season.
Previous report
Further work included advancing the geologic and resource models; reviewing key project assumptions, inputs, and design components for optimization (mine engineering, metallurgy, hydrology, and infrastructure); advancing remaining permits through the regulatory process and supporting the State in maintaining the existing permits; and, through continued engagement, sustaining and expanding project support in the Y-K region. Trade-off studies and extensive analysis on project assumptions, inputs, design components for optimization (mine engineering, metallurgy, hydrology, power, and infrastructure) were completed to inform the next steps in taking the project further up the value chain.
Previous report
On September 21, 2023, both Barrick and NOVAGOLD attended a workshop in Alaska to review the substantial amount of work completed to date and discuss the next steps for the Donlin Gold project and workplan for the coming years.
Previous report
Our share of funding for the Donlin Gold project in 2023 was $17,752, higher than our original expectation of $17,000 to fund additional mining studies. Our share of Donlin Gold expenses was $18,529 in 2023, including $10,288 for project planning and fieldwork; $7,629 for permitting, environmental, community relations, mineral property leases and administrative activities; and $611 for depreciation and accretion.
Previous report
At the December 2023 Donlin Gold LLC board meeting, NOVAGOLD proposed proceeding to an updated feasibility study while the co-owner proposed continued drilling campaigns. Even though the owners did not agree to either proposal at the December meeting, they found common ground on value-adding activities that advance the project. Thus, while discussions continue regarding next steps, the Donlin Gold LLC board approved a budget of $28,500 (100% basis) for 2024, comprising resource modelling, mine planning work, metallurgical test work (pilot plant), regional infrastructure support planning, geoscience hydrology and closure planning, advancement of the dam safety certificate applications, and continued support of pending litigation, government affairs, community engagement activities, and sponsorships. NOVAGOLD will continue to employ concerted and inclusive efforts to advance the Donlin Gold project for the benefit of all our shareholders and Donlin Gold stakeholders. Our 50% share of 2024 Donlin Gold funding is $14,250.
Previous report
Thirteen of the 56 village councils in the Calista Region (Native Village of Kasigluk, ONC, Native Village of Eek, Tuluksak Native Community, Tununak Council, Native Village of Nunapitchuk, Chuloonawick Tribal Council, Native Village of Kwigillingok, Native Village of Kongiganak, Chefornak Traditional Council, Chevak Native Village, Native Village of Napakiak and Quinhagak) have adopted resolutions opposing development of the Donlin Gold project.
Previous report
Donlin Gold, in collaboration with Calista and the village of Crooked Creek continued their proactive, bipartisan outreach in Alaska to highlight the thoroughness of the project’s environmental review and permitting procedures, as well as our strong partnerships with Native Alaskans who own the land. Additional gatherings were held in Washington, D.C. with members of the Congressional delegation and with senior leadership from the U.S. Department of Interior, as part of an ongoing bipartisan outreach campaign directed at the Biden Administration and the U.S. Congress. Notable participants included Senators Lisa Murkowski and Dan Sullivan, along with Representative Mary Peltola from the Y-K region.
Previous report
NOVAGOLD maintains a dedicated commitment to education, community wellness, cultural preservation, and environmental stewardship, actively reinforcing these goals at the Donlin Gold project site and within the communities of the Y-K Region. With a focus on supporting initiatives such as fisheries studies, environmental activities, subsistence, cultural preservation, and grants, NOVAGOLD places a strong emphasis on community and social responsibility. Through continuous collaboration with Calista and TKC, alongside other key representatives of local communities, our collective efforts provide critical support to the Y-K region. This ongoing commitment ensures the sustainable and profitable development of Donlin Gold in the years to come, with a diverse array of projects and activities actively contributing to these overarching objectives in 2023.
Previous report
Donlin Gold supported various search and rescue teams in the region, provided funding to the Bethel Community Services Foundation and Special Olympics Alaska, as well as sponsored and participated in the Alaska Safe Riders initiative, which promotes safety for snowmachines, all-terrain-vehicles and recreational off-road vehicles. In addition, Donlin Gold, in collaboration with Covenant House Alaska and Bethel Community Services, is developing an action plan to help address chronic and ongoing youth food insecurity in the Y-K region. To date, the three entities have successfully leased space from Bethel Winter House toward establishing a housing and service hub for youth aged 18 to 24. Furthermore, Donlin Gold partnered with the Bethel Community Services Foundation and the Aruqutet Project on a regional program to address food insecurity throughout the Bethel community. Over 550 local households are enrolled in the program to date. Employing local staff and committed volunteers has proven critical to the program.
Previous report
As an annual sponsor of the Rural Alaska Community Action Program, Donlin Gold upholds its longstanding support by recruiting and placing local elders in Y-K schools. This program facilitates the sharing of traditional knowledge and values, enriching the educational experience for students across the region. Additionally, Donlin Gold has strengthened its sponsorship of the First Alaskans Institute, extended support and actively participated in key events such as the Elders & Youth statewide conference and the Alaska Federation of Natives annual convention. These efforts foster cultural enrichment and community engagement.
Previous report
In collaboration with the village of Napaimute, Donlin Gold actively participated in and provided principal support for the “In It for The Long Haul” backhaul program for the sixth year in a row. This vital project is dedicated to the collection, removal, and safe disposal of household hazardous and electronic waste from villages across the Y-K region, preventing its adverse impact on landfills and waterways. The program achieved significant new milestones this year, including the removal of waste from fish camps in the Middle Kuskokwim and the initiation of waste backhaul operations along the Yukon River. In total, this year’s program successfully collected and disposed of approximately 235,000 pounds of waste. Donlin Gold also supported 52 villages as part of the annual Clean-up Green-up program, which aims to collect and dispose of trash from the tundra, roads, public areas and beaches in the Y-K region that accumulate over the winter months.
Previous report
Donlin Gold has been increasingly focused on collaborating with our Alaska Native Corporation partners to monitor and assess the conditions and management of salmon fisheries in the Kuskokwim and Yukon River watersheds. In the fourth quarter of 2023, we initiated the identification of specific potential project opportunities aimed at monitoring, evaluating, and enhancing the health of salmon populations. In the first quarter of 2024, Donlin Gold will identify key projects to support with work expected to commence in the third quarter 2024. All such projects will be done in collaboration and partnership with the people of the Y-K region. Furthermore, in collaboration with TKC, the village of Crooked Creek, the Akiak Native Community and the Napaimute Tribe, Donlin Gold provided financial support for the construction and maintenance of the ice roads that allow for winter travel between the remote Kuskokwim River communities – which, in turn, led to increased participation in community events, cultural activities, sports, and provided access for emergency services, law enforcement and travel. On average, a total of 300 miles of ice road is constructed and maintained annually.
Previous report
Education is a cornerstone of Donlin Gold's community engagement efforts, with a steadfast commitment to advancing educational opportunities in Alaska. Collaborating closely with Alaska Resource Education, Donlin Gold actively supports the mission of educating Alaskan students about the state's natural resources. Additionally, the company extends its dedication to education by backing the Alaska School Activities Association, a statewide non-profit organization that directs, develops, and supports high school interscholastic sports, academic, and fine arts activities across Alaska. Both NOVAGOLD and Donlin Gold collectively contribute to educational advancement, with NOVAGOLD funding an annual scholarship at the University of Alaska. This scholarship is specifically designed to benefit underrepresented students pursuing majors in Mine Engineering and Geology, thereby contributing to the development of future talent in these critical professional fields.
Previous report
The Donlin Gold camp re-opened in February to continue geotechnical and hydrological fieldwork to collect additional data for the Alaska Dam Safety certificate applications process, with field work completed in July. The preliminary design packages are expected to be submitted to the Alaska Department of Natural Resources in the first half of 2024. Issuance of the certifications is anticipated in 2026.
Previous report
On June 3, 2020, Earthjustice representing Orutsararmiut Native Council (ONC), ten Y-K villages, and the Alaska Community Action on Toxics filed a formal appeal with the ADEC Commissioner of the State’s water quality certification under Section 401 of the Clean Water Act (the “401 Certification”). The appeal process consisted of an Administrative Hearing in front of an Administrative Law Judge (ALJ) appointed by the ADEC Commissioner. On April 12, 2021, the ALJ issued his opinion for the Commissioner’s consideration recommending the 401 Certification be vacated. The Commissioner issued his decision to uphold the 401 Certification on May 27, 2021. The decision was appealed on June 28, 2021, in Alaska Superior Court by Earthjustice, representing ONC. On September 27, 2021, Donlin Gold filed a motion requesting a short term stay in the case to allow the State to fully consider additional technical materials on mercury and temperature; the State indicated to the Court that they did not oppose the motion. On October 22, 2021, Donlin Gold submitted to ADEC expert technical reports on mercury and temperature. On November 22, 2021, ADEC filed an additional motion asking to remand the 401 certification back to ADEC to determine how the additional information affects the certification. Earthjustice did not oppose the motion although had comments on the remand process. On December 29, 2021, the Court granted the remand request, dismissed the case without prejudice, and left in place the existing certification. On May 13, 2022, the ADEC Water Division Director reaffirmed the 401 certification. On June 13, 2022, Earthjustice appealed the elements of the decision related to temperature to the Commissioner and requested an adjudicatory hearing with an ALJ. On July 14, 2022, the Commissioner granted the request for the hearing and a new ALJ was assigned. On September 14, 2022, Earthjustice filed their initial brief. Donlin Gold and ADEC filed response briefs on October 14, 2022. Earthjustice filed their final reply brief on October 21, 2022. On August 18, 2023, the Commissioner reaffirmed ADEC’s issuance of the 401 Certification. The suspension of the previously filed Alaska Superior Court case was then lifted. Earthjustice’s opening brief was submitted to the Alaska Superior Court on January 5, 2024. Claims related to mercury were not included in Earthjustice’s Alaska Superior Court complaint. ADEC and Donlin Gold response briefs are due on February 5, 2024. A decision is expected later in 2024.
Previous report
On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three Y-K villages, filed an appeal of the State pipeline ROW authorization in Alaska Superior Court. An appeal was also filed by a second party, Robert Fithian, the owner of an outdoor guiding business located near the proposed Donlin Gold pipeline route, on September 20, 2021. The two appeals were consolidated into a single case before the Alaska Superior Court based in Anchorage, Alaska. On April 12, 2023 and July 3, 2023, the Alaska Superior Court affirmed ADNR’s issuance of the ROW lease in the Earthjustice case and Robert Fithian case, respectively. The decision in the Earthjustice case has been appealed to the Alaska Supreme Court. Earthjustice’s opening brief was submitted on September 22, 2023. The State of Alaska, Calista, and Donlin Gold submitted their reply briefs to the Alaska Supreme Court on January 3, 2024. Mr. Fithian did not appeal to the Alaska Supreme Court.
Previous report
Net spending on operating activities decreased by $4,585 primarily due to increased interest proceeds received on cash and term deposits, and the timing of corporate liability insurance payments in the prior year, partially offset by higher corporate travel costs, legal expenses, and remediation expenditures. Cash used in investing activities decreased by $2,034, primarily due to Newmont note proceeds and lower Donlin Gold funding requirements, partially offset by net purchases of term deposits in 2023 compared to net proceeds from term deposits in 2022. In financing activities, the PSU awards that matured in 2023 did not meet the performance criteria; therefore, no common shares were issued and no withholding tax was paid.
Previous report
Income taxes
Previous report
We account for income taxes under the asset and liability method. Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases. Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. Under the asset and liability method, the effect on deferred tax assets and liabilities of a change in tax rates is recognized in income in the period that includes the enactment date. A full valuation allowance has been recognized against deferred tax assets as management has determined that it is not likely that the deferred tax assets will be recognized.
Previous report
In 2023, we incurred $8,731 in share-based compensation costs, an increase of $517 over the prior year. PSU compensation costs increased over the prior year primarily due to 181,700 PSUs granted to the Company’s executive officers on December 15, 2022, as a retention incentive that will vest if their employment continues through June 30, 2024. The retention incentive PSUs were valued at the grant date market price.
Reworded paragraphs (20)
Previous wording
The following MD&A generally discusses our consolidated financial condition and results of operations for 2023 and 2022 and year-to-year comparisons between 2023 and 2022. Discussions of our consolidated financial condition and results of operations for 2022 and year-to-year comparisons between 2022 and 2021 are included in Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, in the Company’s Annual Report on Form 10-K for the fiscal year ended November 30, 2022, filed with the Securities and Exchange Commission on January 25, 2023, are incorporated by reference into this MD&A.
Current wording
The following MD&A generally discusses our consolidated financial condition and results of operations for 2024 and year-over-year comparisons between 2024 and 2023. Discussions of our consolidated financial condition and results of operations for 2023 and year-over-year comparisons between 2023 and 2022 are included in Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, in the Company’s Annual Report on Form 10-K for the fiscal year ended November 30, 2023, filed with the Securities and Exchange Commission on January 24, 2024, are incorporated by reference into this MD&A.
Previous wording
We operate in the gold mining industry, primarily focused on advancing the Donlin Gold project in Alaska. The Donlin Gold project is held by Donlin Gold LLC (“Donlin Gold”), a limited liability company owned equally by wholly-owned subsidiaries of NOVAGOLD and Barrick Gold Corporation (“Barrick”). We record our interest in the Donlin Gold project as an equity investment, which results in our 50% share of Donlin Gold’s expenses being recorded in the income statement as an operating loss. The investment amount recorded on the balance sheet primarily represents unused funds advanced to Donlin Gold.
Current wording
We operate in the gold mining industry, primarily focused on advancing the Donlin Gold project in Alaska. The Donlin Gold project is held by Donlin Gold LLC (“Donlin Gold”), a limited liability company owned equally by wholly-owned subsidiaries of NOVAGOLD and Barrick. We record our interest in the Donlin Gold project as an equity investment, which results in our 50% share of Donlin Gold’s expenses being recorded in the income statement as an operating loss. The investment amount recorded on the balance sheet primarily represents unused funds advanced to Donlin Gold.
Previous wording
In collaboration with Calista Corporation (“Calista”) and The Kuskokwim Corporation (TKC), Donlin Gold actively engages stakeholders and governments in the Y-K region, Alaska and Washington, D.C. The project’s location on private lands selected under the 1971 Alaska Native Claims Settlement Act is a significant feature, setting it apart from most other mining assets in Alaska and guiding our outreach efforts. Donlin Gold’s enduring partnerships with Calista and TKC are pivotal in facilitating comprehensive outreach throughout the Y-K region.
Current wording
In collaboration with Calista and TKC, Donlin Gold actively engages stakeholders and governments in the Y-K region, Alaska and Washington, D.C. The project’s location on private lands selected under the 1971 Alaska Native Claims Settlement Act is a significant feature, setting it apart from most other mining assets in Alaska and guiding our outreach efforts. Donlin Gold’s enduring partnerships with Calista and TKC are pivotal in facilitating comprehensive outreach throughout the Y-K region.
Previous wording
Donlin Gold successfully recruited four new community liaisons from Nunapitchuk, Tuluksak, Pilot Station, and Kwigillingok, expanding the total to nine. It also established three additional Shared Values Statements for a total of 16, which formalize Donlin Gold’s ongoing engagement with local communities, reinforce existing long-term relationships, and address specific community needs. In 2023, Donlin Gold conducted over 7,000 direct engagements with key stakeholders.
Current wording
NOVAGOLD remains committed to stakeholder engagement and community development working closely with Tribal communities and Alaska Native Corporations to identify needs and collaboratively develop solutions that enhance and uplift communities, fostering sustainable growth and shared prosperity for future generations. To that end, NOVAGOLD representatives were on the ground in Alaska providing extensive support to the Donlin Gold team in their outreach efforts. Donlin Gold established three additional Shared Values Statements for a total of 18, which formalize Donlin Gold’s ongoing engagement with local communities, reinforce existing long-term relationships, and address specific community needs. In 2024, over 12,000 direct engagements were conducted with key stakeholders.
Previous wording
In 2022, Donlin Gold applied for a new air quality permit based on updated air quality modeling and emissions controls information. The new air quality permit was issued on July 1, 2023. The Alaska Permit Discharge Elimination System permit, which originally expired in 2023, and the Waste Management Permit, which originally was to expire in January 2024, are administratively extended pending renewal by the Alaska Department of Environmental Conservation (ADEC). The Reclamation Plan approval, which was also to expire in January 2024, is administratively extended to January 2025.
Current wording
The Alaska Pollutant Discharge Elimination System permit, which was originally set to expire in 2023, as well as the Waste Management Permit, which was set to expire in January 2024, are administratively extended by the Alaska Department of Environmental Conservation until renewed. The Reclamation Plan, which was also set to expire in 2024, is administratively extended until 2027.
Previous wording
In September 2022, 13 tribes sent letters to the U.S. Army Corps of Engineers (“Corps”) and the U.S. Environmental Protection Agency (EPA). The letter to the Corps requests that it consider requiring a supplemental environmental impact statement (EIS) on the Donlin Gold project and revoke the Clean Water Act Section 404 permit (the “404 permit”) in light of what the tribes consider “new information” since the final EIS was issued in 2018. Additionally, the EPA letter requested that it initiate a Clean Water Act Section 404(c) veto process for the Donlin Gold project. In early January 2023, Donlin Gold and Calista both submitted responses to the Corps on why the requests to prepare a supplemental EIS or revoke the 404 permit should not be granted. In January 2023, Donlin Gold also provided a response to the EPA describing why the agency should not initiate a 404(c) process. To date, neither the Corps nor EPA has responded to the tribes’ letters.
Current wording
In September 2022, thirteen tribes sent letters to the Corps and the EPA. The letter to the Corps requests that it consider requiring an EIS on the Donlin Gold project and revoke the Clean Water Act Section 404 permit (the “404 permit”) in light of what the tribes consider “new information” since the final EIS was issued in 2018. Additionally, the EPA letter requested that it initiate a Clean Water Act Section 404(c) veto process for the Donlin Gold project. In early January 2023, Donlin Gold and Calista both submitted responses to the Corps on why the requests to prepare a supplemental EIS or revoke the 404 permit should not be granted. In January 2023, Donlin Gold also provided a response to the EPA describing why the agency should not initiate a 404(c) process. To date, neither the Corps nor EPA has responded to the tribes’ letters.
Previous wording
On May 25, 2022, Earthjustice, representing ONC and five Y-K villages, filed an appeal of the final Water Rights in Alaska Superior Court. The appellants filed their initial brief on November 21, 2022. On April 25, 2022, the ADNR Commissioner denied the appeal; however, Earthjustice, ONC and five villages appealed the Commissioner’s decision in Alaska Superior Court on May 25, 2022. The briefing process was completed, and oral arguments were held on July 19, 2023. On September 1, 2023, the Alaska Superior Court affirmed ADNR’s decision on Donlin Gold’s water rights permits, following unsuccessful appeal by Earthjustice to the ADNR Commissioner. On October 2, 2023, Earthjustice appealed the Superior Court decision to the Alaska Supreme Court. Earthjustice’s opening brief was submitted to the Alaska Supreme Court on January 4, 2024.
Current wording
On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three Y-K villages, filed an appeal of the State pipeline ROW authorization in Alaska Superior Court. On April 12, 2023, the Alaska Superior Court affirmed ADNR’s issuance of the ROW lease in the Earthjustice case. Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. On May 25, 2022, Earthjustice, representing ONC and five Y-K villages, filed an appeal of ADNR’s issuance of certain water rights permits to Donlin Gold in Alaska Superior Court. After briefing and oral argument, on September 1, 2023, the Alaska Superior Court affirmed ADNR’s decision on Donlin Gold’s water rights permits. On October 2, 2023, Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. Earthjustice’s opening brief was submitted to the Alaska Supreme Court on January 4, 2024. Response briefs from the State of Alaska and Donlin Gold were completed in April 2024, and Earthjustice subsequently filed their reply brief in May 2024. Briefing on Earthjustice’s appeal of the Alaska Superior Court affirmation of ADNR’s issuance of the State pipeline ROW lease to the Alaska Supreme Court was completed in February 2024. Oral arguments for both the water rights permits and the State pipeline ROW were held November 12, 2024, and a decision is anticipated in 2025.
Previous wording
On April 6, 2023, Earthjustice with ONC and six Y-K villages filed suit against the U.S. government in Anchorage Federal District Court. The lawsuit asks the Court to invalidate the Donlin Gold Joint Record of Decision, including the 404 permit issued by the Corps and ROW lease for the portions of the pipeline on Federal lands issued by the Bureau of Land Management of the U.S. Department of Interior. The U.S. Department of Justice (DOJ) is defending the issuance of the permits by those Federal agencies. The State of Alaska, Donlin Gold and Calista have been granted intervenor status in this case. DOJ is finalizing compilation of the Administrative Record for the court. The briefing schedule was agreed upon in the fourth quarter and will extend through the first half of 2024.
Current wording
On April 5, 2023, Earthjustice representing ONC and six Y-K villages filed suit against the U.S. government in Anchorage Federal District Court (the “Federal District Court”) asking the Federal District Court to invalidate the Donlin Gold Joint Record of Decision, which included the U.S. Army Corps’ of Engineers’ issuance of the 404 permit and the Department of Interior, Bureau of Land Management’s issuance of the ROW lease for the portions of the pipeline on Federal lands. The U.S. Department of Justice (“DOJ”) is defending the issuance of the permits by those Federal agencies. The State of Alaska, Donlin Gold, and Calista were granted intervenor status in this case. The DOJ filed their brief supporting the issuance of the JROD and the sufficiency of the environmental analysis in the Final Environmental Impact Statement on April 2, 2024. Amicus briefs supporting the project were filed by the village of Crooked Creek and the Alaska federal Congressional delegation. Oral arguments were held on June 24, 2024, and the Federal District Court issued a decision on September 30, 2024. The decision rejected the plaintiffs’ arguments on two of the three issues raised in the litigation but agreed with plaintiffs that the federal agencies took too narrow of a view in analyzing the impact of a theoretical release from the TSF. The Federal District Court requested supplemental briefing on the appropriate remedy for addressing this issue. On October 7, 2024, the plaintiffs filed a request for reconsideration on one of the issues on which the Federal District Court had ruled against the plaintiffs and, at DOJ’s request, the Federal District Court suspended the schedule for briefing on the appropriate remedy until after the Federal District Court ruled on plaintiffs’ motion for reconsideration. On December 23, 2024, the Federal District Court denied plaintiffs’ request for reconsideration. The Court reestablished the remedy briefing schedule with initial briefs from all parties now due on January 31, 2025, and response briefs from all parties due on February 14, 2025.
Previous wording
Despite multiple challenges, all appeals against Donlin Gold permits have been unsuccessful to date, underscoring our ongoing confidence in the process. We recognize the importance of preparedness and organization in these matters. With the unwavering support of Donlin Gold and its owners, we will continue to back the state and federal agencies in defending their thorough and diligent permitting processes.
Current wording
To date, all permits and approvals granted to Donlin Gold by federal and state agencies remain issued and in place while the legal challenges described above proceed. We recognize the importance of preparedness and organization in these matters. With the unwavering support of Donlin Gold and its owners, we will continue to back the state and federal agencies in defending their thorough and diligent permitting processes and are committed to working with the federal agencies and all stakeholders on an appropriate remedy to address the Federal District Court’s decision.
Previous wording
During 2023, $1,435 in remediation expenditures were incurred for fieldwork at the historic former New Gold House property in Nome, Alaska. Final work including seeding is planned for the 2024 field season.
Current wording
During 2024, $157 in remediation expenditures were incurred for fieldwork at the historic former New Gold House property in Nome, Alaska, including re-seeding. Monitoring, sampling and maintenance work (as needed, based on monitoring results) is planned for the 2025 field season.
Previous wording
Net lossdecreased by $6,540 from 2022, primarily due to lower field expenses at Donlin Gold, increased interest income, and other income related to the 2021 sale of the Company’s interest in the San Roque mineral property, partially offset by an increase in interest expense on the promissory note and higher general and administrative expenses. Donlin Gold expenses were lower in 2023 with fieldwork and geotechnical drilling completed in July for the Alaska Dam Safety certificate applications and hydrological drilling to support mine planning and design, compared to the large exploration drilling program in 2022. General and administrative costs increased due to higher corporate travel costs, legal expenses, and PSUs granted to the Company’s executive officers on December 15, 2022, as a retention incentive that will vest if their employment continues through June 30, 2024. Higher interest rates in 2023 impacted interest income on cash and term deposits and interest expense on the promissory note. The average effective interest rate on the promissory note increased from 6.8% in 2022 to 10.3% in 2023.
Current wording
Net lossdecreased by $1,182 from 2023, primarily due to lower field expenses at Donlin Gold, partially offset by higher corporate general and administrative expenses, increased interest expense on the promissory note, lower interest income on cash and term deposits and other income related to a gain in the fair market value of marketable securities and proceeds received for the 2021 sale of the Company’s interest in the San Roque mineral property. Donlin Gold expenses were lower with reduced site activity in 2024, compared to fieldwork and geotechnical drilling for the Alaska Dam Safety certificates and hydrological drilling to support mine planning and design in 2023. General and administrative costs increased primarily due to higher professional fees and employee compensation partially offset by lower stock-based compensation expense related to forfeiture of options and performance share units due to the departure of certain former employees.
Previous wording
At present, we believe we have sufficient working capital available to cover anticipated funding of the Donlin Gold project and corporate general and administrative costs for at least the next three years at current spending levels. Additional capital may be required to complete an updated Donlin Gold feasibility study. Considerable additional capital will be required once a decision to commence engineering and construction is reached by the Donlin Gold LLC board for the Donlin Gold project. Future financing to fund construction is anticipated through debt, equity, project specific debt, and/or other means. Our continued operations are dependent on our ability to obtain additional financing or to generate future cash flows. However, there can be no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all. For further information, see sectionItem 1A, Risk Factors–* Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing*.
Current wording
With total cash and term deposits of $101,224, the Company has sufficient working capital available to cover anticipated funding of the Donlin Gold project and corporate general and administrative costs for at least the next two years at current spending levels. Additional capital may be required to complete an updated Donlin Gold feasibility study. Considerable additional capital will be required if a decision to commence engineering and construction is reached by Donlin Gold. Future financing to fund construction is anticipated through debt and equity offerings, project specific debt, and/or other means. Our continued operations are dependent on our ability to obtain additional funding or to generate future cash flows. However, there is no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all. For further information, see sectionItem 1A, Risk Factors–* Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing*.
Previous wording
Our anticipated expenditures in fiscal year 2024 are approximately $31,200, including $14,250 to fund the Donlin Gold project, and $16,950 for corporate general and administrative costs.
Current wording
Our anticipated expenditures in fiscal year 2025 are approximately $37,500, including $21,500 to fund the Donlin Gold project, and $16,000 for corporate general and administrative costs.
Previous wording
In 2023, cash and cash equivalents decreased by $18,133, mainly to fund our share of Donlin Gold, corporate administrative expenses, and net purchases of term deposits, partially offset by the note proceeds received from Newmont.
Current wording
In 2024, cash and cash equivalents decreased by $3,525, mainly to fund our share of Donlin Gold, corporate administrative expenses partially offset by a net reduction of term deposits held.
Previous wording
As of January 16, 2024, the Company had 334,371,223 common shares issued and outstanding. Also, as of January 16, 2024, the Company had: i) a total of 9,605,100 stock options outstanding; 8,260,300 of those stock options with a weighted-average exercise price of $6.21 and the remaining 1,344,800 with a weighted-average exercise price of C$7.73; and ii) 2,173,000 performance shares units (PSUs) and 255,852 deferred share units (DSUs) outstanding. Upon exercise of the foregoing convertible securities, the Company would be required to issue a maximum of 13,029,602 common shares.
Current wording
As of January 13, 2025, the Company had 334,646,571 common shares issued and outstanding. Also, as of January 13, 2025, the Company had: i) a total of 8,838,001 stock options outstanding; 7,816,967 of those stock options with a weighted-average exercise price of $6.21 and the remaining 1,021,034 with a weighted-average exercise price of C$7.62; and ii) 1,225,100 performance shares units (“PSUs”) and 284,378 deferred share units (“DSUs”) outstanding. Upon exercise of the foregoing convertible securities, the Company would be required to issue a maximum of 10,960,029 common shares.
Previous wording
As of November 30, 2023, the Company has accounts receivable from Donlin Gold of $203 (November 30, 2022: $574) included inOther current assets for third party study costs contracted for by the Company on behalf of Donlin Gold.
Current wording
As of November 30, 2024, the Company has accounts receivable from Donlin Gold of $212 (November 30, 2023: $203) included inOther current assets for third party study costs contracted for by the Company on behalf of Donlin Gold.
Previous wording
During the fourth quarter of 2023 we incurred a net loss of $10,421 compared to a net loss of $12,255 in 2022. The decrease in net loss primarily resulted from reduced activity at Donlin Gold and higher interest income, partially offset by increased interest on the promissory note.
Current wording
During the fourth quarter of 2024 we incurred a net loss of $10,860 compared to a net loss of $10,421 in the fourth quarter of 2023. The increase in net loss primarily resulted from higher corporate general and administrative expenses, increased interest on the promissory note, lower interest income, partially offset by reduced activity at Donlin Gold.
Previous wording
The Company’s maximum exposure to loss is its investment in Donlin Gold of $3,071 as of November 30, 2023. The Company reviews and evaluates its investment in the Donlin Gold project for other than temporary impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. Events that could indicate impairment of an investment in affiliates include a significant decrease in long-term expected gold price, a significant increase in expected operating or capital costs, unfavorable exploration results or technical studies, a significant decrease in reserves, a loss of significant mineral claims, or a change in the development plan or strategy for the project. Management reviewed potential impairment indicators and determined that there were none as of November 30, 2023.
Current wording
The Company’s maximum exposure to loss is its investment in Donlin Gold of $2,597 as of November 30, 2024. The Company reviews and evaluates its investment in the Donlin Gold project for other than temporary impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. Events that could indicate impairment of an investment in an affiliate include a significant decrease in long-term expected gold price, a significant increase in expected operating or capital costs, unfavorable exploration results or technical studies, a significant decrease in reserves, a loss of significant mineral claims, or a change in the development plan or strategy for the project. Management reviewed potential impairment indicators and determined that there were none as of November 30, 2024.
Previous wording
We grant members of our board of directors DSUs whereby each DSU entitles the directors to receive one common share of the Company or the market value thereof in cash, at the Company’s option, when they retire from service with the Company. The fair value of the DSUs is measured at the date of the grant in amounts ranging from 50% to 100% of directors’ annual retainers at the election of the directors. The fair value is recognized in theConsolidated Statements of Loss over the related service period.
Current wording
We grant members of the Board DSUs whereby each DSU entitles the directors to receive one common share of the Company or the market value thereof in cash, at the Company’s option, when they retire from service with the Company. The fair value of the DSUs is measured at the date of the grant in amounts ranging from 50% to 100% of directors’ annual retainers at the election of the directors. The fair value is recognized in theConsolidated Statements of Loss over the related service period.
Previous wording
As of November 30, 2023, we had $2,721 of unrecognized compensation cost related to 3,724,884 non-vested stock options expected to be expensed and vest over a period of approximately two years. Also, as of November 30, 2023, we had 1,605,500 non-vested PSU awards outstanding of which 319,300 were fully expensed. On December 1, 2023, it was determined that those expensed PSU awards matured and did not meet the performance criteria; therefore, no common shares were issued. The remaining 1,286,200 non-vested PSU awards with $3,771 of unrecognized compensation cost will be expensed over a period of approximately two years.
Current wording
During 2024, we had 149,000 PSU awards that vested at 100% and 47,000 DSU awards that vested and were settled with the issuance of common shares. As of November 30, 2024, we had $2,348 of unrecognized compensation cost related to 4,361,486 non-vested stock options expected to be expensed and vest over a period of approximately two years. Also, as of November 30, 2024, we had 1,633,500 non-vested PSU awards outstanding of which 408,400 were fully expensed and vested in December 2024 at 25% of the grant amount, which were subsequently settled with the issuance of common shares. The remaining 1,225,100 non-vested PSU awards with $3,715] of unrecognized compensation cost will be expensed over a period of approximately two years.