Applied Digital Corp.

For the period ended Aug 31, 2025. Filed Oct 9, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Aug 31, 2025 · Filed Oct 9, 2025

APLD$15.55+9.7%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-02-28; filed 2025-04-14.

0001628280-25-017684

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-08-31; filed 2025-10-09.

0001144879-25-000069

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 244 previous paragraphs and 150 current paragraphs.

59 unchanged; 43 reworded; 48 added; 138 removed; 4 previous and 0 current paragraphs rearranged.

Tables are not compared: 6 previous and 7 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (48)

Current report

•our ability to complete construction of our HPC facilities at each of the Polaris Forge 1 and Polaris Forge 2 campuses;

Current report

We are a U.S. designer, developer, and operator of high-performance, sustainably engineered data centers and colocation services for artificial intelligence (“AI”), networking, and blockchain workloads. Headquartered in Dallas, TX, and founded in 2021, the Company combines hyperscale expertise, proprietary waterless cooling, and rapid deployment capabilities to deliver secure, scalable compute at industry-leading speed and efficiency, while creating economic opportunities in underserved communities through its award-winning Polaris Forge AI Factory model. We operate in two distinct business segments, data center hosting (the "Data Center Hosting Business") and HPC data center hosting (the "HPC Hosting Business"), as further discussed below.

Current report

During the fiscal quarter ended May 31, 2025, we determined that our Cloud Services Business met the criteria for held for sale and discontinued operations. As such, the results of the Cloud Services Business, which was previously included as a reportable segment, are presented as discontinued operations in the unaudited condensed consolidated statements of operations and have been excluded from both continuing operations and segment results for all periods presented.

Current report

We are currently building two HPC focused data center facilities to provide 100 MW and 150 MW, respectively, of capacity at our Polaris Forge 1 campus in Ellendale, ND. These facilities are being designed and purpose-built to host high-density GPU architecture or other HPC applications, such as artificial intelligence, natural language processing, machine learning, and additional HPC developments. The third HPC focused data center facility, which is expected to provide an additional 150MW of capacity at Polaris Forge 1, is currently in planning stages with an anticipated ready for service date in 2027.

Current report

On May 28, 2025, APLD ELN-02 LLC and APLD ELN-03 LLC, our subsidiaries, each entered into a data center lease (together, the “Data Center Leases”) with CoreWeave, Inc. (“CoreWeave”) to deliver an aggregate of 250 MW of infrastructure to host CoreWeave’s HPC operations at Polaris Forge 1. The first lease is for the full capacity of our 100 MW data center that is currently under construction, and the second lease is for the full capacity of our 150 MW data center that is also under construction. We have guaranteed the obligations of APLD ELN-02 LLC and APLD ELN-03 LLC under the respective Data Center Lease to which such subsidiary is a party.

Current report

On August 28, 2025, APLD ELN-02 C LLC, our subsidiary, entered into a third data center lease, the (“Building 4 Lease”) with CoreWeave to deliver an additional 150 MW at Polaris Forge 1, bringing the total capacity under contract at Polaris Forge 1 to 400 MW. We have guaranteed the obligations of APLD ELN-02 C LLC under the Building 4 Lease.

Current report

We recognized $26.3 million in tenant fit-out revenue from this business segment during the three months ended August 31, 2025. We anticipate that this business segment will begin generating meaningful revenues associated with the leases once the first building within Polaris Forge 1 becomes operational, which is expected in calendar year 2025.

Current report

On August 18, 2025, we also announced that we would be breaking ground on our Polaris Forge 2 campus, a $3 billion, 280 MW data center near Harwood, North Dakota. The project has begun and we currently anticipate reaching initial capacity in 2026 and reaching full capacity in early 2027.

Current report

We recognized $16.7 million in revenue from this business segment during three months ended August 31, 2025 within discontinued operations. The Cloud Services Business operates in three states: Colorado, Minnesota and Utah, by renting space at third party co-location centers and providing customers with Company-owned equipment.

Current report

On August 1, 2025, we entered into an employment agreement with Jason Zhang, one of the Company’s founders and former directors, to serve in the role of Chief Strategy Officer of the Company.

Current report

On August 14, 2025, we entered into the first amendment (the “First Amendment”) to the Preferred Equity Purchase Agreement (the “PEPA”), dated April 30, 2025, to, among other things, (i) increase the aggregate commitment amount of the shares of Series G Convertible Preferred Stock (the “Series G Preferred Stock”) from $150 million to $300 million, and (ii) increase our access to capital by removing the Put Limitation (as defined in the PEPA) that had previously limited the aggregate purchase price for any Put Issuance (as defined in the PEPA) to no more than $75 million. In connection with the First Amendment, on August 14, 2025, we filed an amendment (the “First CoD Amendment”) to the Series G Certificate of Designation, originally filed with the Secretary of State of the State of Nevada on April 30, 2025. The First CoD Amendment amends the Series G Certificate of Designation to, among other things, (i) increase the initial Floor Price (as set forth in Section 1.5(c)(i) of the Series G Certificate of Designation) to $12.50 from $4.25, and (ii) change the limit below which the Floor Price may not be reduced (as set forth in Section 1.5(c)(ii) of the Series G Certificate of Designation) to $4.33 from $1.34. The Floor Price sets the minimum floor for the conversion price of the Series G Preferred Stock, which price may not be reduced unless we determine to do so in our discretion. The First CoD Amendment further amended the status of converted or repurchased preferred stock such that any shares of Series G Preferred Stock that have been or will be converted will be retired and resume the status of authorized but unissued shares.

Current report

As Series G Preferred Stock may be reissued, during the three months ended August 31, 2025, the Company issued and sold 180,000 shares of Series G Preferred Stock for aggregate gross proceeds of $175.0 million with a total of 258,000 shares of Series G Preferred Stock being converted into approximately 28.2 million shares of the Company’s common stock. As of August 31, 2025, no Series G Preferred Stock was issued and outstanding.

Current report

On August 28, 2025, in connection with the entry into the Building 4 Lease, the Company issued to CoreWeave a warrant (the “Building 4 Warrant”) to acquire up to 8,393,611 shares of the Company’s common stock at an exercise price of $10.75 per share, subject to adjustment in accordance with the terms and conditions set forth in the Building 4 Warrant. The Building 4 Warrant is on the same Form of Warrant as the initial warrant issued to CoreWeave on May 28, 2025, in connection with the data center leases entered into for Building 2 and Building 3 on May 28, 2025.

Current report

On September 9, 2025, APLD FAR-01 LLC, our subsidiary, entered into a promissory note (the “Promissory Note”) with Macquarie Equipment Capital, Inc., a Delaware corporation (the “Lender”). The Promissory Note provides for a principal sum of (a) $50 million (the “Initial Loan”), which was drawn on the Closing Date, plus (b) subject to the mutual consent of us and the Lender, additional loans in an aggregate principal amount not to exceed $25 million (the “Additional Loans” and together with the Initial Loan, the “Loan”).

Current report

The Loan shall bear interest at 8.0% per annum, unless an Event of Default (as defined therein) has occurred and is continuing, in which case, the Secured Obligations (as defined therein) shall bear interest at the sum of 8.0% per annum plus an additional 1.50% per month (the “Post-Default Rate”). From the Closing Date until the date that is twelve months following the Closing Date (the “PIK Period”), accrued interest will be paid in kind, with such payment in kind being capitalized to principal monthly and at such other times as may be specified in the Promissory Note. After the PIK Period, accrued interest will be paid in cash, provided that (i) the Post-Default Rate interest is payable in cash on demand and (ii) accrued interest on any principal amount repaid or prepaid is payable on the date of such repayment or prepayment. The Promissory Note matures on the earliest of (i) the date of acceleration of the Loan, (ii) February 1, 2026, if the 200 MW Lease Execution (as defined therein) has not occurred on or before October 31, 2025, or (iii) September 9, 2027. The Loan will accelerate and we must mandatorily prepay the full outstanding principal balance of the Promissory Note, together with accrued interest to the date of prepayment on the principal amount prepaid and any other amounts then due and payable, upon the occurrence of any of the following conditions: (a) a Change of Control (as defined therein), (b) within ninety (90) days following the occurrence of the 200 MW Lease Execution, and (c) within thirty (30) days following a Qualifying Preference Share Issuance (as defined therein).

Current report

We may voluntarily prepay all or part of the Promissory Note at any time with no less than three (3) business days’ notice with accrued interest to the date of prepayment on the principal amount prepaid, so long as, with respect to the portion of the Loan then being prepaid, in each case, such prepayment is accompanied by the payment of amounts sufficient to achieve a rate of return that equals or exceeds 1.10 to 1.00. The same 1.10x return hurdle applies to repayment at maturity. Amounts repaid under the Promissory Note will not be available to be re-borrowed.

Current report

Proceeds of the Loan under the Promissory Note will be used, in part, to (i) pay transaction costs, (ii) pay transaction expenses in connection with the Note Documents (as defined therein), (iii) fund the purchase of the financed properties located on the Company’s campus in Harwood, ND (“Polaris Forge 2”), including all associated closing costs, title fees, and legal expenses, (iv) finance improvements to the Polaris Forge 2 properties, (v) fund the purchase of the Transformers (as defined therein) and other equipment expected to be installed and used for the improvements of the Polaris Forge 2 properties, (v) to pay any other costs, fees, expenses, or amounts related to or in connection with the development and construction of Polaris Forge 2, and (vi) for general corporate working capital purposes.

Current report

In connection with the Loan, (i) APLD FAR-01 LLC, APLD FAR Holdings LLC (“Intermediate Holdings”), a Delaware limited liability company, as parent of the APLD FAR-01 LLC, and APLD FAR-02 LLC (“FAR-02”), a Delaware limited liability company, as a subsidiary of Intermediate Holdings, have entered into a guarantee and collateral agreement, as grantors thereunder, in favor of the Lender (the “Guarantee and Collateral Agreement”) pursuant to which the APLD FAR-01 LLC, Intermediate Holdings, and FAR-02 pledged a continuing security interest in substantially all of their respective assets except for Excluded Assets (as defined in the Guarantee and Collateral Agreement) and (ii) we provided a guarantee (the “Parent Guarantee”) in favor of the Lender that includes certain covenants that limit our ability to (a) transfer or dispose of any Collateral (as defined in the Guarantee and Collateral Agreement) without the prior written consent of the Lender, (b) grant certain liens upon or with respect to the Collateral, and (c) allow APLD FAR-01 LLC and its subsidiaries to sell or otherwise transfer assets to their affiliates, subject to certain specified exceptions in each case. APLD FAR-01 LLC will also grant mortgages to the Lender over certain properties.

Current report

On September 11, 2025, we entered into the second amendment (the “Second Amendment”) to the PEPA, dated April 30, 2025, by and between us and the investors signatory thereto, as amended by the First Amendment, dated August 14, 2025 in order to increase our access to capital to fund the continued construction and development of our Polaris Forge 1 data center campus in Ellendale, North Dakota and other general corporate purposes.

Current report

The Second Amendment amends the PEPA to, among other things, increase the aggregate commitment amount of the shares of Series G Preferred Stock from $300 million to $450 million. Concurrent with the Second Amendment, the Company filed an amendment to the Certificate of Designations to increase the number of shares authorized for issuance as Series G Preferred Stock from 156,000 to 204,000 shares.

Current report

On September 25, 2025, the Company filed an amendment (the “Third CoD Amendment”) to the Series G Certificate of Designation, originally filed with the Secretary of State of the State of Nevada on April 30, 2025, as amended. The Third CoD Amendment amended the Series G Certificate of Designation, as amended, to increase the Floor Price (as set forth in Section 1.5(c)(i) of the Certificate of Designation) to $22.00 from $12.50.

Current report

Since the execution of the Second Amendment, 204,000 shares of Series G Preferred Stock have been issued have been issued for aggregate gross proceeds of $200.0 million, of which all 204,000 shares of Series G Preferred Stock have been converted into an aggregate of approximately 10.2 million shares of common stock.

Current report

On October 7, 2025, the Company entered into the third amendment (the “Third Amendment”) to the PEPA, dated April 30, 2025, by and between the Company and the investors signatory thereto, as amended by the First Amendment and the Second Amendment, in order to increase its access to capital to fund the continued construction and development of its Polaris Forge I data center in Ellendale, North Dakota. The Third Amendment amends the PEPA to, among other things, increase the aggregate commitment amount of the shares of the Series G Preferred Stock from $450.0 million to $590.0 million.

Current report

As previously disclosed, on January 13, 2025, APLD HPC Holdings LLC (formerly, APLD ELN-02 Holdings LLC), an indirect wholly owned subsidiary of the Company, entered into a Unit Purchase Agreement (the “Unit Purchase Agreement” or “UPA”) for its HPC Hosting Business with MIP VI HPC Holdings, LLC, which is an affiliate of funds and investment vehicles managed by entities within Macquarie Asset Management (“MAM”). On February 11, 2025, APLD HPC Holdings LLC novated and assigned its rights, title and interests and duties, liabilities and obligations under the UPA to APLD HPC TopCo LLC, an indirect wholly-owned subsidiary of the Company (“TopCo 1”). On October 3, 2025, the Company, TopCo 1, APLD HPC TopCo 2 LLC, an indirect wholly-owned subsidiary of the Company (the “Subsidiary Issuer”), and MIP HPC Holdings, LLC (formerly, MIP VI HPC Holdings, LLC) (the “Purchaser”) entered into an Amended and Restated Unit Purchase Agreement (the “A&R UPA”).

Current report

On October 6, 2025, all conditions to the Initial Closing (as defined in the A&R UPA) were satisfied and the Initial Closing occurred. At the Initial Closing, the Subsidiary Issuer sold to the Purchaser 112,500 Preferred Units in the Subsidiary Issuer at a price per Preferred Unit of $1,000, for an aggregate purchase price of $112.5 million, and for no additional consideration, the Subsidiary Issuer agreed to issue to the Purchaser such number of Common Units of the Subsidiary Issuer representing, in the aggregate, seven and a half percent (7.5%) of the fully diluted common equity of the Subsidiary Issuer as of immediately following the Initial Closing. The proceeds of the Initial Closing will be used to pay, among other things, construction and development costs of Polaris Forge 1 and transaction expenses. MAM has the right to invest up to an additional $4.9 billion under the A&R UPA.

Current report

In addition, pursuant to the A&R UPA, on October 6, 2025, the Company issued to the designated affiliates of the Purchaser, warrants to purchase an aggregate of 2.4 million shares of the Company’s common stock. The warrants will become exercisable upon the Purchaser funding the full $450 million in Polaris Forge 1. Also on October 6, 2025, the Company entered into a registration rights agreement with the Purchaser, pursuant to which the Company agreed to file with the SEC a registration statement registering the resale of the shares of common stock issuable upon exercise of the warrants within 60 days of the execution of the registration rights agreement.

Current report

Net (loss) income from discontinued operations increased $29.5 million, or 146%, from a net loss of $20.2 million for the three months ended August 31, 2024 to a net income of $9.3 million for the three months ended August 31, 2025 and represents the income statement activity related to the Cloud Services Business. The Cloud Services Business had an increase of $28.3 million in operating income for the comparative periods and a decrease in interest expense of $1.1 million for the comparative periods.

Current report

HPC Hosting Business operating loss decreased $0.9 million, or 31%, from a loss of $2.9 million for the three months ended August 31, 2024 to a loss of $2.0 million for the three months ended August 31, 2025. The change is primarily due to revenue generated related to tenant fit-out services, net of expenses.

Showing the first 40 of 48 passages. Open the source sections for the rest.

Removed paragraphs (138)

Previous report

•our ability to complete construction of the first 100 MW HPC facility in Ellendale, North Dakota (the “Ellendale HPC Facility”);

Previous report

We are a U.S. designer, developer, and operator of next-generation digital infrastructure across North America. We provide digital infrastructure solutions and Cloud services to the rapidly growing industries of High-Performance Computing ("HPC") and Artificial Intelligence ("AI"). We operate in three distinct business segments, Blockchain data center hosting (the "Data Center Hosting Business"), cloud services primarily through a wholly-owned subsidiary (the "Cloud Services Business") and HPC data center hosting (the "HPC Hosting Business"), as further discussed below.

Previous report

Furthermore, using digital assets, including Bitcoin, in illicit financial activities has become a significant concern for regulators and lawmakers. Leaders in the U.S. House Financial Services Committee and U.S. Senate Banking Committee expressed interest in passing legislation to provide additional regulatory authority to address these risks. The U.S. Treasury Department has also requested additional authorities to combat using digital assets in illegal activities. While there is currently insufficient support for any particular proposal, we expect that regulatory efforts in this area will continue to evolve and potentially impact our business.

Previous report

We also closely follow developments related to regulating digital asset markets and financial services. In January 2024, the SEC approved a series of spot Bitcoin exchange-traded funds (ETFs), marking a significant milestone in the mainstream adoption of digital assets. However, the regulatory landscape for digital asset markets remains complex and uncertain, with various agencies and lawmakers proposing different approaches to oversight and regulation. In January 2025, President Donald Trump issued an executive order establishing a presidential working group focused on regulatory clarity for digital assets, and on March 6, 2025, he signed an executive order establishing a Strategic Bitcoin Reserve and a U.S. Digital Asset Stockpile. Legislative bodies in both chambers of Congress have also announced a bipartisan working group with the stated objective of drafting comprehensive legislation to regulate digital assets, and multiple hearings have been held on the subject of fair access to financial services for digital asset companies. Future legislation or rulemaking - whether related to energy consumption, environmental compliance, or digital asset classification - could have a material adverse effect on our business, financial condition, or results of operations.

Previous report

Our Cloud Services Business provides high-performance computing power for artificial intelligence and machine learning applications. Near the end of the fiscal year 2024, equipment began generating revenue resulting in us recognizing $17.8 million and $71.3 million from this business segment during the three and nine months ended February 28, 2025, respectively. We currently operate our Cloud Services Business in four states: Colorado, Minnesota, Nevada and Utah, by renting space at third party colocation centers and providing our customers with Company-owned equipment to generate revenue. As of February 28, 2025, this business segment had two customers and generated 34% of total revenue for the fiscal quarter ended February 28, 2025.

Previous report

During the three months ended November 30, 2024, we renegotiated the majority of our computing equipment finance leases in the Cloud Services Business to extend the amortization period on these computing equipment finance leases to five years, which is better aligned with their expected useful life. As such, during the three months ended February 28, 2025, amortization expense for this business segment decreased compared to previous quarters. Additionally, we transitioned two GPU clusters from reserved compute to on-demand service contracts during the three months ended February 28, 2025.

Previous report

As previously disclosed and as further discussed below, on January 13, 2025, APLD HPC Holdings LLC (“APLDH”), our indirect wholly owned subsidiary, entered into a Unit Purchase Agreement (as amended, the “Unit Purchase Agreement” or “UPA”) for our HPC Hosting Business with MIP VI HPC Holdings, LLC, which is an affiliate of funds and investment vehicles managed by entities within Macquarie Asset Management (“MAM”). The closing under the UPA is subject to certain closing conditions, including, APLDH executing a lease with a hyperscaler for the first 100 MW on the Ellendale Campus, in a form acceptable to MAM, the parties finalizing and executing a limited liability company agreement for APLDH (the “LLCA”), for us and APLDH to carry out an internal restructuring to segregate the HPC Hosting Business’ assets and liabilities before closing (the “Internal Restructuring”), as well as customary closing conditions. As set forth in an amendment to the UPA, entered into by the parties, effective as of April 4, 2025, the parties extended the dates (i) to finalize the form of the LLCA (save for certain specified exhibits thereto) to April 7, 2025, (ii) to finalize the plan for the Internal Restructuring plan and the form of the Corporate Services Agreement to April 18, 2025, and (iii) by which either party may terminate the UPA if closing has not occurred, from July 13, 2025 to October 13, 2025. As of the date of this report, the terms of the LLCA (as disclosed below) have been finalized by the parties, which document is required to be executed and delivered at closing.

Previous report

We continue negotiations with multiple US-based hyperscalers for up to a 400 MW capacity lease, inclusive of the Ellendale HPC Facility under construction and two forthcoming buildings at the Ellendale Campus. We also are in advanced discussions with traditional financing counterparties to facilitate construction activities.

Previous report

On January 6, 2025, we welcomed Laura Laltrello as our Chief Operating Officer. As an inducement to Ms. Laltrello accepting this position, we granted her an employment inducement award of 600,000 RSUs, outside of the Company’s 2024 Omnibus Equity Incentive Plan, in accordance with Rule 5635(c)(4) of the Nasdaq Stock Market LLC.

Previous report

Effective January 31, 2025, David Rench transitioned from his prior role of Chief Administrative Officer to become a consultant at the Company. Additionally, Michael Maniscalco, the Company’s Chief Technology Officer, resigned from the Company, effective January 31, 2025.

Previous report

As previously reported, on June 7, 2024, APLD Holdings 2 LLC (“APLD Holdings”), our subsidiary, entered into a promissory note (as amended, the “CIM Promissory Note”) with CIM APLD Lender Holdings, LLC (the “CIM Lender”). The CIM Promissory Note provides for an initial borrowing of $15 million, which was drawn on June 7, 2024, and subsequent borrowings of up to $110 million (the “Subsequent Tranches”), available subject to the satisfaction of certain conditions as outlined in the CIM Promissory Note. In addition to the initial borrowing, the CIM Promissory Note includes an accordion feature that allows for up to an additional $75 million of borrowings. Principal amounts repaid under the CIM Promissory Note will not be available for reborrowing. On August 11, 2024, we and the CIM Lender entered into a waiver agreement (the “Waiver Agreement”), whereby the CIM Lender agreed to waive the satisfaction of certain conditions for the subsequent borrowings, allowing us to draw an additional $20 million (net of original discount and fees) of borrowings under the CIM Promissory Note.

Previous report

As consideration for the CIM Promissory Note, we agreed to issue to the CIM Lender warrants to purchase up to an aggregate of 9,265,366 shares of common stock. The warrants were issuable in two tranches, (i) for the purchase of up to 6,300,449 shares of common stock (the “Initial Warrants”), and (ii) for the purchase of up to 2,964,917 shares of common stock (the “Additional Warrants”). The Initial Warrants were issued on June 17, 2024 and the Additional Warrants were issued August 11, 2024 (as consideration for entry into the Waiver Agreement). On October 8, 2024, we entered into the First Amendment to the Promissory Note and Waiver Agreement (the “CIM Amendment”) with the CIM Lender, which amended the CIM Promissory Note to, among other things, extend the availability period thereunder, and draw the remaining $20 million (net of original discount and fees) of borrowings of the Subsequent Tranches available under the CIM Promissory Note.

Previous report

During the quarter ended February 28, 2025, 2.3 million of the CIM Warrants were exercised on a cashless basis for approximately 1.1 million shares of the Company’s common stock in a net settlement transaction. A total of 9.3 million warrants exercised on a cashless basis for approximately 4.9 million shares of the Company’s common stock in a net settlement transaction during the nine months ended February 28, 2025. As of February 28, 2025, there are no CIM Warrants outstanding.

Previous report

On November 27, 2024, in connection with the issuance of the Macquarie Promissory Note (as defined and described below) and the receipt by us of the proceeds related thereto, we repaid the CIM Promissory Note in full, including all outstanding and unpaid principal, accrued interest, fees, and expenses.

Previous report

During the fiscal year ended May 31, 2024, we entered into two prepaid advance agreements with YA II PN LTD (“YA Fund”) for promissory notes totaling $92.1 million (collectively, the “YA Notes”).

Previous report

On October 29, 2024, we entered into certain amendments to the Prepaid Advance Agreement between us and YA Fund entered into on March 27, 2024 (the “March PPA”) and the promissory note issued in connection therewith (the “March Note”). The amendments (i) provided consent to the Convertible Notes (as defined below) offering and share repurchase transactions, and (ii) removed certain prior restrictions on redemption of the March Note before January 1, 2025.

Previous report

During the nine months ended February 28, 2025, an aggregate of $71.3 million of the YA Notes had been converted, in exchange for the issuance by us of 19.1 million shares of our common stock to YA Fund, and the aggregate principal amount outstanding under the March Note was$4.8 million. As YA Fund had converted the maximum amount of shares allowable under the Nasdaq rules and regulations, the remaining balance of $4.8 million was payable in cash. During the quarter ended February 28, 2025, the Company repaid the $4.8 million in full, including all outstanding and unpaid principal, accrued interest, fees, and expenses, as well as the $2.1 million Commitment Fee under the SEPA (each as defined and described below).

Previous report

On November 4, 2024, we completed a private offering of 2.75% Senior Unsecured Convertible Notes due 2030 (the "Convertible Notes") to persons reasonably believed to be qualified institutional buyers pursuant to Rule 144A under the Securities Act of 1933, as amended (the “Securities Act”). The aggregate principal amount of Convertible Notes sold in the offering was $450 million, which included $75 million aggregate principal amount issued pursuant to the initial purchasers' fully exercised option. The Convertible Notes bear interest at a rate of 2.75% per year, payable semiannually in arrears on June 1 and December 1 of each year, beginning on June 1, 2025.

Previous report

The net proceeds from the sale of the Convertible Notes were approximately $435.2 million after deducting the initial purchasers' discounts, commissions, and estimated offering expenses. We used approximately $84 million of the net proceeds to fund share repurchases of common stock in connection with the offering, including (i) $52.7 million to fund the cost of entering into prepaid forward repurchase transactions, and (ii) $31.3 million to repurchase shares of our common stock directly. Additionally, approximately $51.8 million was used to pay the cost of the capped call transactions, which have a cap price of $14.72. The remainder of the net proceeds will be used for general corporate purposes.

Previous report

The initial conversion rate is 102.5 shares per $1,000 principal amount of Convertible Notes (equivalent to an initial conversion price of approximately $9.75 per share of common stock). Prior to March 1, 2030, the Convertible Notes are convertible only upon the occurrence of certain events. On or after March 1, 2030 until the close of business on the second scheduled trading day immediately preceding the maturity date, holders may convert their Convertible Notes at any time. The Convertible Notes will be convertible into cash, shares of common stock, or a combination thereof, at our election, subject to certain restrictions.

Previous report

On November 27, 2024, APLD ELN-02 Holdings LLC, our subsidiary, entered into a promissory note (the "Macquarie Promissory Note") with Macquarie Equipment Capital, Inc. for a loan of $150 million. The Macquarie Promissory Note has an 18-month term and bears interest at 0.25% per annum, with no commitment fee or original issue discount. The Macquarie Promissory Note is subject to an initial minimum return hurdle of 1.11x within the first four months that scales up to 1.35x over its term. The proceeds from the Macquarie Promissory Note were used to repay in full and terminate the CIM Promissory Note as well as all of our obligations under the March Note. As partial consideration for the Macquarie Promissory Note, we issued warrants to purchase up to 1,035,197 shares of common stock at an exercise price of $9.66 per share.

Previous report

On February 11, 2025, in connection with the issuance of the SMBC Credit Agreement and receipt by the Company of the proceeds related thereto (as described below), the Company repaid the Macquarie Promissory Note in full. The Macquarie Warrants survived the termination of the Macquarie Promissory Note.

Previous report

On February 11, 2025, APLD HPC Holdings LLC, our subsidiary, entered into a credit and guaranty agreement (the “SMBC Credit Agreement”) with Sumitomo Mitsui Banking Corporation. The SMBC Credit Agreement provides for an aggregate of $375 million of term loans (the “SMBC Loans”), which includes base rate loans and SOFR loans, and matures 18 months after the closing date. Base rate loans bear interest at the base rate plus (i) 2.50% from the closing date until the six month anniversary of the closing date, (ii) 3.50% after the six month anniversary of the closing date until the one year anniversary of the closing date, and (iii) 4.50% after the one year anniversary of the closing date while SOFR loans bear interest at the daily simple SOFR plus (i) 3.50% from the closing date until the six month anniversary of the closing date, (ii) 4.50% after the six month anniversary of the closing date until the one year anniversary of the closing date, and (iii) 5.50% after the one year anniversary of the closing date.

Previous report

The proceeds from the SMBC Loans were used to: (i) prepay in full the Macquarie Promissory Note, (ii) pay for certain data center project development costs at the Company’s 400 MW Ellendale, North Dakota data center campus, and (iii) fund the Interest Reserve Account as defined in the Credit Agreement. Remaining proceeds have been deposited into a separate bank account for future construction costs at the Company’s 400 MW Ellendale, North Dakota data center campus.

Previous report

On November 20, 2024, we filed an amendment to our Articles of Incorporation, increasing the number of shares of common stock authorized for issuance to 400,000,000 shares and the number of shares of preferred stock authorized for issuance to 10,000,000 shares.

Previous report

On May 6, 2024, we began sales of common stock under an "at the market" sale agreement with Roth Capital Partners, LLC pursuant to which we could sell up to $25 million in aggregate proceeds of common stock. During the quarter ended August 31, 2024, we sold approximately 3.1 million shares for net proceeds of approximately $14.6 million with commission and legal fees related to the issuance of approximately $0.5 million. This offering was completed as of August 31, 2024.

Previous report

On July 30, 2024, we announced that the conditional approval requirements related to the release of the escrowed funds from the sale of our Garden City hosting facility had been met. During the quarter ended August 31, 2024, we received the remaining $25 million of the purchase price, previously held in escrow pending such conditional approval.

Previous report

On August 28, 2024, we entered into a Standby Equity Purchase Agreement with YA Fund, as amended on August 29, 2024 (the “SEPA”). Pursuant to the SEPA, subject to certain conditions and limitations, we have the option, but not the obligation, to sell to YA Fund, and YA Fund must subscribe for, an aggregate amount of up to $250.0 million of common stock, at our request any time during the commitment period commencing on September 30, 2024, and terminating on the first day of the month following the 36-month anniversary of September 30, 2024. The shares of common stock issuable pursuant to the SEPA will be offered and sold pursuant to Section 4(a)(2) of the Securities Act (the “Securities Act”).

Previous report

In connection with the execution of the SEPA, we agreed to pay a structuring fee (in cash) to YA Fund in the amount of $25,000. Additionally, we agreed to pay a commitment fee of $2,125,000 to YA Fund (the “Commitment Fee”), in the form of 456,287 shares of common stock (the “Commitment Shares”), representing $2,125,000 divided by the average of the daily VWAPs of the common stock during the three trading days immediately prior to the date of the SEPA. On October 16, 2024, we entered into a letter agreement with YA Fund, whereby we agreed to satisfy our obligations with respect to the Commitment Fee in cash by increasing the principal amount due under the March Note in an equivalent amount, instead of issuing the Commitment Shares. The Commitment Fee has been paid in full during the quarter ended February 28, 2025 as part of our repayment of the March Note.

Showing the first 40 of 138 passages. Open the source sections for the rest.

Reworded paragraphs (43)

Previous wording

•our ability to complete the negotiation and execution of the definitive transaction documents required to close the UPA (as defined below);

Current wording

•our ability to complete the negotiation and execution of the definitive transaction documents to close the sale of our Cloud Services Business that is currently held for sale and treated as discontinued operations;

Previous wording

•our dependence on principal customers, including our ability to execute leases with key customers, including leases for our 400 MW Ellendale, North Dakota datacenter campus (the “Ellendale Campus”);

Current wording

•our dependence on principal customers, including our ability to execute leases with key customers, including leases for our Polaris Forge 1 and Polaris Forge 2 data center campuses;

Previous wording

You should carefully review the risks described in Item 1A of the Company’s Annual Report on Form 10-K for the year ended May 31, 2024, which was filed with the SEC on August 30, 2024, as supplemented by the Risk Factors included in Exhibit 99.2 to the Company’s Form 8-K filed with the SEC on November 5, 2024 and the Company’s Form 10-Q for the quarter ended November 30, 2024 filed with the SEC on January 14, 2025, as well as any other cautionary language in this Quarterly Report on Form 10-Q, as the occurrence of any of these events could have an adverse effect, which may be material, on our business, results of operations, financial condition or cash flows.

Current wording

You should carefully review the risks described in Item 1A of the Company’s Annual Report on Form 10-K for the year ended May 31, 2025, which was filed with the SEC on July 30, 2025, as well as any other cautionary language in this Quarterly Report on Form 10-Q, as the occurrence of any of these events could have an adverse effect, which may be material, on our business, results of operations, financial condition or cash flows.

Previous wording

The regulatory landscape surrounding HPC, cloud, and blockchain hosting services is evolving rapidly, and we anticipate increased scrutiny and potential regulation in the near and long term. These developments may significantly impact our business and operations in ways that are difficult to predict.

Current wording

The regulatory landscape surrounding AI and blockchain hosting services is evolving rapidly, and we anticipate increased scrutiny and potential regulation in the near and long term. Any such developments may significantly impact our business and operations in ways that are difficult to predict.

Previous wording

In the realm of cloud computing, there are growing concerns about the ethical implications and potential misuse of these technologies, particularly in association with AI and machine learning. Governments and regulatory bodies are considering measures to ensure the responsible development and deployment of AI systems, including transparency, accountability, and fairness guidelines.

Current wording

Governments and regulatory bodies are considering measures to ensure the responsible development and deployment of AI systems, including transparency, accountability, and fairness guidelines. For example, in the U.S Senate, committees of jurisdiction have passed several AI bills that establish industry standards and impose significant obligations in relation to the use of AI systems. On the state level, several U.S. states have considered AI legislation, which aims to reduce risk associated with the use of AI; while certain states have passed comprehensive AI legislation. On September 29, 2025, California passed the Transparency in Frontier Artificial Intelligence Act into law, which requires certain AI companies to fulfill transparency requirements and report AI-related safety incidents, among other things. In Europe, the EU AI Act has been adopted, portions of which have started to take effect this year.

Previous wording

The amount of energy used for crypto mining and co-location services has recently received increased attention. In January 2024, the U.S. Energy Information Administration conducted an emergency survey of electricity consumption data from cryptocurrency mining companies in the U.S. This indicates that more focus is being placed on the energy usage of these activities. It is unclear how the information collected will be used for future regulations, but it is expected that energy efficiency and sustainability will become more critical factors regulating this industry.

Current wording

The amount of energy used for AI and crypto mining has also received significant attention. For example, in January 2024, the U.S. Energy Information Administration conducted an emergency survey of electricity consumption data from cryptocurrency mining companies in the U.S. This indicates that more focus is being placed on the energy usage of these activities. It is unclear how the information collected will be used for future regulations, but it is expected that energy efficiency and sustainability will be critical factors regulating both AI data centers and cryptocurrency mining.

Previous wording

As a company operating at the intersection of data center, cloud and HPC hosting services, we are committed to maintaining a proactive and adaptive approach to regulatory compliance. We closely monitor legislative and regulatory developments and engage in dialogue with relevant stakeholders to ensure our business practices align with the evolving legal and regulatory framework. Despite the uncertainties posed by the changing regulatory landscape, we remain committed to delivering innovative and responsible solutions in the data center, cloud and HPC hosting markets while prioritizing compliance and risk management. However, if we fail to comply with applicable laws and regulations, we may be subject to significant liabilities, including fines and penalties, and our business, financial condition, or results of operations could be adversely affected.

Current wording

As a company operating at the intersection of data center and HPC hosting services, we are committed to maintaining a proactive and adaptive approach to regulatory compliance. We closely monitor legislative and regulatory developments and engage in dialogue with relevant stakeholders to ensure our business practices align with the evolving legal and regulatory framework. Despite the uncertainties posed by the changing regulatory landscape, we remain committed to delivering innovative and responsible solutions in the data center and HPC hosting markets while prioritizing compliance and risk management. However, if we fail to comply with applicable laws and regulations, we may be subject to significant liabilities, including fines and penalties, and our business, financial condition, or results of operations could be adversely affected.

Previous wording

Our HPC Hosting Business designs, builds, and operates next-generation data centers, which are being designed to provide massive computing power and support to HPC applications within a cost-effective model. During the prior fiscal year, we broke ground on our Ellendale HPC Facility. The new 369,000-square-foot building is expected to provide ultra-low cost and highly efficient liquid-cooled infrastructure for HPC applications.

Current wording

Our HPC Hosting Business designs, constructs, and operates next-generation data centers, which are designed to provide massive computing power and support HPC applications within a cost-effective model.

Previous wording

During the quarter ended February 28, 2025, we began discussions of the possible sale of the Cloud Services Business and on February 26, 2025, the Board of Directors approved the negotiation of a potential transaction. As of April 10, 2025, we determined that the Cloud Services Business met the criteria to be classified as “held for sale,” as the Board of Directors approved further plans for the sale of the segment. The potential sale of the Cloud Services Business represents a strategic shift in our operations and financial results. Beginning in the fourth quarter of fiscal 2025, we will report the Cloud Services Business as discontinued operations.

Current wording

The Cloud Services Business provides high-performance computing power for AI and machine learning applications. Near the end of the fiscal third quarter 2024, this business began generating revenue. In the fourth quarter of fiscal year 2025, we determined that the Cloud Services Business met the criteria to be classified as “held for sale,” and as the sale represents a strategic shift for the Company, discontinued operations. As such, for the three months ended August 31, 2025, we have reported the Cloud Services Business as held for sale on the unaudited condensed consolidated balance sheets and discontinued operations on the unaudited condensed consolidated statement of operations. The comparative periods have been updated to present the Cloud Services Business as held for sale and discontinued operations as of June 1, 2024.

Previous wording

On July 9, 2024, we entered into a Sales Agreement with B. Riley Securities, Inc., BTIG, LLC, Lake Street Capital Markets, LLC, Northland Securities, Inc. and Roth Capital Partners, LLC (the “Sales Agreement”). Up to $125 million of shares of our common stock may be issued if and when sold pursuant to the Sales Agreement. As of October 30, 2024, approximately 2.9 million shares of our common stock have been issued and sold under the Sales Agreement for approximate proceeds to us of $16.4 million net of issuance costs of $0.5 million. On October 30, 2024, we terminated the Sales Agreement with the Agents.

Current wording

On June 2, 2025, the Company entered into a Sales Agreement with Northland Securities, Inc. and Wells Fargo Securities, LLC (the “June 2025 Sales Agreement”), pursuant to which, up to $200,000,000 of shares of the Company's common stock may be issued if and when sold. As of the date of this report, the Company has issued and sold approximately 15.3 million shares under the June 2025 Sales Agreement for gross proceeds of approximately$196.4 million.

Previous wording

Comparative Results for the Three and Nine Months Ended February 28, 2025 and February 29, 2024:

Current wording

Comparative Results for the Three Months Ended August 31, 2025 and August 31, 2024:

Previous wording

The following table sets forth key components of the results of operations (in thousands) during the three and nine months ended February 28, 2025 and February 29, 2024.

Current wording

The following table sets forth key components of the results of operations (in thousands) during the three months ended August 31, 2025 and August 31, 2024.

Previous wording

(1)Includes related party selling, general and administrative expense of $0.1 million and $0.1 million for the three months ended February 28, 2025 and February 29, 2024, respectively, and $0.2 million and $0.5 million for the nine months ended February 28, 2025 and February 29, 2024, respectively. See Note 5 - Related Party Transactions for further discussion of related party transactions.

Current wording

(1)Includes related party selling, general and administrative expense of $0.1 million for each of the three months ended August 31, 2025 and August 31, 2024, respectively. See Note 6 - Related Party Transactions for further discussion of related party transactions.

Previous wording

(2)Includes $25 million received in connection with the sale of our Garden City facility once conditional approval requirements were met and escrowed funds were released during the nine months ended February 28, 2025. The three and nine months ended February 29, 2024 includes $21.7 million loss on held for sale classification related to the sale of the Garden City facility.

Current wording

(2)Includes $25 million received in connection with the sale of our Garden City facility once conditional approval requirements were met and escrowed funds were released during the three months ended August 31, 2024.

Previous wording

(4)Adjusted Amounts and Other Financial Data are non-GAAP performance measures. A reconciliation of reported amounts to adjusted amounts can be found in the "Non-GAAP Measures and Reconciliation" section of Management’s Discussion and Analysis.

Current wording

(3)Adjusted Amounts and Other Financial Data are non-GAAP performance measures. A reconciliation of reported amounts to adjusted amounts can be found in the "Non-GAAP Measures and Reconciliation" section of Management’s Discussion and Analysis.

Previous wording

Revenue increased $12.6 million, or 31%, from $40.3 million for the three months ended February 29, 2024 to $52.9 million for the three months ended February 28, 2025. Approximately $12.2 million of the increase was due to the continued growth of our Cloud Services Business during the three months ended February 28, 2025 due to the deployment of four additional GPU clusters.

Current wording

Revenue increased $31.3 million, or 95%, from $32.9 million for the three months ended August 31, 2024 to $64.2 million for the three months ended August 31, 2025. Approximately $26.3 million of the increase was due to revenue generated related to tenant fit-out services associated with our HPC Hosting Business. The remaining $5.0 million increase in revenue is related to the Data Center Hosting Business and is due to performance improvements compared to the three months ended August 31, 2024.

Previous wording

Related party revenue decreased $3.1 million, or 100%, from $3.1 million for the three months ended February 29, 2024 to no related party revenue for the three months ended February 28, 2025, driven by certain related parties terminating their contracts during the first fiscal quarter of fiscal year 2025.

Current wording

Related party revenue decreased $1.9 million, or 100%, from $1.9 million for the three months ended August 31, 2024 to no related party revenue for the three months ended August 31, 2025, driven by certain related parties terminating their contracts during the first fiscal quarter of 2025.

Previous wording

•approximately $0.2 million increase in other expenses directly attributable to generating revenue.

Current wording

Cost of revenues increased $32.9 million, or 144%, from $22.7 million for the three months ended August 31, 2024 to $55.6 million for the three months ended August 31, 2025. The increase was primarily driven by an increase of $25.0 million in expenses associated with tenant fit-out services for our HPC Hosting Business, an increase of $7.2 million in energy costs associated with our Data Center Hosting Business, and an increase of $0.6 million in other expenses directly attributable to generating revenue.

Previous wording

Selling, general and administrative expense decreased $7.3 million, or 24%, from $30.0 million for the three months ended February 29, 2024 to $22.7 million for the three months ended February 28, 2025. The change in selling, general and administrative expense is categorized as follows:

Current wording

Selling, general and administrative expense increased $18.2 million, or 165%, from $11.0 million for the three months ended August 31, 2024 to $29.2 million for the three months ended August 31, 2025. The change in selling, general and administrative expense is categorized as follows:

Previous wording

These decreases were partially offset by a $6.0 million increase in stock-based compensation primarily due to accelerated vesting of certain employee stock awards and the recognition of expense related to performance stock units granted during the three months ended February 28, 2025.

Current wording

•approximately $16.6 million increase in stock based compensation primarily due to accelerated vesting of certain employee stock awards; and

Previous wording

•approximately $0.3 million decrease in personnel expenses for employee costs and other costs attributable to supporting the growth of the business.

Current wording

•approximately $3.9 million increase in personnel expenses for employee costs and other costs attributable to supporting the growth of the business.

Previous wording

•approximately $2.6 million decrease in professional service expenses primarily related to legal services provided on discrete transactions and projects, as well as general support of the business; and

Current wording

These increases were partially offset by a $2.3 million decrease in professional service expenses primarily related to a decrease in legal services during the three months ended August 31, 2025 compared to the three months ended August 31, 2024.

Previous wording

Loss on abandonment of assets was $0.8 million for the nine months ended February 28, 2025, driven by the write down of assets to their fair value upon disposal. There were no such losses recorded in the prior year comparative period.

Current wording

Loss on abandonment of assets increased $1.1 million, or 179%, from $0.6 million for the three months ended August 31, 2024 to $1.8 million for the three months ended August 31, 2025. This was driven by the write down of assets to their fair value upon disposal.

Previous wording

Interest expense, net increased $4.1 million, or 87%, from $4.8 million for the three months ended February 29, 2024, to $8.9 million for the three months ended February 28, 2025. The increase was primarily driven by a $3.6 million increase in loan interest due to loan activity as well as a $1.8 million increase in finance lease interest due to lease commencements during the three months ended February 28, 2025. These increases were partially offset by a $0.7 million increase in interest income due to an increase in funds held in money market accounts.

Current wording

Interest expense, net increased $1.0 million, or 33%, from $3.0 million for the three months ended August 31, 2024, to $3.9 million for the three months ended August 31, 2025. The increase was primarily driven by a $1.4 million increase in loan interest due to loan activity during the three months ended August 31, 2025. These increases were partially offset by a $0.5 million increase in interest income due to an increase in funds held in money market accounts.

Previous wording

Comparative Segment Data for the Three and Nine Months Ended February 28, 2025 and February 29, 2024:

Current wording

Comparative Segment Data for the Three Months Ended August 31, 2025 and August 31, 2024:

Previous wording

The following table sets forth our operating profit (loss) for each of our segments for the three and nine months ended February 28, 2025 and February 29, 2024 (in thousands):

Current wording

The following table sets forth our operating profit (loss) for each of our segments for the three months ended August 31, 2025 and August 31, 2024 (in thousands):

Previous wording

Data Center Hosting Business operating profit increased $33.2 million, or 136%, from a loss of $24.4 million for the three months ended February 29, 2024 to a profit of $8.8 million for the three months ended February 28, 2025. This increase was primarily due to a $21.7 million loss on classification of held for sale related to the sale of the Garden City facility during the three months ended February 29, 2024, with no such losses recorded in the current year comparative period. Additionally, cost of revenues decreased by approximately $13.1 million for the three months ended February 28, 2025 compared to the prior period, primarily due to power and other operating expenses incurred at the Garden City facility during the three months ended February 29, 2024, since this facility was sold between the periods.

Current wording

Data Center Hosting Business operating profit decreased $29.8 million, or 83%, from a profit of $35.9 million for the three months ended August 31, 2024 to a profit of $6.0 million for the three months ended August 31, 2025. This decrease was primarily due to a $24.8 million gain on classification of held for sale related to the sale of the Garden City facility during the three months ended August 31, 2024, with no such gain recorded in the current year comparative period. Additionally, cost of revenues increased by approximately $8.0 million for the three months ended August 31, 2025 compared to the prior period, primarily due to an increase of 17% in power cost along with other operating expenses.

Previous wording

Adjusted Operating Loss, Adjusted net loss attributable to common stockholders, and Adjusted net loss attributable to common stockholders per diluted share

Current wording

Adjusted Operating (Loss) Income, Adjusted Net Loss from Continuing Operations Attributable to Common Stockholders, and Adjusted Net Loss from Continuing Operations Attributable to Common Stockholders per Diluted Share

Previous wording

“Adjusted Operating Loss” and “Adjusted net loss attributable to common stockholders” are non-GAAP financial measures that represent operating loss and net loss attributable to common stockholders, respectively. Adjusted Operating Loss is Operating loss excluding stock-based compensation, non-recurring repair expenses, diligence, acquisition, disposition and integration expenses, litigation expenses, non-recurring research and development expenses, loss on abandonment of assets, loss/(gain) on classification of held for sale, accelerated depreciation and amortization, loss on legal settlement, as well as other non-recurring expenses that Management believes are not representative of the Company’s expected ongoing costs. Adjusted net loss attributable to common stockholders is Adjusted Operating Loss further adjusted for the loss on change in fair value of warrants, loss on conversion of debt, loss on change in fair value of debt and related party debt, respectively and loss on the extinguishment of debt and related party debt, respectively and preferred dividends. We define “Adjusted net loss attributable to common stockholders per diluted share” as Adjusted net loss attributable to common stockholders divided by weighted average diluted share count.

Current wording

“Adjusted Operating (Loss) Income” and “Adjusted net loss from continuing operations attributable to common stockholders” are non-GAAP financial measures that represent operating (loss) income and net (loss) income from continuing operations attributable to common stockholders, respectively. Adjusted Operating (Loss) Income is Operating (loss) income excluding stock-based compensation, non-recurring repair expenses, diligence, acquisition, disposition and integration expenses, litigation expenses, loss on abandonment of assets, gain on classification of held for sale, accelerated depreciation and amortization, restructuring expenses and other non-recurring expenses that Management believes are not representative of the Company’s expected ongoing costs. Adjusted net loss from continuing operations attributable to common stockholders is Adjusted Operating (Loss) Income further adjusted for the loss on change in fair value of debt and preferred dividends. We define “Adjusted net loss from continuing operations attributable to common stockholders per diluted share” as Adjusted net loss from continuing operations attributable to common stockholders divided by weighted average diluted share count.

Previous wording

“EBITDA” is defined as earnings before interest expense, net, income tax expense, and depreciation and amortization. “Adjusted EBITDA” is defined as EBITDA adjusted for stock-based compensation, non-recurring repair expenses, diligence, acquisition, disposition and integration expenses, litigation expenses, research and development expenses, loss/(gain) on classification of held for sale, loss on abandonment of assets, loss on conversion of debt, loss on change in fair value of debt and related party debt, respectively, loss on change in fair value of warrants, loss on extinguishment of debt and related party debt, respectively, loss on legal settlement and preferred dividends as well as other non-recurring expenses that Management believes are not representative of our expected ongoing costs.

Current wording

“EBITDA” is defined as earnings before interest expense, net, income tax expense, and depreciation and amortization. “Adjusted EBITDA” is defined as EBITDA adjusted for stock-based compensation, non-recurring repair expenses, diligence, acquisition, disposition and integration expenses, litigation expenses, gain on classification of held for sale, loss on abandonment of assets, loss on change in fair value of debt, preferred dividends, restructuring expenses and other non-recurring expenses that Management believes are not representative of our expected ongoing costs.

Previous wording

(1)Represents costs incurred in the repair and replacement of equipment at our Ellendale HPC Facility as a result of the previously disclosed power outage.

Current wording

(1)Represents costs incurred for the non-recurring repair and replacement of equipment at our Data Center Hosting facilities.

Previous wording

(5)Represents the acceleration of expense related to assets that were abandoned by us due to operational failure or other reasons. Depreciation and amortization in this amount is included in Depreciation and Amortization expense within our calculation of EBITDA, and therefore is not added back as a management adjustment in our calculation of Adjusted EBITDA.

Current wording

(4)Represents the acceleration of expense related to assets that were abandoned by us due to operational failure or other reasons. Depreciation and amortization in this amount is included in Depreciation and Amortization expense within our calculation of EBITDA, and therefore is not added back as a management adjustment in our calculation of Adjusted EBITDA.

Previous wording

(8)Represents loss on change in fair value of debt due to the adjustments to the fair value of the 2.75% Senior Unsecured Convertible Notes, as well as adjustments to the fair value of the YA Notes.

Current wording

(7)Represents loss on change in fair value of debt due to adjustments to the fair value of the Yorkville Convertible Debt.

Previous wording

As of February 28, 2025, we had unrestricted cash and cash equivalents of $68.7 million, funds restricted for construction expenditures of $154.1 million and a working capital deficit of $119.3 million. Historically, we have incurred losses and have relied on equity and debt financings to fund our operations. We have primarily generated cash in the last 12 months from the proceeds of our term loans, issuances of common stock, preferred stock, convertible promissory notes, senior unsecured convertible notes, debt facilities and the receipt of contractual deposits and revenue payments from customers.

Current wording

As of August 31, 2025, we had unrestricted cash and cash equivalents of $73.9 million and funds restricted for construction expenditures of $2.9 million. Historically, we have incurred losses and have relied on equity and debt financings to fund our operations. We have primarily generated cash in the last 12 months from the proceeds of our term loans, issuances of common stock, preferred stock, convertible promissory notes, senior unsecured convertible notes, debt facilities and the receipt of contractual deposits and revenue payments from customers.

Previous wording

During the nine months ended February 28, 2025, we received $41.1 million in payments for future cloud services and $95.4 million in payments for future data center hosting services.

Current wording

During the three months ended August 31, 2025, we received $39.4 million in payments for future data center hosting services.

Previous wording

(1)Debt obligations presented in the table reflect scheduled principal payments related to our long-term debt as described in Note 6 to the unaudited condensed consolidated financial statements for further discussion.

Current wording

(1)Debt obligations presented in the table reflect scheduled principal payments related to our outstanding debt as described in Note 7 to the unaudited condensed consolidated financial statements for further discussion.

Previous wording

(4)Financing lease obligations include future minimum payments for our finance leases. We have entered into various leases which are executed but not yet commenced with total minimum payments of approximately $16.6 million and terms of 2 years.

Current wording

(4)Financing lease obligations include future minimum payments for our finance leases. We have entered into various leases which are executed but not yet commenced with total minimum payments of approximately $16.6 million and terms of 1.5 years to 2.0 years.

Previous wording

(6)Preferred share dividends represent future dividend payments in accordance with preferred stock that has been issued.

Current wording

(6)Preferred share dividends represent estimated future dividend payments per year in accordance with preferred stock that has been issued. The estimated future dividend payments will continue until preferred stock is redeemed.

Previous wording

The following table provides information about our net cash flow for the nine months ended February 28, 2025 and February 29, 2024, respectively.

Current wording

The following table provides information about our net cash flow for the three months ended August 31, 2025 and August 31, 2024, respectively.

Showing the first 40 of 43 pairs. Open the source sections for the rest.

Rearranged previous paragraphs (4)

Previous report — wording carried elsewhere

Commentary on Results of Operations Comparative Results for the Nine Months Ended February 28, 2025 compared to the Nine Months Ended February 29, 2024

Previous report — wording carried elsewhere

Related party revenue decreased $9.0 million, or 82%, from $10.9 million for the nine months ended February 29, 2024 to $1.9 million for the nine months ended February 28, 2025, driven by certain related parties terminating their contracts during the first fiscal quarter of fiscal year 2025.

Previous report — wording carried elsewhere

Loss on change in fair value of debt

Previous report — wording carried elsewhere

Commentary on Segment Data Comparative Results for the Nine Months Ended February 28, 2025 compared to the Nine Months Ended February 29, 2024