What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2023-12-31; filed 2024-02-20.

0001130310-24-000010

Item 7. “Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2024-12-31; filed 2025-02-20.

0001130310-25-000040

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 115 previous paragraphs and 320 current paragraphs.

0 unchanged; 8 reworded; 311 added; 107 removed; 0 previous and 1 current paragraphs rearranged.

Tables are not compared: 0 previous and 24 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (311)

Current report

The following combined discussion and analysis should be read in combination with the consolidated financial statements included in Item 8 herein. The discussion of CenterPoint Energy’s consolidated financial information includes the results of CenterPoint Energy Houston Electric, LLC and CenterPoint Energy Resources Corp., which, along with CenterPoint Energy, Inc., are collectively referred to as the Registrants. Where appropriate, information relating to a specific registrant has been segregated and labeled as such. Unless the context indicates otherwise, specific references to Houston Electric and CERC also pertain to CenterPoint Energy. In this combined Form 10-K, the terms “our,” “we” and “us” are used as abbreviated references to CenterPoint Energy, Inc. together with its consolidated subsidiaries, including Houston Electric and CERC, unless stated otherwise. No registrant makes any representations as to the information related solely to CenterPoint Energy, Inc. or the subsidiaries of CenterPoint Energy, Inc. other than itself.

Current report

CenterPoint Energy is a public utility holding company. CenterPoint Energy’s operating subsidiaries own and operate electric transmission, distribution and generation facilities and natural gas distribution systems. For a detailed description of CenterPoint Energy’s operating subsidiaries, see Note 1 to the consolidated financial statements.

Current report

Houston Electric is an indirect, wholly-owned subsidiary of CenterPoint Energy, which provides electric transmission service to transmission service customers in the ERCOT region and distribution service to REPs serving the Texas Gulf Coast area that includes the city of Houston.

Current report

CERC Corp. is an indirect, wholly-owned subsidiary of CenterPoint Energy, which (i) directly owns and operates natural gas distribution systems in Louisiana, Minnesota, Mississippi and Texas, (ii) indirectly, through Indiana Gas and CEOH, owns and operates natural gas distribution systems in Indiana and Ohio, respectively, and (iii) owns and operates permanent pipeline connections through interconnects with various interstate and intrastate pipeline companies through CEIP.

Current report

We discuss our operating results on a consolidated basis and individually for each of our reportable segments. We are first and foremost an energy delivery company and it is our intention to remain focused on these regulated segments. The results of our business operations are significantly impacted by weather, customer growth, economic conditions, cost management, competition, rate proceedings before regulatory agencies and other actions of the various regulatory agencies to whose jurisdiction we are subject, among other factors.

Current report

Below is a summary of CenterPoint Energy’s reportable segments as of December 31, 2024. For a detailed description of the assets included in each reporting segment, see Part I, Item 1. Business.

Current report

•The Electric reportable segment includes electric transmission and distribution services that are subject to rate regulation in Houston Electric’s and Indiana Electric’s service territories, as well as the impacts of generation-related stranded costs and other true-up balances recoverable by the regulated electric utility and energy delivery services to electric customers and electric generation assets to serve electric customers and optimize those assets in the wholesale power market in Indiana Electric’s service territory.

Current report

•The Natural Gas reportable segment includes (i) intrastate natural gas sales to, and natural gas transportation and distribution for residential, commercial and industrial customers in Indiana, Louisiana, Minnesota, Mississippi, Ohio and Texas; (ii) permanent pipeline connections through interconnects with various interstate and intrastate pipeline companies through CEIP; and (iii) home appliance maintenance and repair services to customers in Minnesota and home repair protection plans to natural gas customers in Indiana, Mississippi, Ohio and Texas through a third party.

Current report

•The Corporate and Other reportable segment includes (i) energy performance contracting and sustainable infrastructure services by Energy Systems Group through June 30, 2023, the date of the sale of Energy Systems Group; (ii) corporate operations that support the business operations of CenterPoint Energy; and (iii) office buildings and other real estate used for business operations.

Current report

Houston Electric and CERC each consist of a single reportable segment.

Current report

We expect our businesses to continue to be affected by the key factors and trends discussed below. Our expectations are based on assumptions made by us and information currently available to us. To the extent our underlying assumptions about, or interpretations of, available information prove to be incorrect, our actual results may vary materially from our expected results.

Current report

We are an energy delivery company with electric transmission and distribution, power generation, and natural gas distribution operations that serve more than seven million metered customers across six jurisdictions. The majority of our revenues are generated from the transmission and delivery of electricity and the sale of natural gas by our subsidiaries.

Current report

We continue to execute on our strategic goals for our businesses which were set in 2021. These include our ten-year capital plan from 2021 through 2030, a focus on targeting controllable operations and maintenance savings for the benefit of our customers, prudent capital funding including divestitures of non-core assets, and net zero and GHG emissions reduction goals. Our focus continues to be on the growth of our regulated utility businesses including our electric and gas utility operations, which comprise over 95% of our earnings for the year ended December 31, 2024. See Note 16 to the consolidated financial statements for further details.

Current report

Pursuant to this business strategy and in light of the nature of our businesses, significant amounts of capital investment are reflected in our current 10-year capital plan, which has increased to nearly $47.5 billion through 2030. These investments include a focus on additional system resiliency, reliability, and grid modernization. These investments are not only intended to meet our customers’ current needs, but are also in anticipation for further organic growth and load growth from increased electrification in our service territories. To fund these capital investments, we rely on internally-generated cash, borrowings under our credit facilities, proceeds from commercial paper, cash proceeds from strategic transactions (such as the divestitures of our Arkansas and Oklahoma LDC businesses in 2022, our Energy Systems Group divestiture in 2023 and the proposed sale of our Louisiana and Mississippi natural gas LDC businesses, which is expected to close in the first quarter of 2025), and issuances of equity and debt in the capital markets, including the issuance of non-recourse securitization bonds at Houston Electric related to costs incurred during the year ended December 31, 2024 due to the May 2024 Storm Events and Hurricane Beryl.

Current report

We strive to maintain investment grade ratings for our securities to access the capital markets on terms we consider reasonable. A reduction in our ratings generally would increase our borrowing costs for new issuances of debt, as well as borrowing costs under our existing revolving credit facilities, and may prevent us from accessing the commercial paper markets. Disruptions in the financial markets along with high or rising interest rates can also affect the availability of new capital on terms we consider attractive. In those circumstances, we may not be able to obtain certain types of external financing or may be required to accept terms less favorable than we would otherwise accept which, among other things, would negatively impact our ability to finance our capital plan. For that reason, we seek to maintain adequate liquidity for our businesses through existing credit facilities and prudent refinancing of existing debt.

Current report

The regulation of electric transmission, distribution and generation facilities as well as natural gas pipelines and related facilities by federal and state regulatory agencies affects our businesses. In accordance with applicable regulations, we are making, and will continue to make, significant capital investments in our service territories under our capital plan to help operate and maintain safer, more reliable and growing electric and natural gas systems. The current economic environment (e.g., sustained higher interest rates and higher relative levels of inflation in the United States) discussed further below could result in heightened regulatory scrutiny as these regulatory agencies seek to reduce the financial impact of utility bills on customers.

Current report

To assess our financial performance, our management primarily monitors the recovery of costs and return on investments by the evaluation of net income and capital expenditures, among other things, from our regulated service territories within our reportable segments. Within these broader financial measures, we monitor margins, natural gas and fuel costs, interest expense, capital spend, working capital requirements, and operation and maintenance expense. In addition to these financial measures, we also monitor a number of variables that management considers important to gauge the performance of our reportable segments, including the number of customers, throughput, commodity prices, heating and cooling degree days, environmental impacts, safety factors, system reliability and customer satisfaction.

Current report

CenterPoint Energy and CERC have weather normalization or other rate mechanisms that largely mitigate the impact of weather on Natural Gas in Indiana, Louisiana, Mississippi, Minnesota and Ohio, as applicable. CenterPoint Energy’s and CERC’s Natural Gas in Texas and CenterPoint Energy’s electric operations in Texas and Indiana do not have such mechanisms, although fixed customer charges are historically higher in Texas for Natural Gas compared to its other jurisdictions. As a result, fluctuations from normal weather may have a positive or negative effect on CenterPoint Energy’s and CERC’s Natural Gas’ results in Texas and on CenterPoint Energy’s electric operations’ results in its Texas and Indiana service territories.

Current report

Each state has a unique economy and is driven by different industrial sectors. Our largest customers reflect the diversity in industries in the states across our footprint. For example, Houston Electric is largely concentrated in Houston, a diverse economy where a higher percentage of employment is tied to the energy sector relative to other regions of the country. Although the Houston area represents a large part of our customer base, we have a diverse customer base throughout the various states our utility businesses serve. In Minnesota, for instance, education and health services are the state’s largest sectors. Indiana and Ohio are impacted by changes in the Midwest economy in general and changes in particular industries concentrated in the Midwest such as automotive, feed and grain processing. Some industries are driven by population growth like education and health care, while others may be influenced by strength in the national or international economy. Adverse economic conditions, coupled with concerns for protecting the environment and increased availability of alternate energy sources, may cause consumers to use less energy or avoid expansions of their facilities, including natural gas facilities, resulting in less demand for our services. Long-term national trends indicate residential customers have reduced their energy consumption, which could adversely affect our results. To the extent population growth is affected by lower energy prices and there is financial pressure on some of our customers who operate within the energy industry, there may be an impact on the growth rate of our customer base and overall demand. Management expects residential meter growth for Houston Electric to remain in line with long term trends at approximately 2%. Management additionally anticipates significant increased electric load growth demand in our Houston Electric service territory, including in relation to the expected expansion of data centers, energy export facilities, including hydrogen facilities, electrification of industrial processes and transport and logistics. Typical customer growth in the jurisdictions served by the Natural Gas reportable segment is approximately 1%. Management expects residential meter growth for CERC to remain in line with long term trends at approximately 1%.

Current report

Inflation and high interest rates and a recessionary environment could potentially adversely impact CenterPoint Energy’s ability to execute on its 10-year capital plan. The inability to execute on our capital plan may result in lost future revenues for CenterPoint Energy. Additionally, these economic conditions may affect customers’ ability to pay their utility bills which may preclude our ability to collect balances due from such customers.

Current report

Further, the global supply chain has experienced significant disruptions due to a multitude of factors, such as geopolitical and economic uncertainty, regulatory and political instability, import tariffs and trade agreements, labor shortages, resource availability, long lead times, manufacturer production limitations, delivery delays, inflation and severe weather events. These disruptions have adversely impacted the utility industry. Like many of our peers, we have experienced disruptions to our supply chain, as well as increased prices, and may continue to experience such disruptions in the future. For example, President Trump has expressed a desire to impose substantial new or increased tariffs, and in February 2025, imposed tariffs on several countries and certain imports into the United States. These tariffs, as well as any new legislation, tariffs, bans, potential retaliatory trade measures taken against the United States or related governmental action, could increase or cause volatility in the cost of and negatively impact our ability to procure materials, supplies (such as natural gas) or services necessary for our business and capital plan, lead to scarcity of resources and labor necessary for our business and capital plan, further extend lead time or otherwise negatively impact the supply chain and our ability to timely execute our capital plan. To the extent adverse economic conditions, including supply chain disruptions, affect our suppliers and customers as well as our ability to meet our capital plan and generation transition plan, including with respect to developing and constructing new generation facilities at the cost and scale and on the timelines that we anticipate, results from our energy delivery businesses may suffer. For more information, see Note 14 to the consolidated financial statements.

Current report

Further, in response to concerns for protecting the environment, we have strived to take a leading stance in the transition to safer and cleaner energy by being the first combined electric and natural gas utility with regulated generation assets to adopt net zero for its Scope 1 and certain Scope 2 emissions by 2035 goals. In addition, we set a Scope 3 emission reduction goal across our multi-state footprint by committing to help our residential and commercial customers reduce GHG emissions attributable to their end use of natural gas by 20% to 30% by 2035 from a 2021 baseline. Our capital plan supports these goals. For more information regarding CenterPoint Energy’s net zero and GHG emissions reduction goals and the risks associated with them, see Part I, Item 1A. “Risk Factors — Risk Factors Affecting Regulatory, Environmental and Legal Risks — CenterPoint Energy is subject to operational and financial risks...”

Current report

May 2024 Storm Events and Hurricane Beryl. Houston Electric’s service territory experienced sudden and destructive severe weather events in May 2024 that included hurricane-like winds and tornadoes. Subsequently, on July 8, 2024, Hurricane Beryl made landfall in Texas, bringing sustained winds, storm surges and torrential rain into Houston Electric’s service territory. The May 2024 Storm Events and Hurricane Beryl caused significant damage to Houston Electric’s electric delivery system and resulted in electric service interruptions peaking at an estimated 922,000 customers and more than 2.1 million customers, respectively.

Current report

Various federal, state and local governmental and regulatory agencies and other entities, such as the Texas Governor’s office, the Texas legislature and the PUCT, have called for or are conducting inquiries and investigations into Hurricane Beryl, the efforts made by Houston Electric to prepare for, and respond to, this event, including the electric service outage issues, and the procurement of TEEEF. Moreover, additional governmental and regulatory agencies and other entities may conduct such inquiries and investigations, as well. On August 12, 2024, Texas Attorney General Ken Paxton opened an investigation to evaluate CenterPoint Energy’s conduct during Hurricane Beryl. Texas Lieutenant Governor Patrick has publicly urged the PUCT to hold Houston Electric, rather than ratepayers, responsible for paying $800 million, which was the amount the PUCT had previously approved Houston Electric to recover from ratepayers pursuant to Texas legislation passed after the 2021 Winter Storm Event relating to emergency responsiveness and the leasing of temporary generation units. Additionally, legislation has been proposed in Texas to, among other things, require the PUCT to review TEEEF leased by TDUs, disallow any leases that do not conform to the terms of the proposed legislation (which include, among other things, requirements relating to the speed with which TEEEF may be deployed), disallow recovery of costs associated with such disallowed leases, and implement a process to refund ratepayers the charges paid for the leasing of certain TEEEF. There are significant uncertainties around these inquiries and investigations and potential results and consequences, including with respect to our recovery of costs incurred as a result of Hurricane Beryl and whether any financial penalties will be assessed or changes to Houston Electric’s system, service territories, operations and/or regulatory treatment will result therefrom. Further, on January 22, 2025, a putative shareholder of CenterPoint Energy, Donel Davidson, filed a derivative petition in Harris County District Court, Texas, alleging breach of fiduciary duty and unjust enrichment on behalf of CenterPoint Energy against certain of its current and former directors and officers citing, in part, the topics of these inquiries and investigations. The action seeks to recover damages and other relief from the defendants on behalf of CenterPoint Energy. Additionally, on February 12, 2025, a second putative shareholder of CenterPoint Energy made a demand on the Board to investigate the same basic allegations raised in the derivative petition filed by Donel Davidson.

Current report

Houston Electric announced an initial hurricane preparedness and response action plan to the PUCT on July 25, 2024 to enhance the resiliency of the electric system through various investments. Following a meeting with Texas Governor Abbott on August 1, 2024, Houston Electric publicly committed to accelerating its previously announced initial hurricane preparedness and response action plan. Accordingly, Houston Electric announced that it was withdrawing its application for approval of its transmission and distribution system resiliency plan with the PUCT in order to focus on addressing the impacts of Hurricane Beryl in its service territory and accelerating preparedness and resiliency efforts for the remaining storm season, and the withdrawal granted by the PUCT. On August 5, 2024, Houston Electric announced the launch of its GHRI. Subsequently, Houston Electric announced the completion of core resiliency actions as part of the first phase of its GHRI, which included certain vegetation management and pole installation goals. In September 2024, Houston Electric announced the launch of the second phase of its GHRI, which included a series of resiliency plans to install new poles, manage higher-risk vegetation and install certain automated devices prior to the start of the 2025 hurricane season as part of its efforts to strengthen grid resiliency, improve public and customer communications and strengthen local, community and emergency partnerships. Following feedback from customers, external experts and other stakeholders, including elected officials and local agencies, Houston Electric filed the SRP with the PUCT on January 31, 2025, which proposes investing approximately $5.75 billion over a three-year period for transmission and distribution infrastructure, information technology and cybersecurity assets, and event response capability.

Current report

Houston Electric announced on August 28, 2024 its proposal to forego approximately $110 million of profit related to its storm hardening and TEEEF efforts, which would be represented by (1) Houston Electric not seeking to recover approximately $70 million in incremental storm hardening costs incurred in connection with accelerated operational activities after Hurricane Beryl; and (2) Houston Electric not filing, beginning in 2028, for approximately $40 million in anticipated equity profit associated with load-shed orientated TEEEF leased by Houston Electric through the remaining regulatory life of the leases in 2032 as new dispatchable generation is likely to come online in the state of Texas as a result of the Texas Energy Fund. Additionally, on December 19, 2024, Houston Electric announced a proposal to release Houston Electric’s 15 large 27 MW to 32 MW TEEEF units to the San Antonio area prior to the summer of 2025 in an effort to help ERCOT address a potential energy shortfall and Load Shed risk and to provide additional electric generation capacity to support growing energy demand in the greater San Antonio region. Under the proposal, Houston Electric would not receive revenue or profit from ERCOT and would also not charge Houston-area customers for these TEEEF units for the period when they are in San Antonio serving ERCOT, which is currently expected to be for a period of up to two years. Houston Electric would anticipate receiving revenues from one or more future transactions after the period the units are utilized to temporarily serve an energy need in the San Antonio area, and would therefore plan to continue to not charge customers for these units for any future periods. As of the date of the filing of this Form 10-K, Houston Electric estimates that the value of the TEEEF units to be removed from the rate base as a result of the aforementioned proposal will be approximately $375 million. The proposal has not been finalized and is subject to the negotiation of definitive documentation among the relevant parties, as well as being subject to the approval of ERCOT and other stakeholders. It is not certain that mutually agreeable definitive documentation will be entered into at all or that all approvals will be obtained.

Current report

For more information, see Note 7, 12 and 14 to the consolidated financial statements and “Liquidity and Capital Resources” below.

Current report

Equity Transactions. On August 9, 2024, CenterPoint Energy issued 9,754,194 shares of Common Stock in an underwritten public offering at a price of $25.36 per share, for net proceeds of $247 million after deducting issuance costs. For further information, see Note 11 to the consolidated financial statements.

Current report

On January 10, 2024, CenterPoint Energy entered into an Equity Distribution Agreement with certain financial institutions with respect to the offering and sale from time to time of shares of Common Stock, having an aggregate gross sales price of up to $500 million. Sales of Common Stock may be made by any method permitted by applicable law and deemed to be an “at the market offering” as defined in Rule 415 of the Securities Act of 1933, as amended. CenterPoint Energy may also enter into one or more forward sales agreements pursuant to master forward confirmations. During the year ended December 31, 2024, CenterPoint Energy issued 8,790,848 shares of Common Stock through the ATM Managers under the Equity Distribution Agreement, representing aggregate cash proceeds of $247 million, which was net of compensation paid by CenterPoint Energy to the ATM Managers of $2 million. As of December 31, 2024, CenterPoint Energy had not entered into any forward sale agreements under the at-the-market program. Additionally, as of December 31, 2024, CenterPoint Energy had $250 million of remaining capacity available under the program. For further information, see Note 11 to the consolidated financial statements.

Current report

Assets Held for Sale. On February 19, 2024, CERC Corp. entered into the LAMS Asset Purchase Agreement to sell its Louisiana and Mississippi natural gas LDC businesses. The purchase price for the Louisiana and Mississippi natural gas LDC businesses is $1.2 billion and subject to adjustment as set forth in the LAMS Asset Purchase Agreement, including adjustments based on net working capital, regulatory assets and liabilities and capital expenditures at closing. The transaction is not subject to a financing condition and is expected to close by the end of the first quarter of 2025, subject to satisfaction of customary closing conditions. The businesses include approximately 12,000 miles of main pipeline in Louisiana and Mississippi serving more than 300,000 customers. The Louisiana and Mississippi natural gas LDC businesses are reflected in CenterPoint Energy’s Natural Gas reportable segment and CERC’s single reportable segment, as applicable. For further information, see Note 4 to the consolidated financial statements.

Current report

Regulatory Proceedings. For further information, see Note 7 to the consolidated financial statements. For information related to our pending and completed regulatory proceedings to date in 2024 and to date in 2025, see “—Liquidity and Capital Resources —Regulatory Matters” below.

Current report

Debt Transactions. In 2024, CenterPoint Energy issued or borrowed a combined $4.0 billion in new debt, including Houston Electric’s issuance of $900 million aggregate principal amount of general mortgage bonds and a $500 million term loan, CERC’s issuance of $400 million principal amount of senior notes, SIGECO’s issuance of $160 million aggregate principal amount of first mortgage bonds, and CenterPoint Energy’s issuance of $700 million aggregate principal amount of senior notes and $1.3 billion aggregate principal amount of junior subordinated notes. During 2024, CenterPoint Energy repaid or redeemed a combined $0.9 billion of debt, including $500 million of its senior notes, $350 million of its floating rate senior notes and $22 million of SIGECO’s first mortgage bonds. For further information about debt transactions in 2024, see Note 12 to the consolidated financial statements.

Current report

Subsequent Events. On January 29, 2025, CenterPoint Energy, Houston Electric, CERC and SIGECO each entered into Extension Agreements to, among other things, extend the maturity date of the lenders’ commitments under each of their respective Credit Agreements by one year, from December 6, 2027 to December 6, 2028.

Current report

Additionally, on January 31, 2025, SIGECO issued $165 million aggregate principal amount of 5.69% First Mortgage Bonds, Series 2025A, Tranche A due 2055. Total net proceeds from SIGECO’s January 2025 issuance of first mortgage bonds, net of transaction expenses and fees, were approximately $164 million, which will be used for the acquisition of Posey Solar.

Showing the first 40 of 311 passages. Open the source sections for the rest.

Removed paragraphs (107)

Previous report

We face risks related to project siting, financing, construction, permitting, governmental approvals, public opposition, and the negotiation of project development agreements that may impede our development and operating activities.

Previous report

Houston Electric, Indiana Electric and CERC own, develop, construct, manage and operate electric generation, transmission and distribution facilities or natural gas distribution facilities, as applicable. A key component of our growth is our ability to construct and operate these facilities. As part of these operations, we must periodically apply for licenses and permits from various local, state, federal and other regulatory authorities and abide by their respective conditions. We have previously experienced delays in receiving approval with regards to certain permits and licenses, and have had investigations and enforcement actions with regards to certain of our projects, which have caused delays to our projects in the past. Should we in the future be unsuccessful in obtaining necessary licenses or permits on acceptable terms or resolving third-party challenges to such licenses or permits, should there be a delay in obtaining or renewing necessary licenses or permits, or should regulatory authorities initiate any associated investigations or enforcement actions or impose related penalties or disallowances, our future net income and cash flows could be reduced and our financial condition could be impacted. Any failure to negotiate successful project development agreements for new facilities with third parties could also have adverse effects. Additionally, our projects have faced and may in the future face opposition from individuals, community organizations, environmental and other activist groups, and other public-interest entities.

Previous report

We are subject to operational and financial risks and liabilities arising from environmental laws and regulations, including regulation of CCR, climate change legislation and certain local initiatives that seek to limit fossil fuel usage.

Previous report

Our operations are subject to stringent and complex laws and regulations pertaining to the environment. As an owner or operator of natural gas pipelines, distribution systems and storage, electric generating facilities and electric transmission and distribution systems, and the facilities that support these systems, we must comply with these laws and regulations at the federal, state and local levels. These laws and regulations can restrict or impact our business activities in many ways, including among others, restricting the use of fossil fuels through future climate legislation or regulation, restricting the use of natural gas-fired appliances in new homes, limiting airborne emissions from generating facilities, restricting the way we manage wastes, including wastewater discharges, air emissions and CCR removal, and requiring remedial action or monitoring to mitigate environmental actions caused by our operations or attributable to former operations. We may need to spend substantial amounts and devote other resources from time to time to comply with these requirements. Further, in the course of operations we have released, and may in the future inadvertently release, various contaminants. Any such releases could have a significant impact on the environment and result in significant fines. Failure to comply with applicable environmental laws and regulations may trigger a variety of administrative, civil and criminal enforcement measures, including the assessment of monetary penalties, which we have been subject to from time to time, revocation of permits, the imposition of remedial actions, and the issuance of orders enjoining future operations. Certain environmental statutes impose strict joint and several liability for costs required to clean, restore and monitor sites where hazardous substances have been stored, disposed or released. Moreover, it is not uncommon for neighboring landowners and other third parties to file claims for personal injury and property damage allegedly caused by the release of hazardous substances or other waste products into the environment.

Previous report

Regulatory agencies have also adopted, and from time to time consider adopting, new legislation and/or modifying existing laws and regulations to reduce GHGs. There continues to be a wide-ranging policy and regulatory debate, both nationally and internationally, regarding the possible means for their regulation. The trend in environmental regulation has been to place more restrictions and limitations on activities that may impact the environment. On April 22, 2021, President Biden announced new goals of 50% reduction of economy-wide GHG emissions and 100% carbon-free electricity by 2035, which formed the basis of the United States’ commitments announced in Glasgow, Scotland. These renewed climate commitments coming out of the 2021 United Nations Climate Change Conference held in Glasgow and President Biden’s executive orders have resulted in the development of additional regulations and changes to existing regulations. For example, in May 2023, the EPA proposed regulations setting new GHG emission reduction targets for coal and gas-fired electric generating units that could potentially require additional operating costs or operating restrictions related to operation of Indiana Electric’s natural-gas fired units. The administration is expected to finalize additional GHG regulations and mandated financial, emissions and other disclosures. As a distributor and transporter of natural gas and electricity, and a generator of electricity in Indiana, the Registrants’ revenues, operating costs and capital requirements could be adversely affected as a result of any regulatory action that would require installation of new control technologies or a modification of its operations or that would have the effect of reducing the consumption of natural gas or electricity or prevent the use of certain fuel types. Also, there can be no assurance as to the amount or timing of future expenditures for environmental compliance or remediation, and actual future expenditures may be greater than the amounts we currently anticipate, which could adversely affect our financial condition, results of operations and cash flows. Likewise, incentives to conserve energy or use energy sources other than natural gas could result in a decrease in demand for our services. For further discussion, see “Business—Environmental Matters” in Item 1 and “ —Natural Gas must compete with…”

Previous report

Evolving investor sentiment related to the use of fossil fuels and initiatives to restrict continued production of fossil fuels may have substantial impacts on CenterPoint Energy’s and CERC’s electric generation and natural gas businesses. For example, because Indiana Electric’s current generating units substantially rely on coal for their operations, certain financial institutions may choose not to participate in CenterPoint Energy’s financing arrangements until future coal generation closures satisfy their thresholds for investments. Further, some investors choose to not invest in CenterPoint Energy due to CenterPoint Energy’s and CERC’s use of fossil fuels. Also, certain cities in CenterPoint Energy’s and CERC’s Natural Gas operational footprint have discussed the adoption of initiatives to prohibit the construction of new natural gas facilities that would provide service and focus on electrification. For example, Minneapolis has adopted carbon emission reduction goals in an effort to decrease reliance on fossil natural gas. Certain state and local governments have also passed, or are considering, legislation banning the use of natural gas-fired appliances in new homes, which could affect consumer use of natural gas. Should such bans be enacted within Natural Gas’ operational footprint, they could adversely affect consumer demand for natural gas. Any such initiatives and legislation could adversely affect CenterPoint Energy’s and CERC’s results of operations. Further, investors, lenders, regulators and other stakeholders are focusing on issues related to environmental justice, which may result in increased scrutiny of our applicable regulatory processes and additional costs of compliance or may adversely affect our reputation. This focus on environmental justice matters at the federal and state levels may also provide communities opposed to our operations with greater opportunities to challenge or delay our projects. Opposition to our projects or successful challenges or appeals to permits issued for our projects could result in cancellation of such projects and the loss of investments we have made with respect thereto.

Previous report

CenterPoint Energy is subject to operational and financial risks and liabilities associated with the implementation of and efforts to achieve its carbon emissions reduction goals.

Previous report

In September 2021, CenterPoint Energy announced its net zero emission goals for Scope 1 and certain Scope 2 emissions by 2035 and a 20-30% reduction in certain Scope 3 emissions by 2035 as compared to 2021 levels. CenterPoint Energy’s analysis and plan for execution requires it to make a number of assumptions. These goals and underlying assumptions involve risks and uncertainties and are not guarantees. Should one or more of CenterPoint Energy’s underlying assumptions prove incorrect, its actual results and ability to achieve net zero emissions by 2035 could differ materially from its expectations. Certain of the assumptions that could impact CenterPoint Energy’s ability to meet its net zero emissions goals include, but are not limited to: emission levels, service territory size and capacity needs remaining in line with expectations; regulatory approvals related to Indiana Electric’s generation transition plan; customer demand for carbon free energy; impacts of future environmental regulations or legislation; impacts of future carbon pricing regulation or legislation, including a future carbon tax; price, availability and regulation of carbon offsets; price of fuel, such as natural gas; cost of energy generation technologies, such as wind and solar, natural gas and storage solutions; adoption of alternative energy by the public, including adoption of electric vehicles; rate of technology innovation with regards to alternative energy resources; CenterPoint Energy’s ability to implement its modernization plans for its pipelines and facilities; the ability to complete and timely implement generation alternatives, such as solar and wind generation, to Indiana Electric’s coal generation and retirement dates of Indiana Electric’s coal facilities by 2035; the ability to construct and/or permit new natural gas pipelines; the ability to procure resources needed to build at a reasonable cost, the lack of or scarcity of resources and labor, any project cancellations, construction delays or overruns and the ability to appropriately estimate costs of new generation; impact of any supply chain disruptions; changes in applicable standards or methodologies; and enhancement of energy efficiencies. Our businesses may face increased scrutiny from investors and other stakeholders related to our sustainability activities, including the goals, targets, and objectives we announce, our methodologies and timelines for pursuing them, and related disclosures. If our sustainability practices do not align with investor or other stakeholder expectations and standards, which continue to evolve, our reputation, our ability to attract or retain employees, and our attractiveness as an investment or business partner could be negatively affected. Similarly, our failure or perceived failure to pursue or fulfill our sustainability-focused goals, targets, and objectives, to comply with ethical, environmental, or other standards, regulations, or expectations, or to satisfy various repo…

Excerpt shortened here; the source contains the full paragraph.

Previous report

Developing and implementing plans for compliance with voluntary climate commitments can lead to additional capital, personnel and operation and maintenance expenditures and could significantly affect the economic position of existing facilities and proposed projects. To the extent that we believe any of these costs are recoverable in rates, cost recovery could be resisted by our regulators and our regulators might attempt to deny or defer timely recovery of these costs. Moreover, we cannot predict the ultimate impact of achieving our emissions reduction goals, or the various implementation aspects, on our system reliability or our financial condition and results of operations.

Previous report

Houston Electric and Indiana Electric, as a member of ERCOT and MISO, respectively, could be subject to higher costs for system improvements, as well as fines or other sanctions as a result of FERC mandatory reliability standards.

Previous report

Houston Electric and Indiana Electric are members of ERCOT and MISO, respectively, which serve the electric transmission needs of their applicable regions. As a result of their respective participation in ERCOT and MISO, Houston Electric and Indiana Electric do not have operational control over their transmission facilities and are subject to certain costs for improvements to these regional electric transmission systems. In addition, FERC has jurisdiction with respect to ensuring the reliability of electric transmission service, including transmission facilities owned by Houston Electric and other utilities within ERCOT and Indiana Electric and other utilities within MISO, respectively. FERC has designated NERC as the ERO to promulgate standards, under FERC oversight, for all owners, operators and users of the bulk power system. FERC has approved the delegation by NERC of authority for reliability in ERCOT to the Texas RE, a Texas non-profit corporation, and for reliability in the portion of MISO that includes Indiana Electric to ReliabilityFirst Corporation, a Delaware non-profit corporation. Compliance with mandatory reliability standards may subject Houston Electric and Indiana Electric to higher operating costs and may result in increased capital expenditures, which may not be fully recoverable in rates. While Houston Electric and Indiana Electric have received minor fines in the past for noncompliance, if Houston Electric or Indiana Electric were to be found to be in noncompliance with applicable mandatory reliability standards again, they would be subject to sanctions, including potential monetary penalties, which could range as high as over a million dollars per violation per day, and non-monetary penalties, such as having to file a mitigation plan to prevent recurrence of a similar violation and having certain milestones in such plan tracked.

Previous report

We are involved in numerous legal proceedings, the outcomes of which are uncertain, and resolutions adverse to us could negatively affect our financial results.

Previous report

The Registrants are subject to numerous legal proceedings, including lawsuits and environmental matters in addition to regulatory proceedings, the most significant of which are summarized in Note 15 to the consolidated financial statements. Litigation is subject to many uncertainties; recent trends have shown jury verdicts, settlements and other liability have been significantly increasing; and the Registrants cannot predict the outcome of all matters with assurance. Additionally, under some circumstances, the Registrants could potentially have claims filed against them or incur liabilities associated with assets and businesses no longer owned by them as a result of sales, divestitures or other transfers to third parties who may be unable to fulfill their indemnity obligations to the Registrants. Final resolution of these matters, or any potential future claims or liabilities, may require additional expenditures over an extended period of time that may be in excess of established insurance or reserves and may have an adverse effect on the Registrants’ financial results.

Previous report

Our businesses may be adversely affected by the intentional misconduct of our employees.

Previous report

We are committed to living our core values of safety, integrity, accountability, initiative and respect and complying with all applicable laws and regulations. Despite that commitment and efforts to prevent misconduct, it is possible for employees to engage in intentional misconduct, fail to uphold our core values, and violate laws and regulations for individual gain through contract or procurement fraud, misappropriation, bribery or corruption, fraudulent related-party transactions and serious breaches of our Ethics and Compliance Code and other policies. If such intentional misconduct by employees should occur, it could result in substantial liability, higher costs, increased regulatory scrutiny and negative public perceptions, any of which could have an adverse effect on our financial condition, results of operations and cash flows. From time to time, including as part of our Ethics and Compliance program’s efforts to detect misconduct, we become aware of and expect to continue to become aware of instances of employee misconduct, which we investigate, remediate and disclose as appropriate and proportionate to the incident.

Previous report

Disruptions to the global supply chain may lead to higher prices for goods and services and impact our operations, which could have an adverse impact on our ability to execute our capital plan and on our financial condition, results of operations and cash flows.

Previous report

The global supply chain has experienced disruptions due to a multitude of factors, such as the COVID-19 pandemic, labor shortages, resource availability, long lead time, delivery delays, inflation, severe weather events and disruptions to internal or international shipping, including as a result of armed conflicts, and these disruptions have adversely impacted the utility industry. We, as well as other companies in our industry, have experienced supply chain disruptions, as well as increased prices, and we may continue to experience this in the future. Examples of materials necessary for the transmission and distribution of power we and our industry have experienced difficulties in procuring include transformers, wires, cables, meters, poles and solar panels. If the supply chain disruption persists or worsens, we may experience difficulties in procuring these resources and others necessary to operate our businesses in the future. As a result, we may not be able to procure the resources, including labor, needed to timely perform storm restoration activities, fully execute on our ten-year capital plan and/or achieve our net zero emission and carbon emissions reduction goals. Moreover, high inflation and persistent high interest rates continue to be an area of economic concern and has contributed to the increased prices for materials and services that have been experienced by us and other companies in our industry. Even if we are able to procure the necessary resources, we might not be able to do so at a reasonable cost or in a timely manner which could result in project cancellations or scope changes, delays, cost overruns and under-recovery of costs. If we are unable to fully execute on capital plans as a result of supply chain disruptions, our financial condition, results of operations and cash flows may be adversely affected.

Previous report

CenterPoint Energy is a holding company that derives all of its operating income from, and holds substantially all of its assets through, its subsidiaries. As a result, CenterPoint Energy depends on the performance of and distributions from its subsidiaries to meet its payment obligations and to pay dividends on its common stock, and provisions of applicable law or contractual restrictions could limit the amount of those distributions.

Previous report

CenterPoint Energy derives all of its operating income from, and holds substantially all of its assets through, its subsidiaries. Similarly, as a result of the Restructuring, CERC derives a significant portion of its operating income from and holds a significant portion of its assets through its subsidiaries, including Indiana Gas and VEDO. As a result, CenterPoint Energy and to a lesser extent, CERC, depend on the performance of and distributions from their respective subsidiaries to meet their respective payment obligations and to pay dividends on their respective common stock. In general, CenterPoint Energy’s and CERC’s subsidiaries are separate and distinct legal entities and have no obligation to provide them with funds for their respective payment obligations, whether by dividends, distributions, loans or otherwise. In addition, provisions of applicable law, such as those limiting the legal sources of dividends, limit CenterPoint Energy’s and CERC’s respective subsidiaries’ ability to make payments or other distributions to CenterPoint Energy or CERC, and their respective subsidiaries could agree to contractual restrictions on their ability to make payments or other distributions. Further, as part of Houston Electric’s 2019 base rate case, Houston Electric agreed to certain “ring-fencing” measures to increase its financial separateness from CenterPoint Energy. Houston Electric is expected to file a base rate proceeding in 2024. In this proceeding, Houston Electric may be requested to institute further ring-fencing measures or further ring-fencing measures could be imposed on Houston Electric in the future through legislation or PUCT rules or orders. While current ring-fencing measures have not impacted Houston Electric’s ability to pay dividends to CenterPoint Energy, the imposition of any additional measures impacting CenterPoint Energy’s ability to receive dividends from Houston Electric could adversely affect CenterPoint Energy’s cash flows, credit quality, financial condition and results of operations. Any such adverse effect on CenterPoint Energy could also adversely affect Houston Electric’s and/or CERC’s cash flows, credit quality, financial condition and results of operations as CenterPoint Energy may not be able to financially support Houston Electric and/or CERC if and when necessary.

Previous report

CenterPoint Energy’s right to receive assets of any subsidiary, and therefore the right of its creditors to participate in those assets, are structurally subordinated to the claims of that subsidiary’s creditors, including trade creditors. In addition, even if CenterPoint Energy were a creditor of any subsidiary, its rights as a creditor would likely be effectively subordinated to any security interest in the assets of that subsidiary and any senior indebtedness of the subsidiary.

Previous report

If we are unable to arrange future financings on acceptable terms, our ability to finance our capital expenditures or refinance outstanding indebtedness could be limited.

Previous report

Our businesses are capital intensive, and we rely on various sources to finance our capital expenditures. For example, we depend on (i) long-term debt, (ii) borrowings through our revolving credit facilities and, for CenterPoint Energy and CERC, commercial paper programs and (iii) if market conditions permit, issuances of additional shares of common stock or shares of preferred stock by CenterPoint Energy. We may also use such sources to refinance any outstanding indebtedness as it matures. Additionally, from time to time, our operating subsidiaries, including Houston Electric and CERC, may rely on intercompany borrowings from CenterPoint Energy that may be sourced from CenterPoint Energy’s external financings. As of December 31, 2023, CenterPoint Energy had $19 billion of outstanding indebtedness on a consolidated basis, which includes $502 million of non-recourse Securitization Bonds. For information on outstanding indebtedness of CenterPoint Energy, Houston Electric and CERC as well as future maturities, see Note 13 to the consolidated financial statements. Our future financing activities may be significantly affected by, among other things:

Previous report

•general economic and capital market conditions, including inflation;

Previous report

•credit availability from financial institutions and other lenders;

Previous report

•investor confidence in us and the markets in which we operate;

Previous report

•actions from the Federal Reserve, including changes in interest rates and unanticipated actions;

Previous report

•market expectations regarding our future earnings and cash flows;

Previous report

•investor willingness to invest in companies associated with fossil fuels;

Previous report

•our ability to access capital markets on reasonable terms;

Previous report

•timing of future securitizations by jurisdictions in which we operate; and

Previous report

CenterPoint Energy’s previously owned Energy Systems Group business has performance and warranty obligations, some of which are guaranteed by CenterPoint Energy.

Previous report

On June 30, 2023, CenterPoint Energy closed the sale of its Energy Systems Group business. Prior to June 30, 2023 and as part of the normal course of its business, Energy Systems Group issued performance bonds and other forms of assurance that committed it to operate facilities, pay vendors or subcontractors and support warranty obligations. As the parent company prior to the closing of the sale, CenterPoint Energy or Vectren guaranteed certain of its subsidiaries’ commitments. When Energy Systems Group was wholly owned by CenterPoint Energy, these guarantees did not represent incremental consolidated obligations, but rather, these guarantees represented guarantees of Energy Systems Group’s obligations to allow it to conduct business without posting other forms of assurance. Neither CenterPoint Energy nor Vectren has been called upon to satisfy any obligations pursuant to these parental guarantees to date, but may be required to do so in the future. For further information, see Note 15(c) to the consolidated financial statements.

Previous report

Long-lived assets, including intangible assets with finite useful lives, are reviewed for impairment whenever events or changes in circumstances indicate the carrying value may not be recoverable. Goodwill is tested for impairment at least annually, as well as when events or changes in circumstances indicates the carrying value may not be recoverable. While CenterPoint Energy has identified and recorded goodwill impairments in the past, no impairments to goodwill were recorded during the years ended December 31, 2023, 2022 and 2021. See Note 6 to the consolidated financial statements for further information. Should the annual goodwill impairment test or another periodic impairment test or an observable transaction indicate the fair value of our assets is less than the carrying value, we would be required to take a non-cash charge to earnings with a correlative effect on equity, increasing balance sheet leverage as measured by debt to total capitalization. A non-cash impairment charge or fair value adjustment could adversely impact our financial condition and results of operations.

Previous report

If CenterPoint Energy redeems the ZENS prior to their maturity in 2029, its ultimate tax liability and redemption payments would result in significant cash payments, which would adversely impact its cash flows. Similarly, a significant amount of exchanges of ZENS by ZENS holders could adversely impact CenterPoint Energy’s cash flows.

Previous report

CenterPoint Energy has approximately $828 million principal amount of ZENS outstanding as of December 31, 2023. CenterPoint Energy owns shares of ZENS-Related Securities equal to approximately 100% of the reference shares used to calculate its obligation to the holders of the ZENS. CenterPoint Energy may redeem all of the ZENS at any time at a redemption amount per ZENS equal to the higher of the contingent principal amount per ZENS ($18 million in the aggregate, or $1.24 per ZENS, as of December 31, 2023), or the sum of the current market value of the reference shares attributable to one ZENS at the time of redemption. In the event CenterPoint Energy redeems the ZENS, in addition to the redemption amount, it would be required to pay deferred taxes related to the ZENS. CenterPoint Energy’s ultimate tax liability related to the ZENS and ZENS-

Previous report

Our potential business strategies and strategic initiatives, including merger and acquisition activities and the disposition of assets or businesses, may not be completed or perform as expected, adversely affecting our financial condition, results of operations and cash flows.

Showing the first 40 of 107 passages. Open the source sections for the rest.

Reworded paragraphs (8)

Previous wording

On February 19, 2024, CenterPoint Energy, through its subsidiary CERC Corp., entered into the LAMS Asset Purchase Agreement to sell its Louisiana and Mississippi natural gas local distribution company businesses. The transaction is expected to close in the first quarter of 2025. For further information, see Note 21 to the consolidated financial statements. We can make no assurances regarding the completion of this sale, which could be subject to delays or otherwise not consummated.

Current wording

On February 19, 2024, CenterPoint Energy, through its subsidiary CERC Corp., entered into the LAMS Asset Purchase Agreement to sell its Louisiana and Mississippi natural gas LDC businesses. The transaction is expected to close in the first quarter of 2025. For further information, see Note 4 to the consolidated financial statements.

Previous wording

Liquidity and Capital Resources — Regulatory Matters” in Item 7 of Part II of this report.

Current wording

While greater than 80% of CenterPoint Energy’s projected consolidated investments are expected to be recovered through interim capital recovery trackers or rate cases based on a forward test year, the balance is expected to be recovered through base rate cases. Indiana Electric filed a rate case during 2023, and Houston Electric and CERC’s Ohio jurisdiction filed rate cases in 2024. The outcome of these base rate proceedings will determine, among other things, the ability to recover certain capital investments within those jurisdictions. The outcome of these base rate proceedings is uncertain and may be impacted by the current economic environment. CERC’s Texas and Minnesota gas jurisdictions filed rate cases in 2023, which were settled in 2024. For additional detail, see “—Liquidity and Capital Resources —Regulatory Matters” below.

Previous wording

Our success depends upon our ability to attract, effectively transition, motivate and retain key employees and identify and develop talent to succeed senior management.

Current wording

•our ability to attract, effectively transition, motivate and retain management and key employees and maintain good labor relations;

Previous wording

Houston Electric’s, Indiana Electric’s and Natural Gas’ revenues and results of operations are subject to seasonality, weather conditions and other changes in electricity and natural gas usage, as applicable. Houston Electric’s revenues are generally higher during the warmer months. As in certain past years, unusually mild weather in the warmer months could diminish Houston Electric’s results of operations and harm its financial condition. Conversely, as in certain past years, extreme warm weather conditions could increase Houston Electric’s results of operations in a manner that would not likely be annually recurring. A significant portion of Indiana Electric’s sales are for space heating and cooling. Consequently, as in certain past years, Indiana Electric’s results of operations may be adversely affected by warmer-than-normal heating season weather or colder-than-normal cooling season weather, while, as has occurred in certain past years, more extreme seasonal weather conditions could increase Indiana Electric’s results of operations in a manner that would not likely be annually recurring. Natural Gas’ revenues are customarily higher during the winter months. As in certain past years, unusually mild weather in the winter months could diminish Natural Gas’ results of operations and harm its financial condition. Conversely, as occurred in certain past years, extreme cold weather conditions could increase its results of operations in a manner that would not likely be annually recurring. For information related to weather normalization regulatory mechanisms and weather hedges, see Note 9(a) to the consolidated financial statements. For additional risks related to the February 2021 Winter Storm Event, see Note 7 to the consolidated financial statements for further information.

Current wording

For information about the February 2021 Winter Storm Event, see Note 7 to the consolidated financial statements.

Previous wording

We may be significantly affected by changes in federal income tax laws and regulations, including any comprehensive federal tax reform legislation.

Current wording

On August 16, 2022, the IRA was signed into law. The law extends or creates tax-related energy incentives for solar, wind and alternative clean energy sources, implements, subject to certain exceptions, a 1% tax on share repurchases after December 31, 2022, and implements a 15% CAMT based on the adjusted financial statement income of certain large corporations. Corporations are entitled to a CAMT credit to the extent CAMT liability exceeds regular tax liability, which can be carried forward indefinitely and used in future years when regular tax exceeds the CAMT. The Registrants will owe CAMT in excess of their regular tax liability beginning in 2024. As a result, the Registrants may experience a temporary increase in federal cash tax liability due to this provision beginning in 2024. On September 12, 2024, the IRS issued proposed regulations addressing the application of the CAMT. The proposed regulations offer guidance for computing an entity’s adjusted financial statement income, in addition to addressing other provisions of the CAMT. At this time, the Company does not anticipate changes to the applicability of CAMT to the Registrants as a result of the proposed regulations. For more information regarding changes in federal income tax laws and regulations and our related risks, see Part I, Item 1A. “Risk Factors — Risk Factors Affecting Regulatory, Environmental and Legal Risks — We may be significantly affected by changes in federal income tax laws and regulations...”

Previous wording

The Registrants’ current credit ratings and any changes in credit ratings in 2023 and to date in 2024 are discussed in “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Liquidity and Capital Resources — Other Matters — Impact on Liquidity of a Downgrade in Credit Ratings” in Item 7 of Part II of this report. These credit ratings may not remain in effect for any given period of time and one or more of these ratings may be reduced or withdrawn by a rating agency. The Registrants note these credit ratings are not recommendations to buy, sell or hold their securities. Each rating should be evaluated independently of any other rating. Any future reduction or withdrawal of one or more of the Registrants’ credit ratings could have an adverse impact on their ability to access capital on acceptable terms. For example, if CERC’s credit rating were to decline, it may have an adverse impact on the cost of borrowings and, in extraordinary market conditions, it may limit the ability to access the debt capital markets. Additionally, CERC might be required to post collateral under its shipping arrangements or to purchase natural gas. If a credit rating downgrade and the resultant cash collateral requirement were to occur at a time when CERC was experiencing significant working capital requirements or otherwise lacked liquidity, CERC’s financial condition, results of operations and cash flows could be adversely affected.

Previous wording

Related Securities continues to increase by the amount of the tax benefit realized each year. If the ZENS had been redeemed on December 31, 2023, deferred taxes of approximately $728 million would have been payable in 2023, based on 2023 tax rates in effect. In addition, if all the shares of ZENS-Related Securities had been sold on December 31, 2023 to fund the aggregate redemption amount, capital gains taxes of approximately $81 million would have been payable in 2023. Similarly, a significant amount of exchanges of ZENS by ZENS holders could adversely impact CenterPoint Energy’s cash flows. This could happen if CenterPoint Energy’s creditworthiness were to drop, the market for the ZENS were to become illiquid, or for some other reason. While funds for the payment of cash upon exchange of ZENS could be obtained from the sale of the shares of ZENS-Related Securities CenterPoint Energy owns or from other sources, ZENS exchanges result in a cash outflow because tax deferrals related to the ZENS and ZENS-Related Securities shares would typically be disposed when ZENS are exchanged and ZENS-Related Securities shares are sold.

Current wording

If CenterPoint Energy’s creditworthiness were to drop such that ZENS holders thought CenterPoint Energy’s liquidity was adversely affected or the market for the ZENS were to become illiquid, some ZENS holders might decide to exchange their ZENS for cash. Funds for the payment of cash upon exchange could be obtained from the sale of the shares of ZENS-Related Securities that CenterPoint Energy owns or from other sources. CenterPoint Energy owns shares of ZENS-Related Securities equal to approximately 100% of the reference shares used to calculate its obligation to the holders of the ZENS. ZENS exchanges result in a cash outflow because tax deferrals related to the ZENS and shares of ZENS-Related Securities would typically cease when ZENS are exchanged or otherwise retired and shares of ZENS-Related Securities are sold. The ultimate tax liability related to the ZENS and ZENS-Related Securities continues to increase by the amount of the tax benefit realized each year, and there could be a significant cash outflow when the taxes are paid as a result of the retirement or exchange of the ZENS. If all ZENS had been exchanged for cash on December 31, 2024, deferred taxes of approximately $802 million would have been payable in 2024. If all the ZENS-Related Securities had been sold on December 31, 2024, capital gains taxes of approximately $84 million would have been payable in 2024 based on 2024 tax rates in effect. For additional information about ZENS, see Note 10 to the consolidated financial statements.

Previous wording

An impairment of goodwill, long-lived assets, including intangible assets, equity method investments and an impairment or fair value adjustment could reduce our earnings.
Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

On February 19, 2024, CenterPoint Energy, through its subsidiary CERC Corp., entered into the LAMS Asset Purchase Agreement to sell its Louisiana and Mississippi natural gas LDC businesses. The transaction is expected to close in the first quarter of 2025. For further information, see Note 4 to the consolidated financial statements.