For the period ended Sep 30, 2024. Filed Oct 28, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2024 · Filed Oct 28, 2024

CNP$40.66+1.7%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 199 previous paragraphs and 197 current paragraphs.

136 unchanged; 51 reworded; 10 added; 9 removed; 3 previous and 0 current paragraphs rearranged.

Tables are not compared: 20 previous and 21 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (10)

Current report

On August 5, 2024, Houston Electric announced the launch of its GHRI. Subsequently, Houston Electric announced the completion of core resiliency actions as part of the first phase of its GHRI, which included certain vegetation management and pole installation goals. In September 2024, Houston Electric announced the launch of the second phase of its GHRI, which included a series of resiliency plans to install new poles, manage higher-risk vegetation and install certain automated devices prior to the start of the 2025 hurricane season as part of its efforts to strengthen grid resiliency, improve public and customer communications and strengthen local, community and emergency partnerships. Houston Electric also announced a longer-term proposal for approximately $5 billion in resiliency investment from 2026 to 2028. Houston Electric intends to include this longer-term proposal in a new transmission and distribution system resiliency plan that is expected to be filed with the PUCT on or before January 31, 2025 following feedback from customers, external experts, elected officials, local agencies and other stakeholders. Additionally, Houston Electric announced its proposal to forego approximately $110 million of profit related to its storm hardening and TEEEF efforts, which would be represented by (1) Houston Electric not seeking to recover approximately $70 million in incremental storm hardening expenses incurred in connection with accelerated operational activities after

Current report

Hurricane Beryl; and (2) Houston Electric not filing, beginning in 2028, for approximately $40 million in anticipated equity profit associated with load-shed orientated TEEEF leased by Houston Electric through the remaining regulatory life of the leases in 2032 as new dispatchable generation is likely to come online in the state of Texas as a result of the Texas Energy Fund.

Current report

•an increase in income available to common shareholders of $3 million for the Natural Gas reportable segment, as further discussed below; and

Current report

Nine months ended September 30, 2024 compared to nine months ended September 30, 2023

Current report

•an increase in income available to common shareholders of $64 million for the Natural Gas reportable segment, as further discussed below; and

Current report

The following table provides variance explanations for the three months ended September 30, 2024 compared to the three months ended September 30, 2023 as well as for the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023 by major income statement caption for CERC:

Current report

(2)Represents cash requirements associated with the estimated storm restoration costs for the remainder of 2024.

Current report

On April 29, 2024, Houston Electric filed its first transmission and distribution system resiliency plan with the PUCT, which proposed to implement 25 resiliency measures over a three-year period. On August 1, 2024, Houston Electric announced that it was withdrawing its application for approval of its transmission and distribution system resiliency plan in order to focus on addressing the impacts of Hurricane Beryl and accelerating preparedness and resiliency efforts for the remaining storm season. The ALJ granted Houston Electric’s request for withdrawal of the transmission and distribution system resiliency plan on August 16, 2024.

Current report

On August 28, 2024, Houston Electric announced a series of resiliency actions, including a proposal for approximately $5 billion in resiliency investment from 2026 to 2028, which Houston Electric intends to include in a transmission and distribution system resiliency plan that is expected to be filed with the PUCT on or before January 31, 2025 following feedback from customers, external experts and other stakeholders, including elected officials and local agencies.

Current report

Ohio Gas Rate Case. On August 27, 2024, CEOH filed a Notice of Intent with PUCO to begin the process of requesting an adjustment in natural gas base rates. CEOH plans to file its Application and Standard Filing Requirement by the end of October 2024 based on a hybrid test year of January through March 2024 results and April through December 2024 estimated financial data. Direct testimony will be filed with PUCO 14 days after the application filing. The need for a rate increase is primarily driven by the continuing investment that is being made to provide safe and reliable service of the system. CEOH’s last base rate case was filed in 2018 with final PUCO approval August 28, 2019.
Removed paragraphs (9)

Previous report

Houston Electric implemented its emergency operations plan’s processes and procedures to respond to these events, including establishing an incident command center and calling for mutual assistance from other utilities, among other measures. Throughout these weather events, Houston Electric remained in contact with its regulators and stakeholders, including federal, state and local officials, as well as the PUCT and ERCOT.

Previous report

The Governor of Texas issued a disaster declaration on April 30, 2024 to address severe storms and flooding and subsequently amended it to include the May 2024 Storm Events. President Biden also approved major disaster declarations for Texas counties impacted by severe weather and flooding events that began April 26, 2024, including the May 2024 Storm Events. On July 5, 2024, a state disaster declaration was issued based on the threat posed by Hurricane Beryl, and on July 6, 2024 was amended to add additional counties to the disaster area. Subsequently, a federal emergency disaster declaration through the Federal Emergency Management Agency to cover certain costs associated with Hurricane Beryl was also issued.

Previous report

Houston Electric currently estimates that total costs to restore the electric delivery facilities damaged as a result of the May 2024 Storm Events and Hurricane Beryl will be in the range of $425 million to $475 million and $1.2 billion to $1.3 billion, respectively, based on currently available information. These preliminary estimates are subject to revision as certain restoration costs may continue through the end of 2024. As is common with electric utilities serving coastal regions, the poles, towers, wires, street lights and pole-mounted equipment that comprise Houston Electric’s transmission and distribution system are not covered by property insurance.

Previous report

The ultimate recovery of costs relating to the May 2024 Storm Events and Hurricane Beryl is expected to be sought through the issuance and sale of non-recourse securitization bonds for distribution-related costs and the TCOS capital mechanism for transmission-related costs, as applicable. However, neither the amount nor timing of the recovery is certain. Assuming such securitization bonds are issued, Houston Electric would seek to recover the amount of the May 2024 Storm Events and Hurricane Beryl storm restoration costs approved by the PUCT out of the net proceeds from the securitization bond offering, with the debt service and other financing costs of the securitization bonds being paid over the term of the securitization bonds through a storm restoration charge imposed on Houston Electric’s customers.

Previous report

•an increase in income available to common shareholders of $12 million for the Natural Gas reportable segment, as further discussed below; and

Previous report

•an increase in income available to common shareholders of $61 million for the Natural Gas reportable segment, as further discussed below; and

Previous report

The following table provides variance explanations for the three months ended June 30, 2024 compared to the three months ended June 30, 2023 as well as for the six months ended June 30, 2024 compared to the six months ended June 30, 2023 by major income statement caption for CERC:

Previous report

(2)Represents the portion of total estimated storm restoration costs expected to be incurred for the remaining six months of 2024.

Previous report

On April 29, 2024, Houston Electric filed its first transmission and distribution system resiliency plan with the PUCT for review and approval. Houston Electric’s transmission and distribution system resiliency plan proposes to implement twenty-five (25) resiliency measures over a three-year period related to: system hardening, grid modernization, flood mitigation, information technology, physical security, and vegetation management. Houston Electric’s transmission and distribution system resiliency plan proposes to further analyze and identify specific wildfire risk and implement additional measures to mitigate the identified wildfire risk. Additionally, Houston Electric is proposing two pilot programs and one activity: 1) a utility-scale microgrid pilot program, 2) a pilot program to fund a City of Houston department responsible for overseeing resiliency issues for the City of Houston, and 3) the transition and migration of Houston Electric’s Systems, Applications & Products in Data Processing software to a cloud-based application. The estimated capital cost is approximately $2.2 billion, and the estimated incremental operations and maintenance expense is approximately $86 million over the three year period. Houston Electric has requested that the PUCT allow Houston Electric to establish a regulatory asset for distribution-related costs relating to the implementation of Houston Electric’s transmission and distribution system resiliency plan. Intervenors and staff filed direct testimony on June 24, 2024 and July 2, 2024, respectively; Houston Electric filed rebuttal testimony on July 15, 2024. On July 19, 2024, parties filed a joint motion to abate the proceedings, which was amended on July 22, 2024. The State Office of Administrative Hearings ALJ approved the joint motion on July 22, 2024. The parties will provide an update on the status of settlement negotiations by October 22, 2024 and every month thereafter.
Reworded paragraphs (51)

Previous wording

May 2024 Storm Events and Hurricane Beryl. Houston Electric’s service territory experienced sudden and destructive severe weather events in May 2024 that included hurricane-like winds and tornadoes. Subsequently, on July 8, 2024, Hurricane Beryl made landfall in Texas, bringing sustained winds, storm surges and torrential rain into Houston Electric’s service territory. The May 2024 Storm Events and Hurricane Beryl caused significant damage to Houston Electric’s electric delivery system and resulted in electric service interruptions peaking at an estimated 922,000 customers and an estimated 2.26 million customers, respectively.

Current wording

May 2024 Storm Events and Hurricane Beryl. Houston Electric’s service territory experienced sudden and destructive severe weather events in May 2024 that included hurricane-like winds and tornadoes. Subsequently, on July 8, 2024, Hurricane Beryl made landfall in Texas, bringing sustained winds, storm surges and torrential rain into Houston Electric’s service territory. The May 2024 Storm Events and Hurricane Beryl caused significant damage to Houston Electric’s electric delivery system and resulted in electric service interruptions peaking at an estimated 922,000 customers and more than 2.1 million customers, respectively.

Previous wording

Various governmental and regulatory agencies and other entities have called for or are conducting inquiries and investigations into Hurricane Beryl and the efforts made by Houston Electric to prepare for, and respond to, this event, including the electric service outage issues. Agencies and entities that may conduct or are conducting such inquiries, investigations and other reviews include the Texas Governor’s office, the Texas Legislature and the PUCT. There are significant uncertainties around these inquiries and investigations and potential results and consequences, including whether any financial penalties will be assessed or changes to Houston Electric’s system, service territories, operations and/or regulatory treatment will result therefrom.

Current wording

Various federal, state and local governmental and regulatory agencies and other entities, such as the Texas Governor’s office, the Texas Legislature and the PUCT, have called for or are conducting inquiries and investigations into Hurricane Beryl, the efforts made by Houston Electric to prepare for, and respond to, this event, including the electric service outage issues, and the procurement of temporary generation units. Moreover, additional governmental and regulatory agencies and other entities may conduct such inquiries and investigations, as well. Texas Lieutenant Governor Patrick has publicly urged the PUCT to hold Houston Electric, rather than ratepayers, responsible for paying $800 million, which was the amount the PUCT had previously approved Houston Electric to recover from ratepayers pursuant to Texas legislation passed after the 2021 Winter Storm Event relating to emergency responsiveness and the leasing of temporary generation units. On August 12, 2024, Texas Attorney General Ken Paxton opened an investigation to evaluate CenterPoint Energy’s conduct during Hurricane Beryl. There are significant uncertainties around these inquiries and investigations and potential results and consequences, including whether any financial penalties will be assessed or changes to Houston Electric’s system, service territories, operations and/or regulatory treatment will result therefrom.

Previous wording

Houston Electric announced an initial hurricane preparedness and response action plan to the PUCT on July 25, 2024 to enhance the resiliency of the electric system through various investments. Through this plan, Houston Electric additionally plans to work to improve customer communications, as well as strengthen the effectiveness of its emergency response, among other things.

Current wording

Houston Electric announced an initial hurricane preparedness and response action plan to the PUCT on July 25, 2024 to enhance the resiliency of the electric system through various investments. Following a meeting with Texas Governor Abbott on August 1, 2024, Houston Electric publicly committed to accelerating its previously announced initial hurricane preparedness and response action plan. Additionally, Houston Electric announced that it was withdrawing both its base rate application and its application for approval of its transmission and distribution system resiliency plan with the PUCT in order to focus on addressing the impacts of Hurricane Beryl in its service territory and accelerating preparedness and resiliency efforts for the remaining storm season. The withdrawal of the system resiliency plan was granted by the PUCT. Subsequently, intervenors filed a motion to challenge the withdrawal of the base rate proceeding. On August 16, 2024, the ALJ issued an order denying the requested withdrawal of the base rate proceeding, leaving the base rate proceeding abated. Houston Electric filed an appeal of the ALJ’s order to the PUCT, and on October 15, 2024, PUCT commissioners voted to consider the merits of Houston Electric’s appeal at the PUCT’s open meeting scheduled for November 14, 2024. The PUCT’s decision on the withdrawal of the base rate proceeding is expected in the fourth quarter of 2024. CenterPoint Energy cannot predict the outcome of this proceeding.

Previous wording

For information regarding factors that may affect the future results of our consolidated operations, please read “Risk Factors” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K.

Current wording

For information regarding factors that may affect the future results of our consolidated operations, see “Risk Factors” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K and in Item 1A of Part II of this combined Form 10-Q.

Previous wording

Income available to common shareholders for the three and six months ended June 30, 2024 and 2023 was as follows:

Current wording

Income available to common shareholders for the three and nine months ended September 30, 2024 and 2023 was as follows:

Previous wording

Income available to common shareholders increased $159 million primarily due to the following items:

Current wording

Income available to common shareholders decreased $63 million primarily due to the following items:

Previous wording

•an increase in income available to common shareholders of $35 million for the Electric reportable segment, as further discussed below;

Current wording

•a decrease in income available to common shareholders of $64 million for the Electric reportable segment, as further discussed below;

Previous wording

•an increase in income available to common shareholders of $75 million for Corporate and Other, primarily due to $12 million of income allocated to holders of Series A Preferred Stock in the second quarter of 2023 prior to the redemption of all outstanding shares of Series A Preferred Stock in September 2023 as discussed in Note 18 to the Interim Condensed Financial statements, a loss on sale of $12 million and current tax expense of $33 million related to divestiture of Energy Systems Group recorded during the three months ended June 30, 2023 further discussed in Note 3 to the Interim Condensed Financial Statements, as well as $19 million due to remeasurement of deferred income tax balances recorded during the three months ended June 30, 2023. The increase is partially offset by $12 million increase in borrowing costs.

Current wording

•a decrease in income available to common shareholders of $2 million for Corporate and Other, primarily due to $9 million of higher state income taxes, $7 million associated with corporate operating expenses, and $6 million associated with increased borrowing costs . The decrease is partially offset by $26 million of income allocated to holders of Series A Preferred Stock in the third quarter of 2023 prior to the redemption of all outstanding shares of Series A Preferred Stock in September 2023 as discussed in Note 18 to the Interim Condensed Financial Statements.

Previous wording

Income available to common shareholders increased $122 million primarily due to the following items:

Current wording

Income available to common shareholders increased $96 million primarily due to the following items:

Previous wording

•an increase in income available to common shareholders of $33 million for the Electric reportable segment, as further discussed below;

Current wording

•a decrease in income available to common shareholders of $31 million for the Electric reportable segment, as further discussed below;

Previous wording

•an increase in income available to common shareholders of $65 million for Corporate and Other, primarily due to $24 million of income allocated to holders of Series A Preferred Stock in the six months ended June 30, 2023 prior to the redemption of all outstanding shares of Series A Preferred Stock in September 2023 as discussed in Note 18 to the Interim Condensed Financial statements, a loss on sale of $12 million and current tax expense of $33 million related to divestiture of Energy Systems Group recorded in the six months ended June 30, 2023 further discussed in Note 3 to the Interim Condensed Financial Statements, as well as $19 million due to remeasurement of deferred income tax balances recorded during the six months ended June 30, 2023. The increase is partially offset by $30 million increase in borrowing costs.

Current wording

•an increase in income available to common shareholders of $63 million for Corporate and Other, primarily due to $50 million of income allocated to holders of Series A Preferred Stock in the nine months ended September 30, 2023 prior to the redemption of all outstanding shares of Series A Preferred Stock in September 2023 as discussed in Note 18 to the Interim Condensed Financial Statements, a loss on sale of $12 million and current tax expense of $33 million related to divestiture of Energy Systems Group recorded in the nine months ended June 30, 2023 further discussed in Note 3 to the Interim Condensed Financial Statements, as well as $19 million due to remeasurement of deferred income tax balances recorded during the six months ended June 30, 2023. The increase is partially offset by $29 million associated with increased borrowing costs, $9 million of higher state income taxes, and $7 million associated with corporate operating expenses.

Previous wording

For information regarding factors that may affect the future results of operations of CenterPoint Energy’s Electric reportable segment, please read “Risk Factors — Risk Factors Affecting Operations — Electric Generation, Transmission and Distribution,” “— Risk Factors Affecting Regulatory, Environmental and Legal Risks,” “— Risk Factors Affecting Financial, Economic and Market Risks,” “— Risk Factors Affecting Safety and Security Risks” and “— General and Other Risks” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K.

Current wording

For information regarding factors that may affect the future results of operations of CenterPoint Energy’s Electric reportable segment, see “Risk Factors — Risk Factors Affecting Operations — Electric Generation, Transmission and Distribution,” “— Risk Factors Affecting Regulatory, Environmental and Legal Risks,” “— Risk Factors Affecting Financial, Economic and Market Risks,” “— Risk Factors Affecting Safety and Security Risks” and “— General and Other Risks” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K and in Item 1A of Part II of this combined Form 10-Q.

Previous wording

The following table provides variance explanations for the three months ended June 30, 2024 compared to the three months ended June 30, 2023 as well as for the six months ended June 30, 2024 compared to the six months ended June 30, 2023 by major income statement caption for CenterPoint Energy’s Electric reportable segment:

Current wording

The following table provides variance explanations for the three months ended September 30, 2024 compared to the three months ended September 30, 2023 as well as for the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023 by major income statement caption for CenterPoint Energy’s Electric reportable segment:

Previous wording

For information regarding factors that may affect the future results of operations of CenterPoint Energy’s Natural Gas reportable segment, please read “Risk Factors — Risk Factors Affecting Operations — Natural Gas,” “— Risk Factors Affecting Regulatory, Environmental and Legal Risks,” “— Risk Factors Affecting Financial, Economic and Market Risks,” “— Risk Factors Affecting Safety and Security Risks” and “— General and Other Risks” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K.

Current wording

For information regarding factors that may affect the future results of operations of CenterPoint Energy’s Natural Gas reportable segment, see “Risk Factors — Risk Factors Affecting Operations — Natural Gas,” “— Risk Factors Affecting Regulatory, Environmental and Legal Risks,” “— Risk Factors Affecting Financial, Economic and Market Risks,” “— Risk Factors Affecting Safety and Security Risks” and “— General and Other Risks” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K.

Previous wording

The following table provides variance explanations for the three months ended June 30, 2024 compared to the three months ended June 30, 2023 as well as for the six months ended June 30, 2024 compared to the six months ended June 30, 2023 by major income statement caption for CenterPoint Energy’s Natural Gas reportable segment:

Current wording

The following table provides variance explanations for the three months ended September 30, 2024 compared to the three months ended September 30, 2023 as well as for the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023 by major income statement caption for CenterPoint Energy’s Natural Gas reportable segment:

Previous wording

Houston Electric’s CODM views net income as the measure of profit or loss for its single reportable segment. Houston Electric’s results of operations are affected by seasonal fluctuations in the demand for electricity. Houston Electric’s results of operations are also affected by, among other things, the actions of various governmental authorities having jurisdiction over rates Houston Electric charges, debt service costs, income tax expense, Houston Electric’s ability to collect receivables from REPs and Houston Electric’s ability to recover its regulatory assets. For more information regarding factors that may affect the future results of operations of Houston Electric’s business, please read “Risk Factors — Risk Factors Affecting Operations — Electric Generation, Transmission and Distribution,” “— Risk Factors Affecting Regulatory, Environmental and Legal Risks,” “— Risk Factors Affecting Financial, Economic and Market Risks,” “— Risk Factors Affecting Safety and Security Risks” and “— General and Other Risks” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K.

Current wording

Houston Electric’s CODM views net income as the measure of profit or loss for its single reportable segment. Houston Electric’s results of operations are affected by seasonal fluctuations in the demand for electricity. Houston Electric’s results of operations are also affected by, among other things, the actions of various governmental authorities having jurisdiction over rates Houston Electric charges, debt service costs, income tax expense, Houston Electric’s ability to collect receivables from REPs and Houston Electric’s ability to recover its regulatory assets. For more information regarding factors that may affect the future results of operations of Houston Electric’s business, see “Risk Factors — Risk Factors Affecting Operations — Electric Generation, Transmission and Distribution,” “— Risk Factors Affecting Regulatory, Environmental and Legal Risks,” “— Risk Factors Affecting Financial, Economic and Market Risks,” “— Risk Factors Affecting Safety and Security Risks” and “— General and Other Risks” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K and in Item 1A of Part II of this combined Form 10-Q.

Previous wording

The following table provides variance explanations for the three months ended June 30, 2024 compared to the three months ended June 30, 2023 as well as for the six months ended June 30, 2024 compared to the six months ended June 30, 2023 by major income statement caption for Houston Electric:

Current wording

The following table provides variance explanations for the three months ended September 30, 2024 compared to the three months ended September 30, 2023 as well as for the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023 by major income statement caption for Houston Electric:

Previous wording

CERC’s CODM views net income as the measure of profit or loss for its single reportable segment. CERC’s results of operations are affected by seasonal fluctuations in the demand for natural gas. CERC’s results of operations are also affected by, among other things, the actions of various federal, state and local governmental authorities having jurisdiction over rates CERC charges, debt service costs and income tax expense, CERC’s ability to collect receivables from customers and CERC’s ability to recover its regulatory assets. For more information regarding factors that may affect the future results of operations for CERC’s business, please read “Risk Factors — Risk Factors Affecting Operations — Natural Gas,” “— Risk Factors Affecting Regulatory, Environmental and Legal Risks,” “— Risk Factors Affecting Financial, Economic and Market Risks,” “— Risk Factors Affecting Safety and Security Risks” and “— General and Other Risks” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K.

Current wording

CERC’s CODM views net income as the measure of profit or loss for its single reportable segment. CERC’s results of operations are affected by seasonal fluctuations in the demand for natural gas. CERC’s results of operations are also affected by, among other things, the actions of various federal, state and local governmental authorities having jurisdiction over rates CERC charges, debt service costs and income tax expense, CERC’s ability to collect receivables from customers and CERC’s ability to recover its regulatory assets. For more information regarding factors that may affect the future results of operations for CERC’s business, see “Risk Factors — Risk Factors Affecting Operations — Natural Gas,” “— Risk Factors Affecting Regulatory, Environmental and Legal Risks,” “— Risk Factors Affecting Financial, Economic and Market Risks,” “— Risk Factors Affecting Safety and Security Risks” and “— General and Other Risks” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K.

Previous wording

For information on other developments, factors and trends that may have an impact on the Registrants’ future earnings, please read “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Certain Factors Affecting Future Earnings” in Item 7 of Part II and “Risk Factors” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K, and “Cautionary Statement Regarding Forward-Looking Information” and “Risk Factors” in this combined Form 10-Q.

Current wording

For information on other developments, factors and trends that may impact the Registrants’ future earnings, see “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Certain Factors Affecting Future Earnings” in Item 7 of Part II and “Risk Factors” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K, and “Cautionary Statement Regarding Forward-Looking Information” and “Risk Factors” in this combined Form 10-Q.

Previous wording

The following table summarizes the net cash provided by (used in) operating, investing and financing activities during the six months ended June 30, 2024 and 2023:

Current wording

The following table summarizes the net cash provided by (used in) operating, investing and financing activities during the nine months ended September 30, 2024 and 2023:

Previous wording

Operating Activities. The following items contributed to increased (decreased) net cash provided by operating activities for the six months ended June 30, 2024 compared to the six months ended June 30, 2023:

Current wording

Operating Activities. The following items contributed to increased (decreased) net cash provided by operating activities for the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023:

Previous wording

Investing Activities. The following items contributed to (increased) decreased net cash used in investing activities for the six months ended June 30, 2024 compared to the six months ended June 30, 2023:

Current wording

Investing Activities. The following items contributed to (increased) decreased net cash used in investing activities for the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023:

Previous wording

Financing Activities. The following items contributed to (increased) decreased net cash used in financing activities for the six months ended June 30, 2024 compared to the six months ended June 30, 2023:

Current wording

Financing Activities. The following items contributed to (increased) decreased net cash provided by (used in) financing activities for the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023:

Previous wording

The liquidity and capital requirements of the Registrants are affected primarily by results of operations, capital expenditures, storm restoration costs, debt service requirements, tax payments, working capital needs and various regulatory actions. Capital expenditures (other than expenditures associated with the May 2024 Storm Events and Hurricane Beryl) are expected to be used for investment in infrastructure. These capital expenditures are anticipated to enhance reliability and safety, increase resiliency and expand our systems through value-added projects. Substantial capital expenditures are also expected for restoration costs associated with the May 2024 Storm Events and Hurricane Beryl, as further described below. In addition to dividend payments on CenterPoint Energy’s Common Stock and interest payments on debt, the Registrants’ principal anticipated cash requirements for the remaining six months of 2024 include the following:

Current wording

The liquidity and capital requirements of the Registrants are affected primarily by results of operations, capital expenditures, storm restoration costs, debt service requirements, tax payments, working capital needs and various regulatory actions. Capital expenditures (other than expenditures associated with the May 2024 Storm Events and Hurricane Beryl) are expected to be used for investment in infrastructure. These capital expenditures are anticipated to enhance reliability and safety, increase resiliency and expand our systems through value-added projects. Substantial capital expenditures are also expected for restoration costs associated with the May 2024 Storm Events and Hurricane Beryl, as further described below. In addition to dividend payments on CenterPoint Energy’s Common Stock and interest payments on debt, the Registrants’ principal anticipated cash requirements for the remainder of 2024 include the following:

Previous wording

The Registrants expect that anticipated cash needs for the remaining six months of 2024 will be met with borrowings under their credit facilities, proceeds from the issuance of long-term debt, proceeds from equity issuances, anticipated cash flows from operations, and, with respect to CenterPoint Energy and CERC, proceeds from commercial paper. Proceeds from equity issuances may include the issuance of shares of Common Stock under the Equity Distribution Agreement entered into on January 10, 2024. Issuances of debt securities in the capital markets, funds raised in the commercial paper markets, term loans and additional credit facilities may not, however, be available on acceptable terms.

Current wording

The Registrants expect that anticipated cash needs for the remainder of 2024 will be met with borrowings under their credit facilities, proceeds from the issuance of long-term debt, anticipated cash flows from operations, and, with respect to CenterPoint Energy and CERC, proceeds from commercial paper. Issuances of debt securities in the capital markets, funds raised in the commercial paper markets, term loans and additional credit facilities may not, however, be available on acceptable terms.

Previous wording

For more information regarding the May 2024 Storm Events and Hurricane Beryl, see Notes 6, 11, 13 and 20 to the Interim Condensed Financial Statements as well as “Recent Events” in Part I. Item 2 and “Risk Factors” in this combined Form 10-Q.

Current wording

For more information regarding the May 2024 Storm Events and Hurricane Beryl, see Notes 6, 11 and 13 to the Interim Condensed Financial Statements as well as “Recent Events” in Part I, Item 2 and “Risk Factors” in Part II, Item 1A of this combined Form 10-Q.

Previous wording

For additional information about Hurricane Beryl, see “Recent Events” in Part I. Item 2 in this combined Form 10-Q.

Current wording

For additional information about Hurricane Beryl, see Note 6 to the Interim Condensed Financial Statements as well as “Recent Events” in Part I, Item 2 and “Risk Factors” in Part II, Item 1A of this combined Form 10-Q.

Previous wording

For additional information about the May 2024 Storm Events, see Note 6 to the Interim Condensed Financial Statements.

Current wording

For additional information about the May 2024 Storm Events, see Note 6 to the Interim Condensed Financial Statements as well as “Recent Events” in Part I, Item 2 and “Risk Factors” in Part II, Item 1A of this combined Form 10-Q.

Previous wording

On May 1, 2024, Indiana Electric filed with the IURC seeking approval to purchase 147 MW of wind power under a 25-year PPA with an affiliate of NextEra Energy, Inc., which is developing a wind project in Knox County, IL. The facility is targeted to be in operation at the end of 2025 or early 2026. Indiana Electric expects a decision from the IURC in the third or fourth quarter of 2024. If Indiana Electric’s request is approved, the purchase power costs will be recovered through the fuel adjustment clause proceedings over the term of the amended PPA.

Current wording

On May 1, 2024, Indiana Electric filed with the IURC seeking approval to purchase 147 MW of wind power under a 25-year PPA with an affiliate of NextEra Energy, Inc., which is developing a wind project in Knox County, IL. The facility is targeted to be in operation in early 2026. Indiana Electric expects a decision from the IURC in the fourth quarter of 2024. If Indiana Electric’s request is approved, the purchase power costs will be recovered through the fuel adjustment clause proceedings over the term of the PPA.

Previous wording

In June 2022, F.B. Culley Unit 3, an Indiana Electric coal-fired electric generation unit with an installed generating capacity of 270 MW, experienced an operating issue relating to its boiler feed pump turbine. The unit returned to service in March 2023. In testimony filed September 13, 2023, the OUCC and an intervenor that represents industrial customers filed testimony with the IURC alleging that Indiana Electric did not act prudently which led to the unplanned outage and recommended disallowances between $21 million to $27 million. On July 3, 2024, the IURC issued an order finding Indiana Electric acted reasonably and prudently with respect to the events that gave rise to the Culley Unit 3 outage and, in addition, did not approve the intervenors proposed disallowance. The order is subject to appeal for a 30-day period.

Current wording

In June 2022, F.B. Culley Unit 3, an Indiana Electric coal-fired electric generation unit with an installed generating capacity of 270 MW, experienced an operating issue relating to its boiler feed pump turbine. The unit returned to service in March 2023. In testimony filed September 13, 2023, the OUCC and an intervenor that represents industrial customers filed testimony with the IURC alleging that Indiana Electric did not act prudently which led to the unplanned outage and recommended disallowances between $21 million to $27 million. On July 3, 2024, the IURC issued an order finding Indiana Electric acted reasonably and prudently with respect to the events that gave rise to the Culley Unit 3 outage and, in addition, did not approve the intervenors proposed disallowance. The order is now final and non-appealable.

Previous wording

On November 17, 2023, Houston Electric filed a CCN application with the PUCT for approval to build a 138 kV double circuit transmission line in Harris and Montgomery counties, Texas that will connect Houston Electric’s transmission system to Houston Electric’s planned Mill Creek substation. The actual capital costs of the project, including the transmission line and the planned Mill Creek substation, will depend on actual land acquisition costs, construction costs, and other factors and have been estimated to be $62 million to $98 million, based on an amended CCN application filed by Houston Electric on February 26, 2024 and subsequent errata filed on May 9, 2024. A decision by the PUCT on the approval of the project is expected in the second half of 2024.

Current wording

On November 17, 2023, Houston Electric filed a CCN application with the PUCT for approval to build a 138 kV double circuit transmission line in Harris and Montgomery counties, Texas that will connect Houston Electric’s transmission system to Houston Electric’s planned Mill Creek substation. The actual capital costs of the project, including the transmission line and the planned Mill Creek substation, will depend on actual land acquisition costs, construction costs, and other factors and have been estimated to be $62 million to $98 million, based on an amended CCN application filed by Houston Electric on February 26, 2024 and subsequent errata filed on May 9, 2024. On October 24, 2024, the PUCT heard oral arguments and indicated that they will issue a decision on this project on November 14, 2024.

Previous wording

•House Bill 2555 became effective on June 13, 2023 and allows an electric utility to file a transmission and distribution system resiliency plan with the PUCT and associated cost recovery to enhance its system through hardening, modernization, undergrounding certain lines, lightning mitigation measures, flood mitigation measures, information technology, cybersecurity, physical security, vegetation management and wildfire mitigation. On January 18, 2024, the PUCT issued an Order adopting its Resiliency Plan Rule (16 Texas Admin Code § 25.62);

Current wording

•House Bill 2555 became effective on June 13, 2023 and allows an electric utility to file a transmission and distribution system resiliency plan with the PUCT and associated cost recovery to enhance its system through hardening, modernization, undergrounding certain lines, lightning mitigation measures, flood mitigation measures, information technology, cybersecurity, physical security, vegetation management and wildfire mitigation. On January 18, 2024, the PUCT issued an Order adopting its Resiliency Plan Rule (16 Tex. Admin. Code § 25.62);

Previous wording

On June 28, 2023, CERC submitted its first innovation plan to the MPUC; the five-year plan includes 18 pilot projects and seven smaller research-and-development projects. These projects will deploy and evaluate a broad array of innovative resources including made-in-Minnesota alternative gases such as renewable natural gas and green hydrogen as well as pioneering technologies such as a networked geothermal district energy system and end-use carbon capture. The proposed plan requires approval from the MPUC through a review process that is expected to take about one year. The MPUC requested comments by September 15, 2023 if parties believe that the filing is incomplete based on the reporting requirements or if parties do not believe that that the MPUC’s standard informal proceeding process is appropriate. No parties filed comments regarding completeness or raising concerns that the MPUC’s standard informal procedural process is inappropriate. The initial comment period closed January 15, 2024, the reply comment period closed March 15, 2024 and the supplemental comments period closed May 15, 2024. On July 25, 2024, the MPUC voted to approve the plan with some minor modifications during its agenda meeting and a formal order is anticipated to be issued in the third quarter of 2024.

Current wording

On June 28, 2023, CERC submitted its first innovation plan to the MPUC; the five-year plan includes 18 pilot projects and seven smaller research-and-development projects. These projects will deploy and evaluate a broad array of innovative resources including made-in-Minnesota alternative gases such as renewable natural gas and green hydrogen as well as pioneering technologies such as a networked geothermal district energy system and end-use carbon capture. The proposed plan requires approval from the MPUC through a review process that is expected to take about one year. The MPUC requested comments by September 15, 2023 if parties believe that the filing is incomplete based on the reporting requirements or if parties do not believe that that the MPUC’s standard informal proceeding process is appropriate. No parties filed comments regarding completeness or raising concerns that the MPUC’s standard informal procedural process is inappropriate. The initial comment period closed January 15, 2024, the reply comment period closed March 15, 2024 and the supplemental comment period closed May 15, 2024. On July 25, 2024, the MPUC voted to approve the plan with some minor modifications during its agenda meeting and a formal order was issued on October 9, 2024.

Previous wording

CenterPoint Energy’s current and future solar projects have been impacted by delays and/or increased costs. The potential delays and inflationary cost pressures communicated from the developers of our solar projects have been primarily due to (i) unavailability of solar panels and other uncertainties related to a DOC investigation on anti-dumping and countervailing duties petition filed by American Alliance of Solar Manufacturing Trade Committee, (ii) the December 2021 Uyghur Forced Labor Prevention Act on solar modules and other products manufactured in China’s Xinjiang Uyghur Autonomous Region and (iii) persistent general global supply chain and labor availability issues. On May 15, 2024, the DOC announced the initiation of antidumping and countervailing duty investigations of silicon photovoltaic cells, from Cambodia, Malaysia, Thailand, and Vietnam. The DOC is expected to issue a preliminary countervailing duty ruling in September 2024 and a preliminary antidumping ruling in the fourth quarter of 2024. On June 7, 2024, the U.S. International Trade Commission preliminarily determined that U.S. solar manufactures are being harmed by unfair trade practices from competitors in Southeast Asia. These impacts could result in cost increases for certain projects, and such impacts may require that we seek additional regulatory review and approvals. Additionally, significant changes to project costs and schedules as a result of these factors could impact the viability of the projects. For more information regarding potential delays, cancellations and supply chain disruptions, see “Item 1A. Risk Factors” in the Registrants’ combined 2023 Form 10-K.

Current wording

CenterPoint Energy’s current and future solar projects have been impacted by delays and/or increased costs. The potential delays and inflationary cost pressures communicated from the developers of our solar projects have been primarily due to (i) unavailability of solar panels and other uncertainties related to DOC anti-dumping and countervailing duties investigation(s), (ii) the December 2021 Uyghur Forced Labor Prevention Act on solar modules and other products manufactured in China’s Xinjiang Uyghur Autonomous Region and (iii) persistent general global supply chain and labor availability issues. On May 15, 2024, based on a petition filed by the American Alliance for Solar Manufacturing Trade Committee, the DOC announced the initiation of antidumping and countervailing duty investigations of silicon photovoltaic cells from Cambodia, Malaysia, Thailand, and Vietnam. On October 1, 2024, the DOC’s preliminary countervailing duty determination affirmed the petition and established preliminary duty rates. The DOC is expected to issue a preliminary antidumping determination in the fourth quarter of 2024 with final determinations expected in the first quarter of 2025. These impacts could result in cost increases for certain projects, and such impacts may require that we seek additional regulatory review and approvals. Additionally, significant changes to project costs and schedules as a result of these factors could impact the viability of the projects. For more information regarding potential delays, cancellations and supply chain disruptions, see “Risk Factors” in Item 1A of Part I of the Registrants’ combined 2023 Form 10-K.

Previous wording

Minnesota Rate Case. On November 1, 2023, CERC filed an application with the MPUC requesting an adjustment to delivery charges in 2024 and 2025 for the natural gas business in Minnesota. The requested increase is approximately 6.5% or $85 million for 2024 and an additional approximately 3.7% or $52 million for 2025. The need for a rate change is primarily driven by the continuing investment in the safety and reliability of the natural gas system, including new Intelis natural gas meters that feature an integrated safety shutoff valve, changes to depreciation rates that better reflect the actual life and salvage characteristics of assets, and changes in other costs to serve customers. The request reflects a proposed 10.3% ROE on a 52.5% equity ratio. Interim rates of $69 million, subject to refund, were implemented as of January 1, 2024. A decision on 2025 interim rates was delayed until the fourth quarter of 2024. The anticipated decision date of the rate case is July 1, 2025.

Current wording

Minnesota Rate Case. On November 1, 2023, CERC filed an application with the MPUC requesting an adjustment to delivery charges in 2024 and 2025 for the natural gas business in Minnesota. The requested increase is approximately 6.5% or $85 million for 2024 and an additional approximately 3.7% or $52 million for 2025. The need for a rate change is primarily driven by the continuing investment in the safety and reliability of the natural gas system, including new Intelis natural gas meters that feature an integrated safety shutoff valve, changes to depreciation rates that better reflect the actual life and salvage characteristics of assets, and changes in other costs to serve customers. The request reflects a proposed 10.3% ROE on a 52.5% equity ratio. Interim rates for 2024 of $69 million, subject to refund, were implemented as of January 1, 2024. A request for interim rates of $33 million for 2025 was filed on September 30, 2024 and decision on 2025 interim rates is expected in the fourth quarter of 2024. A pretrial and settlement conference is scheduled for December 16, 2024 and the anticipated decision date of the rate case is July 1, 2025.

Previous wording

Indiana Electric Rate Case. On December 5, 2023, Indiana Electric filed a petition with the IURC for authority to modify its rates and charges for electric utility service through a phase-in of rates. The requested increase is approximately 16% or $119 million based on a forward looking 2025 test year. The need for a rate increase is primarily driven by the continuing investment that is being made to bolster the safety and reliability of the system and normal increases in operating expenses. The initial filing of the rate case reflected a proposed 10.4% ROE on a 55% equity ratio. On April 9, 2024 Indiana Electric filed rebuttal in the rate case. Indiana Electric reached a settlement agreement with less than all parties and submitted the agreement to the IURC on May 20, 2024. The settlement reflects a proposed 9.8% ROE on a 55% equity ratio. The requested increase was lowered to 11% with an updated requested increase of $80 million. A hearing is scheduled to begin September 3, 2024. A final order is expected in the first quarter of 2025.

Current wording

Indiana Electric Rate Case. On December 5, 2023, Indiana Electric filed a petition with the IURC for authority to modify its rates and charges for electric utility service through a phase-in of rates. The requested increase is approximately 16% or $119 million based on a forward looking 2025 test year. The need for a rate increase is primarily driven by the continuing investment that is being made to bolster the safety and reliability of the system and normal increases in operating expenses. The initial filing of the rate case reflected a proposed 10.4% ROE on a 55% equity ratio. On April 9, 2024 Indiana Electric filed rebuttal in the rate case. Indiana Electric reached a settlement agreement with less than all parties and submitted the agreement to the IURC on May 20, 2024. The settlement reflects a proposed 9.8% ROE on a 55% equity ratio. The requested increase was lowered to 11% with an updated requested increase of $80 million. A hearing took place on September 10, 2024 through September 11, 2024. A final order is expected in the first half of 2025.

Previous wording

Houston Electric Rate Case. On March 6, 2024, Houston Electric filed an application with the PUCT requesting authority to change rates and charges for electric transmission and distribution service. The requested increase is approximately $17 million (1%) for retail customers and $43 million (6.6%) for wholesale transmission service, excluding TCRF and rate case expenses. Texas law mandates that electric utilities file a base rate proceeding no later than every four years from the date of their last base rate proceeding final order. Houston Electric’s most recent base rate proceeding order was approved by the PUCT on March 9, 2020, in Docket No. 49421. Therefore, Houston Electric was required to file its next base rate proceeding no later than March 9, 2024. The need for a rate increase is primarily driven by the continuing investment that has been made to support customer growth and to bolster the safety and reliability of Houston Electric’s transmission and distribution system. The request reflects a proposed 10.4% ROE and a 45% equity ratio. Errata testimony was filed to correct minor errors included in the initial filing which reduced the requested increase to $56 million compared to current rates. Intervenor and PUCT staff testimony was filed in June 2024. Rebuttal testimony was due on July 12, 2024 and Houston Electric filed rebuttal testimony from 13 witnesses that covered issues other than operations; however, due to their significant operational responsibilities associated with Houston Electric’s emergency operations plan and response to Hurricane Beryl, an extension was requested (and granted) for the operations witnesses. A hearing on the merits was scheduled to start in late July 2024. On July 17, 2024, Houston Electric filed an unopposed motion to abate the pending deadlines in order to provide additional time to facilitate the continued settlement discussions; the motion was granted on the same day. Houston Electric will provide the ALJs an update on the status of settlement negotiations by August 2, 2024 and every two weeks thereafter.

Current wording

Houston Electric Rate Case. On March 6, 2024, Houston Electric filed an application with the PUCT requesting authority to change rates and charges for electric transmission and distribution service. The requested increase is approximately $17 million (1%) for retail customers and $43 million (6.6%) for wholesale transmission service, excluding TCRF and rate case expenses. Texas law mandates that electric utilities file a base rate proceeding no later than every four years from the date of their last base rate proceeding final order. Houston Electric’s most recent base rate proceeding order was approved by the PUCT on March 9, 2020, in Docket No. 49421. Therefore, Houston Electric was required to file its next base rate proceeding no later than March 9, 2024. The need for a rate increase is primarily driven by the continuing investment that has been made to support customer growth and to bolster the safety and reliability of Houston Electric’s transmission and distribution system. The request reflects a proposed 10.4% ROE and a 45% equity ratio. Errata testimony was filed to correct minor errors included in the initial filing which reduced the requested increase to $56 million compared to current rates. Intervenor and PUCT staff testimony was filed in June 2024. Rebuttal testimony was due on July 12, 2024 and Houston Electric filed rebuttal testimony from 13 witnesses that covered issues other than operations; however, due to their significant operational responsibilities associated with Houston Electric’s emergency operations plan and response to Hurricane Beryl, an extension was requested (and granted) for the operations witnesses. A hearing on the merits was scheduled to start in late July 2024. On July 17, 2024, Houston Electric filed an unopposed motion to abate the pending deadlines in order to provide additional time to facilitate the continued settlement discussions; the motion was granted on the same day. On August 1, 2024, Houston Electric announced that it was withdrawing its base rate application with the PUCT requesting authority to change rates and charges for electric transmission and distribution service in order to focus on addressing the impacts of Hurricane Beryl in its service territory and accelerating preparedness and resiliency efforts for the remaining storm season. Intervenors filed a motion to challenge the withdrawal of the base rate proceeding. PUCT staff and the Office of Public Utility Counsel filed a letter in support of such withdrawal. On August 16, 2024, the ALJ issued an order denying the requested withdrawal of the base rate proceeding, leaving the base rate proceeding abated. On August 23, 2024, Houston Electric filed an appeal of the ALJ’s order to the PUCT. On September 12, 2024, the PUCT issued an order extending the time to act on Houston Electric’s appeal. On October 24, 2024, the PUCT heard oral arguments on the appeal and indicated that they will decide the appeal on November 14, 2024.

Previous wording

Ohio CEP. On March 1, 2024, CEOH filed an application with the PUCO for authority to modify its CEP rates and charges. The requested increase is approximately $3 million resulting in a proposed CEP rate for residential customers of $1.54 per month. Per the PUCO’s Opinion and Order in the 2018 general rate case, the CEP rate is capped at $1.50 per month for residential customers. CEOH requested deferral of the 2023 CEP revenue requirement above the CEP rate cap of approximately $155,000. On June 20, 2024, PUCO staff filed comments recommending that CEOH be permitted to collect $1.50 in this annual rider. However, PUCO staff recommended that CEOH be denied the opportunity to collect deferrals that exceed $1.50. PUCO staff also recommends that CEOH cease accruing deferrals until such time as a new CEP alternative regulation case has been approved and asserted the $1.50 cap was reached at some point in 2023. CEOH filed comments on July 15, 2024, providing additional clarification on its interpretation of the 2018 rate case stipulation language. CEOH’s interpretation is that CEOH has complied with the PUCO’s Opinion and Order from the 2018 general rate case, and CEOH plans to file a Notice of Intent to file a rate case application prior to the $1.50 cap being reached allowing for the deferral to be maintained. CEOH expects to get a decision regarding the CEP application and deferral continuance in the third quarter of 2024.

Current wording

Ohio CEP. On March 1, 2024, CEOH filed an application with the PUCO for authority to modify its CEP rates and charges. The requested increase is approximately $3 million resulting in a proposed CEP rate for residential customers of $1.54 per month. Per the PUCO’s Opinion and Order in the 2018 general rate case, the CEP rate is capped at $1.50 per month for residential customers. CEOH requested deferral of the 2023 CEP revenue requirement above the CEP rate cap of approximately $155,000. On June 20, 2024, PUCO staff filed comments recommending that CEOH be permitted to collect $1.50 in this annual rider. However, PUCO staff recommended that CEOH be denied the opportunity to collect deferrals that exceed $1.50. PUCO staff also recommended that CEOH cease accruing deferrals until such time as a new CEP alternative regulation case has been approved and asserted the $1.50 cap was reached at some point in 2023. CEOH filed comments on July 15, 2024, providing additional clarification on its interpretation of the 2018 rate case stipulation language. CEOH’s interpretation is that CEOH has complied with the PUCO’s Opinion and Order from the 2018 general rate case, and CEOH plans to file a Notice of Intent to file a rate case application prior to the $1.50 cap being reached, allowing for the deferral to be maintained. CEOH filed a statement of resolution on July 30, 2024, indicating CEOH and PUCO staff agree to certain statements including: CEOH’s existing deferral authority has not expired and will continue uninterrupted, provided CEOH files its notice of intent for its base rate case prior to the new CEP Rider charges taking effect. PUCO issued a Finding & Order on August 21, 2024, finding that the parties’ resolution of the rate cap and deferral authority issues were reasonable.

Previous wording

On August 16, 2022, the IRA was signed into law. The new law extends or creates tax-related energy incentives for solar, wind and alternative clean energy sources, implements, subject to certain exceptions, a 1% tax on share repurchases after December 31, 2022, and implements a 15% CAMT based on the adjusted financial statement income of certain large corporations. Corporations are entitled to a CAMT credit to the extent CAMT liability exceeds regular tax liability, which can be carried forward indefinitely and used in future years when regular tax exceeds the CAMT. It is likely that the Registrants will owe CAMT in excess of their regular tax liability beginning in 2024. As a result, the Registrants may experience a temporary increase in federal cash tax liability due to this provision beginning in 2024.

Current wording

On August 16, 2022, the IRA was signed into law. The new law extends or creates tax-related energy incentives for solar, wind and alternative clean energy sources, implements, subject to certain exceptions, a 1% tax on share repurchases after December 31, 2022, and implements a 15% CAMT based on the adjusted financial statement income of certain large corporations. Corporations are entitled to a CAMT credit to the extent CAMT liability exceeds regular tax liability, which can be carried forward indefinitely and used in future years when regular tax exceeds the CAMT. It is likely that the Registrants will owe CAMT in excess of their regular tax liability beginning in 2024. As a result, the Registrants may experience a temporary increase in federal cash tax liability due to this provision beginning in 2024. On September 12, 2024, the IRS issued proposed regulations addressing the application of the CAMT. The proposed regulations offer guidance for computing an entity’s adjusted financial statement income, in addition to addressing other provisions of the CAMT. At this time, the Company does not anticipate changes to the applicability of CAMT to the Registrants as a result of the proposed regulations.

Previous wording

On August 3, 2015, the EPA released its CPP rule, which required a 32% reduction in carbon emissions from 2005 levels. The final rule was published in the Federal Register on October 23, 2015, and that action was immediately followed by litigation ultimately resulting in the U.S. Supreme Court staying implementation of the rule. On July 8, 2019, the EPA published the ACE rule, which (i) repealed the CPP rule; (ii) replaced the CPP rule with a program that requires states to implement a program of energy efficiency improvement targets for individual coal-fired electric generating units; and (iii) amended the implementing regulations for Section 111(d) of the Clean Air Act. On January 19, 2021, the majority of the ACE rule — including the CPP repeal, CPP replacement, and the timing-related portions of the Section 111(d) implementing rule — was struck down by the U.S. Court of Appeals for the D.C. Circuit and on October 29, 2021, the U.S. Supreme Court agreed to consider four petitions filed by various coal interests and a coalition of 19 states. On June 30, 2022, the U.S. Supreme Court ruled that the EPA exceeded its authority in promulgating the CPP. On May 11, 2023, the EPA announced proposed emission limits and guidelines for carbon dioxide from fossil fuel-fired power plants under Section 111 of the Clean Air Act which, if finalized, apply new GHG performance standards for those existing coal-fired units expected to continue operation beyond December 31, 2029. On February 29, 2024, the EPA announced that it would be delaying the rulemaking as applied to existing natural gas-fired units. On April 25, 2024, the EPA released its New Source Performance Standards for Greenhouse Gas Emissions From New, Modified, Reconstructed Fossil Fuel-Fired Units; Emission Guidelines for Greenhouse Gas Emissions

Current wording

On August 3, 2015, the EPA released its CPP rule, which required a 32% reduction in carbon emissions from 2005 levels. The final rule was published in the Federal Register on October 23, 2015, and that action was immediately followed by litigation ultimately resulting in the U.S. Supreme Court staying implementation of the rule. On July 8, 2019, the EPA published the ACE rule, which (i) repealed the CPP rule; (ii) replaced the CPP rule with a program that requires states to implement a program of energy efficiency improvement targets for individual coal-fired electric generating units; and (iii) amended the implementing regulations for Section 111(d) of the Clean Air Act. On January 19, 2021, the majority of the ACE rule — including the CPP repeal, CPP replacement, and the timing-related portions of the Section 111(d) implementing rule — was struck down by the U.S. Court of Appeals for the D.C. Circuit and on October 29, 2021, the U.S. Supreme Court agreed to consider four petitions filed by various coal interests and a coalition of 19 states. On June 30, 2022, the U.S. Supreme Court ruled that the EPA exceeded its authority in promulgating the CPP. On May 11, 2023, the EPA announced proposed emission limits and guidelines for carbon dioxide from fossil fuel-fired power plants under Section 111 of the Clean Air Act which, if finalized, apply new GHG performance standards for those existing coal-fired units expected to continue operation beyond December 31, 2029. On February 29, 2024, the EPA announced that it would be delaying the rulemaking as applied to existing natural gas-fired units. On April 25, 2024, the EPA released its New Source Performance Standards for Greenhouse Gas Emissions From New, Modified, Reconstructed Fossil Fuel-Fired Units; Emission Guidelines for Greenhouse Gas Emissions From Existing Fossil Fuel-Fired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule. CenterPoint Energy is currently reviewing this rule, but would note that CenterPoint Energy does not currently have plans to operate any of its coal-fired units beyond December 2029.

Showing the first 40 of 51 pairs. Open the source sections for the rest.

Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

Six months ended June 30, 2024 compared to three months ended June 30, 2023

Previous report — wording carried elsewhere

From Existing Fossil Fuel-Fired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule. CenterPoint Energy is currently reviewing this rule, but would note that CenterPoint Energy does not currently have plans to operate any of its coal-fired units beyond December 2029.

Previous report — wording carried elsewhere

For further information, see Note 3 to the Interim Condensed Financial Statements.