Item 1A. RISK FACTORSCurrent report: 10-K
Period ended 2024-12-31; filed 2025-02-28.
0001108426-25-000014
Item 1A. RISK FACTORSThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 106 previous paragraphs and 121 current paragraphs.
45 unchanged; 49 reworded; 22 added; 8 removed; 4 previous and 5 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (22)
Current report
In June 2024, PNM filed the 2025 Rate Request for a two-phase implementation of a $3.0 billion increase in total rate base. The increase includes investments in transmission, distribution, and generation facilities to ensure safe, reliable delivery of electricity and a request for an ROE of 10.45%. An adverse outcome in the 2025 Rate Request could negatively impact PNM’s financial position, results of operation, and cash flows. See Note 17.
Current report
With the proliferation of Generative Artificial Intelligence (“GenAI”) tools like opensource ChatGPT and other public Large Language models, bad actors are becoming better equipped to effectively launch social engineering attacks against individuals and organizations. With their broad array of use cases, these tools are enhancing data theft, malware development, social engineering, ransomware, and misinformation. GenAI technology is enabling malicious actors to increase the speed and variation of their attacks by modifying code almost instantaneously, enabling attacks to be created and deployed with thousands of variations of social engineering messages, effectively changing to a more iterative attack methodology to increase their probability of success. In the event that a capable adversary attacks the Company’s computer and operating systems, despite the best efforts of the Company, the generation, transmission, or distribution of electrical services could be degraded or disrupted, customer information, business records, or other sensitive data could be lost, destroyed, or released outside of the Company’s control.
Current report
TXNM and its subsidiaries’ substantial indebtedness could adversely affect its financial condition.
Current report
TXNM and its subsidiaries currently have a significant amount of indebtedness, including the Convertible Notes. This significant amount of indebtedness could limit TXNM’s ability to obtain additional financing for working capital, capital expenditures, acquisitions, debt service requirements, stock repurchases or other purposes. It may also increase TXNM’s vulnerability to adverse economic, market and industry conditions, limit its flexibility in planning for, or reacting to, changes in its business operations or to its industry overall, and place TXNM at a disadvantage in relation to its competitors that have lower debt levels. Any or all of the above events and/or factors could have an adverse effect on TXNM’s results of operations and financial condition.
Current report
Servicing TXNM and its subsidiaries’ debt requires a significant amount of cash, and it may not have sufficient cash flow from its business to pay its substantial debt.
Current report
TXNM and its subsidiaries’ ability to make scheduled payments of the principal of, to pay interest on or to refinance, its indebtedness, including the Convertible Notes, depends on its future performance, which is subject to economic, financial, competitive and other factors beyond its control. TXNM’s business may not continue to generate cash flow from operations in the future sufficient to service its debt and make necessary capital expenditures. If TXNM is unable to generate such cash flow, TXNM may be required to adopt one or more alternatives, such as selling assets, restructuring debt or obtaining additional equity capital on terms that may be onerous or highly dilutive. TXNM’s ability to refinance its indebtedness will depend on the capital markets and its financial condition at such time. TXNM may not be able to engage in any of these activities or engage in these activities on desirable terms, which could result in a default on its debt obligations.
Current report
Despite TXNM’s current consolidated debt levels, TXNM and its subsidiaries may still incur substantially more debt or take other actions which would intensify the risks discussed above.
Current report
Despite TXNM’s current consolidated debt levels, TXNM and its subsidiaries may be able to incur substantial additional debt in the future, subject to the restrictions contained in its debt instruments, some of which may be senior indebtedness or secured debt. TXNM is not restricted under the terms of the Convertible Notes Indenture from incurring additional debt, securing existing or future debt, recapitalizing its debt or taking a number of other actions. TXNM’s Credit Agreement restricts its ability to incur additional indebtedness, including secured indebtedness, but if the TXNM Credit Agreement matures or is repaid, TXNM may not be subject to such restrictions under the terms of any subsequent indebtedness.
Current report
The conditional conversion feature of the Convertible Notes, if triggered, may adversely affect TXNM’s financial condition and operating results.
Current report
In the event the conditional conversion feature of the Convertible Notes is triggered, holders of Convertible Notes will be entitled to convert the Convertible Notes at any time during specified periods at their option. If one or more holders elect to convert their Convertible Notes, to the extent TXNM is required to pay cash to settle a portion of its conversion obligation, it could adversely affect TXNM’s liquidity. In addition, even if holders do not elect to convert their Convertible Notes, to the extent TXNM is required to pay cash to settle a portion of its conversion obligations, TXNM would be required under applicable accounting rules to reclassify all or a portion of the outstanding principal of the Convertible Notes as a current rather than long-term liability, which would result in a material reduction of its net working capital.
Current report
The accounting method for the Convertible Notes could have a material effect on TXNM’s reported financial results.
Current report
In August 2020, the Financial Accounting Standards Board issued Accounting Standards Update No. 2020-06, Debt—Debt with Conversion and Other Options (Subtopic 470-20) and Derivatives and Hedging—Contracts in Entity’s Own Equity (Subtopic 815-40): Accounting for Convertible Instruments and Contracts in an Entity’s Own Equity (“ASU 2020-06”), which amends the accounting standards for convertible debt instruments that may be settled entirely or partially in cash upon conversion. ASU 2020-06 eliminates requirements to separately account for liability and equity components of such convertible debt instruments and eliminates the ability to use the treasury stock method for calculating diluted earnings per share for
Current report
A - 18 convertible instruments whose principal amount may be settled using shares. Instead, ASU 2020-06 requires (i) the entire amount of the security to be presented as a liability on the balance sheet and (ii) application of the “if-converted” method for calculating diluted earnings per share. Under the “if-converted” method, diluted earnings per share will generally be calculated assuming that all the Convertible Notes were converted solely into shares of common stock at the beginning of the reporting period, unless the result would be anti-dilutive, which could adversely affect TXNM’s diluted earnings per share. However, if the principal amount of the convertible debt security, such as the Convertible Notes, being converted is required to be paid in cash and only the excess is permitted to be settled in shares, the if-converted method will produce a similar result as the “treasury stock” method prior to the adoption of ASU 2020-06 for such convertible debt security.
Current report
ASU 2020-06 became effective for TXNM as of the start of fiscal year end 2022 and as such TXNM did not bifurcate the liability and equity components of the Convertible Notes on its balance sheet and TXNM used the if-converted method of calculating diluted earnings per share. To the extent TXNM is required to pay cash to settle the principal amount of the Convertible Notes upon conversion, with only the excess permitted to be settled in shares of TXNM’s common stock, the application of the if-converted method will produce a similar result as the treasury stock method prior to the adoption of ASU 2020-06. The effect of the treasury stock method is that the shares issuable upon conversion of such Convertible Notes are not included in the calculation of diluted earnings per share except to the extent that the conversion value of such Convertible Notes exceeds their principal amount. The requirement that the principal amount of the Convertible Notes upon conversion must be paid in cash could adversely affect TXNM’s liquidity.
Current report
TXNM cannot be sure whether other changes may be made to the current accounting standards related to the Convertible Notes, or otherwise, that could have a material effect on its reported financial results.
Current report
The fundamental change repurchase features of the Convertible Notes and the TNMP first mortgage bonds may delay or prevent an otherwise beneficial attempt to acquire TXNM.
Current report
Certain provisions in the indenture governing the Convertible Notes and the TNMP first mortgage bonds may make it more difficult or expensive for a third party to acquire TXNM. For example, the Convertible Notes Indenture requires TXNM, subject to certain exceptions, to repurchase the Convertible Notes for cash upon the occurrence of a fundamental change (as defined in the Convertible Notes Indenture) and, in certain circumstances, to increase the conversion rate for a holder that converts its Convertible Notes in connection with a make-whole fundamental change (as defined in the Convertible Notes Indenture). In addition, the supplemental indentures governing certain of the TNMP first mortgage bonds include a provision whereby a change in control in TNMP or TXNM would obligate TNMP to offer to prepay all of such bonds. A takeover of TXNM may trigger the requirement that TXNM repurchase TNMP first mortgage bonds or the Convertible Notes and/or increase the conversion rate on the Convertible Notes, which could make it more costly for a potential acquirer to engage in such takeover. Such additional costs may have the effect of delaying or preventing a takeover of TXNM that would otherwise be beneficial to investors.
Removed paragraphs (8)
Previous report
In December 2022, PNM filed the 2024 Rate Change that included investments in transmission and distribution infrastructure for the six years between 2019 through 2024 as primary drivers of PNM’s identified revenue deficiency and a request for an ROE of 10.25%. The revenue deficiency is largely offset by cost reductions resulting from PNM’s transition to lower-cost, clean generation resources. On January 3, 2024, the NMPRC issued a final order increasing non-fuel rates by a fraction of what was requested in the application and approving an ROE of 9.26%. The final order also provided for specific disallowances of PNM’s undepreciated investments in Four Corners and PVNGS. This adverse outcome in the 2024 Rate Change could negatively impact PNM’s financial position, results of operation, and cash flows. See Note 17.
Previous report
As a result of construction delays, most of the SJGS replacement resources were not available for the 2022 and 2023 summer peak load periods. If these delays continue, PNM’s existing resources, including available reserves, may be insufficient for 2024 summer peak load reliability. Prolonged delays in replacement resources for SJGS, PVNGS, availability of existing resources, and increased costs for purchasing capacity may negatively impact the results of operations and cash flows. See Note 17.
Previous report
In 2022, the NMPRC adopted revisions to the IRP Rule that revamp and modernize the planning process to accommodate increased stakeholder involvement. The IRP Rule establishes a collaborative facilitated process for a utility and stakeholders to agree on a statement of need for potential new or additional resources, as well as an action plan to guide procurement or development of resources to meet the stated need. Following acceptance of the statement of need and action plan, a utility will provide the NMPRC and intervenors drafts of the request for proposals (“RFP”) and a timeline for issuing,
Previous report
A - 17 receiving, evaluating, and ranking bids. The NMPRC will then appoint an Independent Monitor (“IM”) to oversee the RFP process, which allows for parties and the IM to comment on the RFP consistency with the IRP, after which the utility issues the RFP. On December 2, 2022, PNM filed an appeal with the NM Supreme Court of the NMPRC’s final order which adopted revisions to the IRP Rule. See Note 17. The proposed oversight of the procurement process is likely to prevent a utility’s timely acquisition of necessary resources and may inhibit competitive procurement.
Previous report
Continued supply chain issues were initially experienced during high inflation, actions by the Federal Reserve to address inflationary concerns or other market conditions, geopolitical activity and the resulting impact on the economy and financial markets could adversely affect the Company’s business, results of operations, financial condition, cash flows, and access to the capital markets. The Company provides critical electric services and has implemented business continuity and emergency response plans to continue to provide these services to its customers and to support the Company’s operations. The Company is also continuing to work with our suppliers to understand and mitigate the potential impacts to our supply chain and have taken steps to ensure the availability of critical components by increasing lead times and maintaining integrity of our systems.
Reworded paragraphs (49)
Previous wording
The business and financial results of PNMR, PNM, and TNMP are subject to a number of risks and uncertainties, many of which are beyond their control, including those set forth below and in MD&A, Note 16, and Note 17. For other factors that may cause actual results to differ materially from those indicated in any forward-looking statement contained in this report, see Disclosure Regarding Forward Looking Statements in Item 1. Business. TNMP provides transmission and distribution services to REPs that provide electric service to consumers in TNMP’s service territories. References to customers in the risk factors discussed below also encompass the customers of these REPs who are the ultimate consumers of electricity transmitted and distributed through TNMP’s facilities.
Current wording
The business and financial results of TXNM, PNM, and TNMP are subject to a number of risks and uncertainties, many of which are beyond their control, including those set forth below and in MD&A, Note 16, and Note 17. For other factors that may cause actual results to differ materially from those indicated in any forward-looking statement contained in this report, see Disclosure Regarding Forward Looking Statements in Item 1. Business. TNMP provides transmission and distribution services to REPs that provide electric service to consumers in TNMP’s service territories. References to customers in the risk factors discussed below also encompass the customers of these REPs who are the ultimate consumers of electricity transmitted and distributed through TNMP’s facilities.
Previous wording
The profitability of PNMR’s utilities depends on being able to recover their costs through regulated rates and earn a fair return on invested capital, including investments in its generating plants. Without timely cost recovery, including recovery of undepreciated investments and the opportunity to earn a fair return on capital investments, PNMR’s liquidity and results of operations could be negatively impacted. Further, PNM and TNMP are in a period of significant capital expenditures. While increased capital investments, higher interest rates, and other costs are placing upward pressure on rates charged to customers, energy efficiency initiatives and other factors are placing downward pressure on customer usage. The combination of these matters could adversely affect the Company’s results of operations and cash flows.
Current wording
The profitability of TXNM’s utilities depends on being able to recover their costs through regulated rates and earn a fair return on invested capital, including investments in its generating plants. Without timely cost recovery, including recovery of undepreciated investments and the opportunity to earn a fair return on capital investments, TXNM’s liquidity and results of operations could be negatively impacted. Further, PNM and TNMP are in a period of significant capital expenditures. While increased capital investments, higher interest rates, and other costs are placing upward pressure on rates charged to customers, energy efficiency initiatives and other factors are placing downward pressure on customer usage. The combination of these matters could adversely affect the Company’s results of operations and cash flows.
Previous wording
The rates PNM charges its customers are regulated by the NMPRC and FERC. TNMP is regulated by the PUCT. The Company is in a period requiring significant capital investment and is projecting total construction expenditures for the years 2024-2028 to be $6.1 billion. PNM and TNMP anticipate a trend toward increasing costs, for which they will have to seek regulatory recovery. These costs include, or are related to, costs of asset construction for generation, transmission, and distribution systems necessary to provide electric service, as well as the cost to remove and retire existing assets, environmental compliance expenditures, regulatory mandates to acquire power from renewable resources, regulation related to nuclear safety, increased costs related to cybersecurity, increased interest costs to finance capital investments, and depreciation. If the NMPRC does not authorize appropriate recovery of any of the costs discussed above, including undepreciated generating resources at the
Current wording
The rates PNM charges its customers are regulated by the NMPRC and FERC. TNMP is regulated by the PUCT. The Company is in a period requiring significant capital investment and is projecting total construction expenditures for the years 2025-2029 to be $7.8 billion. PNM and TNMP anticipate a trend toward increasing costs, for which they will have to seek regulatory recovery. These costs include, or are related to, costs of asset construction for generation, transmission, and distribution systems necessary to provide electric service, as well as the cost to remove and retire existing assets, environmental compliance expenditures, regulatory mandates to acquire power from renewable resources, regulation related to nuclear safety, increased costs related to cybersecurity, increased interest costs to finance capital investments, and depreciation. If the regulators do not authorize appropriate recovery of any of the costs discussed above, including undepreciated generating resources at the time those resources are removed from service and fails to authorize recovery of the costs of obtaining power to replace those resources, PNM and TNMP’s financial position, results of operations, and cash flows could be negatively impacted.
Previous wording
At the same time costs are increasing, there are factors placing downward pressure on the demand for power, thereby reducing customer usage. These factors include changing customer behaviors, including increased emphasis on energy efficiency measures and utilization of alternative sources of power, rate design that is not driven by economics, which could influence customer behavior, unfavorable economic conditions, reduced new sources of demand, and unpredictable weather patterns. The combination of costs increasing relatively rapidly and the technologies and behaviors that are reducing energy consumption places upward pressure on the per unit prices that must be charged to recover costs. This upward pressure on unit prices could result in additional efforts by customers to reduce consumption through alternative measures. Without timely cost recovery and the authorization to earn a reasonable return on invested capital, the Company’s liquidity and results of operations could be negatively impacted.
Current wording
At the same time costs are increasing, there are factors placing downward pressure on the demand for power, thereby reducing customer usage. These factors include changing customer behaviors, increased emphasis on energy efficiency measures, utilization of alternative sources of power, rate design that is not driven by economics, unfavorable economic conditions, reduced new sources of demand, and unpredictable weather patterns. The combination of costs increasing relatively rapidly and the technologies and behaviors that are reducing energy consumption places upward pressure on the per unit prices that must be charged to recover costs. This upward pressure on unit prices could result in additional efforts by customers to reduce consumption through alternative measures. Without timely cost recovery and the authorization to earn a reasonable return on invested capital, the Company’s liquidity and results of operations could be negatively impacted.
Previous wording
PNMR’s utilities are subject to numerous comprehensive federal, state, tribal, and local environmental laws and regulations, including those related to climate change as well as increased stakeholder actions related to ESG matters and reducing GHG, which may impose significant compliance costs and may significantly limit or affect their operations and financial results.
Current wording
TXNM’s utilities are subject to numerous comprehensive federal, state, tribal, and local environmental laws and regulations, including those related to climate change as well as increased stakeholder actions related to sustainability matters and reducing GHG, which may impose significant compliance costs and may significantly limit or affect their operations and financial results.
Previous wording
Compliance with federal, state, tribal, and local environmental laws and regulations, including those addressing climate change, air quality, CCRs, discharges of wastewater originating from fly ash and bottom ash handling facilities, cooling water, ESG matters, GHG emissions, and other matters, may result in increased capital, operating, and other costs, particularly with regard to enforcement efforts focused on power plant emission control obligations. These costs could include remediation, containment, civil liability, and monitoring expenses. The Company cannot predict how it would be affected if existing environmental laws and regulations were to be repealed, revised, or reinterpreted, or if new environmental laws or regulations were to be adopted. See Note 16 and the Climate Change Issues subsection of the Other Issues Facing the Company section of MD&A.
Current wording
Compliance with federal, state, tribal, and local environmental laws and regulations, including those addressing climate change, air quality, CCRs, discharges of wastewater originating from fly ash and bottom ash handling facilities, cooling water, sustainability, GHG emissions, and other matters, may result in increased capital, operating, and other costs, particularly with regard to enforcement efforts focused on power plant emission control obligations. These costs could include remediation, containment, civil liability, and monitoring expenses. The Company cannot predict how it would be affected if existing environmental laws and regulations were to be repealed, revised, or reinterpreted, or if new environmental laws or regulations were to be adopted. See Note 16 and the Climate Change Issues subsection of the Other Issues Facing the Company section of MD&A.
Previous wording
The utility industry is facing increasing stakeholder scrutiny related to ESG matters. Recently, PNMR has seen a rise in certain stakeholders, such as investors, customers, employees, and lenders, placing increasing importance on the impact and social cost associated with climate change. Federal GHG reduction measures setting emission guidelines remain in a state of uncertainty. Therefore, PNMR is dealing with an uncertain regulatory and policy environment and increased scrutiny and changing stakeholder expectations with respect to environmental and climate change programs, judicial decisions, and international accords. Under the Biden Administration, EPA and other federal agencies have sought to expand climate change regulations and work to aggressively reduce GHG emissions. Many state agencies, environmental advocacy groups, and other organizations will continue to focus on decarbonization with enhanced attention on GHG from fossil-fueled generation facilities. See discussion above and Note 17, regarding PNM’s abandonment applications and the ETA. PNM currently depends on fossil-fueled generation for 43.3% of its electricity. As discussed under Climate Change Issues, this type of generation could be subject to future EPA or state regulations requiring GHG reductions. The anticipated expansion of federal and state regulations could result in additional operating restrictions on facilities and increased generation and compliance costs.
Current wording
The utility industry is facing increasing stakeholder scrutiny related to sustainability. Recently, TXNM has seen a rise in certain stakeholders, such as investors, customers, employees, and lenders, placing increasing importance on the impact and social cost associated with climate change. Federal GHG reduction measures setting standards and emission guidelines, and climate-related disclosure rules remain in a state of uncertainty. Therefore, TXNM is dealing with an uncertain regulatory and policy environment and increased scrutiny and changing stakeholder expectations with respect to environmental and climate change programs, judicial decisions, and international accords. Under the Biden Administration, EPA and other federal agencies have sought to expand climate change regulations and work to aggressively reduce GHG emissions. Although it is uncertain how the current Trump Administration will ultimately act with respect to these regulations, many state agencies, environmental advocacy groups, and other organizations will continue to focus on decarbonization with enhanced attention on GHG from fossil-fueled generation facilities. See discussion above and Note 17, regarding PNM’s abandonment applications and the ETA. PNM currently depends on fossil-fueled generation for 28.2% of its electricity. As discussed under Climate Change Issues, this type of generation is subject to existing and future EPA or state regulations requiring GHG reductions. The anticipated expansion of federal and state regulations could result in additional operating restrictions on facilities and increased generation and compliance costs.
Previous wording
In February 2024, EPA proposed to impose a federal implementation plan on New Mexico to address the interstate transport of ozone and its precursors, referred to by EPA as the “good neighbor” rule. If finalized as proposed, compliance with the rule would require specified fossil fuel-fired generating resources to participate in an ozone-season NOx emission allowance trading program that will limit total NOx emissions from all affected units within the state of New Mexico.
Current wording
In February 2024, EPA proposed to impose a federal implementation plan on New Mexico to address the interstate transport of ozone and its precursors, referred to by EPA as the “good neighbor” rule. If finalized as proposed, compliance with the rule would require specified fossil fuel-fired generating resources to participate in an ozone-season NOx emission allowance trading program that will limit total NOx emissions from all affected units within the state of New Mexico. In December 2024, EPA pulled its proposed rule from the OMB and did not specify if and when the rule might be resubmitted for review.
Previous wording
If PNM fails to timely obtain, maintain or comply with any required environmental regulatory approval, operations at affected facilities could be suspended or could subject PNM to additional expenses and potential penalties. Failure to comply with applicable environmental laws and regulations also could result in civil liability arising out of government enforcement actions or private claims. Environmental noncompliance could also result in reputational harm, which may cause stock price decreases or cause certain investors and financial institutions not to purchase the Company’s debt securities or otherwise provide the Company with capital or credit on favorable terms, which may cause the cost of capital to increase. In addition, PNMR and its operating subsidiaries may underestimate the costs of environmental compliance, liabilities, and litigation due to the uncertainty inherent in these matters. Although there is uncertainty about the timing and form of the implementation of EPA’s regulations regarding GHG emissions, climate change, CCRs, power plant emissions, changes to the ambient air quality standards, and other environmental issues, the promulgation and implementation of such regulations could have a material impact on operations. The Company is unable to estimate these costs due to the many uncertainties associated with, among other things, the nature and extent of future regulations and changes in existing regulations, including the changes in regulatory policy under the Biden Administration. Timely regulatory recovery of costs associated with any environmental-related regulations would be needed to maintain a strong financial and operational profile. The above factors could adversely affect the Company’s business, financial position, results of operations, and liquidity.
Current wording
If PNM fails to timely obtain, maintain, or comply with any required environmental regulatory approval, operations at affected facilities could be suspended or could subject PNM to additional expenses and potential penalties. Failure to comply with applicable environmental laws and regulations also could result in civil liability arising out of government enforcement actions or private claims. Environmental noncompliance could also result in reputational harm, which may cause stock price decreases or cause certain investors and financial institutions not to purchase the Company’s debt securities or otherwise provide the Company with capital or credit on favorable terms, which may cause the cost of capital to increase. In addition, TXNM and its operating subsidiaries may underestimate the costs of environmental compliance, liabilities, and litigation due to the uncertainty inherent in these matters. Although there is uncertainty about the timing and form of the implementation of EPA’s regulations regarding GHG emissions, climate change, CCRs, power plant emissions, changes to the ambient air quality
Previous wording
PNMR, PNM, and TNMP are subject to complex government regulation unrelated to the environment, which may have a negative impact on their businesses, financial position and results of operations.
Current wording
TXNM, PNM, and TNMP are subject to complex government regulation unrelated to the environment, which may have a negative impact on their businesses, financial position and results of operations.
Previous wording
To operate their businesses, PNMR, PNM, and TNMP are required to have numerous permits and approvals from a variety of regulatory agencies. Regulatory bodies with jurisdiction over the utilities include the NMPRC, NMED, PUCT, TCEQ, ERCOT, FERC, NRC, EPA, and NERC. Oversight by these agencies covers many aspects of the Company’s utility operations including, but not limited to: location, construction, and operation of facilities; the purchase of power under long-term contracts; conditions of service; the issuance of securities; and rates charged to customers. FERC has issued a number of rules pertaining to preventing undue discrimination in transmission services and electric reliability standards. The significant level of regulation imposes restrictions on the operations of the Company and causes the incurrence of substantial compliance costs. PNMR and its subsidiaries are unable to predict the impact on their business and operating results from future actions of any agency regulating the Company. Changes in existing regulations or the adoption of new ones could result in additional expenses and/or changes in business operations. Failure to comply with any applicable rules, regulations or decisions may lead to customer refunds, fines, penalties, and other payments, which could materially and adversely affect the results of operations and financial condition of PNMR and its subsidiaries.
Current wording
To operate their businesses, TXNM, PNM, and TNMP are required to have numerous permits and approvals from a variety of regulatory agencies. Regulatory bodies with jurisdiction over the utilities include the NMPRC, NMED, PUCT, TCEQ, ERCOT, FERC, NRC, EPA, and NERC. Oversight by these agencies covers many aspects of the Company’s utility operations including, but not limited to: location, construction, and operation of facilities; the purchase of power under long-term contracts; conditions of service; the issuance of securities; and rates charged to customers. FERC has issued a number of rules pertaining to preventing undue discrimination in transmission services and electric reliability standards. The significant level of regulation imposes restrictions on the operations of the Company and causes the incurrence of substantial compliance costs. TXNM and its subsidiaries are unable to predict the impact on their business and operating results from future actions of any agency regulating the Company. Changes in existing regulations or the adoption of new ones could result in additional expenses and/or changes in business operations. Failure to comply with any applicable rules, regulations or decisions may lead to customer refunds, fines, penalties, and other payments, which could materially and adversely affect the results of operations and financial condition of TXNM and its subsidiaries.
Previous wording
Research and development activities are ongoing for new technologies that produce power or reduce power consumption. These technologies include renewable energy, customer-oriented generation, energy storage, and energy efficiency. PNM generates power at central station power plants to achieve economies of scale and produce power at a cost that is competitive with rates established through the regulatory process. There are distributed generation technologies that produce power, including fuel cells, microturbines, wind turbines, and solar cells, which have become increasingly cost competitive. These advances in technology have reduced the costs of these alternative methods of producing power to a level that is competitive with that of central station power production. In addition, advances made in the capabilities of energy storage have further decreased power production and peak usage through the dispatch of more battery systems. These technological advances have resulted in demand reduction that negatively impact revenue and/or result in underutilized assets that have been built to serve peak usage. In addition, certain federal, state, or local requirements that regulated utilities such as PNM are required to follow could result in third parties being able to provide electricity from similar generation technologies to consumers at prices lower than PNM is able to offer. As these technologies become more cost competitive or can be used by third-parties to supply power at lower prices than PNM is able to offer, PNM’s energy sales and/or regulated returns could be eroded, and the value of its generating facilities could be reduced. Advances in technology could also change the channels through which electric customers purchase or use power, which could reduce the Company’s sales and revenues or increase expenses. These advances can also create more uncertainty in load shapes and forecasts, which could have implications for generation and system planning.
Current wording
A - 13 further decreased power production and peak usage through the dispatch of more battery systems. These technological advances have resulted in demand reduction that negatively impact revenue and/or result in underutilized assets that have been built to serve peak usage. In addition, certain federal, state, or local requirements that regulated utilities such as PNM are required to follow could result in third parties being able to provide electricity from similar generation technologies to consumers at prices lower than PNM is able to offer. As these technologies become more cost competitive or can be used by third parties to supply power at lower prices than PNM is able to offer, PNM’s energy sales and/or regulated returns could be eroded, and the value of its generating facilities could be reduced. Advances in technology could also change the channels through which electric customers purchase or use power, which could reduce the Company’s sales and revenues or increase expenses. These advances can also create more uncertainty in load shapes and forecasts, which could have implications for generation and system planning.
Previous wording
Costs of decommissioning, remediation, and restoration of nuclear and fossil-fueled power plants, as well as reclamation of related coal mines, could exceed the estimates of PNMR and PNM as well as the amounts PNM recovers from its ratepayers, which could negatively impact results of operations and liquidity.
Current wording
Costs of decommissioning, remediation, and restoration of nuclear and fossil-fueled power plants, as well as reclamation of related coal mines, could exceed the estimates of TXNM and PNM as well as the amounts PNM recovers from its ratepayers, which could negatively impact results of operations and liquidity.
Previous wording
PNM has interests in a nuclear power plant, two coal-fired power plants, and several natural gas-fired power plants and is obligated to pay its share of the costs to decommission these facilities. PNM is also obligated to pay for its share of the costs of reclamation of the mines that supply coal to the coal-fired power plants. Likewise, other owners or participants are responsible for their shares of the decommissioning and reclamation obligations and it is important to PNM that those parties fulfill their obligations. Rates charged by PNM to its customers, as approved by the NMPRC, include a provision for recovery of certain costs of decommissioning, remediation, reclamation, and restoration. The NMPRC has established a cap on the amount of costs for the final reclamation of the surface coal mines that may be recovered from customers. PNM records estimated liabilities for its share of the legal obligations for decommissioning and reclamation. These estimates include many
Current wording
PNM has interests in a nuclear power plant, a coal-fired power plant, and several natural gas-fired power plants and is obligated to pay its share of the costs to decommission these facilities. PNM is also obligated to pay for its share of the costs of reclamation of the mine that supplies coal to the coal-fired power plant. Likewise, other owners or participants are responsible for their shares of the decommissioning and reclamation obligations, and it is important to PNM that those parties fulfill their obligations. Rates charged by PNM to its customers, as approved by the NMPRC, include a provision for recovery of certain costs of decommissioning, remediation, reclamation, and restoration. The NMPRC has established a cap on the amount of costs for the final reclamation of the surface coal mines that may be recovered from customers. PNM records estimated liabilities for its share of the legal obligations for decommissioning and reclamation. These estimates include many assumptions about future events and are inherently imprecise. In the event the costs to decommission the facilities or to reclaim the mines serving the plants exceed current estimates, or if amounts are not approved for recovery by the NMPRC, results of operations could be negatively impacted.
Previous wording
The costs of decommissioning any nuclear power plant are substantial. PNM is responsible for all decommissioning obligations related to its entire interest in PVNGS, including portions under lease both during and after termination of the leases. PNM maintains trust funds designed to provide adequate financial resources for decommissioning PVNGS and SJGS, and for reclamation of the coal mine that served SJGS and continue to serve Four Corners at the end of their expected lives. However, if the PVNGS units are decommissioned before their planned date or the coal mine serving Four Corners is shut down sooner than expected, these funds may prove to be insufficient.
Current wording
The costs of decommissioning any nuclear power plant are substantial. PNM is responsible for all decommissioning obligations related to its entire interest in PVNGS, including portions both during and after termination of the leases. PNM maintains trust funds designed to provide adequate financial resources for decommissioning PVNGS and SJGS, and for reclamation of the coal mine that served SJGS and continues to serve Four Corners at the end of its expected life. However, if the PVNGS units are decommissioned before their planned date or the coal mine serving Four Corners is shut down sooner than expected, these funds may prove to be insufficient.
Previous wording
The financial performance of PNMR, PNM, and TNMP may be adversely affected if power plants, other generation resources, and transmission and distribution systems do not operate reliably and efficiently.
Current wording
The financial performance of TXNM, PNM, and TNMP may be adversely affected if power plants, other generation resources, and transmission and distribution systems do not operate reliably and efficiently.
Previous wording
The Company’s financial performance depends on the successful operation of PNM’s generation assets, as well as the transmission and distribution systems of PNM and TNMP. PNM’s retirement of SJGS and the potential retirement of Four Corners will increase PNM’s dependency on other generation resources, including renewable resources, gas-fired facilities, and PVNGS, and will reduce PNM’s flexibility in managing those resources. Unscheduled or longer than expected maintenance outages, breakdown or failure of equipment or processes due to aging infrastructure, inability to install or operate renewable resources, temporary or permanent shutdowns to achieve environmental compliance, other performance problems with the generation assets, severe weather conditions, accidents and other catastrophic events, acts of war or terrorism, cybersecurity attacks, wildfires, disruptions in the supply, quality, and delivery of fuel and water supplies, and other factors could result in PNM’s load requirements being larger than available system generation capacity. Unplanned outages of generating units and extensions of scheduled outages occur from time to time and are an inherent risk of the Company’s business. If these were to occur, PNM would be required to purchase electricity in either the wholesale market or spot market at the then-current market price. There can be no assurance that sufficient electricity would be available at reasonable prices, or available at all. The failure of transmission or distribution facilities may also affect PNM’s and TNMP’s ability to deliver power. These potential generation, distribution, and transmission problems, and any service interruptions related to them, could result in lost revenues and additional costs.
Current wording
The Company’s financial performance depends on the successful operation of PNM’s generation assets, as well as the transmission and distribution systems of PNM and TNMP. PNM’s retirement of SJGS will increase PNM’s dependency on other generation resources, including renewable resources, gas-fired facilities, and PVNGS, and will reduce PNM’s flexibility in managing those resources. Unscheduled or longer than expected maintenance outages, breakdown or failure of equipment or processes due to aging infrastructure, inability to install or operate renewable resources, temporary or permanent shutdowns to achieve environmental compliance, other performance problems with the generation assets, severe weather conditions, accidents and other catastrophic events, acts of war or terrorism, cybersecurity attacks, wildfires, disruptions in the supply, quality, and delivery of fuel and water supplies, and other factors could result in PNM’s load requirements being larger than available system generation capacity. Unplanned outages of generating units and extensions of scheduled outages occur from time to time and are an inherent risk of the Company’s business. If these were to occur, PNM would be required to purchase electricity in either the wholesale market or spot market at the then-current market price. There can be no assurance that sufficient electricity would be available at reasonable prices, or available at all. The failure of transmission or distribution facilities may also affect PNM’s and TNMP’s ability to deliver power. These potential generation, distribution, and transmission problems, and any service interruptions related to them, could result in lost revenues and additional costs.
Previous wording
PNMR, PNM, and TNMP are subject to information security breaches and risks of unauthorized access to their information and operational technology systems as well as physical threats to assets.
Current wording
TXNM, PNM, and TNMP are subject to information security breaches and risks of unauthorized access to their information and operational technology systems as well as physical threats to assets.
Previous wording
The Company faces the risk of physical and cybersecurity attacks, both threatened and actual, against generation facilities, transmission and distribution infrastructure, information technology systems, and network infrastructure, which could negatively impact the ability of the Company to generate, transport, and deliver power, or otherwise operate facilities in the most efficient manner or at all.
Current wording
The Company faces the risk of physical and cybersecurity attacks, both threatened and actual, against generation facilities, transmission and distribution infrastructure, information technology systems, and network infrastructure, which could negatively impact the ability of the Company to generate, transmit, and distribute power, or otherwise operate facilities in the most efficient manner or at all.
Previous wording
The utility industry in which the Company operates is a highly regulated industry that requires the continued operation of sophisticated information technology systems and network infrastructure, some of which are deemed to be critical infrastructure under NERC guidelines. Certain of the Company’s systems are interconnected with external networks. In the regular course of business, the utilities handle a range of sensitive security and customer information. PNM and TNMP are subject to the rules of various agencies and the laws of various states, related to safeguarding and maintaining the confidentiality of this information. Cyber-attacks regularly occur, and generally are unsuccessful. To date, those few events that were successful did not result in significant or consequential business impacts. However, despite steps the Company may take to detect, mitigate, and/or eliminate threats and respond to security incidents, the techniques used by those who wish to obtain unauthorized access, and possibly disable or sabotage systems and/or abscond with information and data, change frequently and continue to evolve with the use of artificial intelligence and the Company may not be able to protect against all such actions.
Current wording
A - 14 subject to the rules of various agencies and the laws of various states, related to safeguarding and maintaining the confidentiality of this information. Cyber-attacks regularly occur, and generally are unsuccessful. To date, those few events that were successful did not result in significant or consequential business impacts. However, despite steps the Company may take to detect, mitigate, and/or eliminate threats and respond to security incidents, the techniques used by those who wish to obtain unauthorized access, and possibly disable or sabotage systems and/or abscond with information and data, change frequently and continue to evolve with the use of artificial intelligence and the Company may not be able to protect against all such actions.
Previous wording
In the event that a capable adversary attacks the Company’s computer and operating systems, despite the best efforts of the Company, the generation, transmission, or distribution of electrical services could be degraded or disrupted, customer information, business records, or other sensitive data could be lost, destroyed, or released outside of the Company’s control. Further, the Company’s use of technologies manufactured by third parties may be subject to espionage activities, and cyber-attack of the third party resulting in losses outside of the control of the Company. Although the Company has implemented security measures to identify, prevent, detect, respond to, and recover from cyber and physical security events and supply chain disruptions, critical infrastructure, including information and operational technology systems, are vulnerable to disability, failures, or unauthorized access, which could occur as a result of malicious compromise, employee error, and/or employee misconduct or supply compromise. A successful physical or cybersecurity attack or other similar failure of the systems could impact the reliability of PNM’s generation and PNM’s and TNMP’s transmission and distribution systems, including the possible unauthorized shutdown of facilities. Such an event could lead to disruptions of business operations, including the Company’s ability to generate, transport, and deliver power to serve customers, to bill customers, and to process other financial information. A breach of the Company’s information systems could also lead to the loss and destruction of confidential and proprietary data, personally identifiable information, trade secrets, intellectual property and supplier data, and could disrupt
Current wording
A successful physical or cybersecurity attack or other similar failure of the systems could impact the reliability of PNM’s generation and PNM’s and TNMP’s transmission and distribution systems, including the possible unauthorized shutdown of facilities. Such an event could lead to disruptions of business operations, including the Company’s ability to generate, transport, and deliver power to serve customers, to bill customers, and to process other financial information. A breach of the Company’s information systems could also lead to the loss and destruction of confidential and proprietary data, personally identifiable information, trade secrets, intellectual property and supplier data, and could disrupt business operations which could harm the Company’s reputation and financial results, as well as potential increased regulatory oversight, litigation, fines, and other remedial action. The costs incurred to investigate and remediate a physical or cybersecurity attack could be significant. A significant physical or cybersecurity attack on the Company’s critical infrastructure could have an adverse impact on the operations, reputation and financial condition of TXNM, PNM, and TNMP.
Previous wording
Following the transfer of the PVNGS Unit 1 Leased Interest to SRP in January 2023 and the expiration of the leased interest in Unit 2 in January 2024, PNM currently has a 7.3% undivided interest in PVNGS. PVNGS represented 10.7% of PNM’s total generating capacity as of December 31, 2023. PVNGS is subject to environmental, health, and financial risks including but not limited to the ability to obtain adequate supplies of nuclear fuel and water, the ability to dispose of spent nuclear fuel, decommissioning of the plant (see above), securing the facilities against possible terrorist attacks, and unscheduled outages due to equipment failures.
Current wording
Following the transfer of the PVNGS Unit 1 Leased Interest to SRP in January 2023 and the expiration of the leased interest in Unit 2 in January 2024, PNM currently has a 7.3% undivided interest in PVNGS. PVNGS represented 6.7% of PNM’s total generating capacity as of December 31, 2024. PVNGS is subject to environmental, health, and financial risks including but not limited to the ability to obtain adequate supplies of nuclear fuel and water, the ability to dispose of spent nuclear fuel, decommissioning of the plant (see above), securing the facilities against possible terrorist attacks, and unscheduled outages due to equipment failures.
Previous wording
In the event of noncompliance with its requirements, the NRC has the authority to impose a progressively increasing inspection regime that could ultimately result in the shutdown of a unit, civil penalties, or both, depending upon the NRC’s assessment of the severity of the situation, until compliance is achieved. Increased costs resulting from penalties, a heightened level of scrutiny, and/or implementation of plans to achieve compliance with NRC requirements could adversely affect the financial condition, results of operations, and cash flows of PNMR and PNM. Although PNM has no reason to anticipate a serious nuclear incident at PVNGS, if an incident did occur, it could materially and adversely affect PNM’s results of operations and financial condition.
Current wording
In the event of noncompliance with its requirements, the NRC has the authority to impose a progressively increasing inspection regime that could ultimately result in the shutdown of a unit, civil penalties, or both, depending upon the NRC’s assessment of the severity of the situation, until compliance is achieved. Increased costs resulting from penalties, a heightened level of scrutiny, and/or implementation of plans to achieve compliance with NRC requirements could adversely affect the financial condition, results of operations, and cash flows of TXNM and PNM. Although PNM has no reason to anticipate a serious nuclear incident at PVNGS, if an incident did occur, it could materially and adversely affect PNM’s results of operations and financial condition.
Previous wording
Peak demand for power could exceed forecasted supply capacity, resulting in increased costs for purchasing capacity in the market or building additional generation facilities and/or battery storage facilities.
Current wording
Peak demand for power could exceed forecasted supply capacity, resulting in increased costs for purchasing capacity in the market or building additional generation facilities and/or energy storage facilities.
Previous wording
At peak times, power demand could exceed PNM’s forecasted available generation capacity, particularly if PNM’s power plants are not performing as anticipated and additional resources are not approved, or are not available, as PNM transitions its system to carbon emission-free generation and battery storage. Availability of this technology may create additional strain on the system by adding these additional resources without adequate storage. Additionally, further advances in the technology of renewable resources may need to occur in order to ensure that these resources meet carbon emission-free standards. Competitive market forces or adverse regulatory actions may require PNM to purchase capacity and energy from the market or build additional resources to meet customers’ energy needs in an expedited manner. If that occurs, PNM may see opposition to recovery of these additional costs and could experience a lag between when costs are incurred and when regulators permit recovery in customers’ rates. These situations could have negative impacts on results of operations and cash flows.
Current wording
At peak times, power demand could exceed PNM’s forecasted available generation capacity, particularly if PNM’s power plants are not performing as anticipated and additional resources are not approved, or are not available, as PNM transitions its system to carbon emission-free generation and energy storage. Availability of this technology may create additional strain on the system by adding these additional resources without adequate storage. Additionally, further advances in the technology of renewable resources may need to occur in order to ensure that these resources meet carbon emission-free standards. Competitive market forces or adverse regulatory actions may require PNM to purchase capacity and energy from the market or build additional resources to meet customers’ energy needs in an expedited manner. If that occurs, PNM may see opposition to recovery of these additional costs and could experience a lag between when costs are incurred and when regulators permit recovery in customers’ rates. These situations could have negative impacts on results of operations and cash flows.
Previous wording
Supply chain issues, high inflation, actions by the Federal Reserve to address inflationary concerns and other market conditions, geopolitical activity and the resulting impact on business and economic conditions could negatively affect the Company’s business, results of operations, financial condition, cash flows, and the trading value of PNMR’s common stock and the Company’s debt securities.
Current wording
Supply chain issues, high inflation, actions by the Federal Reserve to address inflationary concerns and other market conditions, geopolitical activity and the resulting impact on business and economic conditions could negatively affect the Company’s business, results of operations, financial condition, cash flows, and the trading value of TXNM’s common stock and the Company’s debt securities.
Previous wording
However, there is no assurance that the continued effects of these market conditions will not adversely impact our business, results of operations, financial condition, cash flows, ability to access the capital markets, and the trading value of the Company’s common stock and debt securities. These effects could adversely impact the Company by:
Current wording
Continued supply chain issues were initially experienced during high inflation, actions by the Federal Reserve to address inflationary concerns or other market conditions, geopolitical activity and the resulting impact on the economy and financial markets could adversely affect the Company’s business, results of operations, financial condition, cash flows, and access to the capital markets. There is no assurance that the continued effects of these market conditions will not adversely impact our business, results of operations, financial condition, cash flows, ability to access the capital markets, and the trading value of the Company’s common stock and debt securities. These effects could adversely impact the Company by:
Previous wording
Economic activity in the service territories of PNMR subsidiaries is a key factor in their performance. Decreased economic activity can lead to declines in energy consumption, which could adversely affect future revenues, earnings, and growth. Higher unemployment rates, both in the Company’s service territories and nationwide, could result in commercial customers ceasing operations and lower levels of income for residential customers. These customers might then be unable to pay their bills on time, which could increase bad debt expense and negatively impact results of operations and cash flows. Economic conditions also impact the supply and/or cost of commodities and materials needed to construct or acquire utility assets or make necessary repairs.
Current wording
Economic activity in the service territories of TXNM subsidiaries is a key factor in their performance. Decreased economic activity can lead to declines in energy consumption, which could adversely affect future revenues, earnings, and growth. Higher unemployment rates, both in the Company’s service territories and nationwide, could result in commercial customers ceasing operations and lower levels of income for residential customers. These customers might then be unable to pay their bills on time, which could increase bad debt expense and negatively impact results of operations and cash flows. Economic conditions also impact the supply and/or cost of commodities and materials needed to construct or acquire utility assets or make necessary repairs.
Previous wording
The operating results of PNMR and its operating subsidiaries are seasonal and are affected by weather conditions.
Current wording
The operating results of TXNM and its operating subsidiaries are seasonal and are affected by weather conditions.
Previous wording
Electric generation, transmission, and distribution are generally seasonal businesses that vary with the demand for power. With power consumption typically peaking during the hot summer months, revenues traditionally peak during that period. As a result, quarterly operating results of PNMR and its operating subsidiaries vary throughout the year. In addition, PNMR and its operating subsidiaries have historically had lower revenues resulting in lower earnings when weather conditions are milder. Unusually mild weather in the future could reduce the revenues, net earnings, and cash flows of the Company.
Current wording
Electric generation, transmission, and distribution are generally seasonal businesses that vary with the demand for power. With power consumption typically peaking during the hot summer months, revenues traditionally peak during that period. As a result, quarterly operating results of TXNM and its operating subsidiaries vary throughout the year. In addition, TXNM and its operating subsidiaries have historically had lower revenues resulting in lower earnings when weather conditions are milder. Unusually mild weather in the future could reduce the revenues, net earnings, and cash flows of the Company.
Previous wording
PNM and TNMP have large networks of electric transmission and distribution facilities. Weather conditions including severe drought, high winds, and the natural desert vegetation in the U.S. Southwest region and Texas could contribute to wildfires in or near PNM’s and TNMP’s service territories. PNM and TNMP take proactive steps to mitigate wildfire risk. However, wildfire risk is always present and PNM and TNMP could be held liable for damages incurred as a result of wildfires caused, or allegedly caused, by their transmission and distribution systems. In addition, wildfires could cause damage to PNM’s and TNMP’s assets that could result in loss of service to customers or make it difficult to supply power in sufficient quantities to meet customer needs. These events could have negative impacts on the Company’s financial position, results of operations, and cash flows.
Current wording
PNM and TNMP have large networks of electric transmission and distribution facilities. Weather conditions including severe drought, high winds, and the natural vegetation in the U.S. Southwest region and certain parts of Texas, could contribute to wildfires in or near PNM’s and TNMP’s service territories. The risk of wildfires could result in higher maintenance costs, increased insurance premiums, and the inability to maintain adequate insurance coverage. PNM and TNMP take proactive steps to mitigate wildfire risk. However, wildfire risk is always present and PNM and TNMP could be held liable for damages incurred as a result of wildfires caused, or allegedly caused, by their transmission and distribution systems. In addition, wildfires could cause damage to PNM’s and TNMP’s assets that could result in loss of service to customers or make it difficult to supply power in sufficient quantities to meet customer needs. Wildfire avoidance measures, such as intentional power interruptions, also may lead to customer claims for lost service, business interruption, and other injuries.
Previous wording
PNMR has counterparty credit risk in connection with financial support that was provided to facilitate the coal supply arrangement for SJGS. Adverse developments from these factors could have a negative impact on the business, financial condition, results of operations, and cash flows of PNM and PNMR.
Current wording
TXNM has counterparty credit risk in connection with financial support that was provided to facilitate the coal supply arrangement for SJGS. Adverse developments from these factors could have a negative impact on the business, financial condition, results of operations, and cash flows of PNM and TXNM.
Previous wording
PNMR has an arrangement with a bank under which the bank has issued $30.3 million of letters of credit in favor of sureties in order for the sureties to post reclamation bonds that are required under the miner’s operating permit. The Company’s financial position, results of operations, and cash flows could be negatively impacted if the current mine operator were to default on its obligations to reclaim the San Juan mine and PNMR is required to perform under the letter of credit support agreement.
Current wording
TXNM has an arrangement with a bank under which the bank has issued $30.3 million of letters of credit in favor of sureties in order for the sureties to post reclamation bonds that are required under the miner’s operating permit. The Company’s financial position, results of operations, and cash flows could be negatively impacted if the current mine operator were to default on its obligations to reclaim the San Juan mine and TXNM is required to perform under the letter of credit support agreement.
Previous wording
PNMR may be unable to meet its ongoing and future financial obligations and to pay dividends on its common stock if its subsidiaries are unable to pay dividends or distributions to PNMR.
Current wording
TXNM may be unable to meet its ongoing and future financial obligations and to pay dividends on its common stock if its subsidiaries are unable to pay dividends or distributions to TXNM.
Previous wording
PNMR is a holding company and has no operations of its own. PNMR’s ability to meet its financial obligations and to pay dividends on its common stock primarily depends on the net earnings and cash flows of PNM and TNMP and their capacity to pay upstream dividends or distributions. Prior to providing funds to PNMR, PNM and TNMP have financial and regulatory obligations that must be satisfied, including among others, debt service and, in the case of PNM, preferred stock dividends.
Current wording
TXNM is a holding company and has no operations of its own. TXNM’s ability to meet its financial obligations and to pay dividends on its common stock primarily depends on the net earnings and cash flows of PNM and TNMP and their capacity to pay upstream dividends or distributions. Prior to providing funds to TXNM, PNM and TNMP have financial and regulatory obligations that must be satisfied, including among others, debt service and, in the case of PNM, preferred stock dividends.
Previous wording
The NMPRC has placed certain restrictions on the ability of PNM to pay dividends to PNMR, including that PNM cannot pay dividends that cause its debt rating to fall below investment grade. The NMPRC has also restricted PNM from paying dividends in any year, as determined on a rolling four-quarter basis, in excess of net earnings without prior NMPRC approval. PNM is permitted to pay dividends to PNMR from prior equity contributions made by PNMR. Additionally, PNMR’s financing agreements generally include a covenant to maintain a debt-to-capitalization ratio that does not exceed 70%, and PNM and TNMP’s financing arrangements generally include a covenant to maintain debt-to-capitalization ratios that do not exceed 65%. PNM also has various financial covenants that limit the transfer of assets, through dividends or other means and the Federal Power Act imposes certain restrictions on dividends paid by public utilities, including that dividends cannot be paid from paid-in capital.
Current wording
The NMPRC has placed certain restrictions on the ability of PNM to pay dividends to TXNM, including that PNM cannot pay dividends that cause its debt rating to fall below investment grade. The NMPRC has also restricted PNM from paying dividends in any year, as determined on a rolling four-quarter basis, in excess of net earnings without prior NMPRC approval. PNM is permitted to pay dividends to TXNM from prior equity contributions made by TXNM. Additionally, TXNM’s financing agreements generally include a covenant to maintain a debt-to-capitalization ratio that does not exceed 70%, and PNM and TNMP’s financing arrangements generally include a covenant to maintain debt-to-capitalization ratios that do not exceed 65%. PNM also has various financial covenants that limit the transfer of assets, through dividends or other means and the Federal Power Act imposes certain restrictions on dividends paid by public utilities, including that dividends cannot be paid from paid-in capital.
Previous wording
A - 19 future growth plans and the related capital requirements, and other business considerations. Declaration of dividends may also be affected by decisions of the NMPRC, FERC, and PUCT in various regulatory cases currently pending or that may be docketed in the future, including the outcome of appeals of those decisions, conditions imposed by the NMPRC, PUCT, or Federal Power Act, and the effect of federal regulatory decisions and legislative acts.
Current wording
Further, the ability of TXNM to declare dividends depends upon the extent to which cash flows will support dividends, the Company’s financial circumstances and performance, economic conditions in the U.S. and in the Company’s service areas, future growth plans and the related capital requirements, and other business considerations. Declaration of dividends may also be affected by decisions of the NMPRC, FERC, and PUCT in various regulatory cases currently pending or that may be docketed in the future, including the outcome of appeals of those decisions, conditions imposed by the NMPRC, PUCT, or Federal Power Act, and the effect of federal regulatory decisions and legislative acts.
Previous wording
PNMR and its subsidiaries rely on access to both short-term and longer-term capital markets as sources of liquidity for any capital requirements not satisfied by cash flow from operations. In general, the Company relies on its short-term credit facilities as the initial source to finance construction expenditures. This results in increased borrowings under the facilities over time. The Company is currently projecting total construction expenditures for the years 2024-2028 to be $6.1 billion. If PNMR or its operating subsidiaries are not able to access capital at competitive rates, or at all, PNMR’s ability to finance capital requirements and implement its strategy will be limited. Disruptions in the credit markets, which could negatively impact the Company’s access to capital, could be caused by an economic recession, declines in the health of the banking sector generally or the failure of specific banks who are parties to the Company’s credit facilities, deterioration in the overall health of the utility industry, the bankruptcy of an unrelated energy company, war, terrorist attacks, cybersecurity attacks, or threatened attacks.
Current wording
TXNM and its subsidiaries rely on access to both short-term and longer-term capital markets as sources of liquidity for any capital requirements not satisfied by cash flow from operations. In general, the Company relies on its short-term credit facilities as the initial source to finance construction expenditures. This results in increased borrowings under the facilities over time. The Company is currently projecting total construction expenditures for the years 2025-2029 to be $7.8 billion. If TXNM or its operating subsidiaries are not able to access capital at competitive rates, or at all, TXNM’s ability to finance capital requirements and implement its strategy will be limited. Disruptions in the credit markets, which could negatively impact the Company’s access to capital, could be caused by an economic recession, declines in the health of the banking sector generally or the failure of specific banks who are parties to the Company’s credit facilities, deterioration in the overall health of the utility industry, the bankruptcy of an unrelated energy company, war, terrorist attacks, cybersecurity attacks, or threatened attacks.
Previous wording
PNMR, PNM, and TNMP cannot be sure that any of their current credit ratings will remain in effect for any given period of time or that a rating will not be put under review for a downgrade, lowered, or withdrawn entirely by a rating agency. As discussed in MD&A - Liquidity and Capital Resources, all of PNMR, PNM, and TNMP debt ratings are investments grade. Downgrades or changing requirements could result in increased borrowing costs due to higher interest rates on current borrowings or future financings, a smaller potential pool of investors, and decreased funding sources. Such conditions also could require the provision of additional support in the form of letters of credit and cash or other collateral to various counterparties.
Current wording
TXNM, PNM, and TNMP cannot be sure that any of their current credit ratings will remain in effect for any given period of time or that a rating will not be put under review for a downgrade, lowered, or withdrawn entirely by a rating agency. As discussed in MD&A - Liquidity and Capital Resources, all of TXNM, PNM, and TNMP’s senior debt ratings are investment grade. Downgrades or changing requirements could result in increased borrowing costs due to higher interest rates on current borrowings or future financings, a smaller potential pool of investors, and decreased funding sources. Such conditions also could require the provision of additional support in the form of letters of credit and cash or other collateral to various counterparties.
Previous wording
The pension plans’ targeted asset allocation is 50% liability matching fixed and 50% return generating income, which includes alternative income. The Company uses a strategy, known as Liability Driven Investing, which seeks to select investments that match the liabilities of the pension plans. The OPEB plans generally use the same pension fixed income and equity investment managers and utilize the same overall investment strategy as the pension plans, except there is no allocation to alternative investments and the OPEB plans have a target asset allocation of 30% equities and 70% fixed income.
Current wording
The PNM and TNMP Pension Plans have targeted asset allocations of 50% and 70% liability matching fixed and 50% and 30% return generating income, which includes alternative income. The Company uses a strategy, known as Liability Driven Investing, which seeks to select investments that match the liabilities of the pension plans. The OPEB plans generally use the same pension fixed income and equity investment managers and utilize the same overall investment strategy as the pension plans, except there is no allocation to alternative investments and the OPEB plans have a target asset allocation of 30% equities and 70% fixed income.
Showing the first 40 of 49 pairs. Open the source sections for the rest.
Rearranged current paragraphs (5)
Current report — wording carried from elsewhere
A - 12 standards, and other environmental issues, the promulgation and implementation of such regulations could have a material impact on operations. The Company is unable to estimate these costs due to the many uncertainties associated with, among other things, the nature and extent of future regulations and changes in existing regulations, including the changes in regulatory policy under the Trump Administration. Timely regulatory recovery of costs associated with any environmental-related regulations would be needed to maintain a strong financial and operational profile. The above factors could adversely affect the Company’s business, financial position, results of operations, and liquidity.
Current report — wording carried from elsewhere
Research and development activities are ongoing for new technologies that produce power or reduce power consumption. These technologies include renewable energy, customer-oriented generation, energy storage, and energy efficiency. PNM generates power at central station power plants to achieve economies of scale and produce power at a cost that is competitive with rates established through the regulatory process. There are distributed generation technologies that produce power, including fuel cells, microturbines, wind turbines, and solar cells, which have become increasingly cost competitive. These advances in technology have reduced the costs of these alternative methods of producing power to a level that is competitive with that of central station power production. In addition, advances made in the capabilities of energy storage have
Current report — wording carried from elsewhere
The utility industry in which the Company operates is a highly regulated industry that requires the continued operation of sophisticated information technology systems and network infrastructure, some of which are deemed to be critical infrastructure under NERC guidelines. Certain of the Company’s systems are interconnected with external networks. In the regular course of business, the utilities handle a range of sensitive security and customer information. PNM and TNMP are
Current report — wording carried from elsewhere
Further, the Company’s use of technologies manufactured by third parties, including applications with GenAI capabilities, may be subject to espionage activities, and cyber-attack of the third party resulting in the loss of confidentiality, privacy, integrity of data, and other losses outside of the control of the Company. Although the Company has implemented security measures to identify, prevent, detect, respond to, and recover from cyber and physical security events and supply chain disruptions, critical infrastructure, including information and operational technology systems, are vulnerable to disability, failures, or unauthorized access, which could occur as a result of malicious compromise, employee error, and/or employee misconduct or supply compromise.
Current report — wording carried from elsewhere
Failure to adequately address the risk of wildfires could also result in civil liability arising out of government enforcement actions or private claims. These actions could also result in reputational harm, which may cause stock price decreases, increased insurance premiums or the inability to maintain adequate insurance coverage, or cause certain investors and financial institutions not to purchase the Company’s debt securities or otherwise provide the Company with capital or credit on favorable terms, which may cause the cost of capital to increase. In addition, TXNM and its operating subsidiaries may underestimate the costs of litigation due to the uncertainty inherent in these matters. These events could have negative impacts on the Company’s financial position, results of operations, and cash flows.
Rearranged previous paragraphs (4)
Previous report — wording carried elsewhere
A - 12 time those resources are removed from service and fails to authorize recovery of the costs of obtaining power to replace those resources, PNM’s financial position, results of operations, and cash flows could be negatively impacted.
Previous report — wording carried elsewhere
A - 15 assumptions about future events and are inherently imprecise. In the event the costs to decommission the facilities or to reclaim the mines serving the plants exceed current estimates, or if amounts are not approved for recovery by the NMPRC, results of operations could be negatively impacted.
Previous report — wording carried elsewhere
A - 16 business operations which could harm the Company’s reputation and financial results, as well as potential increased regulatory oversight, litigation, fines, and other remedial action. The costs incurred to investigate and remediate a physical or cybersecurity attack could be significant. A significant physical or cybersecurity attack on the Company’s critical infrastructure could have an adverse impact on the operations, reputation and financial condition of PNMR, PNM, and TNMP.
Previous report — wording carried elsewhere
Further, the ability of PNMR to declare dividends depends upon the extent to which cash flows will support dividends, the Company’s financial circumstances and performance, economic conditions in the U.S. and in the Company’s service areas,