A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2026 · Filed Nov 10, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2026-06-30; filed 2026-08-12.
0001104659-26-094733
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-09-30; filed 2026-11-10.
0001104659-26-125154
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 61 previous paragraphs and 61 current paragraphs.
31 unchanged; 23 reworded; 7 added; 6 removed; 1 previous and 0 current paragraphs rearranged.
Tables are not compared: 35 previous and 33 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (7)
Current report
The Company’s drilling programs have led to the discovery of three significant mineral systems; the Richmond Hill breccia, intrusive, and sediment hosted epithermal gold system on the Richmond Hill Project, the JB Zone orogenic gold system hosted in the Homestake Iron Formation on the Maitland Project with similar style gold mineralization as the historical Homestake Mine, and the Unionville Zone, a sediment, intrusive and breccia hosted epithermal gold system spatially above and partially overlapping the JB Zone system on the Maitland Project.
Current report
On September 10, 2026, the Company reported positive results from its metallurgical test program which will be used to inform the pre-feasibility study to be completed in 2026 (the “Pre-Feasibility Study”). Oxide ores and transition materials were defined and tested for metallurgical performance and geochemical stability in the Prefeasibility Met Variability testing. Based on these results, the Company does not expect to process a significant amount of transition material. Transition material accounted for approximately 20% of the resource identified for the purpose of the IACF. All other oxide lithologies present at Richmond Hill exhibited good characteristics of heap leach ores.
Current report
On September 28, 2026, the Company announced key mine design decisions that will be used in the Pre-Feasibility Study to be completed in 2026. The Company will pursue a consolidated heap leach facility design that centralizes all phased expansion modules of the heap leach pad. Further, the design capacity and operating parameters of the processing facilities have been optimized based on the metallurgical testing results in order to maximize metal recovery and provide maximum operational flexibility.
Current report
Although the metallurgical test work to inform the Pre-Feasibility Study has been completed as of September 30, 2026, planned drilling activities for the remainder of 2026 and 2027 for our Richmond Hill Project include a drilling campaign totaling approximately 15,000 meters for metallurgical follow-up (large diameter core), lithogeochemical data collection, and conversion of mineral resources to higher-confidence categories. Results from this drilling and subsequent investigations will be used to refine recovery information, environmental planning and further mineral resource conversion in the planned Feasibility Study.
Current report
Comparison of the Nine months ended September 30, 2026 and 2025
Current report
We had no operating revenue during the nine months ended September 30, 2026 and 2025.
Current report
Cash used in operations for the nine months ended September 30, 2026 was approximately $22.3 million compared to approximately $18.4 million in the prior year comparable period. The increase was primarily driven by higher exploration expenditures, mainly on studies and reports as the Company completed its metallurgical test program and advanced the Pre-Feasibility Study, partially offset by higher interest income.
Removed paragraphs (6)
Previous report
The Company’s unaudited financial statements are stated in United States dollars and are prepared in accordance with U.S. GAAP.
Previous report
Planned activities in 2026 for our Richmond Hill Project include an extensive drilling campaign totaling approximately 15,500 meters across infill, step-out, condemnation, and geotechnical drilling. Infill drilling within the 10-year mine plan is intended to convert inferred resources to measured and indicated classifications, while step-out drilling to the north and northeast targets potential resource expansion. Additional drilling is planned to support infrastructure siting, overburden stockpile areas, and pit slope stability analyses. These activities are designed to refine the mine plan, improve resource confidence, and directly support feasibility-level engineering and economic analysis.
Previous report
Metallurgical test work represents another critical planned activity in 2026. The Company is conducting a staged metallurgical program, including ore characterization, column leach testing, comminution studies, and recovery optimization, with final results expected in the fourth quarter of 2026. This work will inform heap leach pad design, crushing and stacking configurations, agglomeration requirements, and Merrill-Crowe plant sizing. The results will be incorporated into feasibility trade-off studies evaluating mining and stacking rates, heap leach pad layout, and material handling alternatives to optimize project economics and operational flexibility.
Previous report
Comparison of the six months ended June 30, 2026 and 2025
Previous report
We had no operating revenues during the six months ended June 30, 2026 and 2025. We had total comprehensive loss (net losses and comprehensive losses) of approximately $16.8 million and $10.2 million for the six months ended June 30, 2026 and 2025, respectively.
Previous report
Cash used in operations for the six months ended June 30, 2026 was approximately $15.5 million compared to approximately $8.6 million in the prior year comparable period. The Company was not drilling in the first quarter of 2025, the primary driver of higher operating expenses, as the Company was focused on the Richmond Hill Initial Assessment.
Reworded paragraphs (23)
Previous wording
This management’s discussion and analysis should be read in conjunction with the Company’s financial statements and notes thereto as set forth herein and the Company’s annual audited financial statements. Readers are also urged to carefully review and consider the various disclosures made by the Company, which attempt to advise interested parties of the factors that affect our business, including without limitation, the disclosures made under “Risk Factors” of the Annual Report.
Current wording
This management’s discussion and analysis should be read in conjunction with the Company’s financial statements and notes thereto as set forth herein and the Company’s annual audited financial statements. Readers are also urged to carefully review and consider the various disclosures made by the Company, which attempt to advise interested parties of the factors that affect our business, including without limitation, the disclosures made under “Item 1A. Risk Factors” of the Annual Report.
Previous wording
The Company’s goal is to create stockholder value through the acquisition, responsible exploration, and future development of high caliber gold properties in the Homestake District of South Dakota. The Company uses our proprietary information from the Historic Homestake Mining Company, modern exploration and mining techniques, and geologic information and interpretations based on experience at other mines, new academic research and information from proprietary geophysical surveys to focus our programs and build upon where the historic Homestake Mining Company left off in the 1990s.
Current wording
The Company’s goal is to create stockholder value through the acquisition, responsible exploration, and future development of high caliber gold properties in the Homestake District of South Dakota. The Company uses our proprietary information from the Historic Homestake Mining Company, modern exploration and mining techniques, geologic information and interpretations based on experience, new mapping and interpretations from core drilling, and new academic research and information from proprietary geophysical surveys to focus our programs and build upon where the historic Homestake Mining Company left off in the 1990s.
Previous wording
The Homestake District has historically yielded approximately 45 million ounces of gold production as of June 30, 2026 with most of it coming from within a small geographic area. The production ledges of the Homestake Mine define a cumulative surface projection area of less than three square miles. Homestake Mining Company’s historic gold production and exploration in the Homestake District was overwhelmingly focused on the underground mine. Outside of the mine area, the Homestake District has been underexplored and heretofore has not been the subject of modern exploration efforts required to search for other deposits, especially under the cover of younger rocks that dominate the surface.
Current wording
The Homestake District has yielded approximately 45 million ounces of gold production as of September 30, 2026, with most of it coming from within a small geographic area. The production ledges of the historical Homestake Mine, when projected to the surface, define a cumulative area of less than three square miles. Homestake Mining Company’s gold production and exploration in the Homestake District was overwhelmingly focused on the underground mine. Outside of the mine area, the Homestake District has been underexplored and has not been the subject of modern exploration efforts required to discover other deposits, especially under the cover of younger rocks that dominate the surface.
Previous wording
We have consistently pursued a strategy of expanding our portfolio of brownfield properties located exclusively within the Homestake District to build a strong land position with the goal of consolidating possible mineral potential.
Current wording
We have executed a strategy of expanding our portfolio of brownfield properties located exclusively within the Homestake District to build a strong land position with the goal of consolidating possible mineral potential.
Previous wording
The Company has completed drilling projects at Maitland and Richmond Hill, operating up to four drill rigs at any given time. Dakota Gold has completed permit applications and environmental field work and currently has fifteen active permits in place with one additional permit being processed for the Maitland Project. Permitting for other exploration targets is anticipated in 2027.
Current wording
The Company has completed drilling projects at Maitland and Richmond Hill, operating up to four drill rigs at any given time. Dakota Gold has completed exploration permit applications and environmental field work and currently has sixteen active exploration permits in place and one permit submitted and pending regulatory approval.
Previous wording
In total, Dakota Gold has completed 587 holes for over 547,268 feet (166,807 meters) since drilling started in 2022.
Current wording
In total, Dakota Gold has completed 612 holes for approximately 165,000 meters since drilling started in 2022.
Previous wording
Other than our mineral resource estimate with an effective date of February 3, 2025 contained in our updated S-K 1300 Initial Assessment and Technical Report Summary for the Richmond Hill Gold Project (the “IA”), none of our other properties are sufficiently drilled to prepare an estimate of mineral resources under S-K 1300. The Company believes the Homestake District is in a safe jurisdiction with well-developed infrastructure and is in a favorable regulatory environment in which authorities have demonstrated a willingness to work with responsible operators to permit well-planned compliant projects.
Current wording
Other than our mineral resource estimate with an effective date of February 3, 2025 and updated in our S-K 1300 Initial Assessment and Technical Report Summary with cash flow for the Richmond Hill Gold Project filed with a Form 8-K on July 27, 2025 (the “IACF”), we have not prepared an estimate of mineral resources under S-K 1300 for any of our other properties. The Company believes the Homestake District is in a safe jurisdiction with well-developed infrastructure and is in a favorable regulatory environment in which authorities have demonstrated a willingness to work with responsible operators to permit well-planned compliant projects.
Previous wording
On July 24, 2026, Dr. Robert Quartermain, CEO and Co-Chair of the Company’s Board of Directors, notified the Board of Directors of his retirement from his role as CEO, effective August 18, 2026. On July 27, 2026, the Board of Directors appointed Jack Henris, the Company’s current President and Chief Operating Officer, to succeed Dr. Quartermain as CEO upon the effectiveness of his retirement. Mr. Henris will also be appointed as a member of the Board of Directors, effective August 18, 2026. Dr. Quartermain will continue in his roles as a member of the Board of Directors and its Co-Chair.
Current wording
On July 24, 2026, Dr. Robert Quartermain, CEO and Co-Chair of the Company’s Board of Directors, notified the Board of Directors of his retirement from his role as CEO, effective August 18, 2026. On July 27, 2026, the Board of Directors appointed Jack Henris, the Company’s current President and Chief Operating Officer, to succeed Dr. Quartermain as CEO upon the effectiveness of his retirement. Mr. Henris was also appointed as a member of the Board of Directors, effective August 18, 2026. Dr. Quartermain will continue in his roles as a member of the Board of Directors and its Co-Chair.
Previous wording
Planned activities during 2026 will focus on advancing the Richmond Hill Project through feasibility, permitting, and technical de-risking while continuing to progress high-grade exploration at the Maitland Project. At Richmond Hill, the Company is transitioning from an Initial Assessment with Cash Flow to a Pre-Feasibility Study in the second half of 2026, followed by a Feasibility Study targeted for 2027. Key workstreams include mine planning optimization, engineering trade-off studies, metallurgical test work, and baseline data collection to support state and county permitting. Concurrently, the Company plans to file a Notice of Intent and advance permitting activities with Lawrence County and the South Dakota Department of Agriculture and Natural Resources, positioning the project for construction readiness following completion of feasibility studies.
Current wording
Remaining activities for 2026 will focus on completing the Pre-Feasibility Study, advancing permitting and environmental baseline studies, and technical de-risking of the Richmond Hill Project. Following the Pre-Feasibility Study in the fourth quarter of 2026, the completion of a feasibility study is targeted for 2027 (the “Feasibility Study”). Key workstreams include mine planning optimization, engineering trade-off studies, metallurgical test work, closure and reclamation, water treatment design, and baseline data collection to support state and county permitting. The Company plans to prepare a Notice of Intent for future filing with the South Dakota Department of Agriculture and Natural Resources related to the Large Scale Mine permit and continue to advance permitting activities in 2027 with Lawrence County in relation to the conditional use permit.
Previous wording
At the Maitland property, planned activities in 2026 will concentrate on advancing the Unionville Zone toward a maiden mineral resource by the first half of 2027. The Company has outlined an infill drilling program of approximately 5,600 meters in 44 potential holes targeting shallow Tertiary epithermal mineralization that remains open along strike and at depth. In parallel, the Company will continue to evaluate high-grade exploration optionality at the JB Gold Zone, where Precambrian iron-formation-hosted mineralization shows strong geological similarities to the historic Homestake Mine. These efforts are intended to demonstrate the broader district-scale potential of the Maitland property while maintaining focus on near-term value creation at Richmond Hill.
Current wording
At the Maitland property, planned activities in 2027 will concentrate on advancing the Unionville Zone toward a maiden mineral resource. In 2027, the Company plans to continue to execute its infill drilling program targeting the shallow Tertiary epithermal mineralization that remains open along strike and at depth. In parallel, the Company will continue to evaluate high-grade exploration optionality at the JB Gold Zone, where Precambrian iron-formation-hosted mineralization shows strong geological similarities to the historic Homestake Mine. These efforts are intended to demonstrate the broader district-scale potential of the Maitland property while maintaining focus on near-term value creation at Richmond Hill.
Previous wording
We had no operating revenues during the three months ended June 30, 2026 and 2025. We had total comprehensive loss (net losses and comprehensive losses) of approximately $8.3 million and $6.5 million for the three months ended June 30, 2026 and 2025, respectively.
Current wording
We had no operating revenue during the three months ended September 30, 2026 and 2025.
Previous wording
During the three months ended June 30, 2026, our exploration expenses totaled approximately $6.5 million (compared to approximately $5.0 million for the three months ended June 30, 2025). The period-over-period increase is primarily related to period-over-period increases in assay costs of approximately $0.3 million and expenditure on studies and reports of approximately $1.4 million as the Company moved to complete its metallurgical test program. Included in exploration costs were stock-based compensation expenses of approximately $0.2 million and $0.4 million for the three months ended June 30, 2026 and 2025, respectively.
Current wording
During the three months ended September 30, 2026, our exploration expenses totaled approximately $6.3 million (compared to approximately $7.7 million for the three months ended September 30, 2025). The period-over-period decrease is primarily related to a reduced number of drills operating in the current period, which resulted in a decrease of approximately $1.1 million in drilling costs, lower rental and maintenance expenditure on equipment of approximately $1.6 million, and lower road and pad construction costs of approximately $0.2 million. These decreases were partially offset by increased expenditures on studies and reports of approximately $1.0 million as the Company advanced engineering and environmental work for the Pre-Feasibility Study and increases in permitting and environmental costs, associated with the preparation of the Notice of Intent, of approximately $0.4 million and increases in other miscellaneous costs of $0.1 million. Included in exploration costs were stock-based compensation expenses of approximately $0.2 million for each of the three months ended September 30, 2026 and 2025.
Previous wording
Our general and administrative expenses for the three months ended June 30, 2026 were approximately $2.7 million (compared to approximately $1.9 million for the three months ended June 30, 2025). These expenditures were primarily for legal, accounting, and professional fees, investor relations, support costs and other general and administrative expenses necessary for our operations. The period-over-period increase is primarily driven by an increase of approximately $0.3 million in expenditures on support costs, which are higher than the prior year comparable period primarily due to the expansion of the support team, and approximately $0.5 million related to stock-based compensation expense included in general and administrative expenses.
Current wording
Our general and administrative expenses for the three months ended September 30, 2026 were approximately $2.8 million (compared to approximately $3.2 million for the three months ended September 30, 2025). These expenditures were primarily for legal, accounting, and professional fees, investor relations, support costs and other general and administrative expenses necessary for our operations. The period-over-period decrease is primarily driven by a decrease of approximately $0.4 million of support costs.
Previous wording
We earned interest income from bank accounts of approximately $1.4 million and $0.5 million for the six months ended June 30, 2026 and 2025, respectively. Higher interest income was as a result of a higher cash balance as a result of the financing in February 2026.
Current wording
We earned interest income from bank accounts of approximately $0.8 million and $0.4 million for the three months ended September 30, 2026 and 2025, respectively. Higher interest income resulted from a higher cash balance due to the financing in February 2026.
Previous wording
For the three months ended June 30, 2026 and 2025, we had losses from operations totaling approximately $9.2 million and $6.9 million, respectively, and net losses approximately $8.3 million and $6.5 million, respectively.
Current wording
For the three months ended September 30, 2026 and 2025, we had losses from operations totaling approximately $9.1 million and $10.9 million, respectively, and total net losses of approximately $8.4 million and $10.5 million, respectively.
Previous wording
During the six months ended June 30, 2026, our exploration expenses totaled approximately $13.0 million (compared to approximately $6.9 million for the six months ended June 30, 2025). The period-over-period increase is primarily related to the increased drilling activity, which resulted in an increase of approximately $2.1 million compared to 2025. In the prior year comparable period, drilling was paused as the Company focused on the Richmond Hill Initial Assessment. Related to the higher level of drilling, there were period-over-period increases in assay costs of approximately $0.9 million, in permitting and environmental costs of approximately $0.3 million, in road and pad construction costs of approximately $0.2 million, in miscellaneous costs of approximately $0.5 million driven by higher reclamation costs, and in other costs including equipment and exploration payroll of approximately $0.6 million. In addition, expenditures on studies and reports increased by approximately $1.8 million as the Company moved to complete its metallurgical test program. Included in exploration costs were stock-based compensation expenses of approximately $0.3 million and $0.5 million for the six months ended June 30, 2026 and 2025, respectively.
Current wording
During the nine months ended September 30, 2026, our exploration expenses totaled approximately $19.3 million (compared to approximately $14.6 million for the nine months ended September 30, 2025). The period-over-period increase is primarily related to a $2.8 million increase in expenditures on studies and reports as the Company completed its metallurgical test program and advanced the pre-feasibility study, and a $1.0 million increase due to higher drilling activity. Related to the higher level of drilling, assay costs increased by $0.9 million, permitting and environmental costs increased by $0.6 million, and miscellaneous costs increased by $0.6 million. These increases were partially offset by lower rental and maintenance expenditure on equipment of approximately $1.4 million. Exploration costs included stock-based compensation expenses of approximately $0.5 million and $0.7 million for the nine months ended September 30, 2026 and 2025, respectively.
Previous wording
Our general and administrative expenses for the six months ended June 30, 2026 were approximately $5.2 million (compared to approximately $3.8 million for the six months ended June 30, 2025). These expenditures were primarily for legal, accounting, and professional fees, investor relations, support costs, and other general and administrative expenses necessary for our operations. The period-over-period increase is primarily driven by an increase of approximately $0.9 million in expenditures on support costs, which are higher than the prior year comparable period primarily due to the expansion of the support team, and approximately $0.4 million related to stock-based compensation expense included in general and administrative expenses.
Current wording
Our general and administrative expenses for the nine months ended September 30, 2026 were approximately $8.0 million (compared to approximately $6.9 million for the nine months ended September 30, 2025). These expenditures were primarily for legal, accounting, and professional fees, investor relations, support costs, and other general and administrative expenses necessary for our operations. The period-over-period increase is primarily driven by an increase of approximately $0.6 million in support costs due to the expansion of the support team, and an increase of approximately $0.4 million due to an increase in stock-based compensation expense.
Previous wording
We earned interest income from bank accounts of approximately $0.9 million and $0.4 million for the three months ended June 30, 2026 and 2025, respectively. Higher interest income was as a result of a higher cash balance as a result of the financing in February 2026.
Current wording
We earned interest income from bank accounts of approximately $2.2 million and $0.9 million for the nine months ended September 30, 2026 and 2025, respectively. Higher interest income resulted from higher cash balances as a result of the financing in February 2026.
Previous wording
For the six months ended June 30, 2026 and 2025, we had losses from operations totaling approximately $18.2 million and $10.7 million, respectively, and net losses approximately $16.8 million and $10.2 million, respectively.
Current wording
For the nine months ended September 30, 2026 and 2025, we had losses from operations totaling approximately $27.3 million and $21.5 million, respectively, and net losses of approximately $25.2 million and $20.7 million, respectively.
Previous wording
Cash used in investing activities for the six months ended June 30, 2026 was approximately $1.4 million compared to $nil in the prior year comparable period, due to the timing of the purchases of property and equipment and mineral properties.
Current wording
Cash used in investing activities for the nine months ended September 30, 2026 was approximately $2.4 million compared to $0.3 million in the prior year comparable period, due primarily to the timing of advances for the purchase of property and equipment.
Previous wording
During the six months ended June 30, 2026 and 2025, cash flows from financing activities were approximately $86.6 million and $41.2 million, respectively.
Current wording
During the nine months ended September 30, 2026 and 2025, cash flows from financing activities were approximately $87.1 million and $42.3 million, respectively.
Previous wording
In the six months ended June 30, 2025, the Company issued 2,548,713 shares of common stock under the ATM Program for net proceeds of approximately $7.3 million, 12,400,000 shares of common stock for net proceeds of approximately $32.7 million pursuant to a public offering, 50,000 shares of common stock for the exercise of stock options for proceeds of approximately $0.1 million, and 892,601 shares of common stock for the exercise of warrants for proceeds of approximately $1.9 million. Partially offsetting these inflows were taxes remitted on RSUs, PSUs and compensation of approximately $0.8 million.
Current wording
In the nine months ended September 30, 2026, the Company issued 586,749 shares of common stock under the ATM Program for net proceeds of approximately $3.5 million, 12,561,000 shares of common stock for net proceeds of approximately $71.7 million pursuant to a public offering, 5,239,821 shares of common stock for the exercise of warrants for proceeds of approximately $10.9 million and 333,748 shares of common stock for the exercise of stock options for proceeds of approximately $1.3 million. In addition, the Company issued 534,110 shares of common stock for the exercise of options settled on a cashless basis. Partially offsetting these inflows were taxes remitted on RSUs, PSUs and compensation of approximately $0.3 million.
Previous wording
offering, 5,239,821 shares of common stock for the exercise of warrants for proceeds of approximately $10.9 million and 225,082 shares of common stock for the exercise of stock options for proceeds of approximately $0.7 million. In addition, the Company issued 530,701 shares of common stock for the exercise of options settled on a cashless basis. Partially offsetting these inflows were taxes remitted on RSUs, PSUs and compensation of approximately $0.3 million.
Current wording
In the nine months ended September 30, 2025, the Company issued 2,548,713 shares of common stock under the ATM Program for net proceeds of approximately $7.3 million, 12,400,000 shares of common stock for net proceeds of approximately $32.7 million pursuant to a public offering, 1,423,153 shares of common stock for the exercise of warrants for proceeds of approximately $3.0 million and 50,000 shares of common stock for the exercise of stock options for proceeds of approximately $0.1 million. In addition, the Company issued 91,710 shares of common stock for the exercise of stock options settled on a cashless basis.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere