For the period ended Aug 12, 2026. Filed Aug 12, 2026.

View on SEC.gov

About this filing

What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.

Aug 12, 2026 · Filed Aug 12, 2026

Use the contents to explore the available documents and sections.

MINE$2.39-0.8%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.2 · Exploration Program

Exploration Program

As of June 30, 2026, the Company has completed a total of 461 surface drill holes on the Fenn-Gib Project, representing 210,804 metres.

A summary of the Company’s drilling program for the Fenn-Gib Project is as follows:

HolesMetres
North Block Surface DDH Drilling#M
2021 Mayfair holes DDH9054,937
2022 Mayfair holes DDH11861,997
2023 Mayfair holes DDH8954,976
2023 Geotech holes DDH73,230
2024 Mayfair holes DDH4218,230
2025 Mayfair holes DDH594,282
2026 Mayfair holes DDH236,031
428203,683
South Block Surface DDH Drilling
2022 holes DDH183,457
2024 holes DDH153,664
337,121
Total Fenn-Gib Drilling461210,804

In February 2026, the Company reported initial results from its 2025 Grade Control Drilling Program, which comprised 56 tightly spaced (10 m x 10 m) vertical diamond drill holes totaling approximately 4,204 metres within the core of the Phase 1 starter pit. The program was designed to validate local grade variability, support improved ore-waste boundary definition, and inform dilution and ore-loss assumptions in advance of project financing and construction. These results were not incorporated into the 2026 PFS.

In June 2026, the Company reported the final results and evaluation of the tight-spaced Grade Control (GC) drilling program. The GC program returned positive results, confirming approximately 1 million tonnes of ore-grade material that was categorized as probable mineral reserves in the PFS; roughly 25% of the Phase 1 planned designed. For material above 0.80 g/t gold cut-off grade, the GC model returned similar grade and 2% more tonnes than predicted by the probable mineral reserve model. For the higher-grade portions, above a 3.0 g/t gold cut-off grade, the GC model identified 28% more tonnes at 7% higher grade, representing 37% more gold than the probable mineral reserve model for the GD drilling test area. The findings support the accuracy of the mineral reserve block model in the Stage 1 starter pit area tested and validate the higher-grade component of the mineral reserve for mine planning.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.