UR-ENERGY INC

For the period ended Jun 30, 2026. Filed Aug 10, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2026 · Filed Aug 10, 2026

URG$0.74+7.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2026-03-31; filed 2026-05-08.

0001104659-26-057462

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2026-06-30; filed 2026-08-10.

0001104659-26-093458

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 165 previous paragraphs and 146 current paragraphs.

43 unchanged; 57 reworded; 45 added; 64 removed; 1 previous and 1 current paragraphs rearranged.

Tables are not compared: 12 previous and 12 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (45)

Current report

Demand growth, energy-security considerations, and federal policy initiatives continued to support the nuclear industry and domestic uranium production during the second quarter of 2026. Sector developments during the period included progress on federal regulatory reforms affecting uranium recovery, nuclear materials, and reactor licensing; initiatives to strengthen the domestic nuclear fuel cycle; and federal funding allocations for reactor deployment, nuclear safety, and workforce development.

Current report

On June 23, 2026, the U.S. Energy Information Administration (“EIA”) released its 2025 Domestic Uranium Production Report. According to the report, U.S. uranium concentrate production increased to approximately 2.1 million pounds U₃O₈ in 2025 from approximately 0.7 million pounds in 2024. Exploration and development drilling reached its highest level since 2013, employment increased by approximately 41%, and industry expenditures reached their highest level since 2014. For context, 2025 domestic production was equivalent to only approximately 3.8% of the 55.9 million pounds of U₃O₈ equivalent purchased by owners and operators of U.S. civilian nuclear power reactors in 2024, the latest year for

Current report

which EIA uranium-marketing data are available. This comparison involves production and purchases from different reporting years and does not reflect inventory movements or the origin of uranium delivered during either year.

Current report

Federal nuclear regulatory policy continued to be shaped by the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024 (the “ADVANCE Act”) and four nuclear-related Executive Orders (“EOs”) issued on May 23, 2025. Among these, Executive Order 14300 directs the U.S. Nuclear Regulatory Commission (“NRC”) to revise its regulations and processes and states a policy objective of increasing U.S. nuclear generating capacity from approximately 100 gigawatts in 2024 to approximately 400 gigawatts by 2050. Subsequent to the end of the second quarter, the NRC advanced several potentially consequential rulemakings driven by EO 14300 that could broadly affect the nuclear fuel cycle.

Current report

On July 2, 2026, the NRC transmitted its proposed rule, “In-situ Recovery Monitoring and Decommissioning Timeliness,” to the White House Office of Information and Regulatory Affairs (“OIRA”) for interagency review. This proposed rulemaking is intended to codify risk-informed groundwater protection standards for in-situ recovery (“ISR”) facilities and risk-inform decommissioning timeliness regulations to allow site-specific extensions. Additionally, on July 7, 2026, the NRC published a proposed rule to comprehensively overhaul its National Environmental Policy Act (“NEPA”) regulations. This proposal aims to dramatically streamline environmental reviews and to establish new categorical exclusions for projects within the NRC’s jurisdictional authority. This was followed on July 15, 2026, by a proposed rule to reform the NRC’s foundational radiation-protection framework under 10 CFR Part 20. This rulemaking represents the first major modernization of the agency’s baseline dose-limit and monitoring standards in decades, seeking to align U.S. regulations with updated international radiological protection standards and risk-informed methodologies.

Current report

Wyoming is an NRC Agreement State and generally administers source- and byproduct-material licenses for Wyoming uranium recovery facilities through its Uranium Recovery Program (“URP”). Because the Company’s operating facilities are located in Wyoming, NRC rules that are administrative or designated as not required for Agreement State compatibility may have limited direct effect on the Company. Other NRC requirements may require corresponding state action or influence Wyoming’s regulatory approach. The pending ISR monitoring and decommissioning rule is the upcoming rulemaking most directly relevant to the Company’s operations, but its financial and operational effects cannot be determined until the NRC publishes the text of the proposed rule and the State of Wyoming determines what corresponding changes to the URP are required.

Current report

Broader developments in the nuclear industry during the quarter included NRC renewal of the Diablo Canyon and St. Lucie reactor operating licenses and the commencement of construction of Kairos Power’s Hermes 2 demonstration reactor. In infrastructure developments, ConverDyn disclosed that it was evaluating a second U.S. uranium-conversion facility that could approximately duplicate the capacity of its existing plant, which remains subject to completion of engineering studies and a formal decision to proceed. Urenco USA announced plans to increase the annual uranium-enrichment capacity of its New Mexico facility by nearly 50%, with initial production from the new capacity projected for 2032.

Current report

The ultimate effect of these fuel-cycle and regulatory developments on U.S. uranium producers remains subject to substantial uncertainty and will depend on factors including the timing and scale of utility reactor deployment, fuel-procurement practices, domestic-origin procurement mandates, and the implementation timelines of federal program funding. Nevertheless, these comprehensive federal initiatives and infrastructure expansions collectively underscore a robust, long-term commitment to nuclear energy that is widely expected to structurally strengthen the prospective demand outlook for domestic uranium production.

Current report

During 2026 Q2 at Lost Creek, we drummed 140,873 pounds of U 3 O 8 and shipped 149,747 pounds of U 3 O 8 to the conversion facility, including assay adjustments.

Current report

We continued to advance several initiatives at Lost Creek during 2026 Q2 to increase production rates. These efforts included the installation of a sand filtration system while we construct a planned wastewater treatment facility. During 2026 Q2, the sand filtration system was fully installed but testing and other commissioning work extended into July 2026. To accommodate modifications to piping at the plant for the system, the Lost Creek plant suffered nearly two days of downtime and four days of reduced flow in June 2026 that affected quarterly production.

Current report

We made progress on other initiatives to increase production at Lost Creek during Q2 2026, including bringing additional HHs online in MU1 Phase 2 as described above, and continued work to optimize lixiviant chemistry in the formation to increase average grades. We also continued to advance the development of an enhanced maintenance program and improvements to the reverse osmosis system in the plant, and increased our focus on daily drumming to increase the volume of product packaged and shipped. We also progressed the development of the planned wastewater treatment facility at Lost Creek during 2026 Q2, including engineering design work and the procurement of the building shell and internal equipment components.

Current report

The pounds of U 3 O 8 drummed during 2026 Q2 was the highest amount drummed during a calendar quarter since we made the decision in 2022 to ramp-up Lost Creek operations. Nevertheless, startup of the sand filtration system was delayed until July 2026, and production at Lost Creek during 2026 Q2 continued to be negatively affected by fine particles from the host formation that have reduced flow rates.

Current report

With only limited operations, we captured 10,634 pounds of U 3 O 8 at Shirley Basin during 2026 Q2, all from HH 1-1 in Shirley Basin’s first mine unit (“MU1”).

Current report

We have fourteen ion exchange (“IX”) columns at Shirley Basin, which include ten for production, two for restoration, and two for cleaning the waste stream before disposal. Although construction of major infrastructure at Shirley Basin was substantially complete at the end of 2026 Q1 as previously disclosed, construction activities continued during 2026 Q2 after commencement of initial operations, focused on structural steel, piping systems, electrical installation, and interior building work. During the quarter, we completed construction in the plant of the pipeline connections to the first four IX production columns and the infrastructure to transfer U 3 O 8 from the Shirley Basin plant into trailers for trucking to Lost Creek for processing. We also completed the necessary modifications to the Lost Creek plant to accept and process these shipments.

Current report

In the wellfield, drilling and installation of wells and HHs continued during the quarter in MU1. Wellfield construction activity was focused on completing the installation of components and systems for HH 1-2 and progressing the installation of various components for HH 1-3 through HH 1-8. During the quarter, we continued to advance the drilling and installation of the 607 production and injection wells currently planned for HH 1-1 through HH 1-8. At June 30, 2026, approximately 97% of these wells were drilled, 93% were cased, and 84% were completed. We also made improvements

Current report

to well completions in HH 1-1 and HH 1-2 to improve flow rates. At June 30, 2026, we had nine drill rigs on site performing drilling, casing, and completion work at Shirley Basin.

Current report

During 2026 Q2, we completed pump testing of two of the three aquifer test well clusters that we installed prior to the quarter and began work on baseline environmental studies in anticipation of possible permitting of the project. We also began preliminary work on a technical report for the project during the quarter.

Current report

During 2026 Q2, we completed abandonment of all holes drilled during recent exploration activities at North Hadsell, which allows us to devote the three drill rigs that were at North Hadsell to our planned 120-drill hole exploration program at our LC South property.

Current report

Pounds drummed and shipped in 2026 Q2 increased to 140,873 and 149,747, respectively, and were comprised solely of Lost Creek pounds. We received positive assay adjustments totaling 7,745 pounds during 2026 Q2, bringing the year-to-

Current report

date total to 11,429 pounds, indicating we previously drummed and shipped more pounds than estimated. The positive assay adjustments are included in pounds at Lost Creek drummed and shipped during the quarter. We expect pounds drummed and shipped to increase in 2026 Q3 as expected flow rates increase with the Lost Creek sand filtration system online and as Shirley Basin is expected to start shipments and begin to ramp up operations.

Current report

We sold 215,000 pounds at an average price of $66.85 for $14.4 million in 2026 Q2 and sold 165,000 pounds at $63.20 in 2025 Q2 for $10.4 million. We sold 270,000 pounds at an average price of $67.69 for $18.3 million in the six months ended June 30, 2026 and sold 165,000 pounds at $63.20 for $10.4 million in the same period in 2025. The increase in pounds and price was driven by the terms of the underlying sales contracts.

Current report

For the three months ended June 30, 2026, we sold 165,000 pounds from inventory produced at Lost Creek and 50,000 pounds from non-produced inventory. For the six months ended June 30, 2026, we sold 220,000 pounds from inventory produced at Lost Creek and 50,000 pounds from non-produced inventory.

Current report

U 3 O 8 product costs included in cost of sales were greater in the three and six months ended June 30, 2026, compared to 2025 because of the increase in pounds sold, higher labor costs, and the use of purchased pounds to fill an order in 2026. The purchased pounds have a higher cost than our produced pounds.

Current report

For the three months ended June 30, 2026, the $1.9 million gross profit was consistent with the same period in 2025. For the six months ended June 30, 2026, gross profit increased to $3.1 million from a loss of $0.7 million in the comparable 2025 period. The primary reason for the increase was higher 2026 sales volumes that resulted in a lower cost per pound sold, partially offset by higher labor and depreciation.

Current report

Total operating costs increased $2.6 million and $11.0 million in the three and six months ended June 30, 2026, as compared to 2025, respectively. The primary reasons were increased development activities, including higher labor costs due to increased employee levels and increased development activities associated with pre-operational and wellfield development costs at Shirley Basin, and an increase in general and administration expense.

Current report

Investing activities used $27.3 million during the six months ended June 30, 2026. We spent $22.8 million on construction and $0.9 million on rolling stock at Shirley Basin, $3.0 million on construction, primarily related to the sand filtration

Current report

The substantial majority of our 2026 deliveries are scheduled for the latter part of the year consistent with the ramp-up schedules of Lost Creek and Shirley Basin. As discussed above, our total sales in 2026 are projected to be 1,000,000 pounds of U 3 O 8 at an average price of $64 per pound for expected revenues of $64 million.

Current report

We have revised our 2026 capital expenditure estimate for Shirley Basin to approximately $30.5 million and elected to defer $5.3 million related to the wastewater treatment facility to 2027. The combined 2026 and 2027 capital expenditure estimate of $35.8 million is up from the previously projected estimate of $25.5 million (which included $10.1 million in weather-delayed carryover from 2025). During the six months ended June 30, 2026, we spent $21.9 million. The $5.0 million increase in 2026 is driven primarily by initial engineering plan revisions, which led to contractor overtime and expedited labor fees and material cost inflation from procurement delays. Additional cost drivers included higher winter construction expenses and the need to import off-site material for evaporation pond clay liners instead of mining on-site. The $5.3 million increase for 2027 relates to the deferral of the remaining water treatment facility construction costs. The water treatment facility will be required for future restoration activities and is not essential for current production operations.

Current report

As discussed above, we installed a sand filtration system at Lost Creek in 2026 Q2 while a planned wastewater treatment facility is under construction. The estimated cost of the facility is between $25 million and $33 million.

Current report

At Lost Creek, we believe the rate of U 3 O 8 pounds drummed will continue to increase over time as we install additional infrastructure, continue optimization of operations and implementation of process improvements, and our workforce gains more experience,* *recognizing that production rates are expected to vary from quarter to quarter as we continue to add HHs in MU1 Phase 2 and move into additional mine units.

Current report

As described above, we installed a sand filtration system in 2026 Q2 and expect this system will reduce the impact of fine particles from the host formation and assist with increasing flow rates until the planned completion of the wastewater treatment facility. Although testing and other commissioning of the system extended past the end of the quarter, operation of the system commenced in July 2026.

Current report

In early July 2026, we broke ground and began grading the site for the wastewater treatment facility. Additional grading work and forming for building concrete continued through July and into August, when the initial concrete pads are expected to be poured. We expect to complete construction of the facility by the end of 2027 Q1.

Current report

We will continue optimization of the lixiviant chemistry to increase average grades. We will also continue our focus on daily drumming, and plan to complete our initiatives to implement an enhanced maintenance program and improvements to the reverse osmosis system by year-end 2026.

Current report

During the remainder of 2026, we plan to continue wellfield construction and installation in MU1 Phase 2 at a pace similar to 2026 Q2 until all 10 HHs planned for MU1 Phase 2 are in production. As described above, drilling in MU1 Phase 2 is very advanced, and we brought an additional HH in MU1 Phase 2 online in July 2026. Subject to regulatory approval by the Wyoming Department of Environmental Quality (“WDEQ”), we expect to commence wellfield construction and installation in MU5 by the end of the year 2026, where we plan to install 15 HHs from late 2026 through 2028. In July 2026, we began hydrologic testing, archeological studies, and the compilation of other data for the MU5 regulatory approval package, which we plan to submit in 2026 Q3.

Current report

Since the end of 2026 Q2, we have also actively continued to drill delineation holes in MU4 to better define the resources.

Current report

After commencing initial operations and receiving the Authorization for full production operations at Shirley Basin in 2026 Q2, we continue to expect our first shipments of production from Shirley Basin, our second ISER uranium mining facility, this summer.

Showing the first 40 of 45 passages. Open the source sections for the rest.

Removed paragraphs (64)

Previous report

Ur-Energy has one wholly owned subsidiary, Ur-Energy USA Inc., incorporated under the laws of the State of Colorado. Ur-Energy USA Inc. has three wholly-owned subsidiaries: NFU Wyoming, LLC, a limited liability company formed under the laws of the State of Wyoming which acts as our land holding and exploration entity; Lost Creek ISR, LLC, a limited liability company formed under the laws of the State of Wyoming to operate our Lost Creek Project and hold our Lost Creek properties and assets; and Pathfinder Mines Corporation, incorporated under the laws of the State of Delaware, which holds, among other assets, our Shirley Basin Project in Wyoming. Our material U.S. subsidiaries remain unchanged since the filing of our Annual Report on Form 10-K, dated March 10, 2026.

Previous report

Successful production operations depend on strong safety programs. Our safety performance and culture at Lost Creek and Shirley Basin have continued to improve, and we remain focused on safety and compliance throughout our operations.

Previous report

Our combined licensed capacity at Lost Creek and Shirley Basin totals 4.2 million pounds of U 3 O 8 per year. This includes licensed annual capacity at the Lost Creek processing facility of up to 2.2 million pounds of U 3 O 8 slurry and/or dried U 3 O 8, of which up to 1.2 million pounds of U 3 O 8 may be produced from Lost Creek wellfields. It also includes two million pounds of U 3 O 8 slurry and/or dried U 3 O 8 of licensed annual capacity (including toll processing) at Shirley Basin for a full processing facility. As described above, the Shirley Basin facility is designed as a satellite plant, and we plan to process U 3 O 8 extracted and captured at Shirley Basin at the Lost Creek facility, but our ability to construct a full processing facility at Shirley Basin and toll process for other producers in the future provides operating flexibility as may be dictated by future market conditions. The maximum annual wellfield production rate under the mining permit for Shirley Basin is not planned to exceed 1.4 million pounds of dried U 3 O 8 per year.

Previous report

Demand growth, energy security considerations, and government policies continue to support the nuclear industry in the United States and globally. Developments during 2026 Q1 included continued policy support for domestic nuclear fuel cycle capabilities, increasing electricity demand associated with data centers and artificial intelligence (“AI”), and ongoing regulatory reforms intended to facilitate nuclear deployment.

Previous report

Electricity demand growth remains a significant factor supporting interest in nuclear energy as a source of reliable, baseload, low-carbon power. The International Energy Agency reports that nuclear generation reached a record level in 2025 and projects that its growth rate will more than double from 2026 through 2030 compared with 2021 to 2025. The most recent projections of the International Atomic Energy Agency are that global nuclear capacity could more than double by 2050, and the World Nuclear Association has called for nuclear power generation to triple by 2050.

Previous report

Changes in recent years in U.S. government policies, including energy security initiatives, domestic fuel cycle incentives, and reactor deployment programs, are providing greater support to the nuclear industry. In May 2025, President Trump signed four Executive Orders (“EOs”) aimed at accelerating U.S. nuclear technology development and deployment, reforming related regulations, strengthening the fuel cycle industrial base, and supporting nuclear contributions to national security. EO 14300, which mandates a comprehensive revision of U.S. Nuclear Regulatory Commission (“NRC”) regulations and processes, has a policy objective to facilitate the expansion of U.S. nuclear energy capacity from approximately 100 GW in 2024 to approximately 400 GW by 2050. In response, the U.S. government announced a strategic initiative with Westinghouse Electric Company and its owners in October 2025 to help facilitate financing and permitting for a potential multi-reactor build program in the U.S. with an estimated value up to $80 billion.

Previous report

In addition to the broader nuclear industry, the U.S. government has taken actions in recent years that support increased reliance on uranium from U.S. sources. The Prohibiting Russian Uranium Imports Act, enacted in May 2024, restricts imports of Russian uranium products through 2040, subject to limited waivers. The U.S. Geological Survey added uranium to the U.S. Critical Minerals List in 2025, and executive actions, including EO 14241, direct federal agencies to facilitate domestic mineral production.

Previous report

The U.S. government has continued to take actions in 2026 to support the domestic nuclear fuel cycle and reduce reliance on foreign sources of nuclear fuel. The DOE’s fiscal year 2026 budget includes approximately $3.1 billion for the Office of Nuclear Energy to support advanced reactor development and deployment. In January 2026, the DOE announced approximately $2.7 billion in contract awards to support the development of domestic low-enriched uranium (LEU) and high-assay, low-enriched uranium (HALEU) enrichment capacity. In parallel, the NRC has continued implementation of the reforms directed by EO 14300, including to establish defined licensing timelines, streamline regulatory review, and adopt more risk-informed and performance-based licensing approaches.

Previous report

In the broader nuclear market, the military conflict involving Iran that began in late February 2026 and associated shipping disruptions through the Strait of Hormuz introduced uncertainty into global oil and liquefied natural gas markets and highlighted the importance of reliable energy supply. Since the onset of the conflict, several countries in Africa reaffirmed plans to pursue new nuclear generation projects; South Korea moved to increase nuclear generation, including raising utilization rates at existing plants and accelerating maintenance schedules to increase output; Taiwan began evaluating the potential restart of previously shut-down reactors; and Japan entered into new international nuclear cooperation and fuel-related agreements. Japan also restarted the world’s largest nuclear plant, Kashiwazaki-Kariwa, in January 2026, prior to the conflict.

Previous report

During 2026 Q1, spot U 3 O 8 prices remained relatively volatile, increasing from approximately $81.55 per pound at December 31, 2025, to approximately $101.25 per pound on January 29, 2026, and ending the quarter at $84.25 per pound on March 31, 2026. Over a longer period, uranium prices have increased from historical lows in prior years but have continued to fluctuate in response to market developments.

Previous report

Overall, recent developments continue to support the outlook for nuclear energy and uranium markets. Increasing electricity demand, government support for domestic nuclear fuel cycle capabilities, ongoing regulatory reform efforts, and energy security considerations continue to highlight the importance of domestic uranium as a source of fuel for reliable, carbon-free electricity.

Previous report

Our current land portfolio in Wyoming includes 12 projects. Ten of these projects are in the Great Divide Basin (“GDB”), Wyoming, including our flagship Lost Creek Project. We control nearly 1,800 unpatented mining claims and three State of Wyoming mineral leases for a total of approximately 35,400 acres at our Lost Creek Property, including the Lost Creek permit area (the “Lost Creek Project” or “Lost Creek”) and certain adjoining projects, which we refer to as the LC East, LC West, LC North, LC South, and EN project areas (collectively, with the Lost Creek Project, the “Lost Creek Property”). Five of the projects at the Lost Creek Property contain reported mineral resources: Lost Creek, LC East, LC West, LC North, and LC South.

Previous report

We control approximately 3,536 acres of property interests in the general area of our Shirley Basin Project in central southeast Wyoming. Within that area, the permitted area of 2,605 acres includes 1,770 acres of locatable mineral lands that we control, including nine patents, 29 unpatented mining claims, and two tracts of fee minerals.

Previous report

Our Wyoming properties, including our Shirley Basin Project, total approximately 48,000 acres. We have other non-material exploration stage projects in Wyoming located in the GDB, and our Lucky Mc Project is in the Gas Hills Uranium District, Wyoming. The Lost Creek Property and the Shirley Basin Project are the only two mineral properties that we deem to be individually material.

Previous report

During 2026 Q1, production flow averaged approximately 2,700 gpm and production grade averaged approximately 47 mg/L. We continue to optimize plant operations to increase flow rates from the wellfield, including addressing fine particles from the host formation that have reduced flow rates. To better address these fine particles over the long-term, we are developing a water treatment facility at Lost Creek, which we expect will enable sustained higher flow rates. As an interim measure, we progressed work during 2026 Q1 on the installation of a sand filtration system, which is expected to be operational in 2026 Q2.

Previous report

To increase production at Lost Creek, we also plan to continue the shift from MU2 to MU1 Phase 2, bringing additional HHs online in MU1 Phase 2 throughout 2026, and by better optimizing injection fluid chemistry. We have also engaged a contractor to support implementation of an enhanced maintenance program, and we plan to improve our reverse osmosis systems. We continue to focus on daily drumming to increase the volume of product packaged and shipped from the plant.

Previous report

Since year-end 2025, with few exceptions, we have been fully staffed at Lost Creek. Retention and training remain priorities as we continue to optimize operations. Many employees at Lost Creek were hired as part of the ramp-up of operations and are relatively new to the industry. As personnel gain additional experience, we expect continued improvement in production performance.

Previous report

During 2026 Q1, we continued to advance wellfield development and plant construction at our Shirley Basin Project. The plant is being constructed as a satellite facility, with U 3 O 8 extracted from the wellfield and captured on resin in the plant to be transported to Lost Creek for processing, drying, and drumming. The project is planned to include three relatively shallow mine units.

Previous report

Drilling and installation of wells for HH 1-1 in the first mine unit (“MU1”) at Shirley Basin were completed prior to year-end 2025. During 2026 Q1, we completed the connection of HH 1-1 to the plant and progressed surface construction and installation of HH 1-2. The main pipeline has been completed for the first four HHs.

Previous report

Well installation in MU1 progressed well during the quarter and continues at various stages for HH 1-3 through HH 1-8. Historical delineation and exploration drilling at Shirley Basin has allowed for focused wellfield development. At March 31, 2026, 540 injection and production wells in MU1 had been pilot drilled, 312 of those wells had been cased, and eight drill rigs were operating at Shirley Basin. Our Casper shop has completed construction of five HHs planned for MU1 and made progress on components for two additional HHs.

Previous report

Construction activities at Shirley Basin progressed during 2026 Q1 across all structural, mechanical, electrical, and site infrastructure workstreams. Major infrastructure is substantially complete, including primary roads; substation and secondary overhead power; support buildings (including the refurbishment of the existing warehouse, construction bay, maintenance bay, and a new drilling support building); the first two evaporation ponds; the modular main office complex; and the foundation, metal building, and roof of the plant. In addition, all IX columns and most tanks in the plant have been installed and work has progressed on exterior utilities, fencing, and grading. While engineering refinements, procurement activities, and seasonal weather conditions have affected the pace of certain workstreams, construction progress accelerated and execution improved during the quarter. Ongoing construction activities are focused on structural steel, piping systems, electrical installation, and interior building work.

Previous report

Subject to an additional regulatory operational inspection and approval, we expect to complete the installation and commissioning of the production circuits and other development needed to commence the transportation of resin loaded with U 3 O 8 from Shirley Basin to Lost Creek in summer 2026. After processing, drying, and drumming at Lost Creek, U 3 O 8 produced at Shirley Basin will be transported to the third-party conversion facility and added to our inventory for delivery to customers.

Previous report

With few exceptions, we have been fully staffed at Shirley Basin since year-end 2025. A phased recruitment plan implemented in 2025 has allowed us to provide personnel, many of whom are new to the industry, with task, safety, and cross training in advance of operations.

Previous report

During the quarter, we provided notice to one of our customers of the satisfaction of the fourth of four production milestones tied to delivery commitments in 2026 through 2029.

Previous report

In January 2026, Alex Ritchie was appointed General Counsel and Corporate Secretary of the Company to succeed Penne Goplerud, who has retired. Mr. Ritchie has more than 25 years of diverse legal, executive and business experience. He was in private practice from 1999-2009, including nine years at a prominent Denver law firm, where he represented mining and energy clients on billions of dollars of transactions.

Previous report

From 2009 to 2012, Mr. Ritchie served as senior corporate counsel for the U.S. subsidiary of an international oil and gas company, where he worked on environmental, major project, acquisition and divestiture, contract, and corporate matters. Before law school, he was a public accountant for three years at KPMG. Mr. Ritchie has been a thought leader and educator on natural resources law. From 2017 until joining Ur-Energy in January 2026, he was the Executive Director of The Foundation for Natural Resources and Energy Law (formerly the Rocky Mountain Mineral Law Foundation). From 2012 – 2017, he was an associate professor of law at the University of New Mexico School of Law where he taught natural resources, property and business law. Mr. Ritchie obtained his J.D. from the University of Virginia School of Law and his B.S.B.A in accounting from Georgetown University.

Previous report

In 2026 Q1, pounds captured increased 32,137 pounds or about 41% compared to 2025 Q4. Flow rates at Lost Creek improved after being intentionally lowered in late 2025 to allow the plant to make processing modifications and perform additional equipment repairs that would allow it to also produce at greater annual rates. The plant modifications are intended to address the elution, precipitation, washing, and drying processes, including allowing for greater washing efficiency and more routine operation of the dryers. Much of the work related to plant systems was completed in 2025 Q4.

Previous report

Pounds drummed and shipped in 2026 Q1 decreased compared to 2025 Q4 because we intentionally lowered flow rates in late 2025, which lowered the number of pounds captured in 2025 Q4 that were available to be drummed and shipped in the current quarter. We expect pounds drummed and shipped in 2026 Q2 to increase reflecting the increase in pounds captured in 2026 Q1.

Previous report

We sold 55,000 pounds at $70.98 for $3.9 million in 2026 Q1. There were no uranium sales during the comparable quarter in 2025.

Previous report

During 2026 Q1, all product sales were from inventory produced at Lost Creek.

Previous report

There was a positive gross profit in 2026 as the product that was sold was produced and was carried at a lower average cost per pound. As there were no sales in 2025 Q1, the gross loss was the result of the NRV adjustment discussed above.

Previous report

Total operating costs increased $8.3 million in the three months ended March 31, 2026 as compared to 2025, respectively. The drivers of the change were increased pre-operational and wellfield development costs at Shirley Basin, expanded exploration and development at Lost Creek and other non-operating properties and a timing difference related to annual employee bonuses which were accrued at March 31, 2026.

Previous report

We entered into a first amendment (“Amendment No. 1”) to the Restated Agreement with the Agents on December 17, 2021, which was filed in conjunction with a universal shelf registration statement on Form S-3 that was declared effective on December 17, 2021, and a second amendment (“Amendment No. 2”) to the Restated Agreement with the Agents on July 19, 2023, which was filed in conjunction with a universal shelf registration statement on Form S-3 that was declared effective July 19, 2023. These prior registration statements on Form S-3 have expired or been superseded.

Previous report

On April 6, 2026, we filed a new universal shelf registration statement on Form S-3, through which we may offer and sell, from time to time in one or more offerings, and at prices and terms to be determined pursuant to a prospectus supplement, up to $300 million of our common shares, warrants to purchase our common shares, our senior and subordinated debt securities, and rights to purchase our common shares and/or senior and subordinated debt securities. The new registration statement was declared effective on April 16, 2026, and will remain effective for a three-year period.

Showing the first 40 of 64 passages. Open the source sections for the rest.

Reworded paragraphs (57)

Previous wording

The following discussion and analysis by management is designed to provide information that we believe is necessary for an understanding of our financial condition, changes in financial condition, and results of our operations and should be read in conjunction with the audited financial statements and MD&A contained in our Annual Report on Form 10-K for the year ended December 31, 2025.

Current wording

The following discussion and analysis by management is designed to provide information that we believe is necessary for an understanding of our financial condition, changes in financial condition, and results of our operations and should be read in conjunction with the audited financial statements and MD&A contained in our Annual Report.

Previous wording

Incorporated on March 22, 2004, Ur-Energy is an exploration stage issuer, as that term is defined by the U.S. Securities and Exchange Commission (“SEC”). We are engaged in uranium recovery and processing activities, including the acquisition, exploration, development, and operation of uranium mineral properties in the U.S. We are operating our Lost Creek Project, our flagship in situ recovery (“ISR”) mining facility, and have commenced initial operations at our Shirley Basin Project, our second ISR uranium mine. Ur-Energy is a corporation continued under the Canada Business Corporations Act on August 8, 2006. Our common shares are listed on the TSX under the symbol “URE” and on the NYSE American under the symbol “URG.”

Current wording

Incorporated on March 22, 2004, Ur-Energy is an exploration stage issuer, as that term is defined by the U.S. Securities and Exchange Commission (“SEC”). We are engaged in uranium recovery and processing activities, including the acquisition, exploration, development, and operation of uranium mineral properties in the U.S. We are operating our Lost Creek Project, our flagship in situ recovery (“ISR”) mining facility, and our Shirley Basin Project, our second ISR uranium mine. When sold and further processed, our uranium production fuels nuclear power, which is a cost-effective, safe, and reliable source of electrical power that provides an estimated 55% of the carbon-free electricity in the U.S.

Previous wording

We utilize ISR to recover uranium at our Lost Creek Property and Shirley Basin Project, which are both located in Wyoming, and will do so at other projects where possible. The ISR technique is employed in uranium extraction because it allows for an effective recovery of roll front uranium mineralization at a low cost.

Current wording

We utilize ISR to recover uranium at our Lost Creek Property and Shirley Basin Project, which are both located in Wyoming and are the only two mineral properties that we currently deem to be individually material. The ISR technique is employed in uranium extraction because it allows for an effective recovery of roll front uranium mineralization at a low cost.

Previous wording

At Lost Creek, we extract and process uranium oxide (“U 3 O 8”) at the Lost Creek processing facility, which includes all circuits for the production, drying, and drumming (packaging) of U 3 O 8. After processing, drying, and drumming, U 3 O 8 is shipped from Lost Creek to a third-party conversion facility to be weighed, assayed, and stored until sold. When sold and further processed, our uranium production fuels nuclear power, which is a cost-effective, safe, and reliable source of electrical power that provides an estimated 55% of the carbon-free electricity in the U.S.

Current wording

At Lost Creek, we extract and process uranium oxide (“U 3 O 8”) at the Lost Creek processing facility, which includes all circuits for production, drying, and drumming. After processing, U 3 O 8 is shipped to a third-party conversion facility to be weighed, assayed, and stored until sold.

Previous wording

In April 2026, we commenced initial operations to extract and capture U 3 O 8 at Shirley Basin. The Shirley Basin Project is designed as a satellite facility. The Lost Creek processing facility will be utilized to process U 3 O 8 that is extracted and captured on resin (plastic beads that attract and bind uranium ions) in ion exchange (“IX”) columns at the Shirley Basin Project. We expect to begin transporting U 3 O 8-loaded resin from Shirley Basin to Lost Creek in summer 2026, subject to the receipt of additional regulatory approvals.

Current wording

As described in our Annual Report, Shirley Basin is designed as a satellite facility, with U 3 O 8 extracted and captured there transported to Lost Creek for processing. We commenced initial operations to extract and capture U 3 O 8 at Shirley Basin in April 2026. We received final authorization for full ISR operations at Shirley Basin in late June 2026, and expect to begin transporting U 3 O 8 to Lost Creek later this summer. We have the licensed capacity at Shirley Basin to construct a full processing facility to process U 3 O 8 that we extract and capture or to toll process for other producers as may be dictated by future market conditions.

Previous wording

We currently have multi-year sales agreements with eight global nuclear energy companies with projected delivery commitments of approximately 5.75 million pounds U 3 O 8 from 2026 through 2033, including 1.3 million pounds in 2026.

Current wording

Our combined licensed capacity at Lost Creek and Shirley Basin totals 4.2 million pounds of U₃O₈ per year. We currently have multi-year sales agreements with 10 global nuclear energy and trading companies with projected delivery commitments of approximately 5.75 million pounds of U 3 O 8 from 2026 through 2033, including pounds that we delivered in the first half of 2026.

Previous wording

During 2026 Q1, we operated a total of 15 header houses (“HHs”) at Lost Creek, including 13 in our second mine unit (“MU2”) and two brought online during 2026 Q1 in the second phase of our first mine unit (“MU1 Phase 2”). An additional HH in MU1 Phase 2 was recirculating fluid at quarter-end and is expected to be brought online in the coming days.

Current wording

During the quarter, we operated a total of 16 header houses (“HHs”) at Lost Creek, including 12 HHs in our second mine unit (“MU2”) and four HHs in the second phase of our first mine unit (“MU1 Phase 2”). Four of these HHs were brought online in MU1 Phase 2 during 2026 H1, including two in the first quarter and two in the second quarter. During 2026 Q2, production flow averaged approximately 2,519 gpm and production grade averaged approximately 38 mg/L.

Previous wording

Wellfield development and surface construction at Lost Creek during 2026 Q1 were focused on MU1 Phase 2 and remain on schedule for our 2026 operating plans. MU1 Phase 2 is planned to include 10 HHs, several of which we plan to bring online during 2026 Q2. During the quarter, we advanced installation of the remaining production and injection wells planned for MU1 Phase 2, all of which have been drilled and cased. Including HHs already in operation, our Casper shop has completed construction of seven of the 10 HHs planned for MU1 Phase 2 and made progress on components for the remaining three.

Current wording

Wellfield development and surface construction in 2026 Q2 continued to focus on MU1 Phase 2 and remains on schedule for our 2026 operating plans. MU1 Phase 2 is planned to include 10 HHs. During the quarter, we continued to advance installation of the 376 production and injection wells currently planned for the remaining six HHs in MU1 Phase 2. At June 30, 2026, approximately 99.5% of these wells had been drilled and cased and approximately 72% had been completed, and we had 17 drill rigs on site performing open hole drilling, casing, and completion work.

Previous wording

We also continued with wellfield delineation and development in MU4 and MU5 and began pattern planning for MU5. During 2026 Q1, we received approval of an amended aquifer exemption for Lost Creek that covered MU5 and substantially expanded the scope of the exemption. At March 31, 2026, we had 15 drill rigs operating at Lost Creek, which we expect will be sufficient for our 2026 drill programs.

Current wording

We also continued with wellfield delineation and development in our fourth mine unit (“MU4”) and our fifth mine unit (“MU5”) and pattern planning for MU5. As previously disclosed, during 2026 Q1, we received approval of an amended aquifer exemption for Lost Creek that covered MU5 and substantially expanded the scope of the exemption.

Previous wording

Since year-end 2025, the Wyoming Department of Environmental Quality completed its pre-operational inspections for the facility, and in April 2026, we brought HH 1-1 online and commenced initial operations to extract and capture U 3 O 8.

Current wording

As previously disclosed, we brought HH 1-1 online and commenced initial operations to extract and capture U 3 O 8 at Shirley Basin in April 2026. In late June 2026, we received final authorization (the “Authorization”) from the Wyoming Department of Environmental Quality, Uranium Recovery Program (“URP”) to begin full production operations at Shirley Basin, including the transportation of U 3 O 8 captured in the Shirley Basin satellite plant to Lost Creek for drying, packaging, and delivery to the conversion facility for sale to customers.

Previous wording

Our Casper, Wyoming construction shop supplies header houses to both our Lost Creek Project and our Shirley Basin Project. All our header houses are fabricated and built in Casper, allowing for efficiency, cost savings, and greater safety due to minimized travel requirements. During 2026 Q1, our construction team delivered two HHs to Lost Creek and three HHs to Shirley Basin, and advanced construction of five additional header houses.

Current wording

Our Casper, Wyoming construction shop supplies HHs to both Lost Creek and Shirley Basin. All our HHs are fabricated and built in Casper, allowing for efficiency, cost savings, and greater safety due to minimized travel requirements. During 2026 Q2, our construction shop completed the fabrication of two HHs for Lost Creek and one HH for Shirley Basin and advanced components for two additional HHs for Lost Creek and two additional HHs for Shirley Basin. Including HHs already in operation, at June 30, 2026, the shop had completed the fabrication of nine of the 10 HHs planned for MU1 Phase 2 at Lost Creek and the first six HHs planned for Shirley Basin.

Previous wording

Our Casper chemistry lab continues to support mine unit analysis at both Lost Creek and Shirley Basin through uranium analysis, product quality testing, and water sampling analysis. The lab staff also support ongoing research and development programs.

Current wording

Our Casper chemistry lab continued to support mine unit analysis at both Lost Creek and Shirley Basin through uranium analysis, product quality testing, and water sampling analysis. The lab staff also support ongoing research and development programs.

Previous wording

In 2025, we renewed exploration activities in the Great Divide Basin (“GDB”), Wyoming. Work began at our Lost Soldier Project located northeast of Lost Creek in 2025 Q3. The program at Lost Soldier included the installation of a series of aquifer test wells to facilitate a better understanding of the local hydrogeology. While the geology of the project is largely understood with the benefit of data from approximately 4,000 historical drill holes, additional hydrogeologic data and characterization will enable our professional staff to better plan for potential permitting and development of the site. We commenced aquifer testing in April 2026 and plan to initiate baseline environmental studies in 2026 in anticipation of possible permitting to advance the project. We also anticipate preparing a technical report for Lost Soldier in 2026. Located approximately 17 road miles to the Lost Creek plant, Lost Soldier has the potential to be developed as a satellite operation.

Current wording

We renewed exploration activities in the Great Divide Basin (“GDB”), Wyoming in 2025 Q3, beginning with our Lost Solider Project. Located approximately 17 road miles northeast of Lost Creek, Lost Soldier has the potential to be developed as a satellite operation. Although the geology of the project is largely understood with the benefit of data from approximately 4,000 historical drill holes, additional hydrogeologic data gathering and characterization are underway to enable us to better plan for potential permitting and development of the site.

Previous wording

As work concluded at Lost Soldier in 2025, the drill rigs and related teams began exploration drilling at our North Hadsell Project, also in the GDB north of Lost Creek. Through mid-March 2026, when seasonal sage grouse restrictions began, we had drilled 33 wide-spaced framework holes, each approximately 1,000 feet deep, for a total of 33,815 feet. Seven of these initial drill holes have returned significant mineralization, indicating the presence of a stacked roll-front system containing 13 individual intercepts exceeding 0.20 GT (Grade (%eU 3 O 8) times Thickness (ft)). These grades and thicknesses closely resemble the mineralization at Lost Creek, where the Company applies a 0.20 GT cut-off in evaluating economic mineral resources. Preliminary interpretation suggests the potential for up to eight individual roll fronts within a depth range of approximately 300 to 800 feet below surface, ideal for ISR mining, with indications of additional mineralized horizons at depth.

Current wording

In 2025 Q4, we began exploration drilling at our North Hadsell Project, also in the GDB north of Lost Creek. Through mid-March 2026, when seasonal sage grouse restrictions began, we had drilled 33 wide-spaced framework holes, each approximately 1,000 feet deep, for a total of 33,815 feet. Seven of these initial drill holes returned significant mineralization, indicating the presence of a stacked roll-front system containing 13 individual intercepts exceeding 0.20 GT (Grade (%eU 3 O 8) times Thickness (ft)). These grades and thicknesses closely resemble the mineralization at Lost Creek, where the Company applies a 0.20 GT cut-off in evaluating economic mineral resources. Preliminary interpretation suggested the potential for up to eight individual roll fronts within a depth range of approximately 300 to 800 feet below surface, ideal for ISR mining, with indications of additional mineralized horizons at depth.

Previous wording

We sold 55,000 pounds of U 3 O 8 at an average price of $70.98 per pound during 2026 Q1, generating revenue of $3.9 million. During the quarter, we dried and packaged 95,599 pounds of U 3 O 8 and shipped 103,956 pounds of U 3 O 8 to the conversion facility. At March 31, 2026, our finished inventory at the third-party conversion facility totaled 417,231 pounds of U 3 O 8.

Current wording

During 2026 Q2, we sold 215,000 pounds of U 3 O 8 at an average price of $66.85 per pound, generating revenue of $14.37 million. At June 30, 2026, our finished inventory at the third-party conversion facility totaled 348,292 pounds of U 3 O 8.

Previous wording

We currently have multi-year sales agreements with eight global nuclear energy companies. Our agreements call for base annual deliveries of 1.3 million pounds of U 3 O 8 in 2026, 1.15 million pounds in 2027, 1.4 million pounds in 2028, 900 thousand pounds in 2029, 800 thousand pounds in 2030, 100 thousand pounds in 2032, and 100 thousand pounds in 2033, with additional deliveries at our election of up to 100,000 pounds in 2028, 2029, and 2030. Combined base deliveries from 2026 through 2033 total 5.75 million pounds of U 3 O 8.

Current wording

We currently have sales agreements with ten global nuclear energy and uranium trading companies. After the deferral described below under “Looking Ahead,” our agreements call for base annual deliveries of 1.0 million pounds of U 3 O 8 in 2026, including pounds that we delivered in the first half of 2026, and for base annual deliveries of 1.3 million pounds in 2027, 1.4 million pounds in 2028, 1.05 million pounds in 2029, 800 thousand pounds in 2030, 100 thousand pounds in 2032, and 100 thousand pounds in 2033, with additional deliveries at our election of up to 100,000 pounds in 2028, 2029, and 2030. Combined base deliveries from 2026 through 2033 total 5.75 million pounds of U 3 O 8.

Previous wording

In 2026 Q1, we sold 55,000 pounds of U 3 O 8 at an average price of $70.98 per pound for revenues of $3.9 million. The deliveries were made under contracts negotiated in 2024 that included a combination of base-escalated and market-based pricing, which led to the higher price received in 2026 Q1 as compared to the 2025 pricing.

Current wording

In 2026 Q2, we sold 215,000 pounds of U 3 O 8 at an average price of $66.85 per pound for revenues of $14.4 million. In the six months ended June 30, 2026, we sold 270,000 pounds of U 3 O 8 at an average price of $67.69 per pound for revenues of $18.3 million The deliveries were made under contracts negotiated in 2024 that included a combination of base-escalated and market-based pricing, which led to the higher price received in 2026 as compared to the 2025 pricing.

Previous wording

In 2026, we expect to sell 1,300,000 pounds of U 3 O 8 at an average price per pound sold of approximately $63 for revenues of approximately $82 million. Of the 1,300,000 pounds, only 210,000 pounds were contracted in 2024 with a combination of base-escalated and market-based pricing. The remaining 1,090,000 pounds were negotiated as base-escalated contracts in 2022 and 2023, when the long-term price was between $43 and $57, which will lead to the lower average estimated price in 2026 as compared to the 2026 average actual Q1 price.

Current wording

In 2026, we expect to sell a total of 1,000,000 pounds of U 3 O 8 at an average price per pound sold of approximately $64 for revenues of approximately $64 million. Of the 1,000,000 pounds, only 210,000 pounds were contracted in 2024 with a combination of base-escalated and market-based pricing. The remaining 790,000 pounds were negotiated as base-escalated contracts in 2022 and 2023 when the long-term price was between $43 and $57, which will lead to the lower average estimated price for the year ending December 31, 2026, as compared to the June 30, 2026 year-to-date average actual price.

Previous wording

Deliveries for 2026 are committed to six customers with a substantial majority of deliveries occurring in the latter part of the year. Our current expectation is to deliver 55,000 pounds in 2026 Q1, 215,000 pounds in 2026 Q2, 190,000 pounds in 2026 Q3, and 840,000 pounds in 2026 Q4, for a total of 1,300,000 pounds of U 3 O 8 in 2026. The deliveries were scheduled in this fashion to complement the ramp up and start up schedules of Lost Creek and Shirley Basin.

Current wording

Deliveries for 2026 are committed to six customers with a substantial majority of deliveries occurring in the latter part of the year. In addition to the 55,000 pounds that we delivered in 2026 Q1 and the 215,000 pounds that we delivered in 2026 Q2, we expect to deliver 190,000 pounds in 2026 Q3 and 540,000 pounds in 2026 Q4, for a total of 1,000,000 pounds of U 3 O 8 in 2026. The deliveries were scheduled in this fashion to complement the ramp-up and start-up schedules of Lost Creek and Shirley Basin.

Previous wording

In 2026 Q1, we delivered 55,000 produced pounds at an average cost per pound sold of $48.85. The increased production rates in 2025 discussed above, and the resulting lower cost per pound in ending inventory, led to the lower average cost per pound sold in 2026 Q1 as compared to 2025.

Current wording

In 2026 Q2, we delivered 165,000 produced pounds at an average cost per pound sold of $52.96. In the six months ended June 30, 2026, we delivered 220,000 produced pounds at an average cost per pound sold of $51.93. The increased production rates in 2025 and the first six months of 2026 led to the lower average cost per pound sold in the six months ended June 30, 2026 as compared to 2025.

Previous wording

In 2026, we expect to sell 1,300,000 pounds of U 3 O 8. The sales will be made from a combination of produced and purchased pounds. As of March 31, 2026, we had a total of 417,231 pounds of U 3 O 8 at the conversion facility, including 240,000 purchased pounds. Production at Lost Creek is expected to continue to increase in 2026 and we expect to initiate production at Shirley Basin in summer 2026. Uranium bearing solution is now being captured at Shirley Basin and uranium concentrations are expected to increase over time as we expand the wellfield and bring additional production circuits online. As production at Lost Creek increases, we expect to see further decreases in the cost per pound produced. However, initial production at Shirley Basin will likely have higher production costs per pound until production rates increase over time as expected.

Current wording

In 2026, we expect to sell 1,000,000 pounds of U 3 O 8 from a combination of produced and purchased pounds. Production at Lost Creek is expected to continue to increase in 2026 and we expect to initiate production at Shirley Basin in summer 2026. As production increases, we expect further decreases in the cost per pound produced at Lost Creek, although initial production at Shirley Basin will likely have higher costs until production rates increase.

Previous wording

In 2026 Q1, we sold 55,000 produced pounds at an average price per pound sold of $70.98 and the average cost per pound sold was $48.85, which resulted in an average profit per pound sold of $22.13 and an average profit margin per pound sold of about 31%. On a cash cost basis, the average profit per pound sold was $37.31 and the profit margin per pound sold was about 53%. The improvement in 2026 Q1 as compared to 2025 was due to the higher sales price received in combination with a lower cost per pound sold.

Current wording

In 2026 Q2, we sold 165,000 produced pounds at an average price per pound sold of $64.80 and an average cost per pound sold of $52.95, which resulted in an average profit per pound sold of $11.85 and an average profit margin per pound sold of about 18%. In the six months ended June 30, 2026, we sold 220,000 produced pounds at an average price per pound sold of $66.35 and an average cost per pound sold of $51.93, which resulted in an average profit per pound sold of $14.42 and an average profit margin per pound sold of about 22%. On a cash cost basis, the average profit per pound sold was $31.11 and the profit margin per pound sold was about 47%. The improvement in average profit per pound sold and profit margin per pound sold in the first six months of 2026 as compared to 2025 was due to the higher sales price received in combination with a lower cost per pound sold.

Previous wording

In 2026, profit margins from Lost Creek should be better than in 2025 with a slightly higher average sales price and production cost per pound sold. As Shirley Basin comes online, the initial cost per pound produced will be higher until production rates increase over time as expected, which will result in lower initial profit margins.

Current wording

In 2026, profit margins from Lost Creek should be better than in 2025 with a slightly higher average sales price and lower average production cost per pound sold. As Shirley Basin comes online, the initial cost per pound produced will likely be higher until production rates increase over time, which will result in lower initial profit margins.

Previous wording

In 2025, we captured 370,893 pounds, drummed 410,440 pounds and shipped 420,144 pounds as mining activities continued to accelerate.

Current wording

In 2025, we captured 370,893 pounds, drummed 410,440 pounds, and shipped 420,144 pounds.

Previous wording

However, fine particles from the host formation carried in solution continue to inhibit our ability to increase flow rates into the plant. To address the issue, we are currently installing a sand filtration system to further optimize production and processing by selectively removing fine particles before they enter the plant. The installation of the sand filters is in process and expected to be completed in 2026 Q2.

Current wording

In 2026 Q2, we captured 105,016 pounds, and in the six months ended June 30, 2026, we captured 215,330 pounds or about 58% of the total captured in 2025. Pounds captured in 2026 Q2 included 10,633 pounds from Shirley Basin as operations were initiated during the quarter. Flow rates at Lost Creek were intentionally lowered in late 2025 to allow the plant to make processing modifications and perform additional equipment repairs. The work related to plant systems was mostly completed in 2025 Q4, which allowed us to maintain better average flow rates in the first six months of 2026. Fine particles from the host formation carried in solution inhibited our ability to further increase flow rates into the plant during the first six months of 2026. To address this issue, in 2026 Q2 we installed a sand filtration system to further optimize production and processing by selectively removing fine particles before they enter the plant. Although testing and other commissioning work of the sand filtration system extended past 2026 Q2, operation of the system commenced in July 2026, which should allow us to further increase flow rates during the last six months of 2026.

Previous wording

Conversion facility inventories increased during the current quarter, from approximately 365,000 pounds at December 31, 2025 to approximately 417,000 pounds at March 31, 2026. The increase was due to shipping more pounds to the conversion facility than we sold during the quarter. The ending produced inventory cost per pound increased from $46.36 to $51.53 during the quarter, reflecting higher average production costs per pound drummed that resulted from drumming fewer pounds during the quarter.

Current wording

Conversion facility inventories decreased during the current quarter to 348,292 pounds at June 30, 2026. The decrease was due to selling more pounds than were shipped to the conversion facility during the quarter. The ending produced inventory cost per pound increased from $51.53 to $55.01 during the quarter, reflecting higher average production costs per pound shipped to the facility in combination with the sale of lower cost pounds earlier in the quarter.

Previous wording

Three months ended March 31, 2026 compared to the three months ended March 31, 2025

Current wording

Three and six months ended June 30, 2026 compared to the three and six months ended June 30, 2025

Previous wording

The following table summarizes the results of operations for the three months ended March 31, 2026 and 2025:

Current wording

The following table summarizes the results of operations for the three and six months ended June 30, 2026 and 2025:

Previous wording

We also had two transactions totaling $27 thousand in disposal fee revenue in the three months ended March 31, 2026. We had no disposal fee revenues in 2025 Q1. Our disposal income is dependent on the reclamation programs of other companies and varies based on their level of activity.

Current wording

We also had two transactions totaling $27 thousand in disposal fee revenue in the six months ended June 30, 2026, and $7 thousand in disposal fee revenues in the same period in 2025. Our disposal income is dependent on the operating and reclamation programs of other companies and varies based on their level of activity.

Previous wording

The NRV adjustments for the three months ended March 31, 2025 predominantly related to a decline in the market price of U 3 O 8 which reduced the value of the non-produced inventory that had been acquired in 2024.

Current wording

The $0.2 million in NRV adjustments for the six months ended June 30, 2026, primarily related to expected future sales of non-produced inventory at a sales price below carrying cost, while NRV adjustments for the six months ended June 30, 2025, predominantly related to a decline in the market price of U 3 O 8, which reduced the value of the non-produced inventory that had been acquired in 2024 and 2025.

Previous wording

The following table summarizes operating costs for the three months ended March 31, 2026 and 2025:

Current wording

The following table summarizes operating costs for the three and six months ended June 30, 2026 and 2025:

Previous wording

Exploration and evaluation expense consists of labor and the associated costs of the exploration, evaluation, and regulatory departments, as well as land holding and exploration costs on properties that have not reached the development or operations stage. For 2026 Q1, costs increased $1.2 million over 2025 Q1. Labor costs accounted for $0.7 million of the increases in 2026 compared to 2025, due to increases in staffing levels and bonus accruals. In addition, exploration drilling on properties other than Lost Creek and Shirley Basin amounted to $0.4 million for the period.

Current wording

Exploration and evaluation expense consists of labor and the associated costs of the exploration, evaluation, and regulatory departments, as well as land holding and exploration costs on properties that have not reached the development or operations stage. For the six months ended June 30, 2026, these costs increased $1.3 million over the same period in 2025. Labor costs accounted for $0.7 million of the increase, due to increases in staffing levels and increased exploration and evaluation activity, including exploration drilling on properties other than Lost Creek and Shirley Basin.

Previous wording

Development expense, a component of operating costs, increased $5.2 million in 2026 Q1 as compared to 2025 Q1. The following table summarizes the development costs included in operating costs for the three months ended March 31, 2026, and 2025:

Current wording

Development expense, a component of operating costs, increased $1.9 million and $7.1 million in the three and six months ended June 30, 2026, as compared to 2025, respectively. The following table summarizes the development costs included in operating costs for the three and six months ended June 30, 2026, and 2025:

Previous wording

The Company is considered an exploration stage issuer and expenses its pre-production development costs. These development costs are incurred in advance of production from the related mining areas. Development expense includes costs incurred at the Lost Creek Project not directly attributable to current production activities, including wellfield construction, drilling, and development costs. It also includes costs incurred at the Shirley Basin Project not directly attributable to the construction of the capitalizable assets of the project, including the installation of the first mine unit, which is in progress.

Current wording

The Company is considered an exploration stage issuer and expenses its pre-production development costs. These development costs are incurred in advance of production from the related mining areas. Development expense includes costs incurred at Lost Creek not directly attributable to current production activities, including wellfield construction, drilling, and development costs. It also includes costs incurred at Shirley Basin not directly attributable to the construction of the capitalizable assets of the project, including the installation of the first mine unit, which is in progress.

Previous wording

Production stage issuers, as defined by the SEC, having established proven and probable reserves, typically capitalize expenditures relating to ongoing development activities, with corresponding depletion calculated over proven and probable reserves using the units-of-production method. Depletion is then allocated to inventory and as the inventory is sold, to cost of sales. We are an exploration stage issuer which has resulted in the Company reporting larger losses than if we were a production stage issuer, due to the expensing, instead of capitalization, of expenditures relating to ongoing mine development activities. Additionally, there would be no corresponding depletion allocated to future periods of the Company since those costs had been expensed previously, resulting in both lower inventory costs and cost of sales, and results of operations with higher gross profit and lower gross loss than if we would have been in the production stage. As a result, our consolidated financial statements may not be directly comparable to the financial statements of production stage issuers.

Current wording

Production stage issuers, as defined by the SEC, having established proven and probable reserves, typically capitalize expenditures relating to ongoing development activities with corresponding depletion calculated over proven and probable reserves using the units-of-production method. Depletion is then allocated to inventory, and as the inventory is sold, to cost of sales. We are an exploration stage issuer, which has resulted in the Company reporting larger losses than if it was a production stage issuer due to the expensing, instead of capitalization, of expenditures relating to ongoing mine development activities. Correspondingly, there will be no depletion allocated to future periods of the Company since those costs were expensed previously, resulting in both lower inventory costs and cost of sales, and results of operations with higher gross profit and lower gross loss than if we would have been in the production stage. As a result, our consolidated financial statements may not be directly comparable to the financial statements of production stage issuers.

Previous wording

As noted, development expenses increased approximately $5.2 million during the three months ended March 31, 2026, compared to 2025. Development activities at Shirley Basin accounted for increase, which was partially offset by a decrease in development costs at Lost Creek. The Company reached full staffing levels for the development and operations at Shirley Basin and has nearly completed plant construction, but as it has not started production, all wellfield, plant, and site administration costs are treated as development costs. Drilling costs, supplies, and related services as well as repairs, fuel, and overhead, such as insurance and bonding costs, related to these heightened efforts are being expensed to development costs.

Current wording

As noted, development expenses increased approximately $1.9 million and $7.1 million during the three and six months ended June 30, 2026, compared to 2025, respectively. Development activities at Shirley Basin accounted for the majority of the increase, which was partially offset by a decrease in development costs at Lost Creek. The Company reached full staffing levels for the development and operations at Shirley Basin and has substantially completed initial plant construction and commenced capturing U 3 O 8, but because Shirley Basin has not commenced commercial production operations, all wellfield, plant, and site administration costs are treated as development costs. Drilling costs, supplies, and related services as well as repairs, fuel, and overhead, such as insurance and bonding costs, related to these heightened efforts are being expensed to development costs.

Previous wording

General and administration expenses relate to the administration, finance, investor relations, land, and legal functions, and consist principally of personnel, facility, and support costs. For the three months ended March 31, 2026, these expenses increased $1.8 million, compared to 2025. The increase was driven by labor, which increased $1.0 million due to executive staff increases, which took place after 2025 Q1, as well as the 2026 Q1 bonus costs. Stock based compensation also increased by $0.7 million as more personnel qualified for stock-based awards as compared to 2025 Q1 and due to changes in the stock price.

Current wording

General and administration expenses relate to administration, finance, investor relations, land, and legal functions, and consist principally of personnel, facility, and support costs. For the three and six months ended June 30, 2026, these expenses increased $0.5 million and $2.3 million, compared to their respective 2025 periods. The increase was primarily driven by labor, which increased $0.4 million and $1.4 million, respectively, due to continued increases in executive staff, as well as higher 2026 Q1 bonus costs due to higher employee headcount and increased stock-based compensation.

Previous wording

Interest income was slightly lower for the three months ended March 31, 2026, as compared to the same period in 2025. The decrease was primarily driven by lower interest rates. Interest expense increased due to the sale of our Convertible Notes in December 2025, which includes a full quarter of its 4.75% coupon interest expense and the related amortization of debt discounts, including debt issuance costs, during 2026 Q1.

Current wording

Interest income was $0.3 million and $0.2 million higher for the three and six months ended June 30, 2026, as compared to the same periods in 2025, respectively. The increases were primarily driven by higher invested cash balances in 2026 relative to 2025, due to the net proceeds received in connection with our 4.75% Convertible Senior Notes due 2031 (the “Convertible Notes”) issued in December 2025. Interest expense significantly increased in 2026, due to the sale of our Convertible Notes in December 2025. The coupon interest expense and the related amortization of debt discounts, including debt issuance costs, for the Convertible Notes in 2026 were not present during the comparable 2025 periods.

Previous wording

The 2025 mark to market gain included adjustments to the warrant liability and the inventory derivative obligation. The warrants are now fully exercised or forfeited, but the mark to market for 2026 Q1 included final adjustments to the warrant liability during the quarter prior to their expiration and ongoing adjustments to the inventory derivative obligation. In addition, the 2026 Q1 mark to market adjustments also include changes in the derivative values associated with the Convertible Notes sold in 2025 Q4 and changes in the market value of marketable securities that we received in connection with the sale of drilling data in 2026 Q1, as described below.

Current wording

The mark to market adjustments in the three and six months periods ended June 30, 2026, include changes in the values of the capped call and conversion option derivative instruments associated with the Convertible Notes, and changes in the market value of marketable securities that we received in connection with the sale of drilling data in 2026 Q1, as described below. They also include mark to market adjustments to the warrant liability during 2026 Q1, prior to their exercise and expiration, as well as the inventory derivative obligation. The comparable 2025 periods’ mark to market losses include adjustments to the warrant liability and the inventory derivative obligation.

Showing the first 40 of 57 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

Ur-Energy is a corporation continued under the Canada Business Corporations Act on August 8, 2006. Our common shares are listed on the TSX under the symbol “URE” and on the NYSE American under the symbol “URG.” Our corporate structure and material U.S. subsidiaries remain unchanged since the filing of our Annual Report.
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

Deliveries for 2026 are committed to six customers with a substantial majority of deliveries occurring in the latter part of the year. Our current expectation is to deliver 55,000 pounds in 2026 Q1, 215,000 pounds in 2026 Q2, 190,000 pounds in 2026 Q3, and 840,000 pounds in 2026 Q4, for a total of 1,300,000 pounds of U 3 O 8 in 2026. The deliveries were scheduled in this fashion to complement the ramp up and start up schedules of Lost Creek and Shirley Basin.