Riot Platforms, Inc.
For the period ended Jun 30, 2026. Filed Aug 10, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2026 · Filed Aug 10, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2026-03-31; filed 2026-04-30.
0001104659-26-053120
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-06-30; filed 2026-08-10.
0001104659-26-093448
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 161 previous paragraphs and 191 current paragraphs.
102 unchanged; 50 reworded; 25 added; 6 removed; 3 previous and 14 current paragraphs rearranged.
Tables are not compared: 26 previous and 28 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (25)
Current report
In August 2026, we announced the execution of the Tenant Lease to provide 191 MW of critical IT load capacity at the Rockdale Facility. The critical IT load capacity is anticipated to be delivered in phases in December 2027 and June 2028. The Tenant Lease has an initial term of 20 years and includes provisions for two successive five-year renewal terms at the option of the lessee. Immediate funding of long-lead procurement items will be provided by the $573 Million Credit Facility with Morgan Stanley.
Current report
During the six months ended June 30, 2026, we mined 3,060 bitcoin, reflecting an increase of 104 bitcoin compared to the 2,956 bitcoin mined during the six months ended June 30, 2025. The increase was primarily due to our increased average operating hash rate and significantly improved operational efficiency, partially offset by increases in the global network hash rate.
Current report
Operating Metrics
Current report
The following table presents our key operating metrics:
Current report
For the three and six months ended June 30, 2026, Bitcoin Mining revenue was approximately $113.7 million and $225.6 million, respectively.
Current report
Bitcoin Mining revenue was $113.7 million and $140.9 million for the three months ended June 30, 2026 and 2025, respectively. The decrease of $27.2 million was primarily due to higher bitcoin prices in the 2025 period, which averaged $98,800 per bitcoin, as compared to $71,667 per bitcoin for the 2026 period, offset by an increase in Bitcoin production of 11.3% during the three months ended June 30, 2026 compared to the same period in 2025, primarily due to a 17.4% increase in average operating hash rate.
Current report
Data Center revenue of $23.2 million for the three months ended June 30, 2026 was attributable to leasing activity and associated tenant fit-out from the AMD Lease. We began recognizing our Data Center operations as a reportable segment in the first quarter of 2026. Accordingly, there were no Data Center revenues for the three months ended June 30, 2025.
Current report
Cost of revenue and operating expenses
Current report
The following table presents Cost of revenue for Bitcoin Mining:
Current report
Data Center Cost of revenue was $16.7 million for the three months ended June 30, 2026, which was attributable to leasing costs and contract services for tenant-fit-out for the AMD Lease. We began recognizing our Data Center operations as a reportable segment in the first quarter of 2026. Accordingly, there was no Data Center Cost of revenue for the three months ended June 30, 2025.
Current report
The loss on contract settlement of $158.1 million in 2025 was attributable to the Rhodium Settlement.
Current report
Impairment of property and equipment of $28.0 million during the three months ended June 30, 2026, was from certain long-lead items previously included in Construction in progress, withinProperty and equipment, neton the Condensed Consolidated Balance Sheets, related to the planned expansion of the Rockdale Facility for bitcoin mining purposes. These items were deemed to be impaired as a result of our decision to expand the Rockdale Facility for data center application purposes instead.
Current report
Interest income for the three months ended June 30, 2026 and 2025 was $3.6 million and $3.3 million, respectively. The increase was primarily due to an increase in average cash balances on deposit.
Current report
Revenue
Current report
Bitcoin Mining revenue was $225.6 million and $283.7 million for the six months ended June 30, 2026 and 2025, respectively. The decrease of $58.1 million was primarily due to lower bitcoin prices in the 2026 period, which averaged $73,736 per bitcoin, as compared to $95,991 per bitcoin for the 2025 period, partially offset by an increase in bitcoin production of 3.5% due to a 19.5% increase in our average operating hash rate.
Current report
Cost of revenue and operating expenses
Current report
Data Center Cost of revenue was $47.5 million for the six months ended June 30, 2026, which was attributable to leasing costs and contract services for tenant-fit-out for the AMD Lease. We began recognizing our new Data Center operations as a reportable segment in January 2026. Accordingly, there was no Data Center Cost of revenue for the six months ended June 30, 2025.
Current report
Depreciation and amortization for the six months ended June 30, 2026 and 2025 was $195.5 million and $161.1 million, respectively, an increase of approximately $34.4 million. The increase was primarily due to increases in miners deployed.
Current report
The change in fair value of bitcoin for the six months ended June 30, 2026 and 2025 was a loss of $401.3 million and a gain of $262.8 million, respectively, and was recognized to adjust the fair value of our bitcoin held at the end of each period.
Current report
The loss on contract settlement of $158.1 million in 2025 was attributable to the Rhodium Settlement.
Current report
Impairment of property and equipment of $28.0 million during the six months ended June 30, 2026, was from certain long-lead items previously included in Construction in progress, withinProperty and equipment, neton the Condensed Consolidated Balance Sheets, related to the planned expansion of the Rockdale Facility for bitcoin mining purposes. These items were deemed to be impaired as a result of our decision to expand the Rockdale Facility for data center application purposes instead.
Current report
Other income (expense)
Current report
Interest expense for the six months ended June 30, 2026 and 2025 was $5.3 million and $8.4 million, respectively, and was primarily related to interest paid on our revolving lines of credit and letters of credit. The decrease was primarily related to the capitalization of $8.1 million of incurred interest into Construction in progress withinProperty and equipment, net on the Condensed Consolidated Balance Sheets during the six months ended June 30, 2026. No incurred interest was capitalized during the six months ended June 30, 2025.
Current report
During the six months ended June 30, 2026, we did not receive any proceeds from borrowings against our credit facilities. During the six months ended June 30, 2025, we received $251.9 million in net proceeds (net of repayments and issuance costs) from borrowings against our credit facilities.
Current report
For the six months ended June 30, 2026, net cash used in financing activities was $2.9 million. No cash was raised through the issuance of common stock or debt during the period. The net cash used in financing activities was primarily attributable to $2.5 million in common shares repurchased to satisfy employee tax withholding obligations. For the six months ended June 30, 2025, net cash provided by financing activities primarily consisted oftotal net proceeds of $254.3 million from our debt and net proceeds from our ATM Program offerings of $121.1 million.
Removed paragraphs (6)
Previous report
During the three months ended March 31, 2026, we mined 1,473 bitcoin, reflecting a decrease of 57 bitcoin compared to the 1,530 bitcoin mined during the three months ended March 31, 2025. The decrease was primarily due to increases in the global network hash rate, partially offset by our increase in deployed hash rate and significantly improved operational efficiency. For the three months ended March 31, 2026 and 2025, Bitcoin Mining revenue was $111.9 million and $142.9 million, respectively. The decrease of $31.0 million was primarily due to lower bitcoin prices during the 2026 period, which averaged $68,223 per bitcoin, as compared to $82,535 per bitcoin for the 2025 period, and a slight decrease in bitcoin production of 3.7% due to the substantial increase in the global network hash rate. These decreases were partially offset by a 22.6% increase in our average operating hash rate, which increased from 29.7 EH/s during the three months ended March 31, 2025 to 36.4 EH/s during the three months ended March 31, 2026.
Previous report
Bitcoin Mining Metrics
Previous report
The following table presents our key Bitcoin Mining metrics:
Previous report
For the three months ended March 31, 2026, Bitcoin Mining revenue was approximately $111.9 million.
Previous report
Costs and expenses
Previous report
For the three months ended March 31, 2026, no cash was provided by financing activities as we did not issue any shares under our ATM Program, issue debt, or increase the borrowings on any of our existing debt. For the three months ended March 31, 2025, net cash provided by financing activities primarily consisted of proceeds from our ATM Program offerings of $70.0 million.
Reworded paragraphs (50)
Previous wording
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) provides information to assist readers in understanding our results of operations and financial condition. This MD&A should be read in conjunction with the Notes and other financial information included elsewhere in this Quarterly Report, as well as our audited consolidated financial statements included in our Annual Report on Form 10-K for the year ended December 31, 2025.
Current wording
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) provides information to assist readers in understanding our results of operations and financial condition. This MD&A should be read in conjunction with the Notes and other financial information included elsewhere in this Quarterly Report, and our audited consolidated financial statements included in our Annual Report on Form 10-K for the year ended December 31, 2025.
Previous wording
Unless otherwise indicated, amounts are stated in thousands of U.S. dollars except for: share, per share, per MWh and miner amounts; bitcoin quantities, prices, and hash rate; cost to mine one bitcoin; and production value of one bitcoin mined.
Current wording
Unless otherwise indicated, amounts are stated in thousands of U.S. dollars except for: share, per share, per MWh, MW, GW, and miner amounts; bitcoin quantities, prices, and hash rate; cost to mine one bitcoin; and production value of one bitcoin mined.
Previous wording
We own and manage multiple large-scale data center facilities in Texas and Kentucky that provide mission-critical power and infrastructure for our Bitcoin Mining at our Facilities, and non-mining Data Center operations at our Rockdale Facility. Our Rockdale Facility in Texas currently provides up to approximately 700 MW of developed capacity for Bitcoin Mining and Data Center leasing and is among the largest digital infrastructure campuses in North America, as measured by developed capacity. We have completed construction of approximately 400 MW of developed capacity at our second large-scale Texas development, the Corsicana Facility. We expect the Corsicana Facility to reach approximately 1 GW of developed capacity available for Bitcoin Mining and other high-density compute workloads upon full build-out.
Current wording
We own and manage multiple large-scale data center facilities in Texas and Kentucky that provide mission-critical power and infrastructure for our Bitcoin Mining at our Facilities, and non-mining Data Center operations at our Rockdale Facility. Our Rockdale Facility in Texas currently provides up to approximately 700 MW of developed capacity for Bitcoin Mining and Data Center leasing and is among the largest digital infrastructure campuses in North America, as measured by developed capacity. We have completed construction of approximately 400 MW of developed capacity at our second large-scale Texas development, the Corsicana Facility. We expect the Corsicana Facility to reach approximately 1 GW of developed capacity available for Bitcoin Mining and other high-density compute workloads upon full build-out. The Kentucky Facility currently provides approximately 192 MW of developed capacity.
Previous wording
In January 2026, we announced the execution of the AMD Lease to provide 25 MW of critical IT load capacity at our Rockdale Facility. The AMD Lease has an initial term of ten years and provides for expansion options for up to an additional 75 MW of critical IT load capacity, as well as a right of first refusal for up to an additional 100 MW. The AMD Lease also provides three successive five-year term renewal options at the lessee’s discretion.
Current wording
In January 2026, we announced the execution of the AMD Lease to provide 25 MW of critical IT load capacity at our Rockdale Facility. The AMD Lease has an initial term of ten years and provides three successive five-year term renewal options at the lessee’s discretion. The AMD Lease included an expansion option for an additional 75 MW of critical IT load capacity and a right of first refusal for an additional 100 MW.
Previous wording
In April 2026, we entered into the AMD Lease Amendment to exercise a portion of the existing expansion option set forth in the AMD Lease, to provide an additional deployment of 25 MW of critical IT load capacity. Under the AMD Lease Amendment, AMD holds a remaining balance of 50 MW of reserved critical IT load capacity under the existing expansion option. The AMD Lease Amendment also grants AMD a conditional, first-priority right to lease up to an additional 100 MW of critical IT load capacity, exercisable in increments of not less than 50 MW. If both the remaining 50 MW of reserved capacity under the existing expansion option and the additional 100 MW option are fully exercised, AMD’s total leased capacity at the Rockdale Facility would increase to 200 MW. This conditional, first-priority right replaces the right of first refusal for an additional 100 MW previously granted to AMD in the AMD Lease.
Current wording
In April 2026, we announced AMD’s exercise of a portion of the existing expansion option set forth in the AMD Lease, to provide an additional deployment of 25 MW of critical IT load capacity, which was pursuant to the AMD Lease Amendment. Under the AMD Lease Amendment, AMD holds a remaining balance of 50 MW of reserved critical IT load capacity under the existing expansion option. The AMD Lease Amendment also grants AMD a conditional, first-priority right to lease up to an additional 100 MW of critical IT load capacity, exercisable in increments of not less than 50 MW. If both the remaining 50 MW of reserved capacity under the existing expansion option and the additional 100 MW option are fully exercised, AMD’s total leased capacity at the Rockdale Facility would increase to 200 MW. This conditional, first-priority right replaces the right of first refusal for an additional 100 MW previously granted to AMD in the AMD Lease.
Previous wording
During the three months ended March 31, 2026, we continued to deploy miners across all our Facilities, with the objective of improving our operational efficiency and performance. As of March 31, 2026, we had a total deployed hash rate capacity of 42.5 EH/s, as compared to 38.5 EH/s as of December 31, 2025, an increase of 10.4%.
Current wording
During the six months ended June 30, 2026, we continued to deploy miners across all our Facilities, with the objective of improving our operational efficiency and performance. As of June 30, 2026, we had a total deployed hash rate capacity of 44.4 EH/s, as compared to 38.5 EH/s as of December 31, 2025, an increase of 15.3%.
Previous wording
For the three months ended March 31, 2026 and 2025, Bitcoin Mining revenue was $111.9 million and $142.9 million, respectively. The decrease of $31.0 million was primarily due to lower bitcoin prices in the 2026 period, which averaged $68,223 per bitcoin, as compared to $82,535 per bitcoin for the 2025 period, and a slight decrease in bitcoin production of 3.7% due to the substantial increase in the global network hash rate. These decreases were partially offset by a 22.6% increase in our average operating hash rate, which increased from 29.7 EH/s in the three months ended March 31, 2025 to 36.4 EH/s in the three months ended March 31, 2026.
Current wording
For the six months ended June 30, 2026 and 2025, Bitcoin Mining revenue was $225.6 million and $283.7 million, respectively. The decrease of $58.1 million was primarily due to lower bitcoin prices during the 2026 period, which averaged $73,736 per bitcoin, as compared to $95,991 per bitcoin for the 2025 period. The decrease was partially offset by a 19.5% increase in our average operating hash rate, which increased from 30.8 EH/s during the six months ended June 30, 2025, to 36.8 EH/s during the six months ended June 30, 2026, and the increase in bitcoin production.
Previous wording
Our bitcoin custodian and brokerage services relationships are non-exclusive, and we may change our custodian and brokerage relationships at any time. We continually monitor our bitcoin assets held by our custodians. Our insurance providers do not have inspection rights associated with our bitcoin assets held in cold storage. For additional information regarding our relationships with our custodians, NYDIG Trust Company LLC and Coinbase, Inc., on behalf of itself and Coinbase Custody Trust Company, LLC, and, if applicable, Coinbase or Coinbase Custody International Ltd., and a description of our underlying agreements with them, see Part I, Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of our 2025 Annual Report.
Current wording
Our bitcoin custodian and brokerage services relationships are non-exclusive, and we may change our custodian and brokerage relationships at any time. We continually monitor our bitcoin assets held by our custodians. Our insurance providers do not have inspection rights associated with our bitcoin assets held in cold storage. For additional information regarding our relationships with our custodians, NYDIG Trust Company LLC and Coinbase, Inc., on behalf of itself and Coinbase Custody Trust Company, LLC,
Previous wording
During 2023, 2024, and 2025, we entered into purchase orders under the Master Agreement to acquire new miners from MicroBT. These purchase orders represented a total hash rate of 49.2 EH/s, with a total purchase price of approximately $779.5 million, subject to downward price adjustments as provided by the Master Agreement. These miners are primarily intended for deployment at the Corsicana Facility, which commenced operations in April 2024. Delivery of these miners began in 2023, and all miners under these purchase orders are expected to be received by the second quarter of 2026, with deployment following on an ongoing basis. The Master Agreement provided us with four additional annual options to purchase miners, on the same or more favorable terms as the second purchase order executed under the Master Agreement.
Current wording
During 2023 through 2026, we entered into purchase orders under the Master Agreement to acquire new miners from MicroBT. These purchase orders represented a total hash rate of 50.9 EH/s, with a total purchase price of approximately $795.2 million, subject to downward price adjustments as provided by the Master Agreement. These miners are primarily intended for deployment at the Corsicana Facility, which commenced operations in April 2024. Delivery of these miners began in 2023, and all miners under these purchase orders are expected to be received through the end of 2026, with deployment following on an ongoing basis. The Master Agreement provided us with three additional annual options to purchase miners, on the same or more favorable terms as the second purchase order executed under the Master Agreement.
Previous wording
For the three months ended March 31, 2026, Data Center revenue was approximately $33.2 million, reflecting initial leasing activity and associated tenant fit-out, through the AMD Lease.
Current wording
For the three and six months ended June 30, 2026, Data Center revenue was approximately $23.2 million and $56.4 million, respectively, reflecting leasing activity and associated tenant fit-out attributable to the AMD Lease.
Previous wording
engineering services necessary for developments at our Facilities. This integration helps mitigate execution and counterparty risk in ongoing and future expansion projects. The specialized talent employed in our Engineering business allows us to explore new methods to optimize and develop best-in-class Bitcoin Mining operations and has been instrumental in the development of our industrial-scale immersion-cooled Bitcoin Mining hardware. The vertical integration of our Engineering division gives us additional strength and security in developing and deploying our Data Center build-outs. Our Data Center business is able to leverage Engineering’s market specific expertise for best-in-class design as well as speed to market.
Current wording
Our Engineering business designs and manufactures power-distribution equipment and engineered-to-order electrical products. These products support our vertical integration strategy by enabling the internal development of critical electrical equipment and engineering services necessary for developments at our Facilities. This integration helps mitigate execution and counterparty risk in ongoing and future expansion projects. The specialized talent employed in our Engineering business allows us to explore new methods to optimize and develop best-in-class Bitcoin Mining operations and has been instrumental in the development of our industrial-scale immersion-cooled Bitcoin Mining hardware. The vertical integration of our Engineering division gives us additional strength and security in developing and deploying our Data Center build-outs. Our Data Center business is able to leverage Engineering’s market specific expertise for best-in-class design as well as speed to market.
Previous wording
For the three months ended March 31, 2026, Engineering revenue was approximately $22.2 million.
Current wording
For the three and six months ended June 30, 2026, Engineering revenue was approximately $37.3 million and $59.5 million, respectively.
Previous wording
Our investment strategy with respect to our bitcoin (“Bitcoin Treasury Strategy”) is designed to balance long-term value appreciation with operational flexibility and liquidity management. We selectively sell or leverage portions of our bitcoin holdings, and may continue to do so in the future, to fund operational needs, capital expenditures, and strategic initiatives, particularly when market conditions present opportunistic pricing above predetermined thresholds that we believe maximize shareholder value.
Current wording
Our investment strategy regarding our bitcoin (“Bitcoin Treasury Strategy”) is designed to balance long-term value appreciation with operational flexibility and liquidity management. We selectively sell or leverage portions of our bitcoin holdings, and may continue to do so in the future, to fund operational needs, capital expenditures, and strategic initiatives, particularly when market conditions present opportunistic pricing above predetermined thresholds that we believe maximize shareholder value.
Previous wording
This approach enables us to realize value from our bitcoin holdings at favorable market conditions to support our liquidity profile and fund business growth. We believe this strategy enhances our operational stability, supports our liquidity profile, and provides the financial flexibility necessary to execute on our business plan and meet our capital allocation objectives.
Current wording
This approach enables us to realize value from our bitcoin holdings to support our liquidity profile and fund business growth. We believe this strategy enhances our operational stability, supports our liquidity profile, and provides the financial flexibility necessary to execute on our business plan and meet our capital allocation objectives.
Previous wording
The price of bitcoin reached new all-time highs in 2025, supported by continued institutional investment in the Bitcoin spot exchange-traded funds (“ETFs”), global adoption, and increased interest from both retail and sovereign investors, but fell in the first quarter of 2026 to prices last seen in 2024. Bitcoin spot ETFs remained a primary driver of institutional demand, with total assets under management exceeding $85 billion as of March 31, 2026. These ETFs, as investment vehicles, provide investors with a broader way to gain exposure to bitcoin through more traditional financial markets. In March 2025, the United States established the United States Bitcoin Strategic Reserve, which currently holds the largest bitcoin reserve in the world, solidifying bitcoin as a mainstream financial asset and alternative source of value to fiat currency.
Current wording
The price of bitcoin reached new all-time highs in 2025, supported by continued institutional investment in the Bitcoin spot exchange-traded funds (“ETFs”), global adoption, and increased interest from both retail and sovereign investors, but fell in the first half of 2026 to prices last seen in 2024. Bitcoin spot ETFs remained a primary driver of institutional demand. These ETFs, as investment vehicles, provide investors with a broader way to gain exposure to bitcoin through more traditional financial markets. In March 2025, the United States established the United States Bitcoin Strategic Reserve, which currently holds the largest bitcoin reserve in the world, solidifying bitcoin as a mainstream financial asset and alternative source of value to fiat currency.
Previous wording
During 2023 and 2024, the bitcoin mining industry experienced record growth as the price of bitcoin increased from the lows experienced in early 2023. In 2025 and the first quarter of 2026, the industry continued to grow, though at a slower pace due to increased network difficulty during 2025 and more aggressive competition for efficient energy sources globally. The rising bitcoin price renewed opportunities to access capital markets to fund growth, leading to unprecedented expansion in mining operations, which resulted in a doubling of the size of provisioned hash calculation services on the network, as measured by total hash rate. Competition among mining companies continued to intensify in 2025, with top operators focusing on mergers, acquisitions, and direct power procurement contracts to secure stable energy pricing in the face of volatile market conditions.
Current wording
During 2023 and 2024, the bitcoin mining industry experienced record growth as the price of bitcoin increased from the lows experienced in early 2023. In 2025 and the first half of 2026, the industry continued to grow, though at a slower pace due to increased network difficulty during 2025 and more aggressive competition for efficient energy sources globally. The rising bitcoin price renewed opportunities to access capital markets to fund growth, leading to unprecedented expansion in mining operations, which resulted in a doubling of the size of provisioned hash calculation services on the network, as measured by total hash rate. Competition among mining companies continued to intensify in 2025, with top operators focusing on mergers, acquisitions, and direct power procurement contracts to secure stable energy pricing in the face of volatile market conditions.
Previous wording
We have observed that when the market price for bitcoin experiences sustained increases, new miners are introduced onto the bitcoin network, contributing to an increase in the global network hash rate. Our hash rate grew by approximately 10.4% from December 31, 2025 to March 31, 2026, though the number of bitcoin we mined during the same period decreased slightly as a result of the increase in the global network hash rate as compared to the same period in 2025.
Current wording
We have observed that when the market price for bitcoin experiences sustained increases, new miners are introduced onto the bitcoin network, contributing to an increase in the global network hash rate. Our hash rate grew by approximately 15.3% from December 31, 2025 to June 30, 2026, and the number of bitcoin we mined during the same period increased, offsetting the increase in the global network hash rate as compared to the same period in 2025.
Previous wording
The bitcoin mining industry recently experienced an increase in transaction fees on the bitcoin network, alongside growing overall demand for bitcoin. While transaction fees remain inherently volatile, they are paid directly to miners and are representative of the
Current wording
The bitcoin mining industry recently experienced an increase in transaction fees on the bitcoin network, alongside growing overall demand for bitcoin. While transaction fees remain inherently volatile, they are paid directly to miners and are representative of the public interest in transacting on the bitcoin network. These transaction fees, combined with the block subsidy issued by the bitcoin network, make up the total reward paid to miners upon solving a block.
Previous wording
The Public Utility Commission of Texas, ERCOT, and Oncor Electric Delivery Company (“Oncor”)collectively oversee the regulatory, administrative, and delivery aspects of our power supply in Texas. In Kentucky, MISO oversees our power supply. As the bitcoin mining industry has expanded in recent years, regulatory scrutiny on bitcoin mining facilities and their energy consumption has intensified accordingly.
Current wording
The Public Utility Commission of Texas (“PUCT”), ERCOT, and Oncor Electric Delivery Company LLC (“Oncor”)collectively oversee the regulatory, administrative, and delivery aspects of our power supply in Texas. In Kentucky, MISO oversees our power supply. As the bitcoin mining industry has expanded in recent years, regulatory scrutiny on bitcoin mining facilities and their energy consumption has intensified accordingly.
Previous wording
Driven by the proliferation of energy-intensive applications such as bitcoin mining and HPC, demand for energy capacity continues to outpace supply. Data centers are increasingly scrutinized by federal, state, and local authorities due to concerns regarding energy consumption, land use, carbon emissions, water usage, environmental impacts, data-sovereignty considerations, and national-security-related issues. Regulators may impose new permitting requirements, energy-efficiency standards, carbon-reduction mandates, sustainability reporting rules, or operational restrictions specific to data centers, AI infrastructure, or high-density compute environments. Such regulations, particularly at the federal level or in the States of Texas and Kentucky, where our Facilities operate, could increase our capital expenditures, delay development timelines, limit expansion opportunities, or require costly modifications to existing infrastructure.
Current wording
Driven by the proliferation of energy-intensive applications such as bitcoin mining and HPC, demand for energy capacity continues to outpace supply. Data centers are increasingly scrutinized by federal, state, and local authorities due to concerns regarding energy consumption, land use, carbon emissions, water usage, environmental impacts, workforce, data-sovereignty considerations, and national-security-related issues. Regulators may impose new permitting requirements, energy-efficiency standards, carbon-reduction mandates, sustainability reporting rules, or operational restrictions specific to data centers, AI infrastructure, or high-density compute environments. Such regulations, particularly at the federal level or in the States of Texas and Kentucky, where our Facilities operate, could increase our capital expenditures, delay development timelines, limit expansion opportunities, or require costly modifications to existing infrastructure.
Previous wording
Tax abatement programs that have historically supported development, and specifically, data center development, are subject to increasing scrutiny as residents and policymakers reassess the associated economic benefits to their communities relative to perceived impacts on energy demand, utility costs, and natural resource consumption. In response, certain jurisdictions are becoming
Current wording
Tax abatement programs that have historically supported development, and specifically, data center development, are subject to increasing scrutiny as residents and policymakers reassess the associated economic benefits to their communities relative to perceived impacts on energy demand, utility costs, and natural resource consumption. In response, certain jurisdictions are becoming more selective in offering incentives or eliminating them altogether. Certain jurisdictions have implemented, or are considering implementing, temporary moratoriums or other restrictions on new data center development due to these concerns.
Previous wording
The development and expansion of our Facilities require significant quantities of critical components that are currently in high demand and may be difficult to source. To mitigate the risks associated with supply chain volatility, increasing demand, and uncertainty arising from U.S. tariffs and retaliatory international tariffs, we have proactively procured and currently maintain a supply of essential electrical infrastructure components and construction materials. These strategic reserves are intended to support the expansion and data center development of the Corsicana and Rockdale Facilities, the expansion of our Kentucky Facilities, and the maintenance of our existing systems, and to reduce our exposure to potential inflationary pricing and equipment delivery delays.
Current wording
The development and expansion of our Facilities require significant quantities of critical components that are currently in high demand and may be difficult to source. To mitigate the risks associated with supply chain volatility, increasing demand, and uncertainty arising from U.S. tariffs and retaliatory international tariffs, we have proactively procured and currently maintain a supply of essential electrical infrastructure components and construction materials. These strategic reserves are intended to support the expansion and data center development of the Corsicana Facility and Rockdale Facility, the expansion of our Kentucky Facility, and the maintenance of our existing systems, and to reduce our exposure to potential inflationary pricing and equipment delivery delays.
Previous wording
We sell our bitcoin to fund operations. Subsequent to the fiscal year ending December 31, 2025, we have experienced an impact from the recent volatility and downward trend in the market price of Bitcoin reducing the purchasing power of our bitcoin holdings. This decline may necessitate the sale of a greater volume of our bitcoin than previously anticipated to generate the liquidity required to fund our ongoing operations and working capital needs. By diversifying our infrastructure to support broader data services, we aim to mitigate our direct exposure to cryptocurrency price fluctuations and establish a more stable, diversified revenue stream centered on digital infrastructure.
Current wording
We sell our bitcoin to fund operations. During 2026, we have experienced an impact from the recent volatility and downward trend in the market price of bitcoin, which has reduced the purchasing power of our bitcoin holdings. This decline may necessitate the sale of a greater volume of our bitcoin than previously anticipated to generate the liquidity required to fund our ongoing operations and working capital needs. By diversifying our infrastructure to support broader data services, we aim to mitigate our direct exposure to cryptocurrency price fluctuations and establish a more stable, diversified revenue stream centered on digital infrastructure.
Previous wording
Total revenue for the three months ended March 31, 2026 and 2025 was $167.2 million and $161.4 million, respectively. Total revenue consists of our Bitcoin Mining revenue, Data Center revenue, Engineering revenue and Other revenue. Other revenue consists almost entirely of residual activity related to our former Data Center Hosting bitcoin mining operations. See below for explanations of changes in revenue by operating segment.
Current wording
Total revenue for the three months ended June 30, 2026 and 2025 was $174.2 million and $153.0 million, respectively. Total revenue consists of Bitcoin Mining revenue, Data Center revenue, Engineering revenue, and Other revenue. Other revenue consists almost entirely of residual activity related to our former Data Center Hosting bitcoin mining operations. See below for explanations of changes in revenue by operating segment.
Previous wording
For the three months ended March 31, 2026 and 2025, Engineering revenue was $22.2 million and $13.9 million, respectively. The increasewas primarily attributable to the record third-party data center demand for custom electrical equipment. Our custom electrical products are used as important components in data center development and in power generation and distribution facilities. There continues to be significant third-party demand for these products due to the increased interest in data center construction, as well as growing worldwide demand for power.
Current wording
Engineering revenue was $37.3 million and $10.6 million for the three months ended June 30, 2026 and 2025, respectively. The increasewas primarily attributable to strong third-party data center demand for custom electrical equipment. Our custom electrical products are used as important components in data center development and in power generation and distribution facilities. There continues to be significant third-party demand for these products due to the increased interest in data center construction, as well as growing worldwide demand for power.
Previous wording
Cost of revenue for Engineering for the three months ended March 31, 2026 and 2025 was $18.1 million and $11.8 million, respectively, an increase of approximately $6.3 million. The costs consisted primarily of direct materials and labor, as well as indirect manufacturing costs. Consistent with the causes of increased Engineering revenue noted above, the increase was primarily due to increased receipts of materials resulting in our ability to complete projects.
Current wording
Cost of revenue for Engineering for the three months ended June 30, 2026 and 2025 was $27.0 million and $9.9 million, respectively, an increase of approximately $17.1 million. The costs consisted primarily of direct materials and labor, as well as indirect manufacturing costs. Consistent with the causes of increased Engineering revenue noted above, the increase was primarily due to increased receipts of materials resulting in our ability to complete projects.
Previous wording
Depreciation and amortization for the three months ended March 31, 2026 and 2025 was $97.7 million and $77.9 million, respectively, an increase of approximately $19.8 million. The increase was primarily due to increases in miners deployed.
Current wording
Depreciation and amortization for the three months ended June 30, 2026 and 2025 was $97.8 million and $83.2 million, respectively, an increase of approximately $14.6 million. The increase was primarily due to increases in miners deployed.
Previous wording
The change in fair value of bitcoin for the three months ended March 31, 2026 and 2025 were losses of $326.7 million and $208.0 million, respectively, and was recognized to adjust the fair value of our bitcoin held at the end of each period.
Current wording
The change in fair value of bitcoin for the three months ended June 30, 2026 and 2025 was a loss of $74.6 million and a gain of $470.8 million, respectively, and was recognized to adjust the fair value of our bitcoin held at the end of each period.
Previous wording
The change in fair value of our derivatives for the three months ended March 31, 2026 and 2025 was a loss of $51.9 million and a gain of $41.9 million, respectively, and was recorded to adjust the fair value of our PPAs, which were classified as derivatives and measured at fair value. The loss incurred during the three months ended March 31, 2026 was primarily attributable to the average of the forward prices utilized in the discounted cash flow estimation models decreasing from $55.7 per MWh as of December 31, 2025 to $49.1 per MWh as of March 31, 2026. The gain recognized during the three months ended March 31, 2025 was primarily attributable to the average of the forward prices increasing from $51.98 per MWh as of December 31, 2024 to $55.41 per MWh as of March 31, 2025.
Current wording
The change in fair value of our derivatives for the three months ended June 30, 2026 and 2025 was a loss of $8.4 million and $42.7 million, respectively, and was recorded to adjust the fair value of our PPAs, which were classified as derivatives and measured at fair value. The changes in fair value were due to changes in future power prices over the applicable periods. The loss incurred for the three months ended June 30, 2026 was primarily attributable to the average of the forward prices utilized in the discounted cash flow estimation models decreasing from $49.12 per MWh as of March 31, 2026 to $48.60 per MWh as of June 30, 2026. The loss recognized for the three months ended June 30, 2025 was primarily attributable to the average of the forward prices decreasing from $55.41 per MWh as of March 31, 2025 to $53.31 per MWh as of June 30, 2025.
Previous wording
Power curtailment credits for the three months ended March 31, 2026 and 2025 were $21.0 million and $7.8 million, respectively, and represent sales of unused power under our PPAs and participation in ancillary services under ERCOT and MISO Demand Response Service Programs. The amount of these credits varies from period to period depending on various factors impacting the supply of power to, and the demand for power on, the power grids, such as weather and global fuel costs.
Current wording
Power curtailment credits for the three months ended June 30, 2026 and 2025 were $10.1 million and $8.3 million, respectively, and represent sales of unused power under our PPAs and participation in ancillary services under ERCOT and MISO Demand Response Service Programs. The amount of these credits varies from period to period depending on various factors impacting the supply of power to, and the demand for power on, the power grids, such as weather and global fuel costs.
Previous wording
The change in fair value of contingent consideration during the three months ended March 31, 2026 and 2025 were zero and a gain of $8.3 million, respectively, and were a result of the change in estimates for the potential earnout contingent consideration to the former sellers in the Block Mining Acquisition and the E4A Solutions Acquisition.
Current wording
The change in fair value of contingent consideration was a loss of $9.4 million for the three months ended June 30, 2025, as a result of the change in estimates for the potential earnout contingent consideration to the former sellers in the Block Mining Acquisition and the E4A Solutions Acquisition. For the three months ended June 30, 2026, there was no change in the fair value of contingent consideration attributable to either the E4A Solutions Acquisition or the Block Mining Acquisition.
Previous wording
Interest expense for the three months ended March 31, 2026 and 2025 was $2.6 million and $2.3 million, respectively, and was primarily related to interest paid on our revolving lines of credit and letters of credit.
Current wording
Interest expense for the three months ended June 30, 2026 and 2025 was $2.7 million and $6.1 million, respectively, and was primarily related to interest paid on our revolving lines of credit and letters of credit. The decrease was primarily related to the capitalization of $3.4 million of incurred interest into Construction in progress withinProperty and equipment, net on the Condensed Consolidated Balance Sheets, during the three months ended June 30, 2026. No incurred interest was capitalized during the three months ended June 30, 2025.
Previous wording
For the three months ended March 31, 2026, Data Center revenue was approximately $33.2 million, primarily attributable to initial leasing activity and associated tenant fit-out through the AMD Lease. We recognized our new Data Center operations as a reportable segment in the three months ended March 31, 2026. Accordingly, there were no Data Center revenues for the three months ended March 31, 2025.
Current wording
Data Center revenue of $56.4 million for the six months ended June 30, 2026 was attributable to leasing activity and associated tenant fit-out from the AMD Lease. We recognized our new Data Center operations as a reportable segment in the six months ended June 30, 2026. Accordingly, there were no Data Center revenues for the six months ended June 30, 2025.
Previous wording
The increase of approximately $11.9 million was primarily due to increased Bitcoin Mining capacity and power consumption due to the 125 MW of power capacity at the Rockdale Facility that was assumed in the settlement of litigation between the Company and Rhodium Encore LLC in April 2025 and the continued expansion at the Kentucky Facility. The expanded facilities require additional headcount and direct costs necessary to maintain and support our expanded Bitcoin Mining operations. Cost of revenue for Bitcoin Mining excludes depreciation and amortization, which are stated separately on our Condensed Consolidated Statements of Operations. In 2025, we acquired the Rockdale Facility land that was previously subject to a ground lease. As a result, ground rent was zero in 2026.
Current wording
The increase of approximately $23.0 million in Cost of revenue for Bitcoin Mining was primarily due to increased Bitcoin Mining capacity and power consumption due to the 125 MW of power capacity at the Rockdale Facility that was assumed in the settlement of litigation between the Company and Rhodium Encore LLC in April 2025 and the continued expansion at the Kentucky Facility. The expanded facilities require additional headcount and direct costs necessary to maintain and support our expanded Bitcoin Mining operations. Cost of revenue for Bitcoin Mining excludes depreciation and amortization, which are stated separately on our Condensed Consolidated Statements of Operations. In 2025, we acquired the Rockdale Facility land that was previously subject to a ground lease. As a result, ground rent was zero in 2026.
Previous wording
Selling, general, and administrative expenses for the three months ended March 31, 2026 and 2025 were $76.2 million and $71.4 million, respectively, an increase of approximately $4.8 million. Selling, general, and administrative expenses consist of stock-based compensation, legal and professional fees, and other personnel and related costs. The increase was primarily due to an $11.8 million increase in compensation expense, including stock-based compensation, as a result of hiring additional employees to support our ongoing growth and data center development. This increase was partially offset by a $5.0 million decrease in legal fees due to recently ending or settling much of our outstanding litigation. Additional decreases were from lower consulting and insurance costs.
Current wording
Selling, general, and administrative expenses for the six months ended June 30, 2026 and 2025 were $158.2 million and $147.4 million, respectively, an increase of approximately $10.8 million. Selling, general, and administrative expenses consist of stock-based compensation, legal and professional fees, and other personnel and related costs. The increase was primarily due to a $15.0 million increase in stock-based compensation, a $7.0 million increase in compensation expense, and a $2.7 million increase in other coststo support our ongoing growth, partially offset byan$11.3 million decrease in legal and professional feesdue to recently ending or settling much of our outstanding litigation. Additional decreases were primarily due to lower consulting and insurance costs.
Previous wording
Interest income for the three months ended March 31, 2026 and 2025 was $2.3 million and $3.4 million, respectively, and was earned from interest on cash balances held during the period. The decrease was due to lower cash balances on hand and lower interest rates.
Current wording
Interest income for the six months ended June 30, 2026 and 2025 was $5.9 million and $6.7 million, respectively, and was earned from interest on cash balances held during the period. The decrease was primarily due to lower average cash balances on deposit, combined with slightly lower average interest rates during the 2026 period.
Previous wording
The loss on equity method investment – marketable securities for the three months ended March 31, 2025, of $63.2 million was recognized to adjust the fair value of our equity method investment held at the end of each period. The equity method investment was sold in its entirety during the year ended December 31, 2025.
Current wording
The loss on equity method investment – marketable securities for the six months ended June 30, 2025 of $57.1 million was recognized to adjust the fair value of our equity method investment held at the end of each period. The equity method investment was sold in its entirety during the year ended December 31, 2025.
Previous wording
We generate non-cash revenue through mining bitcoin at our Facilities, which we manage based on our Bitcoin Treasury Strategy, while financing operations and other expenses through sales of our bitcoin production, borrowing against our credit facilities, and issuance of common stock under the ATM offering program. During the three months ended March 31, 2026, no shares were sold under the ATM Program. During the three months ended March 31, 2025, we issued and sold approximately 5.4 million shares of our common stock under our ATM offering program for aggregate net proceeds (net of commissions and expenses) of $68.4 million.
Current wording
We generate non-cash revenue through mining bitcoin at our Facilities, which we manage based on our Bitcoin Treasury Strategy, while financing operations and other expenses through sales of our bitcoin holdings, borrowing against our credit facilities, and issuance of common stock under the ATM offering program.
Previous wording
During the three months ended March 31, 2026, we sold 3,778 bitcoin for proceeds of approximately $289.5 million. We monitor our balance sheet on an ongoing basis and evaluate the level of bitcoin retained in consideration of our cash requirements for ongoing operations and expansion.
Current wording
During the six months ended June 30, 2026, we sold 9,665 bitcoin for proceeds of approximately $732.5 million. During the six months ended June 30, 2025, we sold 1,371 bitcoin for proceeds of approximately $131.8 million. We monitor our balance sheet on an ongoing basis and evaluate the level of bitcoin retained in consideration of our cash requirements for ongoing operations and expansion.
Previous wording
As of March 31, 2026, we had net working capital of approximately $33.3 million, which included cash and cash equivalents of $205.7 million. We reported a net loss of $500.5 million during the three months ended March 31, 2026, which included $407.1 million in non-cash net losses primarily consisting of the loss from the change in fair value of bitcoin of $326.7 million, depreciation and amortization of $97.7 million, change in the fair values of derivatives of $51.9 million, and stock-based compensation of $39.2 million, partially offset by revenue recognized from bitcoin mined of $111.9 million.
Current wording
As of June 30, 2026, we had net working capital of approximately $268.0 million, which included cash and cash equivalents of $471.4 million. We reported a net loss of $737.6 million during the six months ended June 30, 2026, which included $541.0 million in non-cash net losses, primarily consisting of the loss from the change in fair value of bitcoin of $401.3 million, depreciation and amortization of $195.5 million, stock-based compensation of $74.7 million, and the change in the fair values of derivatives of $60.2 million, partially offset by revenue recognized from bitcoin mined of $225.6 million.
Showing the first 40 of 50 pairs. Open the source sections for the rest.
Rearranged current paragraphs (14)
Current report — wording carried from elsewhere
and, if applicable, Coinbase or Coinbase Custody International Ltd., and a description of our underlying agreements with them, see Part II, Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of our 2025 Annual Report.
Current report — wording carried from elsewhere
The increase of approximately $11.1 million in Cost of revenue for Bitcoin Mining was primarily due to increased Bitcoin Mining capacity and power consumption due to the 125 MW of power capacity at the Rockdale Facility that was assumed in the settlement of litigation between the Company and Rhodium Encore LLC in April 2025 (the “Rhodium Settlement”) and the continued expansion at the Kentucky Facility. The expanded facilities require additional headcount and direct costs necessary to maintain and support our expanded Bitcoin Mining operations. Cost of revenue for Bitcoin Mining excludes depreciation and amortization, which are stated separately on our Condensed Consolidated Statements of Operations.
Current report — wording carried from elsewhere
Selling, general, and administrative expenses for the three months ended June 30, 2026 and 2025 were $82.0 million and $75.9 million, respectively, an increase of approximately $6.1 million. Selling, general, and administrative expenses consist of stock-based compensation, legal and professional fees, and other personnel and related costs. The increase was primarily due to a $5.4 million increase in stock-based compensation, a $4.8 million increase in compensation expense, and a $2.2 million increase in other coststo support our ongoing growth, partially offset bya$6.3 million decrease in legal and professional feesdue to recently ending or settling much of our outstanding litigation.
Current report — wording carried from elsewhere
The gain on equity method investment – marketable securities for the three months ended June 30, 2025 was $6.1 million and was recognized to adjust the fair value of our equity method investment held at the end of each period. The equity method investment was sold in its entirety during the year ended December 31, 2025.
Current report — wording carried from elsewhere
Comparative Results for the Six Months Ended June 30, 2026 and 2025:
Current report — wording carried from elsewhere
Total revenue for the six months ended June 30, 2026 and 2025 was $341.5 million and $314.4 million, respectively. Total revenue consists of our Bitcoin Mining revenue, Data Center revenue, Engineering revenue, and Other revenue. Other revenue consists almost entirely of residual activity related to our former Data Center Hosting bitcoin mining operations. See below for explanations of changes in revenue by operating segment.
Current report — wording carried from elsewhere
Engineering revenue was $59.5 million and $24.5 million for the six months ended June 30, 2026 and 2025, respectively. The increasewas primarily attributable to the strong third-party data center demand for custom electrical equipment. Our custom electrical products are used as important components in data center development and in power generation and distribution facilities. There continues to be significant third-party demand for these products due to the increased interest in data center construction, as well as growing worldwide demand for power.
Current report — wording carried from elsewhere
Cost of revenue for Engineering for the six months ended June 30, 2026 and 2025 was $45.2 million and $21.7 million, respectively, an increase of approximately $23.5 million. The costs consisted primarily of direct materials and labor, as well as indirect manufacturing costs. Consistent with the causes of increased Engineering revenue noted above, the increase was primarily due to increased receipts of materials resulting in our ability to complete projects.
Current report — wording carried from elsewhere
The change in fair value of our derivatives for the six months ended June 30, 2026 and 2025 were losses of $60.2 million and $0.9 million, respectively, and was recorded to adjust the fair value of our PPAs, which were classified as derivatives and measured at fair value. The losses incurred for the six months ended June 30, 2026 were primarily attributable to the average of the forward prices utilized in the discounted cash flow estimation models decreasing from $55.70 per MWh as of December 31, 2025 to $48.60 per MWh as of June 30, 2026. The loss recognized for the six months ended June 30, 2025 was primarily attributable to the average of the forward prices increasing from $51.98 per MWh as of December 31, 2024 to $55.41 per MWh as of March 31, 2025, but then decreasing to $53.31 per MWh as of June 30, 2025.
Current report — wording carried from elsewhere
Power curtailment credits for the six months ended June 30, 2026 and 2025 were $31.1 million and $16.1 million, respectively, and represent sales of unused power under our PPAs and participation in ancillary services under ERCOT and MISO Demand Response
Current report — wording carried from elsewhere
Service Programs. The amount of these credits varies from period to period depending on various factors impacting the supply of power to, and the demand for power on, the power grids, such as weather and global fuel costs.
Current report — wording carried from elsewhere
The change in fair value of contingent consideration was a gain of $17.6 million for the six months ended June 30, 2025, as a result of the change in estimates for the potential earnout contingent consideration to the former sellers in the Block Mining Acquisition and the E4A Solutions Acquisition. For the six months ended June 30, 2026, there was no change in the fair value of contingent consideration attributable to either the E4A Solutions Acquisition or the Block Mining Acquisition.
Current report — wording carried from elsewhere
During the six months ended June 30, 2026, no shares were sold under the 2025 ATM Program. During the six months ended June 30, 2025, we issued and sold approximately 10.8 million shares of our common stock under our ATM offering program for aggregate net proceeds (net of commissions and expenses) of $121.1 million.
Current report — wording carried from elsewhere
In preparing our financial statements in accordance with GAAP, there are certain accounting policies that may require a choice between acceptable accounting methods or may require substantial judgment or estimation in their application. The methods,
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
Our Engineering business designs and manufactures power-distribution equipment and engineered-to-order electrical products. These products support our vertical integration strategy by enabling the internal development of critical electrical equipment and
Previous report — wording carried elsewhere
public interest in transacting on the bitcoin network. These transaction fees, combined with the block subsidy issued by the bitcoin network, make up the total reward paid to miners upon solving a block.
Previous report — wording carried elsewhere
more selective in offering incentives or eliminating them altogether. Certain jurisdictions have implemented, or are considering implementing, temporary moratoriums or other restrictions on new data center development due to these concerns.