Minera Santa Cruz Segment - Argentina
The Minera Santa Cruz Segment consists of a 49% interest in the San José mine, located in Santa Cruz, Argentina. Hochschild is the majority owner and operator of the San José mine.
The following table sets out certain operating results for the San José mine for the three months ended March 31, 2026 and 2025 on a 100% basis:
| | | | | | | |
|---|---|---|---|---|---|---|
| · · Three months ended March 31, | ||||||
| · · 2026 · · 2025 | ||||||
| Operating Results | | | ||||
| San José Mine—100% basis | | | | | | |
| Stacked mineralized material (kt) | | 176 | | 147 | ||
| Average grade mined (g/t) | | | | | | |
| Gold | | 2.95 | | 3.53 | ||
| Silver | | 151 | | 179 | ||
| Processed mineralized material (kt) | | 181 | | 153 | ||
| Average grade processed (g/t) | | | | | | |
| Gold | | 3.57 | | 3.53 | ||
| Silver | | 143 | | 181 | ||
| Average recovery (%): | | | | | | |
| Gold | | 86.3 | | 81.6 | ||
| Silver | | 84.3 | | 82.0 | ||
| Gold ounces: | | | | | | |
| Produced | | 17,919 | | 14,157 | ||
| Sold | | 19,810 | | 13,971 | ||
| Silver ounces: | | | | | | |
| Produced | | 698,562 | | 729,488 | ||
| Sold | | 774,246 | | 718,383 | ||
| GEOs: | | | | | | |
| Produced | | 29,759 | | 22,294 | ||
| Sold | | 32,933 | | 21,977 | ||
| Revenue from gold and silver sales, ($000s) | | $185,813 | | $71,903 | ||
| Average realized price(1): | | | | | | |
| Gold ($/Au oz) | | $5,394 | | $3,271 | ||
| Silver ($/Ag oz) | | $91.42 | | $36.47 | ||
| Cash costs (1), ($000s) | | $77,871 | | $56,588 | ||
| Cash costs per ounce ($/GEO sold) (1) | | $2,365 | | $2,575 | ||
| All‑in sustaining costs (1), ($000s) | | $89,039 | | $66,972 | ||
| AISC per ounce sold ($/GEO) (1) | | $2,704 | | $3,047 | ||
| Gold : Silver ratio | | | 58:1 | | 90 : 1 | |
(1) This is a Non-GAAP financial performance measure. See “Non-GAAP Financial Performance Measures” beginning on page 41.
The analysis below compares the operating and financial results of MSC on a 100% basis.
Q1/26 compared to Q1/25
On a 100% basis, the San José mine produced 29,759 GEOs in Q1/26, compared to 22,294 GEOs in Q1/25. The increase in Q1/26 was primarily due to a 20% increase in processed mineralized material and a more favorable gold-to-silver ratio of 58:1 compared to 90:1 in Q1/25.
Revenue from gold and silver sales was $185.5 million in Q1/26, compared to $71.9 million in Q1/25. This increase was primarily driven by 65% and 151% higher realized gold and silver prices, respectively, and a 60% increase in GEOs sold.
Production costs applicable to sales were $77.7 million in Q1/26, compared to $56.6 million in Q1/25. Cost increases during Q1/26 were largely attributable to high inflation in the Argentine market, which outpaced the government-controlled depreciation of the peso against the U.S. dollar. This resulted in higher real costs for expenses denominated in local currency.
Cash costs andAISC per GEO sold were $2,365 and $2,704 in Q1/26, respectively, compared to $2,575 and $3,047 in Q1/25. The decrease in both cash costs and AISC in Q1/26 was primarily due to a 50% increase in GEOs sold, partially offset by 38% higher production costs, as noted above.
Investment in MSC
Our 49% attributable share of operations from our investment in MSC in Q1/26 resulted in an income of $32.7 million, compared to an income of $0.5 million in Q1/25. Despite higher than planned unit costs arising from negative macroeconomic factors, the metal price environment has allowed the operation to strengthen its liquidity, improving its working capital balance to $233.3 million as at March 31, 2026, compared to $182.8 million as of December 31, 2025.
MSC Dividend Distribution (49%)
We received $8.8 million in dividends from MSC for Q1/26 compared to $2.2 million in Q1/25. Further, the Company is expected to receive $10.0 million in each quarter for the remainder of 2026 from excess cash after considering reclamation and closure costs.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.