Skip to main content

McEwen Inc.

For the period ended Mar 31, 2026. Filed May 6, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2026 · Filed May 6, 2026

MUX$15.48+4.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 140 previous paragraphs and 128 current paragraphs.

64 unchanged; 30 reworded; 33 added; 44 removed; 2 previous and 1 current paragraphs rearranged.

Tables are not compared: 84 previous and 84 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (33)

Current report

The Company owns 100% of the Froome mine and Stock mill in Ontario, Canada; 100% of the Tartan Mine Project in Manitoba, Canada; 100% of the Gold Bar Mine Complex in Nevada; 100% of El Gallo (previously known as the Fenix Project) in Sinaloa, Mexico; a 46.3% interest in McEwen Copper Inc., the owner of the Los Azules copper project (“Los Azules”) in San Juan, Argentina; a 49% interest in MSC, the owner and operator of the San José mine in Santa Cruz, Argentina and 27% interest in Paragon Advanced Labs Inc. (“Paragon”), a provider of advanced analytical services to the mining industry. In addition to the above, we hold interests in advanced-stage and exploration-stage projects in the United States, Canada, Mexico, and Argentina.

Current report

Q1/26 OPERATING AND FINANCIAL HIGHLIGHTS

Current report

*Production costs applicable to sales:*During Q1/26, production costs applicable to sales increased by 82% to $35.6 million from $19.6 million in Q1/25. The increase was primarily driven by $10.3 million in higher operating costs at the Gold Bar Mine Complex due to costs associated with stripping activities at Pick III, which were previously capitalized in Q1/25 prior to reaching commercial production levels. At the Fox Complex, the increase in operating costs was primarily driven by an 11% increase in GEOs sold during the period along with higher waste tonnes mined as Froome reaches the end of its mine life.

Current report

Advanced project costswere $4.8 million in Q1/26, a $3.1 million increase compared to Q1/25. This increase was primarily attributable to the commencement of our Grey Fox project.

Current report

Income from equity method investments:During Q1/26, we recorded an income of $30.3 million from its equity method investments, compared to a loss of $8.1 million in Q1/25. This amount represents the Company’s proportionate share of the results of MSC, McEwen Copper, and Paragon. Details of operating results of the Company’s equity method investees are presented in the “Operations Review” section of this MDA and Note 9 to theConsolidated Financial Statements.

Current report

*General and administrative expenses:*During Q1/26, we incurred $9.5 million in general and administrative expenses compared to $3.4 million in Q1/25. The increase was primarily attributable to a $4.0 million increase in fees paid for professional services, as well as $0.9 million higher acquisition and financing costs.

Current report

Other income (expense): During Q1/26, we incurred $6.3 million in other expenses, compared to an income of $1.6 million in Q1/25. The $7.9 million decrease was primarily driven by unrealized losses on marketable securities.

Current report

Cash provided by financing activities of $14.5 million during Q1/26 consisted of $14.8 million proceeds from issuance of flow through common shares partially offset by a $0.3 million repayment of finance lease obligations.

Current report

Q1/26 compared to Q1/25

Current report

The Gold Bar Mine produced 7,884 GEOs in Q1/26, representing a 3% increase from 7,688 GEOs produced in Q1/25 driven by higher mined and stacked tonnes. Operational activities in Q1/26 focused on continued mining at the Pick III deposit, supported by definition drilling ahead of mining to optimize mine planning and confirm the updated mine model.

Current report

Revenue from gold and silver sales was $37.7 million in Q1/26, an increase from $22.4 million in Q1/25. The $15.3 million increase was primarily attributable to a higher average realized price of $4,792 per GEO in Q1/26, compared to $2,803 per GEO in Q1/25.

Current report

Production costs applicable to saleswere $19.4 million in Q1/26, an increase of $10.3 million from $9.1 million in Q1/25. This increase was primarily driven by costs associated with stripping activities at Pick III, which were previously capitalized in Q1/25 prior to reaching commercial production levels.

Current report

Cash costs and AISC per GEO sold in Q1/26 were $2,460 and $2,705 respectively, compared to $1,146 and $2,197 in Q1/25, respectively. The increase in cash costs, and a corresponding increase in AISC, was primarily driven by higher mining costs at the Pick III deposit relative to Gold Bar South, which was mined in Q1/25.

Current report

During Q1/26, exploration activities were focused on Windfall and Lookout Mountain. The primary exploration activity consisted of drilling at Windfall which commenced in Q1/26 with a core drill for metallurgical sampling. The results will be used to help generate targets for 2026 exploration. Land Management activities are being performed to survey claims at Windfall and Lookout Mountain to define claim boundaries. In addition, an updated technical report incorporating the results of recent land management activities and updated geological and operational information is expected to be released in H2/26.

Current report

During Q1/26, the Company invested $9.9 million in the Stock project, with development activities progressed in line with the Company’s 2026 mine development plan. Activities during the period included upgrades to ventilation and air heating systems and enhancements to underground readiness. Site construction also progressed across key infrastructure, including shaft electrical power distribution, installation of automation and control systems, development of the Stock West and East haulage ramps, dewatering of the Stock mine shaft, and equipment selection for production and development activities. Pre-commercial production is expected to commence in Q4/26, with commercial production anticipated in Q2/27.

Current report

Q1/26 compared to Q1/25

Current report

The Fox Complex produced 5,784 GEOs from the Froome mine in Q1/26, reflecting a 5% increase from the 5,520 GEOs produced in Q1/25. The increase was driven by an optimized mine plan and higher mined and processed grades of approximately 40%. As of March 31, 2026, all development activities at Froome Main were completed in accordance with the mine plan, with production beginning in late Q3/26 for Froome West.

Current report

Revenue from gold sales was $25.3 million for Q1/26, compared to $13.3 million for Q1/25. This increase of 90% was primarily driven by a 71% increase in the average realized gold price, and an 11% increase in GEOs sold.

Current report

Production costs applicable to sales were $14.7 million in Q1/26, compared to $10.5 million in Q1/25, reflecting an 11% increase in GEOs sold and $1.7 million in higher costs associated with externally sourced material processed.

Current report

Cash costs and AISC per GEO sold were $2,365 and $3,148 for Q1/26, respectively, compared to $2,061 and $2,504 for Q1/25. The increase in unit costs was primarily driven by higher production costs discussed above, as well as a $2.0 million increase in sustaining mining development at Froome West.

Current report

We completed 18,700 feet (5,700 meters) of drilling at our Grey Fox deposit during Q1/26 at a cost of $1.4 million in exploration expenditures. This drilling was designed to support continued resource growth at Grey Fox post Pre-Feasibility Study which is anticipated to be published in Q2/26. Priority areas were the Gibson and Whiskey Jack zones which propose early mining horizons during the initial phases of the Grey Fox project.

Current report

Tartan Mine Project

Current report

The Tartan Mine Project is located in Flin Flon, Manitoba and was acquired as part of our Canadian Gold acquisition completed on January 5, 2026.

Current report

During Q1/26, a total of $1.0 million was incurred at the Tartan Mine Project to advance drilling, permitting, metallurgical testing to optimize both process plant designs and underground mine plans, and engineering studies.

Current report

Q1/26 compared to Q1/25

Current report

On a 100% basis, the San José mine produced 29,759 GEOs in Q1/26, compared to 22,294 GEOs in Q1/25. The increase in Q1/26 was primarily due to a 20% increase in processed mineralized material and a more favorable gold-to-silver ratio of 58:1 compared to 90:1 in Q1/25.

Current report

Production costs applicable to sales were $77.7 million in Q1/26, compared to $56.6 million in Q1/25. Cost increases during Q1/26 were largely attributable to high inflation in the Argentine market, which outpaced the government-controlled depreciation of the peso against the U.S. dollar. This resulted in higher real costs for expenses denominated in local currency.

Current report

Cash costs andAISC per GEO sold were $2,365 and $2,704 in Q1/26, respectively, compared to $2,575 and $3,047 in Q1/25. The decrease in both cash costs and AISC in Q1/26 was primarily due to a 50% increase in GEOs sold, partially offset by 38% higher production costs, as noted above.

Current report

MSC Dividend Distribution (49%)

Current report

We received $8.8 million in dividends from MSC for Q1/26 compared to $2.2 million in Q1/25. Further, the Company is expected to receive $10.0 million in each quarter for the remainder of 2026 from excess cash after considering reclamation and closure costs.

Current report

Average realized price per ounce
Removed paragraphs (44)

Previous report

The Company owns a 100% interest in the Gold Bar Mine Complex in Nevada, United States, the Fox Complex in Ontario, Canada, the Fenix Project in Sinaloa, Mexico and a portfolio of exploration properties in the United States, Canada, Mexico and Argentina. As of September 30, 2025, the Company also holds a 46.4% interest in McEwen Copper Inc. (“McEwen Copper”), which owns the Los Azules copper project in San Juan, Argentina and the Elder Creek exploration project in Nevada, United States, and a 49.0% interest in Minera Santa Cruz S.A. (“MSC”), which owns the producing San José silver-gold mine in Santa Cruz, Argentina and is operated by MSC’s majority owner, Hochschild Mining plc. The Company reports its investments in McEwen Copper and MSC using the equity method of accounting.

Previous report

Q3/25 OPERATING AND FINANCIAL HIGHLIGHTS

Previous report

Three Months Ended September 30, 2025 Compared to Three Months Ended September 30, 2024

Previous report

Production costs applicable to sales: During Q3/25, production costs applicable to sales increased by 19% to $35.2 million from $29.7 million in Q3/24. This increase was primarily driven by higher operational stripping costs for deposits mined at the Gold Bar Mine Complex in Q3/25. At the Fox Complex, our cost base also increased, driven by higher contractor labour and operational development costs to advance Froome West.

Previous report

Advanced project costswere $1.7 million in Q3/25, a decrease of $2.5 million compared to Q3/24. These costs are related to our Fenix Project which remained on care and maintenance during Q3*.*The Company intends to make a production decision on this project by the end of 2025 subject to permit approval.

Previous report

*Loss from investment in McEwen Copper:*During Q3/25, we recorded a loss of $4.3 million from our investments in McEwen Copper, compared to $1.9 million during Q3/24. This loss represents our proportion of McEwen Copper’s net loss. Effective September 3, 2025, the Los Azules project advanced into the development stage following the confirmation of economically viable mineral reserves. During this stage, eligible expenditures will be capitalized, and depreciated over the life of mine after commercial production is achieved.

Previous report

Income from investment in MSC: During Q3/25, we recorded income of $3.5 million from our investment in MSC, compared to a loss of $1.2 million during Q3/24. Details of MSC’s operating results are presented in the “Operations Review” section of this MDA and Note 9 to theconsolidated financial statements.

Previous report

Other income: During Q3/25, we generated $8.3 million of other income, compared to other expense of $0.1 million in Q3/24. The increase was primarily driven by unrealized gains on marketable securities.

Previous report

Nine Months Ended September 30, 2025 Compared to Nine Months Ended September 30, 2024

Previous report

Revenue from gold and silver sales: During 9M/25, revenue from our 100%-owned operations decreased by 6% to $132.9 million, from $141.0 million in 9M/24. This was primarily driven by a 31% decrease in GEOs sold and offset by a 37% increase in realized gold prices, from $2,342 per GEO in 9M/24 to $3,218 per GEO in 9M/25.

Previous report

Production costs applicable to sales: During 9M/25, production costs applicable to sales decreased by 5% to $82.6 million from $86.8 million in 9M/24. This reduction was primarily driven by the lower number of GEOs produced and sold, offset by higher production costs per unit.

Previous report

Advanced project costs were $4.2 million in 9M/25, compared to $7.9 million in 9M/24. These costs are related to our Fenix Project which remained on care and maintenance during Q3/25*.*The Company intends to make a production decision on this project by the end of 2025 subject to permit approval.

Previous report

Exploration costs totaled $15.9 million in 9M/25, comparable to $14.2 million in 9M/24. Of this, $8.1 million was spent on diamond drilling at the Gibson area of the Grey Fox Project, while $7.8 million was invested in infill drill programs at the Gold Bar mine and the Windfall and Lookout Mountain projects in Nevada.

Previous report

Loss from investment in McEwen Copper: During 9M/25, we recorded a loss of $19.8 million from our investments in McEwen Copper, compared to $36.7 million during 9M/24. Details of McEwen Copper’s operating results are presented in the “Operations Review” section of this MDA and Note 9 to theconsolidated financial statements.

Previous report

Income from investment in MSC: During 9M/25, we recorded an income of $7.6 million from our investment in MSC, compared to $4.8 million during 9M/24. Details of MSC’s operating results are presented in the “Operations Review” section of this MDA and Note 9 to theconsolidated financial statements.

Previous report

Interest and other finance expense, net: Interest and other finance expenses totaled $4.7 million in 9M/25, an increase of $1.0 million compared to $3.7 million during 9M/24. This increase reflects the increase in monthly interest payments on the Company’s higher outstanding debt.

Previous report

Other income: Other income of $17.0 million in 9M/25 increased from $0.1 million in 9M/24 mostly due to a $14.5 million gain on our investment in marketable securities and a $2.1 million gain on foreign exchange revaluation of our liabilities.

Previous report

Income and mining tax recovery: For 9M/25, the Company recorded an income tax recovery of $3.5 million, compared to $4.1 million in 9M/24. Income tax recovery primarily reflects the amortization of the flow-through share premium.

Previous report

Cash provided by financing activities of $73.7 million during 9M/25 consisted of $110.0 million in proceeds from the issuance of Senior Convertible Notes and $3.7 million in proceeds from an exercise of stock options warrants, offset by financing costs of $4.1 million, principal repayments on our term loan facility of $20.0 million, a $15.1 million purchase of capped call options, and the repayment of finance lease obligations for $0.8 million.

Previous report

Gold Bar Mine

Previous report

The Gold Bar mine produced 8,191 GEOs in Q3/25, a 40% decrease compared to 13,640 GEOs in Q3/24, primarily due to mining and processing of lower grade material. During 9M/25 and 9M/24, the Gold Bar mine produced 24,285 GEOs, down from 37,654 GEOs in 9M/24. While the decrease in ounces produced primarily reflects the transition of mining activities from the higher grade Gold Bar South deposit in 2024 to the lower grade Pick III deposit in 2025, fewer ounces than expected were produced during Q3/25 due to differences identified between the geological model and mining zones. The Company has reinterpreted historic drill holes supported by the recognition of geological faults in a drilling campaign conducted during Q3/25. The geological model is being updated to reflect these findings.

Previous report

Revenue from gold and silver sales was $29.4 million in Q3/25, down from $33.3 million in Q3/24, primarily due to a 36% decrease in GEOs sold resulting from lower production volumes, partially offset by a 40% increase in the realized gold price. The same factors impacted revenue for 9M/25 compared to 9M/24.

Previous report

Production costs applicable to sales were $21.7 million in Q3/25, a 27% increase from $17.1 million in Q3/24. The increase was primarily driven by increased mining contractor costs to perform stripping activities required at Pick III, which had been capitalized during the comparative period in 2024. For 9M/25 and 9M/24, production costs applicable to sales were $44.8 million and $49.5 million, respectively, reflecting fewer GEOs sold in 2025 compared to the prior year period.

Previous report

Cash costs andAISC per GEO sold in Q3/25 were $2,540 and $2,852 respectively, compared to $1,281 and $1,822 in Q3/24, respectively. Cash costs and AISC per GEO sold in 9M/25 and 9M/24 were $1,805 and $2,286 , respectively, compared to $1,302 and $1,548, respectively. The increase in cash costs, and a corresponding increase in AISC, was primarily attributable to the high-stripping phase at Pick III through Q3/25 and 9M/25.

Previous report

During Q3/25, exploration activities were focused on drill programs within the Gold Bar South deposit where significant mineral inventory has been identified in prior campaigns. Additional drilling was conducted at Taurus and North Hunter to evaluate the resource potential across these key areas. Drilling was also focused on drilling twin holes at the Pick III deposit to have a better understanding of the short-term mine plan.

Previous report

During Q3/25, we continued infill drilling at the Windfall Project to collect sample material for metallurgical testing and to acquire additional geological data on previously drilled mineralized zones. Windfall drilling revealed strong intercepts during Q3/25, including 6.1g/t over 6 meters and 2.0g/t over 20 meters. At Lookout Mountain, reverse circulation drilling continued to upgrade existing inferred resources to the indicated category.

Previous report

Seven Troughs

Previous report

At Seven Troughs, exploration field work continued at key targets including Badger Hill.

Previous report

Development activities at the Stock project advanced in line with the Company’s 2025 mine development plan. In Q3/25, we invested $5.7 million to advance development at the Stock project (9M/25 – $13.7 million). During the period, the project received an updated Closure Plan Permit from the Ministry of Mines and completed major upgrades to ventilation and air heating systems, enhancing underground readiness. Site construction progressed across critical infrastructure, including access roads, building foundations, and essential service areas, as well as surface facilities, including the mine dry, office complex, and maintenance buildings. Rehabilitation of historical infrastructure continued, with steady progress on shaft access and safety improvements. Ramp development advanced at an average rate of 22 feet (6.7 meters) per day during Q3/25, supporting key project milestones. Overall, project execution during 9M/25 remained consistent with schedule and budget expectations, reinforcing the Company’s target for commencement of commercial production in 2026.

Previous report

The Fox Complex produced 6,386 GEOs in Q3/25, representing a 19% decrease from 7,855 GEOs in Q3/24, as mining continues in the lower-grade zones at the bottom of the Froome deposit (9M/25 and 9M/24 – 17,334 GEOs and 23,600 GEOs, respectively). The discovery of higher-grade mineralization at the new Froome West deposit extends production into 2026, supporting the transition into the production phase at the Stock project. Additional development material from Froome West has been incorporated into the near-term mine plan to de-risk Reflecting the focus on continuous production and planned development activities for the remainder of the year, the Company has revised its 2025 annual production guidance for Froome to 25,000 to 28,000 GEOs, down from 30,000 to 35,000 GEOs.

Previous report

Incremental production from this area during Q3/25 has contributed to a higher cost base, which are being expensed as part of ongoing operations, however increased mined grades are expected to assist to lower unit costs. Encouraging drill results at depth have prompted additional drilling that is expected to expand the resource.

Previous report

Revenue from gold saleswas $20.8 million for Q3/25, compared to $19.0 million for Q3/24. This increase was primarily driven by a a 40% increase in the average realized gold price, partially offset by a 21% decrease in GEOs sold. The same factors impacted revenue for 9M/25 compared to 9M/24. Realized gold prices at the Fox Complex are impacted by historic streaming arrangements, which require the sale of a portion of gold produced from the Froome and Black Fox mines at $611 per ounce during Q3/25 and 9M/25.

Previous report

Production costs applicable to sales were $13.5 million in Q3/25, compared to $12.6 million in Q3/24, representing a 7% increase primarily driven by higher mining expenses due to additional third-party contractors hired to address labor shortages and higher unit costs associated with the fixed cost component of underground development, partially offset by a 21% decrease in GEOs sold. The same factors contributed to the variance between 9M/25 and 9M/24 production costs.

Previous report

Cash costs and AISC per GEO sold were $2,132 and $2,352 for Q3/25, respectively, compared to $1,572 and $2,017 for Q3/24. The increase in unit costs was primarily driven by a 21% decrease in GEOs sold. The same factors impacted unit costs on a year-to-date basis, with higher fixed costs spread over fewer ounces sold.

Previous report

During Q3/25 we invested $3.0 million in exploration activities at the Fox Complex. At the Grey Fox property, exploration activities included 67,260 feet (20,500 meters) of diamond drilling, primarily focused on the Gibson Zone, where favorable grades and widths were identified. Other priority drill targets included the Stroud property, which is contiguous with Grey Fox, to verify a historical resource. Objectives for the remainder of 2025 will continue to center on delineating near-term resources at Grey Fox in support of its prefeasibility study, and identifying additional targets to support future resource growth.

Previous report

Advanced-Stage Properties – Fenix Project

Previous report

The Company has also started work on Fenix Phase 2, which would primarily be production from the project’s in-situ silver deposits. This would extend the life of Fenix well beyond the initial 10 years contemplated under Phase 1.

Previous report

On a 100% basis, the San José Mine produced 30,583 GEOs in Q3/25, representing a 10% increase compared to 27,927 GEOs in Q3/24 (9M/25 and 9M/24 – 80,874 GEOs and 84,264 GEOs, respectively). The decrease in the 9M/25 period was primarily due to lower milled grades, with gold and silver head grades declining by 11% and 24%, respectively, with a related 2% decrease in recovery rates for both metals. These impacts were partially offset by a 29% increase in tonnes processed during the period, supported by the installation of a new vertical mill completed in December 2024.

Previous report

Production costs applicable to sales were $50.1 million in Q3/25, compared to $58.0 million in Q3/24. A 25% increase in production costs was primarily driven by inflation outpacing the devaluation of the Argentine peso, impacting local currency expenditures, and increased reliance on contractors to offset workforce availability, and mining higher cost ore as the deposit nears maturity. These impacts were partially offset by a 15% decrease in GEOs sold during the period. Similar trends influenced the year-to-date period.

Previous report

Cash costs andAISC per GEO sold were $2,196 and $2,771 in Q3/25, respectively, compared to $2,173 and $2,675 in Q3/24. The higher unit costs for Q3/25 and 9M/25 compared to prior year periods reflects increased operating costs and lower ounces sold, which resulted in higher per-unit cost metrics. MSC issued revised guidance during Q3/25 due to sustained inflationary pressures in Argentina. Full-year revised cash cost and AISC per GEO guidance ranges from $2,100 to $2,300 and $2,200 to $2,350, respectively.

Showing the first 40 of 44 passages. Open the source sections for the rest.

Reworded paragraphs (30)

Previous wording

The discussion also analyzes our results of operations for the three and nine months ended September 30, 2025, and compares those to the results for the three and nine months ended September 30, 2024. Regarding properties or projects that are not in production, we provide some details of our plan of operation. We suggest that you read this discussion in conjunction with Management’s Discussion and Analysis Of Financial Condition and Results Of Operations and our audited consolidated financial statements contained in our Annual Report on Form 10-K for the year ended December 31, 2024.

Current wording

The discussion also analyzes our results of operations for the three months ended March 31, 2026, and compares those to the results for the three months ended March 31, 2025. Regarding properties or projects that are not in production, we provide some details of our plan of operation. We suggest that you read this discussion in conjunction with Management’s Discussion and Analysis of Financial Condition and Results of Operations and our audited consolidated financial statements contained in our Annual Report on Form 10-K for the year ended December 31, 2025 (“Annual Report”).

Previous wording

The discussion contains financial performance measures that are not prepared in accordance with United States Generally Accepted Accounting Principles (“US GAAP” or “GAAP”). Each of the following is a non-GAAP measure: cash costs, cash costs per ounce, all-in sustaining costs (“AISC”), all-in sustaining cost per ounce, adjusted earnings before interest, taxes, depreciation, and amortization (“Adjusted EBITDA”), and average realized price per ounce. These non-GAAP measures are used by management in running the business and we believe they provide useful information that can be used by investors to evaluate our performance and our ability to generate cash flows. These measures do not have standardized definitions and should not be relied upon in isolation or as a substitute for measures prepared in accordance with GAAP.

Current wording

The discussion contains financial performance measures that are not prepared in accordance with United States Generally Accepted Accounting Principles (“US GAAP” or “GAAP”). Each of the following is a non-GAAP measure: cash costs, cash costs per ounce, all-in sustaining costs (“AISC”), all-in sustaining cost per ounce, adjusted earnings before interest, taxes, depreciation, and amortization (“Adjusted EBITDA”), adjusted EBITDA per share, and average realized price per ounce. These non-GAAP measures are used by management in running the business and we believe they provide useful information that can be used by investors to evaluate our performance and our ability to generate cash flows. These measures do not have standardized definitions and should not be relied upon in isolation or as a substitute for measures prepared in accordance with GAAP.

Previous wording

For a reconciliation of these non-GAAP measures to the most directly comparable GAAP measure included in ourConsolidated Statements of Operations and Comprehensive Income (Loss) for the three and nine months ended September 30, 2025, and 2024 and to ourConsolidated Balance Sheets as of September 30, 2025, and December 31, 2024, and certain limitations inherent in such measures, please see the discussion under “Non-GAAP Financial Performance Measures,” beginning on page 40.

Current wording

For a reconciliation of these non-GAAP measures to the most directly comparable GAAP measure included in ourConsolidated Statements of Operations and Comprehensive Income (Loss) for the three months ended March 31, 2026, and 2025 and to ourConsolidated Balance Sheets as of March 31, 2026, and December 31, 2025, and certain limitations inherent in such measures, see discussion under “Non-GAAP Financial Performance Measures,” beginning on page 41.

Previous wording

Disclosed gold equivalent ounces (“GEO”) includes gold and silver ounces calculated based on a gold to silver ratio of 88:1 for Q3/25, 85:1 for Q3/24, 92:1 for 9M/25, and 85:1 for 9M/24, based on the average per ounce price of gold and silver during each period.

Current wording

Throughout this Management’s Discussion and Analysis (“MDA”), the reporting periods for the three months ended March 31, 2026, and 2025 are abbreviated as Q1/26 and Q1/25, respectively.** **Disclosed gold equivalent ounces (“GEO”) includes gold and silver ounces calculated based on a gold to silver ratio of 58:1 for Q1/26 and 90:1 for Q1/25, based on the average per ounce price of gold and silver during each period.

Previous wording

Highlights for Q3/25 are summarized below and discussed further under “Consolidated Performance”:

Current wording

Highlights for Q1/26 are summarized below and discussed further under “Consolidated Performance”:

Previous wording

The following tables present consolidated selected financial and operating results of the Company for the three and nine months ended September 30, 2025, and 2024:

Current wording

The following tables present consolidated selected financial and operating results of the Company for the three months ended March 31, 2026, and 2025:

Previous wording

*Revenue from gold and silver sales:*During Q3/25, revenue from our 100%-owned operations decreased by 3% to $50.5 million, from $52.3 million in Q3/24. This was primarily driven by a 30% decrease in GEOs sold and offset by a 39% increase in realized gold prices, from $2,499 per GEO in Q3/24 to $3,477 per GEO in Q3/25.

Current wording

*Revenue from gold and silver sales:*During Q1/26, revenue from our 100% owned operations increased by 107% to $74.0 million, from $35.7 million in Q1/25. This was primarily driven by a 21% increase in GEOs sold and a 71% increase in realized gold prices, from $2,803 per GEO in Q1/25 to $4,792 per GEO in Q1/26.

Previous wording

Exploration costs were $6.8 million in Q3/25, compared to $5.3 in Q3/24. At the Fox Complex, $3.0 million was spent primarily on diamond drilling at the Gibson area of the Grey Fox project. At the Gold Bar Mine Complex, $3.8 million was spent on infill drill programs for operational areas, as well as exploration drilling at the Windfall and Lookout Mountain projects.

Current wording

Exploration costs were $5.5 million in Q1/26, compared to $3.7 million in Q1/25. At the Fox Complex, $1.4 million was spent primarily on diamond drilling at the Gibson area of the Grey Fox project. At the Tartan Mine Project, $1.0 million was spent on drilling aimed to expand the Main Zone and for the preparation of a technical report summary. At the Gold Bar Mine Complex, $3.1 million was spent on infill drill programs for operational areas, as well as exploration drilling at the Windfall and Lookout Mountain projects.

Previous wording

*Interest and other finance expense, net:*Interest and other finance expenses totaled $1.6 million in Q3/25 compared to $1.1 million in Q3/24. This increase reflects the increase in monthly interest payments on the Company’s higher outstanding debt.

Current wording

*Interest and other finance expenses, net:*Interest and other finance expenses totaled $1.5 million in Q1/26, a $0.2 million increase from $1.3 million in Q1/25. These changes reflect the increase in monthly interest payments on the Company’s higher outstanding debt.

Previous wording

Income and mining tax recovery: For Q3/25, we recorded an income tax recovery of $1.3 million, compared to an expense of $0.8 million in Q3/24. The current period recovery primarily reflects the amortization of the flow-through share premium of $0.6 million.

Current wording

Income and mining tax recovery: During Q1/26, the Company recorded an income tax recovery of $0.2 million, compared to a recovery of $1.1 million in Q1/25. The current period recovery primarily reflects flow-through share premium amortization of $0.8 million, partially offset by $0.5 million of deferred income and mining tax expense.

Previous wording

Our cash, cash equivalents and restricted cash balance increased by $37.8 million during 9M/25, from $17.5 million as at** **December 31, 2024 to $55.3 million as at September 30, 2025.

Current wording

Our cash, cash equivalents and restricted cash balance increased by $5.7 million during Q1/26, from $55.3 million as at** **December 31, 2025, to $60.9 million as at March 31, 2026.

Previous wording

Cash provided by operating activities of $3.8 million during 9M/25 reflects the net loss of $3.7 million for the period, adjusted for non-cash impacts, including net losses from equity method investments of $12.3 million, depreciation, amortization, and depletion of $20.7 million, unrealized gains on marketable securities of $14.5 million, reclamation accretion and adjustments to estimate of $2.9 million, income and mining tax recovery of $7.7 million, stock-based compensation of $2.2 million, and a $9.1 million outflow from changes in non-cash working capital. Further details are provided in theConsolidated Statements of Cash Flows.

Current wording

Cash provided by operating activities of $12.1 million during Q1/26 reflects the net income of $33.4 million for the period and $8.8 million in dividends received from MSC, adjusted for non-cash impacts, including net income from equity method investments of $30.3 million, depreciation, amortization, and depletion of $7.1 million, unrealized loss on marketable securities of $5.2 million, flow-through premium amortization of $0.8 million, and $14.2 million in changes in non-cash working capital. Further details are provided in theConsolidated Statements of Cash Flows.

Previous wording

Cash used in investing activities of $39.8 million during 9M/25 consisted of additions to mineral property interests, plant and equipment of $35.0 million, advances to McEwen Copper of $5.1 million, and investments in marketable securities of $2.2 million. Cash used was offset by $2.2 million of dividends received from MSC.

Current wording

Cash used in investing activities of $21.0 million during Q1/26 primarily consisted of cash additions to mineral property interests, plant and equipment of $14.6 million and a loan provided to McEwen Copper of $7.5 million, partially offset by cash provided by other investing activities of $1.0 million.

Previous wording

Working capital as at September 30, 2025 was $62.6 million, a $69.1 million increase from negative $6.5 million as at December 31, 2024. The increase in working capital was driven by an increase in cash and cash equivalents of $37.6 million, as well as a $22.6 million increase in marketable securities, a $7.9 million increase in receivables due from McEwen Copper Inc., a $11.4 million increase in current inventories, and a $5.0 million decrease in flow-through share premium, offset by a $5.8 million increase in contract liability and a $7.8 million increase in accounts payable and accrued liabilities.

Current wording

Working capital as at March 31, 2026, was $13.2 million, a $30.9 million decrease from $44.1 million as at December 31, 2025. The decrease in working capital was primarily driven by a $31.2 million increase in consideration payable for the Canadian Gold acquisition, a $7.6 million decrease in marketable securities, a $2.8 million increase in accounts payable, accrued liabilities, a $3.0 million increase in current portion of long-term debt, a $0.5 million increase in tax liabilities, partially offset by a $5.5 million increase in cash and cash equivalents, a $4.5 million increase in inventory, and a $5.7 million decrease in contract liability.

Previous wording

The United States segment is comprised of the Gold Bar Mine Complex, consisting of the operating Gold Bar Mine and Windfall and Lookout Mountaing exploration projects, and other exploration properties in the State of Nevada.

Current wording

The United States segment is comprised of the Gold Bar Mine Complex, consisting of the operating Gold Bar mine, and the Tonkin, Windfall and Lookout Mountain exploration projects; as well as other exploration properties in the State of Nevada.

Previous wording

The following table summarizes the operating and financial results for the Gold Bar Mine for the three and nine months ended September 30, 2025, and 2024:

Current wording

The following table summarizes the operating and financial results for the Gold Bar Mine for the three months ended March 31, 2026, and 2025:

Previous wording

The Canada segment is comprised of the Fox Complex, which currently includes our Froome underground gold mine (including the Froome West deposit); the Stock Mine (consisting of the West, East and Main zones); the Stock mill; the Grey Fox exploration project; and a number of exploration and other properties located near the city of Timmins, Ontario.

Current wording

The Canada segment is comprised of the Fox Complex, which currently includes our Froome underground gold mine (including the Froome West deposit); the Stock Mine (consisting of the West, East and Main zones); the Stock mill; the Grey Fox exploration project; and a number of exploration and other properties located near the city of Timmins, Ontario. The Canada segment also comprises of the Tartan Mine Project located in Flin Flon, Manitoba which is an exploration project within the Flin Flon Greenstone belt.

Previous wording

The following table summarizes the operating and financial results for the Fox Complex for the three and nine months ended September 30, 2025, and 2024:

Current wording

The following table summarizes the operating and financial results for the Fox Complex for the three months ended March 31, 2026, and 2025:

Previous wording

The Mexico segment includes the El Gallo mine and the associated advanced-stage Fenix Project, located in Sinaloa state.

Current wording

The Mexico segment consists of El Gallo, located in Sinaloa state.

Previous wording

We have reached a construction decision for the Phase 1 gold reprocessing project contemplated in our Feasibility Study (previously described as the Fenix project). The Company is waiting for the extension of its Environmental Impact Assessment (Manifestación de Impacto Ambiental) from the Mexican government. McEwen is proceeding with the final detailed engineering plan for the mill, which has been purchased and is onsite. Assuming the extension of the Environmental Impact Assessment is approved, we anticipate beginning construction mid-2026, with production commencing mid-2027.

Current wording

We have reached a construction decision for the Phase 1 heap leach material reprocessing project contemplated in our Feasibility Study (previously described as the Fenix project). In December 2025, the Company was granted the extension of its Environmental Impact Assessment (Manifestación de Impacto Ambiental) from the Mexican government. The Company is currently proceeding with the final detailed engineering plan for the mill, which has been purchased and is onsite. We anticipate beginning construction mid-2026, with production commencing mid-2027.

Previous wording

Phase 1 is expected to produce for 10 years, producing approximately 20,000 GEOs annually once commercial production is achieved. Production will come from the reprocessing of the material currently on the leach pad, through a ball mill with an operating plan optimized for cash flow and recovery. Remaining capital costs to complete construction

Current wording

Phase 1 is expected to produce for 10 years, producing approximately 20,000 GEOs annually once commercial production is achieved. Production will come from the reprocessing of the material currently on the leach pad, through a ball mill with an operating plan optimized for cash flow and recovery. Remaining capital costs to complete construction are estimated at $25 million. Since the material that will be processed has been previously leached, there will be no significant development or exploration costs anticipated.

Previous wording

The Minera Santa Cruz Segment is consists of a 49% interest in the San José mine, located in Santa Cruz, Argentina. Hochschild is the majority owner and operator of the San José mine.

Current wording

The Minera Santa Cruz Segment consists of a 49% interest in the San José mine, located in Santa Cruz, Argentina. Hochschild is the majority owner and operator of the San José mine.

Previous wording

The following table sets out certain operating results for the San José mine for the three and nine months ended September 30, 2025, and 2024 on a 100% basis:

Current wording

The following table sets out certain operating results for the San José mine for the three months ended March 31, 2026 and 2025 on a 100% basis:

Previous wording

Revenue from gold and silver sales was $91.7 million in Q3/25, compared to $70.4 million in Q3/24. (9M/25 and 9M/24 – $258.5 and $210.6, respectively). This increase was primarily driven by 44% and 40% higher realized gold and silver prices, offset by a 15% decrease in GEOs sold. The same factors impacted revenue for 9M/25 compared to 9M/24.

Current wording

Revenue from gold and silver sales was $185.5 million in Q1/26, compared to $71.9 million in Q1/25. This increase was primarily driven by 65% and 151% higher realized gold and silver prices, respectively, and a 60% increase in GEOs sold.

Previous wording

Our 49% attributable share of operations from our investment in MSC in Q3/25 resulted in an income of $3.5 million, compared to a loss of $1.2 million in Q3/24. Despite higher planned unit costs, the favorable metal price environment enabled the operation to maintain a working capital position of $105.7 million as of September 30, 2025 (December 31, 2024 – $87.0 million).

Current wording

Our 49% attributable share of operations from our investment in MSC in Q1/26 resulted in an income of $32.7 million, compared to an income of $0.5 million in Q1/25. Despite higher than planned unit costs arising from negative macroeconomic factors, the metal price environment has allowed the operation to strengthen its liquidity, improving its working capital balance to $233.3 million as at March 31, 2026, compared to $182.8 million as of December 31, 2025.

Previous wording

We own a 46.4% interest in McEwen Copper, which owns a 100% interest in the Los Azules copper project in San Juan, Argentina, and the Elder Creek exploration project in Nevada, USA. We have invested over $426.4 million in exploration expenditures to develop Los Azules into a world-class copper deposit, including amounts spent by Minera Andes Inc. before 2012 and directly by McEwen Inc. prior to 2021.

Current wording

We own a 46.3% interest in McEwen Copper, which owns a 100% interest in the Los Azules copper project in San Juan, Argentina, and the Elder Creek exploration project in Nevada, USA. We have invested over $426.4 million in exploration expenditures to develop Los Azules into a world-class copper deposit, including amounts spent by Minera Andes Inc. before 2012 and directly by McEwen Inc. prior to 2021.

Previous wording

The Feasibility Study established mineral reserves and resources, with proven and probable reserves totaling 10.2 billion pounds of copper based on a copper price of $4.25 per pound. Mineral resources, comprising 5.4 billion pounds of measured and indicated copper and 20.0 billion pounds of inferred copper, were estimated using a copper price of $4.80 per pound.

Current wording

In Q4/25, McEwen Copper achieved a key milestone by completing the Feasibility Study and associated reserve estimate for the project. The Feasibility Study established mineral reserves and resources, with proven and probable reserves totaling 10.2 billion pounds of copper based on a copper price of $4.25 per pound. Mineral resources, comprising 5.4 billion pounds of measured and indicated copper and 20.0 billion pounds of inferred copper, were estimated using a copper price of $4.80 per pound

Previous wording

Preliminary drilling of newly identified targets is expected to commence in early 2026. In parallel, refinement of geological mapping and surface sampling across all target areas is ongoing and will continue into the next field season. This work is expected to significantly improve drill targeting accuracy.

Current wording

Preliminary drilling of newly identified targets is expected to commence later in 2026. In parallel, refinement of geological mapping and surface sampling across all target areas is ongoing and will continue into the next field season. This work is expected to significantly improve drill targeting accuracy.

Previous wording

Cash costs consist of mining, processing, on-site general and administrative expenses, community and permitting costs related to current operations, royalty costs, refining and treatment charges (for both doré and concentrate products), sales costs, export taxes and operational stripping costs, but exclude depreciation and amortization (non-cash items). The sum of these costs is divided by the corresponding gold equivalent ounces sold to determine a per ounce amount.

Current wording

Cash costs consist of mining, processing, onsite general and administrative expenses, community and permitting costs related to current operations, royalty costs, refining and treatment charges (for both doré and concentrate products), sales costs, export taxes and operational stripping costs, but exclude depreciation and amortization (non-cash items). The sum of these costs is divided by the corresponding gold equivalent ounces sold to determine a per ounce amount.

Previous wording

Adjusted earnings before interest, taxes, depreciation, and amortization (“Adjusted EBITDA”) is a non-GAAP financial measure and does not have any standardized meaning. We use adjusted EBITDA to evaluate our operating performance and ability to generate cash flow from our gold operations in production, including the San José mine; we believe this measure provides valuable assistance to investors and analysts in evaluating our ability to finance our precious metal operations and capital activities separately from our copper exploration operations. The most directly comparable measure prepared in accordance with GAAP is net loss before income and mining taxes. Adjusted EBITDA is calculated by adding back McEwen Copper's income or loss impacts on our consolidated income or loss before income and mining taxes.

Current wording

Adjusted earnings before interest, taxes, depreciation, and amortization (“Adjusted EBITDA”) is a non-GAAP financial measure and does not have any standardized meaning. We use adjusted EBITDA to evaluate our operating performance and ability to generate cash flow from our gold operations in production, including the San José mine; we believe this measure provides valuable assistance to investors and analysts in evaluating our ability to finance our precious metal operations and capital activities separately from our copper exploration operations. The most directly comparable measure prepared in accordance with GAAP is net income (loss) before income and mining taxes. Adjusted EBITDA is calculated by adding back McEwen Copper's and Paragon’s income or loss impacts on our consolidated income or loss before income and mining taxes.
Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

As of March 31, 2026, we own a 46.3% interest in McEwen Copper, which owns a 100% interest in the Los Azules copper project in San Juan, Argentina, and the Elder Creek exploration project in Nevada, USA. Including amounts spent by Minera Andes Inc. prior to 2012, and directly by McEwen Inc. prior to 2021, we have invested over $430 million in exploration expenditures to develop Los Azules as a world-class copper deposit.
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

Throughout this Management’s Discussion and Analysis (“MDA”), the reporting periods for the three months ended September 30, 2025, and 2024 are abbreviated as Q3/25 and Q3/24, respectively, and the reporting periods for the nine months ended September 30, 2025, and 2024 are abbreviated as 9M/25 and 9M/24, respectively.** **

Previous report — wording carried elsewhere

are estimated at $25 million. Since the material that will be processed has been previously leached, there will be no significant development or exploration costs are anticipated.