Skip to main content

Versamet Royalties Corp

For the period ended Dec 31, 2025. Filed Mar 31, 2026.

View on SEC.gov

About this filing

What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.

Dec 31, 2025 · Filed Mar 31, 2026

Use the contents to explore the available documents and sections.

VMET$9.13+2.2%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · Data Verification

Data Verification

Several drilling campaigns in the Greenstone database have been validated by Equinox personnel and the independent consultant, GMS, at various points during the generation of the 2016, 2019, and 2024 updates of the Mineral Resource estimates for the Greenstone Mine, and are described in the Greenstone Technical Report. This section summarizes data verification procedures after the 2024 Mineral Resources estimate.

After the 2024 Mineral Resources estimate, drill holes from historical drilling campaigns in the 1980s and 1990s were identified. The assay values from these drill holes match those publicly reported in the Assessment File Research Image database and in historical drill logs; the original assay certificates were not available for validation. Several statistical and visual comparisons with recently completed validated drill holes within a 25 m radius of these drill holes were completed. Historical drill holes with reasonably comparable assay values were incorporated into the 2025 Mineral Resource estimate. Previously incorporated historical drill holes that have not been confirmed due to a lack of new data or poor comparison were excluded from the Mineral Resource database.

Drill hole data added to resource database for the 2025 Mineral Resource estimate comprises only the RCGC drill hole in the open pit area, and the review and validation focused on these drill holes. The close-out date for the 2025 resource database is August 12, 2025.

The Greenstone Mine database was migrated from the Datashed database to the MX Deposit database in December 2024. Several validation processes were conducted to ensure the migrated data retained integrity and accuracy, and that it is reliably in MX Deposit. The migration to the MX Deposit database was verified as accurate and is consistent with the original Datashed database. Additionally, historical data not captured in the Datashed database was included in the MX deposit database in 2025.

The 2025 resource database, including the additional RCGC drill holes, was validated by Equinox QPs. Visits to the sampling preparation facilities for the RCGC drill hole samples, as well as to the mining pit and outcrop, were completed during site visits by the QPs. Review of the RCGC sample preparation facility and process for preparing samples for the laboratory identified no issues. The sampling preparation processes are well established for transporting the samples from Greenstone Mine to the laboratory.

Review of the QA/QC data identified minor issues with CRMs in a subset of data from 2022 to 2025, with CRM values outside the third deviation boundary. These RCGC drill holes were included in the resource database, as the QP considers their inclusion to be immaterial to the Mineral Resource estimate, as the bulk of these drill holes are located within mined-out areas and do not affect any blocks in the Mineral Resources.

Additionally, the imported drill holes from the MX deposit database, earmarked for use in the 2025 Mineral Resource estimate, was also validated in the geological software, and minor issues because of the importing were corrected.

-29-

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.