PERPETUA RESOURCES CORP.
For the period ended Dec 31, 2025. Filed Mar 31, 2026.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Mar 31, 2026
What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2024-12-31; filed 2025-03-19.
0001410578-25-000385
Item 1A. Risk FactorsCurrent report: 10-K
Period ended 2025-12-31; filed 2026-03-31.
0001104659-26-037403
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 154 previous paragraphs and 194 current paragraphs.
55 unchanged; 54 reworded; 76 added; 40 removed; 5 previous and 9 current paragraphs rearranged.
Tables are not compared: 96 previous and 100 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (76)
Current report
According to the TRS, as of December 31, 2025, the total initial capital cost estimate for the Project was approximately $2,576 million, excluding debt service and other financing costs and financial assurance obligations. We do not currently have sufficient funds or committed financing to fund the estimated capital cost of the Project and our ability to obtain sufficient funds or committed financing on acceptable terms, or at all, may be impacted by various factors, including, but not limited to, market conditions or commodity pricing; unfavorable interest rates; regulatory uncertainty; geopolitical events, including tensions or conflict in the Middle East, that may impact global financial stability; the incurrence of additional debt, which may be subject to certain restrictive covenants; and permitting delays, challenges to our existing permits, ability to post financial assurance for operations following completion of construction or other unforeseen issues relating to our existing or future permits. In addition, the initial capital cost estimate reflects the status of engineering and contracting work as of December 31, 2025. Engineering, contracting and financing negotiations are ongoing, and the capital cost estimates may change as those workstreams progress, and such changes may be material.
Current report
As part of our previously announced, comprehensive financing plan for the Project, in May 2025 we submitted a formal loan application to the Export-Import Bank of the United States (“U.S. EXIM”) for debt financing to finance construction of the Project and received a preliminary, non-binding indicative financing term sheet in September 2025. On March 30, 2026, the board of U.S. EXIM initiated the last formal step before a U.S. EXIM board vote on final approval of an approximately $2.7 billion senior secured loan (the “U.S. EXIM loan”) for the construction and development of the Project by unanimously agreeing to publish a notification to Congress with respect to the proposed loan. This step triggers notification of the proposed financing to Congress for a 25-day period (the “Notice Period”). The U.S. EXIM loan, if approved, is expected to be comprised of a direct loan of approximately $2.2 billion for construction of the Project, financial assurance and certain discretionary corporate and exploration costs, and the remainder representing capitalized interest and fees. The initiation of the Notice Period does not represent a financing commitment from U.S. EXIM and is subject to approval of the proposed loan by the U.S. EXIM board following the 25-day Notice Period. There can be no assurance that the board of U.S. EXIM will approve the proposed loan after the Notice Period, or at all, that we will be able to successfully negotiate definitive loan documents to close the loan or that, if closed, any funding provided by U.S. EXIM will be sufficient for us to construct the Project. If the U.S. EXIM loan is not approved, is delayed, is not available in the amounts or on the terms expected, or if the conditions to draw funding are not satisfied, we may not be able to fund the construction of the Project as planned, and would need to seek alternative sources of financing, which may not be available or may be available only on unfavorable terms. If we are able to successfully obtain financing from U.S. EXIM or another lender, the cost and terms of such financing may significantly reduce the expected benefits from development of the Project or render such development uneconomic, including by imposing restrictive covenants; limiting our ability to control certain property or development decisions; the loss of certain economic benefits of our property; or dilution to existing shareholders resulting from additional equity financing.
Current report
The issuance of a final financing commitment from U.S. EXIM is subject to U.S. EXIM’s underwriting criteria, authorization process, completion of due diligence and loan documentation, finalization and satisfaction of terms and conditions and satisfaction of certain conditions. The amount and timing of any funding under the U.S. EXIM facility is subject to the satisfaction of conditions, some of which are outside the Company’s control.
Current report
On March 30, 2026, the board of U.S. EXIM initiated Congressional Notice Period for an approximately $2.7 billion senior secured loan for the Project. The initiation of the Notice Period does not represent a financing commitment from U.S. EXIM. A funding commitment, if any, is conditional upon the satisfaction of certain conditions, including approval by the U.S. EXIM board following the 25-day Notice Period and execution of definitive loan documentation. There can be no assurance that the board of U.S. EXIM will approve the proposed loan after the Notice Period, or at all, or that, if approved, the terms or amount of such loan will be the same as those initially indicated. Availability of the proposed funding is also subject to finalization of definitive documentation, including completion of the due diligence and underwriting process, which may not be completed on the expected timeline, or at all. In addition, as a condition to closing, the Company may be required to put in place one or more secured accounts or debt facilities to fund cost overruns during the construction phase of the Project, which may include cash on hand, subordinated debt, letters of credit or other financial instruments or may require the Company to raise additional capital through debt or equity offerings, or enter into strategic or commercial agreements with third parties. If the financing is approved, there can be no assurance that the U.S. EXIM financing, together with any cost over-run facilities or other sources of capital will be sufficient for the Company to construct the Project. Further, release of funding under any such commitment would be subject to the satisfaction of certain conditions and covenants by the Company at the time of each proposed draw under the facility. Some of these conditions are outside the Company’s control. There can be no assurance that the Company will be able to successfully satisfy any or all of such conditions on the expected timeline, or at all, and the amount and timing of such funding, if any, is uncertain.
Current report
The U.S. EXIM financing, or other debt financing that we may enter into to fund the Project, may subject us to restrictive covenants, significant debt service costs, additional compliance obligations and other obligations and restrictions that may affect the value of the Project and our ability to pursue our business strategy.
Current report
We expect that the terms of the U.S. EXIM financing, or other debt financing we may enter into to fund the Project, will impose operating and financial restrictions on us and our subsidiaries, which may limit our ability to respond to changing business and economic conditions. For example, we expect that any such debt financing will contain restrictive covenants that limit our ability to incur additional indebtedness, make particular types of investments, incur certain types of liens, engage in fundamental corporate changes, enter into transactions with affiliates, make substantial asset sales, make certain restricted payments, enter into amendments or waivers to certain agreements, conduct certain sale leasebacks or enter into certain burdensome agreements. The terms of any such financing may also require the Company to maintain one or more secured accounts or facilities to fund cost overruns, financing costs, or other expenses during or after construction. Such conditions may require the Company to raise additional funds, enter into additional debt facilities, or restrict cash on hand. These covenants could adversely affect our ability to finance our future operations or capital needs, to continue exploration and development activities or to execute preferred business strategies. In addition, complying with these covenants may make it more difficult for us to successfully execute our business strategy and compete against companies who are not subject to such restrictions.
Current report
In addition, in connection with the negotiation and execution of the U.S. EXIM loan or similar financings, we may be required to enter into intercreditor or subordination agreements with other contractors, lenders or stakeholders or to amend agreements already in place with contractors or suppliers. The negotiation, finalization, and ongoing management of such agreements can be complex and may result in additional restrictions, delays in closing, or conflicts between creditor or contractor parties that could adversely affect our financing flexibility and project timeline.
Current report
In addition to these financial and operational restrictions, U.S. EXIM or other lenders may impose additional requirements relating to environmental, social, and governance standards. These may include, but are not limited to, additional compliance or reporting requirements related to environmental and social impacts, community engagement, and monitoring, and adopting international best practices and standards. Complying with such requirements could increase our compliance and operational costs, delay project timelines,
Current report
or require changes to project design or operations. Failure to meet these standards could also result in penalties, loss of financing, or reputational harm.
Current report
Furthermore, we expect to incur significant debt service costs in connection with the U.S. EXIM financing, or other debt financing we may enter into to fund the Project, including regular interest accrual, commitment fees, ongoing administrative, legal and advisory fees and other compliance costs. If we are permitted to defer interest payments until the Project is in operation, the principal amount of the loan may increase materially. These debt service costs are in addition to the indicative commitment amount and will increase our repayment obligations once the Project is in operation. We expect the terms of the U.S. EXIM loan, or any similar project financing facility, to severely restrict our ability to use the proceeds of the Project until a substantial portion of the loan has been repaid. As a result, we may be unable to progress exploration or development activities, pay dividends or otherwise execute preferred business strategies.
Current report
If we are unable to commence operations at the Project when expected due to construction delays, increased costs, compliance with additional lender requirements, or for other reasons, we may be unable to satisfy our payment obligations when due. If we fail to make payments when due or otherwise fail to satisfy the conditions or covenants of the loan, the lenders will have certain remedies to enforce their loan, which may include, under certain circumstances, foreclosure on the Project, which could result in total loss of the Project and our ability to continue our operations.
Current report
Changes in U.S. administrative policy, including tariffs and trade agreements, and uncertainty regarding U.S. EXIM loan financing may adversely affect us.
Current report
Given the relatively fluid regulatory environment in the U.S. and uncertainty regarding future actions of the U.S. government or foreign governments with respect to tariffs and international trade agreements and policies, a trade war, further governmental action related to tariffs or international trade policies, or additional tax or other regulatory changes in the future could directly and adversely impact our financial results and ability to progress the Project. Any adverse developments related to financing, government policy, or trade relations could materially affect our business, results of operations, financial condition, and the price of our common shares.
Current report
Our profitability, long-term viability and ability to finance and develop the Stibnite Gold Project will depend, in large part, on the market prices of gold, antimony and other potential by-products. The prices of these commodities have historically been volatile and are subject to numerous factors beyond our control, including:
Current report
The market prices of gold and antimony have recently experienced significant volatility. Government actions in major consuming or producing countries, including China and India for gold and China for antimony, can have a significant impact on demand and pricing. Antimony prices are subject to sharp, short-term changes and protracted declines, influenced by supply chain disruptions, new sources of supply, and changes in government policy regarding critical minerals.
Current report
A sustained decrease in the prices of gold could render the Project uneconomic, result in asset impairments or write-offs, and adversely affect our business, cash flows and the value of our common shares. While some analysts predict continued strength in gold prices, others expect a potential decline. There can be no assurance that prices will remain at current levels or that a profitable market will exist for our products.
Current report
In addition, our cost estimates for the Project currently benefit from elevated antimony pricing as a by-product credit. If antimony prices fall due to new supply sources or other market factors, our operating costs could materially increase, further impacting project economics and financial performance. The effect of these factors on metal prices cannot be accurately predicted, and any material decrease in prices could have a material adverse effect on our financial condition, results of operations, and ability to finance or advance the Stibnite Gold Project.
Current report
Perpetua Resources’ Canada-U.S. corporate structure and the related changes in critical mineral and trade policies may affect financing and advancement of the Stibnite Gold Project.
Current report
Perpetua Resources is a corporation incorporated under the BCBCA and its registered and record offices are located in British Columbia, Canada, while its head office and its principal asset, the Stibnite Gold Project, are located in Idaho in the United States. This cross-border structure exposes the Company to a dynamic and complex political, regulatory, and industrial policy environment that could impact its ability to fund, develop, and operate the Project. Political changes, including shifts in mining, investment, or other such policies in Canada and/or the United States, or in the relationship between these jurisdictions, may adversely affect Perpetua’s operations, profitability, and its ability to fund ongoing development expenditures at the Stibnite Gold Project. Such changes could also prevent or restrict the advancement of the Project, regardless of its economic viability as increased government involvement may impose new limitations, including restrictions on ownership or business operations with certain parties.
Current report
Additionally, there currently is significant uncertainty regarding the future relationship between the United States and other countries, including with Canada, relating to policy changes arising from the current U.S. administration, with respect to trade policies, treaties, tariffs, taxes, and other limitations on cross-border operations. Changes in tariffs, trade barriers, price and exchange controls, or other regulatory requirements could adversely affect Perpetua’s business, prospects, financial condition, and operating results, the extent of which cannot be predicted with certainty at this time. Perpetua Resources intends to continue to comply with legislation and policies in all jurisdictions where it operates. However, the Company cannot predict whether future policy changes or regulatory actions will result in substantive adverse effects on its business or operations, or impact the intended geographic focus of its business or the ability to fund and advance the Stibnite Gold Project.
Current report
Changes in geopolitical conditions and U.S. critical minerals policy could reduce the strategic importance of domestic antimony production and adversely affect our business.
Current report
A part of our business strategy is supported by the current geopolitical and national security environment, including ongoing trade tensions between the United States and China, China’s restrictions on exports of certain strategic minerals, and U.S. government initiatives to strengthen domestic supply chains for critical minerals such as antimony. These developments have increased interest in and public support for U.S.-based antimony projects like the Stibnite Gold Project.
Current report
There is no assurance that these conditions will persist or that the Stibnite Gold Project will benefit from this strategic focus. Any improvement in U.S.-China relations, reduction or removal of tariffs or export controls, a shift in U.S. government priorities regarding access to critical minerals, or identification of other readily available sources of antimony outside of China, could decrease or eliminate the perceived strategic value of domestic antimony production. Similarly, if China were to resume or expand exports of antimony or related materials, global supply and pricing dynamics could change materially, which could reduce the focus on developing U.S.-based antimony projects.
Current report
In addition, U.S. government agencies, including the DOW, may decide not to continue, or may significantly reduce efforts, to promote domestic critical minerals development. If government interest or policy support for domestic antimony projects declines, our
Current report
ability to attract financing, secure commercial partnerships, or advance the Stibnite Gold Project could be adversely affected. These developments could have a material negative impact on our business, prospects, and the potential economic viability of the Project.
Current report
Although the Project was included on the United States’ FAST-41 list of priority projects, such inclusion may be reconsidered based on updated information and does not imply endorsement of or support for the Project by the federal government, or create a presumption that the Project will receive any required outstanding regulatory approvals or favorably reviewed by any agency, or receive federal funding.
Current report
Mine closure and reclamation regulations and certain permits required to construct and operate mines include requirements that we provide financial assurance supporting our future reclamation obligations. The costs of providing financial assurance could significantly increase and we might not be able to provide financial assurance in the future.
Current report
We are required by federal and state laws and regulations to reclaim our mining properties. The specific requirements may change and vary among jurisdictions, but they are similar in that they aim to minimize long term effects of exploration and mining disturbance by requiring the control of pollutants and other possible deleterious substances, re-establishment to some degree of pre-disturbance landforms and vegetation, and restoration of natural resources. The Company’s approved mine plans also include certain commitments to address legacy conditions at the Project site created by historical mining operations of other mining companies and to restore to some degree natural and environmental resources to conditions existing before those historical mining operations. Such commitments in the approved mine plans are included within the Company’s financial assurance obligations. We are currently required, and may in the future be subject to additional requirements, to provide bonding or other financial assurance as security for reclamation costs, which may exceed our estimates for such costs. In addition, we may enter into various financial agreements to satisfy financial
Current report
assurance requirements, and the terms of such agreements may impose certain restrictions on us or require us to post cash collateral. For example, to facilitate satisfaction of construction phase financial assurance requirements, in October 2025 we entered into multiple related financial agreements consisting of a surety bond and a related indemnity agreement with the surety provider; a credit facility and a standby letter of credit in favor of the surety provider; and additional arrangements with federal and state agencies to satisfy financial assurance requirements. We entered into additional construction phase financial assurance arrangements in November and December 2025 with another state agency and a bank providing a letter of credit in favor of that agency. The terms and conditions of the current financial assurance package with the surety provider require us to, among other things, maintain a minimum balance of collateral, cash and marketable securities, satisfy other collateral maintenance requirements and maintain compliance with reporting requirements and certain other covenants. Compliance with the collateral maintenance requirements of the current financial assurance package may strain our financial resources or otherwise reduce liquidity that would otherwise be available for other uses and, therefore, may have an adverse impact on our financial condition. Furthermore, a claim on the surety bond or a breach of our covenants in favor of the surety provider under or our failure to fulfill our obligations under the related indemnity agreement entitles the surety to demand additional collateral, plus associated costs and expenses. Similarly, a breach of our covenants or other obligations under the credit facility supporting the lenders of credit constituting an event of default enables the bank to accelerate repayment and enforce collateral rights. Any such collateral demand or acceleration would adversely affect our financial condition and may have the effect of delaying the progress of development of the Project.
Current report
We may replace the current financial assurance package with other non-cash financial assurance arrangements prior to or in connection with finalizing full financing for the Project. However, there can be no assurance that we will be able to replace the current financial assurance package on acceptable terms and on the anticipated timeline, or at all. Additionally, our future reclamation costs, whether in the construction phase or operations phase of the Project, may exceed the financial assurances we post, which may require additional financial assurance to be provided to federal and state agencies, and those assurances may ultimately be unavailable to us.
Current report
Construction of mine facilities is subject to all of the risks inherent in construction and start-up, including delays and costs of construction in excess of our projections.
Current report
Construction of mine facilities is inherently risky and subject to many risks, many of which are beyond our control, that could delay or prevent the completion of, or significantly increase the costs of construction of, the Stibnite Gold Project, including:
Current report
In particular, in December 2025, we engaged Hatch Ltd. (“Hatch”) as our EPCM contractor for the processing plan and certain other on-site facilities in respect of the Project, and detailed engineering work is ongoing. The engagement of an EPCM contractor, as well as the ongoing engineering process, creates additional risks of changes to the construction plan, possible added costs, and potential delays to the Project’s timeline. Contracting for major project procurement and project implementation components is ongoing, which adds uncertainties regarding the final costs and schedule for the Project. Our ability to proceed according to plan also remains subject to the continued availability of equipment and skilled labor, which may be impacted by market conditions, supply chain issues and other external factors.
Current report
If any of the foregoing events or other unforeseen events were to occur, our financial condition could be adversely affected and we may be required to seek additional capital, which may not be available on commercially acceptable terms, or at all. If we are unable to complete construction of the Project, we may not be able to recover any costs already incurred. Even if construction of the Project is completed on the expected timeline, the costs could significantly exceed our expectations and result in a materially adverse effect on our business, results of operations, financial condition and cash flows.
Current report
Perpetua Resources’ future exploration efforts may be unsuccessful.
Current report
Perpetua Resources’ future efforts to upgrade and expand Mineral Resources at its properties may be unsuccessful. While the Company has identified mineralized material at the Stibnite Gold Project, there is no assurance that additional drilling, sampling, or technical analysis will result in the conversion of existing resources to higher categories, such as Mineral Reserves, or in the identification of additional resources. Upgrading or expanding Mineral Resources requires significant investment, technical skill and is subject to a number of risks, including the possibility that further work may not improve the quantity or quality of Mineral Resources or may even reduce the existing estimates.
Current report
attributes of the deposit, prevailing commodity prices, government policies and regulations, and environmental protection requirements. Additionally, if any expanded mineralization described above were to result in changes to the Project design or other features incorporated into the Plan of Operations approved by the USFS in October 2025 or into other federal or state permits issued for the Project, additional requirements with respect to environmental review or permit amendments or modifications may be required. Any such additional environmental review and permitting requirements, if applicable, would need to be completed before proceeding with actions requiring such regulatory approvals. Our ability to successfully upgrade or expand resources is also significantly influenced by the technical skill of our personnel and the results of ongoing engineering and evaluation programs.
Current report
If we are unable to upgrade or expand Mineral Resources, or if further work demonstrates that the resources cannot be economically or legally developed, it could have a material adverse effect on our business, financial condition, results of operations and share price.
Current report
Increased industry competition could also adversely affect the Corporation’s ability to attract necessary capital funding, secure construction materials and maintain its construction or production schedule. Any inability to timely recruit and retain qualified personnel, or to secure needed materials and capital, could delay or impede the advancement of the Stibnite Gold Project, which could have a material adverse effect on our business, results of operations, financial condition and share price.
Current report
Changes to United States federal mining law could impose royalties or other fees on hardrock mineral production on federal public lands, which could materially affect the economics of the Stibnite Gold Project.
Showing the first 40 of 76 passages. Open the source sections for the rest.
Removed paragraphs (40)
Previous report
Our ability to continue the exploration, permitting, development, and construction of the Project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing.
Previous report
We have limited financial resources. We will need external financing to develop and construct the Project and to complete the permitting process. The Company’s latest liquidity forecast indicates that available cash resources for expenses not eligible for reimbursement under the TIA (as defined below) are expected to be exhausted in the third quarter of 2025. We expect to incur other costs in the foreseeable future that are not eligible for reimbursement under the TIA and may incur unanticipated increases to costs as a result of inflation, fuel or labor costs or other factors. Furthermore, only approximately $10 million remained available for reimbursement under the TIA as of December 31, 2024, and costs must be incurred on or before June 16, 2025 to be eligible for reimbursement. Once such funding is exhausted or has expired, the Company will need to seek new funding sources for expenses currently reimbursed through the TIA. The Company continues to explore various funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; and/or other financing or strategic opportunities. In particular, the Company has engaged RBC Capital Markets and Endeavour Financial to assist with the evaluation of potential strategic and financing opportunities and to support the Company’s application process in connection with the U.S. EXIM $1.8 billion Letter of Interest received in April 2024. Any such financing or strategic transaction, or any funding commitment from U.S. EXIM, will be subject to due diligence, the negotiation of funding terms and other conditions, and there can be no assurance of the amount, timing or nature of any such financing or strategic transaction, if any, and any such financing or strategic transaction may not be consummated at all. Additionally, the potential costs of obtaining such financing or any strategic transaction can be significant and may put additional strains on our cash flows. Furthermore, in May 2023 the Company entered into the Sales Agreement (as defined herein) with respect to an ATM Offering (as defined herein); however, only $6.2 million remained available under the program as of December 31, 2024. Sales under the program are also subject to certain conditions, including market conditions, and there is no assurance that the Company will be able to raise additional funds under the program, at acceptable stock prices or at all. If additional financing is not secured before the third quarter of 2025, the Company would no longer be able to meet its ongoing obligations or advance construction readiness activities.
Previous report
We have commenced pre-construction engineering and other preparations with the goal of commencing construction of the Project in 2025. According to the Financial Update, as of December 31, 2024, the total initial capital cost estimate for the Project was approximately $2,215 million.
Previous report
We do not currently have sufficient funds or committed financing to commence construction of the Project. Our ability to obtain sufficient funds or committed financing on acceptable terms, or at all, may be impacted by various factors, including, but not limited to, unfavorable market conditions or commodity pricing; unfavorable interest rates; regulatory uncertainty; the incurrence of additional debt, which may be subject to certain restrictive covenants; restrictions on our use of government funding and permitting delays or challenges to our existing permits. The cost and terms of such financing, if obtained, may significantly reduce the expected benefits from development of the Project and/or render such development uneconomic, including by imposing restrictive covenants; limiting our ability to control certain property or development decisions as a result of our entry into joint ventures or other similar arrangements; the loss of certain economic benefits of our property as a result of our entry into royalty or similar agreements; or dilution to existing shareholders resulting from additional equity financing.
Previous report
Funding under the U.S. EXIM letter of interest is subject to an application and diligence process, and the amount and timing of such funding, if any, is uncertain and subject to conditions outside the Company’s control.
Previous report
On April 8, 2024, the Company announced that it received a non-binding and conditional Letter of Interest from the Export-Import Bank of the United States (“U.S. EXIM”) for potential debt financing of up to $1.8 billion through U.S. EXIM’s “Make More in America” and “China and Transformational Exports Program” initiatives. The Company expects to submit a formal application to U.S. EXIM in the second quarter of 2025. Upon receipt of an application for financing, U.S. EXIM will conduct the due diligence necessary
Previous report
to determine if a final commitment may be issued. Any final commitment will be dependent on meeting U.S. EXIM’s underwriting criteria, authorization process, finalization and satisfaction of terms and conditions. All final commitments must comply with U.S. EXIM policies as well as program, legal and eligibility requirements.
Previous report
There can be no assurance that the Company will be able to successfully satisfy any or all of such conditions. In particular, one condition of funding is that the Company raise a certain amount of equity financing. The Company may be unable to raise such additional financing on acceptable terms, or at all. If such condition is satisfied through an issuance of common shares, shareholders may experience significant dilution (see* Item 1A. Risk Factors – Perpetua Resources will need to raise additional capital through the sale of its securities or other interests, resulting in potential for significant dilution to the existing shareholders and, if such funding is not available, Perpetua Resources’ operations would be adversely affected*.).
Previous report
A strategic transaction, whether or not consummated, could have an adverse effect on our business, results of operations and financial conditions.
Previous report
In 2024, the Company engaged RBC Capital Markets and Endeavour Financial to assist with the evaluation of potential strategic and financing opportunities and to support the Company’s application process in connection with the U.S. EXIM $1.8 billion Letter of Interest received in April 2024. The pursuit of such strategic transactions involve significant risks to the Company’s operations and financial results, whether or not such transaction is ultimately consummated. Such risks could include:
Previous report
The negotiation and consummation of any such financing or strategic transaction will require significant expenditures of time, attention and funds. Additionally, we may not control decisions made pursuant to agreements relating to strategic transactions, including joint ventures, to the extent we do not have a controlling interest in the venture or are not an operator under such agreements. The other parties to these arrangements may have economic, business, or legal interests or goals that are inconsistent with the Company’s and, therefore, decisions may be made that the Company does not believe are in its best interest. Moreover, parties to such agreements or ventures may be unable to meet their economic or other obligations, and the Company may be required to fulfill those obligations alone. In either case, the value of the investment and the Company’s business and financial condition may be adversely affected.
Previous report
Achievement of the benefits expected from financing or strategic transactions may require us to incur significant costs and could have a material adverse effect on our business, operating results, financial condition and the price of our common shares. In addition, the negotiation and consummation of any such transaction may require significant attention from our management team, which may detract attention from our day-to-day operations. Any one or more of these factors or other risks could cause us not to realize the anticipated benefits of a financing or strategic transaction and could have a material adverse effect on our financial condition.
Previous report
Our funding under the TIA is subject to certain conditions, limitations and ongoing obligations. If we fail to satisfy these conditions, we may be unable to obtain all of the funding allocated to Perpetua Resources or may be required to disgorge such funds.
Previous report
In December 2022, Perpetua Resources was awarded an undefinitized Technology Investment Agreement (“TIA”) of up to $24.8 million under Title III of the DPA. On July 25, 2023, the TIA was definitized with the United States Department of Defense (the “DOD”), establishing the full, not-to-exceed amount of $24.8 million. The TIA contains customary terms and conditions for technology investment agreements, including ongoing reporting obligations. If we fail to satisfy these conditions, we will be unable to obtain remaining funds available under the TIA and, under certain circumstances, could be required to disgorge funds already paid. On May 2, 2024, the TIA was modified with an additional $34.4 million in funding, bringing the total amount of the TIA to $59.2 million.
Previous report
Under the TIA, Perpetua Resources may request reimbursement for certain costs incurred through June 16, 2025 related to environmental baseline data monitoring, environmental and technical studies and other activities related to advancing Perpetua’s construction readiness and permitting process for the Stibnite Gold Project, which includes reimbursement of employee wages for activities included in the scope of the TIA. The funds may be used only for the purposes specified in the TIA and are not available to the Corporation for general corporate purposes other than those specified. Furthermore, the TIA contains limitations on the Corporation’s ability to share or sell certain assets, interests or technology to foreign counterparties, which may limit the Corporation’s ability to raise funding from foreign sources or capitalize on business opportunities with foreign companies.
Previous report
Perpetua Resources’ future exploration and development efforts may be unsuccessful.
Previous report
Mineral resource exploration and, if warranted, development, is a speculative business, characterized by a number of significant risks, including, among other things, unprofitable efforts resulting not only from the failure to discover mineral deposits but also from finding mineral deposits, which, though present, are insufficient in volume and/or grade to return a profit from production. There is no certainty that the expenditures that have been made and may be made in the future by the Corporation related to the exploration of its properties will result in discoveries of mineralized material in commercially viable quantities.
Previous report
Most exploration projects do not result in the discovery of commercially viable mineral deposits and no assurance can be given that any particular level of recovery or Mineral Reserves will in fact be realized, or that any identified mineral deposit will ever qualify as a commercially viable deposit which can be legally and economically exploited.
Previous report
intense with respect to the acquisition of desirable undeveloped gold and critical mineral properties. The principal competitive factors in the acquisition of such undeveloped properties include the staff and data necessary to identify, investigate and purchase such properties, and the financial resources necessary to acquire and develop such properties. Competition could adversely affect the Corporation’s ability to advance the Project or to acquire suitable prospects for exploration in the future on terms it considers acceptable. The Corporation’s competitive strength is due, in part, to having the only antimony reserves in the United States. If additional accessible sources of antimony become available or demand is reduced, the Corporation’s ability to access funding or government support may be affected. Increased competition could adversely affect the Corporation’s ability to attract necessary capital funding or acquire an interest in additional properties.
Previous report
Our mining, exploration, and development operations, and the permits required for such activities, may be subject to legal challenges at the international, federal, state, and local level by various parties. Such legal challenges may allege non-compliance with laws and regulations or may seek to invalidate permits or regulatory actions regarding the Project or future projects undertaken by the Corporation. For example, in August 2019, the Nez Perce Tribe filed a complaint in the U.S. District Court for the District of Idaho seeking to hold the Company responsible for alleged violations of the CWA through declaratory and injunctive relief. Following the execution of the voluntary ASAOC with the U.S. EPA and the United States Department of Agriculture, the Corporation and the Nez Perce Tribe agreed to stay the CWA litigation and explore alternative dispute resolution through court-ordered mediation. The mediation effort was successful, and the Company and the Nez Perce Tribe filed the Settlement Agreement and Stipulation for Dismissal with the U.S. District Court on August 8, 2023 and the case was dismissed without prejudice on October 2, 2023. Under the settlement, a dismissal with prejudice may occur after completion of our required payments. Once we have satisfied our payment obligations under the settlement, the Company anticipates that the parties will submit a stipulation of dismissal with prejudice to the court.
Previous report
on February 18, 2025 by a number of claimants, including Save the South Fork Salmon and the Idaho Conservation League, alleging violations of NEPA and other federal laws in the regulatory process. Among other remedies, the claimants seek to vacate the ROD, FEIS Errata, Final Biological Opinions and Project approvals and enjoin any further implementation of the Project. PRII has filed a motion with the court to intervene in this lawsuit. While the Company believes the federal regulatory process was conducted thoroughly and completely by the relevant federal regulatory agencies, there can be no assurance that the ROD, FEIS, and other Project approvals will be upheld upon judicial review.
Previous report
Perpetua Resources is dependent on a relatively small number of key personnel, the loss of any of whom could have an adverse effect on the operations of Perpetua Resources. The Corporation’s success is dependent to a great degree on its ability to attract and retain highly qualified management personnel. The loss of any such key personnel, through incapacity or otherwise, would require Perpetua Resources to seek and retain other qualified personnel and could compromise the pace and success of its exploration and permitting activities. Perpetua Resources does not maintain key person insurance in the event of a loss of any such key personnel.
Previous report
Perpetua Resources does not have a full staff of technical experts and relies upon outside consultants to provide critical services.
Previous report
Perpetua Resources has a relatively small staff and depends upon its ability to hire consultants with the appropriate background and expertise. Perpetua Resources’ inability to hire the appropriate consultants at the appropriate time could adversely impact Perpetua Resources’ ability to advance its exploration and permitting activities. For example, Perpetua Resources will need to hire additional staff and consultants in order to commence construction of the Project. SeeItem 1A, Risk Factors - Perpetua Resources faces substantial competition within the mining industry from other mineral companies with much greater financial and technical resources and Perpetua Resources may not be able to effectively compete.
Previous report
Perpetua Resources is dependent on various supplies and equipment to carry out its activities. The shortage of such supplies, equipment and parts, or the inability to obtain such supplies and equipment when needed, whether as a result of inflated costs, supply chain disruptions or other reasons, could have a material adverse effect on Perpetua Resources’ ability to carry out its activities and therefore have a material adverse effect on the cost of doing business.
Previous report
The commercial feasibility of the Project and Perpetua Resources’ ability to arrange funding to conduct its planned exploration projects is dependent on, among other things, the price of gold, silver, antimony and other potential by-products. Depending on the price to be received for any minerals produced, Perpetua Resources may determine that it is impractical to commence or continue commercial production. A reduction in the price of gold, silver, antimony or other potential by-products may prevent the Project from being economically mined or result in the write-off of assets whose value is impaired as a result of low precious metals prices.
Previous report
Future revenues, if any, are expected to be in large part derived from the future mining and sale of gold, antimony and other potential by-products or interests related thereto. The prices of these commodities fluctuate and are affected by numerous factors beyond Perpetua Resources’ control, including, among others:
Previous report
The effect of these factors on the price of gold, silver, antimony and other potential by-products cannot be accurately predicted. If the price of gold and other potential by-products decreases, the value of Perpetua Resources’ assets would be adversely affected, thereby adversely impacting the value and price of Perpetua Resources’ common shares.
Previous report
While the price of gold has recently been strong, there can be no assurance that gold prices will remain at such levels or be such that the Project, and any future operations in which Perpetua Resources has a direct or indirect interest, will be mined at a profit. Some credible industry experts are predicting that gold will continue to increase in price during 2025 and the next several years. However, other credible industry experts expect that the price of gold has generally peaked and be worth much less per ounce than it is today.
Previous report
Furthermore, the Corporation’s cost estimates for the Project are driven, in part, by current and anticipated elevated pricing of antimony as a by-product credit. If antimony prices fall due to the availability of new sources of antimony or other conditions that result in a sustained drop in the price of antimony, the Company’s operating costs could materially increase.
Previous report
Recently, the Trump Administration announced plans to implement or increase tariffs, and on February 10, 2025 confirmed extension of 25 percent import tariffs on steel globally to go into effect on March 12, 2025. The ultimate impact of this tariff is unknown
Previous report
Furthermore, while we generally must comply with Section 404 of Sarbanes-Oxley for our fiscal year ended December 31, 2024, we are not required to have our independent registered public accounting firm attest to the effectiveness of our internal controls over financial reporting until our first annual report subsequent to our ceasing to be an “emerging growth company” within the meaning of the Exchange Act. Once we are required to do so, our independent registered public accounting firm may issue a report that is adverse in the event the independent registered public accounting firm concludes that there is one or more material weaknesses in the effectiveness of our internal control over financial reporting. Compliance with these requirements may strain our resources, increase our costs and use significant management time and resources, and we may be unable to comply with these requirements in a timely or cost-effective manner.
Previous report
For as long as we are an “emerging growth company,” or a “smaller reporting company” we will not be required to comply with certain reporting requirements that apply to some other public companies, and such reduced disclosures requirement may make our Common Shares less attractive.
Previous report
As an “emerging growth company” as defined in the JOBS Act, we may take advantage of exemptions from certain disclosure requirements applicable to other public companies that are not emerging growth companies. We are an emerging growth company until the earliest of (i) the last day of the fiscal year during which we have total annual gross revenues of $1.235 billion or more; (ii) the last day of the fiscal year following the fifth anniversary of the first sale of common equity securities pursuant to an effective registration statement under the Securities Act; (iii) the date on which we have, during the previous three-year period, issued more than $1.0 billion in non-convertible debt; or (iv) the date on which we are deemed to be a “large accelerated filer” under the rules of the SEC.
Previous report
For so long as we remain an “emerging growth company,” we will not be required to, among others:
Previous report
Notwithstanding the above, we are also currently a “smaller reporting company,” meaning that we are not an investment company, an asset-backed issuer, or a majority-owned subsidiary of a parent company that is not a smaller reporting company and have either: (i) a public float of less than $250.0 million, or (ii) annual revenues of less than $100.0 million during the most recently completed fiscal year and: (A) no public float, or (B) a public float of less than $700.0 million. In the event that we are still considered a “smaller reporting company,” at such time we cease being an “emerging growth company,” the disclosure we will be required to provide in our SEC filings will increase but will still be less than it would be if we were not considered either an “emerging growth company” or a “smaller reporting company”. Specifically, similar to “emerging growth companies,” “smaller reporting companies” are able to provide simplified executive compensation disclosures in their filings; are exempt from the provisions of Section 404(b) of the Sarbanes-Oxley Act requiring that independent registered public accounting firms provide an attestation report on the effectiveness of internal control over financial reporting; and have certain other decreased disclosure obligations in their SEC filings, including, among other things, only being required to provide two years of audited financial statements in annual reports. Decreased disclosures in our SEC filings due to our status as an “emerging growth company” or “smaller reporting company” may make it harder for investors to analyze the Company’s results of operations and financial prospects.
Previous report
Because of these disclosure exemptions, some investors may find our common shares less attractive, which may result in a less active trading market for our common shares, and our stock price may be more volatile.
Previous report
In the future, we may be subject to legal proceedings.
Previous report
We are required to develop and maintain proper and effective internal controls over financial reporting. We may not complete our analysis of our internal controls over financial reporting in a timely manner, or these internal controls may not be determined to be effective, which may adversely affect investor confidence in us and, as a result, the value of our common stock.
Previous report
However, for as long as we are an emerging growth company, or a smaller reporting company that is a non-accelerated filer, our independent registered public accounting firm will not be required to attest to the effectiveness of our internal control over financial reporting pursuant to Section 404(b). At such time this attestation will be required, our independent registered public accounting firm may issue a report that is adverse in the event the independent registered public accounting firm concludes that there is one or more material weaknesses in the effectiveness of our internal control over financial reporting. Our remediation efforts may not enable us to avoid a material weakness in the future. We may need to undertake various actions, such as implementing new internal controls and procedures and hiring additional accounting or internal audit staff.
Reworded paragraphs (54)
Previous wording
Investing in our common shares involves a high degree of risk. An investment in our securities is speculative and involves a high degree of risk due to the nature of our business and the present stage of exploration and development of our mineral properties. You should carefully consider the risks described below, as well as the other information in this Annual Report, including our consolidated financial statements and the related notes and Part II, Item 7. entitled “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and in any documents incorporated in this Annual Report by reference, before deciding whether to invest in our common shares. The occurrence of any of the events or developments described below could harm our business, financial condition, results of operations, and growth prospects and could cause them to differ materially from the estimates described in forward-looking statements in this Annual Report. In such an event, the market price of our common shares could decline, and you may lose all or part of your investment. Although we have discussed risks we have identified as material risks, the risks described below are not the only ones that we may face. Additional risks and uncertainties not currently known to us or that we currently deem immaterial may also impair our business operations. Certain statements below are forward-looking statements. See also “Cautionary Note Regarding Forward-Looking Statements” in this Annual Report.
Current wording
Investing in our common shares involves a high degree of risk. An investment in our securities is speculative and involves a high degree of risk due to the nature of our business and the present stage of development of our mineral properties. You should carefully consider the risks described below, as well as the other information in this Annual Report, including our consolidated financial statements and the related notes and Part II, Item 7. entitled “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and in any documents incorporated in this Annual Report by reference, before deciding whether to invest in our common shares. The occurrence of any of the events or developments described below could harm our business, financial condition, results of operations, and growth prospects and could cause them to differ materially from the estimates described in forward-looking statements in this Annual Report. In such an event, the market price of our common shares could decline, and you may lose all or part of your investment. Although we have discussed risks we have identified as material risks, the risks described below are not the only ones that we may face. Additional risks and uncertainties not currently known to us or that we currently deem immaterial may also impair our business operations. Certain statements below are forward-looking statements. See also “Cautionary Note Regarding Forward-Looking Statements” in this Annual Report.
Previous wording
We do not currently have sufficient funds or committed financing necessary to commence construction of the Project, and we may be unable to raise the necessary funds.
Current wording
We do not currently have sufficient funds or committed financing necessary to fund the estimated capital cost of the Project, and we may be unable to raise the necessary funds.
Previous wording
Our failure to obtain sufficient financing could result in the delay or indefinite postponement of exploration, permitting, development, construction, or production at the Project. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.
Current wording
There can be no assurance that we will obtain, or receive the full amount of, the anticipated U.S. EXIM loan, or that the terms and timing of such funding will not be modified, delayed, challenged, or become unavailable, which could have a material adverse effect on our business, results of operations and financial position. Our failure to obtain sufficient financing could result in delay or indefinite postponement of development, construction, or operation of the Project. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.
Previous wording
The application process is controlled by U.S. EXIM and is subject to the procedures, priorities and staffing of the agency. As a result, the Company’s application may not be reviewed or processed on the Company’s preferred or expected timeline, and funds may not be available when needed to commence construction. Furthermore, U.S. EXIM funding is subject to the priorities of the federal government, which may result in changes to the amount, timing or conditions of funding. Even if approved, the terms of any U.S. EXIM funding may not be on acceptable terms or may be subject to conditions that the Company is unable to satisfy. If the Company is unable to secure U.S. EXIM financing, it may be unsuccessful in obtaining other project financing when needed or enter into strategic transactions on acceptable terms, or at all.
Current wording
The underwriting process and finalization of definitive documents is subject to the procedures, priorities and staffing of U.S. EXIM, including in connection with any shutdowns of the federal government. As a result, the Company’s application may not be reviewed or processed on the Company’s preferred or expected timeline, and funds may not be available when needed to continue construction. Furthermore, U.S. EXIM funding is subject to the priorities of the federal government, which may result in changes to the amount, timing or conditions of funding. Even if approved, the terms of any U.S. EXIM funding may not be on acceptable terms or may be subject to conditions that the Company is unable to satisfy. If the Company is unable to secure U.S. EXIM financing, it may be unsuccessful in obtaining other project financing when needed or to continue construction on the Project.
Previous wording
at this time. Additionally, ongoing changes in U.S. and foreign government trade policies, including potential modifications to existing trade agreements and further restrictions on free trade, could introduce additional uncertainty. Any escalation of trade tensions, additional tariffs, retaliatory measures by foreign governments or shifts in U.S. or international trade policies could increase the cost and availability of the raw materials and equipment necessary for the exploration, development, and potential construction of the Project.
Current wording
Our ability to secure debt financing from U.S. EXIM or other sources and advance the Project may be negatively impacted by changes in U.S. administrative policy, such as the imposition or increase of tariffs, changes to existing trade agreements, and shifts in international trade relations. Political and trade relations between the U.S. and countries in our supply chain, as well as changes to trade policies (including the imposition of tariff rates and customs duties) and other macroeconomic issues, could adversely impact our business. Many industries, including the mining industry, have been impacted by these market conditions, which have contributed to increased economic uncertainty, higher capital costs and, for pre-production companies like ours, potentially reduced access to financing. These factors have increased the risk of disruption to global trade flows and supply chains, including availability and lead times for mining and processing equipment. Escalation of trade tensions, additional tariffs, retaliatory measures by foreign governments, or shifts in U.S. or international trade policies, including those arising from geopolitical tensions in the Middle East, could increase the cost and limit the availability of the raw materials and equipment necessary for the development and construction of the Stibnite Gold Project.
Previous wording
We require various permits to commence construction and operation of the Project and any future operations, and delays or a failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, could have a material adverse impact on us.
Current wording
We require various permits to complete construction and commence operation of the Project and continue any future operations, and delays or a failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, could have a material adverse impact on us.
Previous wording
Our current and anticipated future operations, including further exploration and development activities and commencement of construction and operations on the Project, require permits from various United States federal, state, and local governmental authorities. There can be no assurance that all permits that we require for the construction of mining facilities and to conduct mining operations will be obtainable on reasonable terms, or at all. Furthermore, permitting requirements can be costly to comply with and involve extended timelines. Permitting delays, failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained or successful legal challenges to the issuance of permits we have obtained, could have a material adverse impact on us.
Current wording
We have received all permits needed to advance the Project into the initial construction phase, and in October 2025 we received confirmation from the USFS, IDL and USACE that we satisfied the remaining conditions under such permits to commence such initial construction. However, our current and anticipated future operations, including further development and construction activities and commencement of operations on the Project, require additional authorizations from various federal, state and local governmental authorities in the United States that we will need to obtain in the future. For example, in addition to providing construction phase financial assurance in favor of federal and state agencies to satisfy the requirements of applicable federal and state law and the requirements of various governmental approvals, it is expected that additional financial assurance in favor of federal and state agencies in respect of Project operations after construction is completed will be required by the relevant agencies when the Company moves from the construction phase to the operations phase of the Project. Further, certain additional permits, beyond those necessary to initiate construction, will be required from federal and state agencies as part of the Company’s full construction plan. There can be no assurance that such regulatory authorizations will be obtainable on reasonable terms, when expected or at all. Furthermore, permitting requirements can be costly to comply with and involve extended timelines. Permitting delays, failure to obtain such permits, or a failure to comply with the terms of any United States federal, state or local permits that we have obtained or successful legal challenges to the issuance of permits we have obtained, could have a material adverse impact on us.
Previous wording
The duration and success of efforts to obtain and renew permits are contingent upon many variables not within our control. Shortage of qualified and experienced personnel in the various levels of government could result in delays or inefficiencies. Backlog within the permitting agencies could affect the permitting timeline of the various projects. Other factors that could affect the permitting timeline include (i) the number of other large-scale projects currently in a more advanced stage of development which could slow down the review process and (ii) significant public response regarding the Project or any future projects the Corporation undertakes. Additionally, to the extent that we are granted necessary permits, we may be subject to a number of Project requirements or conditions including the installation or undertaking of programs to safeguard protected species and their habitat, sites, or otherwise limit the impacts of our operations. Previously obtained permits may be suspended or revoked for a variety of reasons. While we strive to obtain and comply with all necessary permits and approvals, any failure to do so may have negative impacts upon our business or financial condition, such as increased delays, curtailment of our operations, increased costs, implementation of mitigation or remediation requirements, the potential for litigation or regulatory action, and damage to our reputation.
Current wording
The duration and success of efforts to obtain, maintain and renew permits are contingent upon many variables not within our control. Shortage of qualified and experienced personnel in the various levels of government could result in delays or inefficiencies. Backlog within the permitting agencies could affect the permitting timeline of the various projects. Other factors that could affect the permitting timeline include (i) the number of other large-scale projects currently in a more advanced stage of development which could slow down the review process, (ii) significant public response regarding the Project or any future projects the Company undertakes, and (iii) the initiation and disposition of legal proceedings challenging the Project or any regulatory approvals required for it. Additionally, to the extent that we are granted necessary permits, we may be subject to a number of Project requirements or conditions, including, but not limited, to the installation or undertaking of programs to protect air and water quality and to safeguard protected species and their habitat, sites, or otherwise limit the impacts of our operations. Various permits will require the Company to provide bonding or other financial assurance to federal and state agencies to assure the Company complies with Project requirements, including requirements relating to reclamation of disturbances or impacts to the environment caused by the Project. Previously obtained permits may be suspended or revoked for a variety of reasons. While we strive to obtain and comply with all necessary permits and approvals, any failure to do so may have negative impacts upon our business or financial condition, such as increased delays, curtailment of our operations, increased costs, implementation of mitigation or remediation requirements, the potential for litigation or regulatory action, and damage to our reputation.
Previous wording
The Project is not in production or currently under construction, and we have no ongoing mining operations or revenue from mining operations. Mineral exploration and development has a high degree of risk and few properties that are explored are ultimately developed into producing mines. The future development of the Project will require obtaining federal and state permits and financing and the construction and operation of mines, processing plants and related infrastructure. As a result, we are subject to all of the risks associated with establishing new mining operations and business enterprises, including, among others:
Current wording
We have only recently commenced construction of the Project, and we have no ongoing mining operations or revenue from mining operations. Mineral development and mine construction have a high degree of risk and few properties that are explored are ultimately developed into producing mines. The successful development of the Project will require obtaining committed financing, the completion of a multi-year construction process and operation of mining areas, processing facilities and related infrastructure, as well as ongoing compliance with and maintenance of federal, local and state permits and financial assurance requirements. As a result, we are subject to all of the risks associated with establishing new mining operations and business enterprises, including, among others:
Previous wording
The costs, timing and complexities of mine construction and development are increased by the remote location of the Project, with additional challenges related thereto, including access, water and power supply, and other support infrastructure. The lack of availability of such infrastructure on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay development of the Project. Cost estimates may increase significantly as more detailed engineering work and studies are completed. New mining operations commonly experience unexpected costs, problems and delays during development, construction, and mine start-up. In addition, delays in the commencement of mineral production often occur. Furthermore, a significant drop in commodity prices over a sustained period of time could render the Project not economically viable or limit our ability to maintain operations. Accordingly, there are no assurances that our activities will result in profitable mining operations, that we will successfully establish mining operations, or that we will profitably produce precious metals at the Project.
Current wording
engineering work and studies are completed and as construction activities progress. We do not have an operating history upon which we can base estimates of future operating costs; thus, actual capital costs, operating costs, production and economic returns may differ significantly from those we have anticipated and there are no assurances that any current or future development activities will result in profitable mining operations. New mining operations commonly experience unexpected costs, problems and delays during development, construction and mine start-up. In addition, delays in the commencement of mineral production often occur. Furthermore, a significant drop in commodity prices over a sustained period of time could render the Project not economically viable or limit our ability to maintain operations. Accordingly, there are no assurances that our activities will result in profitable mining operations, that we will successfully establish mining operations, or that we will profitably produce precious metals at the Project.
Previous wording
In addition, there is no assurance that our mineral exploration activities will result in any discoveries of new ore bodies. If further mineralization is discovered, there is also no assurance that the commercial production of the mineralized material would be economical. Discovery of mineral deposits is dependent upon a number of factors and significantly influenced by the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation, and environmental protection requirements.
Current wording
Furthermore, even if further mineralization is discovered, there is no assurance that commercial production of the mineralized material would be economical. The commercial viability of any mineral deposit is dependent on factors beyond our control, such as the
Previous wording
Perpetua Resources’ mineral resource and mineral reserve estimates may not be indicative of the actual gold or other minerals that can be mined.
Current wording
Perpetua Resources’ Mineral Resource and Mineral Reserve estimates may not be indicative of the actual gold, antimony or other minerals that can be mined.
Previous wording
Assay results from core drilling or reverse circulation drilling can be subject to errors at the laboratory analyzing the drill samples. In addition, reverse circulation or core drilling may lead to samples which may not be representative of the gold, antimony or other metals in the entire deposit. Mineral resource and mineral reserve estimates are based on interpretation of available facts and extrapolation or interpolation of data and may not be representative of the actual deposit. In the context of mineral exploration and future development, there is inherent variability between duplicate samples taken adjacent to each other and between sampling points that cannot be reasonably eliminated. There may also be unknown geologic details that have not been identified or correctly appreciated at the current level of delineation in these types of investigations. This results in uncertainties that cannot be reasonably eliminated from the estimation process. Some of the resulting variances can have a positive effect and others can have a negative effect on mining and processing operations. The calculations of amounts of mineralized material within Mineral Resources and Mineral Reserves are estimates only. Actual recoveries of gold, antimony and other potential by-products from Mineral Resources and Mineral Reserves may be lower than those indicated by test work. Any material change in the quantity of mineralization, grade, tonnage or stripping ratio, or the price of gold, antimony and other potential by-products, may affect the economic viability of a mineral property. In addition, there can be no assurance that the recoveries of gold, antimony and other potential by-products in small-scale laboratory tests will be duplicated in larger scale pilot plant tests under on-site conditions or during production. Notwithstanding the results of any metallurgical
Current wording
Assay results from core drilling or reverse circulation drilling can be subject to errors at the laboratory analyzing the drill samples. In addition, reverse circulation or core drilling may lead to samples which may not be representative of the gold, antimony or other metals in the entire deposit. Mineral Resource and Mineral Reserve estimates are based on interpretation of available facts and extrapolation or interpolation of data and may not be representative of the actual deposit. In the context of mineral exploration and future development, there is inherent variability between duplicate samples taken adjacent to each other and between sampling points that cannot be reasonably eliminated. There may also be unknown geologic details that have not been identified or correctly appreciated at the current level of delineation in these types of investigations. This results in uncertainties that cannot be reasonably eliminated from the estimation process. Some of the resulting variances can have a positive effect and others can have a negative effect on mining and processing operations. The calculations of amounts of mineralized material within Mineral Resources and Mineral Reserves are estimates only. Actual recoveries of gold, antimony and other potential by-products from Mineral Resources and Mineral Reserves may be lower than those indicated by test work. Any material change in the quantity of mineralization, grade, tonnage or stripping ratio, or the price of gold, antimony and other potential by-products, may affect the economic viability of a mineral property. In addition, there can be no assurance that the recoveries of gold, antimony and other potential by-products in small-scale laboratory tests will be duplicated in larger scale pilot plant tests under on-site conditions or during production. Notwithstanding the results of any metallurgical testing or pilot plant tests for metallurgy and other factors, there remains the possibility that the ore may not react in commercial production in the same manner as it did in testing.
Previous wording
Information concerning our mining properties inItem 2, Properties has been prepared in accordance with the requirements of Regulation S-K subpart 1300. A mineral is economically recoverable when the price at which it can be sold exceeds the costs and expenses of mining, processing and selling the mineral. Mineral reserve and mineral resource estimates of the gold, silver and antimony in our mining properties are based on many factors, including engineering, economic and geological data assembled and analyzed by internal staff and third parties, which includes various engineers and geologists, the area and volume covered by mining rights, assumptions regarding extraction rates and duration of mining operations, and the quality of in-place mineral reserves and mineral resources. The mineral reserve and mineral resource estimates as to both quantity and quality are updated from time to time to reflect, among other matters, new data received.
Current wording
Information concerning our mining properties in “Item 2. Properties” below has been prepared in accordance with the requirements of S-K 1300. A mineral is economically recoverable when the price at which it can be sold exceeds the costs and expenses of mining, processing and selling the mineral. Mineral Reserve and Mineral Resource estimates of the gold, silver and antimony in our mining properties are based on many factors, including engineering, economic and geological data assembled and analyzed by internal staff and third parties, which includes various engineers and geologists, the area and volume covered by mining rights, assumptions regarding extraction rates and duration of mining operations, and the quality of in-place Mineral Reserves and Mineral Resources. The
Previous wording
Perpetua Resources’ properties consist of various mining concessions in the United States that provide both mineral and surface rights. Under U.S. law, the concessions may be subject to prior unregistered agreements or transfers, which may affect the validity of the Company’s ownership of such concessions. For example, the Company does not hold surface rights on portions of six of the patented mill sites within the boundaries of the Project site. The Company has engaged in discussions with the owner of the property to acquire those lands and holds a right of first refusal with predefined terms, but there is no certainty that a transaction will be finalized. A claim by a third party asserting prior unregistered agreements or transfers on any of Perpetua Resources’ mineral properties, especially where commercially viable Mineral Reserves have been located, could adversely result in Perpetua Resources losing commercially viable Mineral Reserves. Even if a claim is unsuccessful, it may potentially affect Perpetua Resources’ current activities due to the high costs of defending against such claims and its impact on senior management’s time. If the Company loses a commercially viable Mineral Reserve, such a loss could lower Perpetua Resources’ revenues or cause it to cease operations if this Mineral Reserve represented all or a significant portion of Perpetua Resources’ operations at the time of the loss.
Current wording
Perpetua Resources’ properties consist of various mining concessions in the United States that provide both mineral and surface rights. Under U.S. law, the concessions may be subject to prior unregistered agreements or transfers, which may affect the validity of the Company’s ownership of such concessions. For example, Hecla Mining Company (“Hecla”) retains surface rights on portions of six of the patented mill sites within the boundaries of the Project site but holds no mineral rights and IGRCLLC has a right to use the surface for various purposes and holds a right of first refusal should those surface rights be offered for sale. The Company is exploring alternatives with respect to this property, which may include acquiring such property from Hecla. A claim by a third party asserting prior unregistered agreements or transfers on any of Perpetua Resources’ mineral properties, especially where commercially viable Mineral Reserves have been located, could adversely result in Perpetua Resources losing commercially viable Mineral Reserves. Even if a claim is unsuccessful, it may potentially affect Perpetua Resources’ current activities due to the high costs of defending against such claims and its impact on senior management’s time. If the Company loses a commercially viable Mineral Reserve, such a loss could lower Perpetua Resources’ revenues or cause it to cease operations if this Mineral Reserve represented all or a significant portion of Perpetua Resources’ operations at the time of the loss.
Previous wording
Certain of the Company’s mineral rights consist of unpatented mining claims. Unpatented mining claims present unique title risks due to the potential requirements for validity under Unites States law and the opportunities for third-party challenge. In the lawsuit filed in February 2025 in the U.S. District Court for the District of Idaho challenging the validity of the USFS FEIS and ROD for the Project, the plaintiffs have alleged that certain of the unpatented mining claims held by Perpetua Resources are not valid under U.S. law for certain proposed used approved in the ROD. While the Company believes that USFS has properly determined that Perpetua Resources’ unpatented mining claims included within the proposed Project are valid under U.S. law, there can be no assurance the Company will successfully defend against this challenge.
Current wording
filed on February 18, 2025 in the U.S. District Court for the District of Idaho challenging the validity of the USFS FEIS and ROD for the Project, the plaintiffs have alleged that certain of the unpatented mining claims held by Perpetua Resources are not valid under U.S. law for certain proposed uses approved in the ROD. Claims of a similar nature challenging the validity of under U.S. law for certain proposed uses approved in the ROD were made in the lawsuit filed by the Nez Perce Tribe in August 2025 in the U.S. District Court for the District of Idaho. While the Company believes that USFS has properly determined that Perpetua Resources’ unpatented mining claims included within the proposed Project are valid and properly authorize the proposed Project uses under U.S. law, there can be no assurance the Company will successfully defend against these challenges. See “Item 3. Legal Proceedings” for additional information.
Previous wording
We have a history of net losses and we expect to incur net losses for the foreseeable future. The Project has not advanced to the commercial production stage and we have no history of earnings or cash flow from operations. We expect to continue to incur net losses unless and until such time as the Project commences commercial production and generates sufficient revenues to fund continuing operations. The development of our mineral properties to achieve production will require the commitment of substantial financial resources. The amount and timing of expenditures will depend on a number of factors, including the progress of ongoing exploration and development, the results of consultants’ analyses and recommendations, the rate at which operating losses are incurred, the process of obtaining required government permits and approvals, responding to opposition to the Project, including potential litigation, the availability and cost of financing, the participation of our partners, and the execution of any sale or joint venture agreements with strategic partners. These factors, and others, are beyond our control. There is no assurance that we will be profitable in the future.
Current wording
We have a history of net losses and we expect to incur net losses for the foreseeable future. The Project has only recently commenced construction and has not advanced to the commercial production stage and we have no history of earnings or cash flow from operations. We expect to continue to incur net losses unless and until such time as the Project commences commercial production and generates sufficient revenues to fund continuing operations. The development of our mineral properties to achieve production will require the commitment of substantial financial resources to construct the Project and satisfy other requirements of applicable governmental regulators, financing counterparties and other stakeholders. The amount and timing of expenditures will depend on a number of factors, including the timing and terms of any financing arrangements we enter into for the construction of the Project, the process of obtaining required government permits and approvals, and responding to opposition to the Project, including potential litigation Certain of these factors, and others, are outside of our control. There is no assurance that we will be profitable in the future.
Previous wording
The mineral resource industry is intensively competitive in all of its phases, and Perpetua Resources competes with many companies possessing much greater financial and technical research resources for the acquisition of mineral claims, leases and other mineral interests, as well as for the recruitment and retention of qualified employees and other personnel. Competition is particularly
Current wording
The mineral resource industry is intensively competitive in all of its phases, and Perpetua Resources competes with many companies possessing much greater financial and technical resources for the development and construction of mineral properties, including access to construction materials and recruitment and retention of qualified employees, contractors and other personnel. The remote location of the Stibnite Gold Project, roughly 100-150 miles northeast of Boise, Idaho, presents additional logistical challenges. The Project is estimated to require approximately 1,000 workers at peak construction and about 400 workers for mine operations, necessitating the recruitment and retention of a large workforce for both construction and ongoing operations in a rural area with limited local labor availability. We expect to compete for these skilled workers not only with other resource projects in the region but also with other mines being developed nationally, and our ability to attract, mobilize, and retain the necessary personnel could be significantly constrained by competition, wage pressures and the availability of suitable accommodations and support services. In addition to labor and materials, competition is particularly intense with respect to the acquisition of critical minerals such as antimony. While the Corporation’s competitive strength is due, in part, to having the only antimony reserves in the United States, there is currently significant focus on domestic antimony supply among potential producers, processors and the U.S. government. This includes recent government financing and policy support announced for other potential sources of antimony, which may alter the strategic importance of our Project and impact our ability to access funding or government support. Should additional accessible sources of antimony become available or demand be reduced, our competitive position, as well as our ability to attract capital and government support, may be adversely affected.
Previous wording
Our mining, exploration, and development operations are subject to extensive environmental, health, and safety laws and regulations in the jurisdictions in which we operate and include those relating to the discharge and remediation of materials in the environment, waste management, and natural resource protection and preservation. Numerous governmental authorities, such as the U.S. EPA and analogous state agencies, have the authority to enforce compliance with these laws and regulations and the permits issued thereunder, oftentimes requiring difficult and costly response actions. Certain environmental laws, such as CERCLA, can impose strict, joint and several liability for costs required to remediate and restore sites where hazardous substances have been stored or released, including sites subject to legacy contamination. We may be required to remediate contaminated properties currently owned and operated by us regardless of whether such contamination resulted from our actions or from the conduct of others. Additionally, claims for damages to persons or property, including damages to natural resources, may result from the environmental, health, and safety impacts of our operations.
Current wording
laws, such as CERCLA, can impose strict, joint and several liability for costs required to remediate and restore sites where hazardous substances have been stored or released, including sites subject to legacy contamination. We may be required to remediate contaminated properties currently owned and operated by us regardless of whether such contamination resulted from our actions or from the conduct of others. Additionally, claims for damages to persons or property, including damages to natural resources, may result from the environmental, health and safety impacts of our operations.
Previous wording
Our operations, including permitting, currently are and in the future may be subject to legal challenges, which could result in adverse impacts to our business and financial condition.
Current wording
Our operations, including permits, currently are and in the future may be subject to legal challenges, which could result in adverse impacts to our business and financial condition.
Previous wording
Additionally, following the USFS’ publication of the ROD and FEIS Errata authorizing the mine plan for the Project, subject to various requirements, claims were filed in the U.S. District Court for the District of Idaho against the USFS and other federal agencies
Current wording
Our mining, exploration and development operations, including Project construction and operations and the regulatory authorizations required for such activities, may be subject to legal challenges at the international, federal, state and local level by various parties. Such legal challenges may allege non-compliance with laws and regulations by regulatory agencies or the Company and may seek to invalidate permits or regulatory actions regarding the Project or future projects undertaken by the Company. For example, on February 18, 2025 following the USFS’ publication of its ROD and FEIS authorizing the Project, subject to conditions such as approval of the mine plan of operations and other plans and posting of required financial assurance, claims were filed in the U.S. District Court for the District of Idaho against the USFS and other federal agencies by a number of claimants. The claims allege, among other things,
Previous wording
Additionally, our Project is located in a mining district with significant impacts from legacy mining operations prior to our acquisition of and legal interests in certain properties. Pursuant to CERCLA and other statutes, we may be subject to liability and remediation responsibilities with respect to these sites under applicable law, consent decrees or similar agreements.
Current wording
Additionally, our Project is located in a mining district with significant impacts from legacy mining operations of other mine operators prior to our acquisition of legal interests in certain properties. Pursuant to CERCLA and other statutes, there is a risk that we may be subject to liability and remediation responsibilities with respect to these sites under applicable law, consent decrees or similar agreements. The Company is currently party to an ASAOC with the U.S. Environmental Protection Agency and U.S. Department of Agriculture issued pursuant to CERCLA. In the ASAOC, the Company agreed voluntarily to undertake specified response actions under an approved scope of work with respect to certain impacts from legacy mining operations. The response actions performed to date by the Company do not address all legacy conditions at the Project site, and it is uncertain whether the Company and the federal agencies will agree on additional scopes of work and if not, what, if any, regulatory or legal actions may be taken by the federal agencies. Also, the Company is subject to certain restrictions on the use of the Project mine site under the ASAOC and certain other consent decrees and agreements previously entered into by third parties and governmental authorities related to legacy mining impacts at the Project site.
Previous wording
Legal challenges such as those described above and elsewhere in this Annual Report may result in adverse impacts to our planned operations such as increased defense costs (to the extent we are a party to such challenges), the performance of additional mitigation and remedial activities, or significant delays to our Project. We may also be subject to more localized opposition, including efforts by environmental groups, which could attract negative publicity or have an adverse impact on our reputation.
Current wording
Lawsuits and legal challenges to governmental permits and Project approvals, such as those described above and elsewhere in this Annual Report, as well as legal proceedings or administrative challenges that may be brought in the future, may result in adverse impacts to our planned operations such as increased defense costs (to the extent we are a party to such challenges), the performance of additional mitigation and remedial activities, loss or modification permits for the Project, significant delays to our Project or increases to the construction or operating costs of the Project. We may also be subject to national or more localized opposition, including efforts by environmental groups, which could attract negative publicity or have an adverse impact on our reputation.
Previous wording
Increasing attention to, and societal expectations on companies to address, climate change and other environmental and social impacts, investor, regulatory and societal expectations regarding voluntary and mandatory ESG-related disclosures may result in increased costs, reduced profits, increased investigations and litigation, negative impacts on our stock price and reduced access to capital.
Current wording
Increasing attention to, and societal expectations on companies to address, climate change and other environmental and social impacts, investor, regulatory and societal expectations regarding voluntary and mandatory sustainability-related disclosures may result in increased costs, reduced profits, increased investigations and litigation, negative impacts on our stock price and reduced access to capital.
Previous wording
Moreover, while we may create and publish voluntary disclosures regarding ESG matters from time to time, certain statements in those voluntary disclosures may be based on hypothetical expectations and assumptions that may or may not be representative of current or actual risks or events or forecasts of expected risks or events, including the costs associated therewith. Mandatory ESG-related disclosure is also emerging as an area where we may be, or may become, subject to required disclosures in certain jurisdictions, and any such mandatory disclosures may similarly necessitate the use of hypothetical, projected or estimated data, some of which is not controlled by us and is inherently subject to imprecision. Disclosures reliant upon such expectations and assumptions are necessarily uncertain and may be prone to error or subject to misinterpretation given the long timelines involved and the lack of an established single approach to identifying, measuring and reporting on many ESG matters. Additionally, while we may announce various voluntary ESG targets in the future, due to our status as a development stage company, such targets are aspirational. Also, we may not be able to meet such targets in the manner or on such a timeline as initially contemplated and we cannot guarantee that such targets will improve our ESG profile, including, but not limited to, as a result of unforeseen costs or technical difficulties associated with achieving such results. Further, despite any voluntary actions, we may receive pressure from certain investors, lenders, employees or other groups to adopt more aggressive ESG-related targets or policies, but we cannot guarantee that we will be able to implement such targets because of potential costs or technical or operational obstacles. Furthermore, we could be criticized by various anti-ESG stakeholders for the scope of our ESG-related goals or policies, our strategic choices regarding ESG matters as they may impact our operations now or in the future, or for any revisions to the same, as well as initiatives we may pursue or any public statements we may make. We could be subjected to negative responses by governmental actors (such as anti-ESG legislation or retaliatory legislative or administrative treatment) or consumers (such as boycotts or negative publicity campaigns), which could adversely affect our reputation, business, financial performance, market access and growth.
Current wording
assumptions are necessarily uncertain and may be prone to error or subject to misinterpretation given the long timelines involved and the lack of an established single approach to identifying, measuring and reporting on many sustainability matters. Additionally, while we may announce various sustainability targets in the future, due to our status as a development stage company, such targets are aspirational. Also, we may not be able to meet such targets in the manner or on such a timeline as initially contemplated and we cannot guarantee that such targets will improve our sustainability profile, including, but not limited to, as a result of unforeseen costs or technical difficulties associated with achieving such results. Further, despite any voluntary actions, we may receive pressure from certain investors, lenders, employees or other groups to adopt more aggressive sustainability -related targets or policies, but we cannot guarantee that we will be able to implement such targets because of potential costs or technical or operational obstacles. Furthermore, we could be criticized by stakeholders that oppose sustainability policies (which have been labeled by some as anti-ESG movements) for the scope of our sustainability goals or policies, our strategic choices regarding such matters as they may impact our operations now or in the future, or for any revisions to the same, as well as initiatives we may pursue or any public statements we may make. We could be subjected to negative responses by governmental actors (such as anti-ESG legislation or retaliatory legislative or administrative treatment) or consumers (such as boycotts or negative publicity campaigns), which could adversely affect our reputation, business, financial performance, market access and growth.
Previous wording
organizations that provide information to investors on corporate governance and related matters have developed ratings processes for evaluating companies on their approach to ESG matters. Currently, there are no universal standards for such ratings, rankings and voting policies, they often differ based on the provider and the data they prioritize and they are continually changing. However, such ratings, rankings and voting policies may be used by some investors to inform their investment and voting decisions. Additionally, certain investors may use these ratings or rankings to benchmark companies against their peers, and if a company is perceived as lagging, these investors may engage with companies to require improved ESG disclosure or performance. Moreover, certain members of the broader investment community may consider a company’s sustainability score rating or ranking as a reputational or other factor in making an investment decision. Consequently, unfavorable ESG ratings could lead to increased negative investor sentiment toward us and could impact our stock price and access to and costs of capital. Additionally, to the extent ESG matters negatively impact our reputation, we may not be able to compete as effectively to recruit or retain employees, which may adversely impact our business. Furthermore, there has recently been backlash from certain governments and investors against ESG funds and investment practices that has resulted in increased scrutiny and withdrawals from such funds. Such backlash has also resulted in “anti-ESG” focused activism and investment funds, which may result in additional strains on our resources. If we are unable to meet the often conflicting ESG standards or investment, lending, ratings, or voting criteria and policies set by these parties, we may lose investors, investors may allocate a portion of their capital away from us, we may face increased ESG- or anti-ESG-focused activism, our cost of capital may increase, and our reputation may also be negatively affected.
Current wording
Some capital markets participants are increasingly using certain components of sustainability as a factor in their assessments, which could impact our cost of capital or access to financing. There has also been an acceleration in investor demand for sustainability investing opportunities, and many institutional investors have committed to increasing the percentage of their portfolios that are allocated towards sustainability-focused investments. As a result, there has been a proliferation of sustainability-focused investment funds and market participants seeking sustainability-oriented investment products. There has also been an increase in third-party providers of company sustainability ratings and rankings, and an increase in sustainability-focused voting policies among proxy advisory firms, portfolio managers and institutional investors. For example, organizations that provide information to investors on corporate governance and related matters have developed ratings processes for evaluating companies on their approach to sustainability matters. Currently, there are no universal standards for such ratings, rankings and voting policies, they often differ based on the provider and the data they prioritize and they are continually changing. However, such ratings, rankings and voting policies may be used by some investors to inform their investment and voting decisions. Additionally, certain investors may use these ratings or rankings to benchmark companies against their peers, and if a company is perceived as lagging, these investors may engage with companies to require improved ESG disclosure or performance. Moreover, certain members of the broader investment community may consider a company’s sustainability score rating or ranking as a reputational or other factor in making an investment decision. Consequently, unfavorable sustainability ratings could lead to increased negative investor sentiment toward us and could impact our stock price and access to and costs of capital. Additionally, to the extent sustainability approaches negatively impact our reputation, we may not be able to compete as effectively to recruit or retain employees, which may adversely impact our business. Furthermore, there has recently been backlash from certain governments and investors against ESG funds and investment practices that has resulted in increased scrutiny and withdrawals from such funds. Such backlash has also resulted in “anti-ESG” focused activism and investment funds, which may result in additional strains on our resources. If we are unable to meet the often conflicting ESG standards or investment, lending, ratings, or voting criteria and policies set by these parties, we may lose investors, investors may allocate a portion of their capital away from us, we may face increased ESG- or anti-ESG-focused activism, our cost of capital may increase, and our reputation may also be negatively affected.
Previous wording
Our reputation, as well as our stakeholder relationships, could be adversely impacted as a result of, among other things, any failure to meet our ESG plans or targets or stakeholder perceptions of statements made by us, our employees and executives, agents, or other third parties or public pressure from investors or policy groups to change our policies. Furthermore, public statements with respect to ESG matters—for example, emission reduction goals, other environmental targets, or other commitments addressing certain social issues—are becoming increasingly subject to heightened scrutiny from public and governmental authorities related to the risk of potential “greenwashing,” i.e., misleading information or false claims overstating potential ESG benefits. We may face increased litigation risk from private parties and governmental authorities related to our ESG efforts, including the perception that we are doing too much or too little on ESG issues. Additionally, any alleged claims of greenwashing against us or others in our industry could lead to negative sentiment and the diversion of investment. To the extent that we are unable to respond timely and appropriately to any negative publicity, our reputation could be harmed. Damage to our overall reputation could have a negative impact on our financial results and require additional resources to rebuild our reputation.
Current wording
Our reputation, as well as our stakeholder relationships, could be adversely impacted as a result of, among other things, any failure to meet our sustainability plans or targets or stakeholder perceptions of statements made by us, our employees and executives, agents, or other third parties or public pressure from investors or policy groups to change our policies. Furthermore, public statements with respect to sustainability matters—for example, emission reduction goals, other environmental targets, or other commitments addressing certain social issues—are becoming increasingly subject to heightened scrutiny from public and governmental authorities related to the risk of potential “greenwashing,” i.e., misleading information or false claims overstating potential sustainability benefits. We may face increased litigation risk from private parties and governmental authorities related to our sustainability efforts, including the perception that we are doing too much or too little on sustainability issues. Additionally, certain activist groups have targeted others in our industries with claims of greenwashing related to sustainability efforts, and it is possible that such claims could be made against us or others in our industry, which could lead to negative sentiment and the diversion of investment. To the extent that we are unable to respond timely and appropriately to any negative publicity, our reputation could be harmed. Damage to our overall reputation could have a negative impact on our financial results and require additional resources to rebuild our reputation.
Previous wording
Perpetua Resources depends on key personnel for critical management decisions and industry contacts but does not maintain key person insurance.
Current wording
We depend on key personnel for critical management decisions and to manage our business effectively.
Previous wording
Certain Perpetua Resources directors and officers also serve as officers and/or directors of other mining companies, which may give rise to conflicts.
Current wording
Certain Perpetua Resources directors also serve as officers, directors or major shareholders of other mining companies, which may give rise to conflicts.
Previous wording
Certain Perpetua Resources directors and officers are also directors, officers or shareholders of other companies that are similarly engaged in the business of acquiring, developing and exploiting natural resource properties. Such associations may give rise to conflicts of interest from time to time. Directors and officers of the Corporation with conflicts of interest are subject to and are required to follow the procedures set out in applicable corporate and securities legislation, regulations, rules and the Corporation’s policies.
Current wording
Certain Perpetua Resources directors and officers are also directors, officers or major shareholders of other companies that are similarly engaged in the business of acquiring, developing and exploiting natural resource properties. Such associations may give rise to conflicts of interest from time to time. Directors and officers of the Corporation with conflicts of interest are subject to and are required to follow the procedures set out in applicable corporate and securities legislation, regulations, rules and the Corporation’s policies.
Previous wording
Additionally, the Corporation is not insured against most environmental risks. Insurance against all environmental risks (including potential liability for pollution or other hazards as a result of the disposal of waste products by third parties occurring as part of historic exploration and production) has not been generally available to companies within the industry. The Corporation periodically evaluates the cost and coverage of the insurance that is available against certain environmental risks to determine if it would be appropriate to obtain such insurance. Without such insurance, or with limited amounts of such insurance, and should the Corporation become subject to environmental liabilities, the payment of such liabilities would reduce or eliminate its available funds or could exceed the funds the Corporation has to pay such liabilities and could result in bankruptcy. Should the Corporation be unable to fully fund the remedial cost of an environmental problem, it might be required to enter into costly interim compliance measures pending completion of the required remedy.
Current wording
Additionally, the Corporation is not insured against all environmental risks. Insurance against all environmental risks (including potential liability for pollution or other hazards as a result of the disposal of waste products by third parties occurring as part of historic exploration and production) has not been generally available to companies within the industry. The Corporation periodically evaluates the cost and coverage of the insurance that is available against certain environmental risks to determine if it would be appropriate to obtain such insurance. Without such insurance, or with limited amounts of such insurance, and should the Corporation become subject
Previous wording
Resource exploration and development is a speculative business, characterized by a high number of failures. Substantial expenditures are required to discover new deposits and to develop the infrastructure, mining and processing facilities at any site chosen for mining. Resource exploration and development also involves a high degree of risk, which even a combination of experience, knowledge and careful evaluation may not be able to adequately mitigate. Few properties that are explored are ultimately developed into producing mines, and there is no assurance that commercial quantities of ore will be discovered on any of the Company’s exploration properties. There is also no assurance that, even if commercial quantities of ore are discovered, a mineral property will be brought into commercial production, or if brought into production, that it will be profitable. The discovery of mineral deposits is dependent upon a number of factors, including the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon, among a number of other factors, its size, grade, proximity to infrastructure, current metal prices, and government regulations, including regulations relating to required permits, royalties, allowable production, importing and exporting of minerals and environmental protection. The exact effect of these factors cannot be accurately predicted, but any one of these factors, or the combination of any of these factors, may prevent Perpetua Resources from receiving an adequate return on invested capital. In addition, depending on the type of mining operation involved, several years can elapse from the initial phase of drilling until commercial operations are commenced. Some ore reserves may become unprofitable to develop if there are unfavourable long-term market price fluctuations in gold or other metals, or if there are significant increases in operating or capital costs. Most of the above factors are beyond the Company’s control, and it is difficult to ensure that the exploration or development programs proposed by Perpetua Resources will result in a profitable commercial mining operation. Please also see, among other things, sectionItem 1A, Risk Factors - Perpetua Resources’ future exploration and development efforts may be unsuccessful above.
Current wording
Resource exploration and development is a speculative business, characterized by a high number of failures. Substantial expenditures are required to discover new deposits and to develop the infrastructure, mining and processing facilities at any site chosen for mining. Resource exploration and development also involves a high degree of risk, which even a combination of experience, knowledge and careful evaluation may not be able to adequately mitigate. Few properties that are explored are ultimately developed into producing mines, and there is no assurance that commercial quantities of ore will be discovered on any of the Company’s exploration properties. There is also no assurance that, even if commercial quantities of ore are discovered, a mineral property will be brought into commercial production, or if brought into production, that it will be profitable. The discovery of mineral deposits is dependent upon a number of factors, including the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon, among a number of other factors, its size, grade, proximity to infrastructure, current metal prices and government regulations, including regulations relating to required permits, royalties, allowable production, importing and exporting of minerals and environmental protection. The exact effect of these factors cannot be accurately predicted, but any one of these factors, or the combination of any of these factors, may prevent Perpetua Resources from receiving an adequate return on invested capital with respect to its existing Mineral Reserves and Mineral Resources, or any future exploration activities. In addition, depending on the type of mining operation involved, several years can elapse from the initial phase of drilling until commercial operations are commenced. Some ore reserves may become unprofitable to develop if there are unfavourable long-term market price fluctuations in gold or other metals, or if there are significant increases in operating or capital costs. Most of the above factors are beyond the Company’s control, and it is difficult to ensure that the exploration or development programs proposed by Perpetua Resources will result in a profitable commercial mining operation. Please also see, among other things,“— Perpetua Resources’ future exploration efforts may be unsuccessful” above.
Previous wording
losses and periodic interruptions due to inclement or hazardous weather conditions, and the inability to obtain suitable or adequate machinery, equipment or labor, are some of the industry operating risks involved in the conduct of exploration programs and the operation of mines. If any of these events were to occur, they could cause injury or loss of life, environmental damage, operational delays, cost overruns or other monetary losses and/or severe damage to or destruction of mineral properties, production facilities or other properties. As a result, Perpetua Resources could be the subject of a regulatory investigation, potentially leading to penalties and suspension of operations. In addition, Perpetua Resources may have to make expensive repairs and could be subject to legal liability as an outcome of regulatory enforcement. The occurrence of any of these operating risks and hazards may have an adverse effect on Perpetua Resources’ financial condition and operations, and correspondingly on the value and price of Perpetua Resources’ common shares.
Current wording
The Project, and any future operations in which Perpetua Resources has a direct or indirect interest, will be subject to all the hazards and risks normally incidental to resource companies and mining in general. Environmental hazards, unusual or unexpected geological operating conditions, such as rock bursts, structural cave-ins and landslides, fires, earthquakes and flooding, power outages, labor disruptions, industrial accidents such as explosions, unexpected mining dilution, metallurgical and other processing issues, metal losses and periodic interruptions due to inclement or hazardous weather conditions, and the inability to obtain suitable or adequate machinery, equipment or labor, are some of the industry operating risks involved in the conduct of exploration programs and the operation of mines. If any of these events were to occur, they could cause injury or loss of life, environmental damage, operational delays, cost overruns or other monetary losses including, but not limited to, severe damage to or destruction of mineral properties, production facilities or other properties. As a result, Perpetua Resources could be the subject of a regulatory investigation, potentially leading to penalties and suspension of operations. In addition, Perpetua Resources may have to make expensive repairs and could be subject to legal liability as an outcome of regulatory enforcement. The occurrence of any of these operating risks and hazards may have an adverse effect on Perpetua Resources’ financial condition and operations, and correspondingly on the value and price of Perpetua Resources’ common shares.
Previous wording
Perpetua Resources may not be able to obtain insurance to cover these risks at affordable premiums or at all. Insurance against certain environmental risks, including potential liability for pollution or other hazards as a result of operations or other mining activities, is not generally available to Perpetua Resources or to other companies within the mining industry. Perpetua Resources may suffer a materially adverse effect on its business if it incurs losses related to any significant events that are not covered by its insurance policies. Please also see, among other things, the risk factor found under the subheading “Perpetua Resources’ business involves risks for which Perpetua Resources may not be adequately insured, if it is insured at all” above.
Current wording
Perpetua Resources may not be able to obtain insurance to cover these risks at affordable premiums or at all. Insurance against certain environmental risks, including potential liability for pollution or other hazards as a result of operations or other mining activities, is not generally available to Perpetua Resources or to other companies within the mining industry. Perpetua Resources may suffer a materially adverse effect on its business if it incurs losses related to any significant events that are not covered by its insurance policies. Please also see, among other things, “—Perpetua Resources’ business involves risks for which Perpetua Resources may not be adequately insured, if it is insured at all” above.
Previous wording
Increases in metal prices tend to encourage increases in mining exploration, development, and construction activities. During past expansions, demand for and the cost of contract exploration, development and construction services and equipment have increased as well. Increased demand for and cost of services and equipment could cause project costs to increase materially, resulting in delays if services or equipment cannot be obtained in a timely manner due to inadequate availability, and increased potential for scheduling difficulties and cost increases due to the need to coordinate the availability of services or equipment, any of which could materially increase project exploration, development, or construction costs, result in project delays, or both. There can be no assurance that increased costs may not adversely affect the exploration and/or development of our mineral properties in the future.
Current wording
Increases in metal prices tend to encourage increases in mining exploration, development and construction activities. During past expansions, demand for and the cost of contract exploration, development and construction services and equipment have increased as well. Increased demand for and cost of services and equipment could cause project costs to increase materially, resulting in delays if services or equipment cannot be obtained in a timely manner due to inadequate availability, and increased potential for scheduling difficulties and cost increases due to the need to coordinate the availability of services or equipment, any of which could materially increase project exploration, development, or construction costs, result in project delays, or both. There can be no assurance that increased costs may not adversely affect the exploration or the development of our mineral properties in the future.
Previous wording
The U.S. inflation rate steadily rose in 2021 and into 2022 before eventually declining modestly throughout 2023 and 2024. A sustained increase in inflation may continue to increase our costs for labor, services, and materials, which, in turn, could cause our operating costs and capital expenditures to increase materially and may have an adverse effect on our results of operations and financial condition.
Current wording
Higher than usual inflation remains a concern, as do interest rates in the United States and other regions. A sustained increase in inflation may continue to increase our costs for labor, services and materials, which, in turn, could cause our operating costs and capital expenditures to increase materially and may have an adverse effect on our results of operations and financial condition.
Previous wording
Additionally, the Federal Reserve and other central banks have implemented policies in an effort to curb inflationary pressure on the costs of goods and services across the U.S., including the significant increases in prevailing interest rates that occurred during 2022 and 2023 as a result of an increase in the federal funds rate, and the associated macroeconomic impact on slowdown in economic growth could negatively impact our business. While the Federal Reserve reduced benchmark interest rates in late 2024, the continuation of rates at the current level could have the effects of raising the cost of capital and depressing economic growth, either of which—or the combination thereof—could hurt the financial and operating results of our business.
Current wording
In addition, continued volatility in financial markets, uncertainty around future monetary policy and any renewed increase in inflationary pressures may further heighten these risks. Although interest rates are declining, they are still relatively high compared to recent years. While the Federal Reserve reduced benchmark interest rates in late 2025, the continuation of rates at the current level could have the effects of raising the cost of capital and depressing economic growth, either of which, or the combination thereof, could delay or deter our development of the Project.
Previous wording
The requirements of being a public company in the United States and Canada and maintaining a dual listing on both Nasdaq and the TSX, including compliance with the reporting requirements of the Exchange Act, the requirements of the Sarbanes-Oxley Act of 2002 (“Sarbanes-Oxley”) and applicable securities laws of Canada, may strain our resources, increase our costs, and require significant management time and resources.
Current wording
The requirements of being a public company in the United States and Canada and maintaining a dual listing on both Nasdaq and the TSX, including compliance with the reporting requirements of the Exchange Act, the requirements of the Sarbanes-Oxley and applicable securities laws of Canada, may strain our resources, increase our costs and require significant management time and resources.
Previous wording
As a public company in the United States, we need to comply with federal and state laws, regulations and requirements, certain corporate governance provisions of Sarbanes-Oxley, related regulations of the SEC and the requirements of Nasdaq, with which we are not otherwise required to comply as a public company in Canada listed on the Toronto Stock Exchange (the “TSX”). These additional requirements may strain our resources, increase our costs and require significant management time and resources. Specifically, we may incur significant additional accounting, legal, reporting and other expenses in order to maintain a dual listing on both Nasdaq and the TSX, including the costs of listing on two exchanges. Complying with these statutes, regulations and requirements, as well as any applicable securities laws of Canada, occupies a significant amount of time of our Board of Directors (the “Board”) and management and increases our costs and expenses, including an increased reliance on outside counsel and accountants. We also prepare and distribute periodic public reports in compliance with our obligations under the U.S. federal securities laws, in addition to applicable securities laws of Canada.
Current wording
As a public company in the United States, we need to comply with federal and state laws, regulations and requirements, certain corporate governance provisions of Sarbanes-Oxley, related regulations of the SEC and the requirements of Nasdaq, with which we are not otherwise required to comply as a public company in Canada listed on the Toronto Stock Exchange (the “TSX”). These additional requirements may strain our resources, increase our costs and require significant management time and resources. Specifically, we may incur additional accounting, legal, reporting and other expenses in order to maintain a dual listing on both Nasdaq and the TSX, including the costs of listing on two stock exchanges. Complying with these statutes, regulations and requirements, as well as any applicable securities laws of Canada, occupies a significant amount of time of our management and increases our costs and expenses, including an increased reliance on outside counsel and accountants. We also prepare and distribute periodic public reports in compliance with our obligations under the U.S. federal securities laws, in addition to applicable securities laws of Canada.
Previous wording
If we are unable to assert that our internal controls over financial reporting are effective, or if our independent registered public accounting firm is unable to express an opinion on the effectiveness of our internal controls to the extent required, we could lose investor confidence in the accuracy and completeness of our financial reports, which could cause the price of our common stock to decline, and we may be subject to investigation or sanctions by the SEC.
Current wording
registered public accounting firm identifies any material weaknesses in our internal controls, or if we are unable to maintain effective internal controls, investors may lose confidence in the accuracy and completeness of our financial reports, the market price of our common shares could be adversely affected, and we could become subject to litigation or regulatory actions, all of which could have a material adverse effect on our business, financial condition and results of operations.
Showing the first 40 of 54 pairs. Open the source sections for the rest.
Rearranged current paragraphs (9)
Current report — wording carried from elsewhere
The costs, timing and complexities of mine construction and development are increased by the remote location of the Project, with additional challenges related thereto, including access, water and power supply and other support infrastructure. The lack of availability of such infrastructure on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay further development of the Project. Cost estimates have in the past and may in the future increase significantly as more detailed
Current report — wording carried from elsewhere
Mineral Reserve and Mineral Resource estimates as to both quantity and quality are updated from time to time to reflect, among other matters, new data received.
Current report — wording carried from elsewhere
Certain of the Company’s mineral rights consist of unpatented mining claims. Unpatented mining claims present unique title risks due to the potential requirements for validity under Unites States law and the opportunities for third-party challenge. In the lawsuit
Current report — wording carried from elsewhere
Our exploration, development and construction activities are, and our mining operations will be, subject to extensive environmental, health and safety laws and regulations in the jurisdictions in which we operate and include those relating to the discharge and remediation of materials in the environment, waste management and natural resource protection and preservation. Numerous governmental authorities, such as the U.S. EPA and analogous state agencies, have the authority to enforce compliance with these laws and regulations and the permits issued thereunder, oftentimes requiring difficult and costly response actions. Certain environmental
Current report — wording carried from elsewhere
Additionally, due to the nature of our business and our status as a publicly traded company, we may be subject to regulatory investigations, claims, lawsuits and other proceedings, including proceedings related to claims brought pursuant to federal securities laws, in the ordinary course of our business. The results of these or other legal proceedings that may arise cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business.
Current report — wording carried from elsewhere
Moreover, while we may create and publish voluntary or mandatory disclosures regarding sustainability matters from time to time, certain statements in those disclosures may be based on hypothetical expectations and assumptions that may or may not be representative of current or actual risks or events or forecasts of expected risks or events, including the costs associated therewith. Mandatory sustainability-related disclosure is also emerging as an area where we may be, or may become, subject to required disclosures in certain jurisdictions, and any such mandatory disclosures may similarly necessitate the use of hypothetical, projected or estimated data, some of which is not controlled by us and is inherently subject to imprecision. Disclosures reliant upon such expectations and
Current report — wording carried from elsewhere
to environmental liabilities, the payment of such liabilities would reduce or eliminate its available funds or could exceed the funds the Corporation has to pay such liabilities and could result in bankruptcy. Should the Corporation be unable to fully fund the remedial cost of an environmental problem, it might be required to enter into costly interim compliance measures pending completion of the required remedy.
Current report — wording carried from elsewhere
If Paulson or its affiliates sell a substantial number of our common shares in the public market, the market price of the common shares could fall. The perception among the public that these sales will occur could also contribute to a decline in the market price of our common shares.
Current report — wording carried from elsewhere
In addition, as a general matter, the frequency and magnitude of cyberattacks is increasing and attackers have become more sophisticated. Cyberattacks are similarly evolving and include without limitation use of malicious software, surveillance, credential stuffing, spear phishing, social engineering, use of deepfakes (i.e., highly realistic synthetic media generated by artificial intelligence),
Rearranged previous paragraphs (5)
Previous report — wording carried elsewhere
testing or pilot plant tests for metallurgy and other factors, there remains the possibility that the ore may not react in commercial production in the same manner as it did in testing.
Previous report — wording carried elsewhere
Some capital markets participants are increasingly using certain components of ESG as a factor in their assessments, which could impact our cost of capital or access to financing. There has also been an acceleration in investor demand for ESG investing opportunities, and many institutional investors have committed to increasing the percentage of their portfolios that are allocated towards ESG-focused investments. As a result, there has been a proliferation of ESG-focused investment funds and market participants seeking ESG-oriented investment products. There has also been an increase in third-party providers of company ESG ratings and rankings, and an increase in ESG-focused voting policies among proxy advisory firms, portfolio managers, and institutional investors. For example,
Previous report — wording carried elsewhere
The Project, and any future operations in which Perpetua Resources has a direct or indirect interest, will be subject to all the hazards and risks normally incidental to resource companies and mining in general. Environmental hazards, unusual or unexpected geological operating conditions, such as rock bursts, structural cave-ins and landslides, fires, earthquakes and flooding, power outages, labor disruptions, industrial accidents such as explosions, unexpected mining dilution, metallurgical and other processing issues, metal
Previous report — wording carried elsewhere
not less than 10% of our common shares. Andrew Cole and Marcelo Kim are Paulson’s nominees to the Board and Marcelo Kim was appointed Chairman of our Board in March of 2020.
Previous report — wording carried elsewhere
until deployed. We may also be unable to investigate or remediate incidents as attackers are increasingly using techniques and tools designed to circumvent controls, to avoid detection, and to remove or obfuscate forensic evidence.