What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-07-31; filed 2025-09-09.
0001558370-25-011952
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-01-31; filed 2026-03-09.
0001104659-26-024970
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 258 previous paragraphs and 196 current paragraphs.
91 unchanged; 83 reworded; 11 added; 60 removed; 24 previous and 11 current paragraphs rearranged.
Tables are not compared: 37 previous and 33 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (11)
Current report
FuelCell Energy is a clean energy technology company and a stationary fuel cell manufacturer with 22 years of operating experience in this field. We were founded in 1969 to research and develop electrochemical power generation technology and are headquartered in Danbury, Connecticut. Since the early 2000s, we have been manufacturing, selling and servicing our proprietary molten carbonate fuel cell systems, which deliver large-scale, continuous clean power and advanced emissions management. Unlike traditional power generation methods that rely on combustion, our fuel cells generate electricity electrochemically through a chemical reaction rather than burning fuel, resulting in ultra-low emissions and high efficiency. Our carbonate fuel cell systems are fuel-flexible, with the ability to run on biofuels, renewable natural gas, or hydrogen-hydrocarbon blends, and provide reliable baseload power, carbon capture, and thermal energy for chilling, heating, and process steam. As global energy demand rises driven by artificial intelligence (“AI”), electrification, and the need for enhanced grid resiliency, we believe solutions like ours will be vital in addressing next-generation needs, helping to strengthen the grid, reducing pollution, and supporting decarbonization goals. We have proven utility-scale projects operating at 10 MW, 20 MW, and 58.8 MW, with an average of over 10 years of continuous run time. As a company, we are motivated by our purpose of enabling a world empowered by clean energy.
Current report
In addition to our existing core molten carbonate-based commercial products, we engage strategically in research and development, both company-funded and carried out under grants from and commercial agreements with private companies and various government agencies through our Advanced Technologies programs. Our Advanced Technologies programs are currently focused on continued development and advancement of our core carbonate fuel cell technology as well as commercialization of our solid oxide electrolysis technology for distributed hydrogen. We focus on generating revenue from our core recurring and non-recurring revenue sources, while working to identify the next trends in clean energy we believe we can commercialize, take to market, and grow into future revenue streams.
Current report
Other income, net
Current report
Other income, net was $0.5 million and $0.7 million for the three months ended January 31, 2026 and 2025, respectively. Other income, net for the three months ended January 31, 2026 and 2025 relates primarily to unrealized gains of $0.4 million and $0.9 million, respectively, on the OpCo Financing Facility interest rate swap derivative.
Current report
During the first quarter of fiscal year 2026, the Company closed on the 2025 EXIM Financing (as defined elsewhere herein), resulting in gross proceeds of approximately $25.0 million, and net proceeds to the Company of approximately $22.7 million after deducting customary fees and transaction costs of $2.3 million. Under the credit agreement for the 2025 EXIM Financing and through an amendment to the credit agreement for the 2024 EXIM Financing (as defined elsewhere herein), the Company is required to maintain, throughout the remaining term of the credit agreement for the 2024 EXIM Financing and the term of the credit agreement for the 2025 EXIM Financing, a total minimum cash balance of $55.0 million. The amendment to the credit agreement for the 2024 EXIM Financing, which was executed in conjunction with and at the same time as the credit agreement for the 2025 EXIM Financing, reduced the total minimum cash balance requirement from $100.0 million to $55.0 million.
Current report
Generation Projects in Process
Current report
In December 2025, we entered into an amendment of our PPA with the University of Connecticut (“UConn”). Under our amended PPA with UConn, the project was modified to replace the four 250 kW solid oxide fuel cell power generation systems totaling 1 MW contemplated by the original PPA, with one 1.125 MW molten carbonate fuel cell power generation system. The current expectation is that we will complete construction in calendar year 2027 and commence commercial operations in December of 2027, subject in each case to completing customary development steps.
Current report
Overall, backlog decreased by approximately 10.8% to $1.17 billion as of January 31, 2026, compared to $1.31 billion as of January 31, 2025, primarily as a result of revenue recognition over the period, partially offset by new contract backlog.
Current report
The Company has also developed plans to site future final assembly and conditioning facilities in alternate locations, to the extent supported by future demand. We believe this “hub and spoke” model will enable these processes to be optimized closer to customer locations with the potential to reduce logistics cost, lead time and operating costs including the cost of fuel required for conditioning. This “hub and spoke” model can also free up space to further scale cell manufacturing in the Torrington facility above 350 MW. The Company has experience with localized final assembly and conditioning in both South Korea and Germany. Beyond the Torrington facility, the Company also has plans to develop high volume cell manufacturing facilities in the future in size ranges of 500 MW to 1 GW and above as supported by future demand. Other than the estimated capital expenditures described above, the Company has not committed funding to these expansion plans. As part of our expansion planning, we are reviewing various assistance and financial programs offered by municipalities, states and the federal government in the United States to provide subsidies, investment tax credits and other assistance programs to potentially off-set future investments by the Company.
Current report
2025 EXIM Financing
Current report
2024 EXIM Financing
Removed paragraphs (60)
Previous report
At FuelCell Energy, our purpose is to enable a world powered by clean energy. We are a global leader in delivering a variety of clean energy solutions to address some of the world’s most critical challenges around energy access, resilience, reliability, affordability, safety and security. Since our inception, FuelCell Energy has been innovating and developing commercial technologies that produce clean electricity, heat, clean hydrogen, and water. We are also proud to be at the forefront of what we believe to be one of the most critical technologies required to achieve the world’s overall emissions objectives: carbon capture. Today, we offer commercial technology that produces clean electricity, heat, clean hydrogen, and water and is also capable of recovering and capturing carbon for utilization and/or sequestration, depending on product configuration and application. We also continue to make targeted investments in product development and commercializing technologies that are expected to add new capabilities to our platforms’ abilities to deliver hydrogen and long duration hydrogen-based energy storage through our solid oxide technologies, as well as further enhance our existing platforms’ carbon capture solutions.
Previous report
FuelCell Energy, headquartered in Danbury, Connecticut, was founded in 1969 as a New York corporation to provide applied research and development services on a contract basis. We completed our initial public offering in 1992 and reincorporated in Delaware in 1999. We began selling stationary fuel cell power plants commercially in 2003.
Previous report
Impairment expense
Previous report
Impairment expense of $64.5 million for the three months ended July 31, 2025 related to the Company's prior investments in solid oxide technology, including related goodwill and in-process research and development (“IPR&D”) intangible assets, property, plant and equipment and solid oxide inventory. Of the $64.5 million, approximately $42.1 million was related to property, plant and equipment, approximately $9.0 million was related to inventory, approximately $9.3 million was related to IPR&D intangible assets, and approximately $4.1 million was related to goodwill.
Previous report
Other income (expense), net
Previous report
Other income (expense), net was $3.9 million and $(2.2) million for the three months ended July 31, 2025 and 2024, respectively. Other income, net for the three months ended July 31, 2025 relates primarily to $3.4 million of employee retention credits earned during the COVID-19 pandemic that were received during the three months ended July 31, 2025, as well as an unrealized gain of $0.6 million on the OpCo Financing Facility interest rate swap derivative. Other expense, net for the three months ended July 31, 2024 relates primarily to an unrealized loss on the OpCo Financing Facility interest rate swap derivative of $2.4 million.
Previous report
Comparison of the Nine Months Ended July 31, 2025 and 2024
Previous report
Revenues and Costs of revenues
Previous report
Product revenues
Previous report
Product revenues for the nine months ended July 31, 2025 were $39.1 million, compared to $0.3 million of product revenue for the nine months ended July 31, 2024. Product revenues for the nine months ended July 31, 2025 were driven primarily by $36.0 million of revenue recognized under the Company’s LTSA with GGE for the delivery and commissioning of twelve fuel cell modules for GGE’s 58.8 MW fuel cell power plant platform in Hwaseong-si, Korea. Product revenues for the nine months ended July 31, 2025 also include $3.1 million of product revenues recognized under the Company’s sales contract with Ameresco, Inc., which was entered into during the second quarter of fiscal year 2024, pursuant to which the Company is to provide a 2.8 MW carbonate fuel cell platform to the Sacramento Area Sewer District.
Previous report
Cost of product revenues totaled $48.4 million in the nine months ended July 31, 2025, compared to $9.5 million in the nine months ended July 31, 2024. The increase in cost of product revenues in the nine months ended July 31, 2025 is primarily due to the cost of delivering and commissioning twelve fuel cell modules for GGE’s 58.8 MW fuel cell power plant platform in Hwaseong-si, Korea and the costs of product revenues recognized under the Company’s sales contract with Ameresco, Inc. Manufacturing variances, primarily related to production volumes and unabsorbed overhead costs, decreased to approximately $8.5 million for nine months ended July 31, 2025, compared to approximately $8.6 million for the nine months ended July 31, 2024.
Previous report
Service agreements revenues
Previous report
Service agreements revenues and related costs for the nine months ended July 31, 2025 and 2024 were as follows:
Previous report
Service agreements revenues for the nine months ended July 31, 2025 increased $8.7 million to $13.1 million from $4.4 million for the nine months ended July 31, 2024. The increase in service agreements revenues during the nine months ended July 31, 2025 was primarily driven by revenues recognized for module exchanges under the Company’s LTSA with United Illuminating in New Haven, Connecticut, and partially from revenue recognized under the Company’s LTSA with GGE for service provided by the Company to GGE’s 58.8 MW fuel cell power plant platform in Hwaseong-si, Korea. During the nine months ended July 31, 2024, there were no module exchanges.
Previous report
Cost of service agreements revenues increased $10.1 million to $14.4 million for the nine months ended July 31, 2025 from $4.3 million for the nine months ended July 31, 2024. Cost of service agreements revenues includes maintenance and operating costs and costs of module exchanges. The increase reflects higher costs due to the module exchanges during the nine months ended July 31, 2025, while there were no module exchanges during the nine months ended July 31, 2024.
Previous report
Overall gross loss from service agreements revenues was $1.3 million for the nine months ended July 31, 2025, compared to a gross profit of $0.1 million for the nine months ended July 31, 2024. The overall gross margin was (9.6)% for the nine months ended July 31, 2025 compared to a gross margin of 2.2% in the nine months ended July 31, 2024. This decrease in gross margin was primarily due to the fact that work performed during the nine months ended July 31, 2025 was performed pursuant to service agreements with lower margins.
Previous report
Generation revenues
Previous report
Generation revenues and related costs for the nine months ended July 31, 2025 and 2024 were as follows:
Previous report
Cost of generation revenues totaled $49.0 million in the nine months ended July 31, 2025, compared to $61.1 million in the nine months ended July 31, 2024. The overall decrease in cost of generation revenues is primarily due to a decrease in expensed construction costs related to the Toyota Project, which were $0.6 million in the nine months ended July 31, 2025 compared to $6.3 million in the nine months ended July 31, 2024 (which also included expensed gas costs). During the nine months ended July 31, 2025, the Company incurred a mark-to-market net gain of $2.0 million related to natural gas purchase contracts. During the nine months ended July 31, 2024, the Company incurred a mark-to-market net loss of $5.1 million related to natural gas purchase contracts. Cost of generation revenues also decreased due to downtime from maintenance activities performed during the nine months ended July 31, 2025. Cost of generation revenues for the nine months ended July 31, 2024 also included an impairment charge of $1.1 million relating to project assets then under construction relating to the PPAs for Trinity College and for UConn (as defined elsewhere herein). Cost of generation
Previous report
revenues included depreciation and amortization of approximately $24.4 million and $21.3 million for the nine months ended July 31, 2025 and 2024, respectively.
Previous report
Advanced Technologies contract revenues
Previous report
Advanced Technologies contract revenues and related costs for the nine months ended July 31, 2025 and 2024 were as follows:
Previous report
Cost of Advanced Technologies contract revenues were $11.1 million for the nine months ended July 31, 2025, compared to $12.9 million for the nine months ended July 31, 2024.
Previous report
Advanced Technologies contracts for the nine months ended July 31, 2025 generated a gross profit of $4.0 million, compared to a gross profit of $7.2 million for the nine months ended July 31, 2024. The decrease in gross profit was due primarily to lower margins on some of the contracts under which revenues were recognized during the nine months ended July 31, 2025 compared to the nine months ended July 31, 2024.
Previous report
Administrative and selling expenses
Previous report
Research and development expenses
Previous report
Restructuring expense
Previous report
Restructuring expense of $5.6 million for the nine months ended July 31, 2025 was a result of the Company’s workforce reductions in November 2024 and June 2025, which represented approximately 13% and 22% of the Company’s global workforce, respectively, and were intended to reduce operating costs, realign resources toward advancing the Company's
Previous report
core carbonate technologies, and protect the Company's competitive position amid slower-than-expected market investments in clean energy. The workforce was reduced across our global operations including Calgary, Canada and at our North American production facility in Torrington, Connecticut, at our corporate offices in Danbury, Connecticut and at other remote locations.
Previous report
Impairment expense
Previous report
Impairment expense of $64.5 million for the nine months ended July 31, 2025 related to the Company's prior investments in solid oxide technology, including related goodwill and IPR&D intangible assets, property, plant and equipment and solid oxide inventory. Of the $64.5 million, approximately $42.1 million was related to property, plant and equipment, approximately $9.0 million was related to inventory, approximately $9.3 million was related to IPR&D intangible assets, and approximately $4.1 million was related to goodwill.
Previous report
Loss from operations
Previous report
Loss from operations for the nine months ended July 31, 2025 was $164.0 million compared to $117.5 million for the nine months ended July 31, 2024. This increase was driven primarily by the impairment and restructuring expenses recognized during the nine months ended July 31, 2025, partially offset by decreases in Administrative and selling expenses and Research and development expenses compared to the comparable prior year period and a $5.2 million decrease in gross loss.
Previous report
Interest expense
Previous report
Interest income
Previous report
Interest income was $6.4 million and $10.7 million for the nine months ended July 31, 2025 and 2024, respectively. The decrease in interest income during the nine months ended July 31, 2025 was primarily driven by lower money market investments compared to the nine months ended July 31, 2024, partially offset by interest of $0.5 million earned on employee retention credits from the Internal Revenue Service. These employee retention credits were earned during the COVID-19 pandemic and accrued interest until such credits were received by the Company during the nine months ended July 31, 2025. Interest income for the nine months ended July 31, 2025 represents interest earned on money market investments, interest earned on investments in U.S. Treasury Securities and interest earned on employee retention credits. Interest income for the nine months ended July 2024 represents interest earned on money market investments and interest earned on investments in U.S. Treasury Securities.
Previous report
Other income (expense), net
Previous report
Other income (expense), net was $3.5 million and $(3.3) million for the nine months ended July 31, 2025 and 2024, respectively. Other income, net for the nine months ended July 31, 2025 primarily relates to employee retention credits earned during the COVID-19 pandemic of $3.4 million that were received during the three months ended July 31, 2025, as well as an unrealized loss of $0.2 million on the OpCo Financing Facility interest rate swap derivative. Other expense, net for the nine months ended July 31, 2024 primarily relates to an unrealized loss on the OpCo Financing Facility interest rate swap derivative of $3.2 million.
Previous report
Provision for income taxes
Previous report
ended July 31, 2025 was $0.1 million, and provision for income tax recorded for the nine months ended July 31, 2024 was $2.0 thousand.
Showing the first 40 of 60 passages. Open the source sections for the rest.
Reworded paragraphs (83)
Previous wording
This Quarterly Report on Form 10-Q contains statements that the Company believes to be “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 (the “PSLRA”). All statements other than statements of historical fact included in this Form 10-K, including statements regarding the Company’s future financial condition, results of operations, plans, objectives, expectations, future performance, business operations and business prospects, are forward-looking statements. Words such as “expects,” “anticipates,” “estimates,” “goals,” “projects,” “intends,” “plans,” “believes,” “predicts,” “should,” “seeks,” “will,” “could,” “would,” “may,” “forecast,” and similar expressions and variations of such words are intended to identify forward-looking statements and are included, along with this statement, for purposes of complying with the safe harbor provisions of the PSLRA. Forward-looking statements are neither historical facts, nor assurances of future performance. Instead, such statements are based only on our beliefs, expectations, and assumptions regarding the future. As such, the realization of matters expressed in forward-looking statements involves inherent risks and uncertainties. Such statements relate to, among other things, the following: (i) the development and commercialization by FuelCell Energy, Inc. and its subsidiaries of fuel cell technology and products and the market for such products; (ii)the expected timing of completion of our ongoing projects; (iii) our business plans and strategies; (iv) the markets in which we expect to operate; (v)expected operating results such as revenue growth and earnings; (vi) our belief that we have sufficient liquidity to fund our business operations for the next 12 months; (vii) future funding under Advanced Technologies contracts; (viii) future financing for projects, including equity and debt investments by investors and commercial bank financing, as well as overall financial market conditions; (ix) the expected cost competitiveness of our technology; (x) our ability to successfully implement our restructuring plans during the expected timeframe and the expected effects and impacts of the Company’s restructuring plans; and (xi) our ability to achieve our sales plans, our plans to increase our annualized production rate in the future in connection with sales growth, market access and market expansion goals, and cost reduction targets.
Current wording
This Quarterly Report on Form 10-Q contains statements that the Company believes to be “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 (the “PSLRA”). All statements other than statements of historical fact included in this Form 10-Q, including statements regarding the Company’s future financial condition, results of operations, plans, objectives, expectations, future performance, business operations and business prospects, are forward-looking statements. Words such as “expects,” “anticipates,” “estimates,” “goals,” “projects,” “intends,” “plans,” “believes,” “predicts,” “should,” “seeks,” “will,” “could,” “would,” “may,” “forecast,” and similar expressions and variations of such words are intended to identify forward-looking statements and are included, along with this statement, for purposes of complying with the safe harbor provisions of the PSLRA. Forward-looking statements are neither historical facts, nor assurances of future performance. Instead, such statements are based only on our beliefs, expectations, and assumptions regarding the future. As such, the realization of matters expressed in forward-looking statements involves inherent risks and uncertainties. Such statements relate to, among other things, the following: (i) the development and commercialization by FuelCell Energy, Inc. and its subsidiaries of fuel cell technology and products and the market for such products; (ii)the expected timing of completion of our ongoing projects; (iii) our business plans and strategies; (iv) the markets in which we expect to operate; (v)expected operating results such as revenue growth and earnings; (vi) our belief that we have sufficient liquidity to fund our business operations for the next 12 months; (vii) future funding under Advanced Technologies contracts; (viii) future financing for projects, including equity and debt investments by investors and commercial bank financing, as well as overall financial market conditions; (ix) the expected cost competitiveness of our technology; (x) our ability to successfully implement our restructuring plans during the expected timeframe and the expected effects and impacts of the Company’s restructuring plans; and (xi) our ability to achieve our sales plans, our plans to increase our annualized production rate in the future in connection with sales growth, market access and market expansion goals, and cost reduction targets.
Previous wording
The forward-looking statements contained in this report are subject to risks and uncertainties, known and unknown, that could cause actual results and future events to differ materially from those set forth in or contemplated by the forward-looking statements, including, without limitation, the risks described in our Annual Report on Form 10-K for the fiscal year ended October 31, 2024 and in the section below entitled “Item 1A. Risk Factors,” and the following risks and uncertainties: general risks associated with product development and manufacturing; general economic conditions; changes in interest rates, which may impact project financing; supply chain disruptions; changes in the utility regulatory environment; changes in the utility industry and the markets for distributed generation, distributed hydrogen, and fuel cell power plants configured for carbon capture or carbon separation; potential volatility of commodity prices that may adversely affect our projects; availability of government subsidies and economic incentives for alternative energy technologies; risks that our restructuring plans will not result in the intended benefits or savings or will result in unanticipated costs, including but not limited to additional charges and/or higher than expected costs or will yield unintended consequences to our remaining workforce and results of operations; our ability to remain in compliance with U.S. federal and state and foreign government laws and regulations; our ability to maintain compliance with the listing rules of The Nasdaq Stock Market; rapid technological change; competition; the risk that our bid awards will not convert to contracts or that our contracts will not convert to revenue; market acceptance of our products; changes in accounting policies or practices adopted voluntarily or as required by accounting principles generally accepted in the United States (“GAAP”); factors affecting our liquidity position and financial condition; government appropriations; the ability of the government and third parties to terminate their development contracts at any time; the ability of the government to exercise “march-in” rights with respect to certain of our patents; our ability to successfully market and sell our products internationally; our ability to develop additional commercially viable products; our ability to implement our strategy; our ability to reduce our levelized cost of energy and deliver on our cost reduction strategy generally; our ability to protect our intellectual property; litigation and other proceedings; the risk that commercialization of our new products will not occur when anticipated or, if it does, that we will not have adequate capacity to satisfy demand; our need for and the availability of additional financing; our ability to generate positive cash flow from operations; our ability to service our long-term debt; our ability to increase the output and longevity of our platforms and to meet the performance requirem…
Excerpt shortened here; the source contains the full paragraph.
Current wording
The forward-looking statements contained in this report are subject to risks and uncertainties, known and unknown, that could cause actual results and future events to differ materially from those set forth in or contemplated by the forward-looking statements, including, without limitation, the risks described in our Annual Report on Form 10-K for the fiscal year ended October 31, 2025 and in the section below entitled “Item 1A. Risk Factors,” and the following risks and uncertainties: general risks associated with product development and manufacturing; general economic conditions; changes in interest rates, which may impact project financing; supply chain disruptions; changes in the utility regulatory environment; changes in the utility industry and the markets for distributed generation, distributed hydrogen, and fuel cell power plants configured for carbon capture or carbon separation; potential volatility of commodity prices that may adversely affect our projects; availability of government subsidies and economic incentives for alternative energy technologies; risks that our restructuring plans will not result in the intended benefits or savings or will result in unanticipated costs, including but not limited to additional charges and/or higher than expected costs or will yield unintended consequences to our remaining workforce and results of operations; our ability to remain in compliance with U.S. federal and state and foreign government laws and regulations; our ability to maintain compliance with the listing rules of The Nasdaq Stock Market; rapid technological change; competition; the risk that our bid awards will not convert to contracts or that our contracts will not convert to revenue; market acceptance of our products; changes in accounting policies or practices adopted voluntarily or as required by accounting principles generally accepted in the United States (“GAAP”); factors affecting our liquidity position and financial condition; government appropriations; the ability of the government and third parties to terminate their development contracts at any time; the ability of the government to exercise “march-in” rights with respect to certain of our patents; our ability to successfully market and sell our products internationally; our ability to develop additional commercially viable products in the future; our ability to implement our strategy; our ability to reduce our levelized cost of energy and deliver on our cost reduction strategy generally; our ability to protect our intellectual property; litigation and other proceedings; the risk that commercialization of our new products will not occur when anticipated or, if it does, that we will not have adequate capacity to satisfy demand; our need for and the availability of additional financing; our ability to generate positive cash flow from operations; our ability to service our long-term debt; our ability to increase the output and longevity of our platforms and to meet the perfor…
Excerpt shortened here; the source contains the full paragraph.
Previous wording
successful; we will be able to obtain financing or raise capital to achieve our business plans; the government will appropriate the funds anticipated by us under our government contracts; the government will not exercise its right to terminate any or all of our government contracts; or we will be able to achieve any other result anticipated in any other forward-looking statement contained herein.
Current wording
We cannot assure you that: we will be able to meet any of our development or commercialization schedules; any of our new products or technologies, once developed, will be commercially successful; our power plants will be commercially successful; we will be able to obtain financing or raise capital to achieve our business plans; the government will appropriate the funds anticipated by us under our government contracts; the government will not exercise its right to
Previous wording
Management’s Discussion and Analysis of Financial Condition and Results of Operations is provided as a supplement to the accompanying financial statements and footnotes to help provide an understanding of our financial condition, changes in our financial condition and results of operations. The preparation of financial statements and related disclosures requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and the disclosure of contingent assets and liabilities, as well as management’s assessment of the Company’s ability to meet its obligations as they come due over the next twelve months. Actual results could differ from those estimates. Estimates are used in accounting for, among other things, revenue recognition, lease right-of-use assets and liabilities, loss accruals on service agreements, excess, slow-moving and obsolete inventories, product warranty accruals, loss accruals on service agreements, share-based compensation expense, allowance for credit losses, depreciation and amortization, impairment of goodwill and in-process research and development intangible assets, impairment of long-lived assets (including project assets), valuation of derivatives, and contingencies. Estimates and assumptions are reviewed periodically, and the effects of revisions are reflected in the consolidated financial statements in the period they are determined to be necessary. Due to the inherent uncertainty involved in making estimates, actual results in future periods may differ from those estimates. The following discussion should be read in conjunction with information included in our Annual Report on Form 10-K for the fiscal year ended October 31, 2024 filed with the Securities and Exchange Commission (“SEC”). Unless otherwise indicated, the terms “Company”, “FuelCell Energy”, “we”, “us”, and “our” refer to FuelCell Energy, Inc. and its subsidiaries. All tabular dollar amounts are in thousands.
Current wording
Management’s Discussion and Analysis of Financial Condition and Results of Operations is provided as a supplement to the accompanying financial statements and footnotes to help provide an understanding of our financial condition, changes in our financial condition and results of operations. The preparation of financial statements and related disclosures requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and the disclosure of contingent assets and liabilities, as well as management’s assessment of the Company’s ability to meet its obligations as they come due over the next twelve months. Actual results could differ from those estimates. Estimates are used in accounting for, among other things, revenue recognition, lease right-of-use assets and liabilities, excess, slow-moving and obsolete inventories, product warranty accruals, loss accruals on service agreements, share-based compensation expense, allowance for credit losses, depreciation and amortization, impairment of goodwill and in-process research and development intangible assets, impairment of long-lived assets (including project assets), valuation of derivatives, and contingencies. Estimates and assumptions are reviewed periodically, and the effects of revisions are reflected in the consolidated financial statements in the period they are determined to be necessary. Due to the inherent uncertainty involved in making estimates, actual results in future periods may differ from those estimates. The following discussion should be read in conjunction with information included in our Annual Report on Form 10-K for the fiscal year ended October 31, 2025 filed with the Securities and Exchange Commission (“SEC”). Unless otherwise indicated, the terms “Company”, “FuelCell Energy”, “we”, “us”, and “our” refer to FuelCell Energy, Inc. and its subsidiaries. All tabular dollar amounts are in thousands.
Previous wording
We target a range of markets and applications with our products, including utilities and independent power producers, data centers, wastewater treatment, commercial and hospitality, food and beverage, and microgrids, among others. We market our products primarily in the United States, Europe and Korea, and we are also pursuing opportunities in other countries around the world. We target for expansion and development markets and geographic regions that benefit from and value clean distributed generation; are located where there are high energy costs, poor grid reliability, and/or challenged transmission and distribution lines; can leverage the multiple value streams delivered by our platforms (electricity, hydrogen, thermal, water, and carbon recovery); are aligned with regulatory frameworks that harmonize energy, economic and environmental policies; and are committed to reducing their Scope 1 and Scope 2 emissions.
Current wording
We target a range of markets and applications with our products, including utilities and independent power producers, data centers, wastewater treatment, commercial and hospitality, and microgrids, among others. We market our products primarily in the U.S. and Canada, the European Union and the United Kingdom, and priority Asian markets including South Korea, Singapore, Malaysia, and Thailand. We selectively pursue additional opportunities in other regions that align with our strategic priorities. We focus our expansion on markets and regions that value clean distributed generation, have poor grid reliability and/or challenged transmission and distribution lines, and can benefit from the value streams our products provide.
Previous wording
Total revenues for the three months ended July 31, 2025 of $46.7 million reflects an increase of $23.0 million from $23.7 million for the same period in the prior year. Cost of revenues for the three months ended July 31, 2025 of $51.9 million reflects an increase of $22.0 million from $29.9 million for the same period in the prior year. A discussion of the changes in product revenues, service agreements revenues, generation revenues and Advanced Technologies contract revenues follows.
Current wording
Total revenues for the three months ended January 31, 2026 of $30.5 million reflects an increase of $11.5 million from $19.0 million for the same period in the prior year. Cost of revenues for the three months ended January 31, 2026 of $36.4 million reflects an increase of $12.2 million from $24.2 million for the same period in the prior year. A discussion of the changes in product revenues, service agreements revenues, generation revenues and Advanced Technologies contract revenues follows.
Previous wording
Product revenues were $26.0 million during the three months ended July 31, 2025 and $0.3 million in the comparable prior year period. The increase in product revenues during the three months ended July 31, 2025 was primarily driven by $24.0 million of revenue recognized under the Company’s long-term service agreement (“LTSA”) with Gyeonggi Green Energy Co., Ltd. (“GGE”) for the delivery and commissioning of eight fuel cell modules for GGE’s 58.8 MW fuel cell power plant platform in Hwaseong-si, Korea, and $2.0 million of revenue recognized under the Company's sales contract with Ameresco, Inc., which was entered into during the second quarter of fiscal year 2024, pursuant to which the Company is to provide a 2.8 MW carbonate fuel cell platform to the Sacramento Area Sewer District.
Current wording
Product revenues were $12.0 million during the three months ended January 31, 2026 and $0.1 million in the comparable prior year period. The increase in product revenues during the three months ended January 31, 2026 was primarily driven by $6.0 million of revenue recognized under the Company’s long-term service agreement (“LTSA”) with Gyeonggi Green Energy Co., Ltd. (“GGE”) for the delivery and commissioning of two fuel cell modules for GGE’s 58.8 MW fuel cell power plant platform in Hwaseong-si, Korea (the “GGE Platform”), and $6.0 million of revenue recognized under the Company's LTSA with CGN-Yulchon Generation Co., Ltd. (“CGN”) for the delivery and commissioning of two fuel cell modules for CGN’s Yulchon facility in South Korea (the “CGN Platform”). Revenue for the three months ended January 31, 2026 was $6.0 million lower than planned, driven by the timing of commissioning for two delivered and installed modules that entered service in February 2026, for which commissioning was previously planned to take place within the three months ended January 31, 2026.
Previous wording
Cost of product revenues increased $24.9 million for the three months ended July 31, 2025 to $29.1 million, compared to $4.2 million in the same period in the prior year, primarily due to the higher product sales in the three months ended July 31, 2025. Manufacturing variances, primarily related to production volumes and unabsorbed overhead costs, totaled approximately $2.9 million for the three months ended July 31, 2025, compared to approximately $3.5 million for the three months ended July 31, 2024.
Current wording
Cost of product revenues increased $13.4 million for the three months ended January 31, 2026 to $16.4 million, compared to $3.0 million in the same period in the prior year, primarily due to the higher product sales in the three months ended January 31, 2026. Manufacturing variances, primarily related to production volumes and unabsorbed overhead costs, totaled approximately $4.1 million for the three months ended January 31, 2026, compared to approximately $2.7 million for the three months ended January 31, 2025.
Previous wording
For the three months ended July 31, 2025, we operated at an annualized production rate of approximately 33.2 MW in our Torrington, CT manufacturing facility, compared to an annualized production rate of 29.3 MW for the three months ended July 31, 2024.
Current wording
For the three months ended January 31, 2026, we operated at an annualized production rate of approximately 32.6 MW in our Torrington, CT manufacturing facility, compared to an annualized production rate of 31.2 MW for the three months ended January 31, 2025.
Previous wording
Service agreements revenues for the three months ended July 31, 2025 increased $1.7 million to $3.1 million from $1.4 million for the three months ended July 31, 2024. The increase in service agreements revenues during the three months ended July 31, 2025 was primarily driven by revenue recognized under the Company’s LTSA with GGE for service provided by the Company to GGE’s 58.8 MW fuel cell power plant platform in Hwaseong-si, Korea. There were no module exchanges during the three months ended July 31, 2025, and no module exchanges during the three months ended July 31, 2024.
Current wording
Service agreements revenues for the three months ended January 31, 2026 increased $1.3 million to $3.2 million from $1.8 million for the three months ended January 31, 2025. The increase in service agreements revenues during the three months ended January 31, 2026 was primarily driven by revenue recognized under the Company’s LTSA with GGE for service provided by the Company to the GGE Platform, due to the increased number of fuel cell modules in operation at the GGE Platform over the past year. There were no module exchanges during each of the three month periods ended January 31, 2026 and 2025.
Previous wording
Cost of service agreements revenues increased $2.5 million to $3.6 million for the three months ended July 31, 2025 from $1.1 million for the three months ended July 31, 2024, primarily driven by the cost of providing service under the Company’s LTSA with GGE.
Current wording
Cost of service agreements revenues increased $1.2 million to $2.8 million for the three months ended January 31, 2026 from $1.7 million for the three months ended January 31, 2025, primarily driven by the cost of providing service under the Company’s LTSA with GGE.
Previous wording
Overall gross loss from service agreements revenues was $(0.5) million for the three months ended July 31, 2025, compared to a gross profit of $0.3 million for the three months ended July 31, 2024. The overall gross margin was (16.4)% for the three months ended July 31, 2025 compared to a gross margin of 18.8% in the comparable prior year period. Gross margin was lower during the three months ended July 31, 2025 primarily due to the fact that work performed during the three months ended July 31, 2025 was performed pursuant to service agreements with lower margins.
Current wording
Overall gross profit from service agreements revenues was $0.4 million for the three months ended January 31, 2026, compared to a gross profit of $0.2 million for the three months ended January 31, 2025. The overall gross margin was 11.5% for the three months ended January 31, 2026 compared to a gross margin of 9.7% in the comparable prior year period.
Previous wording
Revenues from generation for the three months ended July 31, 2025 totaled $12.4 million, which represents a decrease of $1.0 million from the $13.4 million of revenue recognized for the three months ended July 31, 2024. The decrease in generation revenues reflects lower output from plants in our generation operating portfolio resulting from routine maintenance activities during the quarter. Generation revenues for the three months ended July 31, 2025 and 2024 reflect revenue from electricity generated under our power purchase agreements (“PPAs”) and the sale of renewable energy credits from our generation operating portfolio.
Current wording
Revenues from generation for the three months ended January 31, 2026 totaled $11.0 million, which represents a decrease of $0.4 million from the $11.3 million of generation revenues recognized for the three months ended January 31, 2025. The decrease in generation revenues reflects lower output from plants in our generation operating portfolio during the quarter compared to output from plants in our generation operating portfolio during the same period in the prior year. Generation revenues for the three months ended January 31, 2026 and 2025 reflect revenue from electricity generated under our power purchase agreements (“PPAs”) and the sale of renewable energy credits from our generation operating portfolio.
Previous wording
Cost of generation revenues totaled $15.3 million in the three months ended July 31, 2025, compared to $18.8 million in the three months ended July 31, 2024. The overall decrease in cost of generation revenues is primarily related to a mark-to-market net gain of $1.0 million related to natural gas purchase contracts recognized during the three months ended July 31, 2025, compared to a mark-to-market net loss of $0.9 million during the three months ended July 31, 2024. Cost of generation revenues for the three months ended July 31, 2024 also included an impairment charge of $1.1 million relating to project assets then under construction relating to the PPAs for Trinity College and for UConn (as defined elsewhere herein). Cost of generation revenues included depreciation and amortization of approximately $7.7 million and $7.3 million for the three months ended July 31, 2025 and 2024, respectively.
Current wording
Cost of generation revenues totaled $14.1 million for the three months ended January 31, 2026, compared to $15.3 million for the three months ended January 31, 2025. The overall decrease in cost of generation revenues is primarily related to a mark-to-market net gain of $3.6 million related to natural gas purchase contracts recognized during the three months ended January 31, 2026, compared to a mark-to-market net gain of $1.8 million during the three months ended January 31, 2025. Cost of generation revenues included depreciation and amortization of approximately $8.7 million and $8.0 million for the three months ended January 31, 2026 and 2025, respectively.
Previous wording
We currently have four projects with fuel sourcing risk, which are the Toyota Project, the 14.0 MW Derby Fuel Cell Project and the 2.8 MW SCEF Fuel Cell Project, both located in Derby, Connecticut (collectively, the “Derby Projects”), and our 7.4 MW project in Yaphank Long Island (the “LIPA Yaphank Project”), all of which require natural gas for which
Current wording
We currently have four projects with fuel sourcing risk, which are the Toyota Project, the 14.0 MW Derby Fuel Cell Project and the 2.8 MW SCEF Fuel Cell Project, the latter two of which are located in Derby, Connecticut (collectively, the “Derby Projects”), and our 7.4 MW project in Yaphank Long Island (the “LIPA Yaphank Project”), all of which require natural gas for which there is no pass-through mechanism. A one-year fuel supply contract (through May of 2026) has been executed for the Toyota Project. Six-year (through October 2029) fuel supply contracts have been executed for
Previous wording
there is no pass-through mechanism. A one-year fuel supply contract (through May of 2026) has been executed for the Toyota Project. Six-year (through October 2029) fuel supply contracts have been executed for the 14.0 MW and 2.8 MW Derby Projects. We are currently in the midst of a seven-year contract (through September 2028) for our 7.4 MW LIPA Yaphank Project. The Company will look to extend the duration of these contracts should market and credit conditions allow. If the Company is unable to secure fuel on favorable economic terms, it may result in impairment charges to the Derby Project assets or the LIPA Yaphank Project asset and further impairment charges for the Toyota Project asset.
Current wording
the 14.0 MW and 2.8 MW Derby Projects. We are currently in the midst of a seven-year contract (through September 2028) for our 7.4 MW LIPA Yaphank Project. The Company will look to extend the duration of these contracts should market and credit conditions allow. If the Company is unable to secure fuel on favorable economic terms, it may result in impairment charges to the Derby Project assets or the LIPA Yaphank Project asset and further impairment charges for the Toyota Project asset.
Previous wording
Advanced Technologies contract revenues for the three months ended July 31, 2025 decreased to $5.3 million from $8.6 million for the three months ended July 31, 2024. Advanced Technologies contract revenues recognized under our Joint Development Agreement with ExxonMobil Technology and Engineering Company (“EMTEC”) were approximately $3.1 million, revenues arising from the purchase order received from Esso Nederland B.V. (“Esso”), an affiliate of EMTEC and Exxon Mobil Corporation, related to the Rotterdam project were approximately $1.4 million and revenue recognized under government contracts and other contracts were approximately $0.8 million for the three months ended July 31, 2025. This compares to Advanced Technologies contract revenues recognized under our Joint Development Agreement with EMTEC of approximately $1.8 million, revenue recognized under the Esso purchase order of approximately $3.5 million and revenue recognized under government contracts and other contracts of approximately $3.3 million for the three months ended July 31, 2024.
Current wording
Advanced Technologies contract revenues for the three months ended January 31, 2026 decreased to $4.3 million from $5.7 million for the three months ended January 31, 2025. Advanced Technologies contract revenues recognized under our Joint Development Agreement with ExxonMobil Technology and Engineering Company (“EMTEC”) were approximately $1.7 million, revenues arising from the purchase order received from Esso Nederland B.V. (“Esso”), an affiliate of EMTEC and Exxon Mobil Corporation, related to the Rotterdam project were approximately $1.9 million and revenue recognized under government contracts and other contracts were approximately $0.7 million for the three months ended January 31, 2026. This compares to Advanced Technologies contract revenues recognized under our Joint Development Agreement with EMTEC of approximately $1.2 million, revenue recognized under the Esso purchase order of approximately $3.5 million and revenue recognized under government contracts and other contracts of approximately $1.1 million for the three months ended January 31, 2025.
Previous wording
Cost of Advanced Technologies contract revenues decreased to $3.8 million for the three months ended July 31, 2025, compared to $5.8 million for the three months ended July 31, 2024.
Current wording
Cost of Advanced Technologies contract revenues decreased to $3.1 million for the three months ended January 31, 2026, compared to $4.2 million for the three months ended January 31, 2025.
Previous wording
Advanced Technologies contracts for the three months ended July 31, 2025 generated a gross profit of $1.4 million, compared to a gross profit of $2.8 million for the same period in the prior year. The decrease was due primarily to lower margins on some of the contracts under which revenues were recognized during the three months ended July 31, 2025 compared to the three months ended July 31, 2024.
Current wording
Advanced Technologies contracts for the three months ended January 31, 2026 generated a gross profit of $1.2 million, compared to a gross profit of $1.5 million for the same period in the prior year.
Previous wording
Administrative and selling expenses were $14.1 million and $14.6 million for the three months ended July 31, 2025 and 2024, respectively. Administrative and selling expenses were lower during the three months ended July 31, 2025 than during the three months ended July 31, 2024 primarily due to lower compensation expense as a result of the restructuring actions in September of fiscal year 2024, and in November and June of fiscal year 2025.
Current wording
Administrative and selling expenses were $13.5 million and $15.0 million for the three months ended January 31, 2026 and 2025, respectively. Administrative and selling expenses were lower during the three months ended January 31, 2026 than during the three months ended January 31, 2025 primarily due to lower compensation expense as a result of the restructuring actions in November and June of fiscal year 2025.
Previous wording
Research and development expenses decreased to $7.6 million for the three months ended July 31, 2025 compared to $12.8 million for the three months ended July 31, 2024. The decrease is primarily due to a decrease in spending on the Company’s commercial development efforts related to our solid oxide power generation and electrolysis platforms and carbon separation and carbon recovery solutions compared to the comparable prior year period.
Current wording
Research and development expenses decreased to $7.0 million for the three months ended January 31, 2026 compared to $11.1 million for the three months ended January 31, 2025. The decrease is primarily due to a decrease in spending on the Company’s commercial development efforts related to our solid oxide power generation and electrolysis platforms and related lower compensation expense as a result of the restructuring actions in November and June of fiscal year 2025.
Previous wording
Restructuring expense of $4.1 million for the three months ended July 31, 2025 related to the Company’s workforce reductions in June 2025.
Current wording
Restructuring expense of $1.5 million for the three months ended January 31, 2025 related to the Company’s workforce reductions in November 2024. There were no comparable charges during the three months ended January 31, 2026.
Previous wording
Loss from operations for the three months ended July 31, 2025 was $95.4 million compared to $33.6 million for the three months ended July 31, 2024. This increase was driven primarily by the impairment and restructuring expenses recognized during the three months ended July 31, 2025, partially offset by decreases in Administrative and selling expenses and Research and development expenses compared to the comparable prior year period and a $1.1 million decrease in gross loss.
Current wording
Loss from operations for the three months ended January 31, 2026 was $26.3 million compared to $32.9 million for the three months ended January 31, 2025. This decrease was driven primarily by decreases in Administrative and selling expenses and Research and development expenses compared to the comparable prior year period.
Previous wording
Interest expense for the three months ended July 31, 2025 and 2024 was $2.5 million and $2.6 million, respectively. Interest expense for both periods includes interest on the Derby Senior Back Leverage Loan Facility and the Derby Subordinated Back Leverage Loan Facility (in each case, as defined elsewhere herein), which were entered into in April 2024, the OpCo Financing Facility (as defined elsewhere herein), which was entered into in May 2023, and interest on the Groton Senior Back Leverage Loan Facility and the Groton Subordinated Back Leverage Loan Facility (in each case, as defined elsewhere herein), which were entered into in August 2023. Interest expense for the three months ended July 31, 2025 also includes interest on the facility with EXIM (as defined elsewhere herein), which was entered into in October 2024.
Current wording
Interest expense for the three months ended January 31, 2026 and 2025 was $2.8 million and $2.6 million, respectively. Interest expense for both periods includes interest on the Derby Senior Back Leverage Loan Facility, the Derby Subordinated Back Leverage Loan Facility, the OpCo Financing Facility, the Groton Senior Back Leverage Loan Facility, the Groton Subordinated Back Leverage Loan Facility, and the 2024 EXIM Financing (in each case, as defined elsewhere herein), which was entered into in October 2024. Interest expense for the three months ended January 31, 2026 also includes interest on the 2025 EXIM Financing (as defined elsewhere herein), which was entered into in November 2025.
Previous wording
Interest income was $2.1 million and $3.3 million for the three months ended July 31, 2025 and 2024, respectively. The decrease in interest income during the three months ended July 31, 2025 was primarily driven by lower money market investments compared to the three months ended July 31, 2024, partially offset by interest of $0.5 million earned on employee retention credits from the Internal Revenue Service. These employee retention credits were earned during the COVID-19 pandemic and accrued interest until such credits were received by the Company during the three months ended July 31, 2025. Interest income for the three months ended July 31, 2025 represents interest earned on money market investments, interest earned on investments in U.S. Treasury Securities and interest earned on employee retention credits. Interest income for the three months ended July 31, 2024 represents interest earned on money market investments and interest earned on investments in U.S. Treasury Securities.
Current wording
Interest income was $2.5 million and $2.4 million for the three months ended January 31, 2026 and 2025, respectively. The increase in interest income during the three months ended January 31, 2026 was primarily driven by higher money market investments compared to the three months ended January 31, 2025. Interest income for the three months ended January 31, 2026 represents interest earned on money market investments. Interest income for the three months ended January 31, 2025 represents interest earned on money market investments and interest earned on investments in U.S. Treasury Securities.
Previous wording
We have not paid federal or state income taxes in several years due to our history of net operating losses, although we have paid foreign income and withholding taxes, primarily in Korea. Provision for income tax recorded for the nine months
Current wording
We have not paid federal or state income taxes in several years due to our history of net operating losses, although we have paid foreign income and withholding taxes, primarily in South Korea. Provision for income tax recorded for each of the three months ended January 31, 2026 and 2025 was $0.
Previous wording
For the three months ended July 31, 2025 and 2024, net loss attributable to noncontrolling interest totaled $(0.01) million and $(0.2) million, respectively, for the Groton Project tax equity financing transaction with East West Bank.
Current wording
For the three months ended January 31, 2026 and 2025, net loss attributable to noncontrolling interest totaled $3.9 million and $3.5 million, respectively, for the Groton Project tax equity financing transaction with East West Bank.
Previous wording
For the three months ended July 31, 2025 and 2024, net loss attributable to noncontrolling interest totaled $(0.6) million and $(0.4) million, respectively, for the LIPA Yaphank Project tax equity financing transaction with REI.
Current wording
For the three months ended January 31, 2026 and 2025, net income (loss) attributable to noncontrolling interest totaled $0.3 million and $(1.0) million, respectively, for the LIPA Yaphank Project tax equity financing transaction with REI.
Previous wording
For the three months ended July 31, 2025 and 2024, net income (loss) attributable to noncontrolling interest totaled $0.4 million and $(1.8) million, respectively, for the Derby Projects tax equity financing transaction with Franklin Park. The loss in the three months ended July 31, 2024 was primarily a result of accelerated depreciation allocated to the noncontrolling interest under the HLBV method.
Current wording
For both of the three month periods ended January 31, 2026 and 2025, net income attributable to noncontrolling interest totaled $0.4 million for the Derby Projects tax equity financing transaction with Franklin Park.
Previous wording
Net loss attributable to common stockholders represents the net loss for the period less the preferred stock dividends on the Series B Preferred Stock. For the three month periods ended July 31, 2025 and 2024, net loss attributable to common stockholders was $92.5 million and $33.5 million, respectively, and net loss per common share was $3.78 and $1.99, respectively. The increase in net loss attributable to common stockholders and net loss per common share was primarily due to the impairment and restructuring expenses recognized during the three months ended July 31, 2025. The net loss per share for the three months ended July 31, 2025 benefitted from the higher number of weighted average shares outstanding due to share issuances since July 31, 2024.
Current wording
Net loss attributable to common stockholders represents the net loss for the period less the preferred stock dividends on the Series B Preferred Stock. For the three month periods ended January 31, 2026 and 2025, net loss attributable to common stockholders was $23.7 million and $29.1 million, respectively, and net loss per common share was $0.49 and $1.42, respectively. The decrease in net loss attributable to common stockholders was primarily due to the decrease in loss from operations for the three months ended January 31, 2026. The decrease in net loss per share for the three months ended January 31, 2026 also benefitted from the higher number of weighted average shares outstanding due to share issuances since January 31, 2025.
Previous wording
As of July 31, 2025, unrestricted cash and cash equivalents totaled $174.7 million compared to $148.1 million as of October 31, 2024. During the year ended October 31, 2024 and the nine months ended July 31, 2025, the Company invested in United States (U.S.) Treasury Securities. The amortized cost of the U.S. Treasury Securities outstanding totaled $109.1 million as of October 31, 2024 and were classified as Investments - short-term on the Consolidated Balance Sheets. There were no outstanding U.S. Treasury Securities as of July 31, 2025 as all U.S. Treasury Securities that were outstanding during the nine month period ended July 31, 2025 matured prior to July 31, 2025.
Current wording
As of January 31, 2026, unrestricted cash and cash equivalents totaled $311.8 million compared to $278.1 million as of October 31, 2025. There were no outstanding U.S. Treasury Securities as of January 31, 2026 or October 31, 2025, as all U.S. Treasury Securities that were outstanding during the three month period ended January 31, 2025 matured prior to October 31, 2025.
Previous wording
During the first nine months of fiscal year 2025, the Company received the second annual funding from East West Bank under the tax equity financing transaction between the Company and East West Bank and, as a result, the Company received a $4.0 million contribution during the nine months ended July 31, 2025 which is recorded as noncontrolling interest on the Consolidated Balance Sheets.
Current wording
During the first quarter of fiscal year 2026, the Company received the third and final annual funding from East West Bancorp, Inc. (“East West Bank”) under the tax equity financing transaction between the Company and East West Bank and, as a result, the Company received a $4.0 million contribution which is recorded as noncontrolling interest on the Consolidated Balance Sheets.
Previous wording
On April 10, 2024, the Company entered into Amendment No. 1 to the Open Market Sale Agreement, dated July 12, 2022 (the “2022 Sales Agreement”), with Jefferies LLC, B. Riley Securities, Inc., Barclays Capital Inc., BMO Capital Markets Corp., BofA Securities, Inc., Canaccord Genuity LLC, Citigroup Global Markets Inc., J.P. Morgan Securities LLC and Loop Capital Markets LLC (each, an “Agent” and together, the “Agents”) (the 2022 Sales Agreement as amended, the “Amended Sales Agreement”), with respect to an at the market offering program under which the Company may, from time to time, offer and sell shares of its common stock having an aggregate offering price of up to $300,000,000 (exclusive of any amounts previously sold under the 2022 Sales Agreement prior to its amendment). On December 27, 2024, the Company entered into Amendment No. 2 to the Amended Sales Agreement, which removed certain representations and warranties relating to the Company’s status as a well-known seasoned issuer. During the three months ended July 31, 2025, approximately 6.8 million shares of the Company’s common stock were sold under the Amended Sales Agreement at an average sale price of $5.70 per share, resulting in gross proceeds of approximately $39.0 million before deducting sales commissions and fees, and net proceeds to the Company of approximately $38.1 million after deducting sales commissions totaling approximately $0.8 million and fees totaling approximately $0.1 million. During the first nine months of fiscal year 2025, approximately 9.2 million shares of the Company’s common stock were sold under the Amended Sales Agreement at an average sale price of $5.84 per share, resulting in gross proceeds of approximately $53.5 million before deducting sales commissions and fees, and net proceeds to the Company of approximately $51.6 million after deducting sales commissions totaling approximately $1.1 million and fees totaling approximately $0.8 million. As of July 31, 2025, approximately $151.4 million of shares remained available for sale under the Amended Sales Agreement.
Current wording
On April 10, 2024, the Company entered into Amendment No. 1 to the Open Market Sale Agreement, dated July 12, 2022 (as amended, the “Sales Agreement”), with Jefferies LLC, B. Riley Securities, Inc., Barclays Capital Inc., BMO Capital Markets Corp., BofA Securities, Inc., Canaccord Genuity LLC, Citigroup Global Markets Inc., J.P. Morgan Securities LLC and Loop Capital Markets LLC (each, an “Agent” and together, the “Agents”), with respect to an at the market offering program under which the Company could, from time to time, offer and sell shares of its common stock having an aggregate offering price of up to $300.0 million (exclusive of any amounts previously sold under the Sales Agreement prior to its amendment). On December 27, 2024, the Company entered into Amendment No. 2 to the Sales Agreement, which removed certain representations and warranties relating to the Company’s status as a well-known seasoned issuer. Following the sale of substantially all of the $300.0 million of shares previously available under the Sales Agreement, on December 30, 2025, the Company entered into Amendment No. 3 to the Sales Agreement, which removed J.P. Morgan Securities LLC as an Agent and increased the amount of shares that may be sold by the Company under the Sales Agreement to $200.0 million (exclusive of any amounts previously sold under the Sales Agreement prior to the date of Amendment No. 3). During the three months ended January 31, 2026, approximately 6.4 million shares of the Company’s common stock were sold under the Sales Agreement at an average sale price of $8.82 per share, resulting in gross proceeds of approximately $56.3 million before deducting sales commissions and fees, and net proceeds to the Company of approximately $54.9 million after deducting sales commissions totaling approximately $1.1 million and fees totaling approximately $0.3 million. As of January 31, 2026, approximately $157.1 million of shares remained available for sale under the Sales Agreement.
Previous wording
Following the end of the quarter, approximately 2.7 million shares of the Company’s common stock were sold under the Amended Sales Agreement, at an average sale price of $4.55 per share, resulting in gross proceeds of approximately $12.1 million before deducting sales commissions and fees, and net proceeds to the Company of approximately $11.8 million after deducting sales commissions and fees totaling approximately $0.3 million. Approximately $139.4 million of shares remained available for sale under the Amended Sales Agreement following these sales.
Current wording
Subsequent to January 31, 2026, approximately 0.3 million shares of the Company’s common stock were sold under the Sales Agreement, at an average sale price of $7.67 per share, resulting in gross proceeds of approximately $2.6 million before deducting sales commissions and fees, and net proceeds to the Company of approximately $2.5 million after deducting sales commissions and fees totaling approximately $0.1 million. Approximately $154.5 million of shares remained available for sale under the Sales Agreement following these sales.
Previous wording
See Note 12. “Stockholders’ Equity” for additional information regarding the 2022 Sales Agreement and the Amended Sales Agreement.
Current wording
See Note 12. “Stockholders’ Equity” to our consolidated financial statements for additional information regarding the Sales Agreement.
Previous wording
To date, we have not achieved profitable operations or sustained positive cash flow from operations. The Company’s future liquidity, for the remainder of fiscal year 2025 and in the long-term, will depend on its ability to (i) timely complete current projects in process within budget, (ii) increase cash flows from its generation operating portfolio, including by meeting conditions required to timely commence operation of new projects, operating its generation operating portfolio in compliance with minimum performance guarantees and operating its generation operating portfolio in accordance with revenue expectations, (iii) obtain financing for project construction and manufacturing expansion, (iv) obtain permanent financing for its projects once constructed, (v) increase order and contract volumes, which would lead to additional product sales, service agreements and generation revenues, (vi) obtain funding for and receive payment for research and development under current and future Advanced Technologies contracts, (vii) successfully advance the commercialization of its solid oxide and carbon capture platforms through partnerships with third parties, (viii) implement capacity expansion for our carbonate products when required, (ix) seek partnerships for solid oxide product commercialization and manufacturing, (x) implement the product cost reductions necessary to achieve profitable operations, (xi) manage working capital and the Company’s unrestricted cash balance and (xii) access the capital markets to raise funds through the sale of debt and equity securities, convertible notes, and other equity-linked instruments.
Current wording
To date, we have not achieved profitable operations or sustained positive cash flow from operations. The Company’s future liquidity, for the remainder of fiscal year 2026 and in the long-term, will depend on its ability to (i) timely complete current projects in process within budget, (ii) increase cash flows from its generation operating portfolio, including by meeting conditions required to timely commence operation of new projects, operating its generation operating portfolio in compliance with minimum performance guarantees and operating its generation operating portfolio in accordance with revenue expectations, (iii) obtain financing for project construction and manufacturing expansion, (iv) obtain permanent financing for its projects once constructed, (v) increase order and contract volumes, which would lead to additional product sales, service agreements and generation revenues, (vi) obtain funding for and receive payment for research and development under current and future Advanced Technologies contracts, (vii) successfully advance the commercialization of its solid oxide and carbon capture platforms through partnerships with third parties, (viii) implement capacity expansion for its carbonate products when required, (ix) seek partnerships for solid oxide product commercialization and manufacturing, (x) implement the product cost reductions necessary to achieve profitable operations, (xi) manage working capital and the Company’s unrestricted cash balance and (xii) access the capital markets to raise funds through the sale of debt and equity securities, convertible notes, and other equity-linked instruments.
Previous wording
Our business model requires substantial outside financing arrangements and satisfaction of the conditions of such arrangements to construct and deploy our projects to facilitate the growth of our business. The Company has invested capital raised from sales of its common stock to build out its project portfolio. The Company has also utilized and expects to continue to utilize a combination of long-term debt and tax equity financing (e.g., sale-leaseback transactions, partnership flip transactions and the monetization and/or transfer of eligible investment and production tax credits) to finance its project asset portfolio as these projects commence commercial operations. The Company may also seek to undertake private placements of debt securities to finance its project asset portfolio. The Company is also pursuing financing to support its commercial efforts, which include deployment of modules to the repowering opportunities in the Korean market including the GGE project (as defined elsewhere herein). The proceeds of any such financing, if obtained, may allow the Company to reinvest capital back into the business and to fund other projects. We also expect to seek additional financing in both the debt and equity markets in the future. If financing is not available to us on acceptable terms if and when needed, or on terms acceptable to us or our lenders, if we do not satisfy the conditions of our financing arrangements, if we spend more than the financing approved for projects, if project costs exceed an amount that the Company can finance, or if we do not generate sufficient revenues or obtain capital sufficient for our corporate needs, we
Current wording
Our business model requires substantial outside financing arrangements and satisfaction of the conditions of such arrangements to construct and deploy our projects to facilitate the growth of our business. The Company has invested capital raised from sales of its common stock to build out its project portfolio. The Company has also utilized and expects to continue to utilize a combination of long-term debt and tax equity financing (e.g., sale-leaseback transactions, partnership flip transactions and the monetization and/or transfer of eligible investment and production tax credits) to finance its project asset portfolio as these projects commence commercial operations. The Company may also seek to undertake private placements of debt securities to finance its project asset portfolio. The Company is also pursuing financing to support its commercial efforts, which include deployment of modules to the repowering opportunities in the South Korean market including the GGE (as defined elsewhere herein) project. The proceeds of any such financing, if obtained, may allow the Company to reinvest capital back into the business and to fund other projects. We also expect to seek additional financing in both the debt and equity markets in the future. If financing is not available to us on acceptable terms if and when needed, or on terms acceptable to us or our lenders, if we do not satisfy the conditions of our financing arrangements, if we spend more than the financing approved for projects, if project costs exceed an amount that the Company can finance, or if we do not generate sufficient revenues or obtain capital sufficient for our corporate needs, we may be required to further reduce or slow planned spending, further reduce staffing, sell assets, seek alternative financing and take other measures, any of which could have a material adverse effect on our financial condition and operations.
Previous wording
To grow our generation operating portfolio, the Company may continue to invest in developing and building turn-key fuel cell projects, which will be owned by the Company and classified as project assets on the Consolidated Balance Sheets. This strategy requires liquidity and the Company expects to continue to have increasing liquidity requirements as project sizes increase and more projects are added to backlog. We may commence building project assets upon the award of a project or execution of a multi-year PPA with an end-user that has a strong credit profile. Project development and construction cycles, which span the time between securing a PPA and commercial operation of the platform, vary substantially and can take years. As a result of these project cycles and strategic decisions to finance the construction of certain projects, we may need to make significant up-front investments of resources in advance of the receipt of any cash from the sale or long-term financing of such projects. To make these up-front investments, we may use our working capital, seek to raise funds through the sale of equity or debt securities, or seek other financing arrangements. Delays in construction progress and completing current projects in process within budget, or in completing financing or the sale of our projects may impact our liquidity in a material way.
Current wording
To grow our generation operating portfolio, the Company may continue to invest in developing and building turn-key fuel cell projects, which will be owned by the Company and classified as project assets on the Consolidated Balance Sheets. This strategy requires liquidity and the Company expects to continue to have increasing liquidity requirements as project sizes increase and more projects are added to backlog. We may commence building project assets upon the award of a project or execution of a multi-year PPA with an end-user that has a strong credit profile. Project development and construction cycles, which span the time between securing a PPA and commercial operation of the platform, vary substantially and can take years. As a result of these project cycles and strategic decisions to finance the construction of certain projects, we may need to make significant up-front investments of resources in advance of the receipt of any cash from the sale or long-term financing of such projects. To make these up-front investments, we may use our working capital, seek to raise funds through the sale of equity or debt securities, or seek other financing arrangements. Delays in
Previous wording
We believe retaining ownership of our generation operating portfolio generally contributes to higher long-term cash flows to the Company than if these projects had been sold. Our generation operating portfolio totaled 62.8 MW as of July 31, 2025. We expect generation revenue to continue to grow as additional projects achieve commercial operation, but this revenue amount may also fluctuate from year to year depending on platform output, operational performance and management and site conditions. The Company actively markets its products in order to grow this portfolio; however, the Company may also sell certain projects to investors from time to time. As of July 31, 2025, the Company had one project representing an additional 7.4 MW in development, which is expected to generate operating cash flows in future periods, if completed. We have worked with and are continuing to work with lenders and financial institutions to secure construction financing, long-term debt, tax equity and sale-leasebacks for our project asset portfolio, but there can be no assurance that such financing can be attained, or that, if attained, it will be retained and sufficient.
Current wording
Our generation operating portfolio totaled 62.8 MW as of January 31, 2026. We expect generation revenue to continue to grow as additional projects achieve commercial operation, but this revenue amount may also fluctuate from year to year depending on platform output, operational performance and management and site conditions. The Company actively markets its products in order to grow this portfolio; however, the Company may also sell certain projects to investors from time to time. As of January 31, 2026, the Company had two projects representing an additional 8.5 MW in development, which are expected to generate operating cash flows in future periods, if completed. We have worked with and are continuing to work with lenders and financial institutions to secure construction financing, long-term debt, tax equity and sale-leasebacks for our project asset portfolio, but there can be no assurance that such financing can be attained, or that, if attained, it will be retained and sufficient.
Previous wording
As of July 31, 2025, net debt outstanding related to project assets was $109.0 million. Future required payments, inclusive of principal and interest, totaled $126.5 million as of July 31, 2025. The outstanding finance obligations under our sale-leaseback transactions totaled $18.8 million as of July 31, 2025, of which $11.6 million represents the current carrying value of finance obligations less future required payments.
Current wording
As of January 31, 2026, net debt outstanding related to project assets was $102.7 million. Future required payments, inclusive of principal and interest, totaled $117.6 million as of January 31, 2026. The outstanding finance obligations under our sale-leaseback transactions totaled $18.8 million as of January 31, 2026, of which $12.4 million represents the current carrying value of finance obligations less future required payments.
Showing the first 40 of 83 pairs. Open the source sections for the rest.
Rearranged current paragraphs (11)
Current report — wording carried from elsewhere
terminate any or all of our government contracts; or we will be able to achieve any other result anticipated in any other forward-looking statement contained herein.
Current report — wording carried from elsewhere
construction progress and completing current projects in process within budget, or in completing financing or the sale of our projects may impact our liquidity in a material way.
Current report — wording carried from elsewhere
concurrent with the execution of the GGE LTSA on May 28, 2024, and has since been reduced as revenue has been recognized under the GGE LTSA which commenced in the fourth quarter of fiscal year 2024.
Current report — wording carried from elsewhere
On November 26, 2025, the Company closed on its second project debt financing transaction (the “2025 EXIM Financing”) with the Export-Import Bank of the United States (“EXIM”) to support the Company’s obligations under its LTSA with GGE. In conjunction with this financing, the Company entered into a promissory note and related security agreements securing the loan with equipment liens, resulting in gross proceeds of approximately $25.0 million before deducting customary fees and transaction costs, and net proceeds to the Company of approximately $22.7 million after deducting customary fees and transaction costs of $2.3 million. Interest accrues at a fixed interest rate of 5.29%, and the note is repayable in monthly installments consisting of interest and principal over 7 years from the date of the first debt payment, which was due in December 2025.
Current report — wording carried from elsewhere
Derby Holdco Borrower’s obligations under the Derby Senior Back Leverage Credit Agreement and the Derby Subordinated Back Leverage Credit Agreement are secured by a lien on all of Derby Holdco Borrower’s assets, consisting principally of its Class B Member Interests (the “Derby Class B Interests”) in Derby Fuel Cell Holdco, LLC (the “Derby Tax Equity Holdco”). The Class A Membership Interests (the “Derby Class A Interests”) in the Derby Tax Equity Holdco are held by Franklin Park (see Note 1 for further discussion of the tax equity financing transaction structure). Derby Holdco Borrower is also the Managing Member of the Derby Tax Equity Holdco. The Derby Tax Equity Holdco’s primary asset is ownership of all of the outstanding equity interests in Derby Station Fuel Cell, LLC and SCEF1 Fuel Cell,
Current report — wording carried from elsewhere
and the Bridgeport Project Company agreed that the obligations arising out of the swap transactions contemplated by their related interest rate swap agreement were terminated and waived and the swap agreement was effectively terminated. In addition, in connection with closing on the OpCo Financing Facility, proceeds of the Term Loan were used to repay a portion of Parent’s long-term indebtedness to Connecticut Green Bank in the amount of approximately $1.8 million.
Current report — wording carried from elsewhere
Simultaneously with the execution of the Financing Agreement, OpCo Borrower, Investec Bank plc as Collateral Agent and Administrative Agent and Liberty Bank as Depositary Agent entered into a Depositary Agreement (the “Depositary Agreement”) pursuant to which OpCo Borrower established certain accounts at Liberty Bank, all of which were pledged to Collateral Agent as security for the Term Loan Facility, the LC Facility and the hedge agreements, including a Revenue Account; a Debt Service Reserve Account; a Redemption Account (for prepayments); a Capital Expenditure Reserve Account; and a Distribution Reserve Account (in each case as defined in the Depositary Agreement). Pursuant to the terms
Current report — wording carried from elsewhere
million was released to Parent from the Groton Back Leverage Lenders. As discussed in additional detail below, simultaneous with the Groton Closing, a portion of the proceeds were used to: (a) make Output Shortfall Payments (which are cash payments required to be made by the Groton Project Company in the event that the Groton Project produces electricity in any year less than the minimum required amount for such year) totaling approximately $1.3 million, which were deposited into a payment reserve account, and (b) pay approximately $3.0 million to Connecticut Green Bank, which represented payment, in full, of all outstanding obligations under Parent’s loan agreement with Connecticut Green Bank. After taking into account such Output Shortfall Payments and such payment to Connecticut Green Bank, approximately $6.8 million was classified as unrestricted cash on the Company’s Consolidated Balance Sheet.
Current report — wording carried from elsewhere
Each of the Groton Senior Back Leverage Credit Agreement and the Groton Subordinated Back Leverage Credit Agreement contains certain reporting requirements and other affirmative and negative covenants which are customary for transactions of this type. Included in the covenants are covenants that: (i) Groton Holdco Borrower maintain a “Senior” debt service coverage ratio (which is computed taking into account debt service obligations on the Groton Senior Back Leverage Loans) of not less than 1.20:1.00 (based on the trailing 12 months and tested every quarter) and a “Total” debt service coverage ratio (which is computed taking into account debt service obligations on both the Groton Senior Back Leverage Loans and the Groton Subordinated Back Leverage Loan) of not less than 1.10:1.00 (based on the trailing 12 months and tested on a quarterly basis); (ii) Groton Holdco Borrower may make distributions or dividends only if the
Current report — wording carried from elsewhere
provisions of the Assistance Agreement related to the second phase of the expansion project and the loans related thereto, but the Company had not drawn any funds or received any disbursements under those provisions.
Current report — wording carried from elsewhere
As of January 31, 2026, we have pledged approximately $67.8 million of our cash and cash equivalents as performance security and for letters of credit for certain banking requirements and contracts. As of January 31, 2026, outstanding letters of credit totaled $12.7 million. These expire on various dates through October 2029. Under the terms of certain contracts,
Rearranged previous paragraphs (24)
Previous report — wording carried elsewhere
We cannot assure you that: we will be able to meet any of our development or commercialization schedules; any of our new products or technologies, once developed, will be commercially successful; our power plants will be commercially
Previous report — wording carried elsewhere
We have not paid federal or state income taxes in several years due to our history of net operating losses, although we have paid foreign income and withholding taxes, primarily in Korea. Provision for income tax recorded for the three month periods ended July 31, 2025 and 2024 was $40.0 thousand and $2.0 thousand, respectively.
Previous report — wording carried elsewhere
Our revenues and cost of revenues for the nine months ended July 31, 2025 and 2024 were as follows:
Previous report — wording carried elsewhere
Total revenues for the nine months ended July 31, 2025 of $103.1 million reflects an increase of $40.3 million from $62.8 million for the same period in the prior year. Cost of revenues for the nine months ended July 31, 2025 of $122.9 million reflects an increase of $35.1 million from $87.8 million for the same period in the prior year. A discussion of the changes in product revenues, service agreements revenues, generation revenues and Advanced Technologies contract revenues follows.
Previous report — wording carried elsewhere
Our product revenues and related costs for the nine months ended July 31, 2025 and 2024 were as follows:
Previous report — wording carried elsewhere
For the nine months ended July 31, 2025, we operated at an annualized production rate of approximately 30.5 MW in our Torrington, CT manufacturing facility, compared to an annualized production rate of 31.1 MW for the nine months ended July 31, 2024.
Previous report — wording carried elsewhere
Revenues from generation for the nine months ended July 31, 2025 totaled $35.8 million, which represents a decrease of $2.2 million from generation revenues recognized of $38.0 million for the nine months ended July 31, 2024. The decrease in generation revenues reflects lower output from plants in our generation operating portfolio resulting from routine maintenance activities, partially offset by revenue generated by the Derby Projects, both of which became operational in December 2023. Generation revenues for the nine months ended July 31, 2025 and 2024 reflect revenue from electricity generated under our PPAs and the sale of renewable energy credits from our generation operating portfolio.
Previous report — wording carried elsewhere
We currently have four projects with fuel sourcing risk, which are the Toyota Project, our 14.0 MW and 2.8 MW Derby Projects and our 7.4 MW LIPA Yaphank Project, all of which require natural gas for which there is no pass-through mechanism. A one-year fuel supply contract (through May of 2026) has been executed for the Toyota Project. Six-year (through October 2029) fuel supply contracts have been executed for the 14.0 MW and 2.8 MW Derby Projects. We are currently in the midst of a seven-year contract (through September 2028) for our 7.4 MW LIPA Yaphank Project. The Company will look to extend the duration of these contracts should market and credit conditions allow. If the Company is unable to secure fuel on favorable economic terms, it may result in impairment charges to the Derby Project assets or the LIPA Yaphank Project asset and further impairment charges for the Toyota Project asset.
Previous report — wording carried elsewhere
Advanced Technologies contract revenues decreased to $15.1 million for the nine months ended July 31, 2025 from $20.1 million for the nine months ended July 31, 2024. Compared to the nine months ended July 31, 2024, Advanced Technologies contract revenues recognized under our Joint Development Agreement with EMTEC were approximately $0.4 million lower, revenues arising from the purchase order received from Esso related to the Rotterdam project were approximately $0.6 million lower, and revenue recognized under government contracts and other contracts were approximately $4.0 million lower for the nine months ended July 31, 2025.
Previous report — wording carried elsewhere
Administrative and selling expenses were $45.6 million and $48.7 million for the nine months ended July 31, 2025 and 2024, respectively. Administrative and selling expenses were lower during the nine months ended July 31, 2025 than during the nine months ended July 31, 2024 primarily due to lower compensation expense as a result of the restructuring actions in September of fiscal year 2024, and in November and June of fiscal year 2025.
Previous report — wording carried elsewhere
Research and development expenses decreased to $28.6 million for the nine months ended July 31, 2025 compared to $43.8 million for the nine months ended July 31, 2024. The decrease is primarily due to a decrease in spending on the Company’s commercial development efforts related to our solid oxide power generation and electrolysis platforms and carbon separation and carbon recovery solutions compared to the comparable prior year period.
Previous report — wording carried elsewhere
Interest expense for the nine months ended July 31, 2025 and 2024 was $7.7 million and $7.2 million, respectively. Interest expense for both periods includes interest on the OpCo Financing Facility (as defined elsewhere herein), which was entered into in May 2023, and interest on the Groton Senior Back Leverage Loan Facility and the Groton Subordinated Back Leverage Loan Facility (in each case, as defined elsewhere herein), which were entered into in August 2023. Interest expense increased for the nine months ended July 31, 2025, as this period also includes interest on the Derby Senior Back Leverage Loan Facility and the Derby Subordinated Back Leverage Loan Facility (in each case, as defined elsewhere herein), which were entered into in April 2024, and on the facility with EXIM (as defined elsewhere herein), which was entered into in October 2024.
Previous report — wording carried elsewhere
Net loss attributable to noncontrolling interests
Previous report — wording carried elsewhere
Net loss attributable to common stockholders and net loss per common share
Previous report — wording carried elsewhere
Net loss attributable to common stockholders represents the net loss for the period less the preferred stock dividends on the Series B Preferred Stock. For the nine months ended July 31, 2025 and 2024, net loss attributable to common stockholders was $160.4 million and $87.0 million, respectively, and net loss per common share was $7.22 and $5.56, respectively. The increase in net loss attributable to common stockholders is primarily due to impairment and restructuring expenses recognized during the nine months ended July 31, 2025. The net loss per share for the nine months ended July 31, 2025 benefitted from the higher number of weighted average shares outstanding due to share issuances since July 31, 2024.
Previous report — wording carried elsewhere
may be required to further reduce or slow planned spending, further reduce staffing, sell assets, seek alternative financing and take other measures, any of which could have a material adverse effect on our financial condition and operations.
Previous report — wording carried elsewhere
payable by CGN under the CGN LTSA for the eight replacement fuel cell modules, balance of plant replacement components, and service is $31.7 million USD, with payments to be made over time as such replacement fuel cell modules are commissioned and the service obligations under the CGN LTSA for such CGN Plants commence. This amount was recorded as backlog concurrent with the execution of the CGN LTSA on July 30, 2025.
Previous report — wording carried elsewhere
and service agreements with third parties, sales of our common stock through public equity offerings, and proceeds from debt, project financing and tax monetization transactions.
Previous report — wording carried elsewhere
At the closing (the “Derby Closing”) of each of the Derby Senior Back Leverage Loan Facility and the Derby Subordinated Back Leverage Loan Facility, which occurred simultaneously on April 25, 2024 (the “Derby Closing Date”), the entire amount of each of the Derby Senior Back Leverage Loan Facility and the Derby Subordinated Back Leverage Loan Facility was drawn down in the aggregate amount of $13.0 million. After payment of fees and transaction costs (including fees to the Derby Back Leverage Lenders and legal costs) of approximately $0.2 million in the aggregate, the remaining proceeds
Previous report — wording carried elsewhere
million was used to repay a portion of Parent’s long-term indebtedness to Connecticut Green Bank; (iv) $14.5 million was used to fund a capital expenditure reserve account required to be maintained pursuant to the terms and conditions of the Financing Agreement (which is classified as restricted cash on the Company’s Consolidated Balance Sheets); and (v) approximately $34.9 million was distributed to Parent for use as Parent determines in its sole discretion. In addition, in connection with the extinguishment of the Company’s indebtedness to Liberty Bank and Fifth Third Bank referred to above, approximately $11.2 million of restricted cash was released to the Company from Liberty Bank and Fifth Third Bank. Taking into consideration the release of such funds, the total net proceeds to the Company from these transactions were approximately $46.1 million.
Previous report — wording carried elsewhere
be remeasured to fair value quarterly, with the resulting gains/losses recorded to other income/expense. The fair value adjustments for the three and nine months ended July 31, 2025 resulted in gains (losses) of $0.6 million and $(0.2) million, respectively.
Previous report — wording carried elsewhere
The portion of the Groton Senior Back Leverage Loan provided by Liberty Lender will accrue interest on the unpaid principal amount calculated from the date of such Groton Senior Back Leverage Loan until the maturity date at a rate per annum equal to 6.75%. The portion of the Groton Senior Back Leverage Loan provided by Amalgamated Lender will
Previous report — wording carried elsewhere
also required the Company to furnish a job audit (the “Job Audit”) to the Commissioner of Economic and Community Development (the “Commissioner”) no later than 90 days following the 24-month period described above.
Previous report — wording carried elsewhere
under certain agreements, we are required to produce minimum amounts of power under our PPAs and we have the right to terminate PPAs by giving written notice to the customer, subject to certain exit costs. As of July 31, 2025, our generation operating portfolio was 62.8 MW.