PERPETUA RESOURCES CORP
For the period ended Sep 30, 2024. Filed Nov 13, 2024.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2024 · Filed Nov 13, 2024
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-06-30; filed 2024-08-09.
0001104659-24-087827
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2024-09-30; filed 2024-11-13.
0001104659-24-117760
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 63 previous paragraphs and 57 current paragraphs.
25 unchanged; 27 reworded; 5 added; 11 removed; 0 previous and 0 current paragraphs rearranged.
Tables are not compared: 24 previous and 22 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (5)
Current report
Third Quarter 2024 Highlights
Current report
On September 6, 2024, the USFS published the FEIS and a DROD with respect to the Project. The FEIS analyzes the potential environmental effects of the mining operation of the Project as proposed by the Company through a general plan of operations. The DROD outlines the USFS’s proposed decision to authorize the proposed modifications to the mine plan analyzed in Alternative 2 in the Draft Environmental Impact Statement and to approve a special use authorization for transmission line upgrades and installation of a new power transmission line with supporting infrastructure.
Current report
The publication of the DROD commenced a 45-day pre-decisional objection period in which those parties or persons who have participated in a prior formal public comment period for the Project had an opportunity to have their unresolved concerns reviewed before USFS issues a final Record of Decision (“ROD”). Individuals must have submitted substantive formal comments related to the Project during previous comment periods to participate in this objection period unless the issue is based on new information that arose after the prior opportunities to comment. The objection period expired on October 21, 2024. The objection period will be followed by another 45-day resolution period prior to the publication of the ROD. The resolution period is expected to expire on or about December 5, 2024, which may be extended by the USFS in its sole discretion. Based on the USFS schedule published in October 2024, the ROD is anticipated to be published by the end of 2024. However, the USFS is not bound by the permitting schedule and anticipated milestones may be delayed materially or not be satisfied.
Current report
Previously submitted permit applications are continuing through the administrative review process. These include applications to IDEQ for the Idaho Pollutant Discharge Elimination System discharge permits and to IDWR for water rights authorizations and a stream alteration permit.
Current report
Liquidity and Financing
Removed paragraphs (11)
Previous report
Second Quarter 2024 Highlights
Previous report
Supplemental Draft Environmental Impact Statement (“SDEIS”)
Previous report
In response to public and agency feedback on the Draft Environmental Impact Statement (“DEIS”) released by the United States Forest Service (“USFS”) in August 2020, Perpetua Resources proposed modifications to the mine plan analyzed in Alternative 2 in the DEIS and submitted a refined proposed action to the USFS in December 2020 (the “Modified Mine Plan”). The Modified Mine Plan included refinements to reduce the project footprint, improve water quality, and lower water temperature. The USFS decided to prepare a Supplemental Draft Environmental Impact Statement to further evaluate the project refinements and compare the Company’s proposed site access via Burntlog Route to another action alternative utilizing current roads.
Previous report
After nearly two years of review of the Modified Mine Plan by the USFS and other agencies, the SDEIS was published on October 28, 2022 for a 75-day public comment period. In the SDEIS, the USFS highlighted the net positive environmental outcomes that the Stibnite Gold Project can provide to the abandoned mine site based on the results of comprehensive scientific analysis conducted over the last six years. The USFS identified Perpetua Resources’ proposed action, the “Modified Mine Plan,” as the Preferred Alternative and also concluded the Preferred Alternative would reasonably accomplish the purpose and need for consideration of approval of the Stibnite Gold Project, all while considering environmental, economic, and technical factors. Under NEPA, a “Preferred Alternative” is identified by a Federal agency in a DEIS to advise the public which action the agency is leaning toward selecting as final. However, identification by an agency of a “Preferred Alternative” does not represent a final decision and the USFS may still select an action based on the Modified Mine Plan or a combination of each of the alternatives analyzed in the SDEIS when developing the Final Environmental Impact Statement (“FEIS”). The SDEIS public review period closed on January 10, 2023.
Previous report
Previously submitted permit applications that are continuing through the administrative review process and include Clean Air Act Permit to Construct and Idaho Pollutant Discharge Elimination System industrial outfalls with IDEQ in addition to water rights with IDWR. Regarding the 401 certification discussed above, the U.S. EPA determined not to make a “may affect” finding of downstream neighboring jurisdiction water quality under Section 401(a)(2) of the Clean Water Act, but a state administrative review contested case was filed by petitioners June 28 2024.
Previous report
Franco-Nevada Silver Royalty
Previous report
On March 21, 2024, the Company entered into a royalty agreement with a wholly-owned subsidiary of Franco-Nevada Corporation (“Franco-Nevada”) pursuant to which Perpetua, through its subsidiaries, sold Franco-Nevada a royalty on the future payable silver production from the Project in exchange for a cash payment of $8.5 million. Silver represents less than 0.3% of projected life-of-mine revenue in the 2020 Feasibility Study. Under the agreement, Franco-Nevada will receive all of the payable silver by-product revenue over the life-of-mine, subject to the terms of the agreement. Perpetua intends to use the proceeds for general corporate purposes.
Previous report
Nez Perce Tribe Litigation Settlement
Previous report
On August 8, 2023, the Company and the Nez Perce Tribe (“Parties”) filed a final Settlement Agreement (“Settlement Agreement”) to resolve a Clean Water Act (“CWA”) lawsuit brought by the Nez Perce Tribe in 2019. The Settlement Agreement provides for total payments of $5.0 million by Perpetua over a four-year period, which includes $4.0 million of contributions by Perpetua to a South Fork Salmon Water Quality Enhancement Fund to be used by the Nez Perce Tribe to support water quality improvement projects in the South Fork Salmon River watershed, and $1.0 million of reimbursements to the Nez Perce Tribe for legal expenses. Perpetua intends to fund these payments from cash on hand or funds expected to be raised in connection with construction and operation of the Project. Following a 45-day review period by the United States Justice Department and the U.S. Environmental Protection Agency (the “U.S. EPA”), the U.S. District Court for the District of Idaho approved the Stipulation for Dismissal and entered a Judgment on October 2, 2023 which resulted in the CWA lawsuit being dismissed without prejudice. Under the Settlement Agreement, a dismissal with full prejudice will follow after completion of Perpetua’s required payments.
Previous report
See Note 6(e) to the Interim Financial Statements for the three and six months ended June 30, 2024 for more information regarding the CWA lawsuit and the terms of the settlement.
Reworded paragraphs (27)
Previous wording
You should read the following discussion and analysis of our financial condition and results of operations for the three and six months ended June 30, 2024 and 2023 with our consolidated financial statements and related notes and other financial information appearing in this Quarterly Report. Some of the information contained in this discussion and analysis or set forth elsewhere in this Quarterly Report, including information with respect to our plans and strategy for our business, operations, and product candidates, includes forward-looking statements that involve risks and uncertainties. You should review the sections of this Quarterly Report captioned “Risk Factors” and “Cautionary Note Regarding Forward-Looking Statements” for a discussion of important factors that could cause our actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
Current wording
You should read the following discussion and analysis of our financial condition and results of operations for the three and nine months ended September 30, 2024 and 2023 with our consolidated financial statements and related notes and other financial information appearing in this Quarterly Report. Some of the information contained in this discussion and analysis or set forth elsewhere in this Quarterly Report, including information with respect to our plans and strategy for our business, operations, and product candidates, includes forward-looking statements that involve risks and uncertainties. You should review the sections of this Quarterly Report captioned “Risk Factors” and “Cautionary Note Regarding Forward-Looking Statements” for a discussion of important factors that could cause our actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
Previous wording
Perpetua Resources’ vision is to provide the United States with a domestic source of the critical mineral antimony, develop one of the largest and highest-grade open pit gold mines in the country and restore an abandoned brownfield site. In 2024, Perpetua Resources will continue to focus on advancing the permitting for the Stibnite Gold Project through the National Environmental Policy Act (“NEPA”) process in addition to state ancillary permits and other federal authorization. The NEPA process is intended to ensure that federal agencies and the public are informed of a proposed action’s potential environmental impacts before a final decision is made by the agency regarding the action. The Company is also advancing construction readiness activities in parallel with the permitting process.
Current wording
Perpetua Resources’ vision is to provide the United States with a domestic source of the critical mineral antimony, develop one of the largest and highest-grade open pit gold mines in the country and restore an abandoned brownfield site. In 2024, Perpetua Resources will continue to focus on advancing the permitting for the Stibnite Gold Project through the National Environmental Policy Act (“NEPA”) process in addition to state ancillary permits and other federal authorization. The NEPA process is intended to ensure that federal agencies and the public are informed of the proposed action’s potential environmental impacts before a final decision is made by the agency regarding the action. The Company is also advancing construction readiness activities in parallel with the permitting process.
Previous wording
On January 1, 2024, the USFS released an updated schedule for the Project that stated the USFS expected to publish a FEIS and a Draft Record of Decision in the second quarter of 2024 and a Final Record of Decision (“ROD”) in the fourth quarter of 2024. The USFS has confirmed that cooperating agency review of the FEIS is complete and both documents are completing final consultations and reviews in Washington D.C. As a result, management anticipates the publication of a FEIS and Draft Record of Decision in the third quarter of 2024 and a Final Record of Decision (“ROD”) in the fourth quarter of 2024. The publication of the permitting schedule does not indicate any commitments on the part of the USFS regarding the content or timing of a final decision. In developing the FEIS, the USFS may select an action based on components of each of the alternatives analyzed in the SDEIS. Furthermore, the USFS is not bound by the permitting schedule and anticipated milestones may be delayed materially or not be satisfied.
Current wording
Final Environmental Impact Statement and Draft Record of Decision
Previous wording
The Company continued to advance work on several ancillary permits which are being progressed in parallel with the NEPA process. Recent updates include:
Current wording
The Company advanced work on several ancillary permits which are being progressed in parallel with the NEPA process. Recent updates include:
Previous wording
In December 2022, Perpetua Resources was awarded an undefinitized TIA of up to $24.8 million under Title III of the DPA. On July 25, 2023, the TIA was definitized with the DOD, establishing the full not-to-exceed amount of $24.8 million and on May 2, 2024, the TIA was modified with an additional $34.4 million in funding, bringing the total amount of the TIA to $59.2 million. The funding objective of the TIA, issued by the Air Force Research Laboratory, is to complete environmental and engineering studies necessary to obtain a FEIS, a ROD, and other ancillary permits to sustain the domestic production of antimony trisulfide capability for defense energetic materials. The DPA funding allows the Company to advance the construction readiness of the Stibnite Gold Project while the Company continues through the ongoing permitting process, led by the USFS. Under the funding agreement, Perpetua Resources may request reimbursement for certain costs incurred through June 16, 2025 related to environmental baseline data monitoring, environmental and technical studies and other activities related to advancing Perpetua’s construction readiness and permitting process for the Stibnite Gold Project. The DPA funding does not interrupt the ongoing NEPA review process. The TIA contains customary terms and conditions for technology investment agreements, including ongoing reporting obligations. Perpetua Resources is evaluating other U.S. government funding opportunities, including programs available through the DOD. During the three months and six months ended June 30, 2024, $8,440,373 and $11,049,634, respectively, was recognized as grant income related to the TIA. The Company anticipates recognizing approximately $15,000,000 of additional grant income for the three months ended September 30, 2024. During the three and six months ended June 30, 2024, the Company was reimbursed $1,793,364 (2023: $2,184,944) and $4,750,495 (2023: $4,244,605), respectively, for certain costs incurred.
Current wording
In December 2022, Perpetua Resources was awarded an undefinitized TIA of up to $24.8 million under Title III of the DPA. On July 25, 2023, the TIA was definitized with the DOD, establishing the full not-to-exceed amount of $24.8 million and on May 2, 2024, the TIA was modified with an additional $34.4 million in funding, bringing the total amount of the TIA to $59.2 million. The funding objective of the TIA, issued by the Air Force Research Laboratory, is to complete environmental and engineering studies necessary to obtain a FEIS, a ROD, and other ancillary permits to sustain the domestic production of antimony trisulfide capability for defense energetic materials. The DPA funding allows the Company to advance the construction readiness of the Stibnite Gold Project while the Company continues through the ongoing permitting process, led by the USFS. Under the funding agreement, Perpetua Resources may request reimbursement for certain costs incurred through June 16, 2025 related to environmental baseline data monitoring, environmental and technical studies and other activities related to advancing Perpetua’s construction readiness and permitting process for the Stibnite Gold Project. The DPA funding does not interrupt the ongoing NEPA review process. The TIA contains customary terms and conditions for technology investment agreements, including ongoing reporting obligations. Perpetua Resources is evaluating other U.S. government funding opportunities, including programs available through the DOD. During the three and nine months ended September 30, 2024, $12,615,643 and $23,665,277, respectively, was recognized as grant income related to the TIA. The Company anticipates recognizing approximately $12,000,000 of additional grant income over the next three months. During the three and nine months ended September 30, 2024, the Company was reimbursed $11,667,011 and $16,417,506, respectively, for certain costs incurred. As of September 30, 2024, $20.0 million remained available under the TIA.
Previous wording
On August 18, 2023, the Company’s wholly owned subsidiary, Perpetua Resources Idaho, Inc. was awarded an Ordnance Technology Initiative Agreement (“OTIA”) of up to $15.5 million under the Prototype Other Transaction authority of the DOD through the DOD Ordnance Technology Consortium (“DOTC”). The OTIA will build on research conducted under a previously announced Small Business Innovation Research Grant. The funding objective of the OTIA is to demonstrate a fully domestic antimony trisulfide supply chain using ore from the Stibnite Gold Project site. The OTIA designates funding to the Company to conduct activities to meet this objective, including obtaining additional core samples from the Project site, conducting a pilot plant study to produce mil-spec antimony trisulfide from the samples, designing a full-scale process circuit, and delivering a modular pilot plant for the DOD to use in further investigations. Under the OTIA, the Company will be reimbursed for these activities on a cost-plus fixed fee basis over the 24-month period of performance. The current estimated amount is $15.5 million, which is subject to adjustment by the DOD based on scope, costs, budget, or other factors as the program advances. Perpetua will be entitled to reimbursement for all costs incurred under the agreement, with the negotiated fee being 12%. The OTIA contains customary terms and conditions for OTIAs, including ongoing reporting obligations. During the three months and six months ended June 30, 2024, $35,270 and $2,595,747, respectively, was recognized as grant income related to the OTIA. The Company anticipates recognizing approximately $900,000 of additional grant income for the next three months ended September 30, 2024. During the three and six months ended June 30, 2024, the Company received cash from this grant of $976,352 and $4,466,493 respectively, for reimbursement of certain costs incurred of $871,743 and $3,987,940 and 12% fee income of $104,609 and $478,553, respectively. During the three month and six months ended June 30, 2024, grant income includes $3,779 and $278,116, respectively, of 12% fee income earned on costs incurred. No grant income was earned during the six months ended June 30, 2023.
Current wording
On August 18, 2023, the Company’s wholly owned subsidiary, Perpetua Resources Idaho, Inc. was awarded an Ordnance Technology Initiative Agreement (“OTIA”) of up to $15.5 million under the Prototype Other Transaction authority of the DOD through the DOD Ordnance Technology Consortium (“DOTC”). The OTIA will build on research conducted under a previously announced Small Business Innovation Research Grant. The funding objective of the OTIA is to demonstrate a fully domestic antimony trisulfide supply chain using ore from the Stibnite Gold Project site. The OTIA designates funding to the Company to conduct activities to meet this objective, including obtaining additional core samples from the Project site, conducting a pilot plant study to produce mil-spec antimony trisulfide from the samples, designing a full-scale process circuit, and delivering a modular pilot plant for the DOD to use in further investigations. Under the OTIA, the Company will be reimbursed for these activities on a cost-plus fixed fee basis over the 24-month period of performance. The current estimated amount is $15.5 million, which is subject to adjustment by the DOD based on scope, costs, budget, or other factors as the program advances. Perpetua will be entitled to reimbursement for all costs incurred under the agreement, with the negotiated fee being 12%. The OTIA contains customary terms and conditions for OTIAs, including ongoing reporting obligations. During the three and nine months ended September 30, 2024, $304,774 and $2,900,521, respectively, was recognized as grant income related to the OTIA. The Company anticipates recognizing approximately $1,100,000 of additional grant income over the next three months. During the three and nine months ended September 30, 2024, the Company received cash from this grant of $39,329 and $4,505,821 respectively, for reimbursement of certain costs incurred of $35,115 and $4,023,054 and 12% fee income of $4,214 and $482,767, respectively. During the three and nine months ended September 30, 2024, grant income includes $32,654 and $310,770, respectively, of 12% fee income earned on costs incurred.
Previous wording
After giving effect to the receipt of the $8.5 million upfront payment from Franco-Nevada under the silver royalty on March 21, 2024, the Company’s latest liquidity forecast indicates that available cash resources are expected to be exhausted in the fourth quarter of 2024. Although the Company’s current capital resources and liquidity include up to $59.2 million in funding awarded under the modified TIA pursuant to Title III of the DPA, such funding is available only for the specified costs related to permitting, environmental baseline data monitoring, environmental and technical studies, and advancing construction readiness and is not available to fund the Company’s costs under its ASAOC obligations and certain corporate expenses, including under the Settlement Agreement. Although we expect the DPA funding to provide the Company with sufficient liquidity to complete permitting and environmental monitoring activities on the current timeline as well as additional liquidity to begin advancing construction readiness in 2024, due to costs of the ASAOC restoration obligations, payment obligations under the Settlement Agreement and other corporate expenses, we do not expect the Company will have sufficient assets to discharge its liabilities as they become due for at least 12 months from the date hereof. Absent additional financing, the Company would no longer be able to meet its ongoing obligations or progress critical permitting efforts. The Company continues to explore various funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; and/or other financing opportunities. See “—Liquidity and Capital Resources” for more information.
Current wording
The Company’s latest liquidity forecast indicates that available cash resources are expected to be exhausted in the second quarter of 2025. Although the Company’s current capital resources and liquidity include up to $20.0 million in funding awarded under the modified TIA pursuant to Title III of the DPA as of September 30, 2024, such funding is available only for the specified costs related to permitting, environmental baseline data monitoring, environmental and technical studies, and advancing construction readiness and is not available to fund certain corporate expenses, including under the Settlement Agreement. Although we expect the DPA funding to provide the Company with sufficient liquidity to complete permitting and environmental monitoring activities on the current timeline as well as additional liquidity to begin advancing construction readiness in 2024, due to payment obligations under the Settlement Agreement and other corporate expenses, we do not expect the Company will have sufficient assets to discharge its liabilities as they become due for at least 12 months from the date hereof. Absent additional financing, the Company would no longer be able to meet its ongoing obligations or progress critical permitting efforts. The Company continues to explore various strategic and funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; and/or other financing or strategic opportunities. The Company has engaged RBC Capital Markets and Endeavour Financial to assist with the evaluation of potential strategic and financing opportunities and to support the Company’s application process in connection with the U.S. EXIM $1.8 billion Letter of Interest received in April 2024. Any such financing or strategic transaction, or any funding commitment from U.S. EXIM, will be subject to due diligence and other conditions. There can be no assurance of the amount, timing or nature of any such financing or strategic transaction, if any. See “Liquidity and Capital Resources” below for more information.
Previous wording
Three and six months ended June 30, 2024 compared to three and six months ended June 30, 2023
Current wording
Three and nine months ended September 30, 2024 compared to three and nine months ended September 30, 2023
Previous wording
Net loss for the three months ended June 30, 2024 was $3.7 million compared with a net loss of $7.7 million for the three months ended June 30, 2023. This $4.0 million decrease compared to the prior year period was primarily attributable to $5.0 million recognized for CWA settlement expense in the 2023 period and an increase of $4.2 million in exploration expense in the 2024 period offset by a $4.4 million increase in grant income and a $1.0 million increase in environmental liability expenses during the three months ended June 30, 2024.
Current wording
Net loss for the three months ended September 30, 2024 was $3.6 million compared with a net loss of $2.6 million for the three months ended September 30, 2023. This $1.0 million increase compared to the prior year period was primarily attributable to increases of $5.8 million in exploration expense, $0.8 million in environmental liability expense, and $0.2 million in corporate salaries and benefits in the 2024 period offset by a $6.0 million increase in grant income compared to the prior period.
Previous wording
Net loss for the six months ended June 30, 2024 was $6.6 million compared with a net loss of $12.3 million for the six months ended June 30, 2023. This $5.7 million decrease compared to the prior year period was primarily attributable to a $6.3 million increase in grant income, a $5.0 million decrease in CWA settlement expense, and a $0.3 million decrease in interest income offset by a $5.0 million increase in exploration expenses. As noted above, for the six months ended June 30, 2024, the Company’s main focus was the continued evaluation and advancement of the Stibnite Gold Project.
Current wording
Net loss for the nine months ended September 30, 2024 was $10.2 million compared with a net loss of $14.9 million for the nine months ended September 30, 2023. This $4.7 million decrease compared to the prior year period was primarily attributable to a $12.3 million increase in grant income and a decrease of $5 million in CWA settlement expense. These decreases were offset by increases of $10.9 million in exploration costs, $0.8 million in environmental liability expense, and $0.4 million in corporate salaries and benefits and a decrease in interest income of $0.3 million. As noted above, for the nine months ended September 30, 2024, the Company’s main focus was the continued evaluation and advancement of the Stibnite Gold Project.
Previous wording
This expense results from salaries and benefits of the employees that are not directly related to the exploration and evaluation of the Stibnite Gold Project, primarily corporate employees. Salaries and benefits for the three and six months ended June 30, 2024 were 38% and 29% higher than the 2023 comparative periods primarily due to increased share-based compensation and higher salaries.
Current wording
This expense results from salaries and benefits of the employees that are not directly related to the exploration and evaluation of the Stibnite Gold Project, primarily corporate employees. Salaries and benefits for the three and nine months ended September 30, 2024 were 45% and 34% higher than the 2023 comparative periods primarily due to increased share-based compensation and higher salaries.
Previous wording
Each of the Corporation’s non-executive directors is entitled to annual base fees paid in quarterly installments, with the independent Lead Director, Chairs of Board Committees and Members of Board Committees receiving additional fees commensurate with each role. Directors’ fees are inclusive of cash fees and share-based compensation (deferred share units). This expense for the three months ended June 30, 2024 was 7% lower than the 2023 comparative period due to slightly lower share-based compensation. This expense for the six months ended June 30, 2024 was 13% higher than the 2023 comparative periods due to higher share-based compensation.
Current wording
Each of the Corporation’s non-executive directors is entitled to annual base fees paid in quarterly installments, with the independent Lead Director, Chairs of Board Committees and Members of Board Committees receiving additional fees commensurate with each role. Directors’ fees are inclusive of cash fees and share-based compensation (deferred share units). This expense for the three and nine months ended September 30, 2024 was 81% and 20% higher than the 2023 comparative periods due to higher share-based compensation.
Previous wording
This expense relates to all exploration and evaluation expenditures related to the Stibnite Gold Project, including labor, drilling, field operations, engineering, permitting, environmental, legal and sustainability costs. The Company’s exploration expenses of $10.5 million during the three months ended June 30, 2024 were $4.2 million, or 66%, higher than the three months ended June 30, 2023 primarily due to a $4.0 million increase in engineering and a $0.4 million increase in consulting and labor costs. These increases were offset by a decrease of $0.5 million in permitting costs.
Current wording
This expense relates to all exploration and evaluation expenditures related to the Stibnite Gold Project, including labor, drilling, field operations, engineering, permitting, environmental, legal and sustainability costs. The Company’s exploration expenses of $14.5 million during the three months ended September 30, 2024 were $5.8 million, or 67%, higher than the three months ended September 30, 2023 primarily due to a $4.9 million increase in engineering and a $0.4 million increase in permitting.
Previous wording
The Company’s exploration expenses of $17.0 million during the six months ended June 30, 2024 were $5.0 million, or 41%, higher than the six months ended June 30, 2023 primarily due to a $6.5 million increase in engineering, $0.5 million increase in consulting and labor costs. These increases were offset by a decrease of $2.1 million in permitting costs. Additional details of expenditures incurred are as follows:
Current wording
The Company’s exploration expenses of $31.5 million during the nine months ended September 30, 2024 were $10.8 million, or 52%, higher than the nine months ended September 30, 2023 primarily due to increases of $11.4 million in engineering, $0.8 million in consulting and labor costs, and $0.6 million in field operations and drilling support. These increases were offset by decreases of $1.7 million in permitting costs and $0.4 million of legal and sustainability costs. Additional details of expenditures incurred are as follows:
Previous wording
This expense relates to the ASAOC signed in January 2021 to voluntarily address environmental conditions at the abandoned mine site. Cost estimates were developed with the use of engineering consultants, independent contractor quotes and the Company’s internal development team, and the timing of cash flows is based on the current schedule for early action items. In the three months ended June 30, 2024, the total cost estimate to complete Phase 1 early cleanup actions increased $1.0 million compared to the same period in 2023 driven by an increase in estimated costs for a required lake tank storage solution coupled with a negative $0.5 million recognized in the comparable period ended June 30, 2023 that resulted from a decrease in total estimated costs. The expense recognized during the six month periods ended June 30, 2024 was comparable to the same period in 2023. As of June 30, 2024, the estimate for the remaining environmental liability was $0.8 million, all of which is expected to be incurred in 2024.
Current wording
This expense relates to the ASAOC signed in January 2021 to voluntarily address environmental conditions at the abandoned mine site. Cost estimates were developed with the use of engineering consultants, independent contractor quotes and the Company’s internal development team, and the timing of cash flows is based on the current schedule for early action items. In the three and nine months ended September 30, 2024, the total cost estimate to complete Phase 1 early cleanup actions increased $0.8 million and $0.8 million, respectively, compared to the same period in 2023 driven by an increase in estimated costs for a required lake tank storage solution and EPA agency cost recovery and monitoring costs coupled with a negative $0.2 million recognized in the comparable period ended September 30, 2023 that resulted from a decrease in total estimated costs. As of September 30, 2024, the estimate for the remaining environmental liability was $0.2 million, all of which is expected to be incurred in 2024.
Previous wording
This expense relates to the settlement with the Nez Perce Tribe to resolve the CWA litigation. The Settlement Agreement provides for total payments of $5.0 million by Perpetua over a four-year period. The Company recognized $5.0 million in the second quarter of 2023 for this settlement. No amount was recognized during the three and six month periods ended June 30, 2024.
Current wording
This expense relates to the settlement with the Nez Perce Tribe to resolve the CWA litigation. The Settlement Agreement provides for total payments of $5.0 million by Perpetua over a four-year period. The Company recognized $5.0 million in the second quarter of 2023 for this settlement. No amount was recognized during the three and nine month periods ended September 30, 2024.
Previous wording
This expense is predominantly insurance policies for the U.S. offices. This expense for the three and six months ended June 30, 2024 was 8% and 11% lower than the 2023 comparative periods primarily due to lower insurance premiums.
Current wording
This expense is predominantly insurance policies for the U.S. offices. This expense for the three and nine months ended September 30, 2024 was 12% and 11% lower than the 2023 comparative periods primarily due to lower insurance premiums.
Previous wording
This expense relates to the legal, accounting and consulting costs of the Corporation. This expense for the three months ended June 30, 2024 was 5% higher than the 2023 comparative period primarily due to an increase in legal fees. This expense for the six month ended June 30, 2024 was 23% higher than the 2023 comparative period primarily due to an increase in accounting and project financing related fees.
Current wording
This expense relates to the legal, accounting and consulting costs of the Corporation. This expense for the three and nine months ended September 30, 2024 was 10% and 20% higher, respectively, than the 2023 comparative periods primarily due to an increase in legal fees and consulting costs.
Previous wording
This expense relates to marketing, licenses and fees, and shareholder communications. This expense for the three and six months ended June 30, 2024 was 4% and 11% lower than the 2023 comparative periods primarily due to lower marketing costs.
Current wording
This expense relates to marketing, licenses and fees, and shareholder communications. This expense for the three months ended September 30, 2024 was 29% higher than the 2023 comparative period primarily due an increase in marketing, licensing and other fees. This expense for the nine months ended September 30, 2024 was 2% lower than the 2023 comparative period primarily due to lower marketing costs.
Previous wording
This income results from funding grants awarded to the Company from the DOD to study the domestic production of military-grade antimony trisulfide and to complete environmental and engineering studies necessary to obtain a FEIS, a ROD, and other ancillary permits to sustain the domestic production of antimony trisulfide capability for defense energetic materials. Grant income increased $4.4 million and $6.3 million for the three and six months ended June 30, 2024, compared to the comparable periods in 2023 due to the modified scope of the DPA grant in 2024.
Current wording
This income results from funding grants awarded to the Company from the DOD to study the domestic production of military-grade antimony trisulfide and to complete environmental and engineering studies necessary to obtain a FEIS, a ROD, and other ancillary permits to sustain the domestic production of antimony trisulfide capability for defense energetic materials. Grant income increased $6.0 million and $12.3 million for the three and nine months ended September 30, 2024, compared to the comparable periods in 2023 due to the modified scope of the DPA grant in 2024.
Previous wording
This income results from interest received on the Company’s cash balances. Interest income decreased $120,766 and $266,692 in the three and six months ended June 30, 2024 compared to the three and six months ended June 30, 2023 as a result of lower cash balances in 2024 compared to 2023.
Current wording
This income results from interest received on the Company’s cash balances. Interest income decreased $50,810 and $317,502 in the three and nine months ended September 30, 2024 compared to the three and nine months ended September 30, 2023 as a result of lower cash balances in 2024 compared to 2023.
Previous wording
Capital resources of Perpetua Resources consist primarily of cash and liquid short-term investments. As of June 30, 2024, Perpetua Resources had cash and cash equivalents totaling approximately $1.9 million, approximately $7.6 million in receivables, principally from DOD grants, $0.8 million in prepaid assets, and $4.3 million in trade and other payables.
Current wording
Capital resources of Perpetua Resources consist primarily of cash and liquid short-term investments. As of September 30, 2024, Perpetua Resources had cash and cash equivalents totaling approximately $11.2 million, approximately $8.8 million in receivables, principally from DOD grants, $0.9 million in prepaid assets, and $7.3 million in trade and other payables.
Previous wording
In December 2022, the Company was awarded an undefinitized TIA of up to $24.8 million under Title III of the DPA. On July 25, 2023, the TIA was definitized with the DOD, establishing the full not-to-exceed amount of $24.8 million and on May 2, 2024, the TIA was modified with an additional $34.4 million in funding, bringing the total amount of the TIA to $59.2 million. Under the funding agreement, Perpetua Resources may request reimbursement for certain costs incurred through June 16, 2025 related to environmental baseline data monitoring, environmental and technical studies and other activities related to advancing Perpetua’s construction readiness and permitting process for the Stibnite Gold Project, which includes reimbursement of employee wages for activities included in the scope of the TIA. During the three and six months ended June 30, 2024, $8.4 million and $11.0 million, respectively, was recognized as grant income related to the TIA. During the six months ended June 30, 2024, the Company was reimbursed $4.8 million for certain costs incurred, and received reimbursement of an additional $3.9 million in July 2024 and anticipates receipt of $3.7 million in August 2024, under the TIA with respect to expenses incurred in the three months ended June 30, 2024.
Current wording
In December 2022, the Company was awarded an undefinitized TIA of up to $24.8 million under Title III of the DPA. On July 25, 2023, the TIA was definitized with the DOD, establishing the full not-to-exceed amount of $24.8 million and on May 2, 2024, the TIA was modified with an additional $34.4 million in funding, bringing the total amount of the TIA to $59.2 million. Under the funding agreement, Perpetua Resources may request reimbursement for certain costs incurred through June 16, 2025 related to environmental baseline data monitoring, environmental and technical studies and other activities related to advancing Perpetua’s construction readiness and permitting process for the Stibnite Gold Project, which includes reimbursement of employee wages for activities included in the scope of the TIA. During the three and nine months ended September 30, 2024, $12.6 million and $23.7 million, respectively, was recognized as grant income related to the TIA. During the nine months ended September 30, 2024, the Company was reimbursed $16.4 million for certain costs incurred, and received reimbursement of an additional $4.6 million in October 2024 and anticipates receipt of $3.8 million in November 2024, under the TIA with respect to expenses incurred in the three months ended September 30, 2024. As of September 30, 2024, $20.0 million remained available under the TIA.
Previous wording
Although the Company’s current capital resources and liquidity include up to $59.2 million in funding awarded under the modified TIA pursuant to Title III of the DPA, such funding is available only for the specified costs described above and is not available to fund the Company’s costs under its ASAOC obligations and certain corporate expenses, including payments under the Settlement Agreement. Although we expect the DPA funding to provide the Company with sufficient liquidity to complete permitting on the current timeline as well as additional liquidity to begin advancing construction readiness in 2024, due to costs of the ASAOC restoration obligations, payments under the Settlement Agreement and other corporate expenses, we do not expect the Company will have sufficient assets to discharge its liabilities as they become due for at least 12 months from the date hereof.
Current wording
Although the Company’s current capital resources and liquidity include up to $20.0 million in funding awarded under the modified TIA pursuant to Title III of the DPA as of September 30, 2024, such funding is available only for the specified costs described above and is not available to fund certain corporate expenses, including payments under the Settlement Agreement. Although we expect the DPA funding to provide the Company with sufficient liquidity to complete permitting on the current timeline as well as additional liquidity to begin advancing construction readiness in 2024, due to payments under the Settlement Agreement and other corporate expenses, we do not expect the Company will have sufficient assets to discharge its liabilities as they become due for at least 12 months from the date hereof.
Previous wording
The Company’s latest liquidity forecast indicates that available cash resources for expenses not eligible for reimbursement under the DPA funding are expected to be exhausted in the fourth quarter of 2024. Absent additional financing, the Company would no longer be able to meet its ongoing obligations or progress critical permitting efforts. The Company continues to explore various funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; and/or other financing opportunities. On May 12, 2023, the Company entered into a Controlled Equity Offering SM Sales Agreement (the “Sales Agreement”) providing for the sale by the Company, from time to time, of its common shares having an aggregate gross offering price of up to $20.0 million. As of June 30, 2024, $17.2 million remained available under the program. Future sales under the program are subject to certain conditions, including market conditions, and there is no assurance that the Company will be able to raise additional funds under the program, at acceptable share prices or at all.
Current wording
The Company’s latest liquidity forecast indicates that available cash resources for expenses not eligible for reimbursement under the DPA funding are expected to be exhausted in the second quarter of 2025. Absent additional financing, the Company would no longer be able to meet its ongoing obligations or progress critical permitting efforts. The Company continues to explore various strategic and funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; and/or other financing or strategic opportunities. The Company has engaged RBC Capital Markets and Endeavour Financial to assist with the evaluation of potential strategic and financing opportunities and to support the Company’s application process in connection with the U.S. EXIM $1.8 billion Letter of Interest received in April 2024. Any such financing or strategic transaction, or any funding commitment from U.S. EXIM, will be subject to due diligence and other conditions. There can be no assurance of the amount, timing or nature of any such financing or strategic transaction, if any. On May 12, 2023, the Company entered into a Controlled Equity Offering SM Sales Agreement (the “Sales Agreement”) providing for the sale by the Company, from time to time, of its common shares having an aggregate gross offering price of up to $20.0 million. As of September 30, 2024, $6.2 million remained available under the program. Future sales under the program are subject to certain conditions, including market conditions, and there is no assurance that the Company will be able to raise additional funds under the program, at acceptable share prices or at all.
Previous wording
We believe our plans outlined above to obtain sufficient funding will be successful although there is no certainty that these plans will result in needed liquidity for a reasonable period of time. However, our expectation of incurring ASAOC costs, contributions due under the Settlement Agreement and other costs in the foreseeable future that are not eligible for DPA funding reimbursement and the need for additional funding to further support the development of our planned operations, raise substantial doubt regarding our ability to continue as a going concern for a period of one year after the date that the unaudited condensed consolidated financial statements are issued. The future receipt of potential funding from equity, debt, pursuit of additional government funding opportunities and/or other means cannot be considered probable at this time because these plans are not entirely within our control as of the date hereof.
Current wording
We believe our plans outlined above to obtain sufficient funding will be successful although there is no certainty that these plans will result in needed liquidity for a reasonable period of time. However, contributions due under the Settlement Agreement and our expectation of incurring other costs in the foreseeable future that are not eligible for DPA funding reimbursement and the need for additional funding to further support the development of our planned operations, raise substantial doubt regarding our ability to continue as a going concern for a period of one year after the date that the unaudited condensed consolidated financial statements are issued. The future receipt of potential funding from equity, debt, pursuit of additional government funding opportunities and/or other means cannot be considered probable at this time because these plans are not entirely within our control as of the date hereof.
Previous wording
Our anticipated expenditures for the fiscal year 2024 are approximately $48.0 million, of which approximately $40.0 million are expected to be funded from the DPA reimbursements and the remainder from cash on hand. These expenditures include an estimated $11.2 million to fund permitting of the Stibnite Gold Project, $13.4 million for general corporate purposes, project financing and administrative costs, $17.6 million for engineering and design work, $4.4 million for field operations and approximately $1.4 million to advance early restoration under the ASAOC. These costs are subject to change due to cost over-runs, delays or other unbudgeted events, such as effects of inflation. Our long-term liquidity requirements will require project financing to fund the capital costs to develop the Project, which was estimated to be approximately $1,263 million as of the third quarter of 2020 according to the TRS.
Current wording
Our anticipated expenditures for the fiscal year 2024 are approximately $48.1 million, of which approximately $35.8 million are expected to be funded from the DPA reimbursements and the remainder from cash on hand. These expenditures include an estimated $12.1 million to fund permitting of the Stibnite Gold Project, $12.6 million for general corporate purposes, project financing and administrative costs, $17.8 million for engineering and design work, $3.3 million for field operations and approximately $2.3 million to complete early restoration under the ASAOC. These costs are subject to change due to cost over-runs, delays or other unbudgeted events, such as effects of inflation. Our long-term liquidity requirements will require project financing to fund the capital costs to develop the Project, which was estimated to be approximately $1,263 million as of the third quarter of 2020 according to the TRS.