Skip to main content

TMC the metals Co Inc

For the period ended Jun 30, 2024. Filed Aug 14, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2024 · Filed Aug 14, 2024

TMC$2.27+9.7%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-03-31; filed 2024-05-13.

0001104659-24-060532

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2024-06-30; filed 2024-08-14.

0001104659-24-089697

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 130 previous paragraphs and 134 current paragraphs.

72 unchanged; 34 reworded; 26 added; 14 removed; 10 previous and 2 current paragraphs rearranged.

Tables are not compared: 2 previous and 2 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (26)

Current report

U.S. House Allocates Defense Department Funding to Assess the Feasibility of Domestic Nodule Refining Capacity

Current report

On May 23, 2024, we welcomed the allocation of $2 million under the House version of the fiscal year 2025 National Defense Authorization Act (NDAA) to the Defense Department’s Industrial Base Policy Office to study the feasibility of developing domestic capacity to refine polymetallic nodule-derived intermediates to high-purity nickel, copper and cobalt products. In addition, TMC’s U.S. subsidiary has an outstanding application seeking a $9 million grant under the Defense Production Act Title III program for feasibility work on a domestic refinery for nodule-derived intermediate products. Our U.S. subsidiary may pursue larger grants and/or loans through the Department of Energy’s Loan Programs Office, Export-Import Bank and other departments to fund construction of a refinery.

Current report

Prominent Sustainability Strategist Brendan May Joins TMC’s Board of Directors

Current report

On June 3, 2024, we announced the appointment of Brendan May to our Board of Directors. As a former Chief Executive of the Marine Stewardship Council (MSC) and European Chairman of the Rainforest Alliance, Mr. May has spent over two decades at the forefront of sustainability challenges in globally significant ecosystems. In 2010, he formed renowned global sustainability consultancy, Robertsbridge, whose counsel has been sought by leading companies and NGOs around the world.

Current report

On July 29, 2024, we published our third annual Impact Report to provide an update on key milestones achieved in our assessment of the environmental impacts of nodule collection including, what we believe, is the successful collection of sufficient quantities of environmental baseline and impact data to develop an Environmental Impact Statement and Environmental Mitigation and Management Plan (EMMP) for the world’s first deep-seafloor nodule collection project.

Current report

Data processing from the successful Campaign 8 has been completed, and data packages have been distributed to all relevant subcontractors to advance environmental and technical scopes.

Current report

On April 6, 2024, 2,000 wet tonnes of polymetallic nodules, collected during the successful 2022 pilot nodule collection system test, were delivered to PAMCO, at their facility in Hachinohe, Japan. This delivery facilitated the commencement of calcining trials at the PAMCO facility in mid-May, marking a significant milestone in supporting the metallurgical program.

Current report

Progress continues on the Environmental Impact Statement (EIS), Pre-Feasibility Study (PFS), and Plan of Work application documentation. Key activities during the second quarter 2024 included the development of tender documents by Allseas for long lead items and our EIS team conducted an environmental synthesis workshop with all EIS contributors.

Current report

As we previously disclosed, the ISA did not provisionally adopt and approve the final rules, regulations and procedures (“RRPs” or the “Mining Code”) for the exploitation of seafloor resources by the July 9, 2023 deadline. At its July 2024 session, the ISA agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30 th session of the ISA in 2025. The ISA Council has scheduled two ISA Council meetings in March and July 2025 to progress the Mining Code and has agreed to continue working inter-sessionally to advance the text. In addition, on August 2, 2024, the ISA Assembly elected Leticia Carvalho of Brazil as the new Secretary-General of the ISA for the period 2025-2028.

Current report

Consistent with Nauru’s rights, as the sponsoring state of NORI, under UNCLOS and the 1994 agreement relating to the implementation of Part XI of UNCLOS, NORI reserves its right to submit a plan of work for exploitation, in the absence of the adoption of the final Mining Code pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 agreement relating to the implementation of Part XI of UNCLOS, the possibility of which was recognized in ISA Council decisions ISBA/28/C/24 and ISBA/28/C/25. There can be no assurances, however, that the ISA will provisionally approve our plan of work or that such provisional approval would lead to the issuance of an exploitation contract by the ISA.

Current report

Assuming submission of an application for a plan of work for exploitation prior to the next meeting of the ISA scheduled for March 2025, assuming the ISA’s timely review and approval thereof, based on the current timeline in the consolidated draft regulations issued February 2024, we expect our first production offshore from NORI Area D to be at the end of the first quarter of 2026. There can be no assurances, however, that (i) the Mining Code will be adopted within these timelines, or at all, or (ii) the ISA will provisionally approve our plan of work or that such provisional approval would lead to the issuance of an exploitation contract by the ISA before the final Mining Code is adopted, or at all.

Current report

Exploration and evaluation expenses for the three months ended June 30, 2024 were $12.4 million, compared to $8.1 million for the same period in 2023. The increase of $4.3 million was primarily due to an increase in mining, technological and process development of $1.8 million resulting from increased engineering work by Allseas, increase in share-based compensation of $1.7 million due to amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024 and higher personnel costs of $1 million. This was partially offset by a decrease in environmental studies as the costs to complete Campaign 8b in the second quarter of 2024 was lower than the cost of the environmental work spent in the second quarter of 2023 to complete the NORI pilot nodule collection system test.

Current report

G&A expenses for the three months ended June 30, 2024 were $7.9 million compared to $5.1 million for the same period in 2023. The increase of $2.8 million in G&A expenses was mainly due to an increase in share-based compensation of $1.7 million due to amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024, higher personnel costs and an increase in legal and consulting costs.

Current report

Six Months ended June 30, 2024 compared to Six Months ended June 30, 2023

Current report

G&A expenses for the six months ended June 30, 2024 were $14.5 million, compared to $11.3 million for the same period in 2023. The increase of $3.2 million in G&A expenses in the first half of 2024 was mainly the result of an increase in share-based compensation of $2.2 million due to amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024, higher personnel cost of $1.3 million and higher cost incurred on business development, communication, and advisory activities. This increase was partially offset by decreased legal and insurance costs incurred in the first half of 2024 compared to the same period in 2023.

Current report

The change in fair value of warrants liability consists of the change in the fair value of the 9,500,000 Private Warrants, which is based on the change in the price of our warrants and the price of the Company’s shares and resulted in a small credit in the first half of 2024 and a charge of $1.3 million in the first half of 2023, primarily due to an increase of 150% in the price of our Public Warrants over this period.

Current report

On May 27, 2024, the Company entered into a short-term loan agreement with the Lender (Argentum Cedit Virtuti GCV), an affiliate of Allseas. In accordance with the agreement, the Lender provided a short-term loan amounting to $2 million (the "Loan") on May 30, 2024. The Loan takes priority over the 2024 Credit Facility. The Loan and accrued interest are payable to the Lender on or before the earlier of (i) our next financing and (ii) September 10, 2024 (maturity date). The Loan will accrue interest at a rate of 8% per annum. As of the date of this Quarterly Report on Form 10-Q, the Loan remains outstanding.

Current report

Six Months ended June 30, 2024 compared to Six Months ended June 30, 2023

Current report

On May 27, 2024, the Company entered into a short-term loan agreement with Argentum Cedit Virtuti GCV whereby the Company borrowed $2 million (the "Loan") on May 30, 2024. The Loan takes priority over the 2024 Credit Facility discussed below. The Loan and accrued interest are payable to the Lender on or before the earlier of (i) our next financing and (ii) September 10, 2024 (maturity date). The Loan accrues interest at a rate of 8% per annum.
Removed paragraphs (14)

Previous report

On March 22, 2024, we entered into the Second Amendment to the Unsecured Credit Facility with Argentum Credit Virtuti GCV (the Lender), the parent of Allseas Investments S.A. and an affiliate of Allseas, to further extend the Credit Facility to August 31, 2025 and to provide that the underutilization fee thereunder shall cease to be payable after the date on which we or the Lender gives notice of termination of the agreement (as amended by this amendment and the July 2023 amendment, the “Credit Facility”). Under the Credit Facility, we may borrow from the Lender up to $25,000,000 in the aggregate through August 31, 2025.

Previous report

In February 2024, the ISA published a consolidated set of draft regulations for the first time, harmonizing and cleaning up the text thereof. The 225-page text is comprehensive and signals the next phase in the negotiations to finalize the regulations. Part 1 of the ISA’s 29th Session took place between March 18-29, 2024. During the Session, the ISA Council commenced negotiations on the new consolidated text and identified a number of issues for negotiation inter-sessionally.

Previous report

In March 2024, legislation was introduced in the U.S. House of Representatives calling for the U.S. to “support international governance of seafloor resource exploration and responsible polymetallic nodule collection by allied partners”, and to “provide financial, diplomatic, or other forms of support for seafloor nodule collection, processing and refining.”

Previous report

Extensive Submission of Deep-Sea Environmental Data to the ISA

Previous report

In May 2024, we announced that our subsidiary NORI had made a second submission of key environmental data from all prior environmental baseline campaigns conducted in the NORI-D exploration area up to January 2022 to DeepData, an open database of contractor data managed by the ISA. The submission of this batch of data includes an extensive set of geochemical and biological samples from across the water column.

Previous report

G&A expenses for the three months ended March 31, 2024 were $6.6 million compared to $6.2 million for the same period in 2023. The increase of $0.4 million is due to higher amortization of share-based compensation and higher consulting fees, offset by lower legal costs.
Reworded paragraphs (34)

Previous wording

The following discussion and analysis provide information which management believes is relevant to an assessment and understanding of our condensed consolidated results of operations and financial condition. The discussion should be read in conjunction with the unaudited condensed consolidated financial statements and notes thereto contained in this Quarterly Report on Form 10-Q and the consolidated financial statements and notes thereto for the year ended December 31, 2023 contained in our 2023 Annual Report on Form 10-K. This discussion contains forward looking statements and involves numerous risks and uncertainties, including, but not limited to, those described in “Risk Factors” in Item 1A of Part I of the 2023 Annual Report on Form 10-K, as updated and/or supplemented in subsequent filings with the SEC. Actual results may differ materially from those contained in any forward-looking statements. Unless the context otherwise requires, references to “we”, “us”, “our”, “TMC” and “the Company” are intended to mean the business and operations of TMC the metals company Inc. and its consolidated subsidiaries. The unaudited condensed consolidated interim financial statements for the three months ended March 31, 2024 and 2023, respectively, present the financial position and results of operations of TMC the metals company Inc. and its consolidated subsidiaries.

Current wording

*The following discussion and analysis provide information which management believes is relevant to an assessment and understanding of our condensed consolidated results of operations and financial condition. The discussion should be read in conjunction with the unaudited condensed consolidated financial statements and notes thereto contained in this Quarterly Report on Form 10-Q and the consolidated financial statements and notes thereto for the year ended December 31, 2023 contained in our 2023 Annual Report on Form 10-K. This discussion contains forward looking statements and involves numerous risks and uncertainties, including, but not limited to, those described in “Risk Factors” in Item 1A of Part I of the 2023 Annual Report on Form 10-K, as updated and/or supplemented in subsequent filings with the SEC. Actual results may differ materially from those contained in any forward-looking statements. Unless the context otherwise requires, references to “we”, “us”, “our”,**“TMC”*and “the Company” are intended to mean the business and operations of TMC the metals company Inc. and its consolidated subsidiaries. The unaudited condensed consolidated interim financial statements for the three months and six months ended June 30, 2024 and 2023, respectively, present the financial position and results of operations of TMC the metals company Inc. and its consolidated subsidiaries.

Previous wording

These four metals contained in the polymetallic nodules are critical for the transition to low carbon energy. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped source of critical battery metals. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to produce three types of metal products: (i) feedstock for battery cathode precursors (nickel and cobalt sulfates, or intermediary nickel-copper-cobalt matte, or nickel-copper-cobalt alloy) for electric vehicles (“EV”) and renewable energy storage markets, (ii) copper cathode for EV wiring, energy transmission and other applications, and (iii) manganese silicate for manganese alloy production required for steel production. Our mission is to build a carefully managed, shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. Significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.

Current wording

These four metals contained in the polymetallic nodules are critical for the transition to low carbon energy, as well as for infrastructure and development. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped source of critical battery metals. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to produce three types of metal products: (i) feedstock for battery cathode precursors (nickel and cobalt sulfates, or intermediary nickel-copper-cobalt matte, or nickel-copper-cobalt alloy) for electric vehicles (“EV”) and renewable energy storage markets, (ii) copper cathode for EV wiring, energy transmission and other applications, and (iii) manganese silicate for manganese alloy production required for steel production. Our mission is to build a carefully managed, shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. Significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.

Previous wording

We have key strategic alliances with (i) Allseas, a leading global offshore contractor, which developed and tested a pilot collection system, which is expected to be modified into the first commercial production system and (ii) Glencore which holds offtake rights to 50% of the NORI nickel and copper production. In addition, we have worked with an engineering firm Hatch Ltd. (Hatch) and consultants Kingston Process Metallurgy Inc. (KPM) to develop a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth and XPS’ facilities. The matte refining stages are being tested at SGS Lakefield. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. After several months of pre-feasibility work in 2022 on the possibility of building a processing facility in India for Project Zero, we decided to adopt a capital-light approach and focus on sourcing an existing processing facility requiring lower capital expenditures and which we believe may offer a lower risk solution to get Project Zero into production. In November 2022, we entered into a non-binding Memorandum of Understanding (“MoU”) with Pacific Metals Co Ltd (PAMCO) of Japan pursuant to which PAMCO completed prefeasibility work assessing the prospect of processing nodules using their existing facilities. In November 2023, we entered into a binding MoU with PAMCO whereby they must complete a feasibility study (expected to be completed during the fourth quarter of 2024) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility expected to start in the second quarter of 2026, provided we obtain an exploitation contract from the ISA as expected. The toll treatment is intended to take place on a dedicated Rotary Kiln Electric Arc Furnace (RKEF) processing line and produce two products: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce Li-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing. We expect this partnership to progress to a definitive tolling agreement before the end of 2024, subject to successful evaluation study outcomes and agreement to mutually acceptable commercial terms. There can be no assurance that we will enter into such definitive strategic alliance in a particular time period, or at all, or on terms similar to those set forth in the binding MoU, or that if such definitive tolling agreement is entered into by us or that the existing facility will be able to successfully process nodules in a particular time period, or at all.

Current wording

We have key strategic alliances with (i) Allseas, a leading global offshore contractor, which developed and tested a pilot collection system, and is now working to modify it into the first commercial production system and (ii) Glencore which holds offtake rights to 50% of the NORI nickel and copper production if produced from a DGE-owned or controlled facility. In addition, we have worked with an engineering firm Hatch Ltd. (Hatch) and consultants Kingston Process Metallurgy Inc. (KPM) to develop a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to Ni-Cu-Co matte intermediate were demonstrated as part of our pilot plant program at FLSmidth and XPS’ facilities. The matte refining stages are being tested at SGS Lakefield. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. After several months of pre-feasibility work in 2022 on the possibility of building a processing facility in India for Project Zero, we decided to adopt a capital-light approach and focus on sourcing an existing processing facility requiring lower capital expenditures and which we believe may offer a lower risk solution to get Project Zero into production. In November 2022, we entered into a non-binding Memorandum of Understanding (“MoU”) with Pacific Metals Co Ltd (PAMCO) of Japan pursuant to which PAMCO completed prefeasibility work assessing the prospect of processing nodules using their existing facilities. In November 2023, we entered into a binding MoU with PAMCO whereby they committed to completing a feasibility study (expected to be completed during the fourth quarter of 2024) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility expected to start in the second quarter of 2026, provided we obtain an exploitation contract from the ISA as expected. The toll treatment is intended to take place on a dedicated Rotary Kiln Electric Arc Furnace (RKEF) processing line and produce two products: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce lithium-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing. We expect this partnership to progress to a definitive tolling agreement before the end of 2024, subject to successful evaluation study outcomes and agreement to mutually acceptable commercial terms. There can be no assurance that we will enter into such definitive strategic alliance in a particular time period, or at all, or on terms similar to those set forth in the binding MoU, or that if such definitive tolling agreement is entered into by us or that the existing facility will be able to successfully process nodules in a particular time period, or at all.

Previous wording

We are currently focused on preparing our application to the ISA for our first exploitation contract for the NORI Area D contract area following the July 2024 meetings of the ISA.

Current wording

We are currently focused on preparing our application for a plan of work to the ISA for our first exploitation contract for the NORI contract area, which we expect to be completed and ready for submission prior to the next meeting of the ISA scheduled for March 2025.

Previous wording

We expect to commence production offshore at the end of the first quarter of 2026, assuming an ISA application review and approval process of approximately one year.

Current wording

We expect to commence production offshore at the end of the first quarter of 2026, assuming an ISA application review and approval process of approximately one year, based on the current timeline in the consolidated draft regulations issued February 2024. See “Project and Regulatory Updates - ISA Developments” below for a further discussion of our planned application and recent developments at the ISA.

Previous wording

Below are some of the major developments that occurred in the first quarter of 2024:

Current wording

Below are some of the major developments that occurred in the second quarter of 2024:

Previous wording

In April 2024, renowned Silicon Valley investor Steve Jurvetson joined our board of directors as Vice Chairman and special advisor to the CEO. Mr. Jurvetson is an investor focused on founder-led, mission-driven companies at the cutting edge of disruptive technology and new industry formation. His investments include pioneering technology companies like Tesla, Planet Labs, SpaceX and Commonwealth Fusion Systems, and represent over $800 billion in aggregate value creation.

Current wording

On April 10, 2024, renowned Silicon Valley investor Steve Jurvetson joined our board of directors as Vice Chairman and special advisor to the CEO. Mr. Jurvetson is an investor focused on founder-led, mission-driven companies at the cutting edge of disruptive technology and new industry formation. His investments include pioneering technology companies like Tesla, Planet Labs, SpaceX and Commonwealth Fusion Systems, and represent over $800 billion in aggregate value creation.

Previous wording

World-First Production of Nickel Sulfate from Deep-Seafloor Polymetallic Nodules

Current wording

World-First Cobalt Sulfate Produced from Deep-Seafloor Polymetallic Nodules

Previous wording

In April 2024, we announced that we had successfully produced the world’s first nickel sulfate derived exclusively from seafloor polymetallic nodules during pilot-scale nodule processing. In partnership with SGS Canada Inc, the testing was undertaken on samples of nickel-cobalt-copper matte produced by TMC in 2021 using the Company’s efficient flowsheet to process high-grade nickel matte directly to nickel sulfate without making nickel metal, while producing fertilizer byproducts instead of solid waste or tailings.

Current wording

On June 12, 2024, we announced that we successfully produced the world’s first cobalt sulfate derived exclusively from seafloor polymetallic nodules. The cobalt sulfate was generated during bench-scale testing of our hydrometallurgical flowsheet design with SGS Canada Inc. Based on samples of nickel-cobalt-copper matte first produced by us in 2021, SGS tested our efficient flowsheet to process high-grade nickel-copper-cobalt matte directly to high-purity cobalt sulfate without making cobalt metal, while producing fertilizer byproducts instead of solid waste or tailings. The milestone followed the news in May of our successful production of nickel sulfate, a key raw material input used in the production of energy-dense electric vehicle batteries.

Previous wording

We are an exploration-stage company with no revenue to date and a net loss of $25.2 million for the three months ended March 31, 2024, compared to a net loss of $13.7 million in the same period of 2023. We have an accumulated deficit of approximately $574.1 million from inception through March 31, 2024.

Current wording

We are an exploration-stage company with no revenue to date and a net loss of $20.2 million and $45.4 million for the three and six months ended June 30, 2024, respectively, compared to a net loss of $14.1 million and $27.9 million in the same periods of 2023, respectively. We have an accumulated deficit of approximately $594.3 million from inception through June 30, 2024.

Previous wording

The following is a discussion of our results of operations for the three months ended March 31, 2024 and 2023. Our accounting policies are described in Note 3 “Significant Accounting Policies” in our financial statements filed as part of the 2023 Annual Report on Form 10-K.

Current wording

The following is a discussion of our results of operations for the three and six months ended June 30, 2024 and 2023. Our accounting policies are described in Note 3 “Significant Accounting Policies” in our financial statements filed as part of the 2023 Annual Report on Form 10-K.

Previous wording

Additionally, the unaudited condensed consolidated interim financial statement for the three months ended March 31, 2023 have been revised to correct prior period errors as discussed in Note 22 “Quarterly Financial Data (Unaudited) Restatement of Previously Issued Financial Statements” to the consolidated financial statement included in Part II, Item 8 of our 2023 Annual Report on Form 10-K. Accordingly, the Management’s Discussion and Analysis of Financial Condition and Results of Operations reflects the effects of the revisions.

Current wording

Additionally, the unaudited condensed consolidated interim financial statement for the six months ended June 30, 2023 have been revised to correct prior period errors as discussed in Note 22 “Quarterly Financial Data (Unaudited) Restatement of Previously Issued Financial Statements” to the consolidated financial statement included in Part II, Item 8 of our 2023 Annual Report on Form 10-K. Accordingly, the Management’s Discussion and Analysis of Financial Condition and Results of Operations reflects the effects of the revisions.

Previous wording

Comparison of the Three Months Ended March 31, 2024 and 2023

Current wording

Comparison of the Three and Six Months Ended June 30, 2024 and 2023

Previous wording

We reported a net loss of approximately $25.2 million in the first quarter of 2024, compared to a net loss of $13.7 million in the same period of 2023. The following explains the major reasons for the increase in the net loss in the first quarter of 2024.

Current wording

We reported a net loss of approximately $20.2 million in the second quarter of 2024, compared to a net loss of $14.1 million in the same period of 2023. The following explains the major reasons for the increase in the net loss in the second quarter of 2024.

Previous wording

The change in fair value of warrants liability primarily consists of the change in the fair value of the 9,500,000 Private Warrants. The charge recorded in both years reflects the increase in the market price of our warrants.

Current wording

The change in fair value of warrants liability consists of the change in the fair value of the 9,500,000 Private Warrants, which is based on the change in the price of our warrants and the price of the Company’s shares.

Previous wording

Exploration and evaluation expenses for the three months ended March 31, 2024 were $18.1 million, compared to $7.2 million for the same period in 2023. The increase of $10.9 million was primarily due to an increase in mining, technological and process development of $10.5 million due to increased engineering work and expenses incurred on the transportation of nodules to PAMCO’s facility in Japan, and higher personnel costs. This was partially offset by a decrease in environmental studies as the cost for Campaign 8 which commenced in the fourth quarter of 2023 was completed in the first quarter of 2024 and was lower than the cost of the environmental work in the first quarter of 2023 following the completion of the NORI integrated collector test.

Current wording

Exploration and evaluation expenses for the six months ended June 30, 2024 were $30.5 million, compared to $15.3 million for the same period in 2023. The increase of $15.2 million was primarily due to an increase in mining, technological and process development of $12.2 million resulting from increased engineering work by Allseas, as well as expenses incurred on the transportation of nodules to PAMCO’s facility in Japan, higher personnel costs of $2.2 million and anincrease in share-based compensation of $1.7 million due to amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024. This was partially offset by a decrease in environmental studies as the cost for Campaign 8 which commenced in the fourth quarter of 2023 was completed in the first quarter of 2024 and was lower than the cost of the environmental work in the first half of 2023 following the completion of the NORI pilot nodule collection system test.

Previous wording

Our primary sources of financing have come from private placements and public offerings of Common Shares and warrants, the issuance of convertible debentures and from credit facilities. As of March 31, 2024, we had cash on hand of $4.0 million.

Current wording

Our primary sources of financing have come from private placements and public offerings of Common Shares and warrants, the issuance of convertible debentures and from credit facilities. As of June 30, 2024, we had cash on hand of $0.5 million.

Previous wording

In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for an exploitation contract for the NORI Area D, and by negotiating the settlement of program expenditures with our equity whenever possible.

Current wording

In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for an exploitation contract for the NORI contract area, and by negotiating the settlement of program expenditures with our equity whenever possible.

Previous wording

We expect to incur significant expenses and operating losses for the foreseeable future, particularly as we advance towards our application to the ISA for an exploitation contract and preparation for potential commercialization. Based on our cash balance and availability of borrowing under our credit facility with Allseas and credit facility with ERAS Capital LLC and Gerard Barron, when compared with our forecasted cash expenditures, we believe we will have sufficient funds to meet our obligations that become due within the next twelve months. Our estimates used in reaching this conclusion are based on information available as at the date of filing this Quarterly Report on Form 10-Q. Accordingly, actual results could differ from these estimates and resulting variances may result in our need for additional funding in an amount greater or earlier than expected, due to changes in business conditions or other developments, including, but not limited to, deferral of approvals, capital and operating cost escalation, currently unrecognized technical and development challenges, our ability to pay certain vendors or suppliers in our Common Shares or changes in external business environment.

Current wording

We expect to incur significant expenses and operating losses for the foreseeable future, particularly as we advance towards our application to the ISA for an exploitation contract and preparation for potential commercialization. Based on our cash balance and availability of borrowing under our credit facility with a company related to Allseas, as we expect the credit facility will be amended, and credit facility with ERAS Capital LLC and Gerard Barron, when compared with our forecasted cash expenditures, we believe we will have sufficient funds to meet our obligations that become due within the next twelve months. Our estimates used in reaching this conclusion are based on information available as at the date of filing this Quarterly Report on Form 10-Q. Accordingly, actual results could differ from these estimates and resulting variances may result in our need for additional funding in an amount greater or earlier than expected, due to changes in business conditions or other developments, including, but not limited to, deferral of approvals, capital and operating cost escalation, currently unrecognized technical and development challenges, our ability to pay certain vendors or suppliers in our Common Shares or changes in external business environment.

Previous wording

On December 22, 2022, we entered into an At-the-Market Equity Distribution Agreement (the “Sales Agreement”) with Stifel, Nicolaus & Company, Incorporated (“Stifel”) and Wedbush Securities Inc., as sales agents, allowing us, from time to time, to issue and sell Common Shares with an aggregate offering price of up to $30 million. On December 21, 2023, we amended the Sales Agreement to remove Stifel as a sales agent. The offer and sales of the shares are made under our effective “shelf” registration statement on Form S-3 filed with the SEC on September 16, 2022, which the SEC declared effective on October 14, 2022. In April 2024, we sold 1,607,821 Common Shares pursuant to the Sales Agreement for gross proceeds of $2.6 million ($2.5 million net of fees and commissions).

Current wording

On December 22, 2022, we entered into an At-the-Market Equity Distribution Agreement (the “Sales Agreement”) with Stifel, Nicolaus & Company, Incorporated (“Stifel”) and Wedbush Securities Inc., as sales agents, allowing us, from time to time, to issue and sell Common Shares with an aggregate offering price of up to $30 million. On December 21, 2023, we amended the Sales Agreement to remove Stifel as a sales agent. The offer and sales of the shares are made under our effective “shelf” registration statement on Form S-3 filed with the SEC on September 16, 2022, which the SEC declared effective on October 14, 2022. In the second quarter of 2024, we sold 1,634,588 Common Shares pursuant to the Sales Agreement for net proceeds of $2.6 million, net of fees and commissions.

Previous wording

On March 22, 2023, we entered into a Credit Facility with Argentum Credit Virtuti GCV, the parent of Allseas Investments S.A. and an affiliate of Allseas, which was amended on July 31, 2023 and March 22, 2024, pursuant to which, we may borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions. All amounts drawn under the Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the Credit Facility. We have the right to pre-pay the entire amount outstanding under the Credit Facility at any time, before the Credit Facility’s maturity of

Current wording

On March 22, 2023, we entered into a Credit Facility with Argentum Cedit Virtuti GCV, the parent of Allseas Investments S.A. and an affiliate of Allseas, which was amended on July 31, 2023 and March 22, 2024, pursuant to which, we may borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions. All amounts drawn under the Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the Credit Facility. We have the right to pre-pay the entire amount outstanding under the Credit Facility at any time, before the Credit Facility’s maturity of August 31, 2025. The Credit Facility also contains customary events of default. We believe we have an agreement in principle with the Lender to amend the Credit Facility to increase the borrowing limit of the Credit Facility from $25 million to $27.5 million until certain financing events when the borrowing limit returns to its original amount. We, however, are awaiting the final amendment from the Lender and believe the amendment to the Credit Facility will be executed in the next few days when the authorized signatory is available to sign the amendment. As of the date of this Quarterly Report on Form 10-Q, no amounts have been drawn under this Credit Facility.

Previous wording

On March 22, 2024, we entered into an Unsecured Credit Facility (the “2024 Credit Facility”) with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar (collectively, the “2024 Lenders”), pursuant to which, we may borrow from the 2024 Lenders up to $20,000,000 in the aggregate ($10,000,000 from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of September 22, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least USD $50,000,000 in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. As of May 13, 2024, the Company drew $2.9 million from the 2024 Credit Facility.

Current wording

On March 22, 2024, we entered into an Unsecured Credit Facility (the “2024 Credit Facility”) with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar (collectively, the “2024 Lenders”), pursuant to which, we may borrow from the 2024 Lenders up to $25,000,000 in the aggregate ($12,500,000 from each of the 2024 Lenders), from time to time (was initially $20,000,000 in the aggregate ($10,000,000 from each of the 2024 Lenders), subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of September 22, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least $50,000,000 in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. On August 13, 2024, we entered into an amendment to the 2024 Credit Facility to increase the borrowing limit to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders). Under the terms of the amendment, the borrowing limit will return to the initial $20 million in the aggregate ($10 million from each of the 2024 Lenders) upon certain financing events. As of the date of this Quarterly Report on Form 10-Q, there was $4.2 million drawn under the 2024 Credit Facility, including a draw of $0.3 million subsequent to June 30, 2024.

Previous wording

For the three months ended March 31, 2024, major operating activities over this period involved Campaign 8, as well as advanced work on engineering and pre-feasibility studies as we advance towards our application to the ISA for an exploitation contract and prepare for potential future commercial production. Net cash used in operating activities in the first quarter of 2024, amounted to $11.8 million, and consisted mainly of $6.7 million on various environmental work, $2.1 million on personnel costs, $0.8 million for sponsorship,

Current wording

For the six months ended June 30, 2024, major operating activities over this period involved Campaign 8, as well as advanced work on engineering and pre-feasibility studies as we advance towards our application to the ISA for an exploitation contract and prepare for potential future commercial production. Net cash used in operating activities in the first half of 2024, amounted to $23.9 million, and consisted mainly of $12.1 million on various environmental work, $3.6 million on personnel costs, $2.8 million on legal, advisory and consulting, $1.5 million for sponsorship, training and stakeholder engagement support, $1.8 million spent on engineering and pre-feasibility studies, $1.1 million on communication and business development expenses, and additional payments of $1 million for various expenses.

Previous wording

For the three months ended March 31, 2023, operating activities focused mainly on the continuation of environmental work following the completion of the NORI integrated collector test, as well as progressing on engineering work and pre-feasibility studies on the project. Net cash used in operating activities in the first quarter of 2023, amounted to $23.5 million, and consisted mainly of $17.0 million on various environmental work, $2.7 million on personnel costs, $1.4 million on legal costs, $0.8 million for sponsorship, training, and stakeholder engagement support, $0.4 million spent on engineering and pre-feasibility studies, and additional payments of $1.2 million for various expenses.

Current wording

For the six months ended June 30, 2023, operating activities focused mainly on the continuation of environmental work following the completion of the NORI integrated collector test, as well as progressing on engineering work and pre-feasibility studies on the project. Net cash used in operating activities in the first half of 2023, amounted to $31.9 million, and consisted mainly of $17.2 million on various environmental work, $4.8 million on personnel costs, $3.3 million on legal costs, $1.8 million for sponsorship, training, and stakeholder engagement support, $2.2 million spent on engineering and pre-feasibility studies, $1 million on communication and business development expenses and additional payments of $1.6 million for various expenses.

Previous wording

Net cash provided by investing activities for the three months ended March 31, 2024 was $0.3 million for the purchase of equipment and software development.

Current wording

Net cash provided by investing activities for the six months ended June 30, 2024 was $0.4 million for the purchase of equipment and software development.

Previous wording

Net cash provided by financing activities for the three months ended March 31, 2024 was $9.0 million, representing the net proceeds received from the Registered Direct Offering announced in August 2023, while the 2023 first quarter results represent the cash received of $5 million on closing of our investment in Low Carbon Royalties.

Current wording

Net cash provided by financing activities for the six months ended June 30, 2024 was $17.7 million, which comprised of net proceeds received from the Registered Direct Offering announced in August 2023 of $9 million, proceeds from short term debt and credit facilities of $5.9 million, proceeds from shares issued from ATM of $2.5 million and proceeds from exercise of stock options and employee stock plans of $0.3 million while the 2023 first half results represent the cash received of $5 million on closing of our investment in Low Carbon Royalties.

Previous wording

As part of the NORI Exploration Contract with the ISA, NORI submitted a periodic review report to the ISA in 2021, covering the 2017-2021 period. The periodic review report, which included a proposed work plan and estimated budget for 2022 to 2026, has been reviewed by and agreed with the ISA, and we are implementing this five-year plan. The cost of NORI’s estimated work plan for 2024 onwards is contingent on the ISA’s approval of the NORI Area D exploitation application. Should the approval of NORI’s exploitation application for NORI Area D be delayed or rejected, NORI intends to revise its estimated future work plan in respect of its NORI Area. Work plans are reviewed annually by us, agreed with the ISA and may be subject to change depending on our progress to date.

Current wording

As part of the NORI Exploration Contract with the ISA, NORI submitted a periodic review report to the ISA in 2021, covering the 2017-2021 period. The periodic review report, which included a proposed work plan and estimated budget for 2022 to 2026, has been reviewed by and agreed with the ISA, and we are implementing this five-year plan. The cost of NORI’s estimated work plan for 2024 onwards is contingent on the ISA’s approval of the NORI contract area exploitation application. Should the approval of NORI’s exploitation application for the NORI contract area be delayed or rejected, NORI intends to revise its estimated future work plan in respect of its NORI Area. Work plans are reviewed annually by us, agreed with the ISA and may be subject to change depending on our progress to date.

Previous wording

maintain sponsorship by a host nation that is a member of the ISA and such state must maintain effective supervision and regulatory control over such sponsored contractor. Each of TOML and NORI is subject to the registration and incorporation requirements of these nations. In the event the sponsorship is otherwise terminated, such subsidiary will be required to obtain new sponsorship from another state that is a member of the ISA. Failure to obtain such new sponsorship would have a material impact on the operations of such subsidiary and us.

Current wording

Both TOML and NORI require sponsorship from their host sponsoring nations, Tonga and Nauru, respectively. Each company has been registered and incorporated within the applicable host nation’s jurisdiction. The ISA requires that a contractor must obtain and maintain sponsorship by a host nation that is a member of the ISA and such state must maintain effective supervision and regulatory control over such sponsored contractor. Each of TOML and NORI is subject to the registration and incorporation requirements of these nations. In the event the sponsorship is otherwise terminated, such subsidiary will be required to obtain new sponsorship from another state that is a member of the ISA. Failure to obtain such new sponsorship would have a material impact on the operations of such subsidiary and us.

Previous wording

Through March 31, 2024, we have made the following payments to Allseas under the PMTA: (a) $10 million in cash in February 2020, (b) $10 million through the issuance of 3.2 million Common Shares valued at $3.11 per share in February 2020, (c) issued Allseas a warrant to purchase 11.6 million Common Shares at a nominal exercise price per share in March 2021, (d) $10 million in cash in October 2021, following the closing of the Business Combination and meeting certain progress targets on the PMTS and (e) on February 23, 2023 issued 10.85 million Common Shares to Allseas. On August 9, 2023, 11,578,620 common shares were issued to Allseas upon

Current wording

Through June 30, 2024, we have made the following payments to Allseas under the PMTA: (a) $10 million in cash in February 2020, (b) $10 million through the issuance of 3.2 million Common Shares valued at $3.11 per share in February 2020, (c) issued Allseas a warrant to purchase 11.6 million Common Shares at a nominal exercise price per share in March 2021, (d) $10 million in cash in October 2021, following the closing of the Business Combination and meeting certain progress targets on the PMTS and (e) on February 23, 2023 issued 10.85 million Common Shares to Allseas. On August 9, 2023, 11,578,620 common shares were issued to Allseas upon the exercise of the warrant that was granted to Allseas in March 2021, and receipt of the exercise fee of $115.8 thousand. The warrant vested and became exercisable on successful completion of the PMTS in November 2022.

Previous wording

As described above, on March 22, 2023, we entered into the Credit Facility with Argentum Credit Virtuti GCV, an affiliate of Allseas, under which we may borrow up to $25 million pursuant to the terms and conditions of the Credit Facility, which as amended has a maturity date of August 31, 2025.

Current wording

As described above, on March 22, 2023, the Company entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, an affiliate of Allseas, under which we may borrow up to $25.0 million pursuant to the terms and conditions of the Credit Facility, as amended, which has a maturity date of August 31, 2025. The Company believes it has an agreement in principle with the Lender to amend the Credit Facility to increase the borrowing limit of the Credit Facility from $25 million to $27.5 million until certain financing events when the borrowing limit returns to its original amount. The Credit Facility remained undrawn as at June 30, 2024.

Previous wording

On March 22, 2024, we entered into an Unsecured Credit Facility (the “2024 Credit Facility”) with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar (collectively, the “2024 Lenders”), pursuant to which, we may borrow from the 2024 Lenders up to $20,000,000 in the aggregate ($10,000,000 from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of September 22, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least USD $50,000,000 in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. As of May 13, 2024, the Company drew $2.9 million from the 2024 Credit Facility

Current wording

On March 22, 2024, the Company entered into an Unsecured Credit Facility (as amended, the “2024 Credit Facility”) with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar (collectively, the “2024 Lenders”), pursuant to which, we may borrow from the 2024 Lenders up to $25,000,000 in the aggregate ($12,500,000 from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of September 22, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least USD $50,000,000 in the aggregate (i) through the issuance of any

Previous wording

Section 102(b)(1) of the Jumpstart Our Business Startups (“JOBS”) Act exempts emerging growth companies from being required to comply with new or revised financial accounting standards until private companies are required to comply with the new or revised financial accounting standards. The JOBS Act provides that a company can choose not to take advantage of the extended transition

Current wording

Section 102(b)(1) of the Jumpstart Our Business Startups (“JOBS”) Act exempts emerging growth companies from being required to comply with new or revised financial accounting standards until private companies are required to comply with the new or revised financial accounting standards. The JOBS Act provides that a company can choose not to take advantage of the extended transition period and comply with the requirements that apply to non-emerging growth companies, and any such election to not take advantage of the extended transition period is irrevocable.
Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

We reported a net loss of $45.4 million in the first half of 2024, compared to a net loss of $27.9 million in the same period of 2023. The following explains the major reasons for the increase in the net loss in the first half of 2024.

Current report — wording carried from elsewhere

of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. In the second quarter 2024, the Company drew $3.9 million from the 2024 Credit Facility.
Rearranged previous paragraphs (10)

Previous report — wording carried elsewhere

Change in Fair Value of Warrants Liability

Previous report — wording carried elsewhere

Change in Fair Value of Warrants Liability

Previous report — wording carried elsewhere

August 31, 2025. The Credit Facility also contains customary events of default. As of the date of this Quarterly Report on Form 10-Q, no amounts have been drawn under this Credit Facility.

Previous report — wording carried elsewhere

Comparison of the Three Months Ended March 31, 2024 and March 31, 2023

Previous report — wording carried elsewhere

training and stakeholder engagement support, $0.6 million spent on engineering and pre-feasibility studies, $0.4 million on legal costs, and additional payments of $1.4 million for various expenses.

Previous report — wording carried elsewhere

Both TOML and NORI require sponsorship from their host sponsoring nations, Tonga and Nauru, respectively. Each company has been registered and incorporated within the applicable host nation’s jurisdiction. The ISA requires that a contractor must obtain and

Previous report — wording carried elsewhere

the exercise of the warrant that was granted to Allseas in March 2021, and receipt of the exercise fee of $115.8 thousand. The warrant vested and became exercisable on successful completion of the PMTS in November 2022.

Previous report — wording carried elsewhere

Credit Facility with ERAS Capital LLC and Gerard Barron

Previous report — wording carried elsewhere

As described above, on March 22, 2024, we entered into the 2024 Credit Facility with ERAS Capital LLC and Gerard Barron under which we may borrow up to $20 million pursuant to the terms and conditions of the 2024 Credit Facility through its maturity on September 22, 2025. As of May 13, 2024, the Company drew $2.9 million from the 2024 Credit Facility.

Previous report — wording carried elsewhere

period and comply with the requirements that apply to non-emerging growth companies, and any such election to not take advantage of the extended transition period is irrevocable.