Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-02-07.
0001065059-25-000006
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 190 previous paragraphs and 211 current paragraphs.
96 unchanged; 68 reworded; 45 added; 25 removed; 1 previous and 2 current paragraphs rearranged.
Tables are not compared: 5 previous and 5 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (45)
Current report
Centrus operates two business segments: (a) LEU, which supplies various components of nuclear fuel to commercial customers from our global network of suppliers, and (b) Technical Solutions, which provides advanced uranium enrichment for the nuclear industry and the U.S. government and advanced manufacturing and other technical services to government and private sector customers and advanced uranium enrichment for the nuclear industry and the U.S. government.
Current report
The DOE continues to pursue the availability of HALEU for the ARDP and for the advanced reactor market and the availability of domestically enriched uranium in a quantity that would be sufficient to address a supply disruption and gaps in domestic production and enrichment and issued separate RFPs for the deconversion of HALEU, the production of HALEU and domestic production of LEU. The DOE awarded multiple IDIQ contracts to the successful bidders, after which the awardees will compete for individual task orders. The total aggregate funding to be awarded under the contracts is $3.4 billion with a minimum of $2.0 million for each contract which is partly funded through the IRA. Executive Order 14154, issued on January 20, 2025, directed executive agencies of the U.S. federal government to pause the distribution of federal funding, including funding appropriated under the IRA, pending a review of programs for issuing grants, loans, contracts, or any other financial disbursements. The timing of the pause and subsequent review, as well as the outcome of such review, remain uncertain.
Current report
On October 4, 2024, DOE selected ACO and five other awardees under the November 28, 2023 solicitation aimed at HALEU deconversion, a subsequent step in the HALEU production process. The contract has a minimum value of $2.0 million and a maximum value of $0.8 billion for all awardees. On October 16, 2024, DOE selected ACO and three other awardees under the January 9, 2024 competitive solicitation aimed at expanding domestic commercial production of HALEU, which is needed to fuel many of the next-generation nuclear reactor designs currently under development. The contract has a minimum value of $2.0 million and a maximum value of $2.7 billion for all awardees. On December 10, 2024, DOE selected ACO and five other awardees under the June 27, 2024 solicitation aimed at expanding domestic commercial production of LEU. The award has a minimum contract value of $2.0 million and a maximum value of $3.4 billion over a ten-year period. The ultimate dollar amount under each contract and the potential scale of the expansion supported will depend upon the scope of task orders that DOE may subsequently issue under the contracts for which we will compete. Although we believe that we are well positioned, there is no assurance that we will be awarded any task orders under any of these contracts and, if awarded, the nature, timing and amount of the task orders that may be issued under an award is uncertain. The aggregate total appropriated funding for all awardees is $3.4 billion.
Current report
On November 6, 2024, DOE issued requests for task order proposals under the HALEU Deconversion Contract and the HALEU Enrichment Contracts. DOE contemplates issuing the task orders on a time-and-material basis with a two year period of performance for the purpose of describing the technical approach and price in a optimization study to support DOE in establishing the commercial production of HALEU and commercial deconversion of HALEU, respectively. On January 9, 2025, we submitted our proposals in response to these requests for task order proposals.
Current report
Meanwhile, on November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and the expansion of its manufacturing capacity at our facility in Oak Ridge, Tennessee. The Company is investing an additional $60.0 million over an 18 month period to lay the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio.
Current report
The Qualifying Advanced Energy Project Credit (“§48C”) was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The §48C program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the IRS has granted our request for $62.4 million credit allocation for this facility. Centrus now has two years to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation. It is uncertain how Executive Order 14154 will impact the IRS determination regarding our application request. For further details refer to Liquidity and Capital Resources.
Current report
On December 20, 2024, the Department of Energy’s National Nuclear Security Administration (“NNSA”) announced that it had released a Request for Information (“RFI”) for industry input on an AC100 Deployment Demonstration to address the need for a new domestic uranium enrichment capability. This AC100 deployment demonstration will provide a limited early production capability, demonstrate one of the available centrifuge technologies, and reduce risk to meeting the NNSA defense mission requirements. The deployment demonstration will provide NNSA with data required to determine which technology or technologies may be deployed for the full range of NNSA defense mission requirements. This effort is consistent with NNSA’s approach to meet its defense mission requirements by incrementally deploying centrifuge technologies, with candidates including the AC100 centrifuge and the Domestic Uranium Enrichment Centrifuge Experiment (“DUECE”) centrifuge being developed by Oak Ridge National Laboratory (“ORNL”). NNSA’s incremental approach enables the phase-in of low-enriched uranium (LEU) production capacity as soon as possible to ensure timely delivery of LEU for defense mission requirements. The Company intends to respond to the RFI.
Current report
On November 7, 2024, the Company issued, in a Rule 144A offering, 2.25% Convertible Notes with an aggregate principal amount of $402.5 million, due November 1, 2030, unless earlier repurchased, redeemed or converted. The proceeds from the 2.25% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes. There are no required principal payments prior to the maturity of the 2.25% Convertible Notes. The 2.25% Convertible Notes bear interest at an annual rate of 2.25%, payable semi-annually in arrears on May 1 and November 1 of each year, beginning on May 1, 2025. The Company incurred approximately $13.8 million in issuance costs for the issuance of the 2.25% Convertible Notes. For further details refer to Liquidity and Capital Resources.
Current report
In response to the war in Ukraine, on May 13, 2024, the Import Ban Act was enacted. This new law bans imports of LEU from Russia into the U.S. beginning August 11, 2024, subject to issuance of waivers by the DOE. In accordance with the instructions published by the DOE on May 24, 2024, the Company filed its first waiver request application on May 27, 2024, to permit the importation of LEU already committed for delivery to its U.S. customers in 2024 through 2027. On July 18, 2024, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2024 and 2025. For the years 2026 and 2027, the DOE deferred its decision to an unspecified date closer in time to the deliveries. On June 7, 2024, the Company filed a second waiver request application to allow for importation of LEU from Russia for processing and reexport to the Company's foreign customers. On October 31, 2024, the DOE issued its determination waiving the prohibition of the importation of such material to our foreign customers scheduled in 2025. On December 11, 2024, the Company filed a third waiver request application to allow for importation of LEU from Russia in 2026 and 2027 for use in future sales to our U.S. customers. The U.S. ban on imports of Russian LEU, without the grant of additional timely waivers, would have a negative material impact on our business and financial condition. Through 2027, well over one-half of the LEU that we expect to deliver to customers was sourced under the TENEX Supply Contract. While we have other sources of supply that may be available, they are not sufficient to replace the TENEX supply or may not be available in 2025. It is uncertain whether any waiver would be granted in response to our pending or any potential future applications and, if granted, whether any waiver would be granted in a timely manner for us to benefit from it.
Current report
On November 14, 2024 the government of the Russian Federation passed the Russian Decree, effective through December 31, 2025, that rescinded TENEX’s general license to export LEU to the United States or to entities registered in the United States. Accordingly, TENEX is required to obtain a specific export license from the Russian authorities in order for it to make shipments to Centrus through 2025. Centrus has been informed that TENEX has received three specific licenses to date which allow TENEX to export LEU to the U.S. for our pending orders. Centrus will use the majority of this LEU to satisfy pending orders to a single customer on a delayed basis in reliance on our contractual rights. TENEX has informed Centrus of its plan to seek additional export licenses to meet its delivery obligations under the TENEX Supply Contract for our other pending and future orders. Centrus has been informed that there is no certainty whether additional licenses will be issued by the Russian authorities and if issued, whether they will be issued in a timely manner and not rescinded prior to the shipment taking place. Refer to Part 1, Item 1-Businessand Item 1A -Risk Factors, Operational Risks and - War in Ukraine Risks, for further discussion.
Current report
There is draft legislation in the U.S. Congress designed to impose sanctions on Rosatom which would effectively prohibit (again, subject to government-issued waivers) transactions with TENEX, a subsidiary of Rosatom. Since the enactment of the Import Ban Act and through the issuance of the Russian Decree, TENEX has continued to implement the TENEX Supply Contract while we pursue waivers from the DOE, and since the issuance of the Russian Decree TENEX has sought the necessary export licenses. However, we do not know what future actions, including in response to the Russian Decree, TENEX might take. If TENEX refuses to make future deliveries or otherwise suspends deliveries for an extended period under the TENEX Supply Contract, our delivery obligations to our customers would be negatively impacted, including a material adverse effect on the Company.
Current report
•Our ability to obtain additional waivers to allow us to import LEU from Russia so that we may continue supplying LEU to our customers, given the enactment of the Import Ban Act in May 2024;
Current report
•The ability of TENEX to obtain, or timely obtain, and the willingness of TENEX to continue to request, additional licenses to export LEU from Russia so that we may continue supplying LEU to our customers, given the enactment of the Russian Decree in November 2024;
Current report
•Our ability to be awarded any task orders under any of the HALEU Production Contract, LEU Production Contract or HALEU Deconversion Contract;
Current report
•Insufficient or untimely U.S. government funding and government appropriations to support our IDIQ contracts with the U.S. federal government;
Current report
•Regulatory uncertainty from new or rescinded executive order or new or changes interpretations of federal regulations;
Current report
Backlog
Current report
The Company’s backlog across both segments is $3.7 billion and $2.0 billion as of December 31, 2024 and 2023, respectively, and extends to 2040. The backlog is recognized as revenue in future periods as work is performed or deliveries of SWU and uranium are made.
Current report
Our backlog in the Technical Solutions segment extends to 2034. As of December 31, 2024 and 2023, our backlog is approximately $0.9 billion and $1.0 billion, respectively. Our backlog includes both funded amounts (services for which funding has been both authorized and appropriated by the customer), unfunded amounts (services for which funding has not been appropriated), and unexercised options in our contracts. If any of our contracts were to be terminated or options not being exercised, our remaining backlog would be reduced by the expected value of the cancelled contracts or forgone options.
Current report
The Company generally recognizes revenue for performance obligations to provide services over time based on costs incurred or the right to invoice method (in cases where the value transferred matches the Company’s billing rights), as the customer receives and consumes the benefits. For performance obligations in which control does not continuously transfer to the customer, the Company recognizes revenue at the point in time in which each performance obligation is fully satisfied. This coincides with the point in time the customer obtains control of the product or service, which typically occurs upon customer acceptance or receipt of the product or service, given that the Company maintains control of the product or service until that point.
Current report
Recent Accounting Pronouncements
Current report
Refer to Note 1 –Basis of Presentation and Principles of Consolidation in Part IV of the Consolidated Financial Statements on this Annual Report
Current report
Revenue from the LEU segment was $349.9 million and $269.0 million for the year ended December 31, 2024 and 2023, respectively, an increase of $80.9 million (or 30%). Uranium revenue increased $42.3 million (or 70%) as a result of a 50% increase in the average price of uranium sold and a 13% increase in the volume of uranium sold. SWU revenue increased $38.6 million (or 19%) as a result of a 24% increase in the average price of SWU sold, partially offset by a 4% decrease in the volume of SWU sold.
Current report
Revenue from the Technical Solutions segment was $92.1 million and $51.2 million for the year ended December 31, 2024 and 2023, respectively, an increase of $40.9 million (or 80%). Revenue generated by the HALEU Operation Contract increased by $41.3 million primarily due to the transition from Phase 1 to Phase 2, in late 2023, which shifted the arrangement from a cost-share to a cost-plus-incentive-fee.
Current report
Cost of sales for the LEU segment was $256.0 million and $163.9 million for the year ended December 31, 2024 and 2023, respectively, an increase of $92.1 million (or 56%). SWU costs increased as a result of a 67% increase in the average unit cost of SWU sold, partially offset by a 4% decrease in the volume of SWU sold. Of the $256.0 million cost of sales, 25% is attributable to the release of costs related to previously deferred sales. Excluding the impact of current year deferred sales deliveries, the average unit cost of SWU sold would have only increased 27%. Uranium costs increased as a result of a 33% increase in the average unit cost of uranium sold and a 13% increase in the volume of uranium sold.
Current report
Cost of sales for the Technical Solutions segment was $74.5 million and $44.2 million for the year ended December 31, 2024 and 2023, respectively, an increase of $30.3 million (or 69%). Costs incurred for the HALEU Operation Contract increased by $29.1 million due to the transition from Phase 1 (cost-share) to Phase 2 (cost-plus-incentive-fee) in late 2023. For details on HALEU Operation Contract accounting, refer to Technical Solutions - Government Contracting above.
Current report
Gross profit for the Technical Solutions segment was $17.6 million and $7.0 million for the year ended December 31, 2024 and 2023, respectively, an increase of $10.6 million (or 151%). The increase was primarily attributable to the HALEU Operation Contract and the transition from Phase 1 (cost-share) to Phase 2 (cost-plus-incentive-fee) in late 2023.
Current report
Income Tax Expense (Benefit)
Current report
Net income was $73.2 million and $84.4 million for the year ended December 31, 2024 and 2023, respectively, a decrease of $11.2 million (or 13%). The decrease was primarily driven by a decrease of $11.2 million in gross profit from the LEU segment and a decrease of $8.5 million in nonoperating components of net periodic benefit income, partially offset by an increase of $10.6 million in gross profit from the Technical Solutions segment and an increase in investment income of $4.2 million.
Current report
Expansion of Manufacturing Capacity in Oak Ridge
Current report
On November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and expanding its manufacturing capacity at our facility in Oak Ridge, Tennessee. The Company is investing an additional $60.0 million over an 18 month period to lay the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio.
Current report
Clean Energy Credit
Current report
The Qualifying Advanced Energy Project Credit (“§48C”) was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The Qualifying Advanced Energy Project Credit (“§48C”) program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. As the nation builds a net-zero economy, the §48C tax credit program aims to play a critical role to create high-quality jobs, reduce industrial emissions, and increase domestic production of critical clean energy products and materials. The IRA provided $10 billion in new funding under §48C(e), with at least $4 billion reserved for projects in certain energy communities with closed coal mines or retired coal-fired power plants, to allocate credits to projects in three categories: (1) Clean energy manufacturing and recycling, (2) industrial decarbonization, and (3) critical materials refining, processing, and recycling.
Current report
On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the IRS has granted our request for $62.4 million credit allocation for this facility. Centrus now has two years to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation.
Current report
Section 6418 was added to the Code as part of the IRA and allows certain eligible taxpayers to elect to transfer certain clean energy tax credits to unrelated taxpayers for cash rather than use the credits to offset their U.S. federal income tax liability. The Company expects that we will be able to monetize all credit allocations received from §48C by transferring them to unrelated taxpayers for cash. It is unclear how the January 20, 2025 Executive Order will impact the IRS determination regarding our application request.
Current report
Defined Benefit Pension Plans
Current report
During the third quarter of 2024, the Company transferred $15.4 million of pension plan assets and the related obligations under two participating group annuity contracts to two non-participating group additional agreements for two of its defined benefit plans. The purchase resulted in a transfer of future benefit obligations and administrative responsibilities for more than 400 beneficiaries effective October 1, 2024.
Current report
The Company recognized income in 2024 related to these events of $16.8 million, which was included in Nonoperating Components of Net Periodic Benefit Income in the Consolidated Statements of Operations.
Current report
Potential Transactions
Showing the first 40 of 45 passages. Open the source sections for the rest.
Removed paragraphs (25)
Previous report
On February 9, 2023, the Company announced that construction and initial testing of the demonstration cascade and most of the support systems were complete. On June 12, 2023, following the completion of its operational readiness reviews, the NRC issued a letter authorizing the Company to introduce uranium hexafluoride into the HALEU cascade of centrifuges. This was a critical milestone in advancing toward the production of HALEU and the final NRC approval required before starting enrichment operations. During the third quarter of 2023, the Company completed construction of the remaining support systems, including a fissile materials storage area, for HALEU storage. On September 6, 2023, the Company announced that it was conducting final system tests and other preparations so that production of HALEU could begin. On September 21, 2023, the NRC granted final approval for the company to produce the quantity of HALEU required by Phase 1 of the contract. On October 11, 2023, the Company announced that it began enrichment operations in Piketon, Ohio. On November 7, 2023, the Company announced that it made its first delivery of HALEU to the DOE, completing Phase 1 by successfully demonstrating its HALEU production process. During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract.
Previous report
The DOE is contemplating awarding additional contracts to ensure availability of HALEU for the ARDP and for the advanced reactor market in general, and received a $700 million congressional appropriation from the Inflation Reduction Act as a first step in establishing a domestic supply chain for HALEU. On June 5, 2023, the DOE issued two draft requests for proposals (“RFPs”) seeking public comment, the first focusing on production of HALEU and the second focusing on deconversion of HALEU into different forms used to fabricate fuels needed by various advanced reactor developers. Centrus submitted comments in response to the draft RFPs to ensure the RFPs promote deployment of HALEU capacity to meet U.S. commercial and government needs for HALEU produced with U.S. technology. On November 28, 2023, the DOE issued an RFP focusing on deconversion of HALEU and on January 9, 2024, issued an RFP focusing on the production of HALEU. The Company expects to bid on both RFPs, with the goal of expanding HALEU production capability at the Piketon facility, subject to, among other things, availability of funding and/or offtake commitments.
Previous report
In response to the war in Ukraine, there have been proposals in U.S. Congress and elsewhere to ban imports of uranium products that could affect our ability to import LEU in one or more years under the TENEX Supply Contract. In December 2023, for example, the U.S. House of Representatives passed H.R. 1042, the “Prohibiting Russian Uranium Imports Act”, that, if enacted into law, would ban imports of LEU from Russia beginning ninety (90) days after the date of enactment. Any U.S. ban on imports of Russian LEU would represent a significant risk to our business. Through 2027, well over one-half of the LEU that we expect to deliver to customers will come from material supplied to us under the TENEX Supply Contract. While we have other sources, they are not sufficient to replace the TENEX supply. Accordingly, if the current proposals in Congress are adopted, we would apply for waivers from the Secretary of Energy to allow us to continue supplying our customers, which are uncertain to be granted at this time. Refer to Part 1, Item 1-Businessand Item 1A -Risk Factors, Operational Risks and - War in Ukraine Risks, for further discussion.
Previous report
Given the current uncertainty and disruption in the market, due to among other things, the war in Ukraine, we are no longer providing guidance on our results of operations for 2024. Please see Forward Looking Statements at the beginning of this Annual Report on Form 10-K.
Previous report
Revenue for the Technical Solutions segment is recognized over the contractual period as services are rendered. The Company recognizes revenue over time as it performs on these contracts because of the continuous transfer of control to the customer.
Previous report
In the second quarter of 2020, the valuation allowance on the state net deferred tax assets for the LEU segment was released due to a return to profitability that led to cumulative income for state income tax purposes. A full valuation allowance against the federal and state net deferred tax assets for the rest of the business remained throughout 2020 because negative evidence, including cumulative losses, outweighed positive evidence.
Previous report
Revenue from the LEU segment was $269.0 million and $235.6 million for the year ended December 31, 2023 and 2022, respectively, an increase of $33.4 million (or 14%). SWU revenue increased $12.0 million (or 6%) due to a 37% increase in the volume of SWU sold, partially offset by a 23% decrease in the average price of SWU sold. Uranium revenue increased $21.4 million (or 54%). The increase was driven by a 49% increase in the volume of UF 6 sold and a 18% increase in the average price of UF 6 sold. Revenue from sales of U 3 O 8 was $0 and $4.9 million for the year ended December 31, 2023 and 2022, respectively.
Previous report
Revenue from the Technical Solutions segment was $51.2 million and $58.2 million for the year ended December 31, 2023 and 2022, respectively, a decrease of $7.0 million (or 12%). This decrease was driven by decreased work performed under the HALEU Demonstration Contract, other contracts, and the X-energy contract of $45.4 million, $4.8 million, and $3.2 million, respectively. This was partially offset by increased work performed under the HALEU Operation Contract of $46.4 million.
Previous report
Cost of sales for the LEU segment was $163.9 million and $105.0 million for the year ended December 31, 2023 and 2022, respectively, an increase of $58.9 million (or 56%). The volume of SWU and UF 6 sold increased by 37% and 49%, respectively, and the average SWU and UF 6 unit cost increased by 8% and 31%, respectively. Cost of sales of U 3 O 8 was $0 and $3.6 million for the year ended December 31, 2023 and 2022, respectively.
Previous report
Cost of sales for the Technical Solutions segment was $44.2 million and $70.9 million for the year ended December 31, 2023 and 2022, respectively, a decrease of $26.7 million (or 38%). This decrease was driven by decreased work performed under the HALEU Demonstration Contract, other contracts, and the X-energy contract of $37.6 million, $6.3 million and $3.2 million, respectively. This was partially offset by an increase in work performed under the HALEU Operation Contract of $20.4 million. The costs related to the HALEU Operation Contract for the year ended December 31, 2022 included the $21.3 million accrued loss for Phase 1 of the HALEU Operation Contract. For details on HALEU Operation and Demonstration Contract accounting, refer to Technical Solutions - Government Contracting above.
Previous report
Gross profit for the Technical Solutions segment was $7.0 million for the year ended December 31, 2023 and netted to a loss of $12.7 million for the year ended December 31, 2022, a change of $19.7 million (or 155%). The change was attributable to an increase in gross profit generated from the HALEU Operation Contract and other contracts of $26.0 million and $1.5 million, respectively, partially offset by a $7.8 million decrease in gross profit generated from the HALEU Demonstration Contract.
Previous report
Special Charges for Workforce Reductions
Previous report
Special charges for workforce reductions was $3.6 million and $0.5 million for the year ended December 31, 2023 and 2022, respectively, an increase of $3.1 million (or 620%). Special charges for workforce reductions represents employee-related costs for severance and other related benefits. The increase was due primarily to an increase in severance expense of $3.1 million. In December 2023, the Company recorded a severance charge of $3.6 million related to the separation of one executive under the provisions of the Executive Severance Plan which provides severance benefits to certain covered executives.
Previous report
Income Tax Expense
Previous report
Net income was $84.4 million and $52.2 million for the year ended December 31, 2023 and 2022, respectively, an increase of $32.2 million (or 62%). The increase was primarily driven by an increase in nonoperating components of net periodic benefit income of $16.6 million, a decrease in income tax expense of $15.5 million, and an increase in investment income of $6.7 million, partially offset by a decrease in gross profit of $5.8 million.
Previous report
On February 2, 2021, the Company entered into the Voting Agreement Amendment to its existing Voting and Nomination Agreement with the MB Group and an Exchange Agreement, whereby the MB Group agreed to support management’s recommendation on certain matters at the Company’s 2021 Annual Meeting and Kulayba LLC agreed to exchange shares of Preferred Stock for shares of Class A Common Stock and a warrant to acquire additional shares of Class A Common Stock. Pursuant to the First Amendment to the Voting and Nomination Agreement, the MB Group agreed to cause all shares of Class A Common Stock owned of record or beneficially owned by the MB Group at the Annual Meeting to be voted in favor of (i) an amendment to extend the length of the term of the Company’s Section 382 Rights Agreement dated as of April 6, 2016, as amended to date, for two years from June 30, 2021, to June 30, 2023, and (ii) an increase of shares of Class A Common Stock reserved for delivery under the Company’s 2014 Equity Incentive Plan, as amended to date, of an additional 700,000 shares of Class A Common Stock.
Previous report
In connection with the entry into the Voting Agreement Amendment, the Company and Kulayba LLC also entered into the Exchange Agreement, pursuant to which Kulayba LLC agreed to the Exchange, representing a $5,000,198 liquidation preference (including accrued and unpaid dividends), for (i) 231,276 shares of Class A Common Stock priced at the closing market price of $21.62 on the date the Exchange Agreement was signed and (ii) the Warrant, exercisable for 250,000 shares of Class A Common Stock at an exercise price of $21.62 per share, which was the closing market price on the date the Exchange Agreement was signed, subject to certain customary adjustments pursuant to the terms of the Warrant. The Warrant was exercisable by Kulayba LLC for a period commencing on the closing date of the Exchange and ending, unless sooner terminated as provided in the Warrant, on the first to occur of: (a) the second anniversary of the closing date of the Exchange or (b) the last business day immediately prior to the consummation of a Fundamental Transaction (as defined in the Warrant), which results in the shareholders of the Company immediately prior to such Fundamental Transaction owning less than 50% of the voting equity of the surviving entity immediately after the consummation of the Fundamental Transaction. The Company retired the 3,873 shares of Preferred Stock received by the Company under the Exchange Agreement.
Previous report
On December 29, 2022, the Company amended and restated the Warrant, and entered into a Voting Rights Agreement with the MB Group. Pursuant to the terms of the Voting Rights Agreement, each member of the MB Group and each Permitted Transferee (as defined in the Voting Rights Agreement) agreed, at the Company’s 2023 and 2024 Annual Meetings and at any other vote by the holders of the Company’s Common Stock, to (i) cause, in the case of all Common Stock owned of record, and (ii) instruct and cause the record owner, in the case of all shares of Common Stock of which MB Group is a Beneficial Owner (as defined in the Voting Rights Agreement), but not owned of record, directly or indirectly, by it, or by any MB Affiliate (as defined in the Voting Rights Agreement), as of the applicable record date, in each case entitled to (i) be present for quorum purposes, and (ii) vote, as follows: (a) for all directors nominated by the Board for election, (b) for all other proposals, in accordance with the recommendation of the Board, and (c) for any Company proposed adjournments thereof. In addition, each member of the MB Group agreed to not directly or indirectly gift, sell, dispose or otherwise transfer any shares of Common Stock unless the transferee agreed to be bound to the same voting conditions at the 2023 and 2024 Annual Meetings, and other meetings in 2023 and 2024, except with respect to any sale or disposition of Common Stock on a national securities exchange or any sale or disposition of Common Stock underlying the New Warrant to any person that is not affiliated, associated or otherwise related to any member of the MB Group. In exchange, the Company agreed to amend and restate that Warrant, to extend the term of the Warrant to February 5, 2024, subject to the other terms of the Warrant (as so amended and restated, the New Warrant). Immaterial amendments were made on October 17, 2022.
Previous report
On December 18, 2023, the Company issued 149,179 net shares of Class A Common Stock in connection with the cashless exercise by Kulayba LLC of the New Warrant for 250,000 shares of Class A Common Stock at an exercise price of $21.62.
Previous report
Capital Structure and Financial Resources
Previous report
2021 Tender Offer
Previous report
On October 20, 2021, the Company announced the commencement of a tender offer to purchase all of its outstanding Series B Senior Preferred Stock, par value $1.00 per share (the “Series B Senior Preferred Stock”), at a price of $1,145.20 per share (inclusive of any rights to accrued but unpaid dividends), to the sellers in cash, less any applicable withholding taxes (the “Offer”). The Offer was made pursuant to the Tender Offer Statement on Schedule TO filed by the Company on October 20, 2021, with the SEC. The aggregate liquidation preference per Series B Senior Preferred Stock (including accrued but unpaid dividends) was $1,347.29 as of September 30, 2021.
Previous report
On November 23, 2021, the Company announced the results of the tender offer and the related Consent Solicitation to amend the certificate of designation of the Series B Senior Preferred Stock (the “Series B Preferred Amendment”). 36,867 shares of the Series B Senior Preferred Stock were properly tendered and not properly withdrawn in the Offer, and corresponding consents have been delivered in the Consent Solicitation. Pursuant to the terms of the Offer and Consent Solicitation, the Company has accepted for purchase all of the Series B Senior Preferred Stock tendered in the Offer, for an aggregate purchase price of $42.2 million. The accepted shares represent 97.4% of the Company’s outstanding Series B Senior Preferred Stock as of September 30, 2021. Based on the final results, the requisite consent of at least 90% of the outstanding Series B Senior Preferred Stock required to approve the Series B Preferred Amendment was obtained. On November 23, 2021, the Company issued a Notice of Full Redemption providing for the redemption of any and all shares Series B Senior Preferred Stock outstanding after consummation of the Company’s tender offer to purchase all of its issued and outstanding Series B Senior Preferred Stock. On December 15, 2021, the Company completed the redemption of all 980 outstanding Series B Senior Preferred Stock for aggregate cash consideration of $1.1 million. The aggregate purchase price of $43.3 million was offset by direct costs totaling $0.9 million.
Previous report
The effect of the Series B Preferred Amendment was to: (i) cease any obligation to pay dividends on Series B Senior Preferred Stock (other than the payment of accrued dividends in connection with a redemption or distribution of assets upon liquidation, dissolution or winding up), (ii) permit the Company to redeem Series B Senior Preferred Stock during the 90 days following the date of effectiveness of the Series B Preferred Amendment at a redemption price per share equal to $1,145.20 (plus any additional accrued dividends for the period from and including the date of effectiveness of the Series B Preferred Amendment to the date of redemption), (iii) remove the prohibition on the declaration and payment of dividends on junior stock of the Company, which includes all shares of the Company’s capital stock defined as “Common Stock” in the Company’s Amended and Restated Certificate of Incorporation, or the redemption, purchase or acquisition of such junior stock, and (iv) remove the restriction on redemption, purchase or acquisition of capital stock of the Company ranking on parity with the Series B Senior Preferred Stock.
Previous report
On December 16, 2021, the Company filed a Certificate of Elimination of the Series B Senior Preferred Stock of Centrus Energy Corp. with the Secretary of State of Delaware to eliminate the designation of the Series B Senior Preferred Stock and to return all shares of preferred stock of the Company previously designated as Series B Senior Preferred Stock to authorized but unissued and undesignated shares of preferred stock of the Company.
Reworded paragraphs (68)
Previous wording
Centrus, a Delaware corporation (the “Company”, “we” or “us”), is a trusted supplier of nuclear fuel components and services for the nuclear power industry, which provides a reliable source of carbon-free energy. References to “Centrus”, the “Company”, “our”, or “we” include Centrus Energy Corp. and its wholly-owned subsidiaries as well as the predecessor to Centrus, unless the context indicates otherwise.
Current wording
Centrus Energy Corp., a Delaware corporation, is a trusted supplier of nuclear fuel components for the nuclear power industry, which provides a reliable source of carbon-free energy and provides enrichment and technical services for public and private customers. References to “Centrus”, the “Company”, “our”, or “we” include Centrus Energy Corp. and its wholly-owned subsidiaries as well as the predecessor to Centrus, unless the context indicates otherwise.
Previous wording
Published spot price indicators for SWU reached historic highs in April 2009 at $163 per SWU. In the years following the 2011 Fukushima accident in Japan, spot prices declined more than 75%, bottoming out in August 2018 at $34 per SWU. This was followed by a slow and steady rise, reaching $56 per SWU by December 31, 2021. In 2022, spot prices increased substantially, reaching $110 per SWU by December 31, 2022. In 2023, spot prices continued to increase, reaching $155 per SWU by December 31, 2023. This represents an increase of 41% since the beginning of the year and 356% over the 2018 historic low. This sudden surge in the SWU spot price has been driven by uncertainty created as a result of Russia’s invasion of Ukraine, coupled with growing interest in nuclear power as a source of secure and carbon-free energy.
Current wording
Published spot price indicators for SWU reached historic highs in April 2009 at $163 per SWU. In the years following the 2011 Fukushima accident in Japan, spot prices declined more than 75%, bottoming out in August 2018 at $34 per SWU. This was followed by a period of price increases, which reached $155 per SWU by December 31, 2023. In 2024, spot prices continued to increase, reaching $195 per SWU by December 31, 2024, which surpasses the previous historic high. This represents an increase of 26% since the beginning of the year and 474% over the 2018 historic low. This surge in the SWU spot price beginning in 2022 has been driven by primarily by uncertainty created as a result of Russia’s invasion of Ukraine, coupled with growing interest in nuclear power as a source of secure and carbon-free energy.
Previous wording
When Russian supply is included, the uranium enrichment segment of the global nuclear fuel market is oversupplied, but without Russian supply, the global market would be undersupplied for uranium enrichment. Further, it is not clear that there are sufficient inventories of enriched uranium in the United States to compensate for a loss of Russian supply, absent new capacity that will take a number of years to deploy. A report issued by the International Atomic Energy Agency in 2023, for example, reported that while U.S. utilities may have enough inventory to cover one reload of their reactors, “truly strategic physical stockpiles are almost non-existent.”2
Current wording
When Russian supply is included, the uranium enrichment segment of the global nuclear fuel market is oversupplied, but without Russian supply, the global market for uranium enrichment would be undersupplied. Further, it is not clear that there are sufficient inventories of enriched uranium in the United States to compensate for a loss of Russian supply, absent new capacity that will take a number of years to deploy. A report issued by the International Atomic Energy Agency in 2023 reported that while U.S. utilities may have enough inventory to cover one reload of their reactors, “truly strategic physical stockpiles are almost non-existent.”2
Previous wording
Changes in the supply-demand balance and in the competitive landscape arising from the war in Ukraine may affect pricing trends, change customer spending patterns, and create uncertainty in the uranium market. At the same time, there remains uncertainty about future demand for nuclear power generation. To address these changes, we will continue to evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.
Current wording
Changes in the supply-demand balance and in the competitive landscape arising from the war in Ukraine may affect pricing trends, change customer spending patterns, and create uncertainty in the uranium market. At the same time, uncertainty remains about future demand for nuclear power generation. To address such changes and uncertainty, we continue to evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.
Previous wording
Under the HALEU Demonstration Contract, Centrus was engaged by the DOE to construct a cascade of 16 AC100M centrifuges in Piketon to demonstrate HALEU production. The Company’s goal under the HALEU Demonstration Contract was to complete the demonstration and scale up production of HALEU and LEU, to meet the needs of new and existing reactors as well as national security and other U.S. government requirements for enriched uranium. The HALEU Demonstration Contract was originally set to expire on June 1, 2022; however, it was extended through November 30, 2022. The Company is currently performing closeout activities on the HALEU Demonstration Contract. The DOE elected to change the scope of the HALEU Demonstration Contract and moved the operational portion of the demonstration to a new, competitively-awarded contract that would provide for operations beyond the term of the existing HALEU Demonstration Contract. The DOE has incrementally increased funds on the HALEU Demonstration Contract with total funding to date of $173.0 million.
Current wording
Under the HALEU Demonstration Contract, Centrus was engaged by the DOE to construct a cascade of 16 AC100M centrifuges in Piketon, Ohio, to demonstrate HALEU production. The DOE has funded the HALEU Demonstration Contract up to $173.0 million with a period of performance that ended November 30, 2022. Closeout activities on the HALEU Demonstration Contract are ongoing. The DOE elected to change the scope of the HALEU Demonstration Contract and moved the operational portion of the demonstration to a new, competitively-awarded contract that would provide for operations beyond the term of the existing HALEU Demonstration Contract.
Previous wording
On November 10, 2022, after a competitive solicitation, the DOE notified Centrus that the Company had won the HALEU Operation Contract and work began December 1, 2022. The base contract value is approximately $150 million in two phases through 2024. Phase 1 included an approximately $30 million cost share contribution from Centrus matched by approximately $30 million from the DOE to complete construction of the cascade, begin operations and produce the initial 20 kilograms of HALEU UF 6 by no later than December 31,2023.
Current wording
On November 10, 2022, the Company was awarded the HALEU Operation Contract and work began December 1, 2022. The base contract value was approximately $150.0 million in two phases through 2024. Phase 1 included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from the DOE to complete construction of the cascade, begin operations and produce the initial 20 kilograms of HALEU UF 6 by no later than December 31,2023. On October 11, 2023, the Company announced that it began enrichment operations in Piketon, Ohio. On November 7, 2023, the Company announced that it made its first delivery of HALEU to the DOE, completing Phase 1 by successfully demonstrating its HALEU production process. During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract.
Previous wording
Phase 2 of the contract includes continued operations and maintenance, and production for a full year at an annual production rate of 900 kilograms of HALEU UF 6. The DOE will own the HALEU produced from the demonstration cascade and Centrus will be compensated on a cost-plus-incentive-fee basis, with an expected Phase 2 contract value of approximately $90 million, subject to Congressional appropriations. The HALEU Operation Contract also gives DOE three 3-year options to pay for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE’s sole discretion and subject to the availability of Congressional appropriations. Concurrently, pursuant to an amendment to our lease for the Piketon facility, the DOE assumed all D&D liabilities arising out of the HALEU Operation Contract.
Current wording
Phase 2 of the HALEU Operation Contract includes continued operations and maintenance, and production for a full year at an annual production rate of 900 kilograms of HALEU UF 6. The DOE will own the HALEU produced from the demonstration cascade and Centrus will be compensated on a cost-plus-incentive-fee basis, with an initial Phase 2 contract value of approximately $90.0 million, subject to Congressional appropriations. DOE has increased the Phase 2 contract value and related funding to $129.0 million. The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE’s sole discretion and subject to the availability of Congressional appropriations. Concurrently, pursuant to an amendment to our lease for the Piketon facility, the DOE assumed all D&D liabilities arising out of the HALEU Operation Contract.
Previous wording
Under the HALEU Operation Contract, DOE is contractually required to provide the 5B Cylinders necessary for us to collect the output of the cascade, but supply chain challenges have created difficulties for DOE in securing 5B Cylinders for the entire production year. To support the DOE in mitigating the risk of further delays in delivery of 5B Cylinders, the Company received technical direction and a contract modification from the DOE to procure compliant 5B Cylinders and components while the contractual obligation to furnish compliant 5B Cylinders under the HALEU Operation Contract continues to rest with the DOE. During periods where 5B Cylinders are insufficient, the Company will not be able to produce HALEU, but will be able to continue operations of the cascade and perform preventive maintenance and regulatory compliance type activities. Centrus anticipates that the delays in obtaining sufficient 5B Cylinders will be temporary, but no longer expects to achieve delivery of the 900 kilograms of HALEU UF 6 anticipated for Phase 2 of the contract which extends through November 2024. The target fee for Phase 2 of the contract had been estimated to be $7.5 million based on the estimated costs for the contract and is subject to a contract minimum fee of $6.9 million. The Company is also performing additional work on infrastructure and facility repairs under DOE’s technical direction and subsequent contract modification. For further details refer to Item 1 - Business - Technical Solutions - Government Contracting.
Current wording
Under the HALEU Operation Contract, DOE is contractually required to provide the 5B Cylinders necessary to collect the output of the cascade, but ongoing supply chain challenges had created difficulties for DOE in securing enough 5B Cylinders for the entire production year under Phase 2. To support the DOE in mitigating the risk of further delays in delivery of 5B Cylinders, the Company received technical direction and a contract modification from the DOE to procure compliant 5B Cylinders and components while the contractual obligation to furnish compliant 5B Cylinders under the HALEU Operation Contract continues to rest with the DOE. During the time periods when 5B Cylinders were insufficient, the Company was able to continue operations of the cascade, but did not produce HALEU as it did not have cylinders to store the enriched uranium. Due to these delays, Centrus was unable to achieve delivery of the 900 kilograms of HALEU UF 6 for Phase 2 by November 2024. On November 5, 2024, the HALEU Operation Contract was modified to extend the Phase 2 period of performance to June 30, 2025. Centrus began to receive deliveries of additional 5B Cylinders in October 2024 and currently expects to have adequate cylinders to complete Phase 2. In accordance with the HALEU Operation Contract, the Company has submitted several change requests for work being performed on infrastructure, facility repairs, and 5B Cylinders. The additional work is being performed under the DOE’s technical direction. As of February 7, 2025, Centrus has delivered approximately 545 kilograms of HALEU UF 6 to DOE. For further details refer to Item 1 - Business - Technical Solutions - Government Contracting.
Previous wording
The war in Ukraine has contributed to a significant increase in market prices for enrichment and prompted calls for public and private investment in new, domestic uranium enrichment capacity not only for HALEU production but also for LEU production to support the existing fleet of reactors. As a result, Centrus is exploring the opportunity to deploy LEU enrichment alongside HALEU enrichment to meet a range of commercial and U.S. government requirements, which would bring cost synergies while increasing revenue opportunities. Our ability to deploy LEU and/or HALEU enrichment, and the timing, sequencing, and scale of those capabilities, is subject to the availability of funding and/or offtake commitments.
Current wording
The war in Ukraine, along with Import Ban Act and the Russian Decree, have contributed to a significant increase in market prices for enrichment and prompted calls for public and private investment in new, domestic uranium enrichment capacity not only for HALEU production but also for LEU production to support the existing fleet of reactors. As a result, coupled with the Company’s contract awards for HALEU and LEU production, Centrus is exploring the opportunity to deploy LEU enrichment alongside HALEU enrichment to meet a range of commercial and U.S. government requirements, which would bring cost synergies while increasing revenue opportunities. Our ability to deploy LEU and/or HALEU enrichment, and the timing, sequencing, and scale of those capabilities, is subject to the availability of funding and/or offtake commitments.
Previous wording
The Energy Act of 2020, which was signed into law in December 2020, requires the DOE to establish a program to support the availability of HALEU for civilian domestic research, development, demonstration, and commercial use. The Energy Act also reauthorized DOE nuclear energy research, development, demonstration, and commercial application activities, including advanced fuel, research and development for advanced reactors, used fuel technologies, and integration of nuclear energy systems for both existing plants and advanced nuclear concepts. It also authorized the funding of an ARDP which was launched by the DOE in May 2020. There are a number of advanced reactors under development that would use HALEU. Nine of the ten advanced reactor designs selected by the DOE for its ARDP will require HALEU. Various agencies of the U.S. government, including the U.S. Department of Defense, the Defense Advanced Research Projects Agency, and the DOE supporting the development of microreactors which demonstrates the focus on both the development of microreactors and the ultimate need for HALEU. We believe our investments in advanced enrichment technology and our progress in demonstrating HALEU production will position the Company to meet the needs of government and commercial customers in the future as they deploy advanced reactors and next generation fuels and also offers potential cost synergies for a return to LEU production. Further, the Company is taking steps to pursue, including through the exploration of strategic partnerships, technologies that are complementary to HALEU production and critical to the HALEU ecosystem, including deconversion and fuel fabrication.
Current wording
The Energy Act of 2020 (“Energy Act”) requires the DOE to establish a program to support the availability of HALEU for civilian domestic research, development, demonstration, and commercial use. The Energy Act also reauthorized DOE nuclear energy research, development, demonstration, and commercial application activities, including advanced fuel, research and development for advanced reactors, used fuel technologies, and integration of nuclear energy systems for both existing plants and advanced nuclear concepts. It also authorized the funding of an ARDP which was launched by the DOE in May 2020. There are a number of advanced reactors under development that would use HALEU. Nine of the ten advanced reactor designs selected by the DOE for its ARDP will require HALEU. Various agencies of the U.S. government, including the U.S. Department of Defense, the Defense Advanced Research Projects Agency, and the DOE are building small modular reactors and microreactors, which demonstrates the focus on both the development of microreactors and the ultimate need for HALEU. We believe our investments in advanced enrichment technology and our progress in demonstrating HALEU production will position the Company to meet the needs of government and commercial customers in the future as they deploy advanced reactors and next generation fuels and also offers potential cost synergies for a return to LEU production. Further, the Company is taking steps to pursue, including through the exploration of strategic partnerships, technologies that are complementary to HALEU production and critical to the HALEU ecosystem, including deconversion and fuel fabrication.
Previous wording
We are also actively considering, and expect to consider from time to time in the future, potential strategic transactions, which could involve, without limitation, acquisitions and/or dispositions of businesses or assets, joint ventures or investments in businesses, products or technologies, or changes to our capital structure. In connection with any such transaction, we may seek additional debt or equity financing, contribute or dispose of assets, assume additional indebtedness, or partner with other parties to consummate a transaction.
Current wording
We are also actively considering, and expect to consider potential strategic transactions from time to time, which could involve, without limitation, acquisitions and/or dispositions of businesses or assets, joint ventures or investments in businesses, products or technologies, or changes to our capital structure. In connection with any such transaction, we may seek additional debt or equity financing, contribute or dispose of assets, assume additional indebtedness, or partner with other parties to consummate a transaction.
Previous wording
The global nuclear industry outlook has begun to improve after many years of decline and stagnation. The development of advanced small and large-scale reactors, innovative advanced fuel types, and the commitment of nations to begin deploying or to increase the share of nuclear power in their nations has created optimism in the market. Part of the momentum has resulted from efforts to lower greenhouse gas emissions to combat climate change and improve health and safety.
Current wording
The global nuclear industry outlook has begun to improve after many years of decline and stagnation. The development of advanced small and large-scale reactors, the innovation of advanced fuel types, and the commitment of nations to begin deploying nuclear power or to increase the share of nuclear power in their nations has created optimism in the market. Part of the momentum has resulted from efforts to lower greenhouse gas emissions to combat climate change and improve health and safety.
Previous wording
According to the WNA, as of January 2024, there were approximately 60 reactors under construction worldwide, about a third of which are in China. The United States, with over 90 operating reactors, remains the world’s largest market for nuclear fuel. The nuclear industry in the United States, Japan, and Europe faces headwinds as well as opportunities. In the United States, the industry has been under pressure from the expansion of subsidized renewable energy as well as relatively low-cost natural gas resources in recent years, although natural gas prices in the U.S. electricity sector tripled between 2020 and 2022 according to data from the EIA. Twelve U.S. reactors have prematurely shut down in the past ten years and others could shut down in the next few years. At the same time, one large reactor is under construction, and the DOE recently released a report outlining a pathway to deployment of approximately 200 gigawatts of additional capacity by 2050 which would triple the nuclear energy capacity in the United States.
Current wording
According to the WNA, as of January 2025, there were approximately 65 reactors under construction worldwide, approximately one-half of which are in China. The United States, with over 90 operating reactors, remains the world’s largest market for nuclear fuel. The nuclear industry in the United States, Japan, and Europe faces headwinds as well as opportunities. In the United States, the industry has been under pressure from the expansion of subsidized renewable energy as well as relatively low-cost natural gas resources in recent years, although natural gas prices in the U.S. electricity sector tripled between 2020 and 2022 according to data from the EIA. Nine U.S. reactors have prematurely shut down in the past ten years and others could shut down in the next few years. At the same time, construction was completed and commercial operations began in the second quarter of 2024 on one large reactor and two formerly shutdown reactors have plans to restart. In 2023, the DOE released a report outlining a pathway to deployment of approximately 200 gigawatts of additional capacity by 2050 which would triple the nuclear energy capacity in the United States.
Previous wording
The IEA projects that global nuclear energy generation will grow substantially in the next three decades. In the IEA’s 2023 World Energy Outlook, nuclear generation is forecasted to grow by 25 percent by 2030 and 45 percent by 2040 under the “Stated Policies” scenario. In the “Net Zero Emissions by 2050” scenario, nuclear generation would grow by 47 percent by 2030 and more than double by 2040.
Current wording
The IEA projects that global nuclear energy generation will grow substantially in the next three decades. In the IEA’s 2024 World Energy Outlook, nuclear generation is forecasted to grow by 18% by 2030 and 47% by 2040 under the “Stated Policies” scenario. In the “Net Zero Emissions by 2050” scenario, nuclear generation would grow by 41% by 2030 and more than double by 2040.
Previous wording
As a consequence of the March 2011 earthquake and tsunami in Japan, over 60 reactors in Japan and Germany were taken offline, and other countries curtailed or slowed their construction of new reactors or accelerated the retirement of existing plants. Eleven reactors in Japan have restarted and additional reactors are expected to restart through 2024; more of Japan’s reactors are expected to restart in subsequent years. Due to the war in Ukraine, the EU is encouraging its member countries to reconsider the planned early retirement of existing plants in order to reduce reliance on Russian gas imports.
Current wording
As a consequence of the March 2011 earthquake and tsunami in Japan, over 60 reactors in Japan and Germany were taken offline, and other countries curtailed or slowed their construction of new reactors or accelerated the retirement of existing plants. In Japan, 14 reactors have restarted and an additional 11 reactors are in the process of restart approval. As a result of the war in Ukraine, the EU is encouraging its member countries to reconsider the planned early retirement of existing plants in order to reduce reliance on Russian gas imports.
Previous wording
In October 2020, the DOC reached an agreement with the Russian Federation on an extension of the RSA, a trade agreement which allows for Russian-origin nuclear fuel to be exported to the United States in limited quantities. The two parties agreed to extend the agreement through 2040 and to set aside a significant portion of the annual quota for Centrus’ shipments to the United States through 2028 to execute our long-term TENEX Supply Contract with TENEX. This outcome allows for sufficient quota for Centrus to continue serving its utility customers and support its investments in building new capacity. Use of this quota is subject to compliance with limitations under the RSA. These limitations include a requirement that we return UF 6 to TENEX for the LEU we receive under the TENEX Supply Contract at approximately the same time that we deliver the LEU to our customers. Our ability to meet this requirement depends on the capacity or willingness of the facilities where natural uranium is supplied to us by customers, to allow us to deliver this natural uranium to TENEX. We were recently notified by one facility that it will no longer receive natural uranium for TENEX. As a result, we will need to rely to a greater extent on deliveries at other processors or explore other options in order to comply with the RSA’s natural uranium delivery requirement.
Current wording
In October 2020, the DOC reached an agreement with the Russian Federation on an extension of the RSA, a trade agreement which allows for Russian-origin nuclear fuel to be exported to the United States in limited quantities. The two parties agreed to extend the agreement through 2040 and to set aside a significant portion of the annual quota for Centrus’ shipments to the United States through 2028 to execute our long-term TENEX Supply Contract with TENEX. This outcome allows for sufficient quota for Centrus to continue serving its utility customers and support its investments in building new capacity. Use of this quota is subject to compliance with limitations under the RSA. These limitations include a requirement that we return natural uranium to TENEX for the LEU we receive under the TENEX Supply Contract at approximately the same time that we deliver the LEU to our customers. Our ability to meet this requirement depends on the capacity or willingness of the facilities where natural uranium is supplied to us by customers, to allow us to deliver this natural uranium to TENEX. In 2023, we were notified by one facility that it will no longer receive natural uranium for TENEX. As a result, we will need to rely to a greater extent on deliveries at other processors or explore other options in order to comply with the RSA’s natural uranium delivery requirement.
Previous wording
The war in Ukraine has escalated tensions between Russia and the international community. As a result, the United States and other countries have imposed, and may continue imposing, additional sanctions and export controls against certain Russian products, services, organizations and/or individuals. While sanctions imposed to date do not preclude the import of Russian uranium products into the United States, it is possible that additional restrictions could be added in the future that would affect our ability to purchase and re-sell Russian uranium enrichment, or implement the TENEX Supply Contract, which could have a negative material impact on our business. Further, sanctions by the United States, Russia or other countries may impact our ability and cost to transport, export, import, take delivery, or make payments related to the LEU we purchase and may require us to increase purchases from non-Russian sources to the extent available. For example, due to restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was recently extended to early July 2024, but for so long as the sanctions remain in place, the shipper will require further extensions for us to continue to use the shipper for imports of this LEU beyond July 2024.
Current wording
The war in Ukraine has escalated tensions between Russia and the international community, and particularly the United States. As a result, the United States and other countries have imposed, including through the U.S.’s enactment of the Import Ban Act discussed below, and may continue imposing, additional sanctions and export controls against certain Russian products, services, organizations and/or individuals. Such additional restrictions could affect our ability to purchase, take delivery of, transport, or re-sell Russian uranium enrichment, engage in transactions with TENEX, or implement the TENEX Supply Contract, which would have a negative material impact on our business. Further, sanctions or restrictions by the United States, Russia or other countries may impact our ability and cost to transport, export, import, take delivery, or make payments related to the LEU we purchase and may require us to increase purchases from non-Russian sources to the extent available. For example, due to restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was extended to March 2027, but for so long as the sanctions remain in place, the shipper will require further extensions beyond the current validity of the permit for continued shipments of LEU imports. In addition, on June 24, 2024, members of the EU agreed to issue a 14th sanctions package, primarily targeting the export of Russian liquid natural gas and other services. The sanctions package includes restrictions on the transportation of empty containers to Russia. Since we supply empty cylinders under the TENEX Supply Contract that are filled and returned to us, this new sanctions package may impact the transportation of LEU from Russia to the extent such export activity has a nexus to an EU member state (e.g., through a ship’s flag, nationalities of crew members, etc.). This new sanctions package does not impact our near term deliveries. We are working with our shipper to determine the extent of the impact of the new sanctions on the transportation of LEU from Russia which may ultimately require our shipper to obtain special authorizations for the shipment of empty containers to Russia if a nexus with an EU member state exists. The U.S. and Canadian governments have indicated that the EU agrees that these sanctions should not apply to these containers and are working with the EU to clarify.
Previous wording
In addition to limitations targeted specifically at imports of LEU, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services including transportation and other services have increased the risk that implementation of the TENEX Supply Contract may be disrupted in the future.
Current wording
In addition to limitations targeted specifically at imports of LEU, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation and other services, have increased the risk that implementation of the TENEX Supply Contract may be disrupted in the future. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government.
Previous wording
Given all the foregoing, we continue to monitor the situation closely and assess the potential impact of any new sanctions and how the impact on the Company might be mitigated.
Current wording
Given all the foregoing, we continue to monitor the situation closely and assess the potential impact of any new sanctions or restrictions on the Company and possible mitigation thereof.
Previous wording
Our revenues, operating results, and cash flows can fluctuate significantly from quarter to quarter and year to year. Our Order Book in the LEU segment consists primarily of long-term, fixed commitment contracts, and we have visibility on a significant portion of our revenue for 2024-2026.
Current wording
Our revenues, operating results, and cash flows can fluctuate significantly from quarter to quarter and year to year. Our LEU segment backlog consists primarily of long-term, fixed commitment contracts and contingent sales commitments, and we have visibility on a significant portion of our revenue for 2025-2027, although our revenue is subject to material adverse impacts from the Import Ban Act and the Russian Decree.
Previous wording
•The potential for sanctions and other measures affecting the importation, sales or purchases of SWU or uranium or goods or services required for the purchase or delivery of such SWU or uranium;
Current wording
•Recently enacted sanctions and the potential for additional sanctions and other measures that restrict with whom we may transact or affect the importation, sales or purchases of SWU or uranium or goods or services required for the sale, purchase, transportation or delivery of such SWU or uranium;
Previous wording
•The government’s inability to satisfy its obligations, including supplying government furnished equipment under its agreements with the Company or processing security clearances due to a shutdown or other reasons; and
Current wording
•The government’s inability to satisfy its obligations, including supplying government furnished equipment under its agreements with the Company or processing security clearances resulting from a shutdown or other reasons; and
Previous wording
Our Order Book in the LEU segment extends to 2030. As of December 31, 2023 and December 31, 2022, our Order Book was approximately $1.0 billion. The Order Book is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries, and includes approximately $0.3 billion of deferred revenue and advances from customers as of December 31, 2023, whereby customers have made advance payments to be applied against future deliveries. No orders in our Order Book are considered at risk related to customer operations. These medium and long-term contracts are subject to significant risks and uncertainties, including existing import laws and restrictions, such as the RSA, which limits imports of Russian uranium products into the United States and applies to our sales using material procured under the TENEX Supply Contract as well as the potential for additional sanctions and other restrictions in response to the evolving situation regarding the war in Ukraine.
Current wording
Our backlog in the LEU segment extends to 2040. As of December 31, 2024 and 2023, our backlog is approximately $2.8 billion and $1.0 billion, respectively. The backlog is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments. Of the $2.8 billion, approximately $2.0 billion represents contingent LEU sales commitments, with $0.8 billion of the total under definitive agreements and $1.2 billion of the total subject to entering into definitive agreements, in support of potential construction of LEU production capacity at the Piketon, Ohio facility. On February 4, 2025, we signed an agreement with Korea Hydro & Nuclear Power (“KHNP”) definitizing $0.8 billion of the $1.2 billion of contingent commitments, that were subject to contract definitization, as of December 31, 2024. The contingent sales commitments depend on our ability to secure substantial public and private investment necessary to build new enrichment capacity. The LEU segment backlog also includes approximately $0.2 billion of deferred revenue and advances from customers as of December 31, 2024, whereby customers have made advance payments to be applied against future deliveries. No orders in our backlog are considered at risk related to customer operations. However, these medium and long-term contracts are subject to significant risks and uncertainties, including existing import laws and restrictions, such as the RSA, which limits imports of Russian uranium products into the United States and applies to our sales using material procured under the TENEX Supply Contract, as well as the potential for additional sanctions and other restrictions affecting the Company or its suppliers, in response to the evolving situation regarding the war in Ukraine.
Previous wording
Revenue from our LEU segment is derived primarily from:
Current wording
Our LEU segment revenue is derived primarily from the following:
Previous wording
Our Technical Solutions segment reflects our technical, manufacturing, engineering, and operations services offered to public and private sector customers, including engineering and testing activities as well as technical and resource support currently being performed by the Company. This includes the HALEU Operation Contract and other contracts with public and private sector customers.
Current wording
Our Technical Solutions segment revenue is derived from the production of HALEU under the HALEU Operation Contract with DOE and technical, manufacturing, engineering, and operations services offered to public and private sector customers,
Previous wording
Revenue from our LEU segment accounted for approximately 84% of our total revenue for the year ended December 31, 2023. The majority of our customers are domestic and international utilities that operate nuclear power plants, with international sales constituting approximately 40% of revenue from our LEU segment since 2021. Our agreements with electric utilities are primarily medium-term and long-term fixed-commitment contracts under which our customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts. Individual customer orders for the SWU component of LEU fulfilled in 2023 averaged approximately $7.1 million per order. As a result, a relatively small shift in the timing of customer orders for LEU may cause significant variability in our operating results year over year.
Current wording
Revenue from our LEU segment accounted for approximately 79% of our total revenue for the year ended December 31, 2024. The majority of our customers are domestic and international utilities that operate nuclear power plants, with international sales constituting approximately 40% of revenue from our LEU segment since 2022. Our agreements with electric utilities are primarily medium and long-term fixed-commitment contracts under which our customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts. Individual customer orders for the SWU component of LEU fulfilled in 2024 averaged approximately $9.4 million per order. As a result, a relatively small shift in the timing of customer orders for LEU may cause significant variability in our operating results year over year.
Previous wording
Utility customers, in general, have the option to make payment but defer receipt of SWU and uranium products purchased from Centrus beyond the contractual sale period, resulting in the deferral of costs and revenue recognition. Refer to Note 2, Revenue and Contracts with Customers, in the Consolidated Financial Statements in Part IV of this Annual Report for further details.
Current wording
Utility customers, in general, have the option to make payment but defer receipt of SWU and uranium products purchased from Centrus beyond the contractual sale period, resulting in the deferral of revenue recognition and related costs. Refer to Note 2, Revenue and Contracts with Customers, in the Consolidated Financial Statements in Part IV of this Annual Report for further details.
Previous wording
Our financial performance over time can be affected significantly by changes in prices for SWU and natural uranium hexafluoride. Market prices for SWU and uranium hexafluoride significantly declined from 2011 until mid-2018, when they began to trend upward. More recently, market uncertainty in the wake of the Russian invasion of Ukraine has driven SWU and uranium hexafluoride prices sharply higher. Since our Order Book includes contracts awarded to us in previous years, the average SWU price billed to customers typically lags published price indicators by several years. While some newer sales reflect the low prices prevalent in recent years, certain older contracts included in our Order Book have sales prices that are significantly above current market prices.
Current wording
Our financial performance over time can be affected significantly by changes in prices for SWU and natural uranium hexafluoride. Market prices for SWU and uranium hexafluoride significantly declined from 2011 until mid-2018, when they began to trend upward. More recently, market uncertainty in the wake of the Russian invasion of Ukraine has driven SWU and uranium hexafluoride prices sharply higher. Since our backlog includes contracts awarded to us in previous years, the average SWU price billed to customers typically lags published price indicators by several years. Revenue in our LEU business varies based upon the timing of customer contracts. The pricing of deliveries varies depending upon the market conditions at the time the contract was signed and may not reflect current market prices.
Previous wording
Recent proposals, including proposed U.S. legislation, to severely limit or cut off supply of LEU from Russia have drawn attention to the potential for significant tightening of supplies in the market. Russian enrichment plants represent 44% of the world’s capacity, and Russian capacity significantly exceeds its domestic needs. According to data from the WNA, the annual enrichment requirements of reactors worldwide outside of Russia vastly exceeds the available supply of non-Russian enrichment, which potentially threatens the viability of some reactors, including those in the United States. While inventories and increased production at non-Russian plants may mitigate the shortfall, these options would not fully replace Russian supply. Deployment of new capacity ultimately could replace Russian enrichment but this capacity will take a number of years and significant funding from private or government sources to come online.
Current wording
The Import Ban Act, which bans the importation of LEU from Russia, may severely limit importation through 2027 and will cut off supply of LEU from Russia after 2027. Notwithstanding our ability to obtain waivers under the Import Ban Act, the Russian Decree, which prohibits the exportation of Russian LEU without a license, may severely limit exportation of LEU from Russia through December 31, 2025. This has drawn attention to the potential for significant tightening of supplies in the market. Russian enrichment plants represent 44% of the world’s capacity, and Russian capacity significantly exceeds its domestic needs. According to data from the WNA, the annual enrichment requirements of reactors worldwide outside of Russia vastly exceeds the available supply of non-Russian enrichment, which potentially threatens the viability of some reactors, including those in the United States. While inventories and increased production at non-Russian plants may mitigate the shortfall, these options would not fully replace Russian supply. Deployment of new capacity ultimately could replace Russian enrichment but this capacity will take a number of years and significant funding from private and/or government sources to come online. Centrus is seeking public and private funding to deploy new production capacity at its Piketon, Ohio, plant to help meet the need for new, domestic supplies of enriched uranium.
Previous wording
Our contracts with customers are denominated primarily in U.S. dollars, and, although revenue has not been materially affected by changes in the foreign exchange rate of the U.S. dollar, we may have a competitive price advantage or disadvantage obtaining new contracts in a competitive bidding process depending upon the weakness or strength of the U.S. dollar. Under a customer contract that commenced deliveries in 2023, payments are denominated in euros and the payments are subject to exchange rate risk. Costs of our primary competitors are denominated in other currencies. Our contracts with suppliers are primarily denominated in U.S. dollars. We have a SWU supply agreement that commenced in 2023, with prices payable in a combination of U.S. dollars and euros, but with a contract-defined exchange rate.
Current wording
Our contracts with customers are denominated primarily in U.S. dollars, and, although revenue has not been materially affected by changes in the foreign exchange rate of the U.S. dollar, we may have a competitive price advantage or disadvantage obtaining new contracts in a competitive bidding process depending upon the weakness or strength of the U.S. dollar. Under a customer contract that commenced deliveries in 2023, prices are payable in a combination of U.S. dollars and euros. Costs of our primary competitors are denominated in other currencies. Our contracts with suppliers are primarily denominated in U.S. dollars. We have a SWU supply agreement, that commenced in 2023, with prices payable in a combination of U.S. dollars and euros.
Previous wording
Cost of sales for SWU and uranium is based on the amount of SWU and uranium hexafluoride sold and delivered during the period and unit inventory costs. Unit inventory costs are determined using the average cost method. Changes in purchase costs have an effect on inventory costs and cost of sales. Cost of sales includes costs for inventory management at off-site licensed locations. Cost of sales also includes certain legacy costs related to former employees of the Portsmouth GDP and Paducah GDP.
Current wording
Cost of sales for SWU and uranium is based on the amount of SWU and uranium hexafluoride sold and delivered during the period and unit inventory costs, which are determined using the average cost method. Changes in purchase costs have an effect on inventory costs and cost of sales. Cost of sales includes costs for inventory management at off-site licensed locations, as well as, certain legacy costs related to former employees of the Portsmouth GDP and Paducah GDP.
Previous wording
The accounting for SWU and uranium inventories includes estimates and judgments. SWU and uranium inventory costs are determined using the average cost method. Inventories of SWU and uranium are valued at the lower of cost or NRV. NRV is the estimated selling price in the ordinary course of business less reasonably predictable costs of completion, disposal, and transportation. The estimated selling price for SWU and uranium under contract is based on the pricing terms of contracts in our Order Book. For uranium not under contract, the estimated selling price is based primarily on published price indicators at the balance sheet date.
Current wording
The accounting for SWU and uranium inventories includes estimates and judgments. SWU and uranium inventory costs are determined using the average cost method. Inventories of SWU and uranium are valued at the lower of cost or NRV. NRV is the estimated selling price in the ordinary course of business less reasonably predictable costs of completion, disposal, and transportation. The estimated selling price for SWU and uranium under contract is based on the pricing terms of contracts in our backlog. For uranium not under contract, the estimated selling price is based primarily on published price indicators at the balance sheet date.
Previous wording
Intangible assets originated from our reorganization and application of fresh start accounting as of September 30, 2014. The intangible assets represented the fair value adjustment to the assets and liabilities for our LEU segment. The identifiable intangible assets relate to our Order Book and customer relationships. The Order Book intangible asset is amortized as the Order Book valued at emergence is reduced, principally as a result of deliveries to customers. The customer relationships intangible asset is amortized using the straight-line method over the estimated average useful life of 15 years, with 5 ¾ years of scheduled amortization remaining. The aggregate net balance of identifiable intangible assets was $39.4 million as of December 31, 2023.
Current wording
Intangible assets originated from our reorganization and application of fresh start accounting as of September 30, 2014. The intangible assets represented the fair value adjustment to the assets and liabilities for our LEU segment. The identifiable intangible assets relate to our LEU segment backlog and customer relationships. The backlog intangible asset is amortized as the backlog, valued at emergence, is reduced, principally as a result of deliveries to customers. The customer relationships intangible asset is amortized using the straight-line method over the estimated average useful life of 15 years, with 4 ¾ years of scheduled amortization remaining. The aggregate net balance of identifiable intangible assets was $29.6 million as of December 31, 2024.
Previous wording
Nonoperating Components of Net Periodic Benefit Income netted to income of $23.2 million, $6.6 million, and $67.6 million for the year ended December 31, 2023, 2022, and 2021, including a net actuarial gain of $24.6 million for the year ended December 31, 2023, net actuarial loss of $7.8 million for the year ended December 31, 2022, and net actuarial gain of $50.5 million for the year ended December 31, 2021. For the year ended December 31, 2023, the net actuarial gain reflected favorable investment returns relative to the expected return assumption, partially offset by a decrease in interest rates from approximately 5.5% to 5.2%. For the year ended December 31, 2022, the net actuarial loss reflected unfavorable investment returns relative to the expected return assumption, partially offset by an increase in interest rates from approximately 2.8% to 5.5%, favorable investment returns relative to the expected return assumption, and healthcare claims assumption, partially offset by changes in mortality, healthcare costs trend assumptions, and claims experience. For the year ended December 31, 2021, the net actuarial gain reflected an increase in interest rates from approximately 2.5% to 2.8%, favorable investment returns relative to the expected return assumption, and healthcare claims assumption, partially offset by changes in mortality, healthcare costs trend assumptions, and claims experience.
Current wording
Nonoperating Components of Net Periodic Benefit Income netted to income of $14.7 million, $23.2 million, and $6.6 million for the year ended December 31, 2024, 2023, and 2022, including a net actuarial gain of $17.9 million for the year ended December 31, 2024, net actuarial gain of $24.6 million for the year ended December 31, 2023, and net actuarial loss of $7.8 million for the year ended December 31, 2022. For the year ended December 31, 2024, the net actuarial gain reflected an annuitization in May 2024, favorable investment returns relative to the expected return assumption and an increase in interest rates from approximately 5.2% to 5.65%, partially offset by unfavorable investment returns relative to the expected return assumption. For the year ended December 31, 2023, the net actuarial gain reflected favorable investment returns relative to the expected return assumption, partially offset by a decrease in interest rates from approximately 5.5% to 5.2%. For the year ended December 31, 2022, the net actuarial loss reflected unfavorable investment returns relative to the expected return assumption, partially offset by an increase in interest rates from approximately 2.8% to 5.5%, favorable investment returns relative to the expected return assumption, and healthcare claims assumption, partially offset by changes in mortality, healthcare costs trend assumptions, and claims experience.
Previous wording
•The expected return on benefit plan assets is approximately 6.8% for 2024. The expected return is based on historical returns and expectations of future returns for the composition of the plans’ equity and debt securities. A one-half percentage point decrease in the expected return on plan assets would increase annual pension costs by $1.3 million in 2024. However, the net impact of any changes in the expected return on benefit plan assets on the final benefit cost recognized for fiscal year 2024 would be $0 since the actual return on assets would effectively be reflected at December 31, 2024, under our mark-to-market accounting methodology.
Current wording
•The expected return on benefit plan assets is approximately 6.8% for 2025. The expected return is based on historical returns and expectations of future returns for the composition of the plans’ equity and debt securities. A one-half percentage point decrease in the expected return on plan assets would increase annual pension costs by $0.2 million in 2025. However, the net impact of any changes in the expected return on benefit plan assets on the final benefit cost recognized for fiscal year 2025 would be $0 since the actual return on assets would effectively be reflected at December 31, 2025, under our mark-to-market accounting methodology.
Previous wording
•The present value of pension obligations is calculated by discounting long-term obligations using a market interest rate. This discount rate is the estimated rate at which the benefit obligations could be effectively settled on the measurement date and is based on yields of high quality fixed income investments whose cash flows match the timing and amount of expected benefit payments of the plan. Discount rates of approximately 5.2% were used as of December 31, 2023. A one-half percentage point reduction in the discount rate would increase the valuation of pension benefit obligations by $13.0 million and postretirement health and life benefit obligations by $3.7 million, and the resulting changes in the valuations would decrease the aggregate service cost and interest cost components of annual pension costs and postretirement health and life benefit costs by $0.9 million and $0.3 million, respectively.
Current wording
•The present value of pension obligations is calculated by discounting long-term obligations using a market interest rate. This discount rate is the estimated rate at which the benefit obligations could be effectively settled on the measurement date and is based on yields of high quality fixed income investments whose cash flows match the timing and amount of expected benefit payments of the plan. Discount rates of approximately 5.65% were used as of December 31, 2024. A one-half percentage point reduction in the discount rate would increase the valuation of pension benefit obligations by $1.7 million and postretirement health and life benefit obligations by $3.3 million, and the resulting changes in the valuations would decrease the aggregate service cost and interest cost components of annual pension costs and postretirement health and life benefit costs by $0 and $0.2 million, respectively.
Previous wording
Accounting standards prescribe a minimum recognition threshold that a tax position is required to meet before the related tax benefit may be recognized in the financial statements. As of December 31, 2023, the liability for unrecognized tax benefits, included in Other Long-Term Liabilities on the Consolidated Balance Sheet in Part IV of this Annual Report, was $2.9 million and accrued interest and penalties totaled $0.3 million.
Current wording
Accounting standards prescribe a minimum recognition threshold that a tax position is required to meet before the related tax benefit may be recognized in the financial statements. As of December 31, 2024, the liability for unrecognized tax benefits, included in Other Long-Term Liabilities on the Consolidated Balance Sheet in Part IV of this Annual Report, was $3.4 million and accrued interest and penalties totaled $0.5 million.
Previous wording
The Company evaluated both positive and negative evidence that was objectively verifiable to determine the amount of the federal valuation allowance that was required on Centrus’ federal deferred tax assets. Centrus has visibility on a significant portion of revenue in the LEU segment for 2023 through 2026, primarily from its long-term sales contracts. Centrus determined that the positive evidence of increased forecasted future income in the LEU segment based on existing sales Order Book and supply contracts along with commodity market forward pricing indicators, supported the release of the federal valuation allowance. However, due to lack of objectively verifiable information in later years, it was determined that forecasted future income was not sufficient to realize all the deferred tax assets. Therefore, Centrus recorded a partial release of its federal valuation allowance. In the third and fourth quarters of 2023, respectively, Centrus released $7.7 million and $11.7 million of the valuation allowance against its federal net deferred tax assets.
Current wording
In 2022, 2023 and 2024, Centrus evaluated both positive and negative evidence that was objectively verifiable to determine the amount of the federal valuation allowance that was required on Centrus’ federal deferred tax assets. Based on an analysis of the positive and negative evidence, it was determined that no change to the federal valuation allowance was necessary in 2022. In 2023, Centrus had visibility on a significant portion of revenue in the LEU segment for 2024 through 2026, primarily from its long-term sales contracts. Centrus determined that the positive evidence of increased forecasted future income in the LEU segment based on existing sales backlog and supply contracts along with commodity market forward pricing indicators, supported the release of a portion of the federal valuation allowance. However, because of the lack of objectively verifiable information in later years, it was determined that forecasted future income was not sufficient to realize all the deferred tax assets. Therefore, Centrus recorded a partial release of its federal valuation allowance. In the third and fourth quarters of 2023, respectively, Centrus released $7.7 million and $11.7 million of the valuation allowance against its federal net deferred tax assets. In 2024, Centrus had visibility on a significant portion of revenue in the LEU segment for 2025 through 2027, primarily from its long-term sales contracts. Additionally, Centrus’ interest income forecast increased based upon increased liquidity. Centrus determined that the positive evidence of increased forecasted future income in the LEU segment based on existing sales backlog and supply contracts along with commodity market forward pricing indicators, and interest outlook supported the release of a portion of the federal valuation allowance. However, because of the lack of objectively verifiable information in later years, it was determined that forecasted future income was not sufficient to realize all the deferred tax assets. In the fourth quarter of 2024, Centrus released $16.6 million of the valuation allowance against its federal net deferred tax assets.
Previous wording
The Company continues to maintain a partial valuation allowance against its remaining federal and state net deferred tax assets due to significant federal and state net operating losses and insufficient future taxable income. As of December 31, 2023, the valuation allowance against the remaining federal and state net deferred tax assets was $382.4 million.
Current wording
The Company continues to maintain a partial valuation allowance against its remaining federal and state net deferred tax assets as a result of significant federal and state net operating losses and insufficient future taxable income. As of December 31, 2024, the valuation allowance against the remaining federal and state net deferred tax assets was $365.7 million.
Previous wording
The Company recognized a gross profit of $112.1 million and $117.9 million for the year ended December 31, 2023 and 2022, respectively, a decrease of $5.8 million (or 5%).
Current wording
The Company recognized a gross profit of $111.5 million and $112.1 million for the year ended December 31, 2024 and 2023, respectively, a decrease of $0.6 million (or 1%).
Showing the first 40 of 68 pairs. Open the source sections for the rest.
Rearranged current paragraphs (2)
Current report — wording carried from elsewhere
For performance obligation to deliver products with continuous transfer of control to the customer, the Company uses the cost-to-cost input method of progress because it best depicts the transfer of control to the customer that occurs as the Company incurs costs. Under the cost-to-cost method, the extent of progress towards completion is measured based on the proportion of direct costs incurred to date to the total estimated direct costs at completion of the performance obligation. Revenues are recorded proportionally as costs are incurred.
Current report — wording carried from elsewhere
On May 28, 2024, the Company entered into an agreement with a second insurer (“Second Insurer”) for two of its defined benefit plans to purchase a group annuity contract and transferred approximately $234.0 million of its pension plan obligations to the Second Insurer. The purchase of the group annuity contract was funded directly by the assets of the pension plan of approximately $224.0 million. The purchase resulted in a transfer of future benefit obligations and administrative responsibilities for more than 1,000 beneficiaries effective September 1, 2024.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
In 2021, Centrus evaluated both positive and negative evidence that was objectively verifiable to determine the amount of the federal valuation allowance that was required on Centrus’ federal deferred tax assets. Centrus considered both its achievement of sustained profitability and cumulative income in 2021, as well as the forecasted income to be significant forms of positive evidence. Negative evidence included uncertainty in and the lack of objectively verifiable evidence for profitability in later years when Centrus’ existing Order Book and supply contracts reach expiration in its LEU segment. In Centrus’ Technical Solutions segment, negative evidence included uncertainty in the future funding of the HALEU enrichment facility and thus, no assumptions for the future funding of the HALEU enrichment facility were included in the forecast model because it was not objectively verifiable. Centrus determined that the positive evidence outweighed the negative evidence and supported a release of the federal valuation allowance. However, due to lack of objectively verifiable information in later years, it was determined that forecasted future income was not sufficient to realize all the deferred tax assets. Therefore, Centrus recorded a $40.7 million partial release of its federal valuation allowance in the fourth quarter of 2021. Based on an analysis of the positive and negative evidence, it was determined that no change to the federal valuation allowance was necessary in 2022.