What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-03-31; filed 2024-05-09.
0001064728-24-000077
Item 2. Management's Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2024-06-30; filed 2024-08-08.
0001064728-24-000125
Item 2. Management's Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 162 previous paragraphs and 174 current paragraphs.
100 unchanged; 58 reworded; 15 added; 4 removed; 0 previous and 1 current paragraphs rearranged.
Tables are not compared: 21 previous and 23 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (15)
Current report
Centurion Mine
Current report
Peabody’s redevelopment of the Centurion Mine, an underground longwall metallurgical coal mine in Queensland, Australia, continues to advance as planned. The first development coal was mined in June 2024, and a second continuous mine was commissioned in July 2024. The first coal shipments from the Centurion Mine are expected in the fourth quarter of 2024, and the Company is targeting the commencement of longwall production in the first quarter of 2026. Approximately $200 million of the $489 million of capital expenditures to reach longwall production has been completed as of June 30, 2024. The benchmark premium hard coking coal from Centurion is expected to receive a premium price relative to other metallurgical coals.
Current report
Shoal Creek Insurance Recovery. On March 29, 2023, the Company’s Shoal Creek Mine experienced a fire involving void fill material utilized to stabilize the roof structure of the mine. On June 20, 2023, the Company announced that the Shoal Creek Mine, in coordination with the Mine Safety and Health Administration, had safely completed localized sealing of the affected area of the mine.
Current report
In October 2023, the Company filed an insurance claim against applicable insurance policies with combined business interruption and property loss limits of $125 million above a $50 million deductible. During June 2024, the Company reached a settlement with its insurers and various re-insurers and recognized a $109.5 million insurance recovery which the Company included in its results of operations for the three and six months ended June 30, 2024.
Current report
The increase in income from continuing operations, net of income taxes for the three months ended June 30, 2024 compared to the same period in the prior year ($6.7 million) was driven by the current year insurance recovery related to the 2023 event at the Shoal Creek Mine ($109.5 million), lower operating costs and expenses ($58.1 million), and lower year-over-year provisions for taxes ($34.8 million) and the losses at the NARM and Shoal Creek Mines ($31.8 million). These favorable variances were offset by lower revenue ($226.8 million) due to no unrealized mark-to-market gains from derivative contracts related to forecasted sales in the current year, lower seaborne coal pricing and volume decreases in the U.S. thermal segments.
Current report
Adjusted EBITDA for the three and six months ended June 30, 2024 reflected year-over-year decreases of $48.5 million and $278.6 million, respectively.
Current report
Seaborne Metallurgical. Segment Adjusted EBITDA increased during the three months ended June 30, 2024 compared to the same period in the prior year due to the Shoal Creek insurance recovery ($80.8 million) further discussed in Note 15. “Other Events” in the accompanying unaudited condensed consolidated financial statements and favorable mix variances ($15.4 million) driven by increased production from the Shoal Creek Mine following the fire in the first quarter of 2023, despite the lock outages during 2024. These increases were offset by lower realized prices net of sales price sensitive costs ($41.3 million) and unfavorable operational costs ($24.3 million).
Current report
Segment Adjusted EBITDA decreased during the six months ended June 30, 2024 compared to the same period in the prior year due to lower realized prices net of sales price sensitive costs ($151.0 million) and unfavorable operational costs ($47.7 million). These decreases were offset by favorable volumes ($88.4 million) driven by increased production from the Shoal Creek Mine following the fire in the first quarter of 2023, despite the lock outages during 2024; and the Shoal Creek insurance recovery ($80.8 million).
Current report
Corporate and Other Adjusted EBITDA increased during the three months ended June 30, 2024 compared to the same period in the prior year due to favorable trading results ($14.7 million) and the favorable net impact of foreign currency rate changes ($9.4 million).
Current report
Provision for NARM and Shoal Creek Losses. The provision recorded during the prior year periods was for losses related to the events at the NARM and Shoal Creek Mines, as discussed in Note 15. “Other Events” in the accompanying unaudited condensed consolidated financial statements. Incremental repair costs related to the tornado damage at NARM were recorded during the current year.
Current report
Shoal Creek Insurance Recovery - Property Damage. During June 2024, the Company reached a settlement with its insurers and various re-insurers related to the Shoal Creek losses and recorded a $109.5 million insurance recovery, as discussed in Note 15. “Other Events” in the accompanying unaudited condensed consolidated financial statements. Of this amount, Adjusted EBITDA excludes an allocated amount applicable to total equipment losses recognized at the time of the insurance recovery, which consisted of $28.7 million recognized during the year ended December 31, 2023. The remaining $80.8 million, applicable to incremental costs and business interruption recoveries, is included in Adjusted EBITDA for the three and six months ended June 30, 2024.
Current report
Interest Expense, Net of Capitalized Interest. The decrease in expense during the three and six months ended June 30, 2024 compared to the same periods in the prior year was driven by lower interest and fees for financial assurance instruments and the capitalization of interest related to the redevelopment of the Centurion Mine.
Current report
The final rule is subject to numerous legal challenges that have been consolidated in the U.S. Court of Appeals for the Eighth Circuit (Eighth Circuit). If the Eighth Circuit affirms the final rule, as implemented by the EPA and states, it could have a substantial impact on the use of coal and natural gas for the generation of electricity.
Current report
National Greenhouse and Energy Reporting Act 2007 (NGER Act). The NGER Act imposes requirements for corporations meeting a certain threshold to register and report greenhouse gas emissions and abatement actions, as well as energy production and consumption as part of a single, national reporting system. The Clean Energy Regulator administers the NGER Act. The federal Department of Environment and Energy is responsible for NGER Act-related policy developments and review. In May 2023, the Australian Parliament passed reforms to the National Greenhouse and Energy Reporting (Safeguard Mechanism) Rule 2015. The reforms commenced on July 1, 2023 and introduced site specific baseline emissions for heavy emitting facilities as benchmarks for year-on-year improvement (proposed to be 4.9% each year to 2030) before transitioning to industry average emissions benchmarks by 2030. Proponents will earn tradeable credits (Safeguard Mechanism Credits) when emissions are below their baselines or can purchase credits to offset emissions. Access to existing Australian Carbon Credit Units will continue unchanged albeit with a price ceiling of $75 Australian dollars per tonne of CO 2 in 2023-24, increasing with the Consumer Price Index plus 2% each year. In June 2024 amendments to the NGER Act came into effect requiring open-cut mines covered by the Safeguard Mechanism that currently report fugitive methane emissions using a basic method with minimal data inputs (Method 1) to transition over a two-year period to a more complex method requiring site-level sampling and analysis (Methods 2 or 3). This change in reporting methods is expected to increase the Safeguard Mechanism liability position of open-cut mining operations in Queensland. The impacts of this change are currently being assessed.
Current report
New South Wales Coal Directions. The State of New South Wales enacted the Energy and Utilities Administration Amendment Act 2022 granting the State Premier and Minister for Energy the ability to issue directions in the event of a coal market price emergency (among other powers). On December 22, 2022, the State Premier declared such an emergency, intended to control coal and electricity pricing. Subsequently, directions were issued to Peabody Energy Australia Pty Ltd and other coal producers with operations in NSW, which were amended at various dates. The most recent directions required Peabody Energy Australia Pty Ltd to reserve a portion of coal produced by Wambo Coal Pty Ltd and Wilpinjong Coal Pty Ltd for sale to NSW power generators at a capped price until June 30, 2024 and imposed additional reporting obligations to demonstrate compliance. The Australian Energy Regulator has confirmed that the directions have ended, and the last report was submitted on July 12, 2024.
Removed paragraphs (4)
Previous report
Adjusted EBITDA for the three months ended March 31, 2024 reflected a year-over-year decrease of $230.1 million.
Previous report
Seaborne Metallurgical. Segment Adjusted EBITDA decreased during the three months ended March 31, 2024 compared to the same period in the prior year due to lower realized prices net of sales price sensitive costs ($71.0 million) and unfavorable volumes ($22.0 million) and operational costs ($15.4 million) at the Australian operations primarily resulting from a longwall move at the Metropolitan Mine in the first quarter of 2024. These decreases were offset by favorable volumes from the Shoal Creek Mine ($52.4 million) despite the outage at the Demopolis Lock in the first quarter of 2024.
Previous report
The final rules, as implemented by the EPA and states, could have substantial impacts on the use of coal, oil and natural gas for the generation of electricity. The Company is evaluating the impacts the final rules will have on its results of operations, cash flows and financial condition.
Previous report
New South Wales Environmental. In New South Wales (NSW), laws and regulations related to mining include, but are not limited to, the Mining Act 1992, Work Health and Safety (Mines) Act 2013, Coal Mine Subsidence Compensation Act 2017, Environmental Planning and Assessment Act 1979 (EPA Act), Environmental Planning and Assessment Regulations 2000, Protection of the Environment Operations Act 1997, Contaminated Land Management Act 1997, Explosives Act 2003, Water Management Act 2000, Water Act 1912, Radiation Control Act 1990, Biodiversity Conservation Act 2016 (BC Act), Heritage Act 1977, Aboriginal Land Rights Act 1983, Crown Land Management Act 2016, Dangerous Goods (Road and Rail Transport) Act 2008, Fisheries Management Act 1994, Forestry Act 2012, Native Title (New South Wales) Act 1994, Biosecurity Act 2015, Roads Act 1993 and National Parks & Wildlife Act 1974.
Reworded paragraphs (58)
Previous wording
The following discussion of the Company’s results of operations includes references to and analysis of Adjusted EBITDA and Total Reporting Segment Costs, which are financial measures not recognized in accordance with U.S. generally accepted accounting principles (U.S. GAAP). Adjusted EBITDA is used by management as the primary metric to measure each of its segments’ operating performance and allocate resources. Total Reporting Segment Costs is also used by management as a component of a metric to measure each of its segments’ operating performance.
Current wording
The following discussion of the Company’s results of operations includes references to and analysis of Adjusted EBITDA and Total Reporting Segment Costs, which are financial measures not recognized in accordance with U.S. generally accepted accounting principles (U.S. GAAP). Adjusted EBITDA is used by the chief operating decision maker as the primary metric to measure each of the segments’ operating performance and allocate resources. Total Reporting Segment Costs is also used by management as a component of a metric to measure each of its segments’ operating performance.
Previous wording
Within the global coal industry, supply and demand for its products and the supplies used for mining continue to be impacted by the ongoing Russian-Ukrainian conflict. As future developments related to the Russian-Ukrainian conflict and geopolitical instability in key energy producing regions are unknown, the global coal industry data for the three months ended March 31, 2024 presented herein may not be indicative of their ultimate impacts.
Current wording
Within the global coal industry, supply and demand for its products and the supplies used for mining continue to be impacted by the ongoing Russian-Ukrainian conflict. As future developments related to the Russian-Ukrainian conflict and geopolitical instability in key energy producing regions are unknown, the global coal industry data for the six months ended June 30, 2024 presented herein may not be indicative of their ultimate impacts.
Previous wording
Within the seaborne metallurgical coal market, coking coal prices retreated from a high base during the three months ended March 31, 2024. Outside of India and China, metallurgical coal demand was hampered by thin steel margins. In India robust economic output supported steel making profitability; while in China steel demand was mixed but generally weaker, pressured by real estate sector performance, and domestic metallurgical coal prices declined in response. Meanwhile, Australian high-quality coking coal showed signs of supply improvement after a period of extended production disruptions and relatively high segment prices. This incremental volume of high-quality coking coal was reportedly placed in the seaborne market at progressively lower prices during the three months ended March 31, 2024. In other metallurgical coal market segments, such as pulverized coal injection, prices also retreated during the period however not to the extent of high-quality coking coal given reduced steel making productivity targets under thin margin conditions had already been priced into these segments. In the coming period, improving steel margins, economic stimulus measures and seasonal restocking patterns may lend support to metallurgical coal market pricing. Overall, the market for metallurgical coal remains finely balanced and exposed to volatility, influenced by the rate of recovery of exports from Australia and economic performance in China, India and elsewhere.
Current wording
Within the seaborne metallurgical coal market, coking coal prices have retreated from a high base during the six months ended June 30, 2024. Parts of the global steel market have reported tepid demand and thin profit margins during this period, restricting demand growth for metallurgical coal. In India, steel production was disrupted due to election activities and more recently the onset of the monsoon season; while in China, steel production was mixed with a weak property market slowing demand, partially offset by economic stimulus targeting the real estate sector. Australian high-quality coking coal showed signs of supply improvement during the six months ended June 30, 2024 which has weighed on coking coal prices, however periodic price support has been observed via various supply side disruptions, including rail and port maintenance curtailing exports in Queensland, the restriction of U.S. exports in Baltimore, Maryland and low domestic coal production in China. The June 2024 incident at the Grosvenor Mine in Queensland, Australia has further limited global exports. Despite these constraints, coking coal supply proved sufficient to meet demand during the period. In the PCI segment, prices were initially under pressure early in the year from reduced steel making productivity targets under thin margin conditions, but have since found support from shifting of trade flows from Russian to Australian supply amidst newly announced sanctions. In the coming period, seasonal restocking patterns and ongoing economic stimulus may lend support to metallurgical coal pricing. Overall, the market for metallurgical coal remains finely balanced and exposed to volatility, influenced by the rate of exports from Australia and economic performance in China, India and elsewhere.
Previous wording
Within the seaborne thermal coal market, global thermal coal prices were rangebound during the three months ended March 31, 2024, finding support in Asian markets due to potential supply disruptions following new Russian sanctions. In China, overall total generation demand has been elevated while domestic coal production has declined, which has driven stronger coal import demand year-over-year through the three months ended March 31, 2024. In India, strong growth in coal generation has supported increased import demand, despite elevated domestic coal production. Overall, global thermal coal markets remain turbulent amid ample supply and seasonal demand requirements in the Northern Hemisphere, as well as volatile global natural gas markets.
Current wording
Within the seaborne thermal coal market, global thermal coal prices were rangebound during the six months ended June 30, 2024, driven by healthy supply meeting elevated demand in Asian markets. In China, overall total generation demand has been elevated while domestic coal production has declined, which has driven stronger coal import demand year-over-year through the six months ended June 30, 2024. In India, strong growth in coal generation has supported increased import demand, despite elevated domestic coal production. Overall, global thermal coal markets remain turbulent amid ample supply and seasonal demand requirements in the Northern Hemisphere, as well as volatile global natural gas markets.
Previous wording
In the U.S., overall electricity demand increased approximately 4% year-over-year. Through the three months ended March 31, 2024, electricity generation from thermal coal has declined year-over-year due to low natural gas prices and stronger renewable generation, despite higher overall electricity demand. Coal’s share of electricity generation has declined to approximately 15% for the three months ended March 31, 2024, while wind and solar’s combined generation share is at 17% and the share of natural gas generation has increased to 41%. While U.S. coal inventories declined in January, these levels have reversed and increased through March 31, 2024, resulting in stockpiles slightly above levels seen at the end of 2023. During the three months ended March 31, 2024, utility consumption of PRB coal increased approximately 6% compared to the prior year period.
Current wording
In the U.S., overall electricity demand increased approximately 5% year-over-year. Through the six months ended June 30, 2024, electricity generation from thermal coal has increased slightly year-over-year driven by higher overall electricity demand and despite low natural gas prices and stronger renewable generation. Coal’s share of electricity generation has declined to approximately 14% for the six months ended June 30, 2024, while wind and solar’s combined generation share is at 19% and the share of natural gas generation has decreased slightly to 40%. U.S. coal inventories have declined through June 30, 2024, resulting in stockpiles slightly below levels seen at the end of 2023. During the six months ended June 30, 2024, utility consumption of PRB coal was unchanged compared to the prior year period.
Previous wording
The Company entered into a definitive agreement dated October 26, 2023, to acquire the southern part of the Wards Well tenements (Wards Well area) which are adjacent to the Company’s Centurion Mine in Queensland, Australia. The acquisition was completed on April 16, 2024 for cash consideration of approximately $134 million and a contingent royalty of up to $200 million. The royalty will only be payable once the Company has recovered its investment and development costs of the Wards Well area and if the average sales price achieved exceeds certain thresholds. No royalty is payable if the Company does not commence mining in the Wards Well area.
Current wording
The agreement also includes an initial contingent royalty of up to $200 million. The royalty will only be payable once the Company has recovered its investment and development costs of Wards Well and if the average sales price achieved exceeds certain thresholds. No royalty is payable if the Company does not commence mining Wards Well.
Previous wording
Three Months Ended March 31, 2024 Compared to the Three Months Ended March 31, 2023
Current wording
Three and Six Months Ended June 30, 2024 Compared to the Three and Six Months Ended June 30, 2023
Previous wording
The decrease in income from continuing operations, net of income taxes for the three months ended March 31, 2024 compared to the same period in the prior year ($238.4 million) was driven by lower revenue ($380.4 million) due to no unrealized mark-to-market gains from derivative contracts related to forecasted sales in the current year, lower seaborne coal pricing and volume decreases in the U.S. thermal segments. This unfavorable variance was partially offset by a lower tax provision ($97.9 million) and operating costs and expenses ($32.4 million).
Current wording
The decrease in income from continuing operations, net of income taxes for the six months ended June 30, 2024 compared to the same period in the prior year ($231.7 million) was driven by lower revenue ($607.2 million) due to no unrealized mark-to-market gains from derivative contracts related to forecasted sales in the current year, lower seaborne coal pricing and volume decreases in the U.S. thermal segments. This unfavorable variance was partially offset by a lower tax provision ($132.7 million), the current year insurance recovery related to the 2023 event at the Shoal Creek Mine ($109.5 million), lower operating costs and expenses ($90.5 million) and lower year-over-year provision for losses at the NARM and Shoal Creek Mines ($30.0 million).
Previous wording
(2)Includes revenue-based production taxes and royalties; excludes depreciation, depletion and amortization; asset retirement obligation expenses; selling and administrative expenses; restructuring charges; asset impairment; amortization of take-or-pay contract-based intangibles; and certain other costs related to post-mining activities.
Current wording
(2)Includes revenue-based production taxes and royalties; excludes depreciation, depletion and amortization; asset retirement obligation expenses; selling and administrative expenses; restructuring charges; asset impairment; amortization of take-or-pay contract-based intangibles; insurance recoveries; and certain other costs related to post-mining activities.
Previous wording
Seaborne Thermal. Segment revenue decreased during the three months ended March 31, 2024 compared to the same period in the prior year due to unfavorable realized prices ($94.9 million), partially offset by favorable export volumes ($32.3 million).
Current wording
Seaborne Thermal. Segment revenue decreased during the three and six months ended June 30, 2024 compared to the same periods in the prior year due to unfavorable realized prices ($117.4 million and $217.8 million, respectively), partially offset by favorable export volumes ($25.4 million and $63.2 million, respectively).
Previous wording
Seaborne Metallurgical. Segment revenue decreased during the three months ended March 31, 2024 compared to the same period in the prior year due to unfavorable realized prices ($89.9 million), offset by favorable volumes ($48.5 million) driven by increased production at the Shoal Creek Mine.
Current wording
Seaborne Metallurgical. Segment revenue decreased during the three months ended June 30, 2024 compared to the same period in the prior year due to unfavorable realized prices ($56.8 million) and mix variances ($21.4 million). Segment revenue decreased during the six months ended June 30, 2024 compared to the same period in the prior year due to unfavorable realized prices ($181.1 million), offset by favorable volume and mix variances ($61.5 million) driven by increased production at the Shoal Creek Mine.
Previous wording
Powder River Basin. Segment revenue decreased during the three months ended March 31, 2024 compared to the same period in the prior year primarily due to unfavorable volumes ($48.0 million) resulting from decreased demand driven by low natural gas pricing and mild weather.
Current wording
Powder River Basin. Segment revenue decreased during the three and six months ended June 30, 2024 compared to the same periods in the prior year due to unfavorable volumes ($38.2 million and $85.7 million, respectively) resulting from decreased demand driven by low natural gas pricing and mild weather.
Previous wording
Other U.S. Thermal. Segment revenue decreased during the three months ended March 31, 2024 compared to the same period in the prior year due to unfavorable volumes ($67.2 million) resulting from decreased demand driven by low natural gas pricing and mild weather, partially offset by increased sales contract cancellation settlements ($12.4 million).
Current wording
Other U.S. Thermal. Segment revenue increased during the three months ended June 30, 2024 compared to the same period in the prior year due to favorable realized prices ($3.2 million). Segment revenue decreased during the six months ended June 30, 2024 compared to the same period in the prior year due to unfavorable volumes ($69.4 million) resulting from decreased demand driven by low natural gas pricing and mild weather, partially offset by increased sales contract cancellation settlements ($13.1 million).
Previous wording
Corporate and Other. Segment revenue decreased during the three months ended March 31, 2024 compared to the same period in the prior year due to no unrealized mark-to-market gains from derivative contracts related to forecasted sales in the current year ($118.7 million) as all derivative contracts settled in 2023; lower results from trading activities ($31.8 million); and prior year revenue related to the Company’s assignment of rights to its excess port and rail capacity ($19.2 million) as discussed in Note 15. “Other Events” to the accompanying unaudited condensed consolidated financial statements.
Current wording
Corporate and Other. Segment revenue decreased during the three months ended June 30, 2024 compared to the same period in the prior year due to no unrealized mark-to-market gains from derivative contracts related to forecasted sales in the current year ($40.3 million) as all derivative contracts settled in 2023; offset by favorable results from trading activities ($19.0 million). Segment revenue decreased during the six months ended June 30, 2024 compared to the same period in the prior year due to no unrealized mark-to-market gains from derivative contracts related to forecasted sales in the current year ($159.0 million); prior year revenue related to the Company’s assignment of rights to its excess port and rail capacity ($19.2 million) as discussed in Note 15. “Other Events” to the accompanying unaudited condensed consolidated financial statements; and lower results from trading activities ($12.8 million).
Previous wording
Seaborne Thermal. Segment Adjusted EBITDA decreased during the three months ended March 31, 2024 compared to the same period in the prior year as a result of lower realized prices net of sales price sensitive costs ($89.8 million), partially offset by favorable volume and mix variances ($21.1 million).
Current wording
Seaborne Thermal. Segment Adjusted EBITDA decreased during the three and six months ended June 30, 2024 compared to the same periods in the prior year as a result of lower realized prices net of sales price sensitive costs ($106.0 million and $200.8 million, respectively), partially offset by favorable volume and mix variances ($15.4 million and $39.2 million, respectively).
Previous wording
Powder River Basin. Segment Adjusted EBITDA decreased during the three months ended March 31, 2024 compared to the same period in the prior year due to unfavorable volumes ($24.1 million) and elevated overburden removal costs ($10.5 million), offset by lower costs for materials, services, repairs and labor ($11.0 million) and favorable commodity pricing ($6.9 million).
Current wording
Powder River Basin. Segment Adjusted EBITDA decreased during the three and six months ended June 30, 2024 compared to the same periods in the prior year due to unfavorable volumes ($14.1 million and $44.9 million, respectively) and increased lease spend ($3.4 million and $5.4 million, respectively), offset by lower costs for materials, services, repairs and labor ($9.7 million and $22.3 million, respectively) and favorable commodity pricing ($1.4 million and $8.2 million, respectively).
Previous wording
Other U.S. Thermal. Segment Adjusted EBITDA decreased during the three months ended March 31, 2024 compared to the same period in the prior year due to unfavorable volumes ($39.5 million), offset by increased sales contract cancellation settlements ($12.4 million) and lower costs for materials, services, repairs and labor ($8.2 million).
Current wording
Other U.S. Thermal. Segment Adjusted EBITDA decreased during the three and six months ended June 30, 2024 compared to the same periods in the prior year due to unfavorable volumes ($22.3 million and $59.7 million, respectively), offset by favorable mine sequencing ($2.4 million and $11.5 million, respectively) and increased sales contract cancellation settlements (six months, $13.1 million).
Previous wording
(3)Includes trading and brokerage activities, costs associated with post-mining activities, gains (losses) on certain asset disposals, minimum charges on certain transportation-related contracts, costs associated with suspended operations including the Centurion Mine and expenses related to the Company’s other commercial activities.
Current wording
(3)Includes trading and brokerage activities, costs associated with post-mining activities, gains (losses) on certain asset disposals, minimum charges on certain transportation-related contracts, costs associated with suspended operations including the Centurion Mine, the impact of foreign currency remeasurement and expenses related to the Company’s other commercial activities.
Previous wording
Corporate and Other Adjusted EBITDA decreased during the three months ended March 31, 2024 compared to the same period in the prior year due to unfavorable trading results ($40.2 million); prior year revenue related to the Company’s assignment of rights to its excess port and rail capacity ($19.2 million) as discussed in Note 15. “Other Events” to the accompanying unaudited condensed consolidated financial statements; and the unfavorable net impact of foreign currency rate changes ($15.0 million).
Current wording
Corporate and Other Adjusted EBITDA decreased during the six months ended June 30, 2024 compared to the same period in the prior year due to unfavorable trading results ($25.5 million); prior year revenue related to the Company’s assignment of rights to its excess port and rail capacity ($19.2 million) as discussed in Note 15. “Other Events” to the accompanying unaudited condensed consolidated financial statements; and the unfavorable net impact of foreign currency rate changes ($5.4 million).
Previous wording
The increases in the weighted-average depletion rate per ton for both the Seaborne Metallurgical and the Other U.S. Thermal segments during the three months ended March 31, 2024 compared to the same period in the prior year reflect the impact of volume and mix variances across the segments.
Current wording
The increases in the weighted-average depletion rate per ton for both the Seaborne Metallurgical and the Other U.S. Thermal segments during the three and six months ended June 30, 2024 compared to the same periods in the prior year reflect the impact of volume and mix variances across the segments.
Previous wording
Interest Income. The increase in interest income during the three months ended March 31, 2024 was primarily due to higher cash balances, including restricted cash balances on which the Company earns interest, and higher interest rates in the current year.
Current wording
Interest Income. The decrease in interest income during the three months ended June 30, 2024 was primarily due to lower average cash balances, including restricted cash balances on which the Company earns interest, in the current year.
Previous wording
Income Tax Provision. The decrease in the income tax provision during the three months ended March 31, 2024 compared to the same period in the prior year was primarily due to lower pretax income. Refer to Note 8. “Income Taxes” to the accompanying unaudited condensed consolidated financial statements for additional information.
Current wording
Income Tax Provision. The decrease in the income tax provision during the three and six months ended June 30, 2024 compared to the same periods in the prior year was primarily due to lower pretax income. Refer to Note 8. “Income Taxes” to the accompanying unaudited condensed consolidated financial statements for additional information.
Previous wording
Net Income Attributable to Noncontrolling Interests. The decrease in the results attributable to noncontrolling interests during the three months ended March 31, 2024 compared to the same period in the prior year was primarily due to a decline in the financial results of Peabody’s majority-owned Wambo operations in which there is an outside non-controlling interest.
Current wording
Net Income Attributable to Noncontrolling Interests. The decrease in the results attributable to noncontrolling interests during the three and six months ended June 30, 2024 compared to the same periods in the prior year was primarily due to a decline in the financial results of Peabody’s majority-owned Wambo operations in which there is an outside non-controlling interest.
Previous wording
Diluted EPS is commensurate with the changes in results from continuing operations and discontinued operations during that period. Diluted EPS reflects weighted average diluted common shares outstanding of 144.9 million and 161.4 million for the three months ended March 31, 2024 and 2023, respectively.
Current wording
Diluted EPS is commensurate with the changes in results from continuing operations and discontinued operations during that period. Diluted EPS reflects weighted average diluted common shares outstanding of 142.8 million and 159.0 million for the three months ended June 30, 2024 and 2023, respectively, and 143.8 million and 160.2 million for the six months ended June 30, 2024 and 2023, respectively.
Previous wording
Revenue per Ton and Adjusted EBITDA Margin per Ton are equal to revenue by segment and Adjusted EBITDA by segment, respectively, divided by segment tons sold. Costs per Ton is equal to Revenue per Ton less Adjusted EBITDA Margin per Ton.
Current wording
Revenue per Ton and Adjusted EBITDA Margin per Ton are equal to revenue by segment and Adjusted EBITDA by segment (excluding insurance recoveries), respectively, divided by segment tons sold. Costs per Ton is equal to Revenue per Ton less Adjusted EBITDA Margin per Ton.
Previous wording
Available Free Cash Flow is defined as operating cash flow minus investing cash flow and distributions to noncontrolling interests; plus/minus changes to restricted cash and collateral and other anticipated expenditures. See the table below for a reconciliation of Available Free Cash Flow to its most comparable measure under U.S. GAAP.
Current wording
Available Free Cash Flow is defined as operating cash flow less investing cash flow and distributions to noncontrolling interests; plus/minus changes to restricted cash and collateral and other anticipated expenditures. See the table below for a reconciliation of Available Free Cash Flow to its most comparable measure under U.S. GAAP.
Previous wording
On December 20, 2018, the EPA proposed to revise the 2015 NSPS to modify the minimum requirements for newly constructed coal-fired units from partial CCUS to efficiency-based standards. (83 Fed. Reg. 65,424 (Dec. 20, 2018)). In contrast to the 2015 rule, the proposed rule defined BSER as the most efficient demonstrated steam cycle in combination with the best operating practices. The EPA indicated that the primary reason for revising BSER was the high cost and limited geographic availability of CCUS technology. On May 23, 2023, however, the EPA published a notice of proposed rulemaking addressing NSPS from new, modified and reconstructed fossil-fuel steam EGUs. In contrast to the 2018 proposed rule, the 2023 proposed rule didnot propose to amend the 2015 NSPS for coal-fired EGUs. Status reports filed with the D.C. Circuit in North Dakota v. EPAindicate that litigation on the 2015 rule should remain in abeyance pending the EPA’s action on the 2018 proposed rule and the 2023 proposed rule. As indicated in the following section, the EPA signed a final rule based on the 2023 proposed rule on April 24, 2024. This final rule did not amend the 2015 NSPS for coal-fired EGUs, but indicated that the EPA will continue to consider whether or not to make revisions to that rule in the future.
Current wording
On December 20, 2018, the EPA proposed to revise the 2015 NSPS to modify the minimum requirements for newly constructed coal-fired units from partial CCUS to efficiency-based standards. (83 Fed. Reg. 65,424 (Dec. 20, 2018)). In contrast to the 2015 rule, the proposed rule defined BSER as the most efficient demonstrated steam cycle in combination with the best operating practices. The EPA indicated that the primary reason for revising BSER was the high cost and limited geographic availability of CCUS technology. On May 23, 2023, however, the EPA published a notice of proposed rulemaking addressing NSPS from new, modified and reconstructed fossil-fuel steam EGUs. In contrast to the 2018 proposed rule, the 2023 proposed rule didnot propose to amend the 2015 NSPS for coal-fired EGUs. Status reports filed with the D.C. Circuit in North Dakota v. EPAindicate that litigation on the 2015 rule should remain in abeyance pending the EPA’s action on the 2018 proposed rule and the 2023 proposed rule. As indicated in the following section, on May 9, 2024, the EPA published the final rule in the Federal Register based on the 2023 proposed rule. This final rule did not amend the 2015 NSPS for coal-fired EGUs, but indicated that the EPA will continue to consider whether or not to make revisions to that rule in the future.
Previous wording
EPA Regulation of Greenhouse Gas Emissions from New and Existing Fossil Fuel-Fired EGUs. On April 24, 2024, the EPA signed a pre-publication version of final rules for new, modified and reconstructed fossil fuel-fired EGUs. This rule package consists of four elements: (1) revised NSPS for controlling CO 2 emissions from new and reconstructed stationary combustion turbines; (2) revised NSPS for fossil fuel-fired steam EGUs that undertake a large modification; (3) emission guidelines for existing fossil fuel-fired steam EGUs; and (4) repeal of the Affordable Clean Energy rule promulgated in 2019.
Current wording
EPA Regulation of Greenhouse Gas Emissions from New and Existing Fossil Fuel-Fired EGUs. On May 9, 2024, the EPA published a final rule for new, modified and reconstructed fossil fuel-fired EGUs in the Federal Register. The final rule consists of four elements: (1) revised NSPS for controlling CO 2 emissions from new and reconstructed stationary combustion turbines; (2) revised NSPS for fossil fuel-fired steam EGUs that undertake a large modification; (3) emission guidelines for existing fossil fuel-fired steam EGUs; and (4) repeal of the Affordable Clean Energy rule promulgated in 2019.
Previous wording
With respect to existing fossil fuel-fired steam EGUs (primarily coal-fired) the EPA determined that the BSER that is adequately demonstrated is carbon capture and sequestration (CCS) with 90% capture of CO 2 emissions. Pursuant to the final rules, existing fossil fuel-fired steam EGUs that intend to operate in the long-term will be required to comply with a CO 2 emission rate based on CCS with 90% capture by January 1, 2032. Existing fossil fuel-fired steam EGUs that will permanently cease operations by January 1, 2039 are not subject to emission standards based on 90% CO 2 capture, but will need to meet an emission rate based on co-firing with 40% natural gas by January 1, 2030. (This translates into a 16% reduction in CO 2 emissions determined from a unit-specific baseline). Existing fossil fuel-fired steam EGUs that permanently cease operations by January 1, 2032 are exempt from these requirements.
Current wording
With respect to existing fossil fuel-fired steam EGUs (primarily coal-fired) the EPA determined that the BSER that is adequately demonstrated is carbon capture and sequestration (CCS) with 90% capture of CO 2 emissions. Pursuant to the final rule, existing fossil fuel-fired steam EGUs that intend to operate in the long-term will be required to comply with a CO 2 emission rate based on CCS with 90% capture by January 1, 2032. Existing fossil fuel-fired steam EGUs that will permanently cease operations by January 1, 2039 are not subject to emission standards based on 90% CO 2 capture, but will need to meet an emission rate based on co-firing with 40% natural gas by January 1, 2030. (This translates into a 16% reduction in CO 2 emissions determined from a unit-specific baseline). Existing fossil fuel-fired steam EGUs that permanently cease operations by January 1, 2032 are exempt from these requirements.
Previous wording
All requirements related to existing affected units in the final rules – whether fired by coal, oil or natural gas – will be imposed through state plans that are permitted to take into account the remaining useful life of a generating unit when determining appropriate controls. Under the final rules, such plans must provide for the implementation and enforcement of the NSPS, but states may apply less stringent standards of performance in certain conditions, as specified in EPA regulations. States are also permitted to impose more stringent standards. In addition, the final rules include several “reliability” mechanisms to allow states to provide alternative emission limitations or compliance date extensions in order maintain adequate electric generation resources and grid reliability.
Current wording
All requirements related to existing affected units in the final rule – whether fired by coal or natural gas – will be imposed through state plans that are permitted to take into account the remaining useful life of a generating unit when determining appropriate controls. Under the final rule, such plans must provide for the implementation and enforcement of the NSPS, but states may apply less stringent standards of performance in certain conditions, as specified in EPA regulations. States are also permitted to impose more stringent standards. In addition, the final rule includes several “reliability” mechanisms to allow states to provide alternative emission limitations or compliance date extensions in order to maintain adequate electric generation resources and grid reliability.
Previous wording
Finally, as part of the final rules, any newly constructed stationary combustion turbine (SCT), where construction or reconstruction of the unit was commenced after May 23, 2023, will be subject to CO 2 emission limits based on whether it is considered to be a low load, intermediate load or base load EGU. In addition, for affected base load SCTs, a second phase emission standard applies based on 90% CCS as of January 1, 2032. Any new fossil-fuel steam EGU (where construction or reconstruction was commenced after June 18, 2014) will need to comply with standards promulgated in 2015.
Current wording
Finally, as part of the final rule, any newly constructed stationary combustion turbine (SCT), where construction or reconstruction of the unit was commenced after May 23, 2023, will be subject to CO 2 emission limits based on whether it is considered to be a low load, intermediate load or base load EGU. In addition, for affected base load SCTs, a second phase emission standard applies based on 90% CCS as of January 1, 2032. Any new fossil-fuel steam EGU (where construction or reconstruction was commenced after June 18, 2014) will need to comply with standards promulgated in 2015.
Previous wording
Effluent Limitations Guidelines for the Steam Electric Power Generating Industry. In 2015, the EPA published a final rule setting requirements for wastewater discharge from EGUs. In 2020, the EPA finalized revisions to certain requirements in the 2015 rule. On April 24, 2024, the EPA signed a pre-publication version of a final rule that would establish more stringent standards for flue gas desulfurization wastewater, bottom ash transport water, combustion residual leachate and legacy wastewater discharged from certain surface impoundments. The final revised effluent limitations guidelines would significantly increase costs for many coal-fueled steam electric power plants. In addition, the recently finalized final rule allows EGUs that commit to ceasing coal combustion by December 31, 2034, to comply with less stringent wastewater discharge requirements during the interim. The final rule could influence fuel switching or additional coal generating unit retirements by the end of 2034.
Current wording
Effluent Limitations Guidelines for the Steam Electric Power Generating Industry. In 2015, the EPA published a final rule setting requirements for wastewater discharge from EGUs. In 2020, the EPA finalized revisions to certain requirements in the 2015 rule. On May 9, 2024, the EPA published a final rule that would establish more stringent standards for flue gas desulfurization wastewater, bottom ash transport water, combustion residual leachate and legacy wastewater discharged from certain surface impoundments. The final revised effluent limitations guidelines would significantly increase costs for many coal-fueled steam electric power plants. In addition, the recently finalized final rule allows EGUs that commit to ceasing coal combustion by December 31, 2034, to comply with less stringent wastewater discharge requirements during the interim. The final rule is subject to numerous legal challenges that have been consolidated in the Eighth Circuit. If the Eighth Circuit affirms the final rule, it could influence fuel switching or additional coal generating unit retirements by the end of 2034.
Previous wording
Rules for Disposal of Coal Combustion Residuals (CCR) from Electric Utilities; Federal CCR Permit Program and Revisions to Closure Requirements. On February 20, 2020, as required by the Water Infrastructure Improvements for the Nation Act, the EPA proposed a federal permitting program for the disposal of CCR in surface impoundments and landfills. Under the proposal, the EPA would directly implement the permit program in Indian Country and at CCR units located in states that have not submitted their own CCR permit program for approval. The proposal includes requirements for federal CCR permit applications, content and modification, as well as procedural requirements. The comment period for the EPA’s proposal ended on April 20, 2020. Although the EPA had planned to finalize this rule in 2021, the EPA now expects to issue a final rule around March 2026. Separately, on August 28, 2020 and November 12, 2020, the EPA finalized two sets of amendments to its 2015 CCR rule to partially address the D.C. Circuit’s 2018 decision holding that certain provisions of that rule were not sufficiently protective. On April 24, 2024, the EPA signed a pre-publication version of additional amendments to the 2015 CCR rule that further address aspects of the D.C. Circuit’s 2018 decision. Finally, the EPA is still considering whether to finalize additional revisions to the 2015 CCR Rule related to closure of CCR units.
Current wording
Rules for Disposal of Coal Combustion Residuals (CCR) from Electric Utilities; Federal CCR Permit Program and Revisions to Closure Requirements. On February 20, 2020, as required by the Water Infrastructure Improvements for the Nation Act, the EPA proposed a federal permitting program for the disposal of CCR in surface impoundments and landfills. Under the proposal, the EPA would directly implement the permit program in Indian Country and at CCR units located in states that have not submitted their own CCR permit program for approval. The proposal includes requirements for federal CCR permit applications, content and modification, as well as procedural requirements. The comment period for the EPA’s proposal ended on April 20, 2020. Although the EPA had planned to finalize this rule in 2021, the EPA now expects to issue a final rule around October 2024. Separately, on August 28, 2020 and November 12, 2020, the EPA finalized two sets of amendments to its 2015 CCR rule to partially address the D.C. Circuit’s 2018 decision holding that certain provisions of that rule were not sufficiently protective. On May 8, 2024, the EPA published a final rule containing additional amendments to the 2015 CCR rule that further address aspects of the D.C. Circuit’s 2018 decision. Finally, the EPA is still considering whether to finalize additional revisions to the 2015 CCR Rule related to closure of CCR units.
Previous wording
Implementation of the rule for existing sources (accomplished through state implementation plans) was challenged in several U.S. Courts of Appeal, resulting in different court opinions and in requirements being implemented in some states, but stayed in others. On December 20, 2023, the U.S. Supreme Court issued an order for oral argument regarding applications for an emergency stay of the rule. The U.S. Supreme Court held oral argument on February 21, 2024.
Current wording
Implementation of the rule for existing sources (accomplished through state implementation plans) was challenged in several U.S. Courts of Appeal, resulting in different court opinions and in requirements being implemented in some states, but stayed in others. On June 27, 2024, the U.S. Supreme Court issued a stay of the rule in 11 states pending the disposition of a petition for review of the rule in the D.C. Circuit and any subsequent timely petition for certiorari filed with and granted by the U.S. Supreme Court.
Previous wording
Regional Haze. The CAA contains a national visibility goal for the “prevention of any future, and the remedying of any existing, impairment of visibility in Class I areas which impairment results from man-made air pollution.” The EPA promulgated comprehensive regulations in 1999 requiring all states to submit plans to address regional haze that could affect 156 national parks and wilderness areas, including requirements for certain sources to install the best available retrofit technology and for states to demonstrate “reasonable progress” towards meeting the national visibility goal. States are required to revise plans every 10 years. On March 29, 2024, the EPA published a proposed consent decree under which deadlines would be established for the EPA to take final action to approve, disapprove or conditionally approve, in whole or in part, state regional haze implementation plans for 34 states (at various dates from June 28, 2024 to December 31, 2026).
Current wording
Regional Haze. The CAA contains a national visibility goal for the “prevention of any future, and the remedying of any existing, impairment of visibility in Class I areas which impairment results from man-made air pollution.” The EPA promulgated comprehensive regulations in 1999 requiring all states to submit plans to address regional haze that could affect 156 national parks and wilderness areas, including requirements for certain sources to install the best available retrofit technology and for states to demonstrate “reasonable progress” towards meeting the national visibility goal. States are required to revise plans every 10 years. On March 29, 2024, the EPA published a proposed consent decree under which deadlines would be established for the EPA to take final action to approve, disapprove or conditionally approve, in whole or in part, state regional haze implementation plans for 34 states (at various dates from June 28, 2024 to December 31, 2026). The EPA subsequently filed a motion to approve the consent judgement in the U.S. District Court for the District of Columbia which remains pending.
Previous wording
Federal Coal Leasing Moratorium. The Executive Order on Promoting Energy Independence and Economic Growth (EI Order), signed on March 28, 2017, lifted the Department of Interior’s federal coal leasing moratorium and rescinded guidance on the inclusion of social cost of carbon in federal rulemaking. Following the EI Order, the Interior Secretary issued Order 3349 ending the federal coal leasing moratorium. Environmental groups took the issue to court (District of Montana) and in April 2019, the court held the lifting of the moratorium triggered National Environmental Policy Act (NEPA) review. On May 22, 2020, the court held that the Department of the Interior’s issuance of an Environmental Assessment and Finding of No Significant Impact (FONSI) remedied the prior NEPA violations. Thereafter, environmental groups amended their complaint to challenge the Environmental Assessment and FONSI. On August 12, 2022, the court invalidated the Environmental Assessment and FONSI and reinstated the moratorium until completion of a sufficient NEPA analysis. On appeal, the U.S. Court of Appeals for the Ninth Circuit reversed the district court on February 21, 2024, explaining that the lawsuit was mooted by the Department of Interior’s April 2021 order revoking Order 3349. The Ninth Circuit directed the district court to dismiss the case as moot.
Current wording
Federal Coal Leasing Moratorium. The Executive Order on Promoting Energy Independence and Economic Growth (EI Order), signed on March 28, 2017, lifted the Department of Interior’s federal coal leasing moratorium and rescinded guidance on the inclusion of social cost of carbon in federal rulemaking. Following the EI Order, the Interior Secretary issued Order 3349 ending the federal coal leasing moratorium. Environmental groups took the issue to court (District of Montana) and in April 2019, the court held the lifting of the moratorium triggered National Environmental Policy Act (NEPA) review. On May 22, 2020, the court held that the Department of Interior’s issuance of an Environmental Assessment and Finding of No Significant Impact (FONSI) remedied the prior NEPA violations. Thereafter, environmental groups amended their complaint to challenge the Environmental Assessment and FONSI. On August 12, 2022, the court invalidated the Environmental Assessment and FONSI and reinstated the moratorium until completion of a sufficient NEPA analysis. On appeal, the U.S. Court of Appeals for the Ninth Circuit (Ninth Circuit) reversed the district court on February 21, 2024, explaining that the lawsuit was mooted by the Department of Interior’s April 2021 order revoking Order 3349. The Ninth Circuit directed the district court to dismiss the case as moot.
Previous wording
Endangered Species Act (ESA). The ESA of 1973 and counterpart state legislation is intended to protect species whose populations allow for categorization as either endangered or threatened. Changes in listings or requirements under these regulations could have a material adverse effect on Peabody’s costs or its ability to mine some of its properties in accordance with its current mining plans. During the Trump Administration, the Departments of the Interior and Commerce finalized five rules aiming to streamline and update the ESA. But in June 2021, the agencies announced their plan to revise, rescind or reinstate the rules that were finalized (or withdrawn) during the Trump Administration that conflict with the Biden Administration’s objectives. The agencies issued proposed rules on June 22, 2023, and they issued pre-publication versions of three final revised rules on March 27, 2024.
Current wording
Endangered Species Act (ESA). The ESA of 1973 and counterpart state legislation is intended to protect species whose populations allow for categorization as either endangered or threatened. Changes in listings or requirements under these regulations could have a material adverse effect on Peabody’s costs or its ability to mine some of its properties in accordance with its current mining plans. During the Trump Administration, the Departments of Interior and Commerce finalized five rules aiming to streamline and update the ESA. But in June 2021, the agencies announced their plan to revise, rescind or reinstate the rules that were finalized (or withdrawn) during the Trump Administration that conflict with the Biden Administration’s objectives. The agencies issued proposed rules on June 22, 2023, and they published three final revised rules on April 5, 2024.
Previous wording
SEC Climate-Related Disclosures. On March 6, 2024, the SEC adopted final rules it expects will enhance and standardize climate-related disclosures by public companies and in public offerings. Specifically, the final rules will require disclosure of, among other things, climate-related risks that have had or are reasonably likely to have a material impact on a public company’s business strategy, results of operations or financial condition; certain greenhouse gas (GHG) emissions associated with a public company along with, in many cases, an attestation report by a GHG emissions attestation provider; and certain climate-related financial metrics to be included in a company’s audited financial statements. The final rules were challenged by multiple parties, and the cases were consolidated into a judicial review by the U.S. Court of Appeals for the Eighth Circuit. On April 4, 2024, the SEC voluntarily stayed implementation of the final rules. The Company is assessing the potential impact of the final rules.
Current wording
SEC Climate-Related Disclosures. On March 6, 2024, the SEC adopted final rules it expects will enhance and standardize climate-related disclosures by public companies and in public offerings. Specifically, the final rules will require disclosure of, among other things, climate-related risks that have had or are reasonably likely to have a material impact on a public company’s business strategy, results of operations or financial condition; certain greenhouse gas (GHG) emissions associated with a public company along with, in many cases, an attestation report by a GHG emissions attestation provider; and certain climate-related financial metrics to be included in a company’s audited financial statements. The final rules were challenged by multiple parties, and the cases were consolidated into a judicial review by the Eighth Circuit. On April 4, 2024, the SEC voluntarily stayed implementation of the final rules pending such judicial review. The Company is assessing the potential impact of the final rules.
Previous wording
Under the NSW EPA Act, environmental planning instruments must be considered when approving a mining project development application. Decision makers review the significance of a resource and the state and regional economic benefits of a proposed coal mine when considering a development application on the basis that it is an element of the “public interest” consideration contained in the relevant legislation. Effective from March 1, 2018, the EPA Act was amended to introduce a number of changes to planning laws in New South Wales. The EPA Act was further amended in June 2018 to revoke a process for modifying development approvals under the former Section 75W of the EPA Act. As a result, new development approvals will need to be obtained unless the proposed project will be substantially the same development as it was when the development approval was last modified under Section 75W, in which case the existing development approval can be modified. If a new development approval is required then this could take additional time to achieve.
Current wording
New South Wales (NSW) Environmental. Under the NSW Environmental Planning and Assessment Act 1979 (EPA Act), environmental planning instruments must be considered when approving a mining project development application. Decision makers review the significance of a resource and the state and regional economic benefits of a proposed coal mine when considering a development application on the basis that it is an element of the “public interest” consideration contained in the relevant legislation. Effective from March 1, 2018, the EPA Act was amended to introduce a number of changes to planning laws in New South Wales. The EPA Act was further amended in June 2018 to revoke a process for modifying development approvals under the former Section 75W of the EPA Act. As a result, new development approvals will need to be obtained unless the proposed project will be substantially the same development as it was when the development approval was last modified under Section 75W, in which case the existing development approval can be modified. If a new development approval is required then this could take additional time to achieve.
Previous wording
On August 25, 2017, the BC Act commenced in New South Wales and imposes a revised framework for the assessment of potential impacts on biodiversity that may be caused by a development, such as a proposed mining project. The BC Act requires these potential impacts on biodiversity to be offset in perpetuity, by one or more of the following means: securing land based offsets and retiring biodiversity credits, making a payment into a biodiversity conservation fund or in some cases through mine site ecological rehabilitation. The data collected from the biodiversity impact assessment process is inputted into a new offsets payment calculator in order to determine the amount payable by the proponent to offset the impacts. The proposed development can only proceed once the biodiversity offset obligations have been satisfied. The New South Wales government is currently considering fifty-eight recommendations of a 2023 independent review of the BC Act. Any changes to the BC Act have the potential to affect approval processes for future NSW mining projects.
Current wording
On August 25, 2017, the Biodiversity Conservation Act 2016 (BC Act) commenced in NSW and imposes a revised framework for the assessment of potential impacts on biodiversity that may be caused by a development, such as a proposed mining project. The BC Act requires these potential impacts on biodiversity to be offset in perpetuity, by one or more of the following means: securing land based offsets and retiring biodiversity credits, making a payment into a biodiversity conservation fund or in some cases through mine site ecological rehabilitation. The data collected from the biodiversity impact assessment process is inputted into a new offsets payment calculator in order to determine the amount payable by the proponent to offset the impacts. The proposed development can only proceed once the biodiversity offset obligations have been satisfied. On July 18, 2024, following an independent review of the BC Act, the NSW government announced it would amend the BC Act toreform the biodiversity offsets scheme by introducing anew statutory standard requiring mining proponents to demonstrate how they have genuinely avoided and minimized impacts to biodiversity and removing the option for major mining proponents to meet a credit obligation through a commitment to ecological mine site rehabilitation. When enacted, these and other proposed changes have the potential to affect approval processes for future NSW mining projects.
Showing the first 40 of 58 pairs. Open the source sections for the rest.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
Wards Well Acquisition. The Company entered into a definitive agreement dated October 26, 2023, to acquire the southern part of the Wards Well tenements (Wards Well) which are adjacent to the Company’s Centurion Mine in Queensland, Australia. The acquisition was completed on April 16, 2024 for total consideration of $153.4 million, consisting of cash consideration of $134.4 million, cash transaction costs of $9.4 million and the non-cash settlement of existing receivables with the acquiree of $9.6 million.