Skip to main content

Western Copper & Gold Corp

For the period ended Dec 31, 2025. Filed Mar 26, 2026.

View on SEC.gov

About this filing

The yearly report of certain Canadian companies, filed under a joint US and Canadian system. It is the main yearly account these companies give US investors, largely as filed in Canada.

FY2025 · Filed Mar 26, 2026

Use the contents to explore the available documents and sections.

WRN$1.49-3.2%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.2 · Feasibility Study

Feasibility Study

On June 28, 2022, the Company released the results of its Feasibility Study (the "Study") on the Casino Project. The Study considered the Project being constructed as an open pit mine, with a concentrator processing 120,000 tonnes per day (t/d) to recover copper, gold, molybdenum and silver, as well as a 25,000 t/d oxide heap leach facility to recover gold, silver and copper.

The Study supersedes all previous studies and incorporates an updated mineral resource estimate with an effective date of April 29, 2022 and mineral reserve estimate with an effective date of June 13, 2022. The Study examines the development of the Casino Project, which comprises the processing of 1.43 billion tonnes of Mineral Reserve for both the mill and heap leach, with deposition of mill tailings and mine waste in the Tailings Management Facility ("TMF") consistent with the design concepts considered during the Best Available Tailings Technology ("BATT") Study as a base case development.** **