The AGM processing plant was offline for a period of 14 days due to a key component of the Semi-Autogenous Grinding ("SAG") mill requiring repairs, during which no gold was recovered. This shutdown reduced quarterly production by approximately 4,500 to 5,000 ounces. The repairs to the SAG mill were completed during Q1 2025.
1.1 Mt of ore was milled at an average feed grade of 0.8 g/t, with metallurgical recovery averaging 87%. Throughput remains constrained until a secondary crushing circuit is commissioned during Q3 2025.
Produced 20,734 ounces of gold.
Sold 26,994 ounces of gold at an average realized price of $2,833 per ounce ("/oz").