EX-99.3 · Operations Analysis

Operations Analysis

Full Year Results

Gibraltar produced 105.6 million pounds of copper for the year compared to 122.6 million pounds of copper in 2023 with lower mill running time being the primary factor for the decreased production.

Both concentrators were down for 18 days in June when the unionized workforce went on strike. The strike overlapped with planned downtime in Concentrator #1 for its primary crusher move as well as major maintenance on its SAG, which extended the downtime to approximately seven weeks. Concentrator #2 was also down in January 2024 for a planned major component replacement on its ball mill. The reduced operating hours in 2024 resulted in approximately 15 million fewer copper pounds being produced compared to normal milling rates at similar grades and recoveries.

A total of 88.3 million tons were mined in the year consistent with the 88.1 million tons mined in 2023. The strip ratio increased to 1.6 from 1.3 as mining operations transitioned into the Connector pit in 2024. The Gibraltar pit, which was the main source of ore in 2023, had a lower strip ratio. Ore stockpiles also increased by 5.0 million tons in 2024, comprised primarily of oxide ore from the upper benches of the Connector pit. The oxide ore stockpiled will allow the restart of the Gibraltar SX/EW plant in the second quarter of 2025.

Total site costs* at Gibraltar of $413.9 million (100% basis) were $16.9 million lower than 2023 due to lower input costs such as diesel and the impact of the 18-day labour strike in June 2024 which reduced site operating costs in the second quarter of 2024.

Transportation costs for the year ended December 31, 2024 increased by $5.4 million over the same prior period, due to higher costs for rail, ocean freight and port handling costs, and trucking related costs.

Molybdenum production was 1.4 million pounds in the year compared to 1.2 million pounds in the prior year. Molybdenum prices weakened in 2024 with an average molybdenum price of US$21.30 per pound, a decrease of 12% compared to the 2023 average price of US$24.19 per pound.

Off-property costs per pound produced* were US$0.33 for the year, which is US$0.05 lower than the prior year primarily due to a decrease in realized treatment and refining charges (TC/RC) rates due to the tightening smelter market.

Operations Analysis (Continued)

Total operating costs per pound produced (C1)* was US$2.66 for the year, compared to US$2.37 in the prior year and the increase was substantially attributed to lower production and less capitalized stripping costs as shown in the bridge graph below:

Fourth Quarter Results

Gibraltar produced 28.6 million pounds of copper in the quarter. Copper head grades were 0.22% and copper recoveries in the fourth quarter were 78%, in line with recent quarters. Mill throughput was 8.3 million tons, consistently above nameplate capacity throughout the quarter and benefitting from the softer characteristics of the ore feed.

A total of 24.0 million tons were mined in the fourth quarter at an average strip ratio of 1.9 and the majority of ore and waste mining occurred in the Connector pit.

Total site costs* at Gibraltar of $102.5 million (100% basis) were lower than the third quarter of 2024, with the prior quarter including repairs and maintenance costs associated with a large maintenance project on one of the shovels.

Molybdenum production was 578 thousand pounds in the fourth quarter. The 57% increase in quarter-over-quarter production is primarily due to higher molybdenum grade in the Connector pit ore. At an average molybdenum price of US$21.71 per pound, molybdenum generated a meaningful by-product credit per pound of copper produced of US$0.42 in the fourth quarter.

Off-property costs per pound produced* were US$0.32 for the fourth quarter, in line with average costs for the year.