RECENT DEVELOPMENTS
Advancing Copper Mountain Mine Stabilization Plans
Since completing the acquisition of Copper Mountain on June 20, 2023, we have been focused on advancing our stabilization plans, including opening up the mine by adding additional mining faces and re-mobilizing idle haul trucks, optimizing the ore feed to the plant and implementing plant improvement initiatives.
On December 5, 2023, we released our first NI 43-101 technical report in respect of our 75%-owned Copper Mountain mine. As detailed in the technical report, the mine plan contemplates average annual copper production of 46,500 tonnes in the first five years, 45,000 tonnes in the first ten years and 37,000 tonnes over the 21-year mine life. Average cash costs and sustaining cash costs per pound of copper produced, net of by-product credits,1 over the mine life are expect to be $1.84 and $2.53, respectively. The updated mine plan represents an approximate 90% increase in average annual copper production and an approximate 50% decrease in cash costs over the first 10 years compared to 2022.
Hudbay's stabilization plans are focused on improving reliability and driving sustainable long-term value:
Increased mining activities - Commenced a fleet ramp-up plan to remobilize idle haul trucks. The plan entails remobilization of the mining fleet from 14 trucks to 28 trucks, by the end of 2023. A fully trained complement of truck drivers is expected to be in place in the first half of 2024. Once the fleet ramp up plan is complete, we expect to have improved flexibility in the Copper Mountain mine with additional mining faces.
• Accelerated stripping to access higher grades - We have commenced a campaign of accelerated stripping over the next three years to enable access to higher grade ore and to mitigate the substantially reduced stripping undertaken by Copper Mountain over the four years prior to completion of the acquisition. The accelerated stripping program is expected to improve operating efficiencies and lower unit operating costs.
Improved mill throughput and recoveries - Our mine plan assumes a mill ramp up to its nominal capacity of 45,000 tonnes per day in 2025. An expansion to the permitted capacity of 50,000 tonnes per day is planned in 2027. The mine plan assumes approximately $23 million in growth capital spending over 2025 and 2026 in connection with the mill expansion. We intend to improve mill recoveries with a more consistent ore feed grade, changes to the flotation reagents and replacement of key pumps.
Operating efficiencies and corporate synergies** **- Our stabilization plans are expected to generate more than $20 million in annual operating efficiencies over the next three years, compared to Copper Mountain's performance in 2022, through improvements in copper recovery, higher throughput rates and lower combined unit operating costs. In addition, we have realized the targeted $10 million in annual corporate synergies and is on track to exceed the target.
Ensure stabilization of near-term cash flows-* ***Recently entered into copper hedging contracts representing approximately 25% of expected Copper Mountain production in 2024 as a prudent measure to secure cash flows during the stabilization period.
The mine plan is based on a revised resource model and was constructed using consistent methods applied at the Constancia, Copper World and Mason deposits. The mineral reserve estimates total 367 million tonnes at a copper grade of 0.25% and a gold grade of 0.12 grams per tonne, supporting a 21-year mine life. An additional 140 million tonnes of measured and indicated resources at 0.21% copper and 0.10 grams per tonne gold and 370 million tonnes of inferred resources at 0.25% copper and 0.13 grams per tonne gold, exclusive of mineral reserves, provide significant upside potential for reserve conversion and extending mine life. Infill drilling is planned for 2024 to target reserve conversion.
There are several opportunities to further increase production, improve costs and extend mine life for Copper Mountain. While these opportunities have not been considered in the technical report as they are not yet at the level of required engineering, we are advancing studies to evaluate the potential for these to be reflected in future mine plans.
Please see "Qualified Person and NI 43-101" for further details regarding the technical and scientific information included in the technical report.
1 Cash cost and sustaining cash cost per pound of copper produced, net of by-product credits, are non-IFRS financial performance measures with no standardized definition under IFRS. For further information and a detailed reconciliation, please see the discussion under the "Non-IFRS Financial Performance Measures" section of this MD&A.
Delivered Brownfield Capital Projects On Time and On Budget
The Constancia mill achieved record copper recoveries of 87.4% in the fourth quarter primarily as a result of the successful completion of the recovery improvement program in the second quarter of 2023, as planned, ahead of the start of significantly higher grades being mined from the Pampacancha pit in the second half of 2023. The program scope was to increase copper recoveries by 2% by increasing the rougher mass, and the mill continues to achieve the targeted higher copper recoveries.
After the commissioning of the Stall mill recovery improvement project in the second quarter of 2023, subsequent optimization activities proved highly effective, resulting in notably higher recoveries for copper above 90% and gold above 65% in the second half of 2023. Specifically, the Stall mill achieved its targeted gold recovery levels of 67.5% in the third and fourth quarters, compared to 60% in the second quarter.
The total growth capital expenditures in 2023 associated with the completion of these recovery improvement projects were in line with our guidance of $25 million.
The New Britannia mill has consistently achieved higher throughput levels, averaging 1,650 tonnes per day in 2023 and approximately 1,800 tonnes per day in the fourth quarter, significantly exceeding its original design capacity of 1,500 tonnes per day. We have successfully implemented process improvement initiatives that required minimal capital outlays as we pursue higher output that aligns with increased gold production from the Lalor mine.
Generating Free Cash Flow with Increased Production and Continued Financial Discipline
We delivered a second successive quarter of positive free cash flow during the fourth quarter of 2023 as we executed our plan for higher copper and gold production from Pampacancha and higher gold production at Lalor, both driven by higher grades. We continue to expect to see strong production levels throughout 2024 from sustained higher grades in Peru and Manitoba, along with additional production from the recently acquired Copper Mountain mine.
During the fourth quarter, we completed $30 million in net repayments on our revolving credit facilities and redeemed, in full, the remaining $59.7 million of Copper Mountain's bonds from our treasury. We also recommenced deliveries under the gold forward sale and prepay agreement in October 2023, further reducing our outstanding gold prepayment liability, and are scheduled to fully repay the gold prepay facility by August 2024. Despite these debt repayments, we increased our cash and cash equivalents to $249.8 million and reduced our overall net debt to $1,037.7 million as at December 31, 2023, compared to $245.2 million and $1,132.2 million, respectively, as at September 30, 2023. The $94.5 million decline in net debt, together with higher levels of adjusted EBITDA 1 in thefourth quarter, have improved our net debt to adjusted EBITDA ratio 2 to 1.6x compared to 2.0x at the end of 2022. Subsequent to quarter-end, we continued our deleveraging efforts with an additional$10 million repayment on our revolving credit facilities.
During the fourth quarter, we continued to take steps to ensure free cash flow generation and continued financial discipline into 2024 and 2025. To this end, we entered into forward sales contracts at Copper Mountain for a total of 3,600 tonnes of 2024 copper production over the twelve-month period from May 2024 to April 2025 at an average price of $3.93 per pound as well as a zero-cost collars for 6,000 tonnes of copper production over the twelve-month period from May 2024 to April 2025 at an average floor price of $3.83 per pound and an average cap price of $4.03 per pound. As at December 31, 2023, 7.9 million pounds of copper forwards and 13.2 million pounds of copper collars were outstanding.
We successfully delivered on our annual discretionary spending reduction targets for 2023. As a result of continued financial discipline and capital cost efficiencies achieved, total capital expenditures of approximately $243 million for Peru, Manitoba and Arizona in 2023 were approximately $57 million lower than the original guidance levels, a further decrease from the $30 million reduction announced in the third quarter, representing a 19% reduction from the original 2023 total capital expenditure guidance of $300 million.
2 Net Debt to EBITDA ratio is a non-IFRS financial performance measures with no standardized definition under IFRS. For further information and a detailed reconciliation, please see the discussion under the "Non-IFRS Financial Performance Measures" section of this MD&A. "
Senior Management Team Appointments
In November 2023, Hudbay promoted Luis Santivañez to Vice President, South America. Mr. Santivañez joined Hudbay in Peru in 2018 and was promoted to General Manager of the South America operations in 2022. Mr. Santivañez has over 20 years of experience at global mining companies working across Peru, Central America and Australia. Under his leadership, the Constancia operations have delivered a successful ramp up at Pampacancha, navigated through a period of politically-driven social unrest in Peru and further enhanced our partnerships with the local communities.
In January 2024, Hudbay appointed John Ritter as Vice President, British Columbia Business Unit. Mr. Ritter brings a diverse background with over 30 years of experience in technical, operational and senior leadership roles at global mining companies. He was most recently the General Manager of the New Afton mine in British Columbia and has strong ties with the local community near the Copper Mountain mine. His focus on operational excellence and value-creating improvements will be instrumental as he leads the stabilization and optimization plans at the Copper Mountain mine.
Advancing Permitting at Copper World
The first key state permit required for Copper World, the Mined Land Reclamation Plan, was initially approved by the Arizona State Mine Inspector in October 2021 and was subsequently amended to reflect a larger private land project footprint. This approval was challenged in state court, but the challenge was dismissed in May 2023 as having no basis. In late 2022, Hudbay submitted the applications for an Aquifer Protection Permit and an Air Quality Permit to the Arizona Department of Environmental Quality. We expect to receive these two outstanding state permits in 2024.
We intend to initiate a minority joint venture process prior to commencing a definitive feasibility study, which will allow the joint venture partner to participate in the final Copper World project design and the funding of definitive feasibility study activities. The opportunity to sanction Copper World is not expected until late 2025 based on current estimated timelines. The decision to sanction Copper World will ultimately be evaluated against other competing investment opportunities as part of Hudbay's capital allocation process.
We released results of the de-risked and enhanced Copper World pre-feasibility study for Phase I in September 2023, which demonstrated a simplified mine plan with an extended 20-year mine life requiring only state and local permits, an after-tax net present value (8%) of $1.1 billion and a 19% internal rate of return at a copper price of $3.75 per pound. Average annual copper production over the first ten years is expected to be approximately 92,000 tonnes at cash costs and sustaining cash costs per pound of copper 1 of $1.53 and $1.95, respectively. Copper World is one of the highest-grade open pit copper projects in the Americas with proven and probable mineral reserves of 385 million tonnes at 0.54% copper.
Snow Lake Exploration
We continue to compile results from ongoing infill drilling at Lalor, which will be incorporated into the next annual mineral reserve and resource estimate update expected to be announced in March 2024.
The planned 2024 exploration program is our largest Snow Lake program in Hudbay's history and it is currently underway with plans to continue testing the deep extensions of the gold and copper zones at Lalor and complete follow up drilling at the Lalor Northwest target. The 2024 program will also explore the newly acquired Cook Lake claims and the former Rockcliff claims located within trucking distance of the existing Snow Lake processing infrastructure. As previously disclosed, both the Cook Lake and former Rockcliff claims were acquired by the company as part of transactions completed in 2023. A majority of the Cook Lake and former Rockcliff claims have been untested by modern deep geophysics, which was the discovery method for the Lalor deposit. Our 2024 exploration program includes a large geophysics program consisting of surface electromagnetic surveys using cutting-edge techniques that enable the team to detect targets at depths of almost 1,000 metres below surface. The company is exploring its newly expanded land package in hopes of finding a new anchor deposit to maximize and extend the life of the Snow Lake operations beyond 2038.
We also expect to advance a development and exploration drift at the 1901 deposit located within 1,000 metres of the haulage ramp to Lalor. The program is expected to take place over 2024 and 2025 with the development of an access drift, drill platforms and diamond drilling to further confirm the optimal mining method to extract the base metal and gold lenses and to convert the inferred mineral resources in the gold lenses to mineral reserves.
Advancing Metallurgical Test Work for the Flin Flon Tailings Reprocessing Opportunity
We identified the opportunity to reprocess Flin Flon tailings, with initial confirmatory drilling completed in 2022 indicating higher zinc, copper and silver grades than predicted from historical mill records while confirming the historical gold grade.
In 2023, we advanced metallurgical test work and evaluated metallurgical technologies, including the signing of a test work co-operation agreement with Cobalt Blue Holdings ("COB") examining the use of COB technology to treat Flin Flon tailings. Initial results from preliminary roasting test work were encouraging in converting more than 90% of pyrite into pyrrhotite and elemental sulphur. Final test work results will support the development of an overall flowsheet. We expect to continue these metallurgical activities throughout 2024 as we assess the economic viability of the various metallurgical technologies.
Peru Exploration Update
We continue to execute a limited drill program and technical evaluations at the Constancia deposit to confirm the economic viability of adding an additional mining phase to the current mine plan that would convert a portion of the mineral resources to mineral reserves. The results from this drill program and technical and economic evaluations are expected to be incorporated in the annual mineral reserve and resource estimate update in March 2024.
We control a large, contiguous block of mineral rights with the potential to host satellite mineral deposits in close proximity to the Constancia processing facility, including the past producing Caballito property and the highly prospective Maria Reyna property. We commenced early exploration activities at Maria Reyna and Caballito after completing a surface rights exploration agreement with the community of Uchucarcco in August 2022. A drill permit application was submitted for the Maria Reyna property in November 2023, and a similar application for the Caballito property is planned for the first half of 2024. In parallel, we continue to advance community engagement activities. Surface mapping and geochemical sampling confirm that both Caballito and Maria Reyna host sulfide and oxide rich copper mineralization in skarns, hydrothermal breccias and large porphyry intrusive bodies.
Dividend Declared
A semi-annual dividend of C$0.01 per share was declared on February 22, 2024. The dividend will be paid out on March 22, 2024 to shareholders of record as of March 5, 2024.