Electric Reliability Needs

CECONY monitors the adequacy of the electric capacity resources and related developments in its service area, and works with other parties on long-term resource adequacy within the framework of the NYISO reliability planning process.

In 2019, the New York State Department of Environmental Conservation issued regulations (Peaker Rule) that may require the retirement or seasonal unavailability of fossil-fueled electric generating units owned by CECONY and others in New York City. The Peaker Rule limits nitrous oxides emissions during the ozone season from May through September and affects older peaking units that are generally located downstate and needed during periods of high electric demand or for local reliability purposes. Compliance with the Peaker Rule would impact approximately 1,700 MW (nameplate capacity) of generating units in CECONY's service territory (including 70 MW owned by CECONY), of which approximately 989 MW (including 70 MW owned by CECONY) have since been retired or limited operation. An additional 709 MW (in nameplate capacity) of peaker plants were expected to become unavailable beginning May 1, 2025. In July 2023, the NYISO found an electric reliability need beginning in the summer of 2025 in CECONY’s New York City territory primarily driven by forecasted increases in peak demand and the unavailability of units impacted by the Peaker Rule. In November 2023, after soliciting and evaluating both regulated and market-based solutions, the NYISO determined that there were no viable and sufficient solutions submitted that meet the reliability need in 2025. As a result, the NYISO stated that it may temporarily retain 672 MW of the remaining units impacted by the Peaker Rule until May 2027 to ensure the continued reliability of electric service in New York City.

In January 2021, CECONY updated its Local Transmission Plan to address identified reliability needs on its local system resulting from the Peaker Rule through the construction of three transmission projects, the Reliable Clean City (RCC) projects. In April 2021, the NYSPSC approved CECONY’s December 2020 petition to recover $780 million of costs to construct the RCC projects. In May 2023, the first of the three RCC projects was completed and placed in service; the remaining two are expected to be completed in 2025.

In April 2023, the NYSPSC approved CECONY’s December 2022 petition seeking cost recovery approval for a proposed clean energy hub in Brooklyn, New York (Brooklyn Clean Energy Hub). The Brooklyn Clean Energy Hub primarily addresses an identified reliability need in 2028 due to a forecasted increase in electric demand. Construction began in September 2023 and is expected to be completed by 2028.

In January 2024, the NYSPSC approved CECONY's August 2023 petition requesting authorization and cost recovery to construct two new substations in Jamaica, Queens (the Idlewild Project) that is in addition to the capital expenditures approved in CECONY's 2023 electric rate plan. The project is expected to be completed by May 2028 to meet anticipated reliability needs and to support New York State’s goals set forth in the CLCPA. CECONY estimates that construction will cost $1,200 million.

Capital expenditures approved in CECONY’s 2023 electric rate plan to address identified reliability needs in New York City include CECONY’s projects to: transfer electric customers from its Brownsville substation to its Glendale substation (estimated completion in 2026); and to build a transmission feeder between Vernon and Newtown (estimated completion in 2026). CECONY’s January 2025 electric rate case filing requested approval to add the costs for the Gateway Park area substation (estimated completion in 2028) into its base rates.

In November 2024, the NYISO issued its 2024 Reliability Needs Assessment (RNA) that identifies a bulk power system electric reliability need in New York City beginning in the summer of 2033 and increasing in the summer of 2034 that is primarily driven by a combination of forecasted increases in peak demand and the assumed retirement of the NYPA small gas plants. In 2025, the NYISO is expected to issue a solicitation for both market-based and regulated solutions. CECONY, as the Responsible Transmission Owner, would propose a regulated backstop solution. Additionally, CECONY identified and developed a solution for a local reliability need reported in the RNA that may begin as soon as the summer of 2026 in the Greenwood 138 kV transmission load area. As with other local reliability needs, this need will be addressed through CECONY’s local transmission and distribution plans, which are included in its January 2025 electric rate case filing.

ContentsView on SEC.gov