NVIDIA CORP
For the period ended Jul 27, 2025. Filed Aug 27, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jul 27, 2025 · Filed Aug 27, 2025
What changed in Risk Factors?
Read the current filingPrevious report: 10-Q
Period ended 2025-04-27; filed 2025-05-28.
0001045810-25-000116
Item 1A. Risk FactorsCurrent report: 10-Q
Period ended 2025-07-27; filed 2025-08-27.
0001045810-25-000209
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 61 previous paragraphs and 49 current paragraphs.
24 unchanged; 7 reworded; 17 added; 29 removed; 1 previous and 1 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (17)
Current report
We may not be able to realize the potential benefits of business investments or acquisitions, and we may not be able to successfully integrate acquired companies, which could hurt our ability to grow our business, develop new products or sell our products.
Current report
We acquire and invest in businesses that offer products, services and technologies that we believe will help expand or enhance our strategic objectives. Acquisitions or investments involve significant challenges and risks and could impair our ability to grow our business, develop new products or sell our products and ultimately could have a negative impact on our financial results. If we pursue a particular transaction, we may limit our ability to enter into other transactions that could help us achieve our other strategic objectives. If we are unable to timely complete acquisitions, including due to delays and challenges in obtaining regulatory approvals, we may be unable to pursue other transactions, we may not be able to retain critical talent from the target company, technology may evolve and make the acquisition less attractive, and other changes can take place, which could reduce the anticipated benefits of the transaction and negatively impact our business. Regulators could also impose conditions that reduce the ultimate value of our acquisitions. In addition, to the extent that our perceived ability to consummate acquisitions is harmed, future acquisitions may be more difficult, complex or expensive. Our investments in publicly traded and private companies could create volatility and fluctuations in our results. These investments may generate realized and unrealized gains or losses and we could realize losses up to the value of the investments. In addition, we have invested and may continue to invest in private companies to further our strategic objectives and to support certain key business initiatives. These companies can include early-stage companies still defining their strategic direction. Many of the securities in which we invest are non-marketable and illiquid at the time of our initial investment, and we are not always able to achieve a return. To the extent any of the companies in which we invest are not successful, we could recognize an impairment and/or lose all or part of our investment. Our investment portfolio contains industry sector concentration risks, and a decline in any one or multiple industry sectors could increase our impairment losses.
Current report
We face additional risks related to acquisitions and strategic investments, including the diversion of capital and other resources, including management’s attention; difficulty in realizing a satisfactory return and uncertainties to realize the benefits of an acquisition or strategic investment, if at all; difficulty or inability in obtaining governmental, regulatory approval or restrictions or other consents and approvals or financing; legal proceedings initiated as a result of an acquisition or investment; and potential failure of our due diligence processes to identify significant issues with the assets or company in which we are investing or are acquiring.
Current report
Additional risks related to acquisitions include, but are not limited to:
Current report
•difficulty in integrating the technology, systems, products, policies, processes, or operations and integrating and retaining the employees, including key personnel, of the acquired business;
Current report
•assumption of liabilities and incurring amortization expenses, impairment charges to goodwill or write-downs of acquired assets;
Current report
•integrating accounting, forecasting and controls, procedures and reporting cycles;
Current report
•coordinating and integrating operations, particularly in countries in which we do not currently operate;
Current report
•stock price impact, fines, fees or reputation harm if we are unable to obtain regulatory approval for an acquisition or are otherwise unable to close an acquisition;
Current report
•potential issuances of debt to finance our acquisitions, resulting in increased debt, increased interest expense, and compliance with debt covenants or other restrictions;
Current report
•the potential for our acquisitions to result in dilutive issuances of our equity securities;
Current report
•the potential variability of the amount and form of any performance-based consideration;
Current report
•negative changes in general economic conditions in the regions or the industries in which we or our target operate;
Current report
•exposure to additional cybersecurity risks and vulnerabilities; and
Current report
•impairment of relationships with, or loss of our or our target’s employees, vendors and customers.
Current report
For example, when integrating acquisition target systems into our own, we have experienced and may continue to experience challenges including lengthy and costly systems integration, delays in purchasing and shipping products, difficulties with system integration via electronic data interchange and other processes with our key suppliers and customers, and training and change management needs of integration personnel. These challenges have impacted our results of operations and may continue to do so in the future.
Current report
In August 2025, the USG granted licenses that would allow us to ship certain H20 products to certain China-based customers, but to date, we have not generated any revenue or shipped any H20 products under those licenses. USG officials have expressed an expectation that the USG will receive 15% of the revenue generated from licensed H20 sales, but to date, the USG has not published a regulation codifying such requirement. Any request for a percentage of the revenue by the USG may subject us to litigation, increase our costs, and harm our competitive position and benefit competitors that are not subject to such arrangements.
Removed paragraphs (29)
Previous report
Long manufacturing lead times and uncertain supply and capacity availability, combined with a failure to estimate customer demand accurately, has led and could lead to mismatches between supply and demand.
Previous report
We have long manufacturing lead times and build finished products and maintain inventory in advance of anticipated demand. In periods of shortages impacting the semiconductor industry and/or limited supply or capacity in our supply chain, the lead times for certain supply may be extended. We have previously experienced and may continue to experience extended lead times of more than 12 months. To secure future supply and capacity, we have paid premiums, provided deposits, and entered into long-term supply agreements and capacity commitments, which have increased our product costs and this may continue. We may still be unable to secure sufficient commitments for capacity to address our business needs.
Previous report
If we inaccurately estimate demand, or our customers change orders, as we have experienced in the past, we may not be able to reduce our supply commitments in time, at the same rate, or at all. Significant mismatches between supply and demand have varied across our market platforms, resulted in both product shortages and excess inventory, significantly harmed our financial results and could reoccur. If we underestimate demand, and our foundry partners and contract manufacturers are unable to increase production or provide sufficient supply, we may not be able to meet increased customer demand in a timely manner, or at all. Our reputation and customer relationships could be damaged and we could lose revenue and market share. Additionally, since some of our products are part of a complex data center buildout, supply constraints or availability issues with respect to any one component have had and may have a broader revenue impact. For example, our ability to sell certain products has been and could be impeded if components necessary for the finished products are not available from third parties.
Previous report
If we overestimate demand, or if customers cancel or defer orders or choose to purchase from our competitors, we may not be able to utilize on-hand inventory or reduce purchase commitments accordingly. We have had to reduce average selling prices, including due to our channel pricing programs, increase prices for certain of our products as a result of our suppliers’ increase in prices, write down our inventory, incur cancellation penalties, and record impairments, and may have to do so in the future. These impacts would be amplified by our non-cancellable and non-returnable purchase orders placed in advance of our historical lead times and could be exacerbated if we need to make changes to the design of future products. The risk of these impacts has increased and may continue to increase as our purchase obligations and prepaids have grown and are expected to continue to grow and become a greater portion of our total supply. All of these factors may negatively impact our gross margins and financial results.
Previous report
Factors that have caused and/or could in the future cause us to underestimate or overestimate demand, and impact the timing and volume of our revenue, include:
Previous report
•changes in product development cycles and time to market;
Previous report
•competing technologies and competitor product releases, announcements or other actions;
Previous report
•sudden or sustained government lockdowns or public health issues;
Previous report
•rapidly changing technology or customer requirements;
Previous report
•the availability of sufficient data center capacity or energy for customers to procure;
Previous report
•new product introductions and transitions resulting in less demand for existing products;
Previous report
•purchasing decisions made, and inventory levels held by, distributors, ODMs, OEMs, system integrators, other channel partners and other third parties;
Previous report
•the ability of developers, end customers and other third parties to build, enhance, and maintain accelerated computing applications that leverage our platforms;
Previous report
•the availability of third-party content on our platforms, such as GeForce NOW;
Previous report
•the demand for accelerated computing, AI-related cloud services, or large language models;
Previous report
•changes that impact the ecosystem for the architectures underlying our products and technologies;
Previous report
•government actions or changes in governmental policies, such as export controls, increased restrictions on gaming usage, or tariffs; and
Previous report
•our customers' ability to invest in AI infrastructure.
Previous report
Challenges in estimating demand could become more pronounced or volatile in the future on both a global and regional basis. Extended lead times may occur if we experience other supply constraints caused by natural disasters, pandemics or other events. In addition, geopolitical tensions, such as those involving Taiwan and China, which comprise a significant portion of our revenue and where we have suppliers, contract manufacturers, and assembly partners who are critical to our supply continuity, could have a material adverse impact on us. Publicly announced intentions by governments or other companies to purchase our products can further complicate our demand estimates, as such announcements are often non-binding and may not result in committed volumes.
Previous report
We continue to increase our supply and capacity purchases with existing and new suppliers to support our demand projections and increasing complexity of our data center products. With these additions, we have also entered and may continue to enter into prepaid manufacturing and capacity agreements to supply both current and future products. The increased purchase volumes and integration of new suppliers and contract manufacturers into our supply chain creates more complexity in managing multiple suppliers with variations in production planning, execution and logistics. Our expanding product portfolio and varying component compatibility and quality may lead to increased inventory levels. We have incurred and may in the future incur inventory provisions or impairments if our inventory or supply or capacity commitments exceed demand for our products or demand declines.
Previous report
We plan to increase our U.S.-based manufacturing and invest in specialized equipment and processes to support domestic production. Our ability to increase manufacturing capabilities will depend on the domestic manufacturing ecosystem's capacity to ramp production supply to the required volume timely. Delays or shortfalls could impact our ability to meet demand.
Previous report
Product transitions are complex and we often ship both new and prior architecture products simultaneously as our channel partners prepare to ship and support new products. We are generally in various stages of transitioning the architectures of our Data Center, Gaming, Professional Visualization, and Automotive products. The computing industry is experiencing a broader and faster launch cadence of accelerated computing platforms to meet a growing and diverse set of AI opportunities. We have introduced a new product and architecture cadence of our Data Center solutions where we seek to complete new computing solutions each year and provide a greater variety of Data Center offerings. The increased frequency of these transitions and the larger number of products and product configurations may magnify the challenges associated with managing our supply and demand which may further create volatility in our revenue. Qualification time for new products, customers anticipating product transitions, and channel partners reducing channel inventory of prior architectures ahead of new product introductions can reduce, or create volatility in, our revenue. We have experienced and may in the future experience reduced demand for current generation architectures when customers anticipate transitions, and we may be unable to sell multiple product architectures at the same time for current and future architecture transitions. Our financial results have been and may in the future be negatively impacted if we are unable to execute our architectural transitions as planned for any reason. The increased frequency and complexity of newly introduced products could result in unanticipated quality or production issues that could increase the magnitude of inventory provisions, warranty, or other costs or result in product delays. For example, our gross margins in the second quarter of fiscal year 2025 were negatively impacted by inventory provisions for low-yielding Blackwell material.
Previous report
We incur significant engineering development resources for new products, and changes to our product roadmap may impact our ability to develop other products or adequately manage our supply chain cost. Customers may delay purchasing existing products as we increase the frequency of new products or may not be able to adopt our new products as fast as forecasted, both impacting the timing of our revenue and supply chain cost. While we have managed prior product transitions and have sold multiple product architectures at the same time, these transitions are difficult, may impair our ability to predict demand and impact our supply mix, and may cause us to incur additional costs.
Previous report
Demand estimates for our products, applications, and services can be incorrect, which may create volatility in our revenue or supply levels. We may not be able to generate significant revenue from them. Because our products may be used in multiple use cases and applications, it is difficult to estimate with any reasonable degree of precision the impact of generative AI models on our reported revenue or forecasted demand.
Previous report
The use of our GPUs for new, mercurial, or trendy applications, has impacted and can impact in the future demand for our products, including by leading to inconsistent spikes and drops in demand. For example, several years ago, our Gaming GPUs began to be used for mining digital currencies, such as Ethereum. It is difficult for us to estimate with any reasonable degree of precision the past or current impact of cryptocurrency mining, or forecast the future impact of cryptocurrency mining, on demand for our products. Volatility in the cryptocurrency market, including new compute technologies, price changes in cryptocurrencies, government cryptocurrency policies and regulations, new cryptocurrency standards and changes in the method of verifying blockchain transactions, has impacted and can in the future impact cryptocurrency mining and demand for our products and can further impact our ability to estimate demand for our products. Changes to cryptocurrency standards and processes including, but not limited to, the Ethereum 2.0 merge in 2022, have reduced and may in the future decrease the usage of GPUs for Ethereum mining. This has created and may in the future create increased aftermarket sales of our GPUs, which could negatively impact retail prices for our GPUs and reduce demand for our new GPUs. In general, our new products or previously sold products may be resold online or on the unauthorized “gray market,” which also makes demand forecasting difficult. Gray market products and reseller marketplaces compete with our new products and distribution channels. Our inability to accurately predict our demand that arises from new use cases may create volatility in our revenue.
Reworded paragraphs (7)
Previous wording
Other than the risk factors listed below, there have been no material changes from the risk factors previously described under Item 1A of our Annual Report on Form 10-K for the fiscal year ended January 26, 2025.
Current wording
Other than the risk factors listed below, there have been no material changes from the risk factors previously described under Item 1A of our Annual Report on Form 10-K for the fiscal year ended January 26, 2025 and Item 1A of our Quarterly Report on Form 10-Q for the fiscal quarter ended April 27, 2025.
Previous wording
Purchasing or owning NVIDIA common stock involves investment risks including, but not limited to, the risks described in Item 1A of our Annual Report on Form 10-K for the fiscal year ended January 26, 2025, and below. Any one of those risks could harm our business, financial condition and results of operations or reputation, which could cause our stock price to decline. Additional risks, trends and uncertainties not presently known to us or that we currently believe are immaterial may also harm our business, financial condition, results of operations or reputation.
Current wording
Purchasing or owning NVIDIA common stock involves investment risks including, but not limited to, the risks described in Item 1A of our Annual Report on Form 10-K for the fiscal year ended January 26, 2025, and Item 1A of our Quarterly Report on Form 10-Q for the fiscal quarter ended April 27, 2025, and below. Any one of those risks could harm our business, financial condition and results of operations or reputation, which could cause our stock price to decline. Additional risks, trends and uncertainties not presently known to us or that we currently believe are immaterial may also harm our business, financial condition, results of operations or reputation.
Previous wording
During the third quarter of fiscal year 2024, the USG announced new and updated licensing requirements for exports to China and Country Groups D1, D4, and D5 (including but not limited to, Saudi Arabia, the United Arab Emirates, and Vietnam, but excluding Israel) of our products exceeding certain performance thresholds, including, but not limited to, the A100, A800, H100, H800, L4, L40, L40S RTX 4090, GB200 NVL72, and B200. The licensing requirements also apply to the export of products exceeding certain performance thresholds to a party headquartered in, or with an ultimate parent headquartered in, Country Group D5, including China.
Current wording
During the third quarter of fiscal year 2024, the USG announced new and updated licensing requirements for exports to China and Country Groups D:1, D:4, and D:5 (including but not limited to, Saudi Arabia, the United Arab Emirates, and Vietnam, but excluding Israel) of our products exceeding certain performance thresholds, including, but not limited to, the A100, A800, H100, H800, L4, L40, L40S RTX 4090, GB200 NVL72, and B200. The licensing requirements also apply to the export of products exceeding certain performance thresholds to a party headquartered in, or with an ultimate parent headquartered in, Country Group D5, including China.
Previous wording
In addition to controls targeting D:4 and D:5 countries, the USG has also imposed worldwide export controls impacting our products, and may impose additional controls in the future. On January 15, 2025, the USG published the “AI Diffusion” IFR in the Federal Register. After a 120-day delayed compliance period, the IFR would have imposed a worldwide licensing requirement on all products classified under Export Control Classification Numbers, or ECCNs, 3A090.a, 4A090.a, or corresponding .z ECCNs, including all related software and technology. The licensing requirement would have applied to our most popular data center products, such as our H200 and GB200. The AI Diffusion IFR would have divided the world into three tiers, relegating most countries to “Tier 2” status, and would have created a complex and burdensome scheme for licensing approvals.
Current wording
On January 15, 2025, the USG published the “AI Diffusion” IFR in the Federal Register. The IFR would have imposed a worldwide licensing requirement on our data center products, such as our H200, GB200 and GB300. The AI Diffusion IFR would have divided the world into three tiers, relegating most countries to “Tier 2” status, and would have created a complex and burdensome scheme for licensing approvals.
Previous wording
For example, the USG has already imposed conditions to limit the ability of foreign firms to create and offer as a service large-scale GPU clusters, for example by imposing license conditions on the use of products to be exported to certain countries, and may impose additional conditions such as requiring chip tracking and throttling mechanisms that could disable or impair GPUs if certain events, including unauthorized system configuration, use, or location, are detected. Such government mandates in chip designs could introduce system vulnerabilities and expose us to significant risk and potential liability, negatively impact demand for our products, and could have a material impact on our business, operating results, and financial condition.
Current wording
For example, the USG has already imposed conditions to limit the ability of foreign firms to create and offer as a service large-scale GPU clusters, for example by imposing license conditions on the use of products to be exported to certain countries, and may impose additional conditions such as requiring chip tracking and throttling mechanisms that could disable or impair GPUs if certain events, including unauthorized system configuration, use, or location, are detected. Such government mandates in chip designs could introduce system vulnerabilities and expose us to significant risk and potential liability, negatively impact demand for our products, and could have a material impact on our business, operating results, and financial condition. Even if not enacted into binding legislation, draft bills have impacted and may in the future negatively impact our business. For example, following U.S. legislative proposals calling for mandatory features in our chips, China’s government publicly questioned whether our H20 products have built-in vulnerabilities, discouraging customers from purchasing our products. We provided a public response explaining that our GPUs, including H20, do not include such built-in vulnerabilities, and will respond to any follow-up questions we receive.
Previous wording
advanced semiconductor products, because by the time a new product is ready for market, it may be subject to new unilateral export controls restricting its sale, resulting in excess inventory and purchase obligations as we recently experienced with the H20. At the same time, such controls may increase investment in foreign competitors, which would be less likely to be restricted by U.S. controls.
Current wording
As a result, export controls have in the past and may in the future negatively impact demand for our products and services not only in China, but also in other markets, such as Europe, Latin America, and Southeast Asia. Export controls increase the risk of investing in U.S. advanced semiconductor products, because by the time a new product is ready for market, it may be subject to new unilateral export controls restricting its sale, resulting in excess inventory and purchase obligations as we recently experienced with the H20. At the same time, such controls may increase investment in foreign competitors, which would be less likely to be restricted by U.S. controls.
Previous wording
Additionally, restrictions imposed by the Chinese government on the duration of gaming activities and access to games may adversely affect our Gaming revenue, and increased oversight of digital platform companies may adversely affect our Data Center revenue. The Chinese government may also encourage customers to purchase from our China-based competitors, or impose restrictions on the sale to certain customers of our products, or any products containing components made by our partners and suppliers. For example, the Chinese government announced restrictions relating to certain sales of products containing certain products made by Micron, a supplier of ours. As another example, an agency of the Chinese government announced an Action Plan that endorses new standards regarding the compute performance per watt and per memory bandwidth of accelerators used in new and renovated data centers in China. If the Chinese government modifies or implements the Action Plan in a way that effectively prevents us from being able to design products to meet the new standard, this may restrict the ability of customers to use some of our data center products and may have a material and adverse impact on our business, operating results and financial condition. Further restrictions on our products or the products of our suppliers could negatively impact our business and financial results.
Current wording
Additionally, restrictions imposed by the Chinese government on the duration of gaming activities and access to games may adversely affect our Gaming revenue, and increased oversight of digital platform companies may adversely affect our Data Center revenue. The Chinese government has and may continue to encourage customers to purchase from our China-based competitors, or impose restrictions on the sale to certain customers of our products, or any products containing components made by our partners and suppliers. For example, the Chinese government announced restrictions relating to certain sales of products containing certain products made by Micron, a supplier of ours. As another example, an agency of the Chinese government announced an Action Plan that endorses new standards regarding the compute performance per watt and per memory bandwidth of accelerators used in new and renovated data centers in China. If the Chinese government modifies or implements the Action Plan in a way that effectively prevents us from being able to design products to meet the new standard, this may restrict the ability of customers to use some of our data center products and may have a material and adverse impact on our business, operating results and financial condition. Further restrictions on our products or the products of our suppliers could negatively impact our business and financial results.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
In addition to controls targeting D:1, D:4 and D:5 countries, the USG has also imposed worldwide export controls impacting our products, and may impose additional controls in the future.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
As a result, export controls may negatively impact demand for our products and services not only in China, but also in other markets, such as Europe, Latin America, and Southeast Asia. Export controls increase the risk of investing in U.S.