FIRSTENERGY CORP

For the period ended Sep 30, 2026. Filed Oct 28, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2026 · Filed Oct 28, 2026

FE$46.43-1.4%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 480 previous paragraphs and 501 current paragraphs.

201 unchanged; 169 reworded; 121 added; 87 removed; 23 previous and 10 current paragraphs rearranged.

Tables are not compared: 37 previous and 38 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (121)

Current report

FirstEnergy is uniquely positioned to take advantage of data center growth, both in its service territory and across the region. As of October 27, 2026, FirstEnergy has contracted approximately 8 GWs of capacity and was in active negotiations concerning approximately 4 GWs of additional load. FirstEnergy expects this load growth to drive an increase in the 2027 to 2031 Energize365 investment plan, compared to the current 2026 to 2030 Energize365 investment plan, which is expected to further enhance FirstEnergy’s long-term earnings growth profile.

Current report

On September 15, 2026, Fitch affirmed the ratings of FE and all subsidiaries. Fitch also affirmed the outlook of FE and all subsidiaries excluding OE, CEI, and TE whose outlooks were revised to stable.

Current report

On September 4, 2026, PE filed with the MDPSC a distribution base rate case seeking to, among other things, increase PE’s Maryland annual base rate distribution revenues by approximately $53 million and approve a proposed three-year program focused on improving reliability. The case uses a historic test year of twelve months ending March 31, 2026, and contemplates a requested ROE of 10.6% with no proposed changes to PE’s current capital structure of approximately 54% equity and 46% debt. Evidentiary hearings are scheduled to begin January 11, 2027. A final order and new effective rates are expected in the second quarter of 2027.

Current report

On August 6, 2026, JCP&L filed with the NJBPU a base rate case utilizing a historical test period for the 12 months ending June 30, 2026. JCP&L proposed a net increase in base distribution revenues of approximately $253 million, with an ROE of 10.2% and a capital structure of approximately 47% debt and approximately 53% equity, with an effective date of May 6, 2027. JCP&L has also proposed to offset the increase in rates for residential customers until January 1, 2028, through a new, temporary tax-adjustment rider and amortization of an existing regulatory liability during this period. The filing also proposes a new storm recovery charge rider and requests additional funding for enhanced storm response and expanded vegetation management. The NJBPU has referred the matter to the New Jersey Office of Administrative Law and discovery has begun.

Current report

FirstEnergy expects to finalize the remaining major contracts shortly after receiving a satisfactory final WVPSC order. To support the proposed Maidsville Energy Center project schedule, FirstEnergy has entered into a reservation agreement with Siemens Energy, Inc. for turbines scheduled for delivery in 2030. As described in the CPCN case, any contemplated data center agreements utilizing the Maidsville Energy Center's output, would be expected to address customer protections, pricing, risk transfer and long-term benefit sharing for existing West Virginia customers. Separately from the Maidsville Energy Center, FirstEnergy has issued a request for proposals for an initial 3 GWs of additional combined-cycle turbines to support potential large-load customers in West Virginia and expects to provide an update in early 2027. FirstEnergy is also exploring bridge-power options and temporary behind-the-meter solutions as it develops the grid to support these customers with permanent transmission and generation service.

Current report

Earnings attributable to FE increased $116 million primarily due to the following:

Current report

•Lower investigation and other related costs associated with the ongoing government investigations and ongoing litigation;

Current report

•The recognition of a state tax benefit related to an uncertain tax position being effectively settled in 2026 and absence of a discrete tax charge recognized in 2025 related to the FET Equity Interest Sale.

Current report

•The absence of a discrete tax benefit related to a remeasurement of excess deferred income taxes recognized in 2025.

Current report

First Nine Months of 2026 Compared with First Nine Months of 2025

Current report

Earnings attributable to FE were increased $181 million primarily due to the following:

Current report

•The recognition of a state tax benefit related to an uncertain tax position being effectively settled in 2026 and absence of a discrete tax charge recognized in 2025 related to the FET Equity Interest Sale.

Current report

•The absence of a discrete tax benefit related to a remeasurement of excess deferred income taxes recognized in 2025.

Current report

Summary of Results of Operations — Third Quarter 2026 Compared with Third Quarter 2025

Current report

Distribution Segment — Third Quarter of 2026 Compared with Third Quarter of 2025

Current report

Distribution segment’s earnings attributable to FE increased $54 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to the absence in 2026 of customer credits associated with the PUCO-approved Ohio Stipulation recognized in 2025, higher rider revenues, increased customer demand, lower property taxes, higher pension and OPEB non-service credits, and lower operating expenses, partially offset by higher net financing costs.

Current report

Distribution segment’s total revenues increased $233 million as a result of the following sources:

Current report

Total operating expenses increased $178 million, primarily due to:

Current report

•Other operating expenses increased $86 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to:

Current report

•Higher storm restoration expenses of $122 million, which were deferred for future recovery; and

Current report

•Higher vegetation management expenses of $9 million in Ohio, as approved and recovering in the base rate case.

Current report

•Lower other operating expenses of $21 million, primarily due to accelerated vegetation management work in 2025 in Pennsylvania;

Current report

•Lower energy efficiency and other state mandated program costs of $7 million, which were deferred for future recovery, resulting in no material impact to earnings; and

Current report

•General taxes decreased $6 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to lower property taxes, partially offset by higher gross receipts taxes.

Current report

Distribution segment’s effective tax rate was 13.7% and 17.3% for the three months ended September 30, 2026, and 2025, respectively. The decrease in the effective tax rate was primarily due to increases in state flow-through tax benefits.

Current report

Integrated Segment — Third Quarter of 2026 Compared with Third Quarter of 2025

Current report

Integrated segment’s total revenues increased $157 million as a result of the following sources:

Current report

Generation sales revenues increased $123 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to:

Current report

Transmission revenues increased $19 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to higher recovery of transmission operating expenses and higher rate base from regulated investment programs.

Current report

Total operating expenses increased $131 million, primarily due to:

Current report

•Other operating expenses increased $263 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to:

Current report

•Higher network transmission expenses of $31 million, which were deferred for future recovery, resulting in no material impact to earnings;

Current report

•Higher storm restoration expenses of $201 million, which were mostly deferred for future recovery;

Current report

•Higher energy efficiency and other state mandated program costs of $24 million, which were deferred for future recovery, resulting in no material impact to earnings.

Current report

•Lower regulated generation outage expenses of $9 million, primarily due to fewer planned outages; and

Current report

•Deferral of regulatory assets increased $188 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to $193 million in higher deferral of storm related expenses and $13 million related to net increases in other deferrals, partially offset by an $18 million net decrease from lower generation and transmission related deferrals.

Showing the first 40 of 121 passages. Open the source sections for the rest.

Removed paragraphs (87)

Previous report

On April 5, 2023, the Ohio Companies sought approval from the PUCO for their ESP V. The proposed plan would maintain an eight-year term beginning June 1, 2024, and continue riders recovering costs associated with distribution infrastructure investments and approved grid modernization investments. ESP V additionally proposed new riders that would support reliability, and included provisions supporting affordability and enhancing the customer experience. As more fully described in “Outlook - State Regulation - Ohio,” in Item 2., "Management's Discussion and Analysis of Financial Condition and Results of Operations," on October 29, 2024, the Ohio Companies filed a notice of their intent to withdraw ESP V and proposed the terms under which they would resume operating under ESP IV, which was approved by the PUCO on December 18, 2024. On January 22, 2025, the PUCO approved the Ohio Companies’ ESP IV compliance tariffs with an effective date of February 1, 2025, at which point the Ohio Companies resumed operating under ESP IV with certain modifications, as described in “Outlook - State Regulation - Ohio,” in Item 2., "Management's Discussion and Analysis of Financial Condition and Results of Operations". The Ohio Companies’ return to ESP IV was appealed by certain intervenors and the matter remains pending before the Supreme Court of Ohio.

Previous report

PE anticipates filing a base rate distribution case with the MDPSC in the third quarter of 2026, with new rates expected to become effective in the first quarter of 2027.

Previous report

Second Quarter of 2026 Compared with Second Quarter of 2025

Previous report

Earnings attributable to FE were $288 million or $0.50 per share (basic and diluted) in the second quarter of 2026 compared to $268 million or $0.46 per share (basic and diluted) in the second quarter of 2025, representing an increase of $20 million that was primarily due to the following:

Previous report

•Higher other operating expenses from planned maintenance expenses;

Previous report

First Six Months of 2026 Compared with First Six Months of 2025

Previous report

Earnings attributable to FE were $693 million or $1.20 per share (basic and diluted) in the first six months of 2026 compared to $628 million or $1.09 per share (basic and diluted) in the first six months of 2025, representing an increase of $65 million that was primarily due to the following:

Previous report

•Higher other operating expenses from planned maintenance expenses; and

Previous report

Summary of Results of Operations — Second Quarter 2026 Compared with Second Quarter 2025

Previous report

Distribution Segment — Second Quarter of 2026 Compared with Second Quarter of 2025

Previous report

Distribution segment’s total revenues increased $39 million as a result of the following sources:

Previous report

Total operating expenses increased $63 million, primarily due to:

Previous report

•Other operating expenses increased $28 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to:

Previous report

•Higher energy efficiency and other state mandated program costs of $2 million, which were deferred for future recovery, resulting in no material impact to earnings;

Previous report

•Higher storm restoration expenses of $5 million, which were deferred for future recovery; and

Previous report

•Higher other operating expenses of $28 million, primarily due to planned maintenance expenses.

Previous report

Integrated Segment — Second Quarter of 2026 Compared with Second Quarter of 2025

Previous report

Integrated segment’s total revenues increased $173 million as a result of the following sources:

Previous report

Generation sales revenues increased $102 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to:

Previous report

Total operating expenses increased $157 million, primarily due to:

Previous report

•Other operating expenses increased $112 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to:

Previous report

•Higher network transmission expenses of $15 million, which were deferred for future recovery, resulting in no material impact to earnings;

Previous report

•Higher storm restoration expenses of $40 million, which were mostly deferred for future recovery;

Previous report

•Higher energy efficiency and other state mandated program costs of $23 million, which were deferred for future recovery, resulting in no material impact to earnings.

Previous report

Other expense increased $6 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to higher interest expense as a result of new debt issuances since the second quarter 2025, partially offset by higher capitalized interest and higher pension and OPEB non-service credits.

Previous report

Integrated segment’s effective tax rate was 23.6% and 23.2% for the three months ended June 30, 2026, and 2025, respectively.

Previous report

Stand-Alone Transmission Segment — Second Quarter of 2026 Compared with Second Quarter of 2025

Previous report

Stand-Alone Transmission segment’s effective tax rate was 22.6% and 22.4% for the three months ended June 30, 2026, and 2025, respectively.

Previous report

Corporate / Other — Second Quarter 2026 Compared with Second Quarter 2025

Previous report

Summary of Results of Operations — First Six Months of 2026 Compared with First Six Months of 2025

Previous report

Distribution Segment — First Six Months of 2026 Compared with First Six Months of 2025

Previous report

Distribution segment’s earnings attributable to FE increased $10 million in the first six months of 2026, as compared to the same period of 2025, primarily due to the absence in 2026 of severance and related costs that were recognized in the first quarter of 2025, the absence in 2026 of customer credits associated with the PUCO-approved Ohio Stipulation recognized in 2025 and a reduction in ARO liabilities, partially offset by lower customer usage and demand and higher planned operating expenses.

Previous report

Distribution segment’s total revenues increased $93 million as a result of the following sources:

Previous report

Total operating expenses increased $85 million, primarily due to:

Previous report

•Purchased power costs, which have no material impact to earnings, increased $243 million during the first six months of 2026, as compared to the same period of 2025, primarily due to higher unit costs and generation sales volumes as described above.

Previous report

•Higher network transmission expenses of $37 million, which were deferred for future recovery, resulting in no material impact to earnings;

Previous report

•Higher energy efficiency and other state mandated program costs of $23 million, which were deferred for future recovery, resulting in no material impact to earnings;

Showing the first 40 of 87 passages. Open the source sections for the rest.

Reworded paragraphs (169)

Previous wording

The following Management’s Discussion and Analysis of Financial Condition and Results of Operations in this Form 10-Q discusses the three and six months ended June 30, 2026, and year-over-year comparisons between the three and six months ended June 30, 2026, and 2025, and should be read in conjunction with the Registrants’ interim financial statements and notes included in this Form 10-Q, and the Registrants’ audited financial statements, notes and “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Part II, Item 7. in its Annual Report on Form 10-K for the year ended December 31, 2025, filed with the SEC on February 18, 2026.

Current wording

The following Management’s Discussion and Analysis of Financial Condition and Results of Operations in this Form 10-Q discusses the three and nine months ended September 30, 2026, and year-over-year comparisons between the three and nine months ended September 30, 2026, and 2025, and should be read in conjunction with FirstEnergy’s interim financial statements and notes included in this Form 10-Q, and FirstEnergy’s audited financial statements, notes and “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Part II, Item 7 of its Annual Report on Form 10-K for the year ended December 31, 2025, filed with the SEC on February 18, 2026.

Previous wording

FirstEnergy’s customer-focused Energize365 investment plan for the 2026 to 2030 time period is $36 billion, approximately 25% higher than the previous 2025 to 2029 five-year plan, and aims to strengthen the grid, improve reliability and support growing customer demand. Through the Energize365 program, system-wide capital investments from 2026 to 2030 are expected to include 28% in the Distribution segment, 35% in the Integrated segment, and 35% in the Stand-Alone Transmission segment, focused on the following:

Current wording

FirstEnergy’s customer-focused Energize365 investment plan for 2026 to 2030 is $36 billion, approximately 25% higher than the previous 2025 to 2029 five-year plan, and aims to strengthen the grid, improve reliability and support growing customer demand. Through the Energize365 program, system-wide capital investments from 2026 to 2030 are expected to include 28% in the Distribution segment, 35% in the Integrated segment, and 35% in the Stand-Alone Transmission segment, focused on the following:

Previous wording

•Transmission projects awarded through the PJM Open Window to address regional expansion projects, including incremental opportunities in the 2026 Open Window, for which the planning period was opened.

Current wording

•Transmission projects awarded through the PJM RTEP Open Window to address regional expansion projects, including incremental opportunities submitted by FET through its subsidiaries.

Previous wording

FirstEnergy aims to execute its Energize365 investment plan through a strengthened financial position. Energize365 capital investments included in the current five-year plan are expected to be funded with a combination of organic cash flows and the issuance of debt, including hybrid securities. Additionally, FirstEnergy may issue its common equity to fund capital expenditures in its 2026 through 2030 planning period averaging approximately 1% of its now current market capitalization in each year of the planning period, subject to market conditions and other factors. FirstEnergy believes it has optimized its financing plan to retain flexibility in an uncertain interest rate environment.

Current wording

FirstEnergy aims to execute its Energize365 investment plan through a strengthened financial position. Energize365 capital investments included in the current five-year plan are expected to be funded with a combination of organic cash flows and the issuance of debt, including hybrid securities. The financing plan for the current $36 billion 2026 to 2030 investment program includes up to $2 billion of equity or equity-like securities through 2030. Additionally, FirstEnergy may issue its common equity to fund capital expenditures in its 2026 through 2030 planning period averaging approximately 1% of its now current market capitalization in each year of the planning period, subject to market conditions and other factors. FirstEnergy believes it has optimized its financing plan to retain flexibility in an uncertain interest rate environment.

Previous wording

On October 27, 2025, FE, the Electric Companies, Transmission Companies, and FET, each entered into an amended credit facility to, among other things: (i) remove the 10 basis point credit spread adjustment from the interest rate calculation; (ii) permit a one-week interest period for any Term Benchmark Advance (as defined under each of the Amended Credit Facilities) based upon daily simple SOFR; and (iii) extend the maturity date of each credit facility for an additional one-year period (a) from October 20, 2028 to October 20, 2029 for the KATCo credit facility, (b) from October 20, 2029 to October 20, 2030 for the FET credit facility and (c) from October 18, 2028 to October 18, 2029 for the remaining Amended Credit Facilities.

Current wording

On October 23, 2026, FE, the Electric Companies, Transmission Companies, and FET, each entered into an amended credit facility to, among other things: (i) extend the maturity date of each credit facility for an additional one-year period (a) from October 20, 2029 to October 18, 2030 for the KATCo credit facility, (b) from October 20, 2030 to October 20, 2031 for the FET credit facility and (c) from October 18, 2029 to October 18, 2030 for the remaining Amended Credit Facilities; (ii) allow for the option to extend the Credit Agreement by up to two additional one-year periods; and (iii) increase the letters of credit commitment amount from $100 million to $400 million for the MP and PE credit facility.

Previous wording

FirstEnergy continues to return value to shareholders. In February 2026, the FE Board declared a $0.02 per share increase to the quarterly cash common stock dividend to $0.465 per share payable June 1, 2026, which represents a 4.5% increase compared to dividends declared in 2025. Modest dividend growth is expected to enable enhanced shareholder returns, while still allowing for continued substantial regulated investments. Dividend payments are subject to declaration by the FE Board, and future dividend decisions determined by the FE Board may be impacted by earnings, cash flows, credit metrics and general economic and other business conditions.

Current wording

FirstEnergy continues to return value to shareholders. In February 2026, the FE Board declared a $0.02 per share increase in the quarterly cash common stock dividend to $0.465 per share, payable June 1, 2026, representing a 4.5% increase compared to dividends declared in 2025. In September 2026, the FE Board declared a quarterly cash common stock dividend of $0.465 per share payable December 1, 2026. Modest dividend growth is expected to enable enhanced shareholder returns, while still allowing for continued substantial regulated investments. Dividend payments are subject to declaration by the FE Board, and future dividend decisions determined by the FE Board may be impacted by earnings, cash flows, credit metrics and general economic and other business conditions.

Previous wording

On February 21, 2025, FET, DominionHV and Transource entered into the Valley Link Operating Agreement, which established the general framework for Valley Link and the Valley Link Subsidiaries to accept, design, develop, construct, own, operate and finance those transmission projects awarded by PJM to Valley Link. This general framework includes parameters regarding the relationship among the three members, confers governance rights to its members so long as certain ownership percentages are maintained, as described below, and defines the list of projects that Valley Link will have the right to develop. Valley Link is the owner of the Valley Link Subsidiaries, which are organized in various states. On February 26, 2025, in response to the PJM 2024 RTEP Open Window #1, PJM awarded two electric transmission projects to Valley Link estimated to be approximately $3 billion, with FET’s share estimated to be approximately $1 billion.

Current wording

On February 21, 2025, FET, DominionHV and Transource entered into the Valley Link Operating Agreement, which established the general framework for Valley Link and the Valley Link Subsidiaries to accept, design, develop, construct, own, operate and finance those transmission projects awarded by PJM to Valley Link. This general framework includes parameters regarding the relationship among the three members, confers governance rights to its members so long as certain ownership percentages are maintained, as described below, and defines the list of projects that Valley Link will have the right to develop. Valley Link is the owner of the Valley Link Subsidiaries, which are organized in various states. On February 26, 2025, in response to the 2024 PJM RTEP Open Window, PJM awarded two electric transmission projects to Valley Link estimated to be approximately $3 billion, with FET’s share estimated to be approximately $1 billion.

Previous wording

On February 13, 2026, FET and Transource entered into the Grid Growth Operating Agreement, which established the general framework for Grid Growth to accept, design, develop, construct, own, operate and finance certain transmission projects awarded by PJM to certain of the subsidiaries of Grid Growth. This general framework includes parameters regarding the relationship between the two members, confers governance rights to its members so long as certain ownership percentages are maintained and defines the list of projects that Grid Growth will have the right to develop. The relative ownership interests of the members under the Grid Growth Operating Agreement are 50% for each of FET and Transource. Grid Growth is the sole owner of Grid Growth Ohio and owns an 80% interest in Grid Growth EHV, with Transource owning the remaining interest. On February 12, 2026, in response to the PJM 2025 RTEP Open Window #1, PJM awarded a project to Grid Growth estimated to be approximately $1 billion, with FET’s share estimated to be approximately $448 million.

Current wording

On February 13, 2026, FET and Transource entered into the Grid Growth Operating Agreement, which established the general framework for Grid Growth to accept, design, develop, construct, own, operate and finance certain transmission projects awarded by PJM to certain of the subsidiaries of Grid Growth. This general framework includes parameters regarding the relationship between the two members, confers governance rights to its members so long as certain ownership percentages are maintained and defines the list of projects that Grid Growth will have the right to develop. The relative ownership interests of the members under the Grid Growth Operating Agreement are 50% for each of FET and Transource. Grid Growth is the sole owner of Grid Growth Ohio and owns an 80% interest in Grid Growth EHV, with Transource owning the remaining interest. On February 12, 2026, in response to the 2025 PJM RTEP Open Window, PJM awarded a project to Grid Growth estimated to be approximately $1 billion, with FET’s share estimated to be approximately $448 million.

Previous wording

On May 12, 2026, the governor of Maryland signed the Utility RELIEF Act into law. Among other things, the legislation temporarily limits the use of forecasted costs in certain rate proceedings, modifies the standards by which the MDPSC may approve multi-year rate plans, mandates RTO participation, requires additional review of utility spending and cost recovery, eliminates certain utility earnings incentives, imposes restrictions on recovery of certain administrative compensation costs and includes provisions designed to allocate certain transmission and distribution upgrade costs associated with large-load customers, including data centers, to those customers rather than to the broader customer base. FirstEnergy is currently assessing the full extent of the legislation’s impacts, but the Utility RELIEF Act may affect PE’s timing and amount of cost recovery, authorized returns, customer rate structures, infrastructure investment planning, and future earnings opportunities. See “Outlook - State Regulation - Maryland” and “Outlook – FERC Regulatory Matters – RTO Participation ROE Incentive,” in Item 2., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for a more fulsome discussion of the current Utility RELIEF Act impacts to PE.

Current wording

On May 12, 2026, the governor of Maryland signed the Utility RELIEF Act into law. Among other things, the legislation temporarily limits the use of forecasted costs in certain rate proceedings, modifies the standards by which the MDPSC may approve multi-year rate plans, mandates RTO participation, requires additional review of utility spending and cost recovery, eliminates certain utility earnings incentives, imposes restrictions on recovery of certain administrative compensation costs and includes provisions designed to allocate certain transmission and distribution upgrade costs associated with large-load customers, including data centers, to those customers rather than to the broader customer base. FirstEnergy continues to monitor the full extent of the legislation’s impacts, but the Utility RELIEF Act may affect PE’s timing and amount of cost recovery, authorized returns, customer rate structures, infrastructure investment planning, and future earnings opportunities. See “Outlook - State Regulation - Maryland” and “Outlook – FERC Regulatory Matters – Utility RELIEF Act and Related FERC Complaint,” in Item 2., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for a more fulsome discussion of the current Utility RELIEF Act impacts to PE.

Previous wording

On May 31, 2024, the Ohio Companies filed their application for an increase in base distribution rates based on a 2024 calendar year test period. On January 27, 2025, the Ohio Companies notified the PUCO of their intention to update their application for an increase in base distribution rates to remove ESP V related provisions from the base rate case. On November 19, 2025, the PUCO issued an order in the rate case. On November 26, 2025, the Ohio Companies filed proposed compliance tariffs. On December 19, 2025, the Ohio Companies and other parties filed applications for rehearing and on December 29, 2025, the Ohio Companies filed a memorandum against intervenors’ applications for rehearing. On January 7, 2026, the PUCO issued an entry granting rehearing in order to determine whether its November 19, 2025, base rate case opinion and order should be affirmed, abrogated, or modified on rehearing. On January 9, 2026, the Ohio Companies filed an expedited motion for ruling on the proposed compliance tariffs and on February 4, 2026, PUCO staff issued a letter recommending that most of the Ohio Companies’ proposed compliance tariffs be approved. The Ohio Companies cannot predict the outcome of the rehearing, but do not expect material changes to the November 2025 order. See “Outlook - State Regulation - Ohio,” in Item 2., "Management's Discussion and Analysis of Financial Condition and Results of Operations".

Current wording

On May 31, 2024, the Ohio Companies filed their application for an increase in base distribution rates based on a 2024 calendar year test period. The PUCO issued an order in the base rate case on November 19, 2025. A number of applications for rehearing were subsequently filed and on June 10, 2026, the PUCO issued its last entry on rehearing. On August 10, 2026, the Ohio Companies appealed the matter to the Supreme Court of Ohio where it remains pending. The Ohio Companies cannot predict the outcome of the matter. See “Outlook - State Regulation - Ohio,” in Item 2., "Management's Discussion and Analysis of Financial Condition and Results of Operations.”

Previous wording

On April 22, 2026, the Ohio Companies filed with the PUCO a notice of their intent to file a three-year rate plan, requesting approval of three consecutive, annual test periods that begin July 1, 2027 and end June 30, 2030. The Ohio Companies filed their applications for an increase in their distribution rates on May 22, 2026. The application proposes net increases in the Ohio Companies’ base distribution revenues of approximately $254 million in the first year, approximately $59 million in the second year, and approximately $80 million in the third year, with a return on equity of 10.2% and a capital structure of approximately 47% debt and approximately 53% equity for all three Ohio Companies. On June 12, 2026, PUCO staff issued a deficiency letter requesting additional supplementation in certain areas, which the Ohio Companies provided on June 22, 2026. On July 1, 2026, an administrative law judge deemed the application complete and set a procedural schedule. Evidentiary hearings are set to begin March 1, 2027.

Current wording

On April 22, 2026, the Ohio Companies filed with the PUCO a notice of their intent to file a three-year rate plan, requesting approval of three consecutive, annual test periods that begin July 1, 2027 and end June 30, 2030. The Ohio Companies filed their applications for an increase in their distribution rates on May 22, 2026. The application proposes net increases in the Ohio Companies’ base distribution revenues of approximately $254 million in the first year, approximately $59 million in the second year, and approximately $80 million in the third year, with an ROE of 10.2% and a capital structure of approximately 47% debt and approximately 53% equity for all three Ohio Companies. On June 12, 2026, PUCO staff issued a deficiency letter requesting additional supplementation in certain areas, which the Ohio Companies provided on June 22, 2026. On July 1, 2026, an administrative law judge deemed the application complete and set a procedural schedule. Evidentiary hearings are set to begin March 1, 2027.

Previous wording

On October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC. To ensure that MP and PE can meet their PJM adequacy requirements, the plan proposes, among other things, near-term market capacity purchases and the addition of 70 MWs of solar generation by 2028 and 1,200 MWs of natural gas combined cycle generation by 2031. On February 13, 2026, MP and PE filed a CPCN to construct and operate the proposed generation resources, including a 1,200 MW combined cycle gas turbine plant, that will be known as the Maidsville Energy Center, and 70 MWs of solar generation capacity, for an estimated capital investment of approximately $2.7 billion as of the filing date. The request also includes a surcharge designed to recover financing costs during development and construction of the projects, as well as a transition to recovery in base rates once the projects are placed in service and approved through a base rate case. An evidentiary hearing on the integrated resource plan was held on May 6, 2026, and evidentiary hearings on the CPCN application were held on July 16 and 17, 2026. A final order is expected from the WVPSC in the second half of 2026.

Current wording

On October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC. To allow MP and PE to meet their PJM adequacy requirements, the plan proposes, among other things, near-term market capacity purchases and the addition of 70 MWs of solar generation by 2028 and 1,200 MWs of natural gas combined cycle generation by 2031. On February 13, 2026, MP and PE filed a CPCN to construct and operate the proposed generation resources, including a 1,200 MW combined cycle gas turbine plant, that will be known as the Maidsville Energy Center, and 70 MWs of solar generation capacity, for an estimated capital investment of approximately $2.7 billion as of the filing date. The request also includes a surcharge designed to recover financing costs during development and construction of the projects, as well as a transition to recovery in base rates once the projects are placed in service and approved through a base rate case. An evidentiary hearing on the integrated resource plan was held on May 6, 2026, and evidentiary hearings on the CPCN application were held on July 16 and 17, 2026. A final order is expected from the WVPSC in the fourth quarter of 2026.

Previous wording

On May 15, 2026, MP and PE filed a base rate proceeding proposing an increase in electric rates of $188.4 million, an approximate 10.6% increase in total revenues. The filing includes a base rate increase of $174.6 million and a proposed reliability program and surcharge of $13.8 million. As an alternative, MP and PE requested a phased approach of two increases of $37.9 million effective August 1, 2026, and $37.6 million effective June 1, 2027, with a commitment to abstain from filing another base rate case until April 1, 2028. The WVPSC issued a procedural order on May 21, 2026, on the alternative two-phase approach setting it for hearing on July 9, 2026. On June 11, 2026, the WVPSC staff filed a motion to dismiss, which the WVPSC denied on July 2, 2026. An order is expected from the WVPSC by the end of July 2026. If approved as proposed, new rates associated with the first phase would become effective in August 2026.

Current wording

On May 15, 2026, MP and PE filed a base rate proceeding proposing an increase in electric rates of $188.4 million, an approximate 10.6% increase in total revenues. The filing includes a base rate increase of $174.6 million and a proposed reliability program and surcharge of $13.8 million. As an alternative, MP and PE requested a phased approach of two increases of $37.9 million effective August 1, 2026, and $37.6 million effective June 1, 2027, with a commitment to abstain from filing another base rate case until April 1, 2028. The WVPSC issued a procedural order on May 21, 2026, on the alternative two-phase approach setting it for hearing on July 9, 2026. On June 11, 2026, the WVPSC staff filed a motion to dismiss, which the WVPSC denied on July 2, 2026. The WVPSC held a hearing on the alternative two-phase approach on July 9, 2026. On July 31, 2026, the WVPSC issued an order approving the alternative two-phase approach without modification. New rates associated with the first phase became effective on August 1, 2026. The matter was appealed to the Supreme Court of Appeals of West Virginia on August 31, 2026 and remains pending before the court. MP and PE cannot predict the outcome of this appeal.

Previous wording

•Higher transmission revenues from regulated capital investments that increased rate base and true-up adjustments from the annual forward-looking transmission rate filings;

Current wording

•Higher transmission revenues from regulated capital investments that increased rate base;

Previous wording

Distribution deliveries in the second quarter of 2026 for the residential and commercial customer classes were lower than the same period of 2025 due to the impact of the milder weather temperatures. Cooling degree days in the second quarter of 2026 were consistent with the same period of 2025 and 6% above normal. Heating degree days in the second quarter of 2026 were 5% below the same period of 2025 and 8% below normal. Industrial deliveries in the second quarter of 2026 compared to the same period of 2025 increased primarily due to growth in the manufacturing sector.

Current wording

Cooling degree days in the third quarter of 2026 were 5% above the same period of 2025 and 4% above normal. Heating degree days in the third quarter of 2026 were 20% above the same period of 2025 and 16% below normal. Industrial deliveries in the third quarter of 2026 compared to the same period of 2025 increased primarily due to growth in the manufacturing, oil and gas extraction, and advanced technologies sectors.

Previous wording

•A reduction in ARO liabilities associated with CCR rules based on the completion of engineering studies and field analysis of certain sites; and

Current wording

•A reduction in ARO liabilities associated with CCR rules based on the completion of engineering studies and field analysis of certain sites during 2026;

Previous wording

•Higher interest expenses from new long-term debt and convertible note issuances, net of redemptions and repayments.

Current wording

•Higher interest expenses from new long-term debt and convertible note issuances, net of redemptions and repayments, and higher capitalized financing costs; and

Previous wording

Distribution deliveries in the first six months of 2026 for the commercial customer class were higher than the same period of 2025, while deliveries to residential customers decreased slightly. Cooling degree days in the first six months of 2026 were 1% above the same period of 2025 and 7% above normal. Heating degree days in the first six months of 2026 were 1% above the same period of 2025 and 1% above normal. Industrial deliveries in the second quarter of 2026 compared to the same period of 2025 increased primarily due to growth in the oil and gas extraction and manufacturing sectors.

Current wording

Cooling degree days in the first nine months of 2026 were 4% above the same period of 2025 and 5% above normal. Heating degree days in the first nine months of 2026 were 1% above the same period of 2025 and near normal. Industrial deliveries in the first nine months of 2026 compared to the same period of 2025 increased primarily due to growth in the manufacturing, oil and gas extraction and advanced technologies sectors.

Previous wording

Financial results for FirstEnergy’s business segments for the second quarter of 2026 and 2025 were as follows:

Current wording

Financial results for FirstEnergy’s business segments for the third quarter of 2026 and 2025 were as follows:

Previous wording

Distribution services revenues decreased $41 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to lower customer usage as a result of the milder weather temperatures and customer restitution and refunds resulting from the Ohio Companies’ PUCO-approved settlement. These restitution and refunds were recognized in the fourth quarter of 2025 and are offset by the amortization of a regulatory liability resulting in no impact to earnings in 2026. The revenue decrease was partially offset by higher rider revenues associated with certain regulated investment programs and the absence in 2026 of customer credits associated with the PUCO-approved Ohio Stipulation recognized in 2025. Additionally, revenues increased due to the higher recovery of transmission expenses, which have no material impact to earnings.

Current wording

Distribution services revenues increased $117 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to higher customer usage, higher rider revenues associated with certain regulated investment programs and the absence in 2026 of customer credits associated with the PUCO-approved Ohio Stipulation recognized in 2025. Additionally, revenues increased due to the higher recovery of transmission expenses, which have no material impact to earnings.

Previous wording

Generation sales revenues increased $85 million in the second quarter of 2026, as compared to the same period in 2025, primarily due to higher non-shopping generation auction rates. Total generation provided by alternative suppliers as a percentage of total MWh deliveries for the Ohio Companies and FE PA was flat in the second quarter of 2026, as compared to the same period of 2025. Retail and wholesale generation sales revenues have no material impact to earnings.

Current wording

Generation sales revenues increased $120 million in the third quarter of 2026, as compared to the same period in 2025, primarily due to higher non-shopping generation auction rates. Total generation provided by alternative suppliers as a percentage of total MWh deliveries for the Ohio Companies and FE PA was flat in the third quarter of 2026, as compared to the same period of 2025. Retail and wholesale generation sales revenues have no material impact to earnings.

Previous wording

•Purchased power costs, which have no material impact to earnings, increased $91 million during the second quarter of 2026, as compared to the same period of 2025, primarily due to higher unit costs as described above.

Current wording

•Purchased power costs, which have no material impact to earnings, increased $102 million during the third quarter of 2026, as compared to the same period of 2025, primarily due to higher unit costs as described above.

Previous wording

•Higher network transmission expenses of $9 million, which are deferred for future recovery, resulting in no material impact to earnings;

Current wording

•Lower network transmission expenses of $17 million, which are deferred for future recovery, resulting in no material impact to earnings.

Previous wording

•Depreciation expense increased $1 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to a higher asset base, partially offset by a change in depreciation rates effective March 1, 2026, as a result of the Ohio Base Rate Case.

Current wording

•Depreciation expense was flat in the third quarter of 2026, as compared to the same period of 2025, primarily due to a higher asset base, offset by a change in depreciation rates effective March 1, 2026, as a result of the Ohio Base Rate Case.

Previous wording

•Deferral of regulatory assets increased $65 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to higher deferred storm restoration expenses of $5 million, a $99 million increase in the amortization of a regulatory liability as a result of providing restitution and refunds to Ohio customers, as further discussed below, partially offset by a $7 million net decrease in generation and transmission deferrals, a $7 million decrease from lower deferral of costs associated with customer assistance programs, an $11 million increase in amortization associated with recovery of previously incurred storm costs and a $14 million net decrease in other deferrals.

Current wording

•Amortization of regulatory assets, net decreased $4 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to higher deferred storm restoration expenses of $122 million, partially offset by a $79 million net decrease in generation and transmission deferrals, a $12 million decrease from lower deferral of costs associated with customer assistance programs, a $14 million increase in amortization associated with recovery of previously incurred storm costs and a $13 million net decrease in other deferrals.

Previous wording

Other expense increased $4 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to higher interest expense as a result of new debt issuances since the second quarter of 2025 and lower capitalized interest, partially offset by higher pension and OPEB non-service credits.

Current wording

Other expense increased $4 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to higher interest expense as a result of new debt issuances since the third quarter of 2025, partially offset by higher pension and OPEB non-service credits.

Previous wording

Integrated segment’s earnings attributable to FE increased $7 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to higher transmission revenues from regulated capital investments that increased rate base, true-up adjustments from the annual forward-looking transmission rate filing and increased customer usage and demand.

Current wording

Integrated segment’s earnings attributable to FE increased $22 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to higher transmission revenues from regulated capital investments that increased rate base, lower operating expenses, higher pension and OPEB non-service credits and increased customer usage and demand, partially offset by higher net financing costs.

Previous wording

Distribution services revenues decreased $8 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to lower rider revenues and return of certain ZEC refunds in New Jersey as further described below. These refunds were offset by the amortization of a regulatory liability resulting in no impact to earnings. The decrease in distribution services revenues was partially offset by higher customer demands and higher recovery of transmission expenses, the recovery of which has no material impact to earnings.

Current wording

Distribution services revenues increased $2 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to higher customer usage and higher recovery of transmission expenses, the recovery of which has no material impact to earnings, partially offset by the return of certain ZEC refunds in New Jersey, as further described below. These refunds were offset by the amortization of a regulatory liability resulting in no impact to earnings.

Previous wording

•Retail generation sales increased $55 million in the second quarter of 2026, as compared to the same period in 2025, primarily due to higher non-shopping generation auction rates and higher volumes as a result of the weather temperatures. Retail generation sales, other than those in West Virginia, have no material impact to earnings.

Current wording

•Retail generation sales increased $54 million in the third quarter of 2026, as compared to the same period in 2025, primarily due to higher non-shopping generation auction rates and higher volumes as a result of the warmer weather temperatures. Retail generation sales, other than those in West Virginia, have no material impact to earnings.

Previous wording

•Wholesale generation revenues increased $47 million in the second quarter of 2026, as compared to the same period in 2025, primarily due to higher wholesale rates and capacity revenues, partially offset by lower sales volumes. The difference between current wholesale generation revenues and certain energy costs incurred is deferred for future recovery or refund, with no material impact to earnings.

Current wording

•Wholesale generation revenues increased $69 million in the third quarter of 2026, as compared to the same period in 2025, primarily due to higher wholesale rates, capacity revenues and higher sales volumes. The difference between current wholesale generation revenues and certain energy costs incurred is deferred for future recovery or refund, with no material impact to earnings.

Previous wording

Other revenues increased $41 million in the second quarter of 2026, as compared to the same period of 2025, due to higher FTR credits, which offset higher transmission congestion charges. Due to the ENEC, FTRs have no material impact to earnings.

Current wording

Other revenues increased $13 million in the third quarter of 2026, as compared to the same period of 2025, due to higher FTR credits, which offset higher transmission congestion charges. Due to the ENEC, FTRs have no material impact to earnings.

Previous wording

•Fuel costs decreased $12 million during the second quarter of 2026, as compared to the same period of 2025, primarily due to lower consumption volumes, partially offset by higher unit costs. Due to the ENEC, fuel expense has no material impact to earnings.

Current wording

•Fuel costs increased $26 million during the third quarter of 2026, as compared to the same period of 2025, primarily due to higher consumption volumes and unit costs. Due to the ENEC, fuel expense has no material impact to earnings.

Previous wording

•Purchased power costs, which have no material impact to earnings, increased $112 million during the second quarter of 2026, as compared to the same period of 2025, primarily due to higher volumes, capacity expenses and prices.

Current wording

•Purchased power costs, which have no material impact to earnings, increased $29 million during the third quarter of 2026, as compared to the same period of 2025, primarily due to higher capacity expenses and prices.

Previous wording

•Higher transmission congestion charges of $21 million. Due to the ENEC, congestion charges, net of FTR revenue, have no material impact to earnings;

Current wording

•Higher transmission congestion charges of $14 million. Due to the ENEC, congestion charges, net of FTR revenue, have no material impact to earnings;

Previous wording

•Lower other operating expenses of $3 million, primarily due to the absence in 2026 of a legal reserve recognized in the second quarter of 2025, partially offset by higher regulated generation outage spend and planned maintenance expenses.

Current wording

•Higher formula rate transmission operating and maintenance expenses of $3 million, which have no material impact to earnings;

Previous wording

•Lower planned vegetation management expenses of $6 million, primarily due to accelerated work in 2025 in Pennsylvania; and

Current wording

•Lower other operating expenses of $6 million, primarily due to planned maintenance expenses.

Previous wording

•Depreciation expense increased $3 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to a higher asset base.

Current wording

•Depreciation expense increased $3 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to a higher asset base.

Previous wording

Stand-Alone Transmission segment’s earnings attributable to FE increased $22 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to higher revenues from regulated capital investments that increased rate base, true-up adjustments from the annual forward-looking transmission rate filings, and higher capitalized financing costs, partially offset by higher interest expenses from new long-term debt issuances.

Current wording

Stand-Alone Transmission segment’s earnings attributable to FE decreased $37 million in the third quarter of 2026, as compared to the same period of 2025, primarily due to the absence of a discrete tax benefit related to a remeasurement of excess deferred income taxes recognized in 2025 and higher net financing costs, partially offset by higher revenues from regulated capital investments that increased overall rate base.

Previous wording

Stand-Alone Transmission segment’s total revenues increased $113 million, primarily due to a higher overall rate base, higher recovery of transmission operating expenses, and true-up adjustments from the annual forward-looking transmission rate filings.

Current wording

Stand-Alone Transmission segment’s total revenues increased $13 million, primarily due to a higher overall rate base.

Showing the first 40 of 169 pairs. Open the source sections for the rest.

Rearranged current paragraphs (10)

Current report — wording carried from elsewhere

•The absence in 2026 of debt redemption costs recognized in 2025; and

Current report — wording carried from elsewhere

The decrease in losses was partially offset by:

Current report — wording carried from elsewhere

On October 23, 2026, FE, the Electric Companies, Transmission Companies, and FET, each entered into an amended credit facility to, among other things: (i) extend the maturity date of each credit facility for an additional one-year period (a) from October 20, 2029 to October 18, 2030 for the KATCo credit facility, (b) from October 20, 2030 to October 20, 2031 for the FET credit facility and (c) from October 18, 2029 to October 18, 2030 for the remaining Amended Credit Facilities; (ii) allow for the option to extend the Credit Agreement by up to two additional one-year periods; and (iii) increase the letters of credit commitment amount from $100 million to $400 million for the MP and PE credit facility.

Current report — wording carried from elsewhere

As of September 30, 2026, FE PA could incur approximately $4.4 billion of additional debt or incur an approximate $2.4 billion reduction to equity, as defined under the debt to capital covenant, and FE PA would remain within the limitations of the financial covenant requirements of FE PA's credit facility.

Current report — wording carried from elsewhere

FirstEnergy has pledged to achieve carbon neutrality by 2050 with respect to GHGs within FirstEnergy’s direct operational control (known as Scope 1 emissions). FirstEnergy’s ability to achieve its GHG reduction goal is subject to its ability to make operational changes and is conditioned upon numerous risks, many of which are outside of its control. With respect to

Current report — wording carried from elsewhere

On May 8, 2024, the EPA issued the legacy CCR rule, which finalized changes to the CCR regulations addressing inactive surface impoundments at inactive electric utilities, known as legacy CCR surface impoundments. The rule extends 2015 CCR Rule requirements for groundwater monitoring and protection, operational and reporting procedures as well as closure requirements to impoundments and landfills that were not originally included for coverage by the 2015 CCR Rule. Furthermore, the EPA’s interpretations of the EPA CCR regulations continue to evolve through enforcement and other regulatory actions. FirstEnergy is currently assessing the potential impacts of the final rule, including a review of additional sites to which the new rule might be applicable. On February 13, 2025, the U.S. Department of Justice filed a motion on behalf of the EPA in the D.C.

Current report — wording carried from elsewhere

For additional information with respect to FE PA, please see the information contained in FirstEnergy’s Management’s Discussion and Analysis of Financial Condition and Results of Operations under the following subheadings, which information is incorporated by reference herein: Executive Summary and Recent Developments, Regulatory Assets and Liabilities, Capital Resources and Liquidity, Guarantees and Other Assurances, Market Risk Information, Credit Risk, Outlook and New Accounting Pronouncements.

Current report — wording carried from elsewhere

•Higher energy efficiency and other state mandated program costs of $13 million, which were deferred for future recovery, resulting in no material impact to earnings; and

Current report — wording carried from elsewhere

▪Lower uncollectible expenses of $9 million;

Current report — wording carried from elsewhere

•The absence in 2026 of $6 million of severance and related costs associated with FirstEnergy’s organizational changes announced and recognized in the first quarter of 2025; and
Rearranged previous paragraphs (23)

Previous report — wording carried elsewhere

JCP&L expects to file a base rate case in August 2026.

Previous report — wording carried elsewhere

•The absence in 2026 of debt redemption costs recognized in 2025;

Previous report — wording carried elsewhere

•A reduction in ARO liabilities associated with CCR rules based on the completion of engineering studies and field analysis of certain sites; and

Previous report — wording carried elsewhere

•The absence in 2026 of debt redemption costs recognized in 2025.

Previous report — wording carried elsewhere

•Higher investigation and other related costs associated with the ongoing government investigations and ongoing litigation;

Previous report — wording carried elsewhere

•A $10 million reduction in ARO liabilities associated with CCR rules based on the completion of engineering studies and field analysis of certain sites.

Previous report — wording carried elsewhere

•General taxes increased $8 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to higher property and gross receipts taxes.

Previous report — wording carried elsewhere

Transmission revenues increased $38 million in the second quarter of 2026, as compared to the same period of 2025, primarily due to higher recovery of transmission operating expenses, true-up adjustments from the annual forward-looking transmission rate filing and higher rate base from regulated investment programs.

Previous report — wording carried elsewhere

•Higher vegetation management expenses of $8 million, which were mostly deferred for future recovery, resulting in no material impact to earnings; and

Previous report — wording carried elsewhere

•Deferral of regulatory assets increased $273 million in the first six months of 2026, as compared to the same period of 2025, primarily due to $113 million in higher deferral of storm related expenses, a $5 million increase related to the amortization of a regulatory liability associated with ZEC refunds, further described below, and a $155 million net increase from higher generation and transmission related deferrals.

Previous report — wording carried elsewhere

As of June 30, 2026, JCP&L’s net deficit in working capital (current assets less current liabilities) was approximately $207 million, primarily due to accounts payable, short-term borrowings, accrued interest, and compensation and benefits. JCP&L believes its cash from operations and available liquidity will be sufficient to meet its current working capital needs. See further discussion on cash from operations below.

Previous report — wording carried elsewhere

In the normal course of business, FE and its subsidiaries may enter into physical or financially settled contracts for the sale and purchase of electric capacity, energy, fuel and emission allowances. Certain agreements contain provisions that require FE or its subsidiaries to post collateral. This collateral may be posted in the form of cash or credit support with thresholds contingent upon FE’s or its subsidiaries’ credit rating from each of the major credit rating agencies. The collateral and credit support requirements vary by contract and by counterparty.

Previous report — wording carried elsewhere

JCP&L has various financial and performance guarantees and indemnifications, which are issued in the normal course of business. These contracts include stand-by LOCs and surety bonds. JCP&L enters into these arrangements to facilitate commercial transactions with third parties by enhancing the value of the transaction to the third party. The maximum potential amount of future payments JCP&L could be required to make under these guarantees as of June 30, 2026, was $50 million.

Previous report — wording carried elsewhere

These credit-risk-related contingent features stipulate that if JCP&L were to be downgraded or lose its investment grade credit rating (based on its senior unsecured debt rating), it would be required to provide additional collateral. The following table discloses the potential additional credit rating contingent contractual collateral obligations as of June 30, 2026:

Previous report — wording carried elsewhere

EGSs that fail to provide the contracted service. All New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates.

Previous report — wording carried elsewhere

ENEC rate is typically updated annually and MP and PE filed their ENEC filing on August 29, 2025, for rates effective January 1, 2026. During the first quarter of 2026, MP and PE incurred significant PJM charges during the Winter Storm Fern weather event totaling $145 million, which were deferred for future recovery as part of the ENEC.

Previous report — wording carried elsewhere

•In re FirstEnergy Corp. Securities Litigation (S.D. Ohio); on July 28, 2020, and August 21, 2020, purported stockholders of FE filed putative class action lawsuits alleging violations of the federal securities laws. Those actions have been consolidated and a lead plaintiff, the Los Angeles County Employees Retirement Association, has been appointed by the court. A consolidated complaint was filed on February 26, 2021. The consolidated complaint alleges, on behalf of a proposed class of persons who purchased FE securities between February 21, 2017, and July 21, 2020, that FE and certain current or former FE officers violated Sections 10(b) and 20(a) of the Exchange Act by making alleged misrepresentations or omissions concerning FE’s business and results of operations. The consolidated complaint also alleges that FE, certain current or former FE officers and directors, and a group of underwriters violated Sections 11,

Previous report — wording carried elsewhere

•Higher formula rate transmission operating and maintenance expenses of $8 million, which have no material impact to earnings.

Previous report — wording carried elsewhere

•Depreciation expense decreased $2 million in the second quarter of 2026, as compared to the same period of 2025, primarily dueto the accelerated amortization of legacy smart meters in New Jersey, which concluded in December 2025, partially offset bya higher asset base.

Previous report — wording carried elsewhere

JCP&L’s financial results for the six months ended June 30, 2026, and 2025, were as follows:

Previous report — wording carried elsewhere

(1) Previously issued 2025 JCP&L amounts have been revised due to the correction of immaterial errors as discussed in Note 1., "Organization and Basis of Presentation," of the Combined Notes to Financial Statements of the Registrants.

Previous report — wording carried elsewhere

•Higher formula rate transmission operating and maintenance expenses of $11 million, which have no material impact to earnings.

Previous report — wording carried elsewhere

•Lower other operating expenses of $17 million, primarily due to planned maintenance expenses and the absence in 2026 of a legal reserve recognized in the second quarter of 2025.