Skip to main content

FIRSTENERGY CORP

For the period ended Mar 31, 2025. Filed Apr 30, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed Apr 30, 2025

FE$46.43-1.4%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-09-30; filed 2024-10-29.

0001031296-24-000055

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 487 previous paragraphs and 352 current paragraphs.

86 unchanged; 152 reworded; 99 added; 228 removed; 21 previous and 15 current paragraphs rearranged.

Tables are not compared: 29 previous and 27 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (99)

Current report

•Higher revenues associated with the implementation of base rate cases in New Jersey, West Virginia and Pennsylvania;

Current report

•Higher customer usage as a result of the colder weather temperatures;

Current report

•Higher revenues from regulated capital investments that increased rate base;

Current report

•The absence of a $53 million charge at JCP&L in connection with the base rate case settlement agreement in the first quarter of 2024, as further discussed below;

Current report

•The absence of discrete tax charges related to the FET Equity Interest Sale and PA Consolidation in the first quarter of 2024.

Current report

•The absence of a benefit associated with the approval by the WVPSC to recover costs of certain retired generation stations in the first quarter of 2024;

Current report

•The expected elimination of ATSI’s 50 basis point adder associated with RTO membership as a result of the Sixth Circuit ruling in January 2025;

Current report

•Costs associated with the announced organizational changes; and

Current report

During 2024, as a result of the evaluation of closure options for McElroy’s Run and the adjacent landfill, AE Supply reviewed its ARO and future expected costs to remediate, resulting in an increase to the ARO liability of $87 million. AE Supply transferred the McElroy’s Run CCR impoundment facility and adjacent dry landfill and related remediation obligations on March 4, 2025, pursuant to the environmental liability transfer agreement dated February 3, 2025, with a subsidiary of IDA Power, LLC. Pursuant to the agreement, AE Supply established a $160 million escrow account that AE Supply will fund over five years and is secured by a surety bond, which is guaranteed by FE. In connection with the transfer, AE Supply made a $15 million cash payment to the escrow account, recognized a $130 million liability, based on a 4.8% weighted average discount rate over the contract term, associated with its remaining obligation to fund the escrow account over the next five years, and derecognized the ARO, resulting in an immaterial impact to earnings.

Current report

On March 12, 2025, the EPA announced a series of planned deregulatory actions, including reconsideration of the final legacy CCR rules. We continue to monitor EPA's actions related to CCR; however, the ultimate impact is unknown at this time and subject to the outcome of the litigation and any future state regulatory actions.

Current report

On March 24, 2025, FirstEnergy internally announced organizational changes to FirstEnergy employees. These organizational changes are intended to align FirstEnergy’s organization with its new business model, which is designed to make FE more efficient and sustainable while placing responsibility and accountability closer to customers, employees and regulators. The changes are also consistent with FirstEnergy’s focus on operations and maintenance expense discipline. These organizational changes resulted in approximately two hundred employees being reassigned and FirstEnergy reducing its workforce by less than three percent. As a result, FirstEnergy recognized a pre-tax charge of approximately $26 million ($5 million at JCP&L) during the first quarter of 2025, which is included within “Other operating expenses” on each of the Registrant’s Statements of Income and Comprehensive Income.

Current report

On January 31, 2025, the Ohio Companies filed an application with the PUCO for ESP VI, which would begin concurrently with the effective date of any new base distribution rates resulting from the Ohio Companies’ pending base rate case and continue through May 31, 2028. ESP VI proposes to continue existing riders to support continued maintenance of the distribution system, and to reestablish riders to recover vegetation management and storm restoration expenses. ESP VI also includes provisions supporting affordability and enhancing the customer experience. The PUCO held a technical conference on March 12, 2025. Pending legislation in Ohio would, if enacted, eliminate the PUCO’s ability to authorize future ESPs; therefore, ESP VI could not move forward. Under such legislation, the Ohio Companies would be allowed to continue ESP IV until their final auction delivery period, which is May 31, 2029, and then ESP IV must terminate.

Current report

Distribution Segment — First Quarter of 2025 Compared with First Quarter of 2024

Current report

Distribution’s total revenues increased $169 million as a result of the following sources:

Current report

Total operating expenses increased $96 million, primarily due to:

Current report

•Other operating expenses increased $40 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to:

Current report

•Higher energy efficiency and other state mandated program costs of $19 million, which were deferred for future recovery, resulting in no material impact to earnings; and

Current report

•Higher other operating expenses of $11 million, primarily due to severance and related costs associated with FirstEnergy’s organizational changes announced in the first quarter of 2025.

Current report

•Lower storm restoration expenses of $30 million, which were deferred for future recovery; and

Current report

•Deferral of regulatory assets decreased $69 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to a $69 million net decrease in generation and transmission related deferrals, and a $30 million decrease from lower deferred storm restoration expenses, partially offset by a $10 million net increase in other deferrals, and $20 million of higher amortization expenses resulting from recovery of previously deferred storm costs and customer assistance programs from the implementation of the Pennsylvania base rate case in 2025.

Current report

•General taxes increased $18 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to higher property and gross receipts taxes.

Current report

Other expense increased $1 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to lower interest income on regulated money pool investments being offset by lower interest expense as a result of long-term debt redemptions since the first quarter of 2024, partially offset by higher average short-term borrowings.

Current report

Distribution segment’s effective tax rate was 21.6% and 19.9% for the three months ended March 31, 2025 and 2024, respectively. The increase in the effective tax rate is primarily due to lower tax benefits from state flow-through and an increase in the amortization of excess deferred income taxes.

Current report

Integrated Segment — First Quarter of 2025 Compared with First Quarter of 2024

Current report

Integrated segment’s earnings attributable to FE increased $54 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to the implementation of base rate cases in New Jersey and West Virginia, higher customer usage and demand, higher revenues from regulated investment programs, lower operating expenses, and the absence of a $53 million charge at JCP&L in connection with the base rate case settlement agreement in the first quarter of 2024, as further discussed below, partially offset by costs associated with the announced organizational changes and the absence of a benefit associated with the approval by the WVPSC to recover costs of certain retired generation stations in the first quarter of 2024.

Current report

Integrated’s total revenues increased $254 million as a result of the following sources:

Current report

Total operating expenses increased $211 million, primarily due to:

Current report

•Purchased power costs, which have no material impact to earnings, increased $83 million during the first quarter of 2025, as compared to the same period of 2024, primarily due to higher unit costs, sales volumes and capacity expenses.

Current report

•Other operating expenses decreased $17 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to:

Current report

•Lower storm restoration expenses of $4 million, which were mostly deferred for future recovery; and

Current report

•Higher network transmission expenses of $22 million, which were deferred for future recovery, resulting in no material impact to earnings;

Showing the first 40 of 99 passages. Open the source sections for the rest.

Removed paragraphs (228)

Previous report

On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, including OE subsidiary Penn, rendering FE PA a new, single operating entity and the successor-in-interest to all assets and liabilities of the Pennsylvania Companies. As of January 1, 2024, FE PA is FE’s only regulated distribution power company in Pennsylvania encompassing the operations previously conducted individually by the Pennsylvania Companies. FE PA serves an area with a population of approximately 4.5 million and operates under the rate districts of the former Pennsylvania Companies. FirstEnergy continues to evaluate the legal, financial, operational and branding benefits of consolidating the Ohio Companies into a single Ohio power company.

Previous report

Also on January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo, and PN and ME contributed their respective Class B equity interests of MAIT to FE, which were ultimately contributed to FET in exchange for a special purpose membership interest in FET. So long as FE holds the FET special purpose membership interests, it will receive 100% of any Class B distributions made by MAIT.

Previous report

During the first quarter of 2024, FirstEnergy’s segment reporting structure was modified to increase transparency for leadership and investors, simplify the presentation to corresponding legal entities, and align FirstEnergy’s earnings, cash flows and balance sheets at the business unit level. FirstEnergy’s reportable segments are as follows:

Previous report

The Integrated segment includes the distribution and transmission operations under JCP&L, MP and PE, as well as MP’s regulated generation operations, representing $8.7 billion in 2023 rate base. The Integrated segment distributes electricity to approximately two million customers in New Jersey, West Virginia and Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and operates 3,604 MWs of regulated net maximum generation capacity located primarily in West Virginia and Virginia. The segment will also include MP and PE’s 50 MWs of solar generation at five sites in West Virginia once complete. The first two solar generation sites were completed and placed in-service in January and September 2024, representing 24 MWs of net maximum generation capacity. Construction of the remaining three sites is expected to be completed no later than the end of 2025. The remaining three sites are expected to provide 26 MWs of net maximum generation capacity.

Previous report

Corporate/Other reflects corporate support and other costs not charged or attributable to the Electric Companies or Transmission Companies, including FE’s retained pension and OPEB assets and liabilities of former subsidiaries, interest expense on FE’s holding company debt and other investments or businesses that do not constitute an operating segment, including FEV’s investment of 33-1/3% equity ownership in Global Holding. Additionally, reconciling adjustments for the elimination of inter-segment transactions are included in Corporate/Other. Also included in Corporate/Other for segment reporting is 67 MWs of net maximum generation capacity, representing AE Supply’s OVEC capacity entitlement. As of September 30, 2024, Corporate/Other had approximately $6.1 billion of FE’s holding company debt.

Previous report

FirstEnergy believes that this segment reporting serves to provide:

Previous report

•Greater transparency into our business unit performance;

Previous report

•Alignment with our cash flow, credit metrics, balance sheet and earnings to the companies comprising each segment;

Previous report

•Simplification of our segment reporting so that each entire entity resides within a segment; and

Previous report

On February 2, 2023, FE, along with FET, entered into the FET P&SA II with Brookfield and the Brookfield Guarantors, pursuant to which FE agreed to sell to Brookfield at the closing, and Brookfield agreed to purchase from FE, an incremental 30% equity interest in FET for a purchase price of $3.5 billion. The FET Equity Interest Sale closed on March 25, 2024 and FET continues to be consolidated in FirstEnergy’s financial statements. The purchase price was paid in part by the issuance of two promissory notes at closing having an aggregate principal amount of $1.2 billion with: (i) one promissory note having an aggregate principal amount of $750 million, at an interest rate of 5.75% per annum, with a maturity date of September 25, 2025 and (ii) one promissory note having an aggregate principal amount of $450 million, at an interest rate of 7.75% per annum, with a maturity date of December 31, 2024. The remaining $2.3 billion of the purchase price was paid in cash at closing. On July 17, 2024, Brookfield paid FE approximately $1.2 billion in full satisfaction of the promissory notes. Interest income associated with the promissory notes was $24 million for the nine months ended September 30, 2024 and is reported within “Miscellaneous income, net” on FirstEnergy’s Consolidated Statements of Income. As a result of the consummation of the transaction, Brookfield’s interest in FET increased from 19.9% to 49.9%, while FE retained the remaining 50.1% ownership interests of FET.

Previous report

Powered by its employees and guided by its experienced leadership team and engaged FE Board, FirstEnergy is accelerating its transformation into a premier electric company. The FE Board and FirstEnergy’s executive management team are aligned behind a business model grounded in investing, operating, recovering costs and financing our regulated electric company operations. This business model aims to create a “virtuous cycle” that in turn serves to improve reliability and the customer experience, grow rate base, engage employees, improve returns and maintain a strong balance sheet. Along with an unwavering commitment to ethics and integrity, performance excellence and continuous improvement, FirstEnergy anticipates that strong execution of this model will help achieve its strategic objectives and deliver value to its investors.

Previous report

With a diversified asset mix, improved balance sheet and a strong affordability position, FirstEnergy is well positioned to significantly enhance the customer experience and provide value to its investors.

Previous report

FirstEnergy invests in its regulated operations to improve reliability and the customer experience, and in its people to attract, retain and develop talented, diverse and engaged employees to carry out its mission. It aims to do so through Energize365.

Previous report

A robust plan for customer-focused growth, Energize365 is the centerpiece of FirstEnergy’s regulated distribution and transmission capital investment strategy that aims to utilize all investments to support our EESG and strategic priorities including clean energy, improving grid reliability and resiliency, and supports the clean energy transition. Through the Energize365 program, FirstEnergy expects to spend approximately $26 billion in system-wide capital investments from 2024 through 2028. FirstEnergy expects that these investments will comprise the Distribution segment (29%), the Integrated segment (39%), and the Stand-Alone Transmission segment (32%), focusing on the following:

Previous report

•Energy Transition: FirstEnergy expects to make Distribution and Transmission investments in order to support improvements in grid reliability and resiliency and support interconnection of renewable sources, including through:

Previous report

▪Clean Energy: West Virginia solar generation, energy efficiency, electric vehicle infrastructure and energy storage;

Previous report

▪Grid Modernization: Programs to drive system resiliency through automation technology and communication, including Ohio's phases one and two of the Ohio Companies’ distribution grid modernization plans, Pennsylvania's LTIIP, New Jersey's EnergizeNJ, and implementing advanced metering infrastructure.

Previous report

•Operational Flexibility Projects that build capacity and support the evolving grid such as interconnection of New Jersey offshore wind and data center load;

Previous report

•Enhance system performance by implementing new designs and technologies to reduce load at risk; and

Previous report

•Infrastructure Renewal: Base distribution projects to address aging infrastructure.

Previous report

•Generation Maintenance: Projects to maintain operations of fossil fuel plants and remain compliant with environmental regulations through the end of their useful life.

Previous report

•FirstEnergy believes there is a continued long-term pipeline of investment opportunities for its existing distribution and transmission infrastructure beyond those identified through 2028, which are expected to strengthen grid and cyber security and make the transmission system more reliable, robust, secure and resistant to extreme weather events, with improved operational flexibility.

Previous report

•Revitalizing its leadership team. During the second quarter of 2024, FirstEnergy appointed four executives to oversee the Ohio, Pennsylvania, New Jersey and Transmission operations. FirstEnergy anticipates naming an executive to oversee its combined West Virginia and Maryland operations in the near term. FirstEnergy continues to make progress in filling several key executive positions in an organization that will be structured to allow greater execution at the business unit level.

Previous report

FirstEnergy will continue to engage its skilled, trained, talented and diverse team of employees to effectively implement its investment plans, seek opportunities for continuous improvement as it delivers safe, reliable and affordable electricity to our customers, and deliver value to its investors. It aims to do so through the following:

Previous report

•Enhancing the focus on the customer. FirstEnergy is shifting more decision-making and accountability for our operations closer to our customers, regulators and employees doing the work. FirstEnergy’s new operating structure is organized by: Ohio, Pennsylvania, New Jersey, West Virginia/Maryland and FirstEnergy’s standalone Transmission properties. This structure will foster better execution at the business unit level.

Previous report

•Embracing a continuous improvement mindset. FirstEnergy faced numerous financial headwinds in 2023, including weather and the impact of market conditions on its pension plan. Through a determined effort by its employees, FirstEnergy focused on the things within its control: managing costs, enhancing the customer experience and seeking opportunities for continuous improvement.

Previous report

FirstEnergy is working to establish a track record of strong execution. Operating effectively leads to strong, predictable results and enhances credibility with our stakeholders. In turn, FirstEnergy builds supportive relationships with regulators, customers and intervenors in an effort to drive positive rate outcomes that support recovery of its investments.

Previous report

In order to achieve important regulatory milestones, FirstEnergy has an active regulatory calendar to support its regulated growth strategy and address the critical investments that support reliability and a smarter and cleaner electric grid. This includes the following:

Previous report

•On January 13, 2023, MP and PE filed a request with the WVPSC seeking approval of new depreciation rates for existing and future capital assets. On August 22, 2023, the parties filed a unanimous settlement of the case recommending a $33 million annual increase in depreciation expense, effective April 1, 2024, but deferred issues related to a change in the net energy metering credit. An order was issued on March 26, 2024 approving the settlement without modification.

Previous report

•On March 16, 2023, JCP&L filed a base rate case in New Jersey, requesting a $185 million increase in base distribution revenues to support investments to strengthen the energy grid, enhance the customer experience and provide assistance to low-income and senior citizen customers. February 1, 2024, JCP&L, joined by various parties, filed a stipulated settlement with the NJBPU resolving JCP&L’s request for a distribution base rate increase. The settlement, which was approved by the NJBPU on February 14, 2024, provides for an $85 million annual base distribution revenue increase for JCP&L, which became effective for customers on June 1, 2024.

Showing the first 40 of 228 passages. Open the source sections for the rest.

Reworded paragraphs (152)

Previous wording

FirstEnergy is dedicated to integrity, safety, reliability and operational excellence and is principally involved in the transmission, distribution and generation of electricity through its reportable segments: Distribution, Integrated and Stand-Alone Transmission. Its electric distribution companies form one of the nation's largest investor-owned electric systems, serving over six million customers in Ohio, Pennsylvania, New Jersey, West Virginia, Maryland and New York. FirstEnergy’s transmission subsidiaries operate more than 24,000 miles of transmission lines that connect the Midwest and Mid-Atlantic regions and two regional transmission operation centers. AGC and MP control 3,604 MWs of net maximum generation capacity.

Current wording

FirstEnergy is dedicated to integrity, safety, reliability and operational excellence and is principally involved in the transmission, distribution and generation of electricity through its reportable segments: Distribution, Integrated and Stand-Alone Transmission. Its electric distribution companies form one of the nation's largest investor-owned electric systems, serving over six million customers in Ohio, Pennsylvania, New Jersey, West Virginia, Maryland and New York. FirstEnergy’s transmission subsidiaries operate more than 24,000 miles of transmission lines that connect the Midwest and Mid-Atlantic regions and two regional transmission operation centers. As of March 31, 2025, AGC and MP control 3,604 MWs of net maximum generation capacity.

Previous wording

Earnings attributable to FE from continuing operations was $419 million or $0.73 per share (basic and diluted) in the third quarter of 2024 compared to $421 million or $0.74 per basic share ($0.73 diluted) in the third quarter of 2023, representing a decrease of $2 million that was primarily due to the following:

Current wording

Earnings attributable to FE was $360 million or $0.62 per share (basic and diluted) in the first quarter of 2025 compared to $253 million or $0.44 per share (basic and diluted) in the first quarter of 2024, representing an increase of $107 million that was primarily due to the following:

Previous wording

•Lower interest expense primarily due to the redemption of certain FE long-term debt and lower short-term borrowings; and

Current wording

•Lower interest expense as a result of long-term debt redemptions since the first quarter of 2024 and lower short-term borrowings; and

Previous wording

Residential and commercial distribution deliveries were impacted by higher customer usage as a result of the weather. Cooling degree days in the third quarter of 2024 were 15% above the same period of 2023 and 7% above normal.

Current wording

Residential and commercial distribution deliveries were impacted by higher customer usage as a result of the weather. Heating degree days in the first quarter of 2025 were 15% above the same period of 2024 and flat to normal.

Previous wording

On May 8, 2024, the EPA finalized changes to the CCR regulations addressing inactive surface impoundments at inactive electric utilities, known as legacy CCR surface impoundments. The rule extends 2015 CCR rule requirements for groundwater monitoring and protection procedures, operational and reporting procedures as well as closure requirements for impoundments and landfills that were not originally included for coverage by the 2015 CCR rule. In anticipation of such expenditures, FirstEnergy performed a preliminary assessment of former CCR disposal sites and calculated an initial estimate applying historical experience in remediating comparable sites. As a result, FirstEnergy recorded a $125 million increase to its ARO during the second quarter of 2024, of which $120 million is included in “Other operating expenses” on the Consolidated Statements of Income and was not capitalized as an asset retirement cost since the associated plants do not have future cash flows. During the third quarter of 2024, FirstEnergy determined that an additional site became applicable under the CCR rules, which resulted in a $25 million increase to the ARO, with a corresponding increase to the asset retirement cost.

Current wording

On May 8, 2024, the EPA finalized changes to the CCR regulations addressing inactive surface impoundments at inactive electric utilities, known as legacy CCR surface impoundments, and in November 2024 and January 2025, the EPA made several technical corrections to the rule. The rule extends 2015 CCR rule requirements for groundwater monitoring and protection procedures, operational and reporting procedures, as well as closure requirements for impoundments and landfills that were not originally included for coverage by the 2015 CCR rule. As a result, during 2024, FirstEnergy performed a preliminary assessment of former CCR disposal sites and calculated an initial estimate applying historical experience in remediating comparable sites and recorded a $139 million increase to its ARO in 2024. JCP&L did not have any legacy CCR disposal sites that were applicable to the new CCR rule.

Previous wording

• On July 26, 2024, FE, Virginia Electric and Power Company, a subsidiary of Dominion Energy, Inc. and Transource Energy, LLC, a subsidiary of American Electric Power, Inc. entered into a joint proposal agreement in connection with PJM’s Regional Transmission Expansion Plan Open Window 1 process in September 2024. Pursuant to such joint proposal agreement, FE (through the subsidiaries of FET), Virginia Electric and Power Company and Transource Energy, LLC jointly proposed certain regional electric transmission projects for PJM's consideration during the Open Window process. PJM is expected to approve selected projects in the first quarter of 2025.

Current wording

On July 26, 2024, FE, VEPCO and Transource Energy, LLC, a subsidiary of AEP, entered into a joint proposal agreement in connection with PJM’s 2024 Regional Transmission Expansion Plan Open Window 1 process. Pursuant to such joint proposal agreement, FET, VEPCO and Transource Energy, LLC jointly proposed certain regional electric transmission projects for PJM's consideration during the Open Window process. On November 25, 2024, FET, Dominion High Voltage MidAtlantic, Inc., an affiliate of VEPCO, and Transource Energy, LLC, formed Valley Link, which is the holding company responsible for managing and executing any projects awarded by PJM, and entered into a limited liability agreement. On February 26, 2025, PJM selected certain of the joint proposed projects, which included approximately $3 billion in investments for Valley Link to both build new and upgrade existing transmission infrastructure.

Previous wording

FirstEnergy also expects to continue returning value to shareholders. In March 2024, the FE Board declared a $0.015 per share increase to the quarterly common stock dividend payable June 1, 2024, to $0.425 per share, which represents an approximate 6% increase compared to dividends declared in 2023. Modest dividend growth is expected to enable enhanced shareholder returns, while still allowing for continued substantial regulated investments. Dividend payments are subject to declaration by the FE Board, and future dividend decisions determined by the FE Board may be impacted by earnings growth, credit metrics and other business conditions.

Current wording

FirstEnergy continues to return value to shareholders. In March 2025, the FE Board declared a $0.02 per share increase to the quarterly common stock dividend payable June 1, 2025, to $0.445 per share, which represents an increase of more than 11% in annual dividend declarations since 2023. Modest dividend growth is expected to enable enhanced shareholder returns, while still allowing for continued substantial regulated investments. Dividend payments are subject to declaration by the FE Board, and future dividend decisions determined by the FE Board may be impacted by earnings growth, credit metrics and other business conditions.

Previous wording

•On November 9, 2023, JCP&L filed a petition for approval of its EnergizeNJ with the NJBPU that would, among other things, support grid modernization, system resiliency and substation modernization in technologies designed to provide enhanced customer benefits. On February 14, 2024, the NJBPU approved the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for a distribution base rate increase. On February 27, 2024, as part of the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of NJBPU approval of the base rate case settlement, to remove the high-priority circuits that are to be addressed in the first phase of its reliability improvement plan and to include the second phase of its reliability improvement plan that is expected to further address certain high-priority circuits that require additional upgrades. EnergizeNJ, if approved as amended, will result in the investment of approximately $930.5 million of total estimated costs over five years. JCP&L and various parties are engaged in settlement discussions with respect to the pending EnergizeNJ petition.

Current wording

On November 9, 2023, JCP&L filed a petition for approval of its EnergizeNJ with the NJBPU that would, among other things, support grid modernization, system resiliency and substation modernization in technologies designed to provide enhanced customer benefits. On February 14, 2024, the NJBPU approved the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for a distribution base rate increase. On February 27, 2024, as part of the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of NJBPU approval of the base rate case settlement, to remove the high-priority circuits that are to be addressed in the first phase of its reliability improvement plan and to include the second phase of its reliability improvement plan that is expected to further address certain high-priority circuits that require additional upgrades. On April 10, 2025, JCP&L, joined by various parties, filed a stipulated settlement with the NJBPU resolving JCP&L’s amended EnergizeNJ petition. The settlement provides for total program costs of $339 million, including capital investments in JCP&L’s electric distribution system of approximately $203 million, $132 million of matching capital investments and approximately $4 million of O&M expense. Pursuant to the settlement, the program would begin on July 1, 2025, and continue through December 31, 2028, and JCP&L has agreed to file a base rate case no later than January 1, 2030.

Previous wording

•On April 5, 2023, the Ohio Companies sought approval from the PUCO for its ESP V. The proposed plan would maintain an eight-year term beginning June 1, 2024, and seeks to continue riders recovering costs associated with distribution infrastructure investments and approved grid modernization investments. ESP V additionally proposes new riders that would support reliability, and includes provisions supporting affordability and enhancing the customer experience. On May 15, 2024, the PUCO issued an order approving ESP V with modifications, which are described below in “Outlook - State Regulation - Ohio”. On June 14, 2024, the Ohio Companies filed an Application for Rehearing, which was denied by operation of law as the PUCO did not rule on the applications for rehearing within 30 days of filing. Due to the risks and uncertainty resulting from the Ohio Companies’ application for rehearing being denied by operation of law, on October 29, 2024, the Ohio Companies filed a notice of their intent to withdraw ESP V and proposed the terms under which they would resume operating under ESP IV. The Ohio Companies’ application is subject to PUCO review and approval. The Ohio Companies expect to file an application with the PUCO for ESP VI by early next year in an effort to align with the ongoing base distribution rate case proceedings.

Current wording

On April 5, 2023, the Ohio Companies sought approval from the PUCO for their ESP V. The proposed plan would maintain an eight-year term beginning June 1, 2024, and continue riders recovering costs associated with distribution infrastructure investments and approved grid modernization investments. ESP V additionally proposed new riders that would support reliability, and included provisions supporting affordability and enhancing the customer experience. On May 15, 2024, the PUCO issued an order approving ESP V with modifications, which are described below in “Outlook - State Regulation - Ohio”. On June 14, 2024, the Ohio Companies filed an Application for Rehearing, which was denied by operation of law as the PUCO did not rule on the applications for rehearing within 30 days of filing. Due to the risks and uncertainty resulting from the Ohio Companies’ application for rehearing being denied by operation of law, on October 29, 2024, the Ohio Companies filed a notice of their intent to withdraw ESP V and proposed the terms under which they would resume operating under ESP IV, which was approved by the PUCO on December 18, 2024. On January 22, 2025, the PUCO approved the Ohio Companies’ ESP IV compliance tariffs with an effective date of February 1, 2025, at which point the Ohio Companies resumed operating under ESP IV with modifications, as described below in “Outlook - State Regulation - Ohio”. On April 7, 2025, certain intervenors filed an appeal to the Supreme Court of Ohio challenging the Ohio Companies’ return to ESP IV.

Previous wording

•On May 31, 2024, the Ohio Companies filed their application for an increase in base distribution rates, based on a 2024 calendar year test period ending May 31, 2024. The Ohio Companies requested a net increase in base distribution revenues of approximately $94 million with a return on equity of 10.8% and capital structures of 44% debt and 56% equity for CEI, 46% debt and 54% equity for OE, and 45% debt and 55% equity for TE, and reflects a roll-in of current riders such as DCR and AMI. The net increase represents a 1.5% average residential monthly bill increase. Key components of the base rate case filing include a proposal to change pension and OPEB recovery to the delayed recognition method and to implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension and OPEB expense requested in the proceeding and the actual annual amount each year using this method. Additionally, the Ohio Companies request recovery of certain incurred costs, including the impact of major storms, a program to convert streetlights to LEDs, and others. On June 14, 2024, the Ohio Companies filed supporting testimony and expect by the end of October 2024 to file an update with an adjusted net increase of base distribution revenues and incorporating matters in the rate case as directed by the PUCO’s ESP V order. The Ohio Companies would expect to update their application for an increase in base distribution rates after the PUCO issues its order with respect to the Ohio Companies’ withdrawal of ESP V.

Current wording

On May 31, 2024, the Ohio Companies filed their application for an increase in base distribution rates, based on a 2024 calendar year test period. The Ohio Companies requested a net increase in base distribution revenues of approximately $94 million with a return on equity of 10.8% and capital structures of 44% debt and 56% equity for CEI, 46% debt and 54% equity for OE, and 45% debt and 55% equity for TE, which reflects a roll-in of current riders such as DCR and AMI. The net increase represented a 1.5% average residential monthly bill increase. Key components of the base rate case filing include a proposal to change pension and OPEB recovery to the delayed recognition method and to implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension and OPEB expense requested in the proceeding and the actual amount each year using this method. Additionally, the Ohio Companies requested recovery of certain incurred costs, including the impact of major storms, a program to convert streetlights to LEDs, and others. On June 14, 2024, the Ohio Companies filed supporting testimony and on July 31, 2024, filed an update with an adjusted net increase of base distribution revenues of approximately $190 million and to incorporate matters in the rate case as directed by the PUCO’s ESP V order. On December 18, 2024, the PUCO issued an order approving the Ohio Companies’ withdrawal of ESP V. On January 22, 2025, the PUCO approved the Ohio Companies’ revised ESP IV tariffs, effective February 1, 2025, at which time the Ohio Companies resumed operating under ESP IV. On January 27, 2025, the Ohio Companies notified the PUCO of their intention to update their application for an increase in base distribution rates to remove ESP V related provisions from the base rate case. The PUCO staff hired a third-party auditor to assist in the review of the Ohio Companies’ base rate case filing and on February 21, 2025, PUCO staff and the third party auditor each filed their reports. The auditor’s report recommended adjustments which would result in a net increase of the Ohio Companies’ base distribution revenues of approximately $8 million with a return on equity of 9.63% and capital structures of 48.8% debt and 51.2% equity for each of the Ohio Companies. PUCO staff’s report takes limited positions on the auditor’s finding and recommendations and makes additional findings. On March 24, 2025, the Ohio Companies, OCC, and other parties filed objections to the PUCO’s staff report and the auditor’s report. In addition, the Ohio Companies filed certain pieces of supplemental testimony and intervenors filed direct testimony. The Ohio Companies and various parties are engaged in settlement discussions with respect to the pending base rate case. Evidentiary hearings are scheduled to begin on May 5, 2025.

Previous wording

On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves the U.S. Attorney’s Office investigation into FirstEnergy relating to FirstEnergy’s lobbying and governmental affairs activities concerning HB 6 related to the federal criminal allegations made in July 2020, against former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. Among other things under the DPA, FE paid a $230 million monetary penalty in 2021 and agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor will FirstEnergy seek any tax deduction related to such payment. As of July 21, 2024, FirstEnergy has successfully completed the obligations required within the three-year term of the DPA. Under the DPA, FirstEnergy has an obligation to continue (i) publishing quarterly a list of all payments to 501(c)(4) entities and all payments to entities known by FirstEnergy operating for the benefit of a public official, either directly or indirectly; (ii) not making any statements that contradict the DPA; (iii) notifying the U.S. Attorney’s Office of any changes in FirstEnergy’s corporate form; and (iv) cooperating with the U.S. Attorney’s Office until the conclusion of any related investigation, criminal prosecution, and civil proceeding brought by the U.S. Attorney’s Office. Within 30 days of those matters concluding, and FirstEnergy’s successful completion of its remaining obligations, the U.S. Attorney’s Office will dismiss the criminal information.

Current wording

On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves the U.S. Attorney’s Office investigation into FirstEnergy relating to FirstEnergy’s lobbying and governmental affairs activities concerning HB 6 related to the federal criminal allegations made in July 2020, against former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. Among other things under the DPA, FE paid a $230 million monetary penalty in 2021 and agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor will FirstEnergy seek any tax deduction related to such payment. As of July 22, 2024, FirstEnergy had successfully completed the obligations required within the three-year term of the DPA. Under the DPA, FirstEnergy has an obligation to continue (i) publishing quarterly a list of all payments to 501(c)(4) entities and all payments to entities known by FirstEnergy operating for the benefit of a public official, either directly or indirectly; (ii) not making any statements that contradict the DPA; (iii) notifying the U.S. Attorney’s Office of any changes in FirstEnergy’s corporate form; and (iv) cooperating with the U.S. Attorney’s Office until the conclusion of any related investigation, criminal prosecution, and civil proceeding brought by the U.S. Attorney’s Office, including the January 17, 2025, indictment against two former FirstEnergy senior officers, as described below in “Outlook -- Other Legal Proceedings -U.S. v. Larry Householder, et al.”. Within 30 days of those matters concluding, and FirstEnergy’s successful completion of its remaining obligations, the U.S. Attorney’s Office will dismiss the criminal information.

Previous wording

Despite the many disruptions FirstEnergy has faced, and continues to currently face, the leadership team remains committed and focused on executing its strategy and running the business. See “Outlook - Other Legal Proceedings” below for additional details on the government investigations, the DPA, and ongoing litigation surrounding the investigation of HB 6. See also “Outlook - State Regulation - Ohio” below for details on the PUCO proceeding reviewing political and charitable spending and legislative activity in response to the investigation of HB 6. The outcome of the government investigations, PUCO proceedings, legislative activity, and any of these lawsuits is uncertain and could have a material adverse effect on FirstEnergy’s financial condition, results of operations and cash flows.

Current wording

Despite these events, FirstEnergy has faced, the leadership team remains committed and focused on executing its strategy and running the business. See “Outlook - Other Legal Proceedings” below for additional details on the government investigations, the DPA, and ongoing litigation surrounding the investigation of HB 6. See also “Outlook - State Regulation - Ohio” below for details on the PUCO proceeding reviewing political and charitable spending and legislative activity in response to the investigation of HB 6. The outcome of the PUCO proceedings, legislative activity, and any of these lawsuits is uncertain and could have a material adverse effect on FirstEnergy’s financial condition, results of operations and cash flows.

Previous wording

Summary of Results of Operations — First Nine Months of 2024 Compared with First Nine Months of 2023

Current wording

Summary of Results of Operations — First Quarter 2025 Compared with First Quarter 2024

Previous wording

Financial results for FirstEnergy’s business segments for the third quarter of 2024 and 2023 were as follows:

Current wording

Financial results for FirstEnergy’s business segments for the first quarter of 2025 and 2024 were as follows:

Previous wording

Distribution segment’s earnings attributable to FE from continuing operations increased $18 million in the third quarter of 2024, as compared to the same period of 2023, primarily resulting from higher customer usage as a result of the weather, partially offset by lower weather-adjusted customer usage and demand and lower revenues due to changes in the Ohio DCR that became effective June 1, 2024.

Current wording

Distribution segment’s earnings attributable to FE increased $53 million in the first quarter of 2025, as compared to the same period of 2024, primarily resulting from higher customer usage as a result of the colder weather temperatures and higher revenues associated with the implementation of the Pennsylvania base rate case, partially offset by lower weather-adjusted customer usage and demand, and higher operating expenses.

Previous wording

Distribution services revenues increased $80 million in the third quarter of 2024, as compared to the same period of 2023, primarily resulting from higher customer usage as a result of the weather, lower customer credits associated with the PUCO-approved Ohio Stipulation, and higher rider revenues associated with a Pennsylvania regulated investment program, partially offset by lower rider revenues associated with changes to the Ohio DCR as a result of the PUCO’s ESP V order that became effective June 1, 2024, and lower weather-adjusted customer usage and demand. Additionally, revenues increased due to the higher recovery of transmission expenses, and other FE PA rider rate adjustments, which have no material impact to earnings.

Current wording

Distribution services revenues increased $159 million in the first quarter of 2025, as compared to the same period of 2024, primarily resulting from higher customer usage as a result of the colder weather temperatures, lower customer credits associated with the PUCO-approved Ohio Stipulation, and higher revenues associated with the implementation of the Pennsylvania base rate case, partially offset by lower weather-adjusted customer usage and demand. Additionally, revenues increased due to the higher recovery of transmission expenses, which have no material impact to earnings.

Previous wording

Generation sales revenues decreased $59 million in the third quarter of 2024, as compared to the same period in 2023, primarily due to lower retail generation sales as a result of higher shopping in Ohio, which lowered sales volumes, partially offset by higher non-shopping generation auction rates. Total generation provided by alternative suppliers as a percentage of total MWh deliveries for the Ohio Companies and FE PA in the third quarter of 2024, as compared to the same period of 2023, increased to 90% from 89% in Ohio and decreased slightly to 61% from 62% in Pennsylvania. Retail and wholesale generation sales revenue have no material impact to earnings.

Current wording

Generation sales revenues increased $12 million in the first quarter of 2025, as compared to the same period in 2024, primarily due to higher retail generation sales as a result of colder weather temperatures and lower shopping, which increased sales volumes, partially offset by lower non-shopping generation auction rates. Total generation provided by alternative suppliers as a percentage of total MWh deliveries for the Ohio Companies and FE PA in the first quarter of 2025, as compared to the same period of 2024, decreased to 88% from 89% in Ohio and to 60% from 61% in Pennsylvania. Retail and wholesale generation sales revenues have no material impact to earnings.

Previous wording

•Purchased power costs, which have no material impact to earnings, decreased $262 million during the first nine months of 2024, as compared to the same period of 2023, primarily due to lower generation sales volumes as described above and decreased capacity expenses, partially offset by higher unit costs.

Current wording

•Purchased power costs, which have no material impact to earnings, decreased $32 million during the first quarter of 2025, as compared to the same period of 2024, primarily due to lower unit costs and decreased capacity expenses, partially offset by increased generation sales volumes as described above.

Previous wording

•Higher network transmission expenses of $40 million, which are deferred for future recovery, resulting in no material impact to earnings;

Current wording

•Higher network transmission expenses of $29 million, which are deferred for future recovery, resulting in no material impact to earnings;

Previous wording

•Higher planned vegetation management expenses of $18 million;

Current wording

•Higher planned vegetation management expenses of $5 million, primarily in Pennsylvania as approved and recovering in the base rate case;

Previous wording

•Higher uncollectible expenses of $7 million, which were deferred for future recovery, primarily due to a reduction to the allowance during the second quarter of 2023;

Current wording

•Higher uncollectible expenses of $7 million, which were mostly deferred for future recovery;

Previous wording

Total other expense increased $1 million in the third quarter of 2024, as compared to the same period of 2023, primarily due to higher interest on short-term borrowings and new debt issuances, partially offset by higher capitalized financing costs.

Current wording

•Depreciation expense increased $1 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to a higher asset base.

Previous wording

Distribution services revenues increased $135 million in the first nine months of 2024, as compared to the same period of 2023, primarily resulting from higher revenues from the implementation of base rate cases, higher customer usage as a result of the weather, higher weather-adjusted customer usage and demand, and higher rider revenues associated with certain regulated investment programs. Additionally, revenues increased due to the higher recovery of transmission expenses, which have no material impact to earnings.

Current wording

Distribution services revenues increased $92 million in the first quarter of 2025, as compared to the same period of 2024, primarily resulting from higher customer usage as a result of the colder weather temperatures, higher revenues from the implementation of base rate cases, and higher rider revenues associated with certain regulated investment programs. Additionally, revenues increased due to the higher recovery of transmission expenses, which have no material impact to earnings.

Previous wording

Generation sales revenues increased $107 million in the third quarter of 2024, as compared to the same period of 2023, primarily due to higher retail revenues and lower wholesale revenues.

Current wording

Generation sales revenues increased $140 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to higher retail revenues and higher wholesale revenues.

Previous wording

•Retail generation sales increased $115 million in the third quarter of 2024, as compared to the same period in 2023 primarily due to higher non-shopping generation auction rates and higher customer usage as a result of the weather. Retail generation sales, other than those in West Virginia, have no material impact to earnings.

Current wording

•Retail generation sales increased $123 million in the first quarter of 2025, as compared to the same period in 2024 primarily due to higher non-shopping generation auction rates and higher customer usage as a result of the colder weather temperatures. Retail generation sales, other than those in West Virginia, have no material impact to earnings.

Previous wording

•Wholesale generation revenues decreased $35 million in the first nine months of 2024, as compared to the same period in 2023, primarily due to lower capacity revenues and lower market prices, partially offset by higher sales volumes. The difference between current wholesale generation revenues and certain energy costs incurred is deferred for future recovery or refund, with no material impact to earnings.

Current wording

•Wholesale generation revenues increased $17 million in the first quarter of 2025, as compared to the same period in 2024, primarily due to higher sales volumes, partially offset by lower wholesale rates. The difference between current wholesale generation revenues and certain energy costs incurred is deferred for future recovery or refund, with no material impact to earnings.

Previous wording

Transmission revenues increased $12 million in the third quarter of 2024, as compared to the same period of 2023, primarily due to higher rate base from regulated investment programs.

Current wording

Transmission revenues increased $19 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to a higher rate base from regulated investment programs.

Previous wording

•Fuel costs decreased $27 million during the third quarter of 2024, as compared to the same period of 2023, primarily due to lower unit costs, partially offset by higher consumption volumes. Due to the ENEC, fuel expense has no material impact to earnings.

Current wording

•Fuel costs increased $44 million during the first quarter of 2025, as compared to the same period of 2024, primarily due to higher unit costs and higher consumption volumes. Due to the ENEC, fuel expense has no material impact to earnings.

Previous wording

•$53 million charge at JCP&L in the first quarter 2024 associated with certain corporate support costs recorded to capital accounts from the FERC Audit that were determined, as a result of the base rate case settlement agreement, to be disallowed from future recovery;

Current wording

•The absence of a $53 million pre-tax charge at JCP&L in the first quarter 2024 associated with certain corporate support costs recorded to capital accounts from the FERC Audit that were determined, as a result of the base rate case settlement agreement, to be disallowed from future recovery;

Previous wording

•Higher regulated generation outage spend of $5 million.

Current wording

•Lower other operating expenses of $12 million, primarily due to lower planned regulated generation outage spend and lower maintenance work.

Previous wording

•Higher network transmission expenses of $16 million, which were deferred for future recovery, resulting in no material impact to earnings;

Current wording

•Higher energy efficiency and other state mandated program costs of $16 million, which were deferred for future recovery, resulting in no material impact to earnings.

Previous wording

•Depreciation expense increased $16 million in the third quarter of 2024, as compared to the same period of 2023, primarily due to a higher asset base.

Current wording

•Depreciation expense increased $16 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to a higher asset base.

Previous wording

Other expense increased $38 million in the first nine months of 2024, as compared to the same period of 2023, primarily due to the absence of the pension mark-to-market adjustment, higher interest expense on short-term borrowings and long-term debt, and higher non-recoverable charges related to abandoned transmission projects, partially offset by higher capitalized interest.

Current wording

Other expense decreased $16 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to the absence of certain nonrecoverable charges recognized in the first quarter of 2024, lower interest expense as a result of lower average short-term borrowings and long-term debt redemptions since the first quarter of 2024, and higher capitalized interest.

Previous wording

Stand-Alone Transmission Segment’s earnings attributable to FE from continuing operations decreased $64 million in the first nine months of 2024, as compared to the same period of 2023, primarily due to the dilutive effect and discrete tax charge associated with the FET Equity Interest Sale, and higher interest expense, partially offset by higher revenue from regulated investment programs that increased rate base.

Current wording

Stand-Alone Transmission Segment’s earnings attributable to FE decreased $3 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to the dilutive effect of the FET Equity Interest Sale that closed in March 2024, and the expected elimination of the 50 basis point ROE adder associated with ATSI’s RTO membership as a result of the Sixth Circuit ruling in January 2025, partially offset by the absence of a discrete tax charge related to the FET Equity Interest Sale in the first quarter of 2024 and higher revenues from regulated capital investments that increased rate base.

Previous wording

Stand-Alone Transmission’s total revenues increased $36 million, primarily due to a higher rate base and recovery of higher transmission operating expenses.

Current wording

Stand-Alone Transmission’s total revenues increased $53 million, primarily due to a higher rate base and recovery of higher transmission operating expenses, partially offset by the expected elimination of the 50 basis point ROE adder associated with ATSI’s RTO membership as a result of the Sixth Circuit ruling in January 2025.

Previous wording

Total operating expenses increased $29 million in the third quarter of 2024, as compared to the same period of 2023, primarily due to higher depreciation and property tax expenses from a higher asset base and a $11 million impairment charge related to the Akron general office. Other than the impairment charge, nearly all operating expenses are recovered through formula rates, resulting in no material impact to earnings.

Current wording

Total operating expenses increased $36 million in the first quarter of 2025, as compared to the same period of 2024, primarily due to higher depreciation and property tax expenses from a higher asset base as well as higher operating and maintenance expenses. Nearly all operating expenses are recovered through formula rates, resulting in no material impact on current period earnings.

Previous wording

Total other expense increased $16 million in the first nine months of 2024, as compared to the same period of 2023, primarily due to higher interest on short-term borrowings, new debt issuances, and higher non-recoverable charges at TrAIL, partially offset by higher capitalized financing costs.

Current wording

Total other expense was flat in the first quarter of 2025, as compared to the same period of 2024, primarily due to higher interest expenses from new debt issuances since the first quarter of 2024, offset by higher capitalized financing costs and the absence of a prior year non-recoverable charge recorded in the first quarter of 2024.

Previous wording

Stand-Alone Transmission’s effective tax rate was 28.7% and 22.2% for the nine months ended September 30, 2024 and 2023, respectively. The increase in the effective tax rate is primarily due to a discrete tax charge on the FET Equity Interest Sale in the first quarter of 2024.

Current wording

Stand-Alone Transmission’s effective tax rate was 22.9% and 38.0% for the three months ended March 31, 2025 and 2024, respectively. The decrease in the effective tax rate is primarily due to the absence of a discrete tax charge related to the FET Equity Interest Sale in the first quarter of 2024.

Previous wording

Financial results at Corporate/Other resulted in a $44 million increase in losses attributable to FE from continuing operations in the third quarter of 2024, as compared to the same period of 2023, primarily due to:

Current wording

Financial results at Corporate/Other resulted in a $3 million decrease in losses attributable to FE in the first quarter of 2025, as compared to the same period of 2024, primarily due to:

Showing the first 40 of 152 pairs. Open the source sections for the rest.

Rearranged current paragraphs (15)

Current report — wording carried from elsewhere

•Lower weather-adjusted customer usage and demand;

Current report — wording carried from elsewhere

The following table provides information about the composition of JCP&L’s net regulatory assets and liabilities as of March 31, 2025, and December 31, 2024, and the changes during the three months ended March 31, 2025:

Current report — wording carried from elsewhere

The following table provides information about the composition of JCP&L’s net regulatory assets that do not earn a current return as of March 31, 2025 and December 31, 2024, of which approximately $54 million and $45 million, respectively, are currently being recovered through rates over varying periods, through 2068, depending on the nature of the deferral:

Current report — wording carried from elsewhere

As of March 31, 2025, JCP&L’s net deficit in working capital (current assets less current liabilities) was primarily due to current portion of long-term debt, accounts payable, short-term borrowings and accrued interest and compensation and benefits. JCP&L believes its cash from operations and available liquidity will be sufficient to meet its current working capital needs.

Current report — wording carried from elsewhere

•Higher receipts of cash collateral associated with certain generation suppliers that serve shopping customers;

Current report — wording carried from elsewhere

FirstEnergy has various financial and performance guarantees and indemnifications, which are issued in the normal course of business. These contracts include performance guarantees, stand-by LOCs, debt guarantees, surety bonds and indemnifications. FirstEnergy enters into these arrangements to facilitate commercial transactions with third parties by enhancing the value of the transaction to the third party. As of March 31, 2025, outstanding guarantees and other assurances aggregated approximately $1.1 billion, consisting of parental guarantees on behalf of its consolidated subsidiaries ($651 million) and other assurances of ($440 million).

Current report — wording carried from elsewhere

In the normal course of business, JCP&L may enter into physical or financially settled contracts for the sale and purchase of electric capacity, energy, fuel and emission allowances. Certain agreements contain provisions that require JCP&L to post collateral. This collateral may be posted in the form of cash or credit support with thresholds contingent upon JCP&L's credit rating from each of the major credit rating agencies. The collateral and credit support requirements vary by contract and by counterparty.

Current report — wording carried from elsewhere

JCP&L has posted $28 million of collateral in the form of LOCs as of March 31, 2025. JCP&L is holding $21 million of net cash collateral as of March 31, 2025, from certain generation suppliers, and such amount is included in "Other current liabilities" on JCP&L's Balance Sheets.

Current report — wording carried from elsewhere

These credit-risk-related contingent features stipulate that if JCP&L were to be downgraded or lose its investment grade credit rating (based on its senior unsecured debt rating), it would be required to provide additional collateral. The following table discloses the potential additional credit rating contingent contractual collateral obligations as of March 31, 2025:

Current report — wording carried from elsewhere

(1) Surety bonds are not tied to a credit rating, and their impact assumes maximum contractual obligations, which is ordinarily 100% of the face amount of the surety bond except with respect to $1 million as of March 31, 2025 of surety bond obligations for which the collateral obligation is capped at 60% of the face amount, and typical obligations require 30 days to cure.

Current report — wording carried from elsewhere

ESP IV, as modified, continues the DCR rider, which supports continued investment related to the distribution system for the benefit of customers, with an annual revenue cap of $390 million. In addition, ESP IV, as modified, includes: (1) continuation of a base distribution rate freeze until ESP VI becomes effective or the Ohio Companies’ obtain the PUCO’s staff agreement; (2) a goal across FirstEnergy to reduce CO 2 emissions by 90% below 2005 levels by 2045; and (3) contributions, totaling $6.39 million per year to: (a) fund energy conservation, economic development and job retention programs in the Ohio Companies’ service territories; and (b) establish fuel-funds in each of the Ohio Companies’ service territories to assist low-income customers.

Current report — wording carried from elsewhere

(the CPP) was not authorized by Congress and remanded the rule to the EPA for further reconsideration. In response, on May 23, 2023, the EPA published a proposed rule pursuant to CAA Section 111 (b) and (d) in line with the decision in West Virginia v. Environmental Protection Agency intended to reduce power sector GHG emissions (primarily CO 2 emissions) from fossil fuel based EGUs. The rule, which proposed stringent GHG emissions limitations based on fuel type and unit retirement date, was issued as final by the EPA on April 25, 2024. In May 2024, a group of 25 states, including West Virginia, filed a challenge to the rule in the D.C. Circuit. Also in May 2024, other utility groups, including the Midwest Ozone Group and Electric Generators for a Sensible Transition, both of which MP is a member, filed petitions for review of the GHG rule as well as motions to stay the rule in the D.C. Circuit. On July 19, 2024, the D.C. Circuit denied the stay motions and on July 23 and 26, 2024 the aggrieved petitioners filed emergency stay applications to the Supreme Court of the U.S. On October 16, 2024, the Supreme Court of the U.S. denied the stay applications. On December 6, 2024, oral arguments on the merits of the challenge were heard by the D.C. Circuit. On February 5, 2025, the Department of Justice filed an unopposed motion on behalf of EPA in the D.C. Circuit, seeking to hold the litigation in abeyance, and forego issuing its opinion, for a period of 60 days while the new leadership at EPA evaluates the rule and determines how it wishes to proceed On February 19, 2025, the D.C. Circuit granted EPA’s motion.

Current report — wording carried from elsewhere

Summary of Results of Operations—First Quarter 2025 Compared with First Quarter 2024

Current report — wording carried from elsewhere

▪The absence of a $53 million pre-tax charge at JCP&L in the first quarter 2024 associated with certain corporate support costs recorded to capital accounts from the FERC Audit that were determined, as a result of the base rate case settlement agreement, to be disallowed from future recovery; and

Current report — wording carried from elsewhere

The decrease was partially offset by:
Rearranged previous paragraphs (21)

Previous report — wording carried elsewhere

ITEM 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Previous report — wording carried elsewhere

In addition, on November 30, 2020, AE Supply submitted a closure deadline extension request to the EPA seeking to extend the cease accepting waste date for the McElroy's Run CCR impoundment facility to October 2024, which request was withdrawn by AE Supply on July 9, 2024, prior to the completion of the technical review by the EPA. As of May 31, 2024, AE Supply ceased accepting waste at the McElroy’s Run CCR impoundment facility from Pleasants Power Station. As of September 30, 2024, AE Supply continues to operate the dry landfill adjacent to McElroy’s Run as a disposal facility for Pleasants Power Station. AE Supply continues to evaluate closure options for McElroy’s Run, including the potential transfer of the site and remediation obligations to a third-party, as well as other interpretation changes to its closure plans. As a result, during the second quarter of 2024, AE Supply reviewed its ARO and future expected costs to remediate McElroy’s Run and the adjacent dry landfill, resulting in an increase to the ARO liability and corresponding increase to Other Operating expense of $87 million, which is further described above in Note 8, “Asset Retirement Obligations.”

Previous report — wording carried elsewhere

•On July 22, 2024, FE PA filed its application with the PPUC seeking approval for the next phase of its LTIIP program, which is expected to result in approximately $1.6 billion in investments, with approximately $1.4 billion of such investments going in service during the five-year period beginning January 1, 2025 and ending December 31, 2029.

Previous report — wording carried elsewhere

Determination of the useful life of the regulated coal-fired generating facilities could result in changes in depreciation, and/or continued collection of net plant in rates after retirement, securitization, sale, impairment or regulatory disallowances. If MP is unable to recover these costs, it could have a material adverse effect on FirstEnergy’s and/or MP’s financial condition, results of operations and cash flow.

Previous report — wording carried elsewhere

•The dilutive effect of the FET Equity Interest Sale that closed in March 2024;

Previous report — wording carried elsewhere

These were partially offset by the following:

Previous report — wording carried elsewhere

Detailed segment reporting explanations are included below.

Previous report — wording carried elsewhere

Distribution services by customer class are summarized in the following table:

Previous report — wording carried elsewhere

revenues and certain energy costs incurred is deferred for future recovery or refund, with no material impact to earnings.

Previous report — wording carried elsewhere

The increase was partially offset by:

Previous report — wording carried elsewhere

•$17 million (after-tax) in lower investment earnings related to FEV’s equity method investment in Global Holding; and

Previous report — wording carried elsewhere

Generation sales revenues decreased $277 million in the first nine months of 2024, as compared to the same period in 2023, primarily due to lower retail generation sales as a result of increased customer shopping, partially offset by higher non-shopping generation auction rates. Total generation provided by alternative suppliers as a percentage of total MWh deliveries for the Ohio Companies and FE PA in the first nine months of 2024, as compared to the same period of 2023, increased to 90% from 73% in Ohio and increased to 63% from 62% in Pennsylvania. Retail and wholesale generation sales revenue have no material impact to earnings.

Previous report — wording carried elsewhere

•Higher network transmission expenses of $114 million, which are deferred for future recovery, resulting in no material impact to earnings;

Previous report — wording carried elsewhere

•Higher planned vegetation management expenses of $49 million;

Previous report — wording carried elsewhere

•Fuel costs decreased $67 million during the first nine months of 2024, as compared to the same period of 2023, primarily due to lower unit costs, partially offset by higher consumption volumes. Due to the ENEC, fuel expense has no material impact to earnings.

Previous report — wording carried elsewhere

•Higher energy efficiency and other state mandated program costs of $7 million, which were deferred for future recovery, resulting in no material impact to earnings; and

Previous report — wording carried elsewhere

Stand-Alone Transmission’s total revenues increased $106 million, primarily due to a higher rate base and recovery of higher transmission operating expenses.

Previous report — wording carried elsewhere

The following table shows revenues by transmission asset owner:

Previous report — wording carried elsewhere

The increase in losses were partially offset by:

Previous report — wording carried elsewhere

Borrowings under the 2021 Credit Facilities and 2023 Credit Facilities may be used for working capital and other general corporate purposes. Generally, borrowings under each of the credit facilities are available to each borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment termination date, as the same may be extended.

Previous report — wording carried elsewhere

The increase in cash provided from operating activities was partially offset by: