ITEM 1A. RISK FACTORSThe 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, the 2022 Mosquito fire, or future wildfires;Recovery of excess costs in connection with wildfires; andImplementation of wildfire mitigation initiativesThe hazardous nature of the Utility’s electricity and natural gas operations;Changes in the electric power and natural gas industries;A cyber incident, cybersecurity breach or physical attack;The operation and decommissioning of the Utility’s nuclear generation facilities; andAttracting and retaining specialty personnelExtensive environmental lawsThe Enhanced Oversight and Enforcement Process;Legislative and regulatory developments;Outcomes of enforcement proceedings in connection with extensive regulations to which the Utility is subject;Outcomes of regulatory and ratemaking proceedings and the Utility’s ability to manage its costs; andMunicipalizationPG&E Corporation’s and the Utility’s substantial indebtedness;Restrictions in indebtedness documents;Potential additional dilution to holders of PG&E Corporation common stock;Ownership and transfer restrictions associated with PG&E Corporation common stock;PG&E Corporation’s reliance on dividends, distributions and other payments from the Utility;Restrictions on shareholders’ ability to change the direction or management of PG&E Corporation;The Utilitys ability to manage its costs effectively; andIncreased customer rates;Inflation and supply chain issuesCurrent report: 10-K
Period ended 2024-12-31; filed 2025-02-13.
0001004980-25-000010
ITEM 1A. RISK FACTORSThe 2019 Kincade fire, the 2021 Dixie fire, the 2022 Mosquito fire, or future wildfires;Recovery of excess costs in connection with wildfires; andImplementation of wildfire mitigation initiativesThe hazardous nature of the Utility’s electricity and natural gas operations;Changes in the electric power and natural gas industries;A cyber incident, cybersecurity breach, or physical attack;The operation and decommissioning of the Utility’s nuclear generation facilities; andAttracting and retaining specialty personnelExtensive environmental lawsThe Enhanced Oversight and Enforcement Process;Legislative and regulatory developments;Outcomes of enforcement proceedings in connection with extensive regulations to which the Utility is subject;Outcomes of regulatory and ratemaking proceedings and the Utility’s ability to manage its costs; andAttempts to acquire the Utility's assets and customers through municipalization or bypassPG&E Corporation’s and the Utility’s substantial indebtedness;Restrictions in indebtedness documents;Potential additional dilution to holders of PG&E Corporation common stock;Ownership and transfer restrictions associated with PG&E Corporation capital stock;PG&E Corporation’s reliance on dividends, distributions, and other payments from the Utility;The Utility’s ability to manage its costs effectively;Increased customer rates; andInflation and supply chain issuesThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 185 previous paragraphs and 172 current paragraphs.
116 unchanged; 47 reworded; 5 added; 22 removed; 0 previous and 4 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (5)
Current report
•Attempts to acquire the Utility's assets and customers through municipalization or bypass.
Current report
The Inflation Reduction Act includes a 15% corporate alternative minimum tax on the adjusted financial statement income (“AFSI”) of corporations with average AFSI exceeding $1.0 billion over a three-year period, effective January 1, 2023. If the law or its interpretation is not changed to permit PG&E Corporation to deduct repairs and maintenance expense, it will incur federal cash liabilities beginning in 2027, the amount of which may become substantial in future years. See Legislative and Regulatory Initiatives in Item 8. MD&A.
Current report
In addition, the Utility’s DOE Loan Guarantee Agreement contains similar covenants as well as certain affirmative and negative covenants, events of default, and prepayment events which are incremental to those contained in the Utility’s credit agreements and indentures.
Removed paragraphs (22)
Previous report
•Changes in the electric power andnat uralgas industries;
Previous report
•Restrictions on shareholders’ ability to change the direction or management of PG&E Corporation;
Previous report
PG&E Corporation and the Utility cannot predict the timing and outcome of the various proceedings and litigation in connection with its wildfire mitigation initiatives. PG&E Corporation and the Utility could be subject to additional investigations, regulatory proceedings, or other enforcement actions as well as to additional litigation and claims by customers as a result of the Utility’s implementation of its wildfire mitigation initiatives, which could result in fines, penalties, customer rebates, other payments, or the Utility’s failure to obtain cost recovery for amounts expended on these initiatives. The amount of any fines, penalties, customer rebates or other payments (if PG&E Corporation or the Utility were to issue any credits, rebates or other payments in connection with any other wildfire mitigation initiatives or liability for damages) could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, the PSPS and EPSS programs have had an adverse impact on PG&E Corporation’s and the Utility’s reputation with customers, regulators and policymakers and future PSPS events and EPSS outages may increase these negative perceptions. For more information, see “Regulatory Matters” in Item 7. MD&A.
Previous report
The Utility continues to face public concern about the safety of nuclear generation and nuclear fuel. Some of these nuclear opposition groups regularly file petitions at the NRC and in other forums challenging the actions of the NRC and urging governmental entities to adopt laws or policies in opposition to nuclear power. Even if an action in opposition ultimately fails, regulatory proceedings may take longer to conclude and be more costly to complete. It is also possible that public pressure could grow leading to adverse changes in legislation, regulations, orders, or their interpretation. As a result, operations at the Utility’s two nuclear generation units at Diablo Canyon could cease before their respective current licenses expire in 2024 and 2025 or prior to the expiration of any renewed license and extended operations period. In such an instance, the Utility could be required to record a charge for the remaining amount of its unrecovered investment and such charge could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
Previous report
In addition, in order to retain highly skilled personnel necessary to safely operate Diablo Canyon during the remaining years of operations, the Utility will incur costs in connection with (i) an employee retention program to ensure adequate staffing levels at Diablo Canyon, and (ii) an employee retraining and development program, to facilitate redeployment of a portion of Diablo Canyon personnel to the decommissioning project and elsewhere in the Utility. The Utility may not be successful in retaining highly skilled personnel under its employee programs.
Previous report
The Utility is pursuing the extension of operations at Diablo Canyon through no later than 2030. If Diablo Canyon enters extended operations, the Utility will face operational challenges resulting from a shortened planning period. For instance, the Utility may be unable to procure an adequate supply of nuclear fuel. For more information, see “Extension of Diablo Canyon Operations” under “Other Regulatory Proceedings” in Item 7. MD&A.
Previous report
In June 2018, the State of California enacted the California Consumer Privacy Act of 2018 (the “CCPA”), which went into effect on January 1, 2020, with a 12-month look-back period requiring compliance by January 1, 2019. The CCPA requires companies that process information on California residents to make new disclosures to consumers about their data collection, use and sharing practices, allows consumers to opt out of certain data sharing with third parties and provides a new cause of action for data breaches. The CCPA provides for financial penalties in the event of non-compliance and statutory damages in the event of a data security breach. On November 3, 2020, Californians voted to approve Proposition 24, a ballot measure that created the California Privacy Rights Act (the “CPRA”), which amended and expanded the CCPA. The State of California enacted the CPRA in November 2020, with most provisions operative as of January 1, 2023 and applicable to personal information collected beginning January 1, 2022. Final CPRA regulations are in development. Failure to comply with the CCPA and the CPRA could result in litigation, audits, and the imposition of material fines on PG&E Corporation and the Utility.
Previous report
offset future income.
Previous report
California law and certain provisions in the Amended Articles and the amended and restated bylaws of PG&E Corporation (the “Amended Bylaws”) may prevent efforts by shareholders to change the direction or management of PG&E Corporation.
Previous report
The Amended Articles and the Amended Bylaws contain provisions that may make the acquisition of PG&E Corporation more difficult without the approval of the Board of Directors, including the following:
Previous report
•until 2024, the Board of Directors will be divided into two equal classes, with members of each class elected in different years for different terms;
Previous report
•only holders of shares who are entitled to cast ten percent or more of the votes can request a special meeting of the shareholders, and any such request must satisfy the requirements specified in the Amended Bylaws; action by shareholders may otherwise only be taken at an annual or special meeting duly called by or at the direction of a majority of the Board of Directors, or action by written consent signed by shareholders owning at least the number of votes necessary to authorize the action at a meeting where all shares entitled to vote were present;
Previous report
•advance notice for all shareholder proposals is required; and
Previous report
•any person acquiring PG&E Corporation Equity Securities will be restricted from owning 4.75% or more of such Equity Securities (as determined for federal income tax purposes (see “Tax Matters” in Item 7. MD&A)), subject to certain exceptions as may be determined by the Board of Directors of PG&E Corporation.
Previous report
These and other provisions in the Amended Articles, the Amended Bylaws, and California law could make it more difficult for shareholders or potential acquirers to obtain control of the Board of Directors or initiate actions that are opposed by the then-current Board of Directors, including delaying or impeding merger, tender offer, or proxy contest involving PG&E Corporation. The existence of these provisions could negatively affect the price of PG&E Corporation common stock and limit opportunities for shareholders to realize value in a corporate transaction.
Previous report
The Utility generally recovers its electricity and natural gas procurement costs through rates as “pass-through” costs. Increases in the Utility’s commodity costs directly impact customer bills.
Previous report
Increasing levels of self-generation of electricity by customers (primarily solar installations) and customer enrollment in NEM and NBT, which allows self-generating customers to receive bill credits for power exported to the grid, shifts costs to other customers. Under this structure, NEM and NBT customers do not pay their proportionate share of the cost of maintaining and operating the electric transmission and distribution system, including costs associated with funding social equity programs, subject to certain exceptions, while still receiving electricity from the system when their self-generation is inadequate to meet their electricity needs. These unpaid costs are subsidized by customers not participating in NEM or NBT. Accordingly, as more electric customers switch to the NBT and self-generate energy, the burden on the remaining customers increases, which in turn encourages more self-generation, further increasing rate pressure on existing non-NEM or non-NBT customers.
Previous report
Other long-term trends could also increase costs for gas customers. Natural gas suppliers are subject to compliance with CARB’s cap-and-trade program, and natural gas end-use customers have an increasing exposure to carbon costs under the program through 2030 (when the full cost will be reflected in customer bills). Increased renewable portfolio standards in the electric sector could also reduce electric generation gas load. CARB may also require aggressive energy efficiency programs to reduce natural gas end use consumption. Additionally, the Bay Area Air Quality Management District has adopted rules that restrict the sale of gas space and water heating appliances, and the CARB is considering similar rules. If other jurisdictions also adopt similar rules, reduced gas demand could accelerate customers replacing natural gas appliances with electric appliances. The combination of reduced load and increased costs to maintain the gas system could result in higher natural gas customer bills. In addition, some local city governments have passed ordinances restricting use of natural gas in new construction and, if other jurisdictions follow suit, this could affect future demand for the provision of natural gas. If fewer customers receive gas from the Utility, the Utility’s gas system maintenance costs, many of which cannot be reduced in the short term even if gas quantities decrease, would be borne by fewer customers. Finally, a mandate to purchase renewable natural gas for core customers could lead to increased costs for core customers if utilities are competing with the transportation sector for supplies of renewable natural gas.
Previous report
A confluence of technology-related cost declines, along with sustained or increased federal or state subsidies, could make a combination of distributed generation and energy storage a viable, cost-effective alternative to the Utility’s bundled electric service which could further reduce energy demand. Reduced energy demand or significantly slowed growth in demand due to customer migration to other energy providers, adoption of energy efficient technology, conservation, increasing levels of distributed generation and self-generation, unless substantially offset through regulatory cost allocations, could increase the energy rates for other customers.
Previous report
If rates were to rise too rapidly, customer usage or the number of customers could decline. A decrease in the volume of sales, among which the Utility’s costs are allocated, could further increase rates.
Reworded paragraphs (47)
Previous wording
•The 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, the 2022 Mosquito fire, or future wildfires;
Current wording
•The 2019 Kincade fire, the 2021 Dixie fire, the 2022 Mosquito fire, or future wildfires;
Previous wording
•Ownership and transfer restrictions associated with PG&E Corporation common stock;
Current wording
•Ownership and transfer restrictions associated with PG&E Corporation capital stock;
Previous wording
•The Utility’s ability to manage its costs effectively; and
Current wording
•The Utility’s ability to manage its costs effectively;
Previous wording
If the Utility does not have an approved WMP, the Utility will not be issued a safety certification and will consequently not benefit from the presumption of prudency or the AB 1054 disallowance cap. Under AB 1054, the Utility is required to maintain a safety certification issued by the OEIS to be eligible for certain benefits, including a cap on Wildfire Fund reimbursement and a reformed prudent manager standard. The AB 1054 Wildfire Fund disallowance cap, which caps the amount of liability that the Utility could be required to bear for a catastrophic wildfire, is inapplicable if the Wildfire Fund administrator determines that the electric utility company’s actions or inactions that resulted in the applicable wildfire constituted “conscious or willful disregard for the rights and safety of others,” or the electric utility company fails to maintain a valid safety certification at the time the applicable wildfire ignited. In addition, if the Utility fails to maintain a valid safety certification at the time a wildfire ignites, the initial burden of proof in a prudency proceeding shifts from intervenors to the Utility. The Utility will be required to reimburse amounts that are determined by the CPUC not to be just and reasonable. For more information on the disallowance cap, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8.
Current wording
If the Utility does not have an approved WMP, the Utility will not be issued a safety certification and will consequently not benefit from the presumption of prudency or the AB 1054 disallowance cap. Under AB 1054, the Utility is required to maintain a safety certification issued by the OEIS to be eligible for certain benefits, including a cap on Wildfire Fund reimbursement and all aspects of the reformed prudent manager standard. The AB 1054 Wildfire Fund disallowance cap, which caps the amount of liability that the Utility could be required to bear for a catastrophic wildfire, is inapplicable if the Wildfire Fund administrator determines that the electric utility company’s actions or inactions that resulted in the applicable wildfire constituted “conscious or willful disregard for the rights and safety of others,” or the electric utility company fails to maintain a valid safety certification at the time the applicable wildfire ignited. In addition, if the Utility fails to maintain a valid safety certification at the time a wildfire ignites, the initial burden of proof in a prudency proceeding shifts from intervenors to the Utility. The Utility will be required to reimburse amounts that are determined by the CPUC not to be just and reasonable. For more information on the disallowance cap, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8.
Previous wording
Furthermore, the Wildfire Fund will only be available for payment of eligible claims so long as there are sufficient funds remaining in the Wildfire Fund. Such funds could be depleted more quickly than expected, including as a result of claims made by California’s other participating electric utility companies. If the Utility is unable to maintain an AB 1054 safety certification or if the Wildfire Fund is exhausted, the inability to access the Wildfire Fund could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. Also, the Utility will not be able to obtain any recovery from the Wildfire Fund for wildfire-related losses in any year that do not exceed the greater of $1.0 billion in the aggregate and the amount of insurance coverage required under AB 1054.
Current wording
If the Utility is unable to maintain a safety certification or if the Wildfire Fund is exhausted, the ineffectiveness of the Wildfire Fund could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. Also, the Utility will not be able to obtain any recovery from the Wildfire Fund for wildfire-related losses in any year that do not exceed the greater of $1.0 billion in the aggregate and the amount of insurance coverage required under AB 1054.
Previous wording
The costs of participating in the Wildfire Fund are expected to exceed $6.7 billion over the ten-year contribution period for the fund. The timing and amount of any potential charges associated with the Utility’s contributions would also depend on various factors. In addition, there could also be a significant delay between the occurrence of a wildfire and the timing on which the Utility recognizes impairment for the reduction in future coverage due to the lack of data available to the Utility following a catastrophic event, especially if the wildfire occurs in the service area of another participating electric utility. Participation in the Wildfire Fund is expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, and the benefits of participating in the Wildfire Fund may not ultimately outweigh these substantial costs.
Current wording
In addition, there could be a significant delay between the occurrence of a wildfire and when the Utility recognizes impairment for the reduction in future coverage due to the lack of data available to the Utility following a catastrophic event, especially if the wildfire occurs in the service area of another participating electric utility. Participation in the Wildfire Fund is expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, and the benefits of participating in the Wildfire Fund may not ultimately outweigh the substantial costs of the Utility’s contributions to the Wildfire Fund.
Previous wording
PG&E Corporation and the Utility could be liable as a result of the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, the 2022 Mosquito fire, or future wildfires.
Current wording
PG&E Corporation’s and the Utility’s liabilities for the 2019 Kincade fire, the 2021 Dixie fire, or the 2022 Mosquito fire could exceed their accruals, or they could be liable as a result of future wildfires.
Previous wording
Based on the facts and circumstances available as of the date of this report, PG&E Corporation and the Utility have determined that it is probable they will incur losses in connection with the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, and the 2022 Mosquito fire. PG&E Corporation’s and the Utility’s recorded liabilities for probable losses in connection with these fires correspond to the lower end of the range of reasonably estimable losses unless there is a better estimate, do not include several categories of potential damages that are not reasonably estimable, and are subject to change based on new information. The Utility could be subject to significant liability in excess of recoveries that would be expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
Current wording
Based on the facts and circumstances available as of the date of this report, PG&E Corporation and the Utility have determined that it is probable they will incur losses in connection with the 2019 Kincade fire, the 2021 Dixie fire, and the 2022 Mosquito fire. PG&E Corporation’s and the Utility’s recorded liabilities for probable losses in connection with these fires correspond to the lower end of the range of reasonably estimable losses unless there is a better estimate, do not include several categories of potential damages that are not reasonably estimable, and are subject to change based on new information. The Utility could be subject to significant liability in excess of recoveries that would be expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
Previous wording
PG&E Corporation and the Utility have been the subject of investigations, regulatory enforcement actions, or criminal proceedings in connection with wildfires and could be the subject of additional investigations, regulatory enforcement actions, or criminal proceedings in connection with the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, the 2022 Mosquito fire, or other wildfires. For more information, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8.
Current wording
PG&E Corporation and the Utility have been the subject of investigations, regulatory enforcement actions, and criminal proceedings in connection with wildfires and could be the subject of additional investigations, regulatory enforcement actions, or criminal proceedings in connection with the 2019 Kincade fire, the 2021 Dixie fire, the 2022 Mosquito fire, or other wildfires. For more information, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8.
Previous wording
Additionally, under the doctrine of inverse condemnation, courts have imposed liability against utilities on the grounds that losses borne by the person whose property was damaged through a public-use undertaking should be spread across the community that benefited from such undertaking, even if the utility is unable to recover these costs through rates. In fact, in December 2017, the CPUC denied recovery of costs that San Diego Gas & Electric Company stated it had incurred as a result of the doctrine of inverse condemnation. Legal challenges to that denial were unsuccessful. Plaintiffs have asserted and continue to assert the doctrine of inverse condemnation in lawsuits related to certain wildfires that occurred in the Utility’s service area. Inverse condemnation imposes strict liability (including liability for attorneys’ fees) for damages as a result of the design, construction and maintenance of utility facilities, including utilities’ electric transmission lines. The Utility continues to dispute the applicability of inverse condemnation to the Utility, but the Utility may not be successful in challenging the applicability of inverse condemnation in the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, the 2022 Mosquito fire, or other litigation against PG&E Corporation or the Utility.
Current wording
Additionally, under the doctrine of inverse condemnation, courts have imposed liability against utilities on the grounds that losses borne by the person whose property was damaged through a public-use undertaking should be spread across the community that benefited from such undertaking, even if the utility is unable to recover these costs through rates. In fact, in December 2017, the CPUC denied recovery of costs that San Diego Gas & Electric Company stated it had incurred as a result of the doctrine of inverse condemnation. Legal challenges to that denial were unsuccessful. Plaintiffs have asserted and continue to assert the doctrine of inverse condemnation in lawsuits related to certain wildfires that occurred in the Utility’s service area. Inverse condemnation imposes strict liability (including liability for attorneys’ fees) for damages as a result of the design, construction and maintenance of utility facilities, including utilities’ electric transmission lines. The Utility continues to dispute the applicability of inverse condemnation to the Utility, but the Utility may not be successful in challenging the applicability of inverse condemnation in litigation against PG&E Corporation or the Utility.
Previous wording
Although the Utility has taken extensive measures to reduce the threat of future wildfires, the potential that the Utility’s equipment will be involved in the ignition of future wildfires, including catastrophic wildfires, is significant. This risk may be attributable to, and exacerbated by, a variety of factors, including climate (in particular, extended periods of seasonal dryness coupled with periods of high wind velocities and other storms), infrastructure, and vegetation conditions. The Utility’s significant infrastructure investment, vegetation management, and de-energization strategies do not eliminate wildfire risk and may not prevent future wildfires. Once an ignition has occurred, the Utility is unable to control the extent of damages. The extent of damages for a wildfire is primarily determined by environmental conditions (including weather and vegetation conditions), third-party suppression efforts, and the location of the wildfire.
Current wording
Although the Utility has taken extensive measures to reduce the threat of future wildfires, the potential that the Utility’s equipment will be involved in the ignition of future wildfires, including catastrophic wildfires, is significant. This risk may be attributable to, and exacerbated by, a variety of factors, including climate (in particular, extended periods of seasonal dryness coupled with periods of high wind velocities and other storms), infrastructure, and vegetation conditions. The Utility’s significant infrastructure investment, vegetation management, and de-energization strategies do not eliminate wildfire risk and may not prevent future wildfires. Once an ignition has occurred, the Utility is unable to control the extent of damages, which primarily determined by environmental conditions (including weather and vegetation conditions), third-party suppression efforts, and the location of the wildfire.
Previous wording
In addition, wildfires have had and could continue to have (as a result of any future wildfires) adverse consequences on the Utility’s proceedings with the CPUC and the FERC, and future regulatory proceedings, including future applications with the OEIS for the safety certification required by AB 1054. PG&E Corporation and the Utility may also suffer additional reputational harm and face an even more challenging operating, political, and regulatory environment as a result of the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, the 2022 Mosquito fire, or any future wildfires. For more information about the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, and the 2022 Mosquito fire, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8.
Current wording
In addition, wildfires have had and could continue to have (as a result of any future wildfires) adverse consequences on the Utility’s proceedings with the CPUC and the FERC, and future regulatory proceedings, including future applications with the OEIS for the annual safety certification. PG&E Corporation and the Utility may also suffer additional reputational harm and face an even more challenging operating, political, and regulatory environment as a result of the 2019 Kincade fire, the 2021 Dixie fire, the 2022 Mosquito fire, or any future wildfires. For more information about the 2019 Kincade fire, the 2021 Dixie fire, and the 2022 Mosquito fire, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8.
Previous wording
The Utility may be unable to recover all or a significant portion of its costs in excess of insurance coverage in connection with wildfires, through rates, or from the Wildfire Fund in a timely manner.
Current wording
The Utility may be unable to recover all or a significant portion of its costs in excess of insurance coverage in connection with wildfires through rates.
Previous wording
The Utility could incur substantial costs in excess of insurance coverage or amounts potentially available under the Wildfire Fund under AB 1054 in the future in connection with the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, and the 2022 Mosquito fire. The Utility may not be allowed to recover costs in excess of insurance or amounts potentially available under the Wildfire Fund under AB 1054 in the future either through FERC TO rates or as costs recorded to the WEMA, even if a court decision were to determine that the Utility is liable as a result of the application of the doctrine of inverse condemnation. The inability to recover all or a significant portion of costs in excess of insurance through rates or by collecting such rates in a timely manner could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. For more information on wildfire recovery risk, see “The Wildfire Fund and other provisions of AB 1054 may not effectively mitigate the risk of liability for damages arising from catastrophic wildfires” above and Note 14 of the Notes to the Consolidated Financial Statements in Item 8.
Current wording
PG&E Corporation’s and the Utility’s accrued losses for the 2019 Kincade fire and the 2021 Dixie fire of $1.225 billion and $1.925 billion exceed the amounts of available liability insurance coverage of $430 million and $527 million, respectively. PG&E Corporation and the Utility could also incur substantial costs in excess of insurance coverage in connection with the 2022 Mosquito fire. As of December 31, 2024, the Utility has recorded probable recoveries of $602 million and $60 million for the 2021 Dixie fire and 2022 Mosquito fire, respectively, through FERC TO rates or as costs recorded to the WEMA. The Utility would not be allowed to recover these costs in excess of insurance to the extent that the CPUC or the FERC determines that they were incurred imprudently. The inability to recover all or a significant portion of costs in excess of insurance through rates could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. For more information on wildfire recovery risk, see “The Wildfire Fund and other provisions of AB 1054 may not effectively mitigate the risk of liability for damages arising from catastrophic wildfires” above and Note 14 of the Notes to the Consolidated Financial Statements in Item 8.
Previous wording
Further, the Utility often enters into agreements for third-party contractors to perform work, such as patrolling and inspection of facilities, vegetation management, or the construction or demolition or facilities, and the Utility may have less control over contractors than its employees. The Utility may retain liability for the quality and completion of the contractor’s work and can be subject to penalties or other enforcement action if the contractor violates applicable laws, rules, regulations, or orders. The Utility may also be subject to liability, penalties or other enforcement action as a result of personal injury or death caused by third-party contractor actions or inactions.
Current wording
Further, the Utility often enters into agreements for third-party contractors to perform work, such as patrolling and inspection of facilities, vegetation management, or the construction or demolition or facilities. The Utility has less control over contractors than its employees but may retain liability for the quality and completion of the contractor’s work. The Utility has been and may in the future be subject to penalties or other enforcement action if a contractor violates applicable laws, rules, regulations, or orders. The Utility also has been and may be subject to liability, penalties, or other enforcement action as a result of personal injury or death caused by third-party contractor actions or inactions.
Previous wording
The electric power and natural gas industries are undergoing significant changes driven by technological advancements and a decarbonized economy, which could lead to the reduction in demand for natural gas as an energy resource that could impact the Utility’s ability to recover through rates its investment.
Current wording
The electric power and natural gas industries are undergoing significant changes driven by technological advancements and a decarbonized economy, which could lead to the reduction in demand for natural gas as an energy resource that could impact the Utility’s ability to recover the value of its investments through rates.
Previous wording
Various jurisdictions within California have enacted prohibitions or restrictions on use and consumption of natural gas, for example in buildings, that will reduce the use of natural gas. Reducing natural gas use reduces the gas customer base and could diminish the need for gas infrastructure and, as a result, could lead to certain gas assets no longer being “used and useful,” potentially causing substantial investment value of gas assets to be stranded (under CPUC precedent, when an asset no longer meets the standard of “used and useful,” the asset is removed from rate base, which results in a reduction in associated rate recovery). A substantial reduction in natural gas as an energy source in California without adequate and appropriate recovery of investments could result in impairment of the Utility’s natural gas infrastructure assets if they were not permitted to be repurposed for alternative fuels, were required to be depreciated on an accelerated basis, or were to become stranded. However, even as natural gas demand is projected to decline over time, the costs of operating a safe and reliable gas delivery system in California have been increasing, among other things, to cover the cost of long-term pipeline safety enhancements. If the Utility is unable to recover through rates its investments into the natural gas system while still ensuring gas system safety and reliability, its financial condition, results of operations, liquidity, and cash flows could be materially affected.
Current wording
Various jurisdictions within California have enacted prohibitions or restrictions on use and consumption of natural gas, for example in buildings, that will reduce the use of natural gas. Reducing natural gas use reduces the gas customer base and could diminish the need for gas infrastructure and, as a result, could lead to certain gas assets no longer being “used and useful” (under CPUC precedent, when an asset no longer meets the standard of “used and useful,” the asset is removed from rate base, which may result in a reduction in associated rate recovery). In that case, gas assets with substantial investment value could become stranded, resulting in accelerated depreciation or impairment of assets. The Utility could also be required to incur significant decommissioning costs, which may require additional funding. However, even as natural gas demand is projected to decline over time, the costs of operating a safe and reliable gas delivery system in California have been increasing, among other things, to cover the cost of long-term pipeline safety enhancements. If the Utility is unable to recover through rates its investments into the natural gas system while still ensuring gas system safety and reliability, its financial condition, results of operations, liquidity, and cash flows could be materially affected.
Previous wording
PG&E Corporation and the Utility face various cybersecurity threats, including attempts to gain unauthorized access to their systems and networks, denial-of-service attacks, threats to their information technology infrastructure, ransomware and phishing attacks, and attempts to gain unauthorized access to confidential or sensitive information about the Utility, customers and employees. These threats come from a variety of highly organized actors, including nation-state actors. PG&E Corporation, the Utility and their third-party vendors have been subject to, and will likely continue to be subject to, threats, breaches and attempts to gain unauthorized access to the Utility’s information technology systems or confidential or sensitive data (including information about customers and employees), or to disrupt the Utility’s operations. The Utility may not be able to prevent unauthorized access to its operational networks, information technology systems or data, or the disruption of its operations. Such events could subject the Utility to significant expenses, claims by customers or third parties, government inquiries, penalties for violation of applicable privacy laws, investigations, lawsuits, and regulatory actions and could result in material fines, penalties, loss of customers, and harm to PG&E Corporation’s and the Utility’s reputation, any of which could have a material effect on PG&E Corporation’s and the Utility’s business strategy, financial condition, or results of operations. For more information, see Item 1C. Cybersecurity.
Current wording
PG&E Corporation and the Utility face various cybersecurity threats, including attempts to gain unauthorized access to their systems and networks, denial-of-service attacks, threats to their information technology infrastructure, ransomware and phishing attacks, and attempts to gain unauthorized access to confidential or sensitive information about the Utility, customers and employees. These threats come from a variety of highly organized actors, including nation-state actors. PG&E Corporation, the Utility and their third-party vendors have been subject to, and will likely continue to be subject to, threats, breaches and attempts to gain unauthorized access to the Utility’s information technology systems or confidential or sensitive data (including information about customers and employees), or to disrupt the Utility’s operations. Additionally, artificial intelligence, including generative artificial intelligence, may be used to facilitate or perpetrate these cybersecurity threats, and PG&E Corporation’s and the Utility’s use of generative artificial intelligence (and use by their vendors and agents) may subject them to data privacy, legal, and security risks. The Utility may not be able to prevent unauthorized access to its operational networks, information technology systems or data, or the disruption of its operations. Such events could subject the Utility to significant expenses, claims by customers or third parties, government inquiries, penalties for violation of applicable privacy laws, investigations, lawsuits, and regulatory actions and could result in material fines, penalties, loss of customers, and harm to PG&E Corporation’s and the Utility’s reputation, any of which could have a material effect on PG&E Corporation’s and the Utility’s business strategy, financial condition, or results of operations. For more information, see Item 1C. Cybersecurity.
Previous wording
The operation of the Utility’s nuclear generation facilities exposes it to potentially significant liabilities from environmental, health, and financial risks, such as risks relating to operation of the Diablo Canyon nuclear generation units as well as the storage, handling, and disposal of spent nuclear fuel, and the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act. If the Utility incurs losses that are either not covered by insurance or exceed the amount of insurance coverage available, such losses could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, the Utility may be required under federal law to pay up to $275 million of liabilities arising out of each nuclear incident occurring not only at the Utility’s Diablo Canyon facility but at any other nuclear power plant in the United States.
Current wording
The operation of the Utility’s nuclear generation facilities exposes it to potentially significant liabilities from environmental, health, and financial risks, such as risks relating to operation of the DCPP nuclear generation units as well as the storage, handling, and disposal of spent nuclear fuel, and the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act. If the Utility incurs losses that are either not covered by insurance or exceed the amount of insurance coverage available, such losses could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, the Utility may be required under federal law to pay up to $332 million of liabilities arising out of each nuclear incident occurring not only at the Utility’s DCPP facility but at any other nuclear power plant in the United States.
Previous wording
The Utility has incurred, and may continue to incur, substantial costs to comply with NRC regulations and orders. See “Regulatory Environment” in Item 1. Business above. If the Utility were unable to recover these costs, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. The Utility may determine that it cannot comply with the new regulations or orders in a feasible and economic manner and voluntarily cease operations; alternatively, the NRC may order the Utility to cease operations until the Utility can comply with new regulations, orders, or decisions. The Utility may incur a material charge if it ceases operations at Diablo Canyon’s two nuclear generation units before their respective current licenses expire in 2024 and 2025. As of December 31, 2023, the Utility’s unrecovered investment in Diablo Canyon was $595 million.
Current wording
New legislation, regulations, orders, or their interpretation could increase the Utility’s costs to operate DCPP or lead to the Utility ceasing operations at DCPP. The Utility has incurred, and may continue to incur, substantial costs to comply with NRC regulations and orders. See “Regulatory Environment” in Item 1. Business above. Nuclear opposition groups regularly file petitions at the NRC and in other forums challenging the actions of the NRC and urging governmental entities to adopt laws or policies in opposition to nuclear power. As a result, the Utility may determine that it cannot comply with the new regulations or orders in a feasible and economic manner and voluntarily cease operations; alternatively, the NRC may order the Utility to cease operations until the Utility can comply with new regulations, orders, or decisions. Operations at the Utility’s two nuclear generation units at DCPP could cease before their planned retirement dates in 2029 and 2030. In such an instance, the Utility would not receive the payments for extended operations at DCPP and could be required to record a charge for the remaining amount of its unrecovered investment. These developments could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
Previous wording
The Utility’s workforce is aging, and many employees are or will become eligible to retire within the next few years. The Utility’s efforts to recruit and train new field service personnel may be ineffective, and the Utility may be faced with a shortage of experienced and qualified personnel in certain specialty operational positions. Additionally, the Utility could experience workforce disruptions from personnel in those positions as a result of labor activity, the COVID-19 pandemic or other pandemics, or governmental regulation of pandemic protections. If the Utility were to experience such a shortage or disruptions, work stoppages could occur.
Current wording
The Utility’s workforce is aging, and many employees are or will become eligible to retire within the next few years. The Utility’s efforts to recruit and train new field service personnel may be ineffective, and the Utility may be faced with a shortage of experienced and qualified personnel in certain specialty operational positions, such as certain positions at DCPP. Additionally, the Utility could experience workforce disruptions from personnel in those positions as a result of labor activity, pandemics, or governmental regulation of pandemic protections. If the Utility were to experience such a shortage or disruptions, work stoppages could occur.
Previous wording
Extreme weather, drought and shifting climate patterns have intensified the challenges associated with many of the other risks facing PG&E Corporation and the Utility, particularly wildfire management in California. The Utility’s service area encompasses some of the most densely forested areas in California and, as a consequence, is subject to higher risk from vegetation-related ignition events than other California IOUs. Further, environmental extremes, such as drought conditions and extreme heat followed by periods of wet weather, can drive additional vegetation growth (which can then fuel fires) and influence both the likelihood and severity of extraordinary wildfire events. In particular, the risk posed by wildfires, including during the recent wildfire seasons, has increased in the Utility’s service area as a result of an ongoing extended period of drought, bark beetle infestations in the California forest, and wildfire fuel increases due to rising temperatures and record rainfall following the drought, and strong wind events, among other environmental factors. Precipitation patterns in California vary significantly from year to year, often leading to periods of severe to extreme drought. Drought conditions often occur and can persist in nearly all of the Utility’s service area depending on the amount of precipitation received in the current or previous water years. More than half of the Utility’s service area is in an HFTD. Contributing factors other than environmental can include local land use policies and historical forestry management practices. The combined effects of extreme weather and climate change also impact this risk. In January 2018, the CPUC approved a statewide fire-threat map that shows that approximately half of the Utility’s service area is facing “elevated” or “extreme” fire danger. Approximately 25,000 circuit miles of the Utility’s nearly 80,000 distribution overhead circuit miles and approximately 5,500 miles of the nearly 18,000 transmission overhead circuit miles are in such HFTDs, significantly more in total than other California IOUs.
Current wording
Extreme weather, drought and shifting climate patterns have intensified the challenges associated with many of the other risks facing PG&E Corporation and the Utility, particularly wildfire management in California. The Utility’s service area encompasses some of the most densely forested areas in California and, as a consequence, is subject to higher risk from vegetation-related ignition events than other California IOUs. Further, environmental extremes, such as drought conditions and extreme heat followed by periods of wet weather, can drive additional vegetation growth (which can then fuel fires) and influence both the likelihood and severity of extraordinary wildfire events. In particular, the risk posed by wildfires, including during the recent wildfire seasons, has increased in the Utility’s service area as a result of an ongoing extended period of drought, bark beetle infestations in the California forest, and wildfire fuel increases due to rising temperatures and record rainfall following the drought, and strong wind events, among other environmental factors. Precipitation patterns in California vary significantly from year to year, often leading to periods of severe to extreme drought. Drought conditions often occur and can persist in nearly all of the Utility’s service area depending on the amount of precipitation received in the current or previous water years. More than half of the Utility’s service area is in an HFTD. Contributing factors other than environmental can include local land use policies and historical forestry management practices. The combined effects of extreme weather and climate change also impact this risk. In January 2018, the CPUC approved a statewide fire-threat map that shows that approximately half of the Utility’s service area is facing “elevated” or “extreme” fire danger. Approximately 25,000 circuit miles of the Utility’s nearly 80,000 distribution overhead circuit miles and approximately 5,000 miles of the nearly 18,000 transmission overhead circuit miles are in such HFTDs, significantly more in total than other California IOUs.
Previous wording
Severe weather events and other natural disasters, including wildfires and other fires, storms, tornadoes, floods, extreme heat events, drought, earthquakes, lightning, tsunamis, rising sea levels, pandemics, solar events, electromagnetic events, wind events or other weather-related conditions, climate change, or natural disasters, could result in severe business or operational disruptions, prolonged power outages, property damage, injuries and loss of life, significant decreases in revenues and earnings, and significant additional costs to PG&E Corporation and the Utility. Any such event could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. Any such event also could lead to significant claims against the Utility. Further, these events could result in regulatory penalties and disallowances, particularly if the Utility encounters difficulties in restoring power to its customers on a timely basis or if the related losses are found to be the result of the Utility’s practices or the failure of electric and other equipment of the Utility.
Current wording
Severe weather events and other natural disasters, including wildfires and other fires, storms, tornadoes, floods, extreme heat events, drought, earthquakes, lightning, tsunamis, rising sea levels, mudslides, pandemics, solar events, electromagnetic events, wind events or other weather-related conditions, climate change, or natural disasters, could result in severe business or operational disruptions, prolonged power outages, property damage, injuries and loss of life, significant decreases in revenues and earnings, and significant additional costs to PG&E Corporation and the Utility. Any such event could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. Any such event also could lead to significant claims against the Utility. Further, these events could result in regulatory penalties and disallowances, particularly if the Utility encounters difficulties in restoring power to its customers on a timely basis or if the related losses are found to be the result of the Utility’s practices or the failure of electric and other equipment of the Utility.
Previous wording
Further, the Utility has been studying the potential effects of climate change (increased severity and frequency of storm events, sea level rise, land subsidence, change in temperature extremes, changes in precipitation patterns and drought, and wildfire) on its assets, operations, and services, and the Utility is developing adaptation plans to set forth a strategy for those events and conditions that the Utility believes are most significant. Consequences of these climate-driven events may vary widely and could include increased stress on the energy supply network due to new patterns of demand, reduced hydroelectric output, physical damage to the Utility’s infrastructure, higher operational costs, and an increase in the number and duration of customer outages and safety consequences for both employees and customers. As a result, the Utility’s hydroelectric generation could change, and the Utility would need to consider managing or acquiring additional generation. If the Utility increases its reliance on conventional generation resources to replace hydroelectric generation and to meet increased customer demand, it may become more costly for the Utility to comply with GHG emissions limits. In addition, climate hazards such as heatwaves, windstorms, and flooding caused by rising sea levels and extreme storms could damage the Utility’s facilities, including gas, generation, and electric transmission and distribution assets. The Utility could incur substantial costs to repair or replace facilities, restore service, or compensate customers and other third parties for damages or injuries, or regulators could order the Utility to perform additional work. The Utility anticipates that the increased costs would generally be recovered through rates, but as rate pressures increase, the likelihood of disallowance or non-recovery may increase. See “Concerns about high rates for the Utility’s customers could negatively impact PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows” below.
Current wording
Further, the Utility has been studying the potential effects of climate change (increased severity and frequency of storm events, sea level rise, land subsidence, change in temperature extremes, changes in precipitation patterns and drought, and wildfire) on its assets, operations, and services, and the Utility is developing adaptation plans to set forth a strategy for those events and conditions that the Utility believes are most significant. Consequences of these climate-driven events may vary widely and could include increased stress on the energy supply network due to new patterns of demand, reduced hydroelectric output, physical damage to the Utility’s infrastructure, higher operational costs, and an increase in the number and duration of customer outages and safety consequences for both employees and customers. As a result, the Utility’s hydroelectric generation could change, and the Utility would need to consider managing or acquiring additional generation. If the Utility increases its reliance on conventional generation resources to replace hydroelectric generation and to meet increased customer demand, it may become more costly for the Utility to comply with GHG emissions limits. In addition, climate hazards have damaged and could again damage the Utility’s facilities. The Utility could incur substantial costs to repair or replace facilities, restore service, or compensate customers and other third parties for damages or injuries, or regulators could order the Utility to perform additional work. The Utility anticipates that the increased costs would generally be recovered through rates, but as rate pressures increase, the likelihood of disallowance or non-recovery may increase. See “Concerns about high rates for the Utility’s customers could negatively impact PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows” below.
Previous wording
Additionally, PG&E Corporation and the Utility collect and retain certain personal information of their customers, shareholders, and employees in connection with their business. PG&E Corporation’s and the Utility’s risk management and information security measures may be ineffective, and the personal information that they collect, as well as other commercially-sensitive data that they possess, could become compromised because of certain events, including a cyber incident, the insufficiency or failure of such measures, human error, the misappropriation of data, or the occurrence of any of the foregoing at any third party with which PG&E Corporation or the Utility has shared information. If any of these events were to transpire, it could subject PG&E Corporation and the Utility to financial liability.
Current wording
PG&E Corporation and the Utility collect and retain certain personal information of their customers, shareholders, and employees in connection with their business. The State of California has enacted privacy laws in recent years, and final regulations under the California Privacy Rights Act are under development. PG&E Corporation’s and the Utility’s risk management and information security measures may be ineffective, and the personal information that they collect, as well as other commercially-sensitive data that they possess, could become compromised because of certain events, including a cyber incident, the insufficiency or failure of such measures, human error, the misappropriation of data, or the occurrence of any of the foregoing at any third party with which PG&E Corporation or the Utility has shared information. If any of these events were to transpire, it could subject PG&E Corporation and the Utility to financial liability.
Previous wording
PG&E Corporation and the Utility are subject to federal and state privacy laws, which grant consumers rights and protections, including, among other things, the ability to opt out of receiving certain communications and certain data sharing with third parties.
Current wording
PG&E Corporation and the Utility are subject to federal and state privacy laws, which grant consumers rights and protections, including, among other things, the ability to opt out of receiving certain communications and data sharing with third parties.
Previous wording
Also, SB 100 (the 100 Percent Clean Energy Act of 2018) increased the percentage from 50% to 60% of California’s electricity portfolio that must come from renewables by 2030; and established state policy that 100% of all retail electricity sales must come from renewable portfolio standard-eligible or carbon-free resources by 2045. Failure to comply with SB 100 could result in fines imposed on PG&E Corporation and the Utility that could be material.
Current wording
Also, SB 100 (the 100 Percent Clean Energy Act of 2018) increased the percentage from 50% to 60% of California’s electricity portfolio that must come from renewables by 2030; and established state policy that 100% of all retail electricity sales must come from renewable portfolio standard-eligible or carbon-free resources by 2045. Failure to comply with SB 100 could result in material fines being imposed on PG&E Corporation and the Utility.
Previous wording
The Utility could be subject to additional regulatory or governmental enforcement action in the future with respect to compliance with federal, state, or local laws, regulations or orders that could result in additional fines, penalties or customer refunds, including those regarding renewable energy and RA requirements; customer billing; customer service; affiliate transactions; vegetation management; design, construction, operating and maintenance practices; safety and inspection practices; compliance with CPUC GOs or other applicable CPUC decisions or regulations; whether the Utility is able to achieve the targets in its WMPs; federal electric reliability standards; and environmental compliance. CPUC staff could also impose penalties on the Utility in the future in accordance with its authority under the gas and electric safety citation programs. The amount of such fines, penalties, or customer refunds depends on a variety of factors and could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
Current wording
The Utility could be subject to additional regulatory or governmental enforcement action in the future with respect to compliance with federal, state, or local laws, regulations or orders that could result in additional fines, penalties or customer refunds, including those regarding renewable energy and RA requirements; customer billing; customer service; affiliate transactions; wildfire mitigation initiatives (including EPSS, PSPS, vegetation management, asset inspections, and system hardening); design, construction, operating and maintenance practices; safety and inspection practices; compliance with CPUC general orders (“GOs”) or other applicable CPUC decisions or regulations; whether the Utility is able to achieve the targets in its WMPs; federal electric reliability standards; and environmental compliance. CPUC staff could also impose penalties on the Utility in the future in accordance with its authority under the gas and electric safety citation programs. The amount of such fines, penalties, or customer refunds depends on a variety of factors and could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
Previous wording
The Utility also is a target of a number of investigations, in addition to certain investigations in connection with the wildfires. See “Risks Related to Wildfires” above. The Utility is unable to predict the outcome of pending investigations, including whether any charges will be brought against the Utility, or the amount of any costs and expenses associated with such investigations.
Current wording
The Utility also is a target of a number of investigations, in addition to certain investigations in connection with the wildfires. See “Risks Related to Wildfires” above. PG&E Corporation and the Utility could be subject to additional investigations, regulatory proceedings, or other enforcement actions. The Utility is unable to predict the outcome of these pending or potential investigations, including whether any charges will be brought against the Utility, or the amount of any costs and expenses associated with such investigations.
Previous wording
If these investigations result in enforcement action against the Utility, the Utility could incur additional fines or penalties, the amount of which could be substantial, and, in the event of a judgment against the Utility, suffer further ongoing negative consequences. Furthermore, a negative outcome in any of these investigations, or future enforcement actions, could negatively affect the outcome of future ratemaking and regulatory proceedings to which the Utility may be subject; for example, by enabling parties to challenge the Utility’s request to recover costs that the parties allege are somehow related to the Utility’s violations.
Current wording
If these investigations result in enforcement action against the Utility, the Utility could incur additional fines, penalties, customer rebates, or other payments, the amount of which could be substantial, and, in the event of a judgment against the Utility, suffer further ongoing negative consequences. Furthermore, a negative outcome in any of these investigations, or future enforcement actions, could negatively affect the outcome of future ratemaking and regulatory proceedings to which the Utility may be subject; for example, by enabling parties to challenge the Utility’s request to recover costs that the parties allege are somehow related to the Utility’s violations.
Previous wording
The Utility’s ratemaking and cost recovery proceedings may not authorize sufficient revenues, or the Utility’s actual costs could exceed its authorized or forecasted costs due to various factors.
Current wording
The Utility’s ratemaking and cost recovery proceedings may not authorize sufficient revenues, or the Utility’s actual costs could exceed its authorized or forecasted costs.
Previous wording
In addition to the amount of authorized revenues, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected if the Utility’s actual costs differ from authorized or forecast costs. The Utility’s ability to recover its costs and earn a reasonable rate of return can be affected by many factors, including the time delay between when costs are incurred and when those costs are recovered through rates. The CPUC or the FERC may not allow the Utility to recover costs on the basis that such costs were not reasonably or prudently incurred or for other reasons. Further, the Utility may be required to incur expenses before the relevant regulatory agency approves the recovery of such costs. For example, the Utility has incurred, and continues to incur, costs to strengthen its wildfire mitigation and prevention efforts before it is clear whether such costs will be recoverable through rates. Also, the CPUC may deny recovery of uninsured wildfire-related costs incurred by the Utility if the CPUC determines that the Utility was not prudent.
Current wording
In addition to the amount of authorized revenues, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected if the Utility’s actual costs differ from authorized or forecast costs. The Utility’s ability to recover its costs and earn a reasonable rate of return can be affected by many factors, including the time delay between when costs are incurred and when those costs are recovered through rates. The CPUC or the FERC have not allowed and may in the future not allow the Utility to recover costs on the basis that such costs were not reasonably or prudently incurred or for other reasons. Further, the Utility may be required to incur expenses before the relevant regulatory agency approves the recovery of such costs. For example, the Utility has incurred, and continues to incur, wildfire mitigation and prevention costs before it is clear whether such costs will be recoverable through rates. OEIS has required and may in the future require the Utility to perform work for which the CPUC has not yet authorized recovery. Also, the CPUC may deny recovery of uninsured wildfire-related costs incurred by the Utility if the CPUC determines that the Utility was not prudent.
Previous wording
Jurisdictions may attempt to acquire the Utility’s assets through eminent domain, and third parties may attempt to acquire the Utility’s customers by bypassing the Utility’s electric infrastructure system.
Current wording
Jurisdictions attempt to acquire the Utility’s assets through eminent domain, and third parties attempt to acquire the Utility’s customers by bypassing the Utility’s electric infrastructure system.
Previous wording
Jurisdictions may attempt to acquire the Utility’s assets through eminent domain (“municipalization”). In particular, the City and County of San Francisco (“San Francisco”) has submitted a petition with the CPUC seeking a valuation of the Utility’s electric assets in San Francisco and has expressed intent to acquire such assets. San Francisco would still need to, among other things, initiate and prevail in an eminent domain action in state court to acquire the Utility’s assets, but the Utility may not be successful in defending against such an action or related regulatory proceeding. If municipalization proceedings are permitted to move forward and are successful, the Utility would be entitled to receive the fair market value of the assets that are subject to the takeover effort, as well as associated severance damages, but valuation issues in any municipalization proceeding would be highly contentious and could result in the Utility receiving less than what it believes is just compensation for the applicable assets. Any assets acquired by a third party through eminent domain would be excluded from the Utility’s rate base, reducing the Utility’s revenues and opportunity to earn a return on such assets. In addition, third parties may attempt to bypass the Utility’s existing electric infrastructure system to provide retail electric service to discrete geographic areas or specific customers. Utility assets that are targeted for municipalization, as well as existing or potential future Utility customers targeted for electric services by third parties that bypass the Utility’s facilities, generally are located in geographic areas that have a lower cost of service relative to billed revenues, so municipalization (or bypass) could negatively impact the affordability of the Utility’s service for remaining Utility customers served outside of those geographic areas. A successful municipalization or bypass attempt could also encourage similar attempts by other municipalities or third parties which, if successful, would further divide the Utility’s assets and reduce the Utility’s rate base, profitability, and affordability for remaining Utility customers. It is also unclear how the CPUC would allocate the compensation received by the Utility for any involuntary sale of its assets between shareholders and customers. As a result of these factors, municipalization or electric bypass could materially affect the Utility’s financial condition, results of operations, liquidity, and cash flow.
Current wording
Jurisdictions attempt to acquire the Utility’s assets through eminent domain (“municipalization”). For example, the City and County of San Francisco (“San Francisco”) has submitted a petition with the CPUC seeking a valuation of the Utility’s electric assets in or serving San Francisco and has expressed intent to acquire such assets. San Francisco would still need to, among other things, initiate and prevail in an eminent domain action in state court to acquire the Utility’s assets, but the Utility may not be successful in defending against such an action or related regulatory proceeding. If municipalization proceedings are permitted to move forward and are successful, the Utility would be entitled to receive the fair market value of the assets that are subject to the takeover effort, as well as associated severance damages, but valuation issues in any municipalization proceeding would be highly contentious and could result in the Utility receiving less than what it believes is just compensation for the applicable assets. Any assets acquired by a third party through eminent domain would be excluded from the Utility’s rate base, reducing the Utility’s revenues and opportunity to earn a return on such assets. In addition, third parties attempt to bypass the Utility’s existing electric infrastructure system to provide retail electric service to discrete geographic areas or specific customers. Utility assets that are targeted for municipalization, as well as existing or potential future Utility customers targeted for electric services by third parties that bypass the Utility’s facilities, generally are located in geographic areas that have a lower cost of service relative to billed revenues, so municipalization (or bypass) could negatively impact the affordability of the Utility’s service for remaining Utility customers served outside of those geographic areas. A successful municipalization or bypass attempt could also encourage similar attempts by other municipalities or third parties which, if successful, would further divide the Utility’s assets and reduce the Utility’s rate base, profitability, and affordability for remaining Utility customers. It is also unclear how the CPUC would allocate the compensation received by the Utility for any involuntary sale of its assets between shareholders and customers. As a result of these factors, municipalization or electric bypass could materially affect the Utility’s financial condition, results of operations, liquidity, and cash flow.
Previous wording
PG&E Corporation and the Utility have a substantial amount of indebtedness, most of which is secured by liens on certain assets of PG&E Corporation and the Utility. As of December 31, 2023, PG&E Corporation had approximately $4.65 billion of outstanding indebtedness (such indebtedness consisting of PG&E Corporation’s $2.15 billion aggregate principal amount of convertible senior secured notes due 2027, $1.0 billion aggregate principal amount of senior secured notes due 2028, $1.0 billion aggregate principal amount of senior secured notes due 2030, and $500 million of borrowings under the secured term loan agreement entered into in June 2020), and the Utility had approximately $48.0 billion of outstanding indebtedness. In addition, PG&E Corporation had $500 million of additional borrowing capacity under the Corporation Revolving Credit Agreement, and the Utility had $2.0 billion of additional borrowing capacity under the Utility Revolving Credit Agreement. In addition, the Utility had outstanding preferred stock with an aggregate liquidation preference of $252 million.
Current wording
PG&E Corporation and the Utility have a substantial amount of indebtedness, most of which is secured by liens on certain assets of PG&E Corporation and the Utility. As of December 31, 2024, PG&E Corporation had approximately $5.65 billion of outstanding indebtedness (such indebtedness consisting of PG&E Corporation’s $2.15 billion aggregate principal amount of convertible senior secured notes due 2027, $1.5 billion aggregate principal amount of Junior Subordinated Notes due 2055, $1.0 billion aggregate principal amount of senior secured notes due 2028, and $1.0 billion aggregate principal amount of senior secured notes due 2030, and the Utility had approximately $51.9 billion of outstanding indebtedness. In addition, PG&E Corporation had $500 million of additional borrowing capacity under the Corporation Revolving Credit Agreement, and the Utility had $3.8 billion of additional borrowing capacity under the Utility Revolving Credit Agreement and $1.5 billion under the Receivables Securitization Program. In addition, PG&E Corporation and the Utility had outstanding preferred stock with aggregate liquidation preferences of $1.6 billion and $258 million, respectively.
Previous wording
The restrictions contained in these material financing agreements could affect PG&E Corporation’s and the Utility’s ability to operate their business and may limit their ability to react to market conditions or take advantage of potential business opportunities as they arise. For example, such restrictions could adversely affect PG&E Corporation’s and the Utility’s ability to finance their operations and expenditures, make strategic acquisitions, investments, or alliances, sell assets, restructure their organization, or finance their capital needs. Additionally, PG&E Corporation’s and the Utility’s ability to comply with these covenants and restrictions may be affected by events beyond their control, including prevailing regulatory, economic, financial and industry conditions.
Current wording
The restrictions contained in these material financing agreements could affect PG&E Corporation’s and the Utility’s ability to operate their business and may limit their ability to react to market conditions or take advantage of potential business opportunities as they arise. For example, such restrictions could adversely affect PG&E Corporation’s and the Utility’s ability to finance their operations and expenditures, make strategic acquisitions, investments, or alliances, sell assets, restructure their organization, or finance their capital needs. PG&E Corporation’s and the Utility’s ability to comply with these covenants and restrictions may be affected by events beyond their control, including prevailing regulatory, economic, financial and industry conditions. Failure to comply with these covenants could result in an event of default, which, if not cured or waived, could accelerate PG&E Corporation’s or the Utility’s repayment obligations and could result in a default, acceleration or other consequences under other agreements. For example, a default on indebtedness in a principal amount in excess of $200 million could result in a cross-default or cross-acceleration.
Previous wording
PG&E Corporation common stock is subject to ownership and transfer restrictions intended to preserve PG&E Corporation’s ability to use its net operating loss carryforwards and other tax attributes.
Current wording
PG&E Corporation capital stock is subject to ownership and transfer restrictions intended to preserve PG&E Corporation’s ability to use its net operating loss carryforwards and other tax attributes.
Previous wording
PG&E Corporation has incurred and may also incur in the future significant net operating loss carryforwards and other tax attributes, the amount and availability of which are subject to certain qualifications, limitations and uncertainties. The Amended Articles (as defined below) impose certain restrictions on the transferability and ownership of PG&E Corporation common stock and preferred stock (together, the “capital stock”) and other interests designated as “stock” of PG&E Corporation by the Board of Directors as disclosed in an SEC filing (such stock and other interests, the “Equity Securities,” and such restrictions on transferability and ownership, the “Ownership Restrictions”) in order to reduce the possibility of an equity ownership shift that could result in limitations on PG&E Corporation’s ability to utilize net operating loss carryforwards and other tax attributes from prior taxable years or periods for federal income tax purposes. Any acquisition of PG&E Corporation capital stock that results in a shareholder being in violation of these restrictions may not be valid.
Current wording
PG&E Corporation has incurred and may also incur in the future significant net operating loss carryforwards and other tax attributes, the amount and availability of which are subject to certain qualifications, limitations and uncertainties. The Amended Articles (as defined below) impose certain restrictions on the transferability and ownership of PG&E Corporation common stock and preferred stock (together, the “capital stock”) and other interests designated as “stock” of PG&E Corporation by the Board of Directors as disclosed in an SEC filing (such stock and other interests, the “Equity Securities,” and such restrictions on transferability and ownership, the “Ownership Restrictions”) in order to reduce the possibility of an equity ownership shift that could result in limitations on PG&E Corporation’s ability to utilize net operating loss carryforwards and other tax attributes from prior taxable years or periods for income tax purposes. Any acquisition of PG&E Corporation capital stock that results in a shareholder being in violation of these restrictions may not be valid.
Previous wording
Subject to certain exceptions, the Ownership Restrictions restrict (i) any person or entity (including certain groups of persons) from directly or indirectly acquiring or accumulating 4.75% or more of the outstanding Equity Securities and (ii) the ability of any person or entity (including certain groups of persons) already owning, directly or indirectly, 4.75% or more of the Equity Securities to increase their proportionate interest in the Equity Securities. Additionally, the application of the Ownership Restrictions, as defined in PG&E Corporation’s Amended Articles of Incorporation, will be determined on the basis of a number of shares outstanding that differs materially from the number of shares reported as outstanding on the cover page of its periodic reports under the Exchange Act because it excludes shares owned by the Utility. See “Tax Matters” in Item 7. MD&A for an example of these calculations. Any transferee receiving Equity Securities that would result in a violation of the Ownership Restrictions will not be recognized as a shareholder of PG&E Corporation or entitled to any rights of shareholders, including, without limitation, the right to vote and to receive dividends or distributions, whether liquidating or otherwise, in each case, with respect to the Equity Securities causing the violation.
Current wording
Subject to certain exceptions, the Ownership Restrictions restrict (i) any person or entity (including certain groups of persons) from directly or indirectly acquiring or accumulating 4.75% or more of the combined value of outstanding Equity Securities and (ii) the ability of any person or entity (including certain groups of persons) already owning, directly or indirectly, 4.75% or more of the combined value of the Equity Securities to increase their proportionate interest in the Equity Securities. Additionally, the application of the Ownership Restrictions, as defined in PG&E Corporation’s Amended Articles of Incorporation, will be determined on the basis of a number of shares outstanding that differs materially from the number of shares reported as outstanding on the cover page of its periodic reports under the Exchange Act because it excludes shares owned by the Utility. See “Tax Matters” in Item 7. MD&A for an example of these calculations. Any transferee receiving Equity Securities that would result in a violation of the Ownership Restrictions will not be recognized as a shareholder of PG&E Corporation or entitled to any rights of shareholders, including, without limitation, the right to vote and to receive dividends or distributions, whether liquidating or otherwise, in each case, with respect to the Equity Securities causing the violation.
Previous wording
PG&E Corporation may not be able to use some or all of its net operating loss carryforwards and other tax attributes to
Current wording
PG&E Corporation may not be able to use some or all of its net operating loss carryforwards and other tax attributes to offset future income.
Showing the first 40 of 47 pairs. Open the source sections for the rest.
Rearranged current paragraphs (4)
Current report — wording carried from elsewhere
•Changes in the electric power and natural gas industries;
Current report — wording carried from elsewhere
Furthermore, the Wildfire Fund will only be available for payment of eligible claims so long as there are sufficient funds remaining in the Wildfire Fund. Such funds could be depleted more quickly than PG&E Corporation’s and the Utility’s 20-year estimate for the life of the Wildfire Fund (see Note 2 of the Notes to the Consolidated Financial Statements in Item 8), including as a result of claims made by California’s other participating electric utility companies. For example, victims of wildfires in Southern California in January 2025 have filed lawsuits alleging that Southern California Edison’s equipment was associated with the ignition of such fires.
Current report — wording carried from elsewhere
The deterioration of income from, or other available assets of, the Utility for any reason could limit or impair the Utility’s ability to pay dividends or make other distributions to PG&E Corporation, which could, in turn, materially and adversely affect PG&E Corporation’s ability to pay capital stock dividends or meet other obligations.
Current report — wording carried from elsewhere
The CPUC considers affordability as it adjudicates the Utility’s rate cases, and concerns about affordability could cause the CPUC to approve lesser amounts in the Utility’s ratemaking or cost recovery proceedings.