A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2025 · Filed Aug 14, 2025

ASPI$2.08+20.6%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-03-31; filed 2025-05-20.

0000950170-25-075197

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-06-30; filed 2025-08-14.

0000950170-25-108971

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 136 previous paragraphs and 164 current paragraphs.

103 unchanged; 23 reworded; 31 added; 9 removed; 1 previous and 7 current paragraphs rearranged.

Tables are not compared: 4 previous and 7 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (31)

Current report

In June 2025, we issued 7,518,797 shares of common stock at $6.65 per share in a registered direct offering resulting in net proceeds of approximately $46.8 million after deducting underwriting discounts, commissions and offering expenses.

Current report

In July 2025, we issued 7,500,000 shares of common stock at $8.00 per share in a registered direct offering resulting in net proceeds of approximately $56.4 million after deducting underwriting discounts, commissions and offering expenses.

Current report

On May 20, 2025, we entered into agreement (the “Firm Intention Agreement”) with Renergen Limited, a public company incorporated under the laws of the Republic of South Africa focused on production of liquefied helium (LHe) and liquefied natural gas (LNG) (“Renergen”), pursuant to which, subject to the terms and conditions thereof, the Company will make an offer to acquire all of the issued ordinary shares of Renergen (“Renergen Ordinary Shares”), in exchange for shares of common stock, par value $0.01 per share, of the Company (the “Company Common Stock”), as described below (the “Offer”). The Company intends to implement the Offer through the implementation of a scheme of arrangement (the “Scheme”) in accordance with Sections 114 and 115 of the South African Companies Act, No. 71 of 2008 (the “Companies Act”). As a result of the implementation of the Scheme, Renergen will become a wholly owned subsidiary of the Company. If the Scheme lapses or fails, solely due to one or more Scheme conditions not being fulfilled or, where applicable, not being waived, the Company, as part of the same Offer, will make an offer to acquire up to 100% of the Renergen Ordinary Shares from Renergen shareholders by way of general standby offer, which will not be subject to any condition as to acceptances (the “Standby Offer”).

Current report

The implementation of the Scheme will result in the delisting of the Renergen Ordinary Shares from the Johannesburg Stock Exchange (the “JSE”), the Australian Securities Exchange and A2X. The Company Common Stock will continue to be listed on The Nasdaq Capital Market and will additionally be listed on the JSE by way of a secondary inward listing (the “Company Secondary Listing”).

Current report

Offer Consideration. On the implementation date of the Scheme (the “closing date of the acquisition”), the holders of record of Renergen Ordinary Shares, who are registered as such in Renergen’s securities register as of the applicable record date for purposes of the listing requirements of the JSE (the “Scheme Record Date”), will exchange 100% of the issued Renergen Ordinary Shares as of the Scheme Record Date, excluding treasury shares, in exchange for consideration consisting of 0.09196 shares of Company Common Stock for each Renergen Ordinary Share (the “Scheme Consideration” and the shares of Company Common Stock to be issued as the Scheme Consideration or in the Standby Offer, the “Consideration Shares”). Any entitlements to fractions of shares of Company Common Stock that otherwise would be issuable pursuant to the Scheme will be rounded down to the nearest whole number of shares and a cash payment will be made for any fractional shares resulting from such rounding. In no event will the Company issues more than14,270,000 Consideration Shares.

Current report

The implementation of the Scheme and the issuance of the Consideration Shares is expected to result in current securityholders of Renergen and current securityholders of the Company owning approximately 16% and 84%, respectively, of the outstanding shares of Company Common Stock immediately following the closing date of the acquisition.

Current report

Governance. The Firm Intention Agreement provides that, in the event that either the Scheme or the Stand-by Offer results in the Company acquiring at least 51% of the issued Renergen Ordinary Shares, after such event, Renergen will become an operating subsidiary of the Company and will continue to be led by Stefano Marani, the current Chief Executive Officer of Renergen, who will join the board of directors of the Company and become the Chief Executive Officer of the Electronics and Space Division of ASP Isotopes. Nick Mitchell, the Chief Operating Officer of Renergen, will become Co-Chief Operating Officer of ASP Isotopes.

Current report

Conditions to Closing. The Offer (including the Scheme and the Standby Offer) will be subject to the fulfilment or, where permissible, waiver of the following Offer conditions that, by no later than September 30, 2025: (i) the written consent for the transfer of the Renergen Ordinary Shares in terms of the Offer is obtained from the Industrial Development Corporation of South Africa and the United States International Development Finance Corporation (“Renergen Lenders”) in terms of the change of control provisions under their respective loan and/or funding arrangements with Renergen and subsidiaries of Renergen and that the Renergen Lenders agree not to proceed in foreclosing on outstanding debt due by those subsidiaries, as a result of any breach of covenants, event of default or otherwise, prior to July 31, 2027; (ii) the written consent for the transfer of the Renergen Ordinary Shares in terms of the Offer is obtained from The Standard Bank of South Africa (“SBSA”) in terms of the change of control provisions under its respective loan(s) and/or funding arrangement(s) with Renergen and SBSA agrees to extend the repayment date for the loan(s) and/or funding arrangement(s) to at least March 31, 2026; (iii) AIRSOL SRL agrees to extend the maturity date for the convertible debentures that it holds in Renergen, to at least March 31, 2026; (iv) receipt of required regulatory approvals required to implement the Offer are obtained (except for the requirement that Takeover Panel issue a compliance certificate to Renergen in terms of section 121(b) of the Companies Act); (v) receipt of all regulatory approvals required for the Company Secondary Listing; (vi) approval of applicable competition authorities to implement the Offer; (vii) approval by Renergen’s shareholders of the Shareholder Ratification resolution and the Scheme resolution to be descried in the combined circular to be distributed to Renergen’s shareholders (the “Renergen shareholder Approval”); and (viii) absence of a material adverse change with respect to Renergen. The Renergen shareholder Approval was obtained at a general meeting of shareholders of Renergen held on July 10, 2025.

Current report

Exclusivity Agreement and Bridge Loan. On March 31, 2025, the Company and Renergen entered into an exclusivity agreement (as subsequently amended, the “Exclusivity Agreement”), pursuant to which the parties agreed to discuss and negotiate the proposed transaction on an exclusive basis for a limited period ending on May 31, 2025. Renergen received a refundable exclusivity payment of the ZAR equivalent amount of $10 million, which amount has since been converted into and credited as an advance under a $30 million bridge loan agreement, dated May 19, 2025, by and among the Company, ASP Isotopes South Africa Proprietary Limited, as lender, and Renergen, as borrower (the “Bridge Loan Agreement”). Under the Bridge Loan Agreement, the Company agreed to advance two tranches of loan amounts of the ZAR equivalent amount of $10 million, each of which was advanced to Renergen in the second quarter of 2025, such that the total advanced amounts advanced to Renergen as of June 30, 2025 is the ZAR equivalent of $30 million, to enable Renergen to meet key lender payment deadlines and avoid a default by Renergen under its existing loan/funding arrangements.

Current report

Lease for additional office space. On June 1, 2025, ASP South Africa entered into an agreement of lease with the landlord of facility located in Pretoria for additional office space. The term of the lease ends on May 31, 2028.

Current report

Research and development expenses were $879,925 for the three months ended June 30, 2025, compared to $473,302 for the three months ended June 30, 2024. The overall increase of $406,623 was primarily due to the following:

Current report

Selling, general and administrative expenses were $11,660,759 for the three months ended June 30, 2025, compared to $7,405,178 for the three months ended June 30, 2024. The overall increase of $4,255,581 was primarily due to the following:

Current report

an increase in professional fees of $1,306,636 primarily due to corporate development activity and consulting costs related to new general ledger system.

Current report

Other expense for the three months ended June 30, 2024 was $1,410,217, which includes a $1,574,816 change in fair value of the convertible notes payable issued in March and June 2024, interest expense of $69,078, partially offset by a $164,000 change in the fair value of the share liability related to the shares issuable to a consultant, foreign exchange transaction gain of $26,147 and interest income of $43,530.

Current report

Research and development expenses were $2,409,720 for the six months ended June 30, 2025, compared to $688,436 for the six months ended June 30, 2024. The overall increase of $1,721,284 was primarily due to the following:

Current report

an increase in personnel-related costs of $362,234 primarily due to the increase in headcount, salaries and related costs;

Current report

This increase is partially offset by a decrease in consulting and professional fees of $116,528 due to decreases in outsourced development activity.

Current report

Selling, general and administrative expenses were $18,410,140 for the six months ended June 30, 2025, compared to $13,283,724 for the six months ended June 30, 2024. The overall increase of $5,126,416 was primarily due to the following:

Current report

an increase in personnel-related costs of $4,053,766 primarily due to the increase in headcount, salaries and related costs; and

Current report

an increase in professional fees of $1,288,728 primarily due to corporate development activity and consulting costs related to new general ledger system.

Current report

Other expense for the six months ended June 30, 2025 was $63,673,151, which includes an expense of $64,715,131 due to change in fair value of the convertible notes payable issued in March and June 2024, a change in fair value of share liability related to the shares issuable to consultants of $129,269, interest expense of $168,954 and a foreign exchange transaction loss of $98,517, partially offset by interest income of $1,438,720.

Current report

the costs to spinoff QLE and subsequent arrangement for distributing proceeds; and

Current report

Net cash provided by financing activities was $50,780,627 for the six months ended June 30, 2025 and was comprised primarily of $50,000,000 in gross proceeds from the issuance of common stock and $4,915,312 in proceeds from the exercise of warrants, partially offset by underwriting discounts, commissions and offering expenses from the issuance of common stock of $3,238,630, payments of $409,696 on the note payable related to a financed corporate insurance policy, payment of principal portion of finance leases of $61,831 and distribution to noncontrolling interest in VIE of $79,310.
Removed paragraphs (9)

Previous report

Research and development expenses were $1,529,795 for the three months ended March 31, 2025, compared to $215,134 for the three months ended March 31, 2024. The overall increase of $1,314,661 was primarily due to the following:

Previous report

an increase in personnel-related costs of $362,901 primarily due to the increase in headcount and related costs;

Previous report

Selling, general and administrative expenses were $6,749,381 for the three months ended March 31, 2025, compared to $5,878,546 for the three months ended March 31, 2024. The overall increase of $870,835 was primarily due to the following:

Previous report

a decrease in other selling, general and administrative expenses of $201,600.
Reworded paragraphs (23)

Previous wording

You should read the following discussion and analysis of our financial condition and results of operations together with our condensed consolidated financial statements and related notes included in this Quarterly Report on Form 10-Q. Some of the information contained in this discussion and analysis or set forth elsewhere in this Quarterly Report, including information with respect to our plans and strategy for our business and related financing, includes forward-looking statements that involve risks and uncertainties. As a result of many factors, including those factors set forth in the section entitled “Risk Factors,” our actual results could differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis. You should carefully read the section entitled “Risk Factors” to gain an understanding of the important factors that could cause actual results to differ materially from our forward- looking statements. Please also see the section entitled “Cautionary Note Regarding Forward-Looking Statements.”

Current wording

You should read the following discussion and analysis of our financial condition and results of operations together with our condensed consolidated financial statements and related notes included in this Quarterly Report on Form 10-Q. Some of the information contained in this discussion and analysis or set forth elsewhere in this Quarterly Report, including information with respect to our plans and strategy for our business and related financing, includes forward-looking statements that involve risks and uncertainties. As a result of many factors, including those factors set forth in the section entitled “Risk Factors,” our actual results could differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis. You should carefully read the section entitled “Risk Factors” to gain an understanding of the important factors that could cause actual results to differ materially from our forward-looking statements. Please also see the section entitled “Special Note Regarding Forward-Looking Statements.”

Previous wording

We have completed the commissioning phase and are commencing commercial production at our C-14, Si-28 and Yb-176 enrichment facilities in Pretoria, South Africa. Our C-14 and Si-28 enrichment facilities utilize the ASP technology and our Yb-176 enrichment facility utilizes QE technology. We expect our first three enrichment facilities to generate commercial product during 2025. In addition, we have started planning additional isotope enrichment plants both in South Africa and in other jurisdictions, including Iceland and the United States. We believe the C-14 we may produce using the ASP technology could be used in the development of new pharmaceuticals and agrochemicals. We believe the Si-28 we may produce using the ASP technology may be used to create advanced semiconductors and in quantum computing. We believe the Yb-176 we may produce using the QE technology may be used to create radiotherapeutics that treat various forms of oncology. We anticipate shipping the first commercial batches of enriched Carbon-14 in mid-2025 and enriched Silicon-28 during the second quarter of 2025. We expect to commence commercial production of Ytterbium-176 during the second quarter of 2025.

Current wording

We have completed the commissioning phase and are commencing commercial production at our C-14 and Si-28 enrichment facilities in Pretoria, South Africa. We have also completed the commissioning phase and are commencing production of commercial samples of highly enriched Yb-176 at the Yb-176 enrichment facility in Pretoria, South Africa. Our C-14 and Si-28 enrichment facilities utilize the ASP technology and our Yb-176 enrichment facility utilizes QE technology. We expect our first three enrichment facilities to generate commercial product during 2025. In addition, we have started planning additional isotope enrichment plants both in South Africa and in other jurisdictions, including Iceland and the United States. We believe the C-14 we may produce using the ASP technology could be used in the development of new pharmaceuticals and agrochemicals. We believe the Si-28 we may produce using the ASP technology may be used to create advanced semiconductors and in quantum computing. We believe the Yb-176 we may produce using the QE technology may be used to create radiotherapeutics that treat various forms of oncology.

Previous wording

For the three months ended March 31, 2025, no collaboration revenue has been recognized in the consolidated statements of operations and comprehensive loss.

Current wording

For the six months ended June 30, 2025, no collaboration revenue has been recognized in the consolidated statements of operations and comprehensive loss.

Previous wording

In May 2025, we entered into a Loan Agreement with TerraPower, which provides conditional commitments from TerraPower to us through one of our wholly-owned U.S.-based subsidiaries (“Borrower”) for a multiple advance term loan totaling $22,000,000 for the purpose of partially funding the construction of a proposed new uranium enrichment facility in South Africa. The total loan amount is inclusive of a 10% original issue discount on each disbursement and carries a fixed interest rate of 10% per annum. Per the terms of the Loan Agreement and subject to the satisfaction of various conditions precedent to disbursements (including receiving all required licenses and permits to perform uranium enrichment in South Africa), we will receive aggregate loan disbursements of $20,000,000. The Loan Agreement matures on May 16, 2032. Interest will begin accruing upon each milestone disbursement we receive and will be added to the principal balance until November 2027. Principal and interest payments will be made in 60 equal installments beginning in November 2027.

Current wording

In May 2025, we entered into a Loan Agreement with TerraPower, which provides conditional commitments from TerraPower to us through one of our wholly-owned U.S.-based subsidiaries (“Borrower”) for a multiple advance term loan totaling $22,000,000 for the purpose of partially funding the construction of a proposed new uranium enrichment facility in South Africa. The total loan amount is inclusive of a 10% original issue discount on each disbursement and carries a fixed interest rate of 10% per annum. Per the terms of the Loan Agreement and subject to the satisfaction of various conditions precedent to disbursements (including receiving all required licenses and permits to perform uranium enrichment in South Africa), we will receive aggregate loan disbursements of $20,000,000. The Loan Agreement matures on May 16, 2032. Interest will begin accruing upon each milestone disbursement we receive and will be added to the principal balance until November 2027. Principal and interest payments will be made in 60 equal installments beginning in November 2027. The Company does not plan to request drawdown on this loan until early 2026 when construction of the uranium enrichment facility is expected to begin.

Previous wording

Lease for Molybdenum Processing Plant. On October 12, 2021, ASP South Africa entered into an agreement of lease with the landlord of the facility located at 33 Eland Street, Koedoespoort Industrial, Pretoria where we operate our Molybdenum processing plant where gaseous Molybdenum compound will be treated (which process comprises several stages of compression and expansion during which the product is purified). The term of the lease ends on December 31, 2030.

Current wording

Lease for Processing Plant. On October 12, 2021, ASP South Africa entered into an agreement of lease with the landlord of the facility located at 33 Eland Street, Koedoespoort Industrial, Pretoria where we operate our multi-isotope processing plant where gaseous compounds will be treated (which process comprises several stages of compression and expansion during which the product is purified). The term of the lease ends on December 31, 2030.

Previous wording

an increase in facility and depreciation expenses of $630,533 due to an increase in space dedicated to development and repairs and maintenance; and

Current wording

an increase in facility and depreciation expenses of $456,069 due to an increase in space dedicated to development, noncapitalized expenses and repairs and maintenance; and

Previous wording

an increase in other expenses of $131,712 primarily related to other general research and development expenses.

Current wording

an increase in other expenses of $67,749 primarily related to other general research and development expenses.

Previous wording

an increase in consulting and professional fees of $189,515 due to increased outsourced development activity for new specialty isotopes;

Current wording

This increase is partially offset by a decrease in consulting and professional fees of $116,528 due to increased outsourced development activity for new specialty isotopes.

Previous wording

an increase in personnel-related costs of $921,938 primarily due to the increase in headcount and salaries and travel related costs of $254,260; and

Current wording

an increase in personnel-related costs of $3,131,829 primarily due to the increase in headcount and salaries; and

Previous wording

Other expense for the three months ended March 31, 2025 was $579,816, which includes a loss of $957,408 due to change in fair value of the convertible notes payable issued in March and June 2024 and a foreign exchange transaction loss of $61,470, partially offset by interest income of $513,713.

Current wording

Other expense for the three months ended June 30, 2025 was $63,093,335, which includes an expense of $63,757,723 due to change in fair value of the convertible notes payable issued in March and June 2024, a change in fair value of share liability of $141,769 related to the share issued to consultants, interest expense of $81,803 and a foreign exchange transaction expense of $37,047, partially offset by interest income of $925,007.

Previous wording

Other expense for the three months ended March 31, 2024 was $1,197,653, which includes a $218,000 change in the fair value of the share liability related to the shares issuable to a consultant and a $953,710 change in fair value of the convertible notes payable issued in March 2024.

Current wording

Other expense for the six months ended June 30, 2024 was $2,607,870, which includes a $54,000 change in the fair value of the share liability related to the shares issuable to a consultant, a $2,528,526 change in fair value of the convertible notes payable issued in March and June 2024 and interest expense of $82,866, partially offset by interest income of $55,718.

Previous wording

As of March 31, 2025, we had cash and cash equivalents of $56.0 million. We have not generated any revenue from the sale of our enriched isotopes, and our ability to generate product revenue from the sale of enriched isotopes sufficient to achieve profitability will depend on the successful development and eventual commercialization of one or more of our current or future enriched isotopes.

Current wording

As of June 30, 2025, we had cash and cash equivalents of $67.7 million. We have not generated any revenue from the sale of our enriched isotopes, and our ability to generate product revenue from the sale of enriched isotopes sufficient to achieve profitability will depend on the successful development and eventual commercialization of one or more of our current or future enriched isotopes.

Previous wording

the costs of obtaining, expanding, maintaining and enforcing our patent and other intellectual property rights; and

Current wording

the costs of obtaining, expanding, maintaining and enforcing our patent and other intellectual property rights;

Previous wording

Net cash used in operating activities was $3,169,976 for the three months ended March 31, 2025 and was primarily due to our net loss of $8.5 million, adjusted for stock-based compensation expense of $1,889,701, amortization of right-of-use asset of $129,709, depreciation expense of $149,003, issuance of common stock to a consultant with a fair value of $247,000, change in fair values for the convertible notes payable of $957,408 and a $1,950,848 change in our operating assets and liabilities.

Current wording

Net cash used in operating activities was $11,071,311 for the six months ended June 30, 2025 and was primarily due to our net loss of $83.6 million, adjusted for stock-based compensation expense of $6,319,378, amortization of right-of-use asset of $267,952, depreciation expense of $678,959, issuance of common stock to a consultant with a fair value of $673,497, change in fair values for the convertible notes payable of $64,715,131 and a $148,671 change in our operating assets and liabilities.

Previous wording

Net cash used in operating activities was $2,970,469 for the three months ended March 31, 2024, and was primarily due to our net loss of $7.0 million, adjusted for stock-based compensation expense of $1,713,654, non-cash issuance costs for the convertible notes payable of $513,748, issuance of common stock to a consultant with a fair value of $195,000, change in fair values for the convertible notes payable of $953,710, change in fair value of share liability of $218,000, amortization of right-of-use asset of $98,658 and a $274,553 change in our operating assets and liabilities, partially offset by a change in deferred tax liabilities of $49,771.

Current wording

Net cash used in operating activities was $8,095,256 for the six months ended June 30, 2024, and was primarily due to our net loss of $15.8 million, adjusted for stock-based compensation expense of $4,231,670, non-cash issuance costs for the convertible notes payable of $621,915, amortization of right-of-use asset of $217,997, issuance of common stock to a consultant with a fair value of $619,200, change in fair values for the convertible notes payable of $2,528,526, change in deferred tax liabilities of $39,068, and a $734,590 change in our operating assets and liabilities.

Previous wording

Net cash used in investing activities was $2,359,368 for the three months ended March 31, 2025 and was comprised of the purchases of machinery and equipment, vehicles and construction in progress.

Current wording

Net cash used in investing activities was $34,107,564 for the six months ended June 30, 2025 and was comprised of cash paid for a note receivable of $30.0 million and the purchases of machinery and equipment, vehicles and construction in progress of $4,520,048.

Previous wording

Net cash used in investing activities was $1,245,825 for the three months ended March 31, 2024 and was comprised of the purchases of machinery and equipment and additional construction in progress.

Current wording

Net cash used in investing activities was $3,867,903 for the six months ended June 30, 2024 and was comprised of the purchases of machinery and equipment and additional construction in progress.

Previous wording

Net cash used in financing activities was $225,096 for the three months ended March 31, 2025 and was comprised primarily of payments of $187,167 on the note payable related to a financed corporate insurance policy, payment of principal portion of finance leases of $10,267 and distribution to noncontrolling interest in VIE of $38,304, partially offset by gross proceeds of proceeds from collection of receivable from noncontrolling interest in VIE of $28,857.

Current wording

Net cash provided by financing activities was $32,414,967 for the six months ended June 30, 2024, and was comprised primarily of gross proceeds of $25,936,228 from the issuance of convertible notes payable, proceeds of $5,537,975 million from the issuance of common stock for a warrant exercise, contributions from noncontrolling interest in VIE of $807,975, proceeds from collection of receivable from noncontrolling interest in VIE of $705,403, partially offset by payments of $438,569 on the note payable related to a financed corporate insurance policy, payment of principal portion of finance leases of $61,929 and distribution to noncontrolling interest in VIE of $27,116.

Previous wording

We lease our main facility in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $9,000 with a term expiring on December 31, 2030. We also lease additional space on a short term basis in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $18,000 with a term expiring on February 28, 2026 and the Company is continuing to occupy that space under the monthly extensions. We also lease additional space in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $2,000 with a term expiring on October 30, 2026.

Current wording

We lease our main facility in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $9,000 with a term expiring on December 31, 2030. We also lease additional space on a short term basis in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $18,000 with a term expiring on February 28, 2026 and the Company is continuing to occupy that space under the monthly extensions. We also lease additional space in Pretoria, South Africa under leases with a base monthly rent payment of approximately $2,000 with a term expiring on October 30, 2026 and a base monthly rent payment of approximately $3,000 with a term expiring on May 31, 2028.

Previous wording

In November 2024 and 2023, the Company executed a promissory note payable with a finance company to fund its directors and officers’ insurance policy for $500,923 and $526,282, respectively. During 2024, the Company entered into several loans to purchase motor vehicles and certain equipment totaling $2,020,511. For the three months ended March 31, 2025, the Company entered into loans to purchase motor vehicles and certain equipment totaling $47,247. These loans are secured by the underlying assets included in property and equipment. Refer to Note 6 to our condensed consolidated financial statements included in Part I, Item 1, for information regarding interest rates and maturities.

Current wording

In November 2024 and 2023, the Company executed a promissory note payable with a finance company to fund its directors and officers’ insurance policy for $500,923 and $526,282, respectively. During 2024, the Company entered into several loans to purchase motor vehicles and certain equipment totaling $2,020,511. For the six months ended June 30, 2025, the Company entered into loans to purchase motor vehicles and certain equipment totaling $47,045. These loans are secured by the underlying assets included in property and equipment. Refer to Note 6 to our condensed consolidated financial statements included in Part I, Item 1, for information regarding interest rates and maturities.

Previous wording

On March 31, 2025, after the annual report on Form 10-K was filed, we entered into an Exclusivity Agreement with Renergen Limited (“Renergen”), an entity in South Africa listed on the Johannesburg Stock Exchange (“JSE”) and the Australian Stock Exchange. On May 18, the Exclusivity Agreement was amended. Per the terms of the amended Exclusivity Agreement, we received the rights to negotiate the terms of the acquisition of Renergen during an exclusive negotiation period that ends on May 31, 2025. In April 2025, we paid an exclusivity fee of $10,000,000 to Renergen. On May 19, 2025 we entered into a Firm Intention Letter with Renergen. The Firm Intention Letter sets the acquisition terms for us to purchase 100% of the outstanding shares of Renergen in exchange for our shares. The completion of the acquisition is subject to Renergen shareholder approval.

Current wording

On March 31, 2025, after the annual report on Form 10-K was filed, we entered into an Exclusivity Agreement with Renergen Limited (“Renergen”), an entity in South Africa listed on the Johannesburg Stock Exchange (“JSE”) and the Australian Stock Exchange. On May 18, the Exclusivity Agreement was amended. Per the terms of the amended Exclusivity Agreement, we received the rights to negotiate the terms of the acquisition of Renergen during an exclusive negotiation period that ends on May 31, 2025. In April 2025, we paid an exclusivity fee of $10,000,000 to Renergen. On May 19, 2025 we entered into a Firm Intention Letter with Renergen. The Firm Intention Letter sets the acquisition terms for us to purchase 100% of the outstanding shares of Renergen in exchange for our shares. The acquisition has been approved by Renergen shareholders. The completion of the acquisition is subject to certain regulatory and debtor approvals.

Previous wording

In addition, we entered into a Loan Agreement with Renergen in which a total of $30,000,000 will be provided by us in periodic payments for the purpose of funding Renergen’s operations. In conjunction with the Loan Agreement, the full amount of the previously paid exclusivity fee of $10,000,000 is applied to the loan. The remaining $20,000,000 available under the loan is expected to be paid by us to Renergen.

Current wording

In addition, we entered into a Loan Agreement with Renergen in which a total of $30,000,000 will be provided by us in periodic payments for the purpose of funding Renergen’s operations. In conjunction with the Loan Agreement, the full amount of the previously paid exclusivity fee of $10,000,000 is applied to the loan. The remaining $20,000,000 available under the loan was paid by us to Renergen prior to June 30, 2025.

Previous wording

In addition, we enter into contracts in the normal course of business with vendors for services and products for operating purposes. These contracts do not contain any minimum purchase commitments and generally provide for termination after a notice period and, therefore, are not considered long-term contractual obligations. Payments due upon cancellation consist only of payments for services provided and expenses incurred up to the date of cancellation.

Current wording

In addition, we entered into contracts in the normal course of business with vendors for services and products for operating purposes. These contracts do not contain any minimum purchase commitments and generally provide for termination after a notice period and, therefore, are not considered long-term contractual obligations. Payments due upon cancellation consist only of payments for services provided and expenses incurred up to the date of cancellation.
Rearranged current paragraphs (7)

Current report — wording carried from elsewhere

Select information from the consolidated statements of operations and comprehensive loss as of the six months ended June 30, 2025 and 2024 is as follows:

Current report — wording carried from elsewhere

The following table summarizes our results of operations for the six months ended June 30, 2025 and 2024:

Current report — wording carried from elsewhere

Revenue and Cost of Goods Sold

Current report — wording carried from elsewhere

We have recognized revenue of PET Labs from the sale of nuclear medical doses for PET scanning for the six months ended June 30, 2025 and 2024. In addition, we have recognized the related cost of goods sold, operating expenses and other income and expenses of PET Labs for the same periods.

Current report — wording carried from elsewhere

The following table summarizes our research and development expenses for the six months ended June 30, 2025 and 2024:

Current report — wording carried from elsewhere

an increase in facility and depreciation expenses of $1,054,921 due to an increase in space dedicated to development, noncapitalized expenses and repairs and maintenance; and

Current report — wording carried from elsewhere

an increase in other expenses of $420,657 primarily related to other general research and development expenses.
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

Net cash provided by financing activities was $20,263,995 for the three months ended March 31, 2024, and was comprised primarily of gross proceeds of $20,550,000 from the issuance of convertible notes payable, partially offset by payments of $263,141 on the note payable related to a financed corporate insurance policy.