A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 20, 2025

ASPI$2.08+20.6%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-09-30; filed 2024-11-19.

0000950170-24-128551

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-03-31; filed 2025-05-20.

0000950170-25-075197

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 155 previous paragraphs and 136 current paragraphs.

85 unchanged; 28 reworded; 19 added; 37 removed; 5 previous and 4 current paragraphs rearranged.

Tables are not compared: 7 previous and 4 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (19)

Current report

We have completed the commissioning phase and are commencing commercial production at our C-14, Si-28 and Yb-176 enrichment facilities in Pretoria, South Africa. Our C-14 and Si-28 enrichment facilities utilize the ASP technology and our Yb-176 enrichment facility utilizes QE technology. We expect our first three enrichment facilities to generate commercial product during 2025. In addition, we have started planning additional isotope enrichment plants both in South Africa and in other jurisdictions, including Iceland and the United States. We believe the C-14 we may produce using the ASP technology could be used in the development of new pharmaceuticals and agrochemicals. We believe the Si-28 we may produce using the ASP technology may be used to create advanced semiconductors and in quantum computing. We believe the Yb-176 we may produce using the QE technology may be used to create radiotherapeutics that treat various forms of oncology. We anticipate shipping the first commercial batches of enriched Carbon-14 in mid-2025 and enriched Silicon-28 during the second quarter of 2025. We expect to commence commercial production of Ytterbium-176 during the second quarter of 2025.

Current report

We are currently pursuing an initiative to apply our enrichment technologies to the enrichment of Uranium-235 (“U-235”) in South Africa. We believe that the U-235 we may produce using quantum enrichment technology may be commercialized as a nuclear fuel component for use in the new generation of high-assay low-enriched uranium (“HALEU”)-fueled small modular reactors that are now under development for commercial and government uses. In furtherance of our uranium enrichment initiative, in October 2024, we entered into a term sheet with TerraPower, LLC (“TerraPower”) which contemplates the parties entering into definitive agreements pursuant to which TerraPower would provide funding for the construction of a HALEU production facility and agree to purchase all HALEU produced at the facility over a 10-year period after the planned completion of the facility in 2027. In addition, in November 2024, we entered into a memorandum of understanding with The South African Nuclear Energy Corporation (“Necsa”), a South African state-owned company responsible for undertaking and promoting research and development in the field of nuclear energy and radiation sciences, to collaborate on the research, development and ultimately the commercial production of advanced nuclear fuels. Subject to the receipt of funding and all required permits and licenses to begin enrichment of U-235 in South Africa, it is anticipated that the research, development and ultimate construction of a HALEU production facility will take place at South Africa’s main nuclear research center at Pelindaba in Pretoria. See the section captioned “TerraPower” below for disclosures regarding certain definitive agreements entered into between TerraPower and us and/or our subsidiaries, including a term loan subject to conditions to support construction of a new uranium enrichment facility at Pelindaba, South Africa and supply agreements for the future supply of HALEU to TerraPower, as a customer.

Current report

On April 4, 2024, we entered into an agreement with TerraPower to develop a conceptual design, refined cost/schedule/financing, risk register, and term sheet for a HALEU facility (the “TerraPower Agreement”). The TerraPower Agreement may be terminated for (a) breach or default, (b) our convenience or (c) TerraPower’s convenience. TerraPower is obligated to make all payments for milestones completed by us and these payments are nonrefundable.

Current report

On October 18, 2024, we signed a term sheet with TerraPower (the “TerraPower Term Sheet”) that provides for the execution of two definitive agreements: (1) an agreement pursuant to which TerraPower will provide funding for our construction of a uranium enrichment facility capable of producing HALEU using our proprietary aerodynamic separation process technology to be located in the Republic of South Africa and (2) An agreement pursuant to which we will deliver to TerraPower the full capacity of the enrichment facility.

Current report

In May 2025, we entered into a Loan Agreement with TerraPower, which provides conditional commitments from TerraPower to us through one of our wholly-owned U.S.-based subsidiaries (“Borrower”) for a multiple advance term loan totaling $22,000,000 for the purpose of partially funding the construction of a proposed new uranium enrichment facility in South Africa. The total loan amount is inclusive of a 10% original issue discount on each disbursement and carries a fixed interest rate of 10% per annum. Per the terms of the Loan Agreement and subject to the satisfaction of various conditions precedent to disbursements (including receiving all required licenses and permits to perform uranium enrichment in South Africa), we will receive aggregate loan disbursements of $20,000,000. The Loan Agreement matures on May 16, 2032. Interest will begin accruing upon each milestone disbursement we receive and will be added to the principal balance until November 2027. Principal and interest payments will be made in 60 equal installments beginning in November 2027.

Current report

In addition to a loan agreement, in May 2025, we and TerraPower have entered into two supply agreements for the HALEU expected to be produced at our uranium enrichment facility. The initial core supply agreement is intended to support the supply of the required first fuel cores for the initial loading of TerraPower’s Natrium project in Wyoming. The long-term supply agreement is a 10-year supply agreement of up to a total of 150 metric tons of HALEU, commencing in 2028 through end of 2037.

Current report

Research and development expenses were $1,529,795 for the three months ended March 31, 2025, compared to $215,134 for the three months ended March 31, 2024. The overall increase of $1,314,661 was primarily due to the following:

Current report

an increase in facility and depreciation expenses of $630,533 due to an increase in space dedicated to development and repairs and maintenance; and

Current report

an increase in other expenses of $131,712 primarily related to other general research and development expenses.

Current report

Selling, general and administrative expenses were $6,749,381 for the three months ended March 31, 2025, compared to $5,878,546 for the three months ended March 31, 2024. The overall increase of $870,835 was primarily due to the following:

Current report

an increase in personnel-related costs of $921,938 primarily due to the increase in headcount and salaries and travel related costs of $254,260; and

Current report

a decrease in other selling, general and administrative expenses of $201,600.

Current report

In November 2024 and 2023, the Company executed a promissory note payable with a finance company to fund its directors and officers’ insurance policy for $500,923 and $526,282, respectively. During 2024, the Company entered into several loans to purchase motor vehicles and certain equipment totaling $2,020,511. For the three months ended March 31, 2025, the Company entered into loans to purchase motor vehicles and certain equipment totaling $47,247. These loans are secured by the underlying assets included in property and equipment. Refer to Note 6 to our condensed consolidated financial statements included in Part I, Item 1, for information regarding interest rates and maturities.

Current report

On March 31, 2025, after the annual report on Form 10-K was filed, we entered into an Exclusivity Agreement with Renergen Limited (“Renergen”), an entity in South Africa listed on the Johannesburg Stock Exchange (“JSE”) and the Australian Stock Exchange. On May 18, the Exclusivity Agreement was amended. Per the terms of the amended Exclusivity Agreement, we received the rights to negotiate the terms of the acquisition of Renergen during an exclusive negotiation period that ends on May 31, 2025. In April 2025, we paid an exclusivity fee of $10,000,000 to Renergen. On May 19, 2025 we entered into a Firm Intention Letter with Renergen. The Firm Intention Letter sets the acquisition terms for us to purchase 100% of the outstanding shares of Renergen in exchange for our shares. The completion of the acquisition is subject to Renergen shareholder approval.

Current report

In addition, we entered into a Loan Agreement with Renergen in which a total of $30,000,000 will be provided by us in periodic payments for the purpose of funding Renergen’s operations. In conjunction with the Loan Agreement, the full amount of the previously paid exclusivity fee of $10,000,000 is applied to the loan. The remaining $20,000,000 available under the loan is expected to be paid by us to Renergen.
Removed paragraphs (37)

Previous report

We are also developing Quantum Enrichment technology to produce enriched Ytterbium-176 (“Yb-176”), Nickel-64, Lithium 6, Lithium7 and Uranium-235 (“U-235”). Quantum enrichment is an advanced isotope enrichment technique that is currently in development that uses lasers. We believe that the U-235 we may produce using quantum enrichment technology may be commercialized as a nuclear fuel component for use in the new generation of HALEU- fueled small modular reactors that are now under development for commercial and government uses. The construction of our first quantum enrichment facility was completed in August 2024, and we produced the first semi-finished material of enriched Yb-176 during the commissioning phase of the plant in October 2024. We expect to be able to achieve a 99.75% enrichment for Yb-176 and offer highly enriched Yb-176 for commercial sale during 2025. We also expect to proceed with the plans to construct Nickel-64 and Lithium- 6/7 quantum enrichment plants with targeted production during 2025.

Previous report

In October 2024, we entered into a term sheet with TerraPower, LLC related to the construction of a uranium enrichment facility capable of producing HALEU and the future supply of HALEU to TerraPower. The term sheet contemplates the parties entering into a definitive agreement, pursuant to which TerraPower would provide funding for the construction of a HALEU production facility. In addition, the parties anticipate entering into a long-term supply agreement for HALEU expected to be produced at this facility, pursuant to which the customer would purchase all HALEU produced at the facility over a 10-year period after the expected completion of the facility in 2027. It is anticipated that the definitive agreements will be assigned to QLE. Except for binding periods of exclusivity, during which we will not negotiate with third parties for the supply of HALEU or work on another ASP technology-based uranium enrichment facility, the term sheet is non-binding and there is no assurance that the parties will enter into definitive agreements.

Previous report

In November 2024, we entered into a memorandum of understanding (“MOU”) with The South African Nuclear Energy Corporation (Necsa) to collaborate on the research, development and ultimately the commercial production of advanced nuclear fuels. Necsa is a state-owned company established by the Republic of South Africa Nuclear Energy Act in 1999 with a mandate to undertake and promote research and development in the field of nuclear energy and radiation sciences. Necsa is also responsible for processing source material, and co-operating with other institutions on nuclear and related matters. The proposed structure under discussion for the delivery of the objectives of the MOU contemplates the formation of a new entity in South Africa with a board of directors consisting of at least two representatives from the Company and Necsa. Discussions between the parties during the last three years have focused on advancing new nuclear fuel to cater especially for small modular reactors as a start and eventually the construction of a nuclear fuel facility for the production of HALEU. It is anticipated that the research, development and ultimate construction of a HALEU production facility will take place at Pelindaba in Pretoria, South Africa. Pelindaba is South Africa’s main nuclear research center and is the home of the 20MW research nuclear reactor, SAFARI-1, which over the last several years has become one of the world’s largest suppliers of Molybdenum-99 and other radioisotopes.

Previous report

In March 2023, we issued 3,164,557 shares of our common stock at a purchase price of $1.58 per share and warrants to purchase up to an aggregate of 3,164,557 shares of our common stock with an exercise price of $1.75 per share for gross proceeds of $5.0 million. We incurred $506,390 in cash issuance costs and issued warrants to purchase up to an aggregate of 221,519 shares of common stock with an exercise price of $1.975 per share to the placement agent with an initial fair value of $179,116.

Previous report

In October 2023, we entered into Securities Purchase Agreements with certain institutional and other accredited investors and certain directors of ours to issue and sell an aggregate of 9,952,510 shares of our common stock, for aggregate cash consideration of $9,129,495, as follows: (i) 8,459,093 shares to investors at a purchase price per share of $0.9105, (ii) 1,190,239 shares to investors at a purchase price per share of $0.9548, and (iii) 303,178 shares to directors at a purchase price per share of $0.96. We incurred issuance costs equivalent to 5% of the gross proceeds from new investors which was settled in stock through the issuance of 472,582 shares to the placement agent and additional cash issuance costs totaling $57,083.

Previous report

In November 2024, the Company issued an additional 2,754,250 shares of common stock in a public offering at a public offering price of $6.75 per share for aggregate gross proceeds totaling approximately $18,600,000. The estimated issuance costs, including commissions and expenses, are expected to be approximately $1,455,000.

Previous report

In October 2023, we entered into a Share Purchase Agreement with Nucleonics Imaging Proprietary Limited, a company incorporated in South Africa, to purchase 51% of the ordinary shares in Nucleonics’ wholly-owned subsidiary, Pet Labs Pharmaceuticals Proprietary Limited ("Pet Labs"), a company incorporated in South Africa and dedicated to nuclear medicine and the science of radiopharmaceutical production.

Previous report

To date, we have purchased certain assets of Molybdos Proprietary Limited, a South Africa company (Molybdos), and entered into a number of agreements with Klydon (Pty) Limited, a South Africa company (Klydon). Below is a summary of the key terms for our former licenses and other agreements with Klydon.

Previous report

Acquisition of Molybdos Assets. On September 30, 2021, our subsidiary, ASP Isotopes South Africa (Proprietary) Limited (“ASP South Africa”), participated in and was declared the winner of a competitive auction process under Section 45 of the South Africa Consumer Protection Act, 2008 related to the sale and assignment of the assets of Molybdos (the “Molybdos Business Rescue Auction”). On October 12, 2021, ASP South Africa acquired the assets of Molybdos for ZAR 11,000,000 (which at the then current exchange rate was approximately $734,000), plus value added tax (VAT) levied by the government of South Africa at the rate of 15% and auctioneers’ commission at the rate of 10%.

Previous report

Acquisition of Silicon-28 Plant Assets. On July 26, 2022, we acquired assets comprising a dormant Silicon-28 aerodynamic separation processing plant from Klydon for ZAR 6,000,000 (which at the then current exchange rate was approximately $364,000), which will be payable to Klydon on the later of 180 days of the acquisition and the date on which the assets generate any revenues of any nature.

Previous report

Exclusive Mo-100 License (superseded and replaced by new license (see “Omnibus Klydon License” below)). On September 30, 2021, ASP South Africa, as licensee, entered into a license with Klydon, as licensor, pursuant to which ASP South Africa acquired from Klydon an exclusive license to use, subcontract and sublicense certain intellectual property rights relating to the ASP technology for the development and/or otherwise disposing of the ASP technology and production, distribution, marketing and or sale of Mo-100 isotope produced using the ASP technology (as amended on June 8, 2022, the “Mo-100 license”). The intellectual property rights granted to us through the Mo-100 license included all existing and/or future proprietary rights of Klydon relating to the ASP technology, whether or not such rights have been registered, including the copyright, designs, know-how, patents and trademarks (although Klydon currently has no such patents, patent applications or copyrights). The exclusive Mo-100 license was royalty-free, had a term of 999 years and was for the global development of the ASP Technology and production of the Mo-100 Isotope and global for the distribution, marketing and sale of the Mo-100 Isotope. No upfront or other payment was made or is owed in connection with the Mo-100 license. Klydon had the right to terminate the exclusivity of the Mo-100 license in the event that the licensee ceased carrying on activities of Mo-100 enrichment for a period longer than 24 consecutive months. Klydon had no other rights to terminate the Mo-100 license. Effective July 26, 2022, the parties agreed to terminate the Mo-100 license, which was superseded and replaced by a new license agreement (described under the heading “Omnibus Klydon License” below).

Previous report

Exclusive U-235 License (superseded and replaced by new license (see “Omnibus Klydon License” below)). On January 25, 2022, ASP South Africa, as licensee, entered into a license with Klydon, as licensor, pursuant to which ASP South Africa acquired from Klydon an exclusive license to use, subcontract and sublicense certain intellectual property rights relating to the ASP technology for the development and/or otherwise disposing of the ASP technology and production, distribution, marketing and or sale of U-235 produced using the ASP (as so amended, the “U-235 license”). The intellectual property rights granted to us through the U-235 license included all existing and/or future proprietary rights of Klydon relating to the ASP technology, whether or not such rights have been registered, including the copyright, designs, know-how, patents and trademarks (although Klydon currently has no such patents, patent applications or copyrights). The exclusive U-235 license had a term of 999 years and was for the global development of the ASP technology and production of U-235 and global for the distribution, marketing and sale of U-235. In connection with the U-235 license we made an upfront payment of $100,000 and agreed to pay certain royalties (the greater of $50 per k.g. of U-235 and 10% of profits) and a 33% sublicensing revenue share of any cash consideration we may receive for any sublicenses we may grant. Klydon had the right to terminate the exclusivity of the U-235 license in the event that the licensee ceased carrying on activities of U-235 enrichment for a period longer than 24 consecutive months. Klydon had no other rights to terminate the U-235 license. Effective July 26, 2022, the parties agreed to terminate the U-235 license, which was superseded and replaced by a new license agreement (described under the heading “Omnibus Klydon License” below).

Previous report

Omnibus Klydon License. On July 26, 2022, ASP Isotopes UK Ltd ("ASP UK"), as licensee, entered into a license agreement with Klydon, as licensor, pursuant to which ASP UK acquired from Klydon an exclusive license to use, develop, modify, improve, subcontract and sublicense certain intellectual property rights relating to the ASP technology for the production, distribution, marketing and sale of all isotopes produced using the ASP technology (the “Klydon license agreement”). The intellectual property rights granted to us through the Klydon license agreement included all existing and/or future proprietary rights of Klydon relating to the ASP technology, whether or not such rights have been registered, including the copyright, designs, know-how, patents and trademarks (although Klydon currently has no such patents, patent applications or copyrights). The Klydon license agreement was royalty-free, had a term of 999 years and was worldwide for the development of the ASP technology and the distribution, marketing and sale of isotopes. Future production of isotopes is limited to member countries of the Nuclear Suppliers Group. In connection with the Klydon license agreement, we agreed to make an upfront payment of $100,000 (to be included within the payments we made under the Turnkey Contract (described below) and deferred payments of $300,000 over 24 months. Effective April 4, 2023, pursuant to the Acknowledgement of Debt Agreement described below, we acquired the ASP technology, among other things, from Klydon, and the Klydon license agreement is no longer in effect.

Previous report

Turnkey Contract. On November 1, 2021, ASP South Africa and Klydon, as the contractor, entered into a contract under which Klydon has been appointed to supply to ASP South Africa a complete turnkey isotope enrichment plant (the “Turnkey Contract”). The activities to be undertaken or performed by Klydon include: taking control of the assets acquired in the Molybdos Business Rescue Auction; the design of an isotope enrichment facility; the supply of components, equipment and labor required for the construction; the installation, testing and commissioning of the isotope enrichment plant; securing all required approvals, regulatory authorizations and other required consents for the operation of the plant; providing training to local ASP Isotopes South Africa (Proprietary) Limited personnel to enable them to operate the plant going forward; and providing warranties in relation to the performance targets of the plant which are required to be met. Klydon was responsible for liaising with the relevant South African authorities, including the South African Non Proliferation Council, the Nuclear Suppliers Group and International Atomic Energy Agency to ensure that the Turnkey Contract and the isotope enrichment plant are compliant with international laws and guidelines.

Previous report

Acknowledgement of Debt Agreement. Klydon performed a portion of the services required under the Turnkey Contract described above; however, services were incomplete and many of the services were not completed within the time frame required. As a result, Klydon and ASP South Africa entered into an Acknowledgement of Debt Agreement dated November 30, 2022, whereby Klydon (i) agreed to pledge its assets (the “Pledged Assets”) to ASP South Africa to secure its performance of the Turnkey Contract by December 31, 2022, and (ii) acknowledged that ASP South Africa would suffer damages in the amount of $6,050,000 (“Damage Amount”) should it fail to perform. Under the Acknowledgement of Debt Agreement, the Pledged Assets would serve as collateral for Klydon’s obligation to pay the Damage Amount should Klydon fail to perform. In connection therewith, also on November 30, 2022, ASP South Africa and Klydon entered into a Deed of Security Agreement whereby, if Klydon failed to complete its obligations under the Turnkey Contract by December 31, 2022, all of Klydon’s rights of any nature to and interests of any nature in the Pledged Assets would be transferred to ASP South Africa. Klydon failed to complete its obligations under the Turnkey Contract by December 31, 2022.

Previous report

On April 4, 2023, we perfected our interests in the assets under the Acknowledgement of Debt Agreement, pursuant to which we acquired the Pledged Assets, including certain intellectual property, from Klydon and settled all amounts due to Klydon, including the ZAR 6,000,000 for the acquisition of the Silicon-28 plant assets.

Previous report

Political Risk Insurance Policy with Optio Group. On October 25, 2021, ASP Guernsey entered into a contract of insurance to cover against political risk and expropriation, to off-set the risk of events detrimental to the company occurring in the Republic of South Africa for a period of three years. The insurer is Optio Group Limited which is 100% underwritten by one or more syndicates at Lloyd’s of London. The specific risks covered in the policy are: (i) permanent and total abandonment of operations, (ii) deprivation of assets or shareholding, (iii) physical damage due to political violence, (iv) non-transfer or inconvertibility, (v) business interruption, (vi) non-honouring of arbitration award, and (vii) crisis management support. The limit of cover is equal to or in excess of the projected amount of investment required to complete the initial stage of the first planned Molybdenum enrichment plant. The limit of cover is capable of being increased and extended by mutual agreement with the insurer.

Previous report

Research and development expenses were $1,034,446 for the three months ended September 30, 2024. These expenses include $368,515 of personnel-related costs, including $82,619 in stock-based compensation expense, $316,157 in consulting and professional costs and $349,774 in facility and other expenses.

Previous report

Research and development expenses were $239,199 for the three months ended September 30, 2023. These expenses include $113,336 of personnel-related costs, including $92,886 in stock-based compensation expense, and $50,000 in consulting and professional costs, and $75,863 in facility and other expenses.

Previous report

Selling, general and administrative expenses were $4,693,158 for the three months ended September 30, 2024. These expenses include $2,985,744 of personnel-related costs, including $1,985,471 in stock-based compensation expense, $1,063,595 of professional services and legal related fees and $643,819 in facility and other corporate expenses.

Previous report

Selling, general and administrative expenses were $3,707,311 for the three months ended September 30, 2023. These expenses include $2,484,637 of personnel-related costs, including $1,978,904 in stock-based compensation expense, $669,118 of professional services and legal related fees and $553,556 in facility and other corporate expenses.

Previous report

The increase in personnel-related costs is due to an increase in headcount and salaries. The increase in professional services and legal related fees is primarily attributable to the timing of corporate activity. The increase in facility and other corporate expenses is primarily attributable to the expansion of our operations in 2024.

Previous report

Comparison of the Nine Months Ended September 30, 2024 and 2023

Previous report

Effective with the acquisition of 51% of PET Labs, we have recognized revenue from the sale of nuclear medical doses for PET scanning for the two month period since the acquisition was effective on October 31, 2023 and December 31, 2023 and the three and nine months ended September 30, 2024. In addition, we have recognized the related cost of goods sold, operating expenses and other income and expenses of PET Labs for the same periods. No revenue or cost of goods sold was recognized for the nine months ended September 30, 2023.

Previous report

Research and development expenses were $1,722,882 for the nine months ended September 30, 2024. These expenses include $673,140 of personnel-related costs, including $247,403 in stock-based compensation expense, $490,647 in consulting and professional, and $559,095 in facility and other expenses.

Previous report

Research and development expenses were $699,413 for the nine months ended September 30, 2023. These expenses include $369,136 of personnel-related costs, including $278,686 in stock-based compensation expense, $150,000 in consulting expenses and $180,277 in facility and other expenses.

Previous report

Selling, general and administrative expenses were $17,976,882 for the nine months ended September 30, 2024. These expenses include $9,048,993 of personnel-related costs, including $6,052,357 in stock-based compensation expense, $4,720,772 of professional services and legal related fees and $4,207,117 in facility and other corporate expenses.

Previous report

Selling, general and administrative expenses were $11,319,465 for the nine months ended September 30, 2023. These expenses include $7,720,997 of personnel-related costs, including $6,311,890 in stock-based compensation expense, $2,165,926 of professional services and legal related fees and $1,432,542 in facility and other corporate expenses.

Previous report

The increase in personnel-related costs is due to an increase in headcount and salaries. The increase in professional services and legal related fees is mainly due to the timing of corporate activity. The increase in facility and other corporate expenses is mainly due to the expansion of our operations in 2024 and commission and fee expenses related to the issuance of convertible notes payable.

Previous report

Other expense for the nine months ended September 30, 2024 was $4,538,006, which includes a loss of $5,220,599 due to change in fair value of the convertible notes payable issued in March and June 2024, partially offset by $657,899 of interest income and a gain of $327,969 due to change in fair value of share liability.

Previous report

Other expense for the nine months ended September 30, 2023 was $105,029, which includes a $109,040 change in the fair value of the share liability related to the shares issuable to a placement agent and other consultants.

Previous report

Net cash provided by financing activities was $4,493,610 for the nine months ended September 30, 2023, and was comprised primarily of net proceeds of $4,493,610 from the sale and issuance of 3,164,557 shares of our common stock in March 2023.
Reworded paragraphs (28)

Previous wording

We are a development stage advanced materials company dedicated to the development of technology and processes that, if successful, will allow for the enrichment of natural isotopes into higher concentration products, which could be used in several industries. Our proprietary technology, the Aerodynamic Separation Process (“ASP technology”), originally developed by Klydon Proprietary Ltd (“Klydon”), is designed to enable the production of isotopes used in several industries. Our initial focus is on the production and commercialization of enriched Carbon-14 (“C-14”), Molybdenum-100 (“Mo-100”) and Silicon-28 (“Si-28”). We have completed an isotope enrichment plant for the enrichment of C-14 located in Pretoria, South Africa and we expect to start commercial supply of C-14 in the first quarter of 2025 assuming timely delivery of the feedstock from the Company’s customer. We anticipate completion and commissioning of a multi-isotope enrichment plant in Pretoria, South Africa in the fourth quarter of 2024, and we expect to start initial commercial supply of Si-28 in early 2025. In addition, we have started planning additional isotope enrichment plants. We believe the C-14 we may produce using the ASP technology could be used in the development of new pharmaceuticals and agrochemicals. We believe the Mo-100 we may produce using the ASP technology could have significant potential advantages for use in the preparation of nuclear imaging agents by radiopharmacies and others in the medical industry. We believe the Si-28 we may produce using the ASP technology may be used to create advanced semiconductors and in quantum computing. In addition, we are considering the future development of the ASP technology for the separation of Zinc-68, Xenon-129/136 for potential use in the healthcare end market, Germanium 70/72/74 for possible use in the semiconductor end market, and Chlorine -37 for potential use in the nuclear energy end market.

Current wording

We are a development stage advanced materials company dedicated to the development of technology and processes that, if successful, will allow for the enrichment of natural isotopes into higher concentration products, which could be used in several industries. Our proprietary technologies, the Aerodynamic Separation Process (“ASP technology”) and Quantum Enrichment technology (“QE technology”), are designed to enable the production of isotopes used in several industries. Our initial focus is on the production and commercialization of enriched Carbon-14 (“C-14”), Silicon-28 (“Si-28”) and Ytterbium-176 (“Yb-176”).

Previous wording

In September 2023, we formed Quantum Leap Energy LLC, or “QLE,” which also has subsidiaries in the United Kingdom (Quantum Leap Energy Limited) and South Africa (Quantum Leap Energy (Pty) Limited), to focus on the development and commercialization of advanced nuclear fuels such as HALEU and Lithium-6.

Current wording

QLE. In September 2023, we formed Quantum Leap Energy LLC (“QLE”), which also has subsidiaries in the United Kingdom (Quantum Leap Energy Limited) and South Africa (Quantum Leap Energy (Pty) Limited), to focus on the development and commercialization of advanced nuclear fuels such as HALEU and Lithium-6.

Previous wording

In connection with the anticipated spin-out, in February 2024, we entered into a number of agreements with QLE, including a License Agreement, pursuant to which QLE has licensed from us the rights to technologies and methods used to separate Uranium 235 and Lithium 6 (including but not limited to the quantum enrichment and ASP technologies) in exchange for a perpetual royalty in the amount of 10% of all future QLE revenues, and an EPC Services Framework Agreement, pursuant to which we will provide services for the engineering, procurement and construction of one or more turnkey Uranium-235 and Lithium-6 enrichment facilities in locations to be identified by QLE and owned or leased by QLE, and commissioning, start-up and test services for each such facility, subject to the receipt of all applicable regulatory approvals, permits, licenses, authorizations, registrations, certificates, consents, orders, variances and similar rights. In addition, in February 2024, we assigned to QLE certain existing memoranda of understanding with U.S.-based small modular reactor companies for the use of Quantum Enrichment for the production of High-Assay Low Enriched Uranium (HALEU). The MOUs provide for substantial financial support for the development of HALEU production facilities that should be capable of supplying metric ton quantities of HALEU by 2027.

Current wording

In connection with the anticipated spin-out, we entered into a number of agreements with QLE, including a License Agreement, pursuant to which QLE has licensed from us the rights to technologies and methods used to separate Uranium 235 and Lithium 6 (including but not limited to the quantum enrichment and ASP technologies) in exchange for a perpetual royalty in the amount of 10% of all future QLE revenues, and an EPC Services Framework Agreement, pursuant to which we will provide services for the engineering, procurement and construction of one or more turnkey Uranium-235 and Lithium-6 enrichment facilities in locations to be identified by QLE and owned or leased by QLE, and commissioning, start-up and test services for each such facility, subject to the receipt of all applicable regulatory approvals, permits, licenses, authorizations, registrations, certificates, consents, orders, variances and similar rights. In addition, in February 2024, we assigned to QLE certain existing memoranda of understanding with U.S.-based small modular reactor companies for the use of Quantum Enrichment for the production of HALEU. The MOUs provide for substantial financial support for the development of HALEU production facilities that should be capable of supplying metric ton quantities of HALEU by 2027.

Previous wording

Per the Share Purchase Agreement, we have agreed to pay a total of $2,000,000 for the shares in two installments. The first installment of $500,000 was paid in November 2023. In January 2024, we paid $264,750 towards the balance due. The remaining balance of $1,235,250 is due upon demand any time after October 31, 2024 and is expected to be paid in November 2024.

Current wording

PET Labs. We have a 51% ownership stake in PET Labs Pharmaceuticals Proprietary Limited (“PET Labs”), a South African radiopharmaceutical operations company focused on the production of fluorinated radioisotopes and active pharmaceutical ingredients, through which we entered the downstream medical isotope production and distribution market. Under the terms of the Share Purchase Agreement pursuant to which we acquired the shares in PET Labs, we agreed to pay a total of $2,000,000 for the shares in two installments. The first installment of $500,000 was paid in November 2023. In January 2025 and 2024, we paid $750,000 and $264,750, respectively, towards the balance due. The remaining balance of $485,250 is due upon demand any time after October 31, 2024, and is expected to be paid in 2025.

Previous wording

In addition, in the fourth quarter of 2023, we entered into a strategic relationship with Pet Labs Pharmaceuticals (Pty) Limited (PET Labs) by acquiring a 51% ownership stake in PET Labs. We anticipate this transaction will allow us to enter the downstream medical isotope production and distribution market. Beginning in 2024, primarily as a result of the increased business activities of QLE, we have two operating segments: (i) nuclear fuels, and (ii) specialist isotopes and related services.

Current wording

Beginning in 2024, primarily as a result of the increased business activities of QLE, we have two operating segments: (i) nuclear fuels, and (ii) specialist isotopes and related services.

Previous wording

In March 2024, our wholly owned subsidiary Quantum Leap Energy received gross proceeds of $20,550,000 through the issuance of Convertible Promissory Notes with a stated interest rate of 6% for the first year and 8% thereafter. The maturity date of the Convertible Promissory Notes is March 7, 2029. The Convertible Promissory Notes automatically convert into common shares upon Quantum Leap Energy’s closing of an IPO or other qualifying public transaction at 80% of the share price taking into consideration a valuation cap.

Current wording

In March 2024, our wholly owned subsidiary QLE received gross proceeds of $20,550,000 through the issuance of Convertible Promissory Notes. These convertible notes have a stated interest rate of 6% for the first year and 8% thereafter. The maturity date of these convertible promissory notes is March 7, 2029. These convertible promissory notes automatically convert into common shares upon Quantum Leap Energy’s closing of an IPO or other qualifying public transaction at 80% of the share price taking into consideration a valuation cap.

Previous wording

On November 15, 2022, we completed an IPO of our common stock and issued and sold 1,250,000 shares of common stock at a public offering price of $4.00 per share, resulting in net proceeds of $3.8 million after deducting underwriting discounts and commissions and offering expenses.

Current wording

In November 2024, we issued 2,754,250 shares of common stock at a public offering price of $6.75 per share resulting in net proceeds of approximately $17.1 million after deducting underwriting discounts, commissions and offering expenses.

Previous wording

As described above, Klydon charged us for expenses associated with these research and development functions under the Turnkey Contract. We expect that our research and development expenses will increase substantially for the foreseeable future as we continue the development of our future isotopes. We cannot determine with certainty the timing of initiation, the duration or the completion costs of development activities. Actual development timelines, the probability of success and development costs can differ materially from expectations.

Current wording

We expect that our research and development expenses will increase substantially for the foreseeable future as we continue the development of our future isotopes. We cannot determine with certainty the timing of initiation, the duration or the completion costs of development activities. Actual development timelines, the probability of success and development costs can differ materially from expectations.

Previous wording

We may need to raise substantial additional capital in the future. In addition, we cannot forecast which future isotopes may be subject to future collaborations, when such arrangements will be secured, if at all, and to what degree such arrangements would affect our development plans and capital requirements.

Current wording

We will need to raise substantial additional capital in the future. In addition, we cannot forecast which future isotopes may be subject to future collaborations, when such arrangements will be secured, if at all, and to what degree such arrangements would affect our development plans and capital requirements.

Previous wording

As of December 31, 2023, we managed our operations as a single segment, specialist isotopes and related services. Beginning in 2024, primarily as a result of the increased business activities of our subsidiary, Quantum Leap Energy LLC, we have two operating segments: (i) nuclear fuels, and (ii) specialist isotopes and related services.

Current wording

Beginning in 2024, primarily as a result of the increased business activities of our subsidiary QLE, we have two operating segments: (i) nuclear fuels, and (ii) specialist isotopes and related services.

Previous wording

The nuclear fuels segment is focused on research and development of technologies and methods used to produce high-assay low-enriched uranium (HALEU) and Lithium-6 for the advanced nuclear fuels target end market.

Current wording

The nuclear fuels segment is focused on research and development of technologies and methods used to produce HALEU and Lithium-6 for the advanced nuclear fuels target end market.

Previous wording

Effective with the acquisition of 51% of PET Labs, we have recognized revenue from the sale of nuclear medical doses for PET scanning for the two month period since the acquisition was effective on October 31, 2023 and December 31, 2023 and the three and nine months ended September 30, 2024. In addition, we have recognized the related cost of goods sold, operating expenses and other income and expenses of PET Labs for the same periods. No revenue or cost of goods sold was recognized for the three months ended September 30, 2023.

Current wording

We have recognized revenue of PET Labs from the sale of nuclear medical doses for PET scanning for the three months ended March 31, 2025 and 2024. In addition, we have recognized the related cost of goods sold, operating expenses and other income and expenses of PET Labs for the same periods.

Previous wording

The increase in personnel-related costs is mainly due to the increase in headcount and related costs. The increase in consulting and professional is due to increased outsourced development activity for new specialty isotopes. The increase in facility is due to increase in space dedicated to development.

Current wording

an increase in personnel-related costs of $362,901 primarily due to the increase in headcount and related costs;

Previous wording

The increase in personnel-related costs is primarily attributable to the increase in headcount. The increase in consulting and professional costs is due to increased outsourced development activity for new specialty isotopes. The increase in facility and other is due to increase in space dedicated to development.

Current wording

an increase in consulting and professional fees of $189,515 due to increased outsourced development activity for new specialty isotopes;

Previous wording

Other expense for the three months ended September 30, 2024 was $1,930,136, which includes a loss of $2,692,073 due to change in fair value of the convertible notes payable issued in March and June 2024, partially offset by interest income of $602,181.and a gain of $381,969 due to change in fair value of share liability.

Current wording

Other expense for the three months ended March 31, 2025 was $579,816, which includes a loss of $957,408 due to change in fair value of the convertible notes payable issued in March and June 2024 and a foreign exchange transaction loss of $61,470, partially offset by interest income of $513,713.

Previous wording

Other expense for the three months ended September 30, 2023 was $275,973, which includes a $279,425 change in the fair value of the share liability related to the shares issuable to a placement agent and other consultants.

Current wording

Other expense for the three months ended March 31, 2024 was $1,197,653, which includes a $218,000 change in the fair value of the share liability related to the shares issuable to a consultant and a $953,710 change in fair value of the convertible notes payable issued in March 2024.

Previous wording

We have incurred net losses and negative cash flows from operations since our inception, and we expect to continue to incur significant and increasing net losses for the foreseeable future. We have principally financed our operations to date through the issuance of our common stock, including our IPO, subsequent common stock offerings and the issuance of convertible notes payable. In July 2024, we issued 13,800,000 in a public offering at a public offering price of $2.50 per share resulting in net proceeds of approximately $32.3 million after deducting underwriting discounts, commissions and offering expenses. In November 2024, we issued an additional 2,754,250 shares of common stock in a public offering at a public offering price of $6.75 per share resulting in net proceeds of approximately $17.1 million after deducting underwriting discounts, commissions and offering expenses.

Current wording

We have incurred net losses and negative cash flows from operations since our inception, and we expect to continue to incur significant and increasing net losses for the foreseeable future. We have principally financed our operations to date through the issuance of our common stock, including our IPO, and the issuance of convertible notes payable.

Previous wording

As of September 30, 2024, we had cash and cash equivalents of $51,571,540. We have not generated any revenue from the sale of our enriched isotopes, and our ability to generate product revenue from the sale of enriched isotopes sufficient to achieve profitability will depend on the successful development and eventual commercialization of one or more of our current or future enriched isotopes.

Current wording

As of March 31, 2025, we had cash and cash equivalents of $56.0 million. We have not generated any revenue from the sale of our enriched isotopes, and our ability to generate product revenue from the sale of enriched isotopes sufficient to achieve profitability will depend on the successful development and eventual commercialization of one or more of our current or future enriched isotopes.

Previous wording

Effective with the acquisition of 51% of PET Labs Pharmaceuticals on October 31, 2023, we have begun to recognize revenue from the sale of nuclear medical doses for PET scanning in South Africa. Our ability to generate product revenue from the sale of nuclear medical doses for PET scanning sufficient to achieve profitability will depend on the successful expansion of production capabilities and commercialization of the results of that expansion.

Current wording

We recognize revenue from the sale of nuclear medical doses for PET scanning in South Africa. Our ability to generate product revenue from the sale of nuclear medical doses for PET scanning sufficient to achieve profitability will depend on the successful expansion of production capabilities and commercialization of the results of that expansion.

Previous wording

Developing isotopes is a time-consuming, expensive and uncertain process that takes years to complete, and we may never achieve the necessary results required or obtain applicable regulatory approval for any isotopes or generate revenue from the sale of any future isotopes (assuming applicable regulatory approval is received). In addition, our future isotopes (assuming applicable regulatory approval is received) may not achieve commercial success. Our commercial revenues, if any, will be derived from sales of isotopes that we expect to be commercially available in substantial quantities in the last quarter of 2024. If we receive permits and licenses to enrich U-235 (which in itself is highly uncertain), we do not expect U-235 to be commercially available for at least several years, if ever. As a result, we may need substantial additional financing to support our continuing operations and further the development of and commercialization of our future isotopes.

Current wording

Developing isotopes is a time-consuming, expensive and uncertain process that takes years to complete, and we may never achieve the necessary results required or obtain applicable regulatory approval for any isotopes or generate revenue from the sale of any future isotopes (assuming applicable regulatory approval is received). In addition, our future isotopes (assuming applicable regulatory approval is received) may not achieve commercial success. Our commercial revenues, if any, will be derived from sales of isotopes that we do not expect to be commercially available in substantial quantities until at least 2025. If we receive permits and licenses to enrich U-235 (which in itself is highly uncertain), we do not expect U-235 to be commercially available for at least several years, if ever. As a result, we may need substantial additional financing to support our continuing operations and further the development of and commercialization of our future isotopes.

Previous wording

Net cash used in operating activities was $12,935,554 for the nine months ended September 30, 2024 and was primarily due to our net loss of $23,201,675, adjusted for stock-based compensation expense of $6,299,760, non-cash issuance costs for the convertible notes payable of $621,915, amortization of right-of-use asset of $343,473, depreciation expense of $425,630, issuance of common stock to a consultant with a fair value of $783,200, change in fair values for the convertible notes payable of $5,220,599 and a $3,071,004 change in our operating assets and liabilities.

Current wording

Net cash used in operating activities was $3,169,976 for the three months ended March 31, 2025 and was primarily due to our net loss of $8.5 million, adjusted for stock-based compensation expense of $1,889,701, amortization of right-of-use asset of $129,709, depreciation expense of $149,003, issuance of common stock to a consultant with a fair value of $247,000, change in fair values for the convertible notes payable of $957,408 and a $1,950,848 change in our operating assets and liabilities.

Previous wording

Net cash used in operating activities was $3,355,171 for the nine months ended September 30, 2023, and was primarily due to our net loss of $12,123,907, adjusted for stock-based compensation expense of $6,590,576, expense related to the issuance of common stock to consultants of $669,700, a change in fair value of share liability of $109,040 and amortization of right-of-use asset of $49,173, partially offset by a $1,349,278 change in our operating assets and liabilities.

Current wording

Net cash used in operating activities was $2,970,469 for the three months ended March 31, 2024, and was primarily due to our net loss of $7.0 million, adjusted for stock-based compensation expense of $1,713,654, non-cash issuance costs for the convertible notes payable of $513,748, issuance of common stock to a consultant with a fair value of $195,000, change in fair values for the convertible notes payable of $953,710, change in fair value of share liability of $218,000, amortization of right-of-use asset of $98,658 and a $274,553 change in our operating assets and liabilities, partially offset by a change in deferred tax liabilities of $49,771.

Previous wording

Net cash used in investing activities was $8,352,422 for the nine months ended September 30, 2024 and was comprised of the purchases of machinery and equipment, vehicles and construction in progress.

Current wording

Net cash used in investing activities was $2,359,368 for the three months ended March 31, 2025 and was comprised of the purchases of machinery and equipment, vehicles and construction in progress.

Previous wording

Net cash used in investing activities was $1,190,157 for the nine months ended September 30, 2023 and was comprised of additional construction in progress.

Current wording

Net cash used in investing activities was $1,245,825 for the three months ended March 31, 2024 and was comprised of the purchases of machinery and equipment and additional construction in progress.

Previous wording

Net cash provided by financing activities was $64,841,207 for the nine months ended September 30, 2024 and was comprised primarily of gross proceeds of $34,500,000 from issuance of common stock, gross proceeds of $25,936,228 from the issuance of convertible notes payable, proceeds of $5,537,975 from the issuance of common stock for a warrant exercise, contributions from noncontrolling interest in VIE of $891,479, proceeds from collection of receivable from noncontrolling interest in VIE of $706,774, partially offset by costs to issue common stock of $2,194,041, payments of $438,569 on the note payable related to a financed corporate insurance policy, payment of principal portion of finance leases of $38,347 and distribution to noncontrolling interest in VIE of $60,292.

Current wording

Net cash used in financing activities was $225,096 for the three months ended March 31, 2025 and was comprised primarily of payments of $187,167 on the note payable related to a financed corporate insurance policy, payment of principal portion of finance leases of $10,267 and distribution to noncontrolling interest in VIE of $38,304, partially offset by gross proceeds of proceeds from collection of receivable from noncontrolling interest in VIE of $28,857.

Previous wording

We lease our main facility in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $8,000 with a term expiring on December 31, 2030. We also lease additional space in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $16,000 with a term that expires on February 28, 2026. We also lease additional space in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $2,000 with a term expiring on October 30, 2026.

Current wording

We lease our main facility in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $9,000 with a term expiring on December 31, 2030. We also lease additional space on a short term basis in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $18,000 with a term expiring on February 28, 2026 and the Company is continuing to occupy that space under the monthly extensions. We also lease additional space in Pretoria, South Africa under a lease with a base monthly rent payment of approximately $2,000 with a term expiring on October 30, 2026.

Previous wording

PET Labs operates in a facility in Pretoria, South Africa is under a lease with a base monthly rent payment of approximately $28,000 with a term expiring on March 30, 2026 with automatic monthly extension afterwards. PET Labs also rents space at a local hospital in Pretoria, South Africa for which there was a lease with a base monthly rent payment of approximately $5,000 which expired on December 31, 2023 and is currently in automatic monthly extensions.

Current wording

PET Labs Pharmaceuticals operates in a facility in Pretoria, South Africa is under a lease with a base monthly rent payment of approximately $27,000 with a term expiring on March 30. 2026 with automatic monthly extension afterwards. PET Labs Pharmaceuticals also rents space at a local hospital in Pretoria, South Africa for which there was a lease with a base monthly rent payment of approximately $5,000 which expired on December 31, 2023 and is currently in automatic monthly extensions.

Previous wording

See Note 2 to our consolidated financial statements which discusses new accounting pronouncements.

Current wording

See Note 2 to our condensed consolidated financial statements which discusses new accounting pronouncements.
Rearranged current paragraphs (4)

Current report — wording carried from elsewhere

In addition, we are considering the future development of the ASP technology for the separation of Zinc-68 and Xenon-129/136 for potential use in the healthcare end market, Germanium 70/72/74 for potential use in the semiconductor end market, and Chlorine -37 for potential use in the nuclear energy end market. We are also considering the future development of QE technology for the separation of Nickel-64, Gadolinium-160, Ytterbium-171, Lithium 6 and Lithium7.

Current report — wording carried from elsewhere

In June 2024, our wholly owned subsidiary QLE received gross proceeds of $5,386,228 through this issuance of additional Convertible Promissory Notes with a stated interest rate of 6% for the first year and 8% thereafter. One of the notes totaling $108,167 was issued to the placement agent in lieu of cash issuance costs. The maturity date of the Convertible Promissory Notes is March 7, 2029. The Convertible Promissory Notes automatically convert into common shares upon Quantum Leap Energy’s closing of an IPO or other qualifying public transaction at 80% of the share price taking into consideration a valuation cap.

Current report — wording carried from elsewhere

For the three months ended March 31, 2025, no collaboration revenue has been recognized in the consolidated statements of operations and comprehensive loss.

Current report — wording carried from elsewhere

Net cash provided by financing activities was $20,263,995 for the three months ended March 31, 2024, and was comprised primarily of gross proceeds of $20,550,000 from the issuance of convertible notes payable, partially offset by payments of $263,141 on the note payable related to a financed corporate insurance policy.
Rearranged previous paragraphs (5)

Previous report — wording carried elsewhere

Acquisition of 51% of PET Labs

Previous report — wording carried elsewhere

Select information from the consolidated statements of operations and comprehensive loss as of the nine months ended September 30, 2024 and 2023 is as follows:

Previous report — wording carried elsewhere

The following table summarizes our results of operations for the nine months ended September 30, 2024 and 2023:

Previous report — wording carried elsewhere

Revenue and Cost of Goods Sold

Previous report — wording carried elsewhere

The following table summarizes our research and development expenses for the nine months ended September 30, 2024 and 2023: