A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 15, 2025

FEAM$1.91+1.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-12-31; filed 2025-02-13.

0000950170-25-019943

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-03-31; filed 2025-05-15.

0000950170-25-072736

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 115 previous paragraphs and 125 current paragraphs.

38 unchanged; 45 reworded; 41 added; 31 removed; 1 previous and 1 current paragraphs rearranged.

Tables are not compared: 2 previous and 2 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (41)

Current report

During April 2025, samples of boric acid that we supplied to a global specialty glass manufacturer successfully produced glass during qualification trials against other suppliers, with results showing that our boric acid performed as well as or better than the product of other suppliers across a variety of attributes of comparison. The successful trial advances our customer onboarding and qualification process, and we believe demonstrates that our boron production is of the necessary quality to meet the rigorous standards of the specialty glass market. As the next phase of the qualification process, we plan to ship larger quantities of boric acid for production scale evaluation.

Current report

During the first three months of calendar year 2025, we received initial capital estimates from our Engineering Procurement and Construction firm, Fluor Corporation. Updated analysis indicates that the Project is expected to deliver stronger Phase 1 economics than previously forecasted while maintaining additional optionality for advanced materials and bi-product production. The first phase of commercial production now forecasts 77,000 short tons of B2O3, targeted capital expenditure between approximately $390 and $430 million, and targets a project unlevered internal rate of return ranging from 18% to 22%. We believe these updates support our delivery of a pre-feasibility report with a robust final economic analysis in June 2025.

Current report

Project Timeline and Path to Final Investment Decision (“FID”)

Current report

Completion of vendor equipment testing remains the critical step on our path to completing the first phase of commercial engineering. We have made meaningful progress to date and we are now targeting completion of vendor testing during June 2025. Upon completion of the vendor equipment testing and subsequent release of our pre-feasibility report, the Company expects to stage-gate to a streamlined Front End Engineering Design (“FEED”) phase and anticipates a final investment decision (FID) in early calendar year 2026.

Current report

Pursuant to the Restructuring Support Agreement, the parties agreed to implement the Exchange Transaction either as an:

Current report

On March 4, 2025, at a special meeting of stockholders, our stockholders voted in favor of the Out-of-Court Restructuring, and on March 5, 2025 the Exchange was completed and resulted in 13,586,524 shares of the Company’s Common Stock issued to Bluescape and Ascend, the termination of the Amended and Restated Note Purchase Agreement and the extinguishment of all indebtedness owed by the Company under the Amended and Restated Note Purchase Agreement.

Current report

On March 13, 2025, pursuant to the January 2025 Subscription Agreement, we issued and sold an aggregate of 1,408,173 shares of Common Stock to Bluescape and Ascend, at a Subscription Price of $3.5507 per share for aggregate gross proceeds of $5.0 million (the “March 2025 Subscription”). Also pursuant to the January 2025 Subscription Agreement, we issued Restructuring Warrants to purchase up to an aggregate of 5,632,692 shares of Common Stock to Bluescape and Ascend. The Restructuring Warrants are immediately exercisable and expire on March 13, 2026, and have an exercise price per share equal to the Subscription Price.

Current report

On May 12, 2025 and May 13, 2025, we entered into a subscription agreements to issue and sell an aggregate of 1,984,709 shares of our Common Stock at a price of $3.55 per share (collectively, the “May 2025 Subscription”). In connection with the May 2025 Subscription, we also issued 37,402 shares of our Common Stock as an advisory fee. The May 2025 Subscription closed on May 15, 2025 and resulted in aggregate proceeds to us of approximately $7.0 million before deducting fees and other offering expenses payable by us.

Current report

On February 14, 2025, following approval by our stockholders at our 2024 annual meeting of our stockholders (the “Annual Meeting”), we effected a 1-for-23 reverse stock split (the "Reverse Stock Split") of our Common Stock.

Current report

The Reverse Stock Split did not affect the number of authorized shares of Common Stock or the par value of each share of Common Stock. The number of CHESS Depositary Interests (“CDIs”) in respect of the Company’s shares of Common Stock outstanding immediately prior to the effectiveness of the Reverse Stock Split was proportionately reduced by the final split ratio, subject to rounding. The 1:10 share-to-CDI ratio was not affected by the Reverse Stock Split.

Current report

Our Common Stock began trading on a post-split adjusted basis on February 18, 2025. On March 4, 2025, we were notified by the Nasdaq Listing Qualifications staff that the closing bid price of our Common Stock had been at $1.00 per share or greater for 10 consecutive business days, from February 18, 2025 to March 3, 2025, and accordingly, that we had regained compliance with Nasdaq Listing Rule 5450(a)(1) and this matter is now closed. If our Common Stock again closes below the $1.00 per share minimum bid price required by Nasdaq for 30 consecutive business days, we would again receive another notice of non-compliance with Nasdaq's listing standards and face the risk of delisting.

Current report

All references to the number of shares and per share amounts of our Common Stock included in this Quarterly Report on Form 10-Q have been retroactively adjusted to give effect to the Reverse Stock Split for all periods presented.

Current report

In late January 2025, our executive management held meetings with representatives of the Export-Import Bank of the United States (“EXIM”) in Washington, D.C., through which we gained deeper insights into the funding process requirements and expected timetables for EXIM’s loan programs, and provided EXIM with additional education on our Project. As previously disclosed, in September 2024, we received a non-binding letter of intent from EXIM for a loan-backed guarantee on project debt financing of up to

Current report

$285 million for our proposed commercial scale facility. We now expect to formally apply for the EXIM loan package once the first phase of commercial engineering is complete with diligence on-going during the FEED engineering phase.

Current report

Effective December 31, 2024, David J. Salisbury, Chairman and Director, and Keith Jennings, Director, resigned from the Board, and the Board’s size was reduced from six to four. On January 21, 2025, Paul Weibel, our Chief Executive Officer, was elected to the Board at the Annual Meeting, and succeeded Jimmy Lim, who was not re-nominated for election at the Annual Meeting. On March 5, 2025, upon the effectiveness of the Exchange, Mr. Weibel resigned from the Board and was succeeded by Curtis L. Hebert, Jr.

Current report

The gain on extinguishment of debt incurred for the three and nine months ended March 31, 2025 resulted from the Exchange Transaction and the related extinguishment of all indebtedness owed by the Company under the Amended and Restated Note Purchase Agreement. As discussed within Note 7-Debt to the unaudited condensed consolidated financial statements, the Exchange Transaction was accounted for as a troubled debt restructuring. As a result, we derecognized the remaining principal, accrued interest and unamortized discount and debt issuance costs associated with the Convertible Notes of $82.4 million, and recognized the fair value of various equity interests issued to the former noteholders, less $5.0 million of proceeds received, at their fair value of $65.1 million. The difference in value between the Convertible Notes and the net fair value of equity interests issued resulted in a gain on extinguishment of debt of $17.3 million.

Current report

The loss on extinguishment of debt incurred for the three and nine months ended March 31, 2024 resulted from the modification of the terms of our Convertible Notes contained in the Amended and Restated Note Purchase Agreement executed January 18, 2024. The modified terms of the Convertible Notes were evaluated and determined to be representative of an in-substance extinguishment of the Convertible Notes and establishment of new debt, for accounting purposes, primarily due to the significance of the changes to the terms of the conversion features. As a result, we derecognized the remaining principal, accrued interest and unamortized discount and debt issuance costs associated with the prior debt with an aggregate value of $44.2 million, and recognized the modified debt at its fair value of $65.2 million upon execution of the Amended and Restated Note Purchase Agreement. The difference in value between the prior debt and the modified debt resulted in a loss on extinguishment of debt of $21.0 million.

Current report

Other expense relates to losses on foreign currency transactions and certain non-income related taxes and penalties. For the three months ended March 31, 2025, other expense decreased $1 thousand, or 50%, versus the comparable period in the prior fiscal year. The decrease primarily relates to reduced foreign currency transaction losses compared to the prior year.

Current report

For the nine months ended March 31, 2025, other expense decreased $3 thousand, or 38%, versus the comparable period in the prior fiscal year. The decrease primarily relates to reduced foreign currency transaction losses compared to the prior year.

Current report

We did not have any income tax expense or benefit for the three and nine months ended March 31, 2025 and 2024, as we have recorded a full valuation allowance against our net deferred tax asset.

Current report

Cash flows provided by financing activities for the nine months ended March 31, 2024 were the result of $15.8 million of proceeds received from two closings of a private placement of our Common Stock in January of 2024, after recognition of the related costs and fees. The net proceeds from our private placement were offset, to a lesser extent, by $2.6 million of cash used to pay legal and accounting fees associated with the January 2024 Amended and Restated Note Purchase Agreement.

Current report

Summary of Financing Transactions for the nine months ended March 31, 2025

Current report

On September 16, 2024, pursuant to an amended and restated note purchase agreement (the “September 2024 Amended and Restated Note Purchase Agreement”), we issued and sold the September 2024 Notes in an aggregate principal amount of $6.0 million, to Bluescape and Ascend. The net proceeds to us for the September 2024 Notes offering were approximately $5.5 million after deducting issuance costs and fees payable by us.

Showing the first 40 of 41 passages. Open the source sections for the rest.

Removed paragraphs (31)

Previous report

On August 11, 2022, the Company executed a $60.0 million private placement of senior secured convertible notes (the “August 2022 Notes”) with Bluescape. On January 18, 2024, the Company entered into an amended and restated note purchase agreement (the “January 2024 Amended and Restated Note Purchase Agreement”) which modified certain terms of the August 2022 Notes, including to extend the maturity date of the August 2022 Notes to August 15, 2028.

Previous report

On May 28, 2024, the Company entered into a second amendment (“Amendment No. 2”) to the January 2024 Amended and Restated Note Purchase Agreement and agreed, among other things, to (i) issue and sell new senior secured convertible notes in substantially the same form and under the same terms as the August 2022 Notes, as amended, in an aggregate principal amount of $6.0 million (the “June 2024 Notes”) to Bluescape, Ascend and Meridian, and (ii) amend and restate the January 2024 Amended and Restated Note Purchase Agreement in the form attached as Annex A to Amendment No. 2 (the “May 2024 Amended and Restated Note Purchase Agreement”).

Previous report

On September 16, 2024, the Company entered into a third amendment (“Amendment No. 3”) to the January 2024 Amended and Restated Note Purchase Agreement and agreed, among other things, to (i) issue and sell new senior secured convertible notes in substantially the same form and under the same terms as the June 2024 Notes, in an aggregate principal amount of $6.0 million (the “September 2024 Notes”) to Bluescape, Ascend and Meridian, and (ii) amend and restate the January 2024 Amended and Restated Note Purchase Agreement in the form attached as Annex A to Amendment No. 3 (the “September 2024 Amended and Restated Note Purchase Agreement”).

Previous report

On January 21, 2025, our stockholders approved amendments to our Amended and Restated Certificate of Incorporation to effect a reverse stock split of our Common Stock at a ratio ranging from any whole number between 1-for-10 and 1-for-25, with the exact ratio within such range to be determined by the Company’s Board of Directors (the “Board”) in its discretion (the “Reverse Stock Split”). On February 3, 2025, the Board approved a 1-for-23 Reverse Stock Split, which will become effective upon filing of the amendment to the Company’s Amended and Restated Certificate of Incorporation with the Secretary of State of the State of Delaware. As of the date these financial statements were issued, the Reverse Stock Split had not yet become effective and the Company’s Common Stock had not yet begun to trade on a reverse split basis. Unless otherwise specified, all share and per share figures within this Quarterly Report on Form 10-Q are presented prior to any adjustment for the Reverse Stock Split.

Previous report

During the three months ended December 31, 2024, we optimized plant-level production rates and streamlined overall operations and production processes at our Small-Scale Facility (the “SSF”). Such efforts have resulted in operating cost reductions and an improvement in the quality and consistency of our boric acid production. We continued to maintain production of boric acid at one short ton per day with continuous improvement in production rates and product specification at the facility at a level designed to meet volumetric needs for expanded customer qualification and testing needs for our commercial strategy, while minimizing liquidity impacts.

Previous report

We have made the critical strategic decision to pursue calcium chloride as our byproduct and have now begun incorporating this decision into our commercial basis of design for the commercial scale facility (the “Commercial Scale Facility”) and are working towards partnership and offtake of our potential calcium chloride stream with multiple strategic players. We believe that the pursuit of calcium chloride for our by-production alongside boric acid has the potential to ultimately yield a significant decrease in the capital expenditures needed for our Commercial Scale Facility while simplifying its design, to meaningfully improve the Project’s rate of return.

Previous report

We also continued to progress FEL-2 engineering for Phase 1 of the Commercial Scale Facility. We anticipate that Fluor, our EPC contractor, will provide a capital estimate for Phase 1 no later than Spring 2025. We continued to focus our efforts during FEL-2 on ensuring the project is appropriately scoped and of high quality to position the Company for success as we move toward FEL-3. We anticipate that FEL-3 engineering will be a seven-to-eight-month process which allows us to target a final investment decision in late 2025.

Previous report

We have advanced our commercial strategy, and during the quarter, we met a key milestone in our timeline through the delivery of our first truckload of boric acid super sacks to a U.S. customer. In October 2024, we added two seasoned borates sales and marketing professionals who have already driven important advancements in translating customer engagement to initial off-take discussions. We are currently in the process of negotiating contracts for a portion of our initial boric acid production in commercial Phase 1. Additionally, we have expanded the geographic reach of our commercial program to the Asia-Pacific region, with coverage over more than 80% of the global borates demand as we look to high-grade the margin profile of our commercial scale production through targeted industry segmentation.

Previous report

During November 2024, we undertook a strategic reduction in work force, which reduced our company-wide headcount by approximately 40% with the goal of optimizing our team, reducing fixed and variable operating costs and increasing our efficiency at current production level at the SSF. We estimate that this initiative could allow us to save approximately $2.2 million in operating expenditures during calendar year 2025.

Previous report

Refer to the discussion above under the headings Recent Developments – Restructuring Support Agreement and Related Agreements, and January 2025 Notes.

Previous report

As of December 31, 2024, we had an aggregate principal amount of Convertible Notes of approximately $81.1 million outstanding. The Convertible Notes are convertible into shares of the Company’s Common Stock, are secured by substantially all of the Company’s assets and mature on August 15, 2028, as further described below. Additional details related to the Convertible Notes can be found in Note 7–Debt to the unaudited condensed consolidated financial statements.

Previous report

The August 2022 Notes are convertible into 66,261,623 shares of Common Stock (including principal and accrued interest paid-in-kind until maturity) and may be convertible into a maximum of an additional 33,130,816 Additional Shares upon the occurrence of a Make-Whole Fundamental Change.

Previous report

The June 2024 Notes are convertible into 6,252,367 shares of Common Stock (including principal and accrued interest paid-in-kind until maturity) and may be convertible into a maximum of an additional 3,126,184 Additional Shares upon the occurrence of a Make-Whole Fundamental Change.

Previous report

The September 2024 Notes are convertible into 9,380,671 shares of Common Stock (including principal and accrued interest paid-in-kind until maturity) and may be convertible into a maximum of an additional 3,908,615 Additional Shares upon the occurrence of a Make-Whole Fundamental Change.

Previous report

The January 2025 Notes are convertible into 24,317,039 shares of Common Stock (including principal and accrued interest paid-in-kind until maturity) and may be convertible into a maximum of an additional 10,113,955 Additional Shares upon the occurrence of a Make-Whole Fundamental Change.

Previous report

If the Out-of-Court Restructuring transaction is consummated (refer to Recent Developments – Restructuring Support Agreement and Related Agreements above), the Convertible Notes, including accrued interest thereon, will be exchanged for 312,490,076 shares of our Common Stock, and all related rights and obligations (other than with respect to expense and reimbursement or indemnification obligations under the Amended and Restated Note Purchase Agreement, or obligations that expressly survive the termination of the Amended and Restated Note Purchase Agreement) will be extinguished.

Previous report

On March 28, 2024, we entered into an equity distribution agreement (the “Equity Distribution Agreement”) with Canaccord Genuity LLC and D.A. Davidson & Co. (the “Agents”) pursuant to which we may offer and sell up to $15.0 million of shares of our Common

Previous report

Stock from time to time through the Agents, acting as our sales agents, or directly to one or more of the Agents, acting as principal (the “ATM Program”).

Previous report

Neither of the Agents is required to sell any specific number or dollar amount of shares of our Common Stock, but each has agreed, subject to the terms and conditions of the Equity Distribution Agreement, to use its commercially reasonable efforts, consistent with its normal trading and sales practices, to sell the shares of Common Stock on the terms agreed upon by such Agent and the Company.

Previous report

We did not sell any shares of common stock nor receive any proceeds under the Equity Distribution Agreement during the six months ended December 31, 2024. As a result of the August 2024 Equity Offering, we are precluded from utilizing the ATM program until after August 27, 2025.

Previous report

In November 2024, the FASB issued ASU 2024-04, Debt–Debt with Conversion and Other Options (Subtopic 470-20): Induced Conversion of Convertible Debt Instruments (“ASU 2024-04”), which clarifies the requirements for determining whether certain settlements of convertible debt instruments should be accounted for as an induced conversion. ASU 2024-04 is effective for annual reporting periods beginning after December 15, 2025, and interim reporting periods within those annual reporting periods. Early adoption is permitted for all entities that have adopted the amendments in Update 2020-06, which includes the Company. Adoption can be on a prospective or retrospective basis. We adopted ASU 2024-04 effective January 1, 2025 on a prospective basis.
Reworded paragraphs (45)

Previous wording

The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) summarizes the significant factors affecting the operating results, financial condition, liquidity and capital resources, and cash flows of our Company for the three and six months ended December 31, 2024 and 2023. This MD&A should be read in conjunction with, and is qualified in its entirety by, the unaudited condensed consolidated financial statements, the accompanying notes thereto and other financial information included in this Quarterly Report on Form 10-Q, and the consolidated financial statements and accompanying notes thereto and Management’s Discussion and Analysis of Financial Condition and Results of Operations contained in our Annual Report on Form 10-K, filed with the SEC on September 9, 2024 (the “Annual Report”). Except for historical information, this discussion and analysis contains forward looking statements that involve risks, uncertainties and assumptions and other important factors, which include, but are not limited to, the risks described elsewhere in this Form 10-Q under “Item 1A. Risk Factors” and elsewhere in our Annual Report filed with the SEC, any of which could cause the Company’s actual results, performance or achievements, or industry results, to differ materially from any future results, performance or achievements expressed or implied by such forward-looking statements. All forward-looking statements speak only as of the date on which they are made. We undertake no obligation to update such statements to reflect events that occur or circumstances that exist after the date on which they are made. Additionally, you should refer to the “Cautionary Note Regarding Forward-Looking Statements.” References within this MD&A to the “Company,” “we,” “our,” and “us,” refer to 5E Advanced Materials, Inc., and its subsidiaries.

Current wording

The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) summarizes the significant factors affecting the operating results, financial condition, liquidity and capital resources, and cash flows of our Company for the three and nine months ended March 31, 2025 and 2024. This MD&A should be read in conjunction with, and is qualified in its entirety by, the unaudited condensed consolidated financial statements, the accompanying notes thereto and other financial information included in this Quarterly Report on Form 10-Q, and the consolidated financial statements and accompanying notes thereto and Management’s Discussion and Analysis of Financial Condition and Results of Operations contained in our Annual Report on Form 10-K, filed with the U.S. Securities and Exchange Commission (“SEC”) on September 9, 2024 (the “Annual Report”). Except for historical information, this discussion and analysis contains forward looking statements that involve risks, uncertainties and assumptions and other important factors, which include, but are not limited to, the risks described elsewhere in this Quarterly Report on Form 10-Q under “Item 1A. Risk Factors” and elsewhere in our Annual Report filed with the SEC, any of which could cause the Company’s actual results, performance or achievements, or industry results, to differ materially from any future results, performance or achievements expressed or implied by such forward-looking statements. All forward-looking statements speak only as of the date on which they are made. We undertake no obligation to update such statements to reflect events that occur or circumstances that exist after the date on which they are made. Additionally, you should refer to the “Cautionary Note Regarding Forward-Looking Statements.” References within this MD&A to the “Company,” “we,” “our,” and “us,” refer to 5E Advanced Materials, Inc., and its subsidiaries.

Previous wording

5E Advanced Materials, Inc. is focused on becoming a vertically integrated global leader and supplier of specialty boron and advanced boron derivative materials whose mission is to enable decarbonization, increase food security, and ensure domestic supply of critical materials. We hold 100% of the rights through ownership in the 5E Boron Americas (Fort Cady) Complex (the “Project”) through our wholly owned subsidiary 5E Boron Americas LLC. Our Project is underpinned by a mineral resource that includes boron and lithium, with the boron being contained in a conventional boron mineral known as colemanite. In 2022, our facility was designated as Critical Infrastructure by the U.S. Department of Homeland Security’s Cybersecurity and Infrastructure Security Agency. Our vision is to safely process boric acid, lithium carbonate and industry minerals through sustainable best practices to enable decarbonization, food security and domestic supply surety.

Current wording

We are an exploration stage company focused on becoming a vertically integrated global leader and supplier of specialty boron and advanced boron derivative materials whose mission is to enable decarbonization, increase food security, and ensure domestic supply of critical materials through sustainable best practices. Our business strategy and objectives are to develop capabilities ranging from upstream extraction and product sales of boric acid, lithium carbonate and potentially other co-products, to downstream boron advanced material processing and development. We hold 100% of the rights through ownership and lode claims filed with the United States Bureau of Land Management in the 5E Boron Americas (Fort Cady) Complex (the “Project”) located in southern California through our wholly owned subsidiary 5E Boron Americas LLC. Our Project is underpinned by a mineral resource that includes boron and lithium, with the boron being contained in a conventional boron mineral known as colemanite. In 2022, our facility was designated as Critical Infrastructure by the U.S. Department of Homeland Security’s Cybersecurity and Infrastructure Security Agency. We believe the Project represents one of the most compelling domestic critical material projects in the United States as a strategically located operation that targets stable long-term demand, with a defined pathway to production and a low-cost, high margin and profitable financial profile.

Previous wording

On January 14, 2025, the Company entered into a fourth amendment (“Amendment No. 4”) to the January 2024 Amended and Restated Note Purchase Agreement and agreed, among other things, to (i) issue and sell new senior secured convertible notes in substantially the same form and under the same terms as the September 2024 Notes, in an aggregate principal amount of $5.0 million (the “January 2025 Notes” and, together with the August 2022 Notes, the June 2024 Notes and the September 2024 Notes the “Convertible Notes”) to Bluescape, Ascend and Meridian, and (ii) amend and restate the January 2024 Amended and Restated Note Purchase Agreement in the form attached as Annex A to Amendment No. 4 (as amended, the “Amended and Restated Note Purchase Agreement”). The Amended and Restated Note Purchase Agreement also extended the date to which the Company must comply with a financial covenant for the Company to maintain a cash balance of at least $7.5 million from December 31, 2024 to March 31, 2025. Concurrently with the execution of Amendment No. 4, the Company entered into the Restructuring Support Agreement, and other related agreements, as discussed above). See Note 7–Debt to our financial statements included elsewhere in this Quarterly Report on Form 10-Q for more information.

Current wording

On January 14, 2025, we entered into a fourth amendment (“Amendment No. 4”) to the January 2024 Amended and Restated Note Purchase Agreement and agreed, among other things, to (i) issue and sell an aggregate $5 million of new senior secured convertible notes (the “January 2025 Notes”) in substantially the same form and under the same terms as the then existing convertible notes issued in June 2024 (the “June 2024 Notes”) and September 2024 (the “September 2024 Notes”, together with the June 2024 Notes, the “Existing Notes”) and together with the January 2025 Notes, the “Convertible Notes”) to BEP Special Situations IV LLC (“Bluescape”), Meridian Investments Corporation (“Meridian”) and Ascend Global Investment Fund SPC, for and on behalf of Strategic SP (together with Meridian, “Ascend”), and (ii) amend and restate the January 2024 Amended and Restated Note Purchase Agreement in the form attached as Annex A to Amendment No. 4 (as amended, the “Amended and Restated Note Purchase Agreement”). The Amended and Restated Note Purchase Agreement also extended the date to which we were required to comply with the then enforce financial covenant for us to maintain a cash balance of at least $7.5 million from December 31, 2024 to March 31, 2025. Concurrently with the execution of Amendment No. 4, we entered into the Restructuring Support Agreement, and other related agreements, as discussed below.

Previous wording

On January 14, 2025, we entered into a Restructuring Support Agreement (the “Restructuring Support Agreement”) with BEP Special Situations IV LLC (“Bluescape”), Meridian Investments Corporation (“Meridian”) and Ascend Global Investment Fund SPC, for and on behalf of Strategic SP (together with Meridian, “Ascend”) in connection with certain restructuring and recapitalization transactions with respect to our capital structure (collectively the “Transaction”), including our senior secured convertible promissory notes (the "Convertible Notes“) issued pursuant to the Amended and Restated Note Purchase Agreement, dated January 18, 2024 by and among us, Bluescape, Ascend, the Guarantors from time to time party thereto and Alter Domus (US) LLC, as collateral agent (as amended, the “Amended and Restated Note Purchase Agreement”).

Current wording

On January 14, 2025, we entered into a Restructuring Support Agreement (the “Restructuring Support Agreement”) with Bluescape, and Ascend in connection with certain restructuring and recapitalization transactions with respect to our capital structure (collectively the “Exchange Transaction”), including our Convertible Notes issued pursuant to the Amended and Restated Note Purchase Agreement.

Previous wording

pursuant to an Exchange Agreement dated January 14, 2025 among Ascend, Bluescape and us (the “Exchange Agreement”), the issuance of an aggregate of 312,490,076 shares of our common stock, par value $0.01 per share (“Common Stock”) to Ascend and Bluescape upon exchange of all of the outstanding Convertible Notes (the “Exchange”);

Current wording

pursuant to an Exchange Agreement dated January 14, 2025 among Ascend, Bluescape and us (the “Exchange Agreement”), the issuance of an aggregate of 13,586,524 shares of our common stock, par value $0.01 per share (“Common Stock”) to Ascend and Bluescape upon exchange of all of the outstanding Convertible Notes (the “Exchange”);

Previous wording

pursuant to a Securities Subscription Agreement dated January 14, 2025 among Ascend, Bluescape and us (the “Subscription Agreement”), the issuance and sale by us of an aggregate of $5.0 million of Common Stock to Ascend and Bluescape at a price per share equal to the lesser of (a) $0.2920 per share (appropriately adjusted to reflect any stock split, stock dividend, stock combination, recapitalization, or the like occurring after the date of the Restructuring Support Agreement) and (b) the volume weighted average price for the Common Stock on the five consecutive trading days immediately following the date of the Exchange (the “Subscription Price”);

Current wording

pursuant to a Securities Subscription Agreement dated January 14, 2025 among Ascend, Bluescape and us (the “January 2025 Subscription Agreement”), the issuance and sale by us of an aggregate of $5.0 million of Common Stock to Ascend and Bluescape at a price per share equal to the lesser of (a) $6.716 per share and (b) the volume weighted average price for the Common Stock on the five consecutive trading days immediately following the date of the Exchange (the “Subscription Price”);

Previous wording

pursuant to the Subscription Agreement, the issuance by us to Ascend and Bluescape of warrants with a one-year term (the “Restructuring Warrants”) to purchase an aggregate number of shares of Common Stock represented by up to $20.0 million divided by the Subscription Price, at a price per share equal to the Subscription Price; and o

Current wording

pursuant to the January 2025 Subscription Agreement, the issuance by us to Ascend and Bluescape of warrants with a one-year term (the “Restructuring Warrants”) to purchase an aggregate number of shares of Common Stock represented by up to $20.0 million divided by the Subscription Price, at a price per share equal to the Subscription Price; and

Previous wording

pursuant to a Fourth Amended and Restated Investor and Registration Rights Agreement dated January 14, 2025 among Ascend, Bluescape and us (the “IRRA”), the right of each of Ascend and Bluescape to designate two directors to serve on our Board following the consummation of the Transaction for so long as such party beneficially owns 25% of our Common Stock and one director to serve on our Board for so long as such party beneficially owns 10% of our Common Stock (clauses (i) through (iv), together, the “Out-of-Court Restructuring”); or

Current wording

pursuant to a Fourth Amended and Restated Investor and Registration Rights Agreement dated January 14, 2025 among Ascend, Bluescape and us (the “IRRA”), the right of each of Ascend and Bluescape to designate two directors to serve on our Board of Directors (“Board”) following the consummation of the Exchange Transaction for so long as such party beneficially owns 25% of our Common Stock and one director to serve on our Board for so long as such party beneficially owns 10% of our Common Stock (clauses (i) through (iv), together, the “Out-of-Court Restructuring”); or

Previous wording

In-Court Restructuring: To the extent that the terms of or the conditions precedent to the Out-of-Court Restructuring cannot be timely satisfied or waived, we shall file voluntary pre-packaged cases under chapter 11 of title 11 of the United States Code in a United States Bankruptcy Court (the “Bankruptcy Court”) pursuant to a pre-packaged plan of reorganization (the “Pre-Packaged Chapter 11 Plan”) pursuant to which, among other things, all of our existing equity interests shall be extinguished, with Ascend and Bluescape each owning their respective pro rata share of 100% of the new equity interests in the Company upon the effective date of the Pre-Packaged Chapter 11 Plan (the “In-Court Restructuring”). The Restructuring Support Agreement further provides that Ascend and Bluescape shall provide a $10.0 million debtor-in-possession financing facility pursuant to a debtor-in-possession credit agreement to be agreed upon by the parties and, as necessary, approved by the Bankruptcy Court.

Current wording

In-Court Restructuring: To the extent that the terms of or the conditions precedent to the Out-of-Court Restructuring could not be timely satisfied or waived, we would file voluntary pre-packaged cases under chapter 11 of title 11 of the United States Code in a United States Bankruptcy Court (the “Bankruptcy Court”) pursuant to a pre-packaged plan of reorganization (the “Pre-Packaged Chapter 11 Plan”) pursuant to which, among other things, all of our existing equity interests would be extinguished, with Ascend and Bluescape each owning their respective pro rata share of 100% of the new equity interests in the Company upon the effective date of the Pre-Packaged Chapter 11 Plan (the “In-Court Restructuring”). The Restructuring Support Agreement further provided that Ascend and Bluescape would provide a $10.0 million debtor-in-possession financing facility pursuant to a debtor-in-possession credit agreement to be agreed upon by the parties and, as necessary, approved by the Bankruptcy Court.

Current wording

Financing Transactions — Liquidity Considerations and Going Concern

Previous wording

Although the January 2025 Notes improved our cash position by providing an aggregate of $5.0 million of proceeds to the Company prior to recognition of issuance costs and fees, and we continue to operate under a business plan that includes reductions in certain spending, we will need additional financing in order to continue as a going concern and, as long as the Convertible Notes are outstanding, maintain a cash balance in excess of the $7.5 million minimum cash covenant contained in the Amended and Restated Note Purchase Agreement (as discussed in Note 7–Debt to the unaudited condensed consolidated financial statements). An event of default under the September 2024 Amended and Restated Note Purchase Agreement would give the holders of the Convertible Notes the right to cause all of our Convertible Notes to become immediately due and payable, for which we would not have the resources to repay without additional financing. The receipt of potential funding cannot be considered probable at this time because these plans are not entirely within management's control as of the date of the unaudited condensed consolidated financial statements. Therefore, there exists substantial doubt regarding our ability to continue as a going concern. Even if additional financing is successfully consummated, including as part of the proposed Out-of-Court Restructuring, available liquidity may still not be sufficient to eliminate the aforementioned substantial doubt regarding our ability to continue as a going concern. Refer to the “Going Concern” discussion within Note 1–Basis of Financial Statement Presentation of the unaudited condensed consolidated financial statements and “Liquidity and Capital Resources” below for more information.

Current wording

Although the January 2025 Notes, March 2025 Subscription and May 2025 Subscription improved our cash position by providing an aggregate of $17.0 million of proceeds to the Company, prior to recognition of issuance costs and transaction fees, and we continue to operate under a business plan that includes reductions in certain spending, we will need additional financing in order to continue as a going concern for a period of at least one year after the date these financial statements are issued. The receipt of potential funding cannot be considered probable at this time because these plans are not entirely within management's control as of the date of the unaudited condensed consolidated financial statements. Therefore, there exists substantial doubt regarding our ability to continue as a going concern. Even if additional financing is successfully consummated, available liquidity may still not be sufficient to eliminate the aforementioned substantial doubt regarding our ability to continue as a going concern. Refer to the “Going Concern” discussion within Note 1–Basis of Financial Statement Presentation of the unaudited condensed consolidated financial statements and “Liquidity and Capital Resources” below for more information.

Previous wording

Comparison of the three and six months ended December 31, 2024 and 2023

Current wording

Comparison of the three and nine months ended March 31, 2025 and 2024

Previous wording

Project expenses include drilling, plug and abandonment, site preparation, engineering, consumables, testing and sampling, hydrology, permits, surveys, and other expenses associated with further progressing our Project. Prior to April 1, 2024, Project expenses also included non-labor related costs incurred to prepare for the operation of the SSF, as these costs were incurred prior to the SSF being placed into operation. For the three months ended December 31, 2024, project expenses increased $248 thousand, or 17%, versus the comparable period in the prior year. The increase was primarily the result of increased wellfield development activity primarily related to the installation of additional observation monitoring wells ($0.4 million). This increase was offset by decreases in: (i) testing and analysis costs ($0.1 million), and (ii) insurance costs ($0.1 million).

Current wording

Project expenses include drilling, plug and abandonment, site preparation, engineering (excluding amounts eligible to be capitalized), consumables, testing and sampling, hydrology, permits, surveys, and other expenses associated with further progressing our Project. Prior to April 1, 2024, Project expenses also included non-labor related costs incurred to prepare for the operation of the SSF, as these costs were incurred prior to the SSF being placed into operation. For the three months ended March 31, 2025, project expenses decreased $105 thousand, or 9%, versus the comparable period in the prior year. The decrease was primarily the result of decreases in: (i) testing and analysis costs, primarily for environmental compliance ($0.2 million), (ii) wellfield development costs ($0.2 million), and (iii) Environmental Protection Agency and other environmental compliance costs ($0.1 million). These decreases were offset by increases in: (i) site-related costs ($0.3 million), and (ii) insurance costs ($0.1 million).

Previous wording

For the six months ended December 31, 2024, project expenses increased $219 thousand, or 7%, versus the comparable period in the prior year. The increase was primarily the result of: (i) increased wellfield development activity primarily related to the installation of additional observation monitoring wells ($0.9 million), and (ii) and increase in site related costs ($0.4 million). These increases were offset by decreases in: (i) Environmental Protection Agency and other environmental compliance costs ($0.5 million), (ii) testing and analysis costs ($0.3 million), (iii) insurance costs ($0.2 million), and (iv) expenses incurred relating to our plug and abandonment program to prepare the wellfield for injection operations ($0.1 million).

Current wording

For the nine months ended March 31, 2025, project expenses increased $114 thousand, or 3%, versus the comparable period in the prior year. The increase was primarily the result of: (i) increased wellfield development activity primarily related to the installation of additional observation monitoring wells that were required for environmental compliance ($0.8 million), and (ii) an increase in site related costs due to increased activity at the Project ($0.7 million). These increases were offset by decreases in: (i) Environmental Protection Agency and other environmental compliance costs, including permit activity ($0.6 million), (ii) testing and analysis costs, primarily for environmental compliance ($0.5 million), (iii) insurance costs ($0.2 million), and (iv) expenses incurred relating to our plug and abandonment program to prepare the wellfield for injection operations ($0.1 million).

Previous wording

Small-scale facility operating costs consists of raw materials, salaries and benefits for employees that are directly responsible for the operation of the SSF, and maintenance and upkeep related to the SSF after April 1, 2024. Prior to April 1, 2024, such costs were reported within either Project expenses or General and administrative expenses as the SSF had not yet been placed into operation. For the three months ended December 31, 2024, Small-scale facility operating costs consisted of: (i) salaries and benefits for our employees directly responsible for operating the SSF ($0.8 million), (ii) raw materials necessary to operate the SSF and produce boric acid ($0.2 million), and (iii) maintenance, upkeep and other costs incurred for the operation of the SSF ($0.1 million). There were no comparable expenses for the same period in the prior year as the SSF had not yet been placed into service and such costs were reported as either Project expenses or General and administrative expenses, as appropriate.

Current wording

Small-scale facility operating costs consists of raw materials, salaries and benefits for employees that are directly responsible for the operation of the SSF, and maintenance and upkeep related to the SSF after April 1, 2024. Prior to April 1, 2024, such costs were reported within either Project expenses or General and administrative expenses as the SSF had not yet been placed into operation. For the three months ended March 31, 2025, Small-scale facility operating costs consisted of: (i) salaries and benefits for our employees directly responsible for operating the SSF ($0.6 million), (ii) raw materials necessary to operate the SSF and produce boric acid ($0.2 million), and (iii) maintenance, upkeep and other costs incurred for the operation of the SSF ($0.1 million). There were no comparable expenses for the same period in the prior year as the SSF had not yet been placed into service and such costs were reported as either Project expenses or General and administrative expenses, as appropriate.

Previous wording

For the six months ended December 31, 2024, Small-scale facility operating costs consisted of: (i) salaries and benefits for our employees directly responsible for operating the SSF ($2.0 million), (ii) raw materials necessary to operate the SSF and produce boric acid ($0.4 million), (iii) maintenance, upkeep and other costs incurred for the operation of the SSF ($0.2 million), and (iv) other operating costs ($0.1 million). There were no comparable expenses for the same period in the prior year as the SSF had not yet been placed into service and such costs were reported as either Project expenses or General and administrative expenses, as appropriate.

Current wording

For the nine months ended March 31, 2025, Small-scale facility operating costs consisted of: (i) salaries and benefits for our employees directly responsible for operating the SSF ($2.6 million), (ii) raw materials necessary to operate the SSF and produce boric acid ($0.6 million), (iii) maintenance, upkeep and other costs incurred for the operation of the SSF ($0.3 million), and (iv) other operating costs ($0.1 million). There were no comparable expenses for the same period in the prior year as the SSF had not yet been placed into service and such costs were reported as either Project expenses or General and administrative expenses, as appropriate.

Previous wording

General and administrative expenses include professional fees, costs associated with marketing, on-going SEC and public company costs, public relations, rent, salaries, share based compensation and other expenses. Prior to April 1, 2024, all salaries and benefits for the entire organization were reported in general and administrative expenses. After April 1, 2024, the date which we began operation of the SSF, salaries and benefits for employees that are directly responsible for the operation of the SSF are reported in Small-scale facility operating costs. For the three months ended December 31, 2024, general and administrative expenses decreased $4.1 million, or 56%, versus the comparable period in the prior fiscal year. The decrease was primarily due to: (i) decreases in professional fees, primarily as a result of incurring incremental legal fees in the prior year leading up to the prior-year out-of-court restructuring transaction ($2.4 million), (ii) a reduction of incentive compensation related costs, inclusive of share based compensation expense ($0.8 million), (iii) a reduction in base compensation and employee benefits, resulting from the combined impact of (a) salaries and benefits for personnel responsible for the operation of the SSF now reported as Small-scale facility operating costs, and (b) a reduction in head count across the organization (for a combined impact of $0.8 million), and (iv) a reduction in marketing related costs ($0.1 million).

Current wording

General and administrative expenses include professional fees, costs associated with marketing, on-going SEC and public company costs, public relations, rent, salaries for administrative personnel within the Company, share based compensation and other expenses. Prior to April 1, 2024, all salaries and benefits for the entire organization were reported in general and administrative expenses. After April 1, 2024, the date which we began operation of the SSF, salaries and benefits for employees that are directly responsible for the operation of the SSF are reported in Small-scale facility operating costs. For the three months ended March 31, 2025, general and administrative expenses increased $268 thousand, or 9%, versus the comparable period in the prior fiscal year. The increase was primarily due to increases in professional fees ($2.1 million), primarily due to a $1.8 million reclassification of legal and accounting fees to either debt or equity issuance costs in the prior year which resulted from the successful implementation of the January 2024 restructuring transaction. The increase was offset by decreases in: (i) base compensation and employee benefits, resulting from the combined impact of (a) salaries and benefits for personnel responsible for the operation of the SSF now reported as Small-scale facility operating costs, and (b) a reduction in head count across the organization (for a combined impact of $0.9 million), (ii) incentive compensation related costs, inclusive of share based compensation expense ($0.5 million), (iii) miscellaneous, travel and marketing costs as a result of cost cutting measures across the organization ($0.3 million), and (iv) insurance costs ($0.1 million).

Previous wording

For the six months ended December 31, 2024, general and administrative expenses decreased $5.4 million, or 40%, versus the comparable period in the prior fiscal year. The decrease was primarily due to: (i) decreases in professional fees, primarily as a result of incurring incremental legal fees in the prior year leading up to the prior-year out-of-court restructuring transaction ($2.8 million), (ii) a reduction in base compensation and employee benefits, resulting from the combined impact of (a) salaries and benefits for personnel responsible for the operation of the SSF now reported as Small-scale facility operating costs, and (b) a reduction in head count across the organization (for a combined impact of $1.8 million), (iii) a reduction of incentive compensation related costs, inclusive of share based compensation expense ($0.4 million), (iv) a reduction in marketing related costs ($0.3 million), and (v) other miscellaneous cost cutting measures across the organization ($0.1 million).

Current wording

For the nine months ended March 31, 2025, general and administrative expenses decreased $5.1 million, or 31%, versus the comparable period in the prior fiscal year. The decrease was primarily due to decreases in: (i) base compensation and employee benefits, resulting from the combined impact of (a) salaries and benefits for personnel responsible for the operation of the SSF now reported as Small-scale facility operating costs, and (b) a reduction in head count across the organization (for a combined impact of $2.7 million), (ii) incentive compensation related costs, inclusive of share based compensation expense ($0.9 million), (iii) professional fees, primarily as a result of incurring incremental legal fees in the prior year leading up to the January 2024 restructuring transaction ($0.6 million), (iv) miscellaneous and travel costs resulting from cost cutting measures across the organization ($0.5 million), and (v) marketing related costs ($0.4 million).

Previous wording

Research and development expense includes costs incurred under research agreements with Georgetown University and Boston College that aim to enhance the performance of permanent magnets through increased use of boron. Both engagements were completed during the second fiscal quarter of 2024. Therefore, we incurred no research and development costs in the three and six months ended December 31, 2024.

Current wording

Research and development expense includes costs incurred under research agreements with Georgetown University and Boston College that aim to enhance the performance of permanent magnets through increased use of boron. Both engagements were completed during the second fiscal quarter of 2024. Therefore, we incurred no research and development costs in the three months ended March 31, 2024 or the three and nine months ended March 31, 2025, compared to $45 thousand in research and development costs incurred in the nine months ended March 31, 2024.

Previous wording

Depreciation and amortization relates to use of our SSF, injection and recovery wells, owned or leased vehicles, buildings and equipment and the accretion of our asset retirement obligations. For the three months ended December 31, 2024, depreciation and amortization expense increased $4.9 million versus the comparable period in the prior year. For the six months ended December 31, 2024, depreciation and amortization expense increased $9.9 million versus the comparable period in the prior year. These increases were primarily due to placing the SSF and its related injection and recovery wells, facilities, and equipment into service as of April 1, 2024, corresponding with the commencement of operations.

Current wording

Depreciation and amortization relates to use of our SSF, injection and recovery wells, owned or leased vehicles, buildings and equipment and the accretion of our asset retirement obligations. For the three months ended March 31, 2025, depreciation and amortization expense increased $4.9 million versus the comparable period in the prior year. For the nine months ended March 31, 2025, depreciation and amortization expense increased $14.8 million versus the comparable period in the prior year. These increases were primarily due to placing the SSF and its related injection and recovery wells, facilities, and equipment into service as of April 1, 2024, corresponding with the commencement of operations.

Previous wording

Interest income is derived from the investment of our excess cash and cash equivalents in short-term (original maturities of three months or less) investments of highly liquid treasury bills and certificates of deposit. For the three months ended December 31, 2024, interest income increased $15 thousand, or 150%, versus the comparable period in the prior fiscal year. For the six months ended December 31, 2024, interest income decreased $94 thousand, or 66%, versus the comparable period in the prior fiscal year. Such increase and decrease correspond to an increase and decrease, respectively, in our average cash and cash equivalent balances between the periods.

Current wording

Interest income is derived from the investment of our excess cash and cash equivalents in short-term (original maturities of three months or less) investments of highly liquid treasury bills and certificates of deposit. For the three months ended March 31, 2025, interest income decreased $52 thousand, or 71%, versus the comparable period in the prior fiscal year. For the nine months ended March 31, 2025, interest income decreased $147 thousand, or 68%, versus the comparable period in the prior fiscal year. Such decreases correspond to decreases in our average cash and cash equivalent balances between the periods.

Previous wording

Other income is derived from the third-party use of our hydrology wells, the sale of scrap and other materials, and other non-operating income. For the three months ended December 31, 2024, other income increased $4 thousand versus the comparable period in the prior fiscal year. For the six months ended December 31, 2024, other income increased $1 thousand, or 33%, versus the comparable period in the prior fiscal year. The increases primarily relate to other non-operating income compared to the same periods in the prior year.

Current wording

Other income is derived from the third-party use of our hydrology wells, the sale of scrap and other materials, and other non-operating income. For the three months ended March 31, 2025, other income decreased $4 thousand, or 100%, versus the comparable period in the prior fiscal year. For the nine months ended March 31, 2025, other income decreased $3 thousand, or 43%, versus the comparable period in the prior fiscal year. The decreases primarily relate to other non-operating income compared to the same periods in the prior year.

Previous wording

Derivative gain (loss) results from changes in the fair value of the embedded conversion features relating to degressive issuance provisions originally contained in the May 2024 Amended and Restated Note Purchase Agreement, and subsequently incorporated into and continued under the September 2024 Amended and Restated Note Purchase Agreement. As a result, these conversion features were deemed to be embedded derivatives requiring bifurcation and separate accounting as stand-alone derivative instruments (the “June 2024 Convertible Note Derivative” and “September 2024 Convertible Note Derivative”) (as discussed within Note 7-Debt and Note 8-Convertible Note Derivatives to the unaudited condensed consolidated financial statements).

Current wording

Derivative gain (loss) results from changes in the fair value of the embedded conversion features relating to degressive issuance provisions originally contained in the May 2024 Amended and Restated Note Purchase Agreement, and subsequently incorporated into and continued under the September 2024 Amended and Restated Note Purchase Agreement. As a result, these conversion features were deemed to be embedded derivatives requiring bifurcation and separate accounting as stand-alone derivative instruments (the “June 2024 Convertible Note Derivative” and “September 2024 Convertible Note Derivative”). On December 31, 2024, upon the expiration of the degressive issuance conversion feature associated with the June 2024 Notes and September 2024 Notes, the June 2024 Convertible Note Derivative and September 2024 Convertible Note Derivative expired and the remaining aggregate fair value of such derivatives of $3.6 million was transferred to additional paid-in capital. Refer to Note 7-Debtand Note 8-Convertible Note Derivativesto the unaudited condensed consolidated financial statements for additional details.

Previous wording

The unrealized derivative gain (loss) during the three months ended December 31, 2024, was primarily due to an increase in our stock price during the period, which resulted in losses on the June 2024 Convertible Note Derivative and September 2024 Convertible Note Derivative. Our stock price on September 30, 2024 (the last trading day of our prior fiscal quarter) and December 31, 2024 (the end of the current fiscal quarter) was $0.54 and $0.64, respectively. The observed increase in our stock price resulted in increases in the value of the embedded conversion feature liabilities and resulted in aggregate derivative losses of $0.8 million. There were no comparable embedded conversion features requiring bifurcation and separate accounting in the comparative period in the prior fiscal year and therefore there was no related Derivative gain (loss).

Current wording

There was no unrealized derivative gain (loss) during the three months ended March 31, 2025, as the June 2024 Convertible Note Derivative and September 2024 Convertible Note Derivative expired prior to the beginning of such period. There was no unrealized derivative gain (loss) during the three months ended March 31, 2024, as this period occurred before the existence of the June 2024 Convertible Note Derivative and September 2024 Convertible Note Derivative.

Previous wording

The unrealized derivative gain of $1.4 million during the six months ended December 31, 2024, was primarily due to a decrease in our stock price during the period, which resulted in a gain on the June 2024 Convertible Note Derivative. Our stock price on June 28, 2024 (the last trading day prior to the end of our prior fiscal year) and December 31, 2024 (the end of the current fiscal quarter) was $1.21 and $0.64, respectively. The observed decline in our stock price resulted in a decline in the value of the embedded conversion feature liability and a resulting derivative gain of $2.2 million. This derivative gain was offset, to a lesser extent, by a loss with respect to the September 2024 Convertible Note Derivative during the same period. The unrealized derivative loss was primarily due to an increase in our stock price from $0.50 on September 16, 2024 (the issuance date of the September 2024 Notes) to $0.64 on December 31, 2024 (the end of the current fiscal quarter), resulting in an increase in the value of the embedded conversion feature liability during such period and a resulting derivative loss of $0.9 million. There were no comparable embedded conversion features requiring bifurcation and separate accounting in the comparative period in the prior fiscal year and therefore there was no related Derivative gain (loss). On December 31, 2024, the conversion features associated with the June 2024 Notes and September 2024 Notes that resulted in separate accounting expired and the remaining aggregate fair value of such derivatives of $3.6 million was transferred to additional paid-in capital.

Current wording

The unrealized derivative gain of $1.4 million during the nine months ended March 31, 2025, was primarily due to a decrease in our stock price during the period, which resulted in a gain on the June 2024 Convertible Note Derivative. Our stock price on June 28, 2024 (the last trading day prior to the end of our prior fiscal year) and December 31, 2024 (the date the June 2024 Convertible Note Derivative expired) was $27.83 and $14.72, respectively. The observed decline in our stock price resulted in a decline in the value of the embedded conversion feature liability and a resulting derivative gain of $2.2 million. This derivative gain was offset, by a loss with respect to the September 2024 Convertible Note Derivative during the same period, which was primarily due to an increase in our stock price from $11.50 on September 16, 2024 (the issuance date of the September 2024 Notes) to $14.72 on December 31, 2024 (the date the September 2024 Convertible Note Derivative expired), resulting in an increase in the value of the embedded conversion feature liability during such period and a resulting derivative loss of $0.8 million. There were no comparable embedded conversion features requiring bifurcation and separate accounting in the comparative period in the prior fiscal year and therefore there was no related Derivative gain (loss).

Previous wording

Interest expense primarily relates to interest expense incurred on the Convertible Notes and is net of amounts capitalized to construction-in-progress. Prior to the execution of an amended and restated note purchase agreement on January 18, 2024 (the “January 2024 Amended and Restated Note Purchase Agreement”), the August 2022 Notes accrued interest at a rate of 6% when interest was paid-in-kind through the issuance of additional notes. Subsequent to the January 2024 Amended and Restated Note Purchase Agreement and continuing under the September 2024 Amended and Restated Note Purchase Agreement, the August 2022 Notes accrue interest at a rate of 10% when interest is paid-in-kind through the issuance of additional notes, with such rate also applying to the June 2024 Notes and September 2024 Notes. We also recognize interest expense for the amortization of debt issuance costs and the amortization of debt discounts on the Convertible Notes. As part of the modification of the terms of our debt associated with the January 2024 Amended and Restated Note Purchase Agreement, the modified debt was recognized at fair value on our balance sheet which eliminated the prior debt discount and prior debt issuance costs that were amortized to interest expense.

Current wording

Interest expense primarily relates to interest expense incurred on the Convertible Notes and is net of amounts capitalized to construction-in-progress. Prior to the January 2024 Amended and Restated Note Purchase Agreement, the August 2022 Notes accrued interest at a rate of 6% when interest was paid-in-kind through the issuance of additional notes. Subsequent to the January 2024 Amended and Restated Note Purchase Agreement, the August 2022 Notes accrue interest at a rate of 10% when interest is paid-in-kind through the issuance of additional notes, with such rate also applying to the June 2024 Notes, September 2024 Notes and January 2025 Notes. We also recognize interest expense for the amortization of debt issuance costs and the amortization of debt discounts on the Convertible Notes. As part of the modification of the terms of our debt associated with the January 2024 Amended and Restated Note Purchase Agreement, the modified debt was recognized at fair value on our balance sheet which eliminated the prior debt discount and prior debt issuance costs that were amortized to interest expense. In connection with the Exchange Transaction on March 5, 2025, all indebtedness owed by the Company under the Amended and Restated Note Purchase Agreement was extinguished and the recognition of interest expense ceased.

Previous wording

2024 Amended and Restated Note Purchase Agreement compared to 6% under our prior agreement in the prior period, (ii) on a $12.0 million aggregate increase in the principal balance of Convertible Notes resulting from the issuance of the June 2024 Notes and September 2024 Notes, and (iii) on $2.1 million and $3.4 million of interest that was paid-in-kind during February of 2024 and August of 2024, respectively (for a combined impact of $2.0 million increase in interest expense). Interest expense also increased as a result of capitalizing less interest expense to construction-in-progress between periods as a result of the SSF being placed into service on April 1, 2024 and therefore no longer eligible for interest capitalization (an impact of $1.2 million increase in interest expense). These increases were partially offset by the effects of a reduction in the amount of debt discount amortization primarily resulting from the write-off of the remaining unamortized debt discount (established August 26, 2022) and corresponding elimination of the amortization of such amount in connection with the accounting for the January 2024 Amended and Restated Note Purchase Agreement ($2.1 million reduction in interest expense).

Current wording

For the three months ended March 31, 2025, interest expense increased $1.0 million, or 127%, versus the comparable period in the prior fiscal year. This increase was primarily a result of capitalizing less interest expense to construction-in-progress between periods (which results in an increase in the amount of interest expense recognized) as a result of the SSF being placed into service on April 1, 2024 and therefore no longer eligible for interest capitalization (an impact of $1.1 million increase in interest expense). Although interest expense accrued more rapidly during the current period due to the combined effect of interest accruing (i) at 10% under the terms of our January 2024 Amended and Restated Note Purchase Agreement compared to 6% under our prior agreement in the prior period, (ii) on a $17.0 million aggregate increase in the principal balance of Convertible Notes resulting from the issuance of the June 2024 Notes, September 2024 Notes, and January 2025 Notes and (iii) on $3.4 million and $4.0 million of interest that was paid-in-kind during August of 2024 and February 2025, respectively, this impact was not material due to the shorter period over which the Convertible Notes were outstanding in the current year, as a result of the Exchange Transaction.

Previous wording

For the three months ended December 31, 2024, interest expense increased $691 thousand, or 40%, versus the comparable period in the prior fiscal year. This increase was primarily due to the combined effect of interest accruing (i) at 10% under the terms of our January 2024 Amended and Restated Note Purchase Agreement compared to 6% under our prior agreement in the prior period, (ii) on a $12.0 million aggregate increase in the principal balance of Convertible Notes resulting from the issuance of the June 2024 Notes and September 2024 Notes, and (iii) on $2.1 million and $3.4 million of interest that was paid-in-kind during February of 2024 and August of 2024, respectively (for a combined impact of $1.1 million increase in interest expense). Interest expense also increased as a result of capitalizing less interest expense to construction-in-progress between periods as a result of the SSF being placed into service on April 1, 2024 and therefore no longer eligible for interest capitalization (an impact of $0.6 million increase in interest expense). These increases were partially offset by the effects of a reduction in the amount of debt discount amortization primarily resulting from the write-off of the remaining unamortized debt discount (established August 26, 2022) and corresponding elimination of the amortization of such amount in connection with the accounting for the January 2024 Amended and Restated Note Purchase Agreement ($1.0 million reduction in interest expense).

Current wording

For the nine months ended March 31, 2025, interest expense increased $2.1 million, or 48%, versus the comparable period in the prior fiscal year. This increase was primarily the result of (i) capitalizing less interest expense to construction-in-progress between periods (which results in an increase in the amount of interest expense recognized) as a result of the SSF being placed into service on April 1, 2024 and therefore no longer eligible for interest capitalization (an impact of $2.3 million increase in interest expense), and (ii) the combined effect of interest accruing (a) at 10% under the terms of our January 2024 Amended and Restated Note Purchase Agreement compared to 6% under our prior agreement in the prior period, (b) on a $17.0 million aggregate increase in the principal balance of Convertible Notes resulting from the issuance of the June 2024 Notes, September 2024 Notes, and January 2025 Notes, and (c) on $3.4 million and $4.0 million of interest that was paid-in-kind during August of 2024 and February 2025, respectively (for a combined impact of $2.0 million increase in interest expense). These increases were partially offset by the effects of a reduction in the amount of debt discount amortization primarily resulting from the write-off of the remaining unamortized debt discount (established August 26, 2022) and corresponding elimination of the amortization of such amount in connection with the accounting for the January 2024 Amended and Restated Note Purchase Agreement ($2.2 million reduction in interest expense).

Previous wording

As of December 31, 2024, we had cash and cash equivalents of $0.8 million and a working capital deficit of $8.0 million compared to $4.9 million of cash and cash equivalents and a working capital deficit of $2.9 million as of June 30, 2024. Our predominant source of cash has been generated through equity financing from issuances of our common stock and equity-linked securities, including our Convertible Notes. Since inception, we have not generated revenues, and as such, have relied on equity financing and equity-linked instruments to fund our operating and investing activities. We maintain the majority of our cash and cash equivalents in accounts with major U.S. and multi-national financial institutions, and our deposits at certain of these institutions may exceed insured limits. Market conditions can impact the viability of these institutions.

Current wording

As of March 31, 2025, we had cash and cash equivalents of $4.0 million and a working capital deficit of $1.6 million compared to $4.9 million of cash and cash equivalents and a working capital deficit of $2.9 million as of June 30, 2024. We maintain the majority of our cash and cash equivalents in accounts with major U.S. and multi-national financial institutions, and our deposits at certain of these institutions may exceed insured limits. Market conditions can impact the viability of these institutions.

Previous wording

A summary of our cash flows for the six months ended December 31, 2024 and 2023 follows.

Current wording

A summary of our cash flows for the nine months ended March 31, 2025 and 2024 follows.

Previous wording

Net cash used in operating activities for each of the above periods was primarily the result of general and administrative costs (exclusive of share based compensation), costs incurred in furthering the Project, preparing us for the operation of the SSF, and operating costs of the SSF. During the six months ended December 31, 2024, we used $11.7 million of cash for operating activities, a decrease of approximately $3.1 million or 21% compared to the comparable period in the prior fiscal year. The decrease in cash used in operations during the current period primarily results from the combined decrease in General and administrative and Small-scale facility operating costs, net of non-cash share based compensation expense (refer to the discussion of year-over-year changes in Project expenses and General and administrative expenses above for additional details).

Current wording

Net cash used in operating activities for each of the above periods was primarily the result of general and administrative costs (exclusive of share based compensation), costs incurred in furthering the Project, operating costs of the SSF, and transaction costs incurred related to the Exchange Transaction that were not directly related to the issuance of the related equity interests issued to our former noteholders. During the nine months ended March 31, 2025, we used $17.4 million of cash for operating activities, a decrease of approximately $2.2 million or 11% compared to the comparable period in the prior fiscal year. The decrease in cash used in operations during the current period primarily results from the decrease in General and administrative expenses, net of non-cash share based compensation expense, offset by the incurrence of Small-scale facility operating costs (refer to the discussion of year-over-year changes in General and administrative expenses and Small-scale facility operating costs above for additional details).

Previous wording

Our cash flows used for investing activities primarily relate to equipment purchases, engineering, the construction and commissioning of our SSF, and FEL-2 engineering related to our commercial-scale facility. During the six months ended December 31, 2024, we used $0.8 million of cash for investing activities, a decrease of approximately $2.7 million, or 78%, compared to the comparable period in the prior fiscal year. Net cash used in investing activities during the six months ended December 31, 2024 related to engineering services for FEL-2 engineering of our commercial-scale facility. Net cash used in investing activities during the six months ended December 31, 2023 primarily related to final construction and commissioning of our SSF.

Current wording

Our cash flows used for investing activities primarily relate to equipment purchases, engineering, the construction and commissioning of our SSF, FEL-2 engineering and related vendor testing related to our commercial-scale facility. During the nine months ended March 31, 2025, we used $1.4 million of cash for investing activities, a decrease of approximately $4.5 million, or 76%, compared to the comparable period in the prior fiscal year. Net cash used in investing activities during the nine months ended March 31, 2025 related to engineering services for FEL-2 engineering and related vendor testing for our commercial-scale facility. Net cash used in investing activities during the nine months ended March 31, 2024 primarily related to final construction and commissioning of our SSF.

Previous wording

Our cash flows from financing activities primarily relate to equity and equity-linked financing transactions to fund our business and operations. Cash flows provided by financing activities for the six months ended December 31, 2024 were the result of (i) approximately $3.0 million of net proceeds received from the August 2024 Equity Offering, after recognition of the related costs and fees, (ii) approximately $5.5 million of proceeds received from the issuance of September 2024 Notes, after recognition of the related costs and fees, and (iii) approximately $0.1 million of taxes withheld and paid upon the vesting and release of shares for equity awards. Cash flows used in financing activities during the comparable prior fiscal year were the result of payments on the Company’s vehicle loans.

Current wording

Our cash flows from financing activities primarily relate to equity and equity-linked financing transactions to fund our business and operations. Cash flows provided by financing activities for the nine months ended March 31, 2025 were the result of (i) approximately $3.0 million of net proceeds received from the August 2024 Equity Offering, (ii) approximately $5.5 million of net proceeds received from the issuance of September 2024 Notes, (iii) approximately $4.7 million of net proceeds received from the issuance of January 2025 Notes, (iv) approximately net $4.9 million of proceeds received from the March 2025 Subscription, after recognition of the related costs and fees related directly to the issuance of the related equity instruments, and (v) approximately $0.2 million of taxes withheld and paid upon the vesting and release of shares for equity awards.

Previous wording

Refer to the discussion above under the caption Recent Developments – Restructuring Support Agreement and Related Agreements for a description of the restructuring support agreement we entered into during January 2025, and the potential related impacts of such agreements.

Current wording

Refer to the discussion above under the caption Recent Developments – Debt Exchange and Related Agreements for a description of the Exchange Transaction during March 2025.

Previous wording

On August 27, 2024, we completed the August 2024 Equity Offering of (i) 5,333,333 Shares of Common Stock, (ii) Series A Warrants to purchase up to an aggregate of up to 5,333,333 shares of Common Stock, and (iii) Series B Warrants to purchase an aggregate of 5,333,333 shares of Common Stock. The Shares and Warrants were offered and sold on a combined basis for consideration equating to $0.75 for one Share and two Warrants.

Current wording

On August 27, 2024, we completed the August 2024 Equity Offering of (i) 231,884 Shares of Common Stock, (ii) Series A Warrants to purchase up to an aggregate of up to 231,885 shares of Common Stock, and (iii) Series B Warrants to purchase an aggregate of 231,885 shares of Common Stock. The Common Stock, Series A Warrants and Series B Warrants were offered and sold on a combined basis for consideration equating to $17.25 for one share of Common Stock, one Series A Warrant and one Series B Warrant.

Previous wording

The Series A Warrants and the Series B Warrants are initially exercisable on February 27, 2025. The Series A Warrants will expire on February 27, 2030 and the Series B Warrants will expire on February 27, 2027. The Warrants contain standard adjustments to the exercise price including for stock splits, stock dividends, rights offerings and pro rata distributions. The Warrants also include certain rights upon the occurrence of a “fundamental transaction” (as described in the Warrants), including the right of the holder thereof to receive from the Company or a successor entity the same type or form of consideration (and in the same proportion) that is being offered and paid to the holders of Common Stock in such fundamental transaction in the amount of the Black Scholes value (as described in the Warrants) of the unexercised portion of the Warrant on the date of the consummation of such fundamental transaction. The Warrants include cashless exercise rights to the extent the resale of the shares of Common Stock underlying the Warrants are not registered under the Securities Act.

Current wording

The Series A Warrants and the Series B Warrants became exercisable on February 27, 2025. The Series A Warrants will expire on February 27, 2030 and the Series B Warrants will expire on February 27, 2027. The exercise price for each of the Series A Warrants and Series B Warrants is $18.3563 per share. Refer to Note 10-Equity to the unaudited condensed consolidated financial statements included elsewhere in the Quarterly Report on Form 10-Q for a complete description of the warrants.

Previous wording

Our material short-term cash requirements include general and administrative expenses including recurring payroll and benefit obligations for our employees, costs necessary to further the engineering of our proposed commercial-scale complex, operating costs for the SSF, project related costs, payments under certain lease agreements and working capital needs. Our long-term material cash requirements from currently known obligations include repayment of outstanding borrowings and interest payment obligations under our Convertible Notes (which may be avoided to the extent the Convertible Notes are converted to shares of our Common Stock and/or interest is paid-in-kind) and future obligations to reclaim, remediate, or otherwise restore properties to a condition that existed prior to our operations. Refer to the “Construction in Progress,” “Asset Retirement Obligations,” “Accounts Payable and Accrued Liabilities,” “Long-term Debt” and “Commitments and Contingencies” footnotes in the unaudited condensed consolidated financial statements for more information on certain of these expenditures and obligations.

Current wording

Our material short-term cash requirements include general and administrative expenses including recurring payroll and benefit obligations for our employees, costs necessary to further the engineering of our proposed commercial-scale complex, professional fees, operating costs for the SSF, Project related costs, payments under certain lease agreements and working capital needs. Our long-term material cash requirements from currently known obligations include future obligations to reclaim, remediate, or otherwise restore properties to a condition that existed prior to our operations. Refer to the “Construction in Progress,” “Asset Retirement Obligations,” “Accounts Payable and Accrued Liabilities,” and “Commitments and Contingencies” footnotes in the unaudited condensed consolidated financial statements for more information on certain of these expenditures and obligations.

Previous wording

As of December 31, 2024, we had purchase order commitments of approximately $2.4 million primarily for raw materials for the operation of the SSF, engineering services for our proposed commercial-scale facility, drilling services related to wellfield development, testing and analytical services, and other services.

Current wording

As of March 31, 2025, we had purchase order commitments of approximately $2.7 million primarily for raw materials for the operation of the SSF, engineering services and vendor testing for the Company’s proposed commercial-scale facility, and drilling services related to wellfield development.

Current wording

Progress FEL-2, FEL-3, and the related detailed engineering and vendor testing;

Previous wording

Further define our advanced materials strategy with consideration to engineering and repurposing our SSF to produce boron advanced materials once sufficient data has been obtained for flow sheet optimization and the production of product for customer qualification.

Current wording

Further define our advanced materials strategy with consideration to engineering and repurposing our SSF once sufficient data has been obtained for flow sheet optimization and the production of product for customer qualification.

Showing the first 40 of 45 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

Our predominant source of cash has been generated through equity financing from issuances of our common stock and equity-linked securities, including our Convertible Notes. Since inception, we have not generated revenues, and as such, have relied on equity financing and equity-linked instruments to fund our operating and investing activities. As a result of the Exchange Transaction in March of 2025, all outstanding indebtedness pursuant to the Convertible Notes was extinguished in exchange for equity interest in the Company, and the financial covenant requiring us to maintain a minimum cash balance was eliminated. Refer to the discussion above under the caption Recent Developments – Debt Exchange and Related Agreements for a description of the Exchange Transaction.
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

For the six months ended December 31, 2024, interest expense increased $1.1 million, or 30%, versus the comparable period in the prior fiscal year. This increase was primarily due to the combined effect of interest accruing (i) at 10% under the terms of our January