Excelerate Energy, Inc.
For the period ended Mar 31, 2025. Filed May 8, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2025 · Filed May 8, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-09-30; filed 2024-11-07.
0000950170-24-123531
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-03-31; filed 2025-05-08.
0000950170-25-067156
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 148 previous paragraphs and 138 current paragraphs.
76 unchanged; 32 reworded; 30 added; 38 removed; 2 previous and 0 current paragraphs rearranged.
Tables are not compared: 5 previous and 10 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (30)
Current report
During the first quarter of 2025, Dutch Title Transfer Facility (“TTF”) prices rose to $14.39 per million British thermal units (“MMBtu”) from $13.57/MMBtu in the fourth quarter of 2024. Japan Korea Marker (“JKM”) reported average first quarter 2025 prices of $14.35/MMBtu, which increased from fourth quarter 2024 prices of $13.94/MMBtu.
Current report
Global LNG trade volumes reached approximately 108 million tons per annum (“MTPA”) in the first quarter of 2025, slightly increased from 107 MTPA in the fourth quarter of 2024. Higher winter demand from Europe, fueled by precautionary measures against potential supply disruptions and a colder-than-expected winter supported strong LNG demand in the first quarter of 2025. This higher European demand elevated TTF prices relative to JKM. European demand increased by 24% quarter-over-quarter. Over the same period, Asian imports decreased by 7% as demand declined, supported by sufficient storage and milder winter weather.
Current report
For Excelerate, we believe the evolving LNG market dynamics support our growth strategy. We expect the heightened focus on energy security, coupled with the global shift toward cleaner energy sources, will continue to support demand for LNG. As LNG supply continues to grow, with an estimated 46 MTPA of new capacity coming online worldwide in 2025, there will be an increasing need for more FSRUs to connect this supply with demand centers worldwide. This reinforces our commitment to focusing on the downstream segment of the LNG value chain, where we believe Excelerate is well positioned to be a key player in facilitating the transition to a more secure and diversified energy landscape.
Current report
Pending Acquisition
Current report
On March 26, 2025, EELP entered into an equity and asset purchase agreement (the “Purchase Agreement”) with Atlantic Energy Holdings LLC, a Delaware limited liability company (“Seller”) and New Fortress Energy Inc., a Delaware corporation (“NFE,” and together with Seller, the “NFE Parties”), pursuant to which EELP will acquire the NFE Parties’ business in Jamaica (the “Business”) from the NFE Parties (the “Pending Acquisition”).
Current report
Pursuant to the Purchase Agreement, we agreed to purchase the Business for an aggregate initial purchase price of $1.055 billion, in cash, subject to certain adjustments for cash, indebtedness, transaction expenses, working capital and LNG and fuel inventory.
Current report
The Pending Acquisition is expected to close as early as the second quarter of 2025, subject to satisfaction or waiver of certain customary closing conditions, including (i) the consummation of certain pre-closing restructuring transactions by the NFE Parties, (ii) the delivery of certain required consents, (iii) the delivery of audited and interim GAAP-compliant financial statements of the Business and (iv) the release of the assets of the Business from certain debt facilities and the delivery of payoff letters related to outstanding third-party indebtedness.
Current report
The Pending Acquisition directly aligns with our strategies of (1) acquiring interests in LNG regasification terminals and integrated LNG infrastructure projects, which we believe will enhance long-term contract revenue and margins, and (2) diversifying the geographic mix of the LNG markets we serve and our customer base.
Current report
We believe that the Pending Acquisition is complementary to our existing assets and business strategy and is expected to drive greater demand for our core FSRU and terminal services business and establish Excelerate as a provider of “last-mile” LNG infrastructure in Jamaica. Additionally, the Pending Acquisition provides an attractive downstream natural gas market for Excelerate’s 20-year Venture Global LNG supply agreement and secures pull through demand and value-accretive offtake for our LNG supply portfolio. The Pending Acquisition aligns with our investment thesis in the following ways:
Current report
Transition and transaction expenses
Current report
We incurred transition and transaction expenses related to consulting, legal and due diligence costs incurred as part of and in preparation for the Pending Acquisition.
Current report
Net income was $52.1 million for the three months ended March 31, 2025, an increase of $24.0 million, as compared to $28.1 million for the three months ended March 31, 2024. Net income was higher primarily due to the drydocking of Summit LNG and Excellence in the first three months of 2024 ($18.4 million), an increase in gas sales opportunities ($4.4 million), a decrease in personnel costs in Argentina ($3.8 million), and a decrease in foreign exchange losses ($1.3 million), partially offset by transition and transaction costs incurred as a result of the Pending Acquisition ($3.7 million).
Current report
Gross Margin was $90.8 million for the three months ended March 31, 2025, an increase of $24.1 million, as compared to $66.7 million for the three months ended March 31, 2024. For the three months ended March 31, 2025, Adjusted Gross Margin was $112.4 million, an increase of $22.8 million, as compared to $89.6 million for the three months ended March 31, 2024. Gross Margin and Adjusted Gross Margin was higher primarily due to the drydocking of Summit LNG and Excellence in the first three months of 2024 ($18.4 million), an increase in gas sales opportunities ($4.4 million), a decrease in personnel costs in Argentina ($3.8 million), and a decrease in foreign exchange losses ($1.3 million), partially offset by transition and transaction costs incurred as a result of the Pending Acquisition ($3.7 million).
Current report
FSRU and terminal services revenues were $148.4 million for the three months ended March 31, 2025, a decrease of $8.6 million as compared to $157.0 million for the three months ended March 31, 2024. FSRU and terminal services revenues were lower primarily due to the recognition of deferred revenue for the drydocking of Summit LNGin the first quarter of 2024, which occurs when we drydock either of our two vessels accounted for as a sales-type lease.
Current report
Gas sales revenues were $166.7 million for the three months ended March 31, 2025, an increase of $123.6 million, as compared to $43.1 million for the three months ended March 31, 2024. The increase was primarily due to increased LNG sales in Asia Pacific and the Atlantic Basin in the first quarter of 2025.
Current report
Direct cost of gas sales was $160.8 million for the three months ended March 31, 2025, an increase of $120.9 million, as compared to $39.9 million for the three months ended March 31, 2024. The increase was primarily due to increased LNG sales in Asia Pacific and the Atlantic Basin in the first quarter of 2025.
Current report
Transition and transaction expenses
Current report
Transition and transaction expenses were $3.7 million for the three months ended March 31, 2025. Transition and transaction expenses relate to due diligence and legal costs on the Pending Acquisition.
Current report
Equity Offering
Current report
On March 31, 2025, the Company and EELP entered into an underwriting agreement (the “Underwriting Agreement”) relating to an underwritten public offering (the “Equity Offering”) of 6,956,522 shares (the “Shares”) of the Company’s Class A common stock, par value $0.001 per share (the “Class A Common Stock”). The offering price of the Shares to the public was $26.50 per share, and the underwriters agreed to purchase the Shares from the Company pursuant to the Underwriting Agreement at a price of $25.308 per share. Under the terms of the Underwriting Agreement, the Company granted the underwriters an option, exercisable for 30 days, to purchase up to an additional 1,043,478 shares of Class A Common Stock at the same price per share as the Shares. The Equity Offering closed on April 2, 2025. The underwriters’ option was fully exercised and subsequently closed on May 1, 2025. The net proceeds from the Equity Offering to the Company from the sale of the Shares, after deducting underwriting discounts and commissions and estimated offering expenses, were approximately $201.9 million.
Current report
During the year ended December 31, 2024, we repurchased 2,473,787 shares of our outstanding Class A Common Stock at a weighted average price of $20.41 per share, for a total net cost, including commission fees and taxes, of approximately $50.0 million. As indicated under the EELP Limited Partnership Agreement, for each Class A Common Stock we repurchased, EELP, immediately prior to the repurchase, redeemed an equal number of Class A interests held by us, upon the same terms and at the same price, as the shares of our Class A Common Stock were repurchased.
Current report
Cash flows provided by operating activities increased by $90.1 million for the three months ended March 31, 2025, as compared to the three months ended March 31, 2024, primarily due to differences in the timing of collections and payments related to gas purchases and sales, collections received after our power barge assets went into service, and 2024 drydock expenditures, partially offset by costs related to the Pending Acquisition.
Current report
Capital Expenditures
Current report
The following table summarizes our cash outlays for capital projects for the three months ended March 31, 2025 and 2024:
Current report
On March 26, 2025, EELP entered into an amendment to the Amended Credit Agreement, which provided for, among other things (i) additional covenant baskets to permit the Pending Acquisition and the incurrence of debt in connection therewith, and (ii) replacement of the collateral vessel maintenance coverage covenant with a collateral maintenance coverage covenant, which includes the value of the assets acquired in the Pending Acquisition.
Current report
On April 21, 2025, EELP and the Company entered into an amendment (the “Fifth Amendment”) to the Amended Credit Agreement. The Fifth Amendment provides for, among other things, (i) the extension of the maturity of the revolving facility thereunder to March 17, 2029 and (ii) an increase in the aggregate commitments under the revolving facility to $500 million. The Fifth Amendment is contingent upon, among other conditions, the closing of the Pending Acquisition and the repayment in full of the existing Term Loan Facility.
Current report
Senior Notes Offering
Current report
On May 5, 2025, EELP closed on an offering (the “Debt Offering”) of $800 million in aggregate principal amount of 8.000% senior unsecured notes due 2030 (the “2030 Notes”). The 2030 Notes were issued pursuant to an Indenture, dated as of May 5, 2025, by and among EELP, the Guarantors a party thereto and U.S. Bank Trust Company, National Association, as trustee, paying agent and registrar (the “Indenture”), will mature on May 15, 2030 and were issued at par. Interest on the 2030 Notes is payable semi-annually in arrears on each May 15 and November 15, beginning on November 15, 2025. Excelerate intends to use the net proceeds from the Debt Offering, together with the net proceeds from the Equity Offering and cash on hand to (i) fund the consideration payable by the Company in the Pending Acquisition of the Business, (ii) repay the outstanding borrowings under the Term Loan Facility, and (iii) pay related fees and expenses. The 2030 Notes are guaranteed by certain direct and indirect restricted subsidiaries of EELP. As a result of the Debt Offering and Equity Offering, the amount available under the previously announced senior secured bridge term loan facility was reduced to zero.
Current report
For information about our other debt obligations, see Notes 9 and 10 in the Notes to our Consolidated Financial Statements.
Current report
LNG purchase commitments
Removed paragraphs (38)
Previous report
Natural gas and LNG prices increased during the third quarter of 2024 as compared to the second quarter of 2024. Dutch Title Transfer Facility (TTF) and Japan Korea Marker (JKM) average second quarter pricing of $10.02/million British thermal units (“MMBtu”) and $11.14/MMBtu, respectively, increased to an average of $11.53/MMBtu and $13.03/MMBtu, respectively, in the third quarter of 2024. The increase in pricing was due to higher demand amid supply constraints.
Previous report
Global LNG trade volumes increased to about 99.6 million tons per annum (“MTPA”) in the third quarter of 2024, a slight increase from the second quarter’s trade volumes of 99.5 MTPA. Heat waves across Asia triggered increased spot cargo purchasing, causing LNG imports to rise to approximately 74 MTPA in the third quarter of 2024, a 3.5% increase as compared to the second quarter of 2024. Similarly in the Middle East and North Africa, domestic energy shortages, primarily caused by high electricity demand and low domestic gas production, also led to increased LNG imports.
Previous report
At the end of summer 2024, the need for natural gas injections to fill storage was reduced as European natural gas inventories ended the 2023-2024 winter heating season at record levels. Natural gas demand was reduced during the summer of 2024, which saw temperatures closer to seasonal averages, as compared to the summer of 2023, which experienced higher than normal temperatures. As of the end of September 2024, European natural gas underground storage inventories were approximately 94% full. Although European LNG demand decreased to approximately 20 MTPA in the third quarter of 2024, a 13% decrease from the prior quarter, higher demand in other regions, coupled with supply side constraints, reduced LNG availability in the international market.
Previous report
On the supply-side, planned and unplanned outages at major LNG production facilities for maintenance and technical issues reduced cargo availability. Geopolitical instability in certain LNG-producing regions, namely North Africa, the Middle East and Russia, further disrupted supply. Delays in new project start-ups, particularly from the United States, caused by construction setbacks and regulatory hurdles, limited anticipated growth in LNG production. Certain LNG-exporting countries faced increased domestic gas demand for electricity generation, reducing the amount of LNG available for export. These supply-side challenges combined with growing global demand significantly tightened the market and supported price increases during the third quarter of 2024.
Previous report
Factors Affecting the Comparability of Our Results of Operations
Previous report
As a result of a number of factors, our historical results of operations may not be comparable from period to period or going forward. Set forth below is a brief discussion of the key factors impacting the comparability of our results of operations.
Previous report
Depreciation Expense
Previous report
During the fourth quarter of 2023, we performed a review of the estimated useful lives of our FSRU vessels. As a relatively new asset class, being first built in 2005, we initially estimated a useful life of 30 years with no salvage value. As the vessels approach almost 20 years of life, there has been improved visibility into the expected term of FSRU productive capabilities, demand, and salvage potential. As a result, we changed the useful lives of our FSRU vessel assets to 40 years and added an estimated salvage value.
Previous report
Three and Nine Months Ended September 30, 2024 Compared to Three and Nine Months Ended September 30, 2023
Previous report
Three and Nine Months Ended September 30, 2024 Compared to Three and Nine Months Ended September 30, 2023
Previous report
Net income was $45.5 million for the three months ended September 30, 2024, a decrease of $1.0 million, as compared to $46.5 million for the three months ended September 30, 2023. Net income was lower primarily due to the transition of Sequoia to a time charter party (“TCP”) agreement in the first quarter of 2024 ($6.8 million), increased selling, general and administrative costs primarily related to business development activities ($4.3 million), a decrease in revenue related to 2023 seasonal service in Argentina ($3.8 million), a decrease in other gas sales opportunities ($3.5 million), partially offset by the update to our useful life assumption in the fourth quarter of 2023 ($6.0 million), extended commissioning time for our power barge assets in Albania during 2023 ($4.6 million), lower interest expense due to decreased debt balances ($2.2 million), a decrease in the provision for income taxes ($2.0 million), and higher interest income received on cash balances invested in money market funds ($1.3 million).
Previous report
Net income was $107.0 million for the nine months ended September 30, 2024, an increase of $0.2 million, as compared to $106.8 million for the nine months ended September 30, 2023. Net income was higher primarily due to the update to our useful life assumption in the fourth quarter of 2023 ($17.9 million), various charter rate increases ($10.0 million), a full first quarter of our charter with Germany ($8.1 million), an increase in interest income ($5.2 million), a decrease in the provision for income taxes ($5.0 million), the benefit of the Sequoia acquisition ($4.0 million), and lower interest expense due to decreased debt balances ($3.4 million), partially offset by the drydocking of Summit LNGand Excellence, our two vessels accounted for as sales-type leases ($17.7 million), the transition of Sequoia to a TCP agreement in the first quarter of 2024 ($15.6 million), a decrease in other gas sales opportunities ($7.5 million), increased selling, general and administrative expenses primarily due to business development activities ($7.3 million), and increased personnel costs in Argentina ($4.8 million).
Previous report
Gross Margin was $83.6 million for the three months ended September 30, 2024, a decrease of $3.4 million, as compared to $87.0 million for the three months ended September 30, 2023. Adjusted Gross Margin was $106.6 million for the three months ended September 30, 2024, a decrease of $13.6 million, as compared to $120.2 million for the three months ended September 30, 2023. Gross Margin and Adjusted Gross Margin decreased due to the transition of Sequoia to a TCP agreement in the first quarter of 2024 ($6.8 million), a decrease in revenue related to 2023 seasonal service in Argentina ($3.8 million), and a decrease in other gas sales opportunities ($3.5 million). Gross Margin was improved by the update to our useful life assumption in the fourth quarter of 2023 ($6.0 million) and extended commissioning time for our power barge assets in Albania during 2023 ($4.6 million).
Previous report
Gross Margin was $225.5 million for the nine months ended September 30, 2024, a decrease of $8.6 million, as compared to $234.1 million for the nine months ended September 30, 2023. For the nine months ended September 30, 2024, Adjusted Gross Margin was $301.8 million, a decrease of $21.5 million, as compared to $323.3 million for the nine months ended September 30, 2023. Gross Margin and Adjusted Gross Margin were lower primarily due to the drydocking of Summit LNGand Excellence, our two vessels accounted for as sales-type leases ($17.7 million), the transition of Sequoia to a TCP agreement in the first quarter of 2024 ($15.6 million), a decrease in other gas sales opportunities ($7.5 million), and increased personnel costs in Argentina ($4.8 million), partially offset by various charter rate increases ($10.0 million), a full first quarter of our charter with Germany ($8.1 million), and lower operating lease expense due to the acquisition of Sequoia ($6.0 million). Gross Margin was improved by the update to our useful life assumption in the fourth quarter of 2023 ($17.9 million), partially offset by extended commissioning time for our power barge assets in Albania ($4.2 million) and lower depreciation expense as a result of our acquisition of Sequoia ($2.0 million).
Previous report
Adjusted EBITDA was $256.6 million for the nine months ended September 30, 2024, a decrease of $18.8 million, as compared to $275.4 million for the nine months ended September 30, 2023. Adjusted EBITDA was lower primarily due to the drydocking of Summit LNGand Excellence, our two vessels accounted for as sales-type leases ($17.7 million), the transition of Sequoia to a TCP agreement in the first quarter of 2024 ($15.6 million), a decrease in other gas sales opportunities ($7.5 million), higher selling, general and administrative expenses primarily due to business development activities ($5.0 million), increased personnel costs in Argentina ($4.8 million), partially offset by various charter rate increases ($10.0 million), a full first quarter of our charter with Germany ($8.1 million), lower operating lease expense due to the acquisition of Sequoia ($6.0 million), and an increase in interest income ($5.2 million).
Previous report
FSRU and terminal services revenues were $150.1 million for the three months ended September 30, 2024, an increase of $16.9 million, as compared to $133.2 million for the three months ended September 30, 2023. FSRU and terminal services revenues were higher primarily due to beginning our TCP agreement in Brazil in the first quarter of 2024 and our new charter in Germany, partially offset by 2023 seasonal service in Argentina.
Previous report
FSRU and terminal services revenues were $458.1 million for the nine months ended September 30, 2024, an increase of $80.9 million as compared to $377.2 million for the nine months ended September 30, 2023. FSRU and terminal services revenues were higher primarily due to beginning our TCP agreement in Brazil in the first quarter of 2024 and our new charter in Germany, partially offset by 2023 seasonal service in Argentina.
Previous report
Gas sales revenues were $43.3 million for the three months ended September 30, 2024, a decrease of $99.0 million, as compared to $142.3 million for the three months ended September 30, 2023. The decrease was primarily due to the completion of our natural gas sales agreement in Brazil in December 2023, partially offset by fewer LNG sales in Asia Pacific.
Previous report
Gas sales revenues were $118.7 million for the nine months ended September 30, 2024, a decrease of $423.0 million, as compared to $541.7 million for the nine months ended September 30, 2023. The decrease was primarily due to the completion of our natural gas sales agreement in Brazil in December 2023, fewer LNG sales in Asia Pacific, and a spot sale in Finland in the first quarter of 2023.
Previous report
Cost of revenue and vessel operating expenses was $162.6 million for the nine months ended September 30, 2024, an increase of $6.0 million, as compared to $156.6 million for the nine months ended September 30, 2023. The increase in cost of revenue and vessel operating expenses was primarily due to drydock costs on Summit LNGand increased personnel costs in Argentina, partially offset by lower operating lease expense due to the acquisition of Sequoia and lower expenses in Brazil as a result of transitioning to a TCP agreement in the first quarter of 2024.
Previous report
Direct cost of gas sales was $41.4 million for the three months ended September 30, 2024, a decrease of $64.7 million, as compared to $106.1 million for the three months ended September 30, 2023. The decrease was primarily due to the completion of our natural gas sales agreement in Brazil in December 2023 and fewer LNG sales in Asia Pacific.
Previous report
Direct cost of gas sales was $112.5 million for the nine months ended September 30, 2024, a decrease of $326.5 million, as compared to $439.0 million for the nine months ended September 30, 2023. The decrease was primarily due to the completion of our natural gas sales agreement in Brazil in December 2023, fewer LNG sales in Asia Pacific, and a spot sale in Finland in the first quarter of 2023.
Previous report
Depreciation and amortization expenses were $76.3 million for the nine months ended September 30, 2024, a decrease of $12.8 million, as compared to $89.1 million for the nine months ended September 30, 2023. Depreciation and amortization decreased primarily due to the update to our useful life assumptions and accelerated depreciation recognized in the second quarter of 2023 for assets removed from service, partially offset by extended commissioning time on our power barge assets in Albania and increases from the acquisition of Sequoia in the second quarter of 2023.
Previous report
Selling, general and administrative expenses were $70.7 million for the nine months ended September 30, 2024, an increase of $7.3 million, as compared to $63.4 million for the nine months ended September 30, 2023. Selling, general and administrative expenses increased primarily due to business development activities.
Previous report
Interest expense was $35.9 million for the nine months ended September 30, 2024, a decrease of $3.5 million, as compared to $39.4 million for the nine months ended September 30, 2023. Interest expense decreased due to accelerated amortization of deferred issuance costs related to the Amended Credit Agreement (as defined herein) recognized in the nine months ended September 30, 2024, partially offset by our entering into the Term Loan Facility (as defined herein) in the second quarter of 2023.
Previous report
Other income, net was $17.2 million for the nine months ended September 30, 2024, an increase of $5.8 million as compared to $11.4 million for the nine months ended September 30, 2023. The increase was primarily due to higher interest income received on cash balances invested in money market funds.
Previous report
At times, we purchase and sell natural gas and LNG. Some of the inventory purchases that we make to fulfill these sales could potentially exceed cash on hand. We plan to fund any cash shortfalls with borrowings under the EE Revolver (as defined herein). Management believes the EE Revolver will provide sufficient liquidity to execute our contractual purchase obligations. In the event sufficient funds were not available under the EE Revolver, we would seek alternative funding sources.
Previous report
On February 22, 2024, our board of directors approved a share repurchase program (the “Share Repurchase Program”) to purchase up to $50.0 million of our Class A Common Stock, par value $0.001 per share (“Class A Common Stock”). The Share Repurchase
Previous report
Program does not obligate us to acquire any specific number of shares and will expire on February 28, 2026, and the Share Repurchase Program may be suspended, extended, modified or discontinued at any time. During the three and nine months ended September 30, 2024, the Company repurchased 363,974 and 1,625,784 shares, respectively, of its outstanding Class A Common Stock at a weighted average price of $20.61 and $17.24 per share, respectively, for a total net cost of approximately $7.5 million and $28.0 million, respectively. For more information, see Part II – Other Information – Item 2. Unregistered Sales of Equity Securities and Use of Proceeds – Share Repurchase Program.
Previous report
Nine Months Ended September 30, 2024 Compared to Nine Months Ended September 30, 2023
Previous report
Cash flows provided by operating activities decreased by $0.5 million for the nine months ended September 30, 2024, as compared to the nine months ended September 30, 2023, primarily due to:
Previous report
$158.8 million decrease in cash received for other current assets and other assets primarily due to inventory sold in the first quarter of 2023;
Previous report
a $17.7 million decrease in cash related to the drydocking of Summit LNGand Excellence; and
Previous report
a $15.8 million decrease in cash received from collections of accounts receivable primarily related to receipt of payment for gas sales in Brazil;
Previous report
partially offset by a $122.6 million increase in deferred revenues recognized related to the 2023 gas sales in Brazil;
Previous report
a $57.1 million decrease in cash flows used in settling accounts payable and accrued liabilities primarily due to payments made in the first quarter of 2023 for LNG cargoes sold in the fourth quarter of 2022; and
Previous report
a $10.0 million increase in various charter rates increases.
Previous report
LNG purchase and sale obligations
Reworded paragraphs (32)
Previous wording
The following discussion and analysis of our financial condition and results of operations should be read in conjunction with the consolidated financial statements and notes thereto included in this Form 10-Q and included in the 2023 Annual Report. This discussion contains forward-looking statements that involve risks and uncertainties. Our actual results could differ materially from those discussed below. Factors that could cause or contribute to such differences include, but are not limited to, those identified below and those discussed in the section titled “Risk Factors” included in the 2023 Annual Report, this Form 10-Q and our other filings with the SEC. Please also see the section titled “Forward-Looking Statements.”
Current wording
The following discussion and analysis of our financial condition and results of operations should be read in conjunction with the consolidated financial statements and notes thereto included in this Form 10-Q and included in the 2024 Annual Report. This discussion contains forward-looking statements that involve risks and uncertainties. Our actual results could differ materially from those discussed below. Factors that could cause or contribute to such differences include, but are not limited to, those identified below and those discussed in the section titled “Risk Factors” included in the 2024 Annual Report, this Form 10-Q and our other filings with the Securities and Exchange Commission (“SEC”). Please also see the section titled “Forward-Looking Statements.”
Previous wording
Excelerate is changing the way the world accesses cleaner and more reliable energy by delivering regasified natural gas, which benefits hundreds of millions of people around the world. From our founding, we have focused on providing flexible liquefied natural gas (“LNG”) solutions to markets in diverse environments across the globe, providing a lesser emitting form of energy to markets that often rely on coal as their primary energy source. At Excelerate, we believe that access to energy sources such as LNG is critical to assisting markets in their decarbonization efforts, while at the same time promoting economic growth and improving quality of life.
Current wording
Excelerate Energy, Inc. (“Excelerate” and together with its subsidiaries, “we,” “us,” “our” or the “Company”) offers liquified natural gas (“LNG”) solutions, providing integrated services along the LNG value chain. We offer a full range of services, including floating storage and regasification units (“FSRUs”), LNG import infrastructure development and LNG and natural gas supply. From our founding, we have focused on providing LNG solutions to markets in diverse environments across the globe, providing a lesser emitting form of energy to markets that often rely on coal as their primary energy source. At Excelerate, we believe that access to energy sources such as LNG is critical to assisting markets with enhancing energy security and advancing their decarbonization efforts.
Previous wording
Our business focuses on the integration of natural gas-to-power in the LNG value chain, and as part of this value chain, we operate at regasification terminals that utilize our FSRU fleet to serve economies throughout the world. Our business is substantially supported by time charter and terminal use contracts, which are effectively long-term, take-or-pay arrangements and provide consistent revenue and cash flow from our high-quality customer base. As of September 30, 2024, we operate a fleet of ten purpose-built FSRUs, have completed more than 2,900 ship-to-ship transfers of LNG with over 50 LNG operators since we began operations and have safely delivered more than 7,100 billion cubic feet of natural gas through 16 LNG regasification terminals. For the three months ended September 30, 2024 and 2023, we generated revenues of $150.1 million and $133.2 million, respectively, from our FSRU and terminal services businesses, representing approximately 78% and 48% of our total revenues for each of those periods.
Current wording
Our business focuses on the integration of natural gas-to-power in the LNG value chain, and as part of this value chain, we operate at regasification terminals that utilize our FSRU fleet to serve economies throughout the world. Our business is substantially supported by time charter and terminal use contracts, which are effectively long-term, take-or-pay arrangements and provide consistent revenue and cash flow from our high-quality customer base. As of March 31, 2025, we operate a fleet of 10 purpose-built FSRUs, and since we began operations, we have completed more than 3,000 ship-to-ship transfers of LNG with over 50 LNG operators and have safely delivered more than 7,400 billion cubic feet of natural gas through 16 LNG regasification terminals. We expect to bring online Hull 3407, our newbuild FSRU currently being constructed by Hyundai Heavy Industries in South Korea, in 2026 to support our fleet expansion plans and to meet the growing need for floating regasification capacity. For the three months ended March 31, 2025 and 2024, we generated revenues of $148.4 million and $157.0 million, respectively, from our FSRU and terminal services businesses, representing approximately 47% and 78% of our total revenues for each of those periods.
Previous wording
Our business spans the globe, with regional office presences in 11 countries and an operational presence in Argentina, Bangladesh, Brazil, Finland, Germany, Pakistan, the United Arab Emirates (“UAE”), and the United States. We are the largest provider of regasified LNG capacity in Argentina, Bangladesh, Finland and the UAE, one of the largest providers of regasified LNG capacity in Brazil and Pakistan, and we operate the largest floating storage and regasification unit (“FSRU”) in Brazil. We intend to continue marketing natural gas and LNG, both of which offer a cleaner energy source from which power can be generated consistently, in the markets where we operate. The high value our customers place on our services has resulted in a reliable source of revenues to us. For the three months ended September 30, 2024, we generated revenues of $193.4 million, net income of $45.5 million and Adjusted EBITDA of $92.3 million. For the three months ended September 30, 2023, we generated revenues of $275.5 million, net income of $46.5 million and Adjusted EBITDA of $106.9 million. For more information regarding our non-GAAP measure Adjusted EBITDA and a reconciliation to net income, the most comparable U.S. Generally Accepted Accounting Principles (“GAAP”) measure, see “How We Evaluate Our Operations.”
Current wording
Our business spans the globe, with regional presences in 11 countries and an operational presence in Argentina, Bangladesh, Brazil, Finland, Germany, Pakistan, the United Arab Emirates (“UAE”), and the United States. We are the largest provider of regasified LNG capacity in Argentina, Bangladesh, Finland and the UAE. We are also one of the largest providers of regasified LNG in Brazil, where we operate the largest FSRU, and Pakistan, where we have regasified more LNG than any other provider in the past 10 years. Our business strategy includes marketing natural gas and LNG, both of which offer a cleaner energy source from which power can be generated consistently, through our infrastructure assets in the markets where we operate. The high value our customers place on our services has resulted in a reliable source of revenues to us. For the three months ended March 31, 2025, we generated revenues of $315.1 million, net income of $52.1 million and adjusted earnings before income tax, depreciation and amortization (“Adjusted EBITDA”) of $100.4 million. For the three months ended March 31, 2024, we generated revenues of $200.1 million, net income of $28.1 million and Adjusted EBITDA of $75.4 million. For more information regarding our non-GAAP measure Adjusted EBITDA and a reconciliation to net income, the most comparable U.S. Generally Accepted Accounting Principles (“GAAP”) measure, see “How We Evaluate Our Operations.”
Previous wording
We also procure LNG from major producers and sell natural gas through our flexible LNG terminals. For the three months ended September 30, 2024 and 2023 we generated revenues of $43.3 million and $142.3 million, respectively, from LNG and natural gas sales, representing approximately 22% and 52% of our total revenues for each of those periods. We believe that the commercial momentum that we have established in recent years and the increasing need for access to LNG around the world have resulted in a significant portfolio of new growth opportunities for us to pursue. In addition to our FSRU and terminal services businesses and LNG and natural gas sales, we plan to expand our business through investments in organic and inorganic commercial opportunities. We are evaluating and pursuing early-stage projects with opportunities in South Asia, Asia Pacific, Latin America, Europe, and the Middle East.
Current wording
We also procure LNG from major producers and sell natural gas through our LNG terminals. For the three months ended March 31, 2025 and 2024, we generated revenues of $166.7 million and $43.1 million, respectively, from LNG and natural gas sales, representing approximately 53% and 22% of our total revenues for each of those periods. We believe that the commercial momentum that we have established in recent years and the increasing need for access to LNG around the world have resulted in a significant portfolio of new growth opportunities for us to pursue. In addition to our FSRU and terminal services businesses and LNG and natural gas sales, we plan to expand our business through investments in LNG import and related infrastructure.
Previous wording
We incur significant equipment costs in connection with the operation of our business, including capital equipment recorded as property and equipment, net on our balance sheets and related depreciation and amortization on our income statement. In addition, we incur repair and maintenance and leasing costs related to our property and equipment utilized both in our FSRU and terminal services and gas sales. Property and equipment and other assets include costs incurred for our fleet of FSRUs and terminal assets, including capitalized costs related to drydocking activities. Generally, we are required to drydock each of our vessels every five years, but vessels older than 15 years of age require a shorter duration drydocking or in-place bottom survey every two and a half years.
Current wording
We incur significant equipment costs in connection with the operation of our business, including capital equipment recorded as property and equipment, net on our balance sheets and related depreciation and amortization on our income statement. In addition, we incur repair and maintenance and leasing costs related to our property and equipment utilized both in our FSRU and terminal services and gas sales. Property and equipment and other assets include costs incurred for our fleet of FSRUs and terminal assets, including capitalized costs related to drydocking activities. We are required to drydock our vessels periodically for maintenance and in accordance with applicable international regulations.
Previous wording
Selling, general and administrative expenses (“SG&A”) consist primarily of compensation and other employee-related costs for personnel engaged in executive management, sales, finance, legal, tax and human resources. SG&A also consists of expenses associated with office facilities, information technology, external professional services, business development, legal costs and other administrative expenses.
Current wording
Selling, general and administrative expenses consist primarily of compensation and other employee-related costs for personnel engaged in executive management, sales, finance, legal, tax and human resources. Selling, general and administrative expenses also consists of expenses associated with office facilities, information technology, external professional services, business development, legal costs and other administrative expenses.
Previous wording
Adjusted EBITDA was $92.3 million for the three months ended September 30, 2024, a decrease of $14.6 million, as compared to $106.9 million for the three months ended September 30, 2023. Adjusted EBITDA was lower primarily due to the transition of Sequoia to a TCP agreement in the first quarter of 2024 ($6.8 million), higher selling, general and administrative expenses primarily due to business development activities ($4.3 million), a decrease in revenue related to 2023 seasonal service in Argentina ($3.8 million), and a decrease in other gas sales opportunities ($3.5 million), partially offset by higher interest income received on cash balances invested in money market funds ($1.3 million).
Current wording
Adjusted EBITDA was $100.4 million for the three months ended March 31, 2025, an increase of $25.0 million, as compared to $75.4 million for the three months ended March 31, 2024. Adjusted EBITDA was higher primarily due the drydocking of Summit LNG and Excellence in the first three months of 2024 ($18.4 million), an increase in gas sales opportunities ($4.4 million), a decrease in personnel costs in Argentina ($3.8 million), and a decrease in foreign exchange losses ($1.3 million).
Previous wording
Cost of revenue and vessel operating expenses was $45.4 million for the three months ended September 30, 2024, a decrease of $3.8 million, as compared to $49.2 million for the three months ended September 30, 2023. The decrease in cost of revenue and vessel operating expenses was primarily due to lower expenses in Brazil as a result of transitioning to a TCP agreement in the first quarter of 2024, partially offset by increased personnel costs in Argentina.
Current wording
Cost of revenue and vessel operating expenses was $41.9 million for the three months ended March 31, 2025, a decrease of $28.7 million, as compared to $70.6 million for the three months ended March 31, 2024. The decrease in cost of revenue and vessel operating expenses was primarily due to drydock costs on Summit LNGin the first quarter of 2024 and decreased personnel costs in Argentina.
Previous wording
Depreciation and amortization expenses were $23.0 million for the three months ended September 30, 2024, a decrease of $10.2 million, as compared to $33.2 million for the three months ended September 30, 2023. Depreciation and amortization decreased primarily due to the update to our useful life assumptions and extended commissioning time on our power barge assets in Albania during 2023.
Current wording
Depreciation and amortization expenses were $21.6 million for the three months ended March 31, 2025, a decrease of $1.3 million, as compared to $22.9 million for the three months ended March 31, 2024. Depreciation and amortization decreased primarily due to the extended commissioning time on our power barge assets in Albania during 2024.
Previous wording
Selling, general and administrative expenses were $23.8 million for the three months ended September 30, 2024, an increase of $4.3 million, as compared to $19.5 million for the three months ended September 30, 2023. Selling, general and administrative expenses increased primarily due to business development activities.
Current wording
Selling, general and administrative expenses were $21.4 million for the three months ended March 31, 2025, a decrease of $0.2 million, as compared to $21.6 million for the three months ended March 31, 2024. Selling, general and administrative expenses were essentially flat.
Previous wording
Interest expense was $11.7 million for the three months ended September 30, 2024, a decrease of $2.2 million, as compared to $13.9 million for the three months ended September 30, 2023. Interest expense decreased primarily due to lower balances on our loans.
Current wording
Interest expense was $11.1 million for the three months ended March 31, 2025, a decrease of $1.0 million, as compared to $12.1 million for the three months ended March 31, 2024. The decrease was due to lower balances remaining on our finance leases and long-term debt and decreases in interest rates.
Previous wording
Other income, net was $6.5 million for the three months ended September 30, 2024, an increase of $1.2 million, as compared to $5.3 million for the three months ended September 30, 2023. The increase was primarily due to higher interest income received on cash balances invested in money market funds.
Current wording
Other income, net was $6.2 million for the three months ended March 31, 2025, an increase of $1.2 million, as compared to $5.0 million for the three months ended March 31, 2024. The increase was primarily due to a decrease in foreign exchange losses.
Previous wording
The provision for income taxes for the three months ended September 30, 2024 and 2023 was $6.2 million and $8.2 million, respectively. For the nine months ended September 30, 2024 and 2023, the provision for income taxes was $20.5 million and $25.5 million, respectively. The decrease was primarily attributable to the year-over-year change in the amount and geographical distribution of income.
Current wording
The provision for income taxes for the three months ended March 31, 2025 and 2024 was $6.0 million and $6.9 million, respectively. The decrease was primarily attributable to the year-over-year change in the geographical distribution of income.
Previous wording
The effective tax rate for the three months ended September 30, 2024 and 2023 was 11.9% and 15.0%, respectively. For the nine months ended September 30, 2024 and 2023, the effective tax rate was 16.1% and 19.3%, respectively. The decrease was primarily driven by the geographical distribution of income and the varying tax regimes of jurisdictions.
Current wording
The effective tax rate for the three months ended March 31, 2025 and 2024, was 10.4% and 19.7%, respectively. The decrease was primarily driven by the geographical distribution of income and the varying tax regimes of jurisdictions.
Previous wording
The Company has international operations that are also subject to foreign income tax and U.S. corporate subsidiaries subject to U.S. federal tax. Therefore, its effective income tax rate is dependent on many factors, including the Company’s geographical distribution of income, a rate benefit attributable to the portion of the Company’s earnings not subject to corporate level taxes, and the impact of nondeductible items and foreign exchange impacts as well as varying tax regimes of jurisdictions. In one jurisdiction, the Company’s tax rate is significantly less than the applicable statutory rate as a result of a tax holiday that was granted. This tax holiday will expire in 2033 at the same time that our contract and revenue with our customer ends.
Current wording
We have international operations that are also subject to foreign income tax and U.S. corporate subsidiaries subject to U.S. federal tax. Therefore, its effective income tax rate is dependent on many factors, including the geographical distribution of income, a rate benefit attributable to the portion of our earnings not subject to corporate level taxes, and the impact of nondeductible items and foreign exchange impacts as well as varying tax regimes of jurisdictions. In one jurisdiction, our tax rate is significantly less than the applicable statutory rate as a result of a tax holiday that was granted. This tax holiday will expire in 2033 at the same time that our contract and revenue with our customer ends.
Previous wording
Net income attributable to non-controlling interest was $36.6 million for the three months ended September 30, 2024, an increase of $4.0 million, as compared to $32.6 million for the three months ended September 30, 2023. The increase in net income attributable to non-controlling interest was primarily due to higher net income attributable to owners of our Class B Common Stock.
Current wording
Net income attributable to non-controlling interest was $40.7 million for the three months ended March 31, 2025, an increase of $18.9 million, as compared to $21.8 million for the three months ended March 31, 2024. The increase in net income attributable to non-controlling interest was primarily due to higher net income attributable to owners of our Class B Common Stock.
Previous wording
Based on our cash positions, cash flows from operating activities and borrowing capacity on our debt facilities, we believe we will have sufficient liquidity for the next 12 months for ongoing operations, planned capital expenditures, other investments, debt service obligations, payment of tax distributions and our announced and expected quarterly dividends and distributions, as described in our Dividend and Distribution Policy in the 2023 Annual Report. For more information regarding our planned dividend payments, see Note 11 – Equity. As of September 30, 2024, we had $608.4 million in unrestricted cash and cash equivalents.
Current wording
Based on our cash positions, cash flows from operating activities and borrowing capacity on our debt facilities, we believe we will have sufficient liquidity for the next 12 months for ongoing operations, planned capital expenditures, other investments, debt service obligations, payment of tax distributions and our announced and expected quarterly dividends and distributions, as described in Part II, Item 5 – Our Dividend and Distribution Policy in the 2024 Annual Report. For more information regarding our planned dividend payments, see Note 11 – Equity. As of March 31, 2025, we had $619.5 million in unrestricted cash and cash equivalents.
Previous wording
Cash flows used in investing activities were primarily comprised of capital expenditures made for the purchases of property and equipment, which decreased by $250.6 million for the nine months ended September 30, 2024, as compared to the same period in 2023. The decrease was primarily due to the 2023 purchase of Sequoia and 2023 vessel upgrades made on Exemplar ahead of beginning service at the Inkoo Terminal in Finland, partially offset by upgrades on Excelsior in 2024.
Current wording
Cash flows used in investing activities were primarily comprised of capital expenditures made for the purchases of property and equipment, which increased by $31.4 million for the three months ended March 31, 2025, as compared to the same period in 2024. The increase was primarily due to the 2025 milestone payment under the Newbuild Agreement (as defined herein).
Previous wording
Cash flows used in financing activities increased by $284.3 million for the nine months ended September 30, 2024, as compared to the nine months ended September 30, 2023, primarily due to the proceeds of $250.0 million received from the Term Loan Facility in 2023, $27.2 million in cash paid under the Share Repurchase Program in 2024, an $11.4 million increase in repayments on long-term debt, and a $2.1 million decrease in contributions received from our minority owner related to the Albania Power Project, partially offset by payments of $7.3 million for debt issuance costs in 2023.
Current wording
Cash flows used in financing activities decreased by $0.1 million for the three months ended March 31, 2025, as compared to the three months ended March 31, 2024, primarily due to $8.4 million in cash paid for share repurchases in 2024, partially offset by increased distributions to our stockholders as a result of increasing the dividend from $0.025 per share to $0.06 per share in the third quarter of 2024, a $2.1 million increase in repayments on long-term debt and finance leases and payments of $0.8 million for debt issuance costs in 2025.
Previous wording
On March 17, 2023, EELP entered into an amended and restated senior secured credit agreement (“Amended Credit Agreement”), by and among EELP, as borrower, Excelerate, as parent, the lenders party thereto, the issuing banks party thereto and Wells Fargo Bank,
Current wording
On March 17, 2023, EELP entered into an amended and restated senior secured credit agreement (“Amended Credit Agreement”), by and among EELP, as borrower, Excelerate, as parent, the lenders party thereto, the issuing banks party thereto and Wells Fargo Bank, N.A., as administrative agent. Under the Amended Credit Agreement, EELP obtained a new $250.0 million term loan facility (the “Term Loan Facility” and, together with the EE Revolver, as amended by the Amended Credit Agreement, the “EE Facilities”). The EE
Previous wording
N.A., as administrative agent. Under the Amended Credit Agreement, EELP obtained a new $250.0 million term loan facility (the “Term Loan Facility” and, together with the EE Revolver, as amended by the Amended Credit Agreement, the “EE Facilities”). The EE Facilities mature in March 2027. In April 2023, Excelerate purchased Sequoia for $265.0 million using $250.0 million borrowed through our Term Loan Facility together with cash on hand.
Current wording
Facilities mature in March 2027. In April 2023, we purchased Sequoia for $265.0 million using $250.0 million borrowed through our Term Loan Facility together with cash on hand.
Previous wording
Borrowings under the EE Facilities bear interest at a per annum rate equal to the term SOFR reference rate for such period plus an applicable margin, which applicable margin is based on EELP’s consolidated total leverage ratio as defined and calculated under the Amended Credit Agreement and can range from 2.75% to 3.50%. The unused portion of the EE Revolver commitments is subject to an unused commitment fee calculated at a rate per annum ranging from 0.375% to 0.50% based on EELP’s consolidated total leverage ratio.
Current wording
Borrowings under the EE Facilities bear interest at a per annum rate equal to the term Secured Overnight Financing Rate (“SOFR”) reference rate for such period plus an applicable margin, which applicable margin is based on EELP’s consolidated total leverage ratio as defined and calculated under the Amended Credit Agreement and can range from 2.75% to 3.50%. The unused portion of the EE Revolver commitment is subject to an unused commitment fee calculated at a rate per annum ranging from 0.375% to 0.50% based on EELP’s consolidated total leverage ratio.
Previous wording
As of September 30, 2024, the Company had issued $0.1 million in letters of credit under the EE Revolver. As a result of the EE Revolver’s financial ratio covenants and after taking into account the outstanding letters of credit issued under the facility, all of the $349.9 million of undrawn capacity was available for additional borrowingsas of September 30, 2024.
Current wording
As of March 31, 2025, we had issued less than $0.1 million in letters of credit under the EE Revolver. As a result of the EE Revolver’s financial ratio covenants and after taking into account the outstanding letters of credit issued under the facility, all of the $350.0 million of undrawn capacity was available for additional borrowingsas of March 31, 2025.
Previous wording
As of September 30, 2024, the Company was in compliance with the covenants under its debt facilities.
Current wording
As of March 31, 2025, we were in compliance with the covenants under our debt facilities.
Previous wording
We lease a terminal and offices in various locations under noncancelable operating leases. As of December 31, 2023, we had future minimum lease payments totaling $7.3 million. As of September 30, 2024, we had future minimum lease payments totaling $6.1 million and are committed to $0.5 million in year one, $3.2 million for years two and three, $1.9 million for years four and five and $0.4 million thereafter.
Current wording
We lease offices in various locations under noncancelable operating leases. As of December 31, 2024, we had future minimum lease payments totaling $5.6 million. As of March 31, 2025, we had future minimum lease payments totaling $5.5 million and are committed to $1.3 million in year one, $2.6 million for years two and three, $1.5 million for years four and less than $0.1 million thereafter.
Previous wording
Certain enforceable vessel charters and pipeline capacity agreements are classified as finance leases, and the right-of-use assets are included in property and equipment. As of December 31, 2023, we had future minimum lease payments totaling $274.1 million. As of September 30, 2024, we had future minimum lease payments totaling $248.8 million and are committed to $8.3 million in payments in year one, $66.5 million for years two and three, $60.8 million for years four and five and $113.2 million thereafter.
Current wording
Certain enforceable vessel charters and pipeline capacity agreements are classified as finance leases, and the right-of-use assets are included in property and equipment. As of December 31, 2024, we had future minimum lease payments totaling $240.4 million. As of March 31, 2025, we had future minimum lease payments totaling $232.1 million and are committed to $24.9 million in payments in year one, $66.5 million for years two and three, $55.2 million for years four and five and $85.6 million thereafter.
Previous wording
In October 2022, we signed a binding shipbuilding contract (“the Newbuild Agreement”) with HD Hyundai Heavy Industries for a new FSRU to be delivered in 2026. As part of and related to the Newbuild Agreement, our milestone payments are due in installments with the final installment due concurrently with the delivery of the vessel, which is expected in 2026. In the fourth quarter of 2024, we made a milestone payment of approximately $50 million, leaving approximately $260 million in remaining spend. Our near-term payment commitments related to the Newbuild Agreement are expected to be approximately $30 million in the first quarter of 2025 and $20 million in the second quarter of 2025, with the remainder due beyond the next twelve months.
Current wording
In October 2022, we signed a binding shipbuilding contract (“the Newbuild Agreement”) with HD Hyundai Heavy Industries for a new FSRU to be delivered in 2026. As part of and related to the Newbuild Agreement, our milestone payments are due in installments with the final installment due concurrently with the delivery of the vessel, which is expected in 2026. In the fourth quarter of 2024 and first quarter of 2025, we made milestone payments of approximately $50 million and $30 million, respectively, leaving approximately $230 million in remaining spend. Our near-term payment commitments related to the Newbuild Agreement are expected to be approximately $20 million in the second quarter of 2025, with the remainder due beyond the next twelve months.
Previous wording
In April 2022, we entered into the TRA with Excelerate Energy Holdings, LLC (“EEH”) and the George Kaiser Family Foundation (the “Foundation” and, together with EEH, the “TRA Beneficiaries”). The TRA will provide for payment by us to the TRA Beneficiaries of 85% of the amount of the net cash tax savings, if any, that we are deemed to realize as a result of our utilization of certain tax benefits resulting from (i) certain increases in the tax basis of assets of EELP and its subsidiaries resulting from exchanges of EELP partnership interests in the future, (ii) certain tax attributes of EELP and subsidiaries of EELP (including the existing tax basis of assets owned by EELP or its subsidiaries and the tax basis of certain assets purchased from the Foundation) that exist as of the time of the IPO or may exist at the time when Class B interests of EELP are exchanged for shares of Class A Common Stock, and (iii) certain other tax benefits related to us entering into the TRA, including tax benefits attributable to payments that we make under the TRA. As a result of the Share Repurchase Program, our expected payments under the TRA decreased by $6.0 million for the nine months ended September 30, 2024.
Current wording
In April 2022, we entered into the TRA with Excelerate Energy Holdings, LLC (“EEH”) and the George Kaiser Family Foundation (the “Foundation” and, together with EEH, the “TRA Beneficiaries”). The TRA will provide for payment by us to the TRA Beneficiaries of 85% of the amount of the net cash tax savings, if any, that we are deemed to realize as a result of our utilization of certain tax benefits resulting from (i) certain increases in the tax basis of assets of EELP and its subsidiaries resulting from exchanges of EELP partnership interests in the future, (ii) certain tax attributes of EELP and subsidiaries of EELP (including the existing tax basis of assets owned by EELP or its subsidiaries and the tax basis of certain assets purchased from the Foundation) that existed as of the time of our Initial Public Offering or may exist at the time when Class B interests of EELP are exchanged for shares of Class A Common Stock, and (iii) certain other tax benefits related to us entering into the TRA, including tax benefits attributable to payments that we make under the TRA.
Previous wording
In February 2023, we executed a 20-year LNG sale and purchase agreement with Venture Global LNG (the “Venture Global SPA”). Under the Venture Global SPA, we will purchase 0.7 MTPA of LNG on a free-on-board basis from the Plaquemines Phase 2 LNG facility in Plaquemines Parish, Louisiana. Our purchase commitment will be based on the final settlement price of monthly Henry
Current wording
In February 2023, we executed a 20-year LNG sale and purchase agreement (“SPA”) with Venture Global LNG. Under the agreement, we will purchase 0.7 MTPA of LNG on a free-on-board basis from the Plaquemines Phase 2 LNG facility in Plaquemines Parish, Louisiana. Our purchase commitment will be based on the final settlement price of monthly Henry Hub natural gas futures contracts plus a contractual spread. The start of this commitment, however, is dependent on the second phase of the LNG facility becoming operational, which is not expected in the next 12 months.
Previous wording
In January 2024, we executed a 15-year sale and purchase agreement with QatarEnergy (the “QatarEnergy SPA”). Under the QatarEnergy SPA, we have agreed to purchase LNG from QatarEnergy beginning in 2026. QatarEnergy will deliver 0.85 MTPA of LNG in 2026 and 2027 and 1.0 MTPA from 2028 to 2040. Our purchase commitment will be based on a three-month average of Brent Crude prices for the months immediately preceding each delivery, times a fixed percentage. These LNG volumes are intended to be used to supply sales under the Petrobangla SPA.
Current wording
In January 2024, we executed a 15-year SPA with QatarEnergy. Under the agreement, we have agreed to purchase LNG from QatarEnergy beginning in 2026. QatarEnergy will deliver 0.85 MTPA of LNG in 2026 and 2027 and 1.0 MTPA from 2028 to 2040. Our purchase commitment will be based on a three-month average of Brent Crude prices for the months immediately preceding each delivery, multiplied by a fixed percentage. These LNG volumes are intended to be used to supply sales under the SPA we have with Petrobangla.
Previous wording
In the third quarter of 2024, Excelerate signed medium-term agreements for LNG purchases and sales in one of the Atlantic Basin regions in which we do business. Over the term of these agreements, we will purchase and sell approximately 0.65 million tonnes of LNG, the pricing of which will be based on a major European natural gas index. We expect that, under these agreements, the first purchase will be made during the fourth quarter of 2024.
Current wording
In the third quarter of 2024, we signed a medium-term agreement for LNG purchases in one of the Atlantic Basin regions in which we do business. Over the term of this agreement, we will purchase approximately 0.65 million tonnes of LNG, the pricing of which will be based on TTF. The first purchase under this agreement was made during the fourth quarter of 2024.
Rearranged previous paragraphs (2)
Previous report — wording carried elsewhere
Net income attributable to non-controlling interest was $85.0 million for the nine months ended September 30, 2024, an increase of $4.9 million, as compared to $80.1 million for the nine months ended September 30, 2023. The increase in net income attributable to non-controlling interest was primarily due to higher net income attributable to owners of our Class B Common Stock.
Previous report — wording carried elsewhere
Hub natural gas futures contracts plus a contractual spread. The start of this commitment, however, is dependent on the LNG facility becoming operational, which is not expected in the next 12 months.