Montauk Renewables, Inc.
For the period ended Dec 31, 2024. Filed Mar 14, 2025.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2024 · Filed Mar 14, 2025
What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-03-14.
0000950170-24-031587
Item 1A. RISK FACTORSCurrent report: 10-K
Period ended 2024-12-31; filed 2025-03-14.
0000950170-25-039495
Item 1A. RISK FACTORSThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 205 previous paragraphs and 195 current paragraphs.
157 unchanged; 32 reworded; 1 added; 11 removed; 5 previous and 5 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (1)
Current report
Since 2015, EPA has been attempting to regulate carbon dioxide (CO 2) emissions from existing fossil-fuel fired electric power generation facilities under section 111(d) of the Clean Air Act. Depending on how these regulations are structured, they could result in favorable treatment for renewable energy, as happened with the 2015 Clean Power Plan, which allowed facility owners to reduce emissions with “outside the fence” measures, including those associated with renewable energy projects. EPA’s first two efforts to regulate these emissions from power generation facilities, including the Clean Power Plan and the later Affordable Clean Energy Rule, have been struck down through a combination of changes in administration and judicial review. EPA’s most recent regulation is the 2024 Power Plant GHG Rule, which was published on May 9, 2024. The Power Plant GHG Rule rule includes performance-based mechanisms for EGUs burning coal and incentivizes the early retirement of coal-fired plants by having less stringent (or no) emission limits for plants that agree to retire by certain dates. States are required to submit their individual compliance plans by May 11, 2026. State plans could include compliance flexibilities such as emission trading. However, the Power Plant GHG Rule has been heavily litigated, and EPA recently filed a motion that was granted to hold the case in abeyance so that new leadership at EPA can review the rule and consider next steps. Given the emphasis in President Trump’s executive orders regarding favoring fossil fuel production and rescinding the Biden administration’s executive orders on climate change, it is expected that EPA will reconsider this rule. In addition, in the Unleashing American Energy executive order, President Trump also directed the EPA Administrator to submit a report on the “legality and continuing applicability” of its 2009 endangerment finding for GHGs under the CAA. Revoking this finding would undermine the EPA’s regulations covering CO 2 and other GHG emissions from power plants and its climate regulatory authority in general.
Removed paragraphs (11)
Previous report
-22- operations, more vigorous enforcement policies and discovery of currently unknown conditions may require substantial expenditures that could have a material adverse effect on our results of operations and financial condition. In January 2021, President Biden issued an executive order directing all federal agencies to review and take action to address any federal regulations, orders, guidance documents, policies, and any similar agency actions promulgated during the prior administration that may be inconsistent with the current administration’s policies and to address climate change. The federal agencies review of previous agency actions remain ongoing. In January 2021, President Biden also issued an executive order solely targeting climate change. Pursuant to these executive orders, on February 19, 2021 the United States formally rejoined the Paris Climate Agreement, an international treaty that provides for the cutting of carbon emissions every five years, beginning in 2023. In August 2022, President Biden signed into law the Inflation Reduction Act, which includes incentives for development and production of renewable energy. These incentives include grants, loan guaranties, development funding, investment tax credits, and production tax credits. At this time, we cannot predict the outcome of any of these executive actions on our operations.
Previous report
In addition, in June 2019, the EPA issued the final Affordable Clean Energy (“ACE”) rule and repealed the Clean Power Plan (the “CPP”), which had previously established standards to limit carbon dioxide (CO 2) emissions from existing fossil-fueled power generation facilities. Under the ACE rule, emissions from electric utility generation facilities would be regulated only through the use of various “inside the fence” or onsite efficiency improvements and emission control technologies. In contrast, the CPP allowed facility owners to reduce emissions with “outside the fence” measures, including those associated with renewable energy projects. On January 19, 2021, the United States Court of Appeals for the D.C. Circuit vacated the ACE rule and remanded the rule back to EPA
Previous report
-23- for reconsideration of the “best system of emission reduction.” On February 22, 2021, the D.C. Circuit subsequently issued an order allowing EPA to promulgate new standards in lieu of reviving the CPP. In June 2022, however, the U.S. Supreme Court reversed the D.C. Circuit’s decision on the ACE rule and remanded the case back to the D.C. Circuit. The U.S. Supreme Court restricted the EPA’s authority to regulate GHGs from existing power plants under Section 111(d). The U.S. Supreme Court concluded that Congress did not grant the EPA authority under the CAA to demand generation-shifting to achieve reduction of GHG emissions, but the court did not hold that the EPA is limited in future rulemakings to just the heat-rate improvements that made up the ACE rule. On remand from the Supreme Court, the D.C. Circuit in October 2022 upheld EPA's repeal of the CPP, and it granted the parties' motion to hold the remaining challenges to the ACE rule in abeyance, as EPA indicated it intended to repeal the ACE rule and issue a new proposed regulation for GHG from electric generating units. To ensure that the ACE rule is not implemented in the interim period, EPA issued a direct final rule in March 2023, delaying the deadlines for states to submit implementation plans for the ACE rule. On May 23, 2023, the EPA published a proposed rule that would vacate the ACE rule, establish emissions guidelines in the form of CO2 emissions limitations for certain existing fossil-fueled power generation facilities and would require states to develop state plans that establish standards of performance for such facilities that are at least as stringent as the EPA’s emissions guidelines. Depending on various facility-specific factors, the bases of proposed emissions guidelines range from routine methods of operation to shutting down certain types of units in the early 2030s, to carbon capture and sequestration or co-firing low-GHG hydrogen starting in the 2030s. The EPA is expected to publish a final rule in the first half of 2024, which is expected to face legal challenges similar to prior challenges to the ACE rule and the CPP. We are unable to predict the future course of the EPA's proposed rule and any related litigation, nor the direction that the EPA may take in the future to regulate GHG emissions from existing fossil fuel-fired generation facilities. The impact of these potential developments is unclear.
Previous report
The United States has not implemented comprehensive federal climate change legislation. The EPA has adopted rules that, among other things, establish permit reviews for GHG emissions from certain large stationary sources, require the monitoring and annual reporting of GHG emissions from specified sources in the U.S., implement standards reducing emissions of methane, a form of GHG, from specified oil and gas sectors, and together with the U.S. Department of Transportation, implement GHG emissions limits on vehicles manufactured for operation in the United States. While these rules largely do not directly impact our operations, they do represent a concerted effort at the federal agency level to reduce emissions of GHGs in an effort to mitigate adverse effects associated with climate change, which could in turn result in increased demand for renewable energy.
Previous report
In addition, on March 6, 2024, the SEC adopted new rules mandating significantly expanded climate-related disclosures in SEC filings, including disclosures relating to certain climate-related risks and related governance matters, climate-related metrics and Scope 1 and 2 GHG emissions, if material, information about climate-related targets and goals, transition plans, if any, and certain attestation requirements. The rules include certain phase-in compliance dates based a filer’s status under applicable SEC rules. Under the phase-in dates included in the SEC’s rules, assuming that we continue to be an “accelerated filer” as defined in SEC rules, we would become subject to the new disclosure requirements commencing with our Annual Report on Form 10-K for the fiscal year beginning January 1, 2026, except for the following disclosure requirements: (i) requirements to disclose certain material expenditures incurred and material impacts on financial estimates and assumptions relating to mitigation activities, transition plans and targets and goals, to which we would become subject commencing with our Annual Report on Form 10-K for the fiscal year beginning January 1, 2027 and (ii) requirements to disclose Scope 1 and 2 GHG emissions metrics that we determine to be material, to which we would become subject commencing with our Quarterly Report on Form 10-Q for the fiscal quarter ending June 30, 2029 (in relation to the fiscal year beginning January 1, 2028). In addition, commencing with our Quarterly Report on Form 10-Q for the fiscal quarter ending June 30, 2032, we will be required to obtain and file with the SEC a “limited assurance” attestation report from an independent attestation service provider covering the Scope 1 and 2 GHG emissions metrics that we disclose (if any). We are currently assessing the impact these SEC’s new rules will have on us. In addition, a group of 10 state attorneys general have already filed a petition in the U.S. Court of Appeals for the Eleventh Circuit asking the court to vacate the SEC’s rules, and it is widely expected that the rules will face additional legal challenges. For these reasons, we cannot currently predict with certainty the timing and costs of implementation or any potential adverse impacts resulting therefrom. However, assuming that the rules take effect in the form adopted by the SEC, we expect to incur significant additional costs relating to the assessment and disclosure of climate-related matters, including costs relating to establishment of additional internal controls, monitoring, collecting, analyzing and reporting the new metrics and implementing systems and procuring additional internal and external personnel with the requisite skills and expertise to serve those functions. These additional costs or changes in operations could have a material adverse effect on our business, financial condition, results of operations and cash flows. We may also face increased litigation risks related to disclosu…
Excerpt shortened here; the source contains the full paragraph.
Previous report
The SEC’s new climate-related disclosure rules will require public companies to disclose the capitalized costs, expenditures expensed, and losses related to carbon offsets and RECs if used as a material component of the company’s plans to achieve its disclosed climate-related targets or goals. It is possible that these disclosure requirements could make RECs less attractive to customers, which could negatively impact demand and market prices for RECs. Although the RECs we currently produce are sold under long-term PPAs with prices that are not subject to adjustment based on market prices, if demand and market prices for RECs decrease, then our ability to sell additional RECs in the future at attractive prices may be negatively affected.
Previous report
Variable rate indebtedness under our Amended Credit Agreement may adversely affect our business, financial condition and results of operations.
Previous report
Borrowings under our Amended Credit Agreement are at variable rates of interest, particularly the Bloomberg Short-Term Bank Yield Index Rate (“BSBY”), which will fluctuate with changing market conditions. If BSBY increases, our interest expense will mechanically increase, which could adversely affect our cash flow and our ability to service our indebtedness and fund our operations. Additionally, BSBY is a relatively new reference rates. Therefore, based on its limited historical performance and other available information, the future performance of BSBY cannot be accurately predicted, which could result in increases in our interest expense that may adversely impact the amount of interest payments under the Amended Credit Agreement.
Previous report
In addition, on November 15, 2023, the Bloomberg Index Services Limited announced that the permanent cessation of BSBY and all its tenors will be effective on November 15, 2024. Under the terms of our Amended Credit Agreement, the first alternative reference rate to be used upon the cessation of BSBY is Term SOFR, as administered by CME Group Benchmark Administration Limited, plus a “SOFR Adjustment” equal to (i) 0.11448% per annum for borrowings with a one-month duration and (ii) 0.26161%
Previous report
-29- per annum for borrowings of a three-month duration (or other durations). Assuming the reference rate under our Amended Credit Agreement transitions to Term SOFR plus the applicable SOFR Adjustment following cessation of BSBY, if Term SOFR increases, our interest expense will mechanically increase, which could adversely affect our cash flow and our ability to service our indebtedness and fund our operations.
Reworded paragraphs (32)
Previous wording
than expected diminishment of such biogas supply; or volume disruption in our fuel supply collection system. Any extended interruption and/or volume disruption in the project’s operation, or failure of the project for any reason to generate the expected amount of output, could adversely affect our business and operating results. For example, we produced fewer MMBTu and MWh in the third quarter of 2023 compared with the third quarter of 2022 due to dry weather conditions and higher ambient temperatures. In addition, we have in the past, and may in the future, incur material asset impairment charges if any of our renewable energy projects incurs operational issues that indicate our expected future cash flows from the project are less than the project’s carrying value. Any such impairment charge could adversely affect our operating results in the period in which the charge is recorded.
Current wording
Landfills contain organic material whose decomposition causes the generation of gas consisting primarily of methane, which our RNG projects use to generate power or renewable natural gas, and carbon dioxide. The estimation of landfill gas production volume is an inexact process and dependent on many site-specific conditions, including the estimated annual waste volume, composition of waste, regional climate and the capacity and construction of the landfill. Production levels are subject to a number of additional risks, including a failure or wearing out of our or our landfill operators’, customers’ or utilities’ equipment; an inability to find suitable replacement equipment or parts; less than expected supply or quality of the project’s source of biogas and faster than expected diminishment of such biogas supply; or volume disruption in our fuel supply collection system. Any extended interruption and/or volume disruption in the project’s operation, or failure of the project for any reason to generate the expected amount of output, could adversely affect our business and operating results. For example, certain of our Houston-based operating sites were impacted by severe weather events during the first nine month of 2024 including multiple day extended outages from Hurricane Beryl in July 2024. Furthermore, we produced fewer MMBTu and MWh in the third quarter of 2023 compared with the third quarter of 2022 due to dry weather conditions and higher ambient temperatures. In addition, we have in the past, and may in the future, incur material asset impairment charges if any of our renewable energy projects incurs operational issues that indicate our expected future cash flows from the project are less than the project’s carrying value. Any such impairment charge could adversely affect our operating results in the period in which the charge is recorded.
Previous wording
A substantial portion of our revenues are generated from five project sites. For the years ended December 31, 2023 and 2022, excluding the effect of derivative instruments, approximately 68.4% and 72.4%, respectively, of operating revenues were derived from these locations. During 2023, RNG production at our McCarty, Rumpke, Atascocita and Apex facilities accounted for approximately 16.2, 18.8%, 21.0% and 9.9% of our RNG revenues, respectively, and 14.5%, 24.7%, 20.2% and 9.9% of the RNG we produced during 2023, respectively. During 2023, Renewable Electricity production at our Bowerman Power LFG, LLC (“Bowerman”) facility accounted for approximately 89.7% of our Renewable Electricity Generation revenues and 80.3% of the Renewable Electricity we produced during 2023. A lengthy interruption of production or transmission of renewable energy from one or more of these projects, as a result of a severe weather event, failure or degradation of our or a landfill operator’s equipment or interconnection transmission problems could have a disproportionate effect on our revenues and cash flow.
Current wording
A substantial portion of our revenues are generated from five project sites. For the years ended December 31, 2024 and 2023, excluding the effect of derivative instruments, approximately 69.1% and 68.4%, respectively, of operating revenues were derived from these locations. During 2024, RNG production at our Atascocita, Rumpke, McCarty and Galveston facilities accounted for approximately 20.3%, 18.9%, 16.4% and 11.0% of our RNG revenues, respectively, and 18.7%, 21.4%, 15.0% and 8.7% of the RNG we produced, respectively. During 2024, Renewable Electricity production at our Bowerman Power LFG, LLC (“Bowerman”) facility accounted for approximately 92.2% of our Renewable Electricity Generation revenues and 82.6% of the Renewable Electricity we produced during 2024. A lengthy interruption of production or transmission of renewable energy from one or more of these projects, as a result of a severe weather event, failure or degradation of our or a landfill operator’s equipment or interconnection transmission problems could have a disproportionate effect on our revenues and cash flow.
Previous wording
Our Atascocita, McCarty, Galveston and Coastal Plains projects are located within 20 miles of each other near Houston, Texas and seven of our other RNG projects are located in relatively close proximity to each other in Pennsylvania and Ohio. Regional events, such as gas transmission interruptions, regional availability of replacement parts and service in the event of equipment failures and severe weather events in either of those geographic regions have previously adversely affected, and if the future could adverse
Current wording
Our Atascocita, McCarty, Galveston and Coastal Plains projects are located within 20 miles of each other near Houston, Texas and six of our other RNG projects are located in relatively close proximity to each other in Pennsylvania and Ohio. Regional events, such as gas transmission interruptions, regional availability of replacement parts and service in the event of equipment failures and severe weather events in either of those geographic regions have previously adversely affected, and if the future could adversely
Previous wording
-15- affect, our RNG production and transmission. These impacts are greater than would be if our business was more geographically diverse.
Current wording
-16- affect, our RNG production and transmission. These impacts are greater than would be if our business was more geographically diverse.
Previous wording
Our success will depend on our ability to create and maintain a competitive position in the renewable energy industry. Other than the patented technology acquired through the Montauk Ag Renewables Acquisition and our internally developed condensate neutralization technology, we do not have any exclusive rights to any of the technologies that we utilize, and our competitors may currently use and may be planning to use identical, similar or superior technologies. While significant to the development associated with our emerging North Carolina Montauk Ag Renewables business, we do not currently consider patented technology material to the total business. In addition, the technologies that we use may be rendered obsolete or uneconomical by technological advances, more efficient and cost-effective processes or entirely different approaches developed by one or more of our competitors or others.
Current wording
Our success will depend on our ability to create and maintain a competitive position in the renewable energy industry. Other than the patented technology acquired through the Montauk Ag Renewables Acquisition, our internally developed condensate neutralization technology and an RNG processing skid we developed, we do not have any exclusive rights to any of the technologies that we utilize, and our competitors may currently use and may be planning to use identical, similar or superior technologies. While significant to the development associated with our emerging North Carolina Montauk Ag Renewables business, we do not currently consider patented technology material to the total business. In addition, the technologies that we use may be rendered obsolete or uneconomical by technological advances, more efficient and cost-effective processes or entirely different approaches developed by one or more of our competitors or others.
Previous wording
We aim to maintain and grow our position as a leading producer of RNG in the United States. Our specific focus on the renewable energy sector exposes us to risks related to the supply of and demand for energy commodities and Environmental Attributes, the cost of capital expenditures, government regulation, world and regional events and economic conditions, and the acceptance of alternative power sources. As a renewable energy producer, we may also be negatively affected by lower energy output resulting from variable inputs, mechanical breakdowns, faulty technology, competitive electricity markets or changes to the laws and regulations that mandate the use of renewable energy sources by refiners and importers of gasoline and diesel fuel and electric utilities.
Current wording
We aim to maintain and grow our position as a leading producer of RNG in the United States. Our specific focus on the renewable energy sector exposes us to risks related to the supply of, demand for and the ultimate price of energy commodities and Environmental Attributes, inflation, taxes, tariffs, duties or other assessments on necessary equipment, the cost of capital expenditures, government regulation, world and regional events and economic conditions, and the acceptance of alternative power sources. As a renewable energy producer, we may also be negatively affected by lower energy output resulting from variable inputs, mechanical breakdowns, faulty technology, competitive electricity markets or changes to the laws and regulations that mandate the use of renewable energy sources by refiners and importers of gasoline and diesel fuel and electric utilities.
Previous wording
regulatory changes that affect the demand for or supply of Environmental Attributes and the prices thereof, which could have a significant effect on the financial performance of our projects and the number of potential projects with attractive economics;
Current wording
regulatory changes, whether as a result of the new presidential administration or otherwise, that affect the demand for or supply of Environmental Attributes and the prices thereof, which could have a significant effect on the financial performance of our projects and the number of potential projects with attractive economics;
Previous wording
the ability to obtain financing for a project on acceptable terms or at all and the need for substantially more capital than initially budgeted to complete projects and exposure to liabilities as a result of unforeseen environmental, construction, technological or other complications;
Current wording
the ability to obtain financing for a project on acceptable terms or at all and the need for substantially more capital than initially budgeted to complete projects and exposure to liabilities as a result of unforeseen costs or environmental, construction, technological or other complications;
Previous wording
a decrease in the availability, pricing and timeliness of delivery of raw materials and components, necessary for the projects to function;
Current wording
a decrease in the availability and timeliness of delivery of raw materials and components necessary for the projects to function or an increase in the costs of raw materials and components due to, among other reasons, inflation, tariffs, duties, taxes or assessments;
Previous wording
Our dairy farm project produces significantly less RNG than our landfill facilities. As a result, we will be even more dependent on the LCFS credits and RINs produced at our dairy farm project than on the RINs produced at our landfill facilities for the project’s commercial viability. Since the number of LCFS credits for RNG generated on dairy farms is significantly greater than the number of LCFS credits for RNG generated at landfills, we are substantially more dependent upon the revenue from LCFS credits for the commercial viability of the dairy farm project. In the event that CARB worsens the CI score that it applies to waste conversion projects, such as dairy digesters, the number of LCFS credits for RNG generated at our dairy farm project will decline. Additionally, revenue from LCFS credits also depends on the price per LCFS credit, which is driven by various market forces, including the supply of and demand for LCFS credits, which in turn depends on the demand for traditional transportation fuel and the supply of renewable fuel from other renewable energy sources, and mandated CI targets, which determine the number of LCFS credits required to offset LCFS deficits, and which increase over time. Fluctuations in the price of LCFS credits or the number of LCFS credits assigned will have a significantly greater impact on the success of our dairy farm project than the value that RINs have on our landfill facilities. A significant decline in the value of LCFS credits could require us to incur an impairment charge on our dairy farm project and could adversely affect our business, financial condition and results of operations.
Current wording
Our dairy farm project produces significantly less RNG than our landfill facilities. As a result, we will be even more dependent on the LCFS credits and RINs produced at our dairy farm project than on the RINs produced at our landfill facilities for the project’s commercial viability. In the event that CARB worsens the CI score that it applies to waste conversion projects, such as dairy digesters, the number of LCFS credits for RNG generated at our dairy farm project will decline. Additionally, revenue from LCFS credits also depends on the price per LCFS credit, which is driven by various market forces, including the supply of and demand for LCFS credits, which in turn depends on the demand for traditional transportation fuel and the supply of renewable fuel from other renewable energy sources, and mandated CI targets, which determine the number of LCFS credits required to offset LCFS deficits, and which increase over time. Fluctuations in the price of LCFS credits or the number of LCFS credits assigned will have a significantly greater impact on the success of our dairy farm project than the value that RINs have on our landfill facilities. A significant decline in the value of LCFS credits could require us to incur an impairment charge on our dairy farm project and could adversely affect our business, financial condition and results of operations.
Previous wording
Our business is currently focused on converting methane into renewable energy. In the future, we may expand our strategy to include other types of projects. For example, we recently entered into an agreement with European Energy North America under which we supply biogenic carbon dioxide for the creation of e-methanol. We cannot assure you that we will be able to identify
Current wording
Our business is currently focused on converting methane into renewable energy. In the future, we may expand our strategy to include other types of projects. For example, we have entered into an agreement with European Energy North America under which we supply biogenic carbon dioxide for the creation of e-methanol and have announced a pilot project with Emvolon in which we will recover and convert biogas into green methanol. We cannot assure you that we will be able to identify attractive opportunities outside of our current area of focus or acquire or develop such projects at a price and on terms that are attractive or that, once acquired or
Previous wording
-19- attractive opportunities outside of our current area of focus or acquire or develop such projects at a price and on terms that are attractive or that, once acquired or developed, such projects will operate profitably. In addition, these projects could expose us to increased operating costs, unforeseen liabilities or risks, and regulatory and environmental concerns associated with entering into new sectors of the energy industry, including requiring a disproportionate amount of our management’s attention and resources, which could adversely affect our business, as well as place us at a competitive disadvantage relative to more established market participants. A failure to successfully integrate such new projects into our existing project portfolio as a result of unforeseen operational difficulties or otherwise, could adversely affect our business, financial condition and results of operations.
Current wording
-20- developed, such projects will operate profitably. In addition, these projects could expose us to increased operating costs, unforeseen liabilities or risks, and regulatory and environmental concerns associated with entering into new sectors of the energy industry, including requiring a disproportionate amount of our management’s attention and resources, which could adversely affect our business, as well as place us at a competitive disadvantage relative to more established market participants. A failure to successfully integrate such new projects into our existing project portfolio as a result of unforeseen operational difficulties or otherwise, could adversely affect our business, financial condition and results of operations.
Previous wording
We depend, in part, on Environmental Attributes, which are federal, state and local government incentives in the United States, provided in the form of RINs, RECs, LCFS credits, rebates, tax credits and other incentives to end users, distributors, system integrators and manufacturers of renewable energy projects, that promote the use of renewable energy. RINs are created through the RFS program administered by the EPA, which requires transportation fuel sold in the United States to contain a minimum volume of renewable fuel and has historically permitted refineries and importers of transportation fuel to satisfy their RVOs by purchasing either (i) D5 RINs and cellulosic waiver credits (“CWCs”) or (ii) D3 RINs. In a December 1, 2022 proposed rule, EPA proposed to not utilize its cellulosic waiver authority for the years 2023-2025. However, if actual production is lower than the RVO, the EPA will have discretion to utilize CWC. RECs are created through state law requirements for utilities to purchase a portion of their energy from renewable energy sources. 76% and 70% of our operating revenues for 2023 and 2022, respectively, were generated from the sale of Environmental Attributes. These government economic incentives could be reduced or eliminated altogether, or the categories of renewable energy qualifying for such government economic incentives could be changed. These renewable energy program incentives are subject to regulatory oversight and could be administratively or legislatively changed in a manner that could adversely affect our operations. Further, the generation of LCFS credits on our dairy farm project is expected to increase the percentage of our revenues generated from Environmental Attributes. Reductions in, changes to, or eliminations or expirations of governmental incentives could result in decreased demand for, and lower revenues from, our projects. Changes in the level or structure of the RPS of a state for electricity could also result in a decline in our revenues or decreased demand for, and lower revenues from, our electricity projects.
Current wording
We depend on Environmental Attributes, which are federal, state and local government incentives in the United States, provided in the form of RINs, RECs, LCFS credits, rebates, tax credits and other incentives to end users, distributors, system integrators and manufacturers of renewable energy projects, that promote the use of renewable energy. RINs are created through the RFS program administered by the EPA, which requires transportation fuel sold in the United States to contain a minimum volume of renewable fuel and has historically permitted refineries and importers of transportation fuel to satisfy their RVOs by purchasing either (i) D5 RINs and cellulosic waiver credits (“CWCs”) or (ii) D3 RINs. In a December 1, 2022 proposed rule, EPA proposed to not utilize its cellulosic waiver authority for the years 2023-2025. However, if actual production is lower than the RVO, the EPA will have discretion to utilize CWC. This rule was finalized in July 2023. On December 12, 2024, EPA proposed a partial waiver of 2024 Cellulosic Biofuel Volume Requirements due to the projected shortfall of D3 RINs available to meet the 2024 RVO. This proposal is still pending and, with a new presidential administration, it is unknown when this proposed rule will be finalized (if at all) in 2025. In addition, under the RFS, EPA was required to finalize RVO volumes for 2026 by November 1, 2024 but did not meet that deadline. According to the White House Office of Management and Budget’s Fall Unified Agenda and Regulatory Plan, published on December 13, 2024, EPA indicates that it expects in March 2025 to (i) publish a rule finalizing its December 12, 2024 proposed partial waiver of 2024 Cellulosic Biofuel Volume Requirements and (ii) propose RVO volumes for 2026 (which EPA expects to finalize in December 2025). There can be no assurance that EPA will meet its proposed timelines for these actions. RECs are created through state law requirements for utilities to purchase a portion of their energy from renewable energy sources. 74% and 76% of our operating revenues for 2024 and 2023, respectively, were generated from the sale of Environmental Attributes. These government economic incentives could be reduced or eliminated altogether, or the categories of renewable energy qualifying for such government economic incentives could be changed. These renewable energy program incentives are subject to regulatory oversight and could be administratively or legislatively changed in a manner that could adversely affect our operations. Further, the generation of LCFS credits on our dairy farm project is expected to increase the percentage of our revenues generated from Environmental Attributes. Reductions in, changes to, or eliminations or expirations of governmental incentives could result in decreased demand for, and lower revenues from, our projects. Changes in the level or structure of the RPS of a state for electricity could also result in a decline in our revenues or decreased dem…
Excerpt shortened here; the source contains the full paragraph.
Previous wording
Our operations are subject to various federal, state and local EHS laws and regulations, including those relating to the release, emission or discharge of materials into the air, water and ground, the generation, storage,
Current wording
Our operations are subject to various federal, state, and local EHS laws and regulations, including those relating to the release, emission or discharge of materials into the air, water and ground, the generation, storage, handling, use, transportation and disposal of hazardous materials and wastes, the health and safety of our employees and other persons, and the generation of RINs and LCFS credits.
Previous wording
Our operations inherently risk incurring significant environmental costs and liabilities due to the need to manage waste from our processing facilities. Spills or other releases of regulated substances, including spills and releases that occur in the future, could expose us to material losses, expenditures and liabilities under applicable environmental laws, rules and regulations. Under certain of such laws and regulations, we could be held strictly liable for the removal or remediation of previously released materials or property contamination, regardless of whether we were responsible for the release or contamination and even if our operations met previous standards in the industry at the time they were conducted. In connection with certain acquisitions, we could acquire, or be required to provide indemnification against, environmental liabilities that could expose us to material losses. In addition, claims for damages to persons or property, including natural resources, may result from the EHS impacts of our operations. Our insurance may not cover all environmental risks and costs or may not provide sufficient coverage if an environmental claim is made against us.
Current wording
Our operations inherently risk incurring significant environmental costs and liabilities due to the need to manage waste from our processing facilities. Spills or other releases of regulated substances, including spills and releases that occur in the future, could expose us to material losses, expenditures and liabilities under applicable environmental laws, rules and regulations. Under certain of such laws and regulations, we could be held strictly liable for the removal or remediation of previously released materials or property contamination, regardless of whether we were responsible for the release or contamination and even if our operations met previous standards in the industry at the time they were conducted. In connection with certain acquisitions, we could acquire, or be required to
Previous wording
New laws, changes to existing laws, new interpretations of existing laws, increased governmental enforcement of environmental laws or other developments could require us to make significant additional expenditures. Continued government and public emphasis on environmental issues can be expected to result in increased future investments for environmental controls at our plants. Present and future environmental laws and regulations, and interpretations of those laws and regulations, applicable to our
Current wording
New laws, changes to existing laws, new interpretations of existing laws, increased governmental enforcement of environmental laws or other developments could require us to make significant additional expenditures. Continued government and public emphasis on environmental issues can be expected to result in increased future investments for environmental controls at our plants under federal or state law. Present and future federal and state environmental laws and regulations, and interpretations of those laws and regulations, applicable to our operations, more vigorous enforcement policies and discovery of currently unknown conditions may require substantial expenditures that could have a material adverse effect on our results of operations and financial condition. In January 2025, President Trump’s Putting America First in International Environmental Agreements executive order withdrew the United States from the United Nations Framework Convention on Climate Change’s (UNFCCC) Paris Agreement, which aims to reduce net greenhouse gas emissions by 61% below 2005 levels by 2030. This order also withdrew the United States from any similar climate-related agreements made under the UNFCCC. The stated purpose of Trump’s Initial Rescissions of Harmful Executive Orders and Actions executive order is to retract certain practices of President Biden, including those addressing public health and the environment, the climate crisis and climate-related financial risks. The order rescinds identified initiatives related to environmental justice, clean energy and electric vehicles, and energy and infrastructure. These executive orders present risks to federal incentives available to promote renewable energy, as can be seen in the Unleashing American Energy executive order signed by President Trump that explicitly calls for an immediate pause of the disbursement of funds under the IRA and the Infrastructure Investment and Jobs Act, both of which contain renewable energy incentives.
Previous wording
Parties with an interest in other energy sources, including lawmakers, regulators, policymakers, environmental and advocacy organizations or other activists may invest significant time and money in efforts to delay, repeal or otherwise negatively influence regulations and programs that promote renewable energy. Many of these parties have substantially greater resources and influence than we have. Further, changes in U.S. federal, state or local political, social or economic conditions, including a lack of legislative focus on these programs and regulations, could result in their modification, delayed adoption or repeal. Any failure to adopt, delay in implementing, expiration, repeal or modification of these programs and regulations, or the adoption of any programs or regulations that encourage the use of other energy sources over renewable energy, could adversely affect our business, financial condition and results of operations.
Current wording
Parties with an interest in other energy sources, including lawmakers, regulators, policymakers, environmental and advocacy organizations or other activists may invest significant time and money in efforts to delay, repeal or otherwise negatively influence regulations and programs that promote renewable energy. Many of these parties have substantially greater resources and influence than we have. Further, changes in U.S. federal, state or local political, social or economic conditions, including a lack of legislative focus on these programs and regulations, could result in their modification, delayed adoption or repeal. Any failure to adopt, delay in implementing, expiration, repeal or modification of these programs and regulations, or the adoption of any programs or regulations
Previous wording
Certain persons, associations and groups could oppose renewable energy projects in general or our projects specifically, citing, for example, misuse of water resources, landscape degradation, land use, food scarcity or price increase and harm to the environment. Moreover, regulation may restrict the development of renewable energy plants in certain areas. In order to develop a renewable energy project, we are typically required to obtain, among other things, environmental impact permits or other authorizations and building permits, which in turn require environmental impact studies to be undertaken and public hearings and comment periods to be held during which any person, association or group may oppose a project. Any such opposition may be taken into account by government officials responsible for granting the relevant permits, which could result in the permits being delayed or not being granted or being granted solely on the condition that we carry out certain corrective measures to the proposed project. Opposition to our projects’ requests for permits or successful challenges or appeals to permits issued for our projects could adversely affect our operating plans.
Current wording
Certain persons, associations and groups could oppose renewable energy projects in general or our projects specifically, citing, for example, misuse of water resources, landscape degradation, land use, food scarcity or price increase and harm to the environment. Moreover, regulation may restrict the development of renewable energy plants in certain areas. In order to develop a renewable energy project, we are typically required to obtain, among other things, environmental impact permits or other authorizations and building permits, which in turn require environmental impact studies to be undertaken and public hearings and comment periods to be held during which any person, association or group may oppose a project. Any such opposition may be considered by government officials responsible for granting the relevant permits, which could result in the permits being delayed or not being granted or being granted solely on the condition that we carry out certain corrective measures to the proposed project. Opposition to our projects’ requests for permits or successful challenges or appeals to permits issued for our projects could adversely affect our operating plans.
Previous wording
-24- manage the capacity that we expect from our projects in our anticipated timeframes, it could adversely affect our business, financial condition and results of operations.
Current wording
-25- manage the capacity that we expect from our projects in our anticipated timeframes, it could adversely affect our business, financial condition and results of operations.
Previous wording
The market for renewable energy is influenced by U.S. federal, state and local government regulations and policies concerning renewable energy. These regulations and policies are continuously being modified, which could result in a significant future reduction in the potential demand for renewable energy, including RINs, RECs and LCFS credits, renewable energy project development and investments. Renewable Fuel Standards for 2023 through 2025 remain subject to finalization. Any new government regulations applicable to our renewable energy projects or markets for renewable energy may result in significant additional expenses or related development costs and, as a result, could cause a significant reduction in demand for our renewable energy. For additional information on regulatory developments, see “Item 7A.—Management’s Discussion and Analysis of Financial Condition and Results of Operations —Key Trends—Regulatory, Environmental and Social Trends.”
Current wording
The market for renewable energy is influenced by U.S. federal, state and local government regulations and policies concerning renewable energy. These regulations and policies are continuously being modified, which could result in a significant future reduction in the potential demand for renewable energy, including RINs, RECs and LCFS credits, renewable energy project development and investments. For example, on December 12, 2024, EPA proposed a partial waiver of 2024 Cellulosic Biofuel Volume Requirements due to the projected shortfall of D3 RINs available to meet the 2024 RVO. This proposal is still pending, and, with a new presidential administration, it is unknown when this proposed rule will be finalized (if at all) in 2025. Any new government regulations applicable to our renewable energy projects or markets for renewable energy may result in significant additional expenses or related development costs and, as a result, could cause a significant reduction in demand for our renewable energy. For additional information on regulatory developments, see “Item 7A.—Management’s Discussion and Analysis of Financial Condition and Results of Operations —Key Trends—Regulatory, Environmental and Social Trends.”
Previous wording
We are required to register an RNG project with the EPA and relevant state regulatory agencies. Further, we qualify our RINs through a voluntary Quality Assurance Plan, which typically takes from three to five months from first injection of RNG into the commercial pipeline system. Although no similar qualification process currently exists for LCFS credits, we expect such a process to be implemented and would expect to seek qualification on a state-by-state basis under such future programs. Changes to the LCFS program require annual verification of the CI score assigned to a project. Annual verification could significantly affect the profitability of a project, particularly in the case of a livestock farm project. Delays in obtaining registration, RIN qualification, and any future LCFS credit qualification, or CI rescoring through CARB annual audits, of a new project could delay future revenues from the project and could adversely affect our cash flow. Further, we typically make a large investment in the project prior to receiving the regulatory approval and RIN qualification. By registering each RNG project with the EPA’s voluntary Quality Assurance Plan, we are subject to quarterly third-party audits and semi-annual on-site visits of our projects to validate generated RINs and overall compliance with the RFS program. We are also subject to a separate third party’s annual attestation review. The Quality Assurance Plan provides a process for RIN owners to follow, for an affirmative defense to civil liability, if used or transferred Quality Assurance Plan verified RINs were invalidly generated. A project’s failure to comply could result in remedial action by the EPA, including penalties, fines, retirement of RINs, or termination of the project’s registration, any of which could adversely affect our business, financial condition and results of operations. For additional information on recent developments in this area, including the Pico facility’s CI score, see “Item 7A.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—Key Trends—Regulatory, Environmental and Social Trends.”
Current wording
We are required to register an RNG project with the EPA and relevant state regulatory agencies to generate Environmental Attributes. As a participant of the EPA's RFS program, we qualify our RINs through a voluntary Quality Assurance Plan, which typically takes from three to five months from first injection of RNG into the commercial pipeline system. The Biogas Regulatory Reform Rule ("BRRR") implemented changes to the RFS program effective January 1, 2025. The BRRR requires that all unseparated K3 RINs generated by the RNG producer on RNG volumes injected into the commercial pipeline distribution system only become valid for sale once they are separated with the support of dispensing statements by a registered dispenser or RIN separator. This process could result in delays to the RNG producer's receipt of the separated K2 RINs from the dispenser. This rule change could also result in a RNG producer's failure to generate K3 RINs for a given gas flow month if the registered biogas producer negligently fails to generate the necessary biogas tokens before the end of the subsequent gas flow month. Furthermore, although no similar qualification process currently exists for LCFS credits, we expect such a process to be implemented and would expect to seek qualification on a state-by-state basis under such future programs. Changes to the LCFS program require annual verification of the CI score assigned to a project. Annual verification could significantly affect the profitability of a project, particularly in the case of a livestock farm project. Delays in obtaining registration, RIN qualification, and any future LCFS credit qualification, or CI rescoring through CARB annual audits, of a new project could delay future revenues from the project and could adversely affect our cash flow. Further, we typically make a large investment in the project prior to receiving the regulatory approval and RIN qualification. BRRR now requires that all RNG producers register their projects and use a Quality Assurance Plan (QAP). QAPs required third-party audits and semi-annual on-site visits of projects to validate generated RINs and overall compliance with the RFS program. We are also subject to a separate third party’s annual attestation review. The QAP provides a process for RIN owners to follow, for an affirmative defense to civil liability, if used or transferred QAP verified RINs were invalidly generated. A project’s failure to comply could result in remedial action by the EPA, including penalties, fines, retirement of RINs, or termination of the project’s registration, any of which could adversely affect our business, financial condition and results of operations. For additional information on recent developments in this area, including the Pico facility’s CI score, see “Item 7A.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—Key Trends—Regulatory, Environmental and Social Trends.”
Previous wording
Furthermore, extreme weather events, such as lightning strikes, ice storms, tornados, extreme wind, hurricanes and other severe storms, wildfires and other unfavorable weather conditions or natural disasters, such as floods, fires, earthquakes, and rising sea-levels, could adversely affect the input and output commodities associated with the renewable energy sector. Such weather events or natural disasters could also require us to temporarily or permanently shut down the equipment associated with our renewable energy projects, such as our access to power and our power to biogas collection, separation and transmission systems, which would impede the ability of our projects to operate and decrease production levels and our revenue. Operational problems, such as degradation of our project’s equipment due to wear or weather or capacity limitations or outages on the electrical transmission network, could also affect the amount of energy that our projects are able to deliver. Any of these events, to the extent not fully covered by insurance, could adversely affect our business, financial condition and results of operations.
Current wording
Furthermore, extreme weather events, such as lightning strikes, ice storms, tornados, extreme wind, hurricanes and other severe storms, wildfires and other unfavorable weather conditions or natural disasters, such as floods, fires, earthquakes, and rising sea-levels, could adversely affect the input and output commodities associated with the renewable energy sector. Such weather events or natural disasters could also require us to temporarily or permanently shut down the equipment associated with our renewable energy projects, such as our access to power and our power to biogas collection, separation and transmission systems, which would impede the ability of our projects to operate and decrease production levels and our revenue. Operational problems, such as degradation of our project’s equipment due to wear or weather or capacity limitations or outages on the electrical transmission network, could also affect
Previous wording
Additionally, in August 2022 the Inflation Reduction Act of 2022 was signed into law, which appropriates significant federal funding for renewable energy initiatives and, for the first time ever, imposes a fee on GHG emissions from certain facilities in the oil and natural gas sector. The emissions fee and renewable and low carbon energy funding provisions of the law could accelerate the transition away from fossil fuels, which could in turn have an indirect adverse effect on our business and results of operations. Under the Biden Administration, it is anticipated that efforts by the EPA or other federal agencies to restrict GHG emissions will continue. Additionally, various states and groups of states have adopted or are considering adopting legislation, regulations or other regulatory initiatives that are focused on such areas as GHG cap and trade programs, carbon taxes, reporting and tracking programs, and restriction of emissions. As a result, there exists the possibility of executive orders being issued or federal legislation or regulatory initiatives being adopted that could result in further restrictions on fossil fuels and have a further indirect effect on the demand for renewable energy and our products.
Current wording
The United States has not implemented comprehensive federal climate change legislation. Furthermore, the new presidential administration froze all funding provided by the Bipartisan Infrastructure Law (“Infrastructure Investment and Jobs Act”) and Section 7 of the IRA. However, various states and groups of states have adopted or are considering adopting legislation, regulations or other regulatory initiatives that are focused on such areas as GHG cap and trade programs, carbon taxes, reporting and tracking programs, and restriction of emissions.
Previous wording
We currently operate seven renewable energy projects (six RNG projects and one Renewable Electricity project) on landfills operated by Waste Management and two RNG projects on landfills operated by Republic Services. Our projects located on Waste Management operated landfills represented 37.3% and 38.9% of our revenue in 2023 and 2022, respectively. Our projects located on Republic Services operated landfills represented 22.2% and 25.1% of our revenue in 2023 and 2022, respectively.We are dependent upon Waste Management and Republic Services to operate and maintain their landfill facilities and provide a continuous supply of waste for conversion to RNG and Renewable Electricity. Further, we consider our relationship with these landfill operators an important factor in our growth strategy for additional projects. In the event that we fall out of favor with either of these landfill
Current wording
We currently operate seven renewable energy projects (six RNG projects and one Renewable Electricity project) on landfills operated by Waste Management and two RNG projects on landfills operated by Republic Services. Our projects located on Waste Management operated landfills represented 38.5%, 37.3% and 38.9% of our revenue in 2024, 2023 and 2022, respectively. Our projects located on Republic Services operated landfills represented 24.6%, 22.2% and 25.1% of our revenue in 2024, 2023 and 2022, respectively. We are dependent upon Waste Management and Republic Services to operate and maintain their landfill facilities and provide a continuous supply of waste for conversion to RNG and Renewable Electricity. Further, we consider our relationship with these landfill operators an important factor in our growth strategy for additional projects. In the event that we fall out of favor with either of these landfill operators due to a dispute, problems with our operations at one of their facilities or otherwise, the landfill operator may seek to terminate the related project and be less inclined to work with us on future projects.
Previous wording
In 2023, sales to Valero, GE Warren and HF Sinclair represented approximately 22.0%, 11.7% and 11.7%, respectively of our operating revenue. For 2022, sales to ExxonMobil, Valero, and the City of Anaheim represented approximately 32.0%, 17.0%, and 7.6%, respectively of our operating revenues. Five customers made up approximately 70.7% and 69.0% of our accounts receivable as of December 31, 2023 and 2022, respectively. Revenues from our largest customers may fluctuate from time to time based on our customers’ business needs, market conditions or other factors outside of our control. If any of our largest customers terminates its relationship with us, such termination could adversely affect our revenues and results of operations.
Current wording
In 2024, sales to Valero, GE Warren, ExxonMobil and Mercuria represented approximately 17.6%, 15.7%, 13.8 and 11.8%, respectively of our operating revenue. In 2023, sales to Valero, GE Warren and HF Sinclair represented approximately 22.0%, 11.7% and 11.7%, respectively of our operating revenue. Five customers made up approximately 68.2% and 70.7% of our accounts receivable as of December 31, 2024 and 2023, respectively. Revenues from our largest customers may fluctuate from time to time based on our customers’ business needs, market conditions or other factors outside of our control. If any of our largest customers terminates its relationship with us, such termination could adversely affect our revenues and results of operations.
Previous wording
Our senior credit facility consists of an $80.0 million principal amount term loan, of which $64.0 remains outstanding as of December 31, 2023, and a $120.0 million revolving credit line, which is undrawn as of December 31, 2023. This facility may not be sufficient to meet our financial needs as our business grows. The senior credit facility matures in December 2026 and we may be unable to extend or replace it on acceptable terms, or at all. Furthermore, the credit agreement governing our facility (the “Amended Credit Agreement”) imposes business restrictions and contains other covenants that require us to meet specified financial ratios and financial tests. Under the Amended Credit Agreement, we are required to maintain:
Current wording
Our senior credit facility consists of an $80.0 million principal amount term loan, of which $56.0 remains outstanding as of December 31, 2024, and a $120.0 million revolving credit line, which is undrawn as of December 31, 2024. This facility may not be sufficient to meet our financial needs as our business grows. The senior credit facility matures in December 2026 and we may be unable to extend or replace it on acceptable terms, or at all. Furthermore, the credit agreement governing our facility (the “Amended Credit Agreement”) imposes business restrictions and contains other covenants that require us to meet specified financial ratios and financial tests. Under the Amended Credit Agreement, we are required to maintain:
Previous wording
a total leverage ratio of not more than 3.25 to 1.00 as of the end of any fiscal quarter from June 30, 2023 through June 29, 2024 and 3.00 to 1.00 after June 30, 2024.
Current wording
a total leverage ratio of not more than 3.00 to 1.00.
Previous wording
The Amended Credit Agreement is subject to customary events of default, and contemplates that we would be in default if, for any fiscal quarter (x) the average monthly D3 RIN price is less than $0.80 per RIN and (y) the consolidated EBITDA for such quarter is less than $6.0 million. Additional information regarding the senior credit facility and the Amended Credit Agreement can be found in Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Liquidity and Capital Resources.”
Current wording
The Amended Credit Agreement is subject to customary events of default, and contemplates that we would be in default if, for any fiscal quarter (x) the average monthly D3 RIN price is less than $0.80 per RIN and (y) the consolidated EBITDA for such quarter is less than $6.0 million. Additional information regarding the senior credit facility and the Amended Credit Agreement can be found
Previous wording
In accordance with GAAP, we capitalize certain expenditures and advances relating to our acquisitions, pending acquisitions, project development costs, interest costs related to project financing and certain energy assets. In addition, we have considerable unamortized assets. In 2023, we recorded impairment charges of $0.9 million of which $0.8 million related to specifically identified RNG machinery and feedstock processing equipment that were no longer in operational use and $0.1 related to obsolete REG critical spares. In 2022, we recorded impairment charges of $2.1 million related to our estimate of future cash flows not exceeding the carrying amount of a Renewable Electricity facility and discrete charges of $1.4 million and $1.1 million related to the ongoing development of the Montauk Ag Renewables and an asset component of an RNG facility. In 2021, we recorded impairment charges of $0.8 million related to the ongoing Renewable Electricity facility decommissioning and $0.4 million related to certain assets at one RNG facility. In addition, from time to time in future periods, we may be required to incur a charge against earnings in an amount equal to any unamortized capitalized expenditures and advances, net of any portion thereof that we estimate will be recoverable, through sale or otherwise, relating to: (i) any operation or other asset that is being sold, permanently shut down, impaired or has not generated or is not expected to generate sufficient cash flow; (ii) any pending acquisition that is not consummated; (iii) any project that is not expected to be successfully completed; and (iv) any goodwill or other intangible assets that are determined to be impaired. A material write-off or impairment change could adversely affect our ability to comply with the financial covenants under the Amended Credit Agreement, and otherwise adversely affect our business, financial condition and results of operations.
Current wording
In accordance with GAAP, we capitalize certain expenditures and advances relating to our acquisitions, pending acquisitions, project development costs, interest costs related to project financing and certain energy assets. In addition, we have considerable unamortized assets. In 2024, we recorded impairment charges of $1.6 million of which $1.0 related to RNG and REG assets that were deemed obsolete or inoperable for current operations, $0.3 million related to an REG site that ceased operations and was subsequently sold, and $0.3 related to REG assets following initial startup testing failures for one of our construction work in progress sites. In 2023, we recorded impairment charges of $0.9 million of which $0.8 million related to specifically identified RNG machinery and feedstock processing equipment that were no longer in operational use and $0.1 related to obsolete REG critical spares. In 2022, we recorded impairment charges of $2.1 million related to our estimate of future cash flows not exceeding the carrying amount of a Renewable Electricity facility and discrete charges of $1.4 million and $1.1 million related to the ongoing development of the Montauk Ag Renewables and an asset component of an RNG facility. In addition, from time to time in future periods, we may be required to incur a charge against earnings in an amount equal to any unamortized capitalized expenditures and advances, net of any portion thereof that we estimate will be recoverable, through sale or otherwise, relating to: (i) any operation or other asset that is being sold, permanently shut down, impaired or has not generated or is not expected to generate sufficient cash flow; (ii) any pending acquisition that is not consummated; (iii) any project that is not expected to be successfully completed; and (iv) any goodwill or other intangible assets that are determined to be impaired. A material write-off or impairment change could adversely affect our ability to comply with the financial covenants under the Amended Credit Agreement, and otherwise adversely affect our business, financial condition and results of operations.
Previous wording
We are required to comply with the SEC’s rules implementing Sections 302 and 404 of the Sarbanes-Oxley Act, which require management to certify financial and other information in our quarterly and annual reports and provide an annual management report on the effectiveness of controls over financial reporting. As an emerging growth company, our independent registered public accounting firm will not be required to formally attest to the effectiveness of our internal controls over financial reporting pursuant to
Current wording
We are required to comply with the SEC’s rules implementing Sections 302 and 404 of the Sarbanes-Oxley Act, which require management to certify financial and other information in our quarterly and annual reports and provide an annual management report on the effectiveness of controls over financial reporting. As an emerging growth company, our independent registered public accounting firm will not be required to formally attest to the effectiveness of our internal controls over financial reporting pursuant to Section 404 until the date we are no longer an emerging growth company. At such time, our independent registered public accounting firm may issue a report that is adverse in the event that it is not satisfied with the level at which our controls are documented, designed or operating.
Previous wording
capital through the sale of additional equity securities. Many of our existing equity holders have substantial unrecognized gains on the value of the equity they hold and may take steps to sell their shares or otherwise secure the unrecognized gains on those shares. Additionally, pursuant to the terms of the Fourth Amended and Restated Promissory Note, MNK is required to use the proceeds from any sale of the 976,623 shares of our common stock pledged as security for MNK’s loan obligations to repay the amounts due under the Note. These sales may have a downward impact on the prevailing market price of our common stock. The maturity of the loan has been extended until 2033 but MNK will continue to evaluate options to complete the sale of these shares including but not limited to register sale or underwritten offering in the US or direct sale to a South African investor. We also have default provisions in the underlying note whereby MNK can satisfy the note by delivering the shares back to us as permitted by applicable law. We are unable to predict the timing of or the effect that such sales, by MNK or by other shareholders, may have on the prevailing market price of our common stock.
Current wording
Sales of a substantial number of shares of our common stock in the public market, or the perception that these sales might occur, could depress the market price of our common stock and could impair our ability to raise capital through the sale of additional equity securities. Many of our existing equity holders have substantial unrecognized gains on the value of the equity they hold and may take steps to sell their shares or otherwise secure the unrecognized gains on those shares. Additionally, pursuant to the terms of the Fourth Amended and Restated Promissory Note, MNK is required to use the proceeds from any sale of the 976,623 shares of our common stock pledged as security for MNK’s loan obligations to repay the amounts due under the Note. These sales may have a downward impact on the prevailing market price of our common stock. The maturity of the loan has been extended until 2033 but MNK will continue to evaluate options to complete the sale of these shares including but not limited to register sale or underwritten offering in the US or direct sale to a South African investor. We also have default provisions in the underlying note whereby MNK can satisfy the note by delivering the shares back to us as permitted by applicable law. We are unable to predict the timing of or the effect that such sales, by MNK or by other shareholders, may have on the prevailing market price of our common stock.
Previous wording
Competition for qualified highly skilled personnel can be strong, and we cannot assure you that we will be successful in attracting or retaining such personnel now or in the future. Any inability to recruit, develop and retain qualified employees may result in high employee turnover and may force us to pay significantly higher wages, which may harm our profitability. Additionally, we do not carry key personnel insurance for any of our management executives, and the loss of any key employee or our inability to recruit, develop and retain these individuals as needed, could adversely affect our business, financial condition and results of operations.
Current wording
Competition for qualified highly skilled personnel can be strong, and we cannot assure you that we will be successful in attracting or retaining such personnel now or in the future. Any inability to recruit, develop and retain qualified employees may result in high employee turnover and may force us to pay significantly higher wages, which may harm our profitability. Additionally, we do
Rearranged current paragraphs (5)
Current report — wording carried from elsewhere
-23- provide indemnification against, environmental liabilities that could expose us to material losses. In addition, claims for damages to persons or property, including natural resources, may result from the EHS impacts of our operations. Our insurance may not cover all environmental risks and costs or may not provide sufficient coverage if an environmental claim is made against us.
Current report — wording carried from elsewhere
-24- that encourage the use of other energy sources over renewable energy, could adversely affect our business, financial condition and results of operations.
Current report — wording carried from elsewhere
-26- the amount of energy that our projects are able to deliver. Any of these events, to the extent not fully covered by insurance, could adversely affect our business, financial condition and results of operations.
Current report — wording carried from elsewhere
-29- in Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Liquidity and Capital Resources.”
Current report — wording carried from elsewhere
-32- not carry key personnel insurance for any of our management executives, and the loss of any key employee or our inability to recruit, develop and retain these individuals as needed, could adversely affect our business, financial condition and results of operations.
Rearranged previous paragraphs (5)
Previous report — wording carried elsewhere
Landfills contain organic material whose decomposition causes the generation of gas consisting primarily of methane, which our RNG projects use to generate power or renewable natural gas, and carbon dioxide. The estimation of landfill gas production volume is an inexact process and dependent on many site-specific conditions, including the estimated annual waste volume, composition of waste, regional climate and the capacity and construction of the landfill. Production levels are subject to a number of additional risks, including a failure or wearing out of our or our landfill operators’, customers’ or utilities’ equipment; an inability to find suitable replacement equipment or parts; less than expected supply or quality of the project’s source of biogas and faster
Previous report — wording carried elsewhere
handling, use, transportation and disposal of hazardous materials and wastes, the health and safety of our employees and other persons, and the generation of RINs and LCFS credits.
Previous report — wording carried elsewhere
-28- operators due to a dispute, problems with our operations at one of their facilities or otherwise, the landfill operator may seek to terminate the related project and be less inclined to work with us on future projects.
Previous report — wording carried elsewhere
Section 404 until the date we are no longer an emerging growth company. At such time, our independent registered public accounting firm may issue a report that is adverse in the event that it is not satisfied with the level at which our controls are documented, designed or operating.
Previous report — wording carried elsewhere
Sales of a substantial number of shares of our common stock in the public market, or the perception that these sales might occur, could depress the market price of our common stock and could impair our ability to raise