What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-03-06.
0001830033-24-000029
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-02-27.
0000950170-25-028422
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 191 previous paragraphs and 204 current paragraphs.
82 unchanged; 47 reworded; 68 added; 55 removed; 7 previous and 7 current paragraphs rearranged.
Tables are not compared: 5 previous and 5 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (68)
Current report
PCT’s process includes the following steps:
Current report
Compounding is a step which can be used on a case-by-case basis. Compounding allows for the modification of the resin to meet the end-user’s qualifications with melt flow, flexibility, clarity and strength being some of the properties that can be tailored through compounding.
Current report
The Feedstock Evaluation Unit
Current report
The FEU is an 11,000 square foot facility located adjacent to the commercial line at the Ironton Facility with over 1 mile of stainless-steel piping. The facility was completed in July 2019 and has been producing PureFive™ resin since that time. The FEU is considered a pilot scale replica of the larger commercial line at the Ironton Facility.
Current report
Located on the same site as the FEU, PCT commenced construction in October 2020 of its first commercial-scale plant, the Ironton Facility. PCT commenced commissioning activities at the Ironton Facility in April 2023, and later in 2023, PCT achieved mechanical completion of the plant and commenced pellet production from post-industrial and post-consumer materials. The Ironton Facility is expected to have PureFive™ resin capacity of approximately 107 million pounds per year when fully operational. While the facility is currently operational, PCT is pacing production with the level of anticipated commercial sales, while working on improving reliability and product quality. During 2024, the Company initiated compounding operations to blend its resin with either post-industrial recycled material or virgin polypropylene, which is expected to improve product consistency and accelerate the product delivery to customers. Currently, PCT is focused on customer sampling and qualifications and believes that this will lead to meaningful future sales.
Current report
PCT has experienced intermittent mechanical challenges during the commissioning process including, but not limited to, limits in the rates at which certain contaminants can currently be removed from the purification process, as well as challenges with sustaining continuous operations. Recently, PCT has been focused on the recovery and removal of polyethylene and other solids (“CP2”), which impacts the ability to run higher volumes and produce consistent, high quality PureFive™ resin. PCT has modified the CP2 removal system to remove higher volumes of CP2 more quickly and believes these changes enable us to produce higher volumes of on-spec product. The Company is currently testing the system improvements at various operating conditions to validate the new limits.
Current report
The Research and Development Lab
Current report
The lease for the Company's research and development lab in Durham, North Carolina commenced in 2023 and the facility opened in 2024. The lab is instrumental in developing cutting-edge analytical techniques to characterize polymer-solvent interaction in supercritical fluids, advancing fundamental process understanding to target hard to recycle polypropylene materials, generating insights into process modifications that drive energy reduction and capital expenditure reductions for future plant sites, leveraging research and development analytical techniques and expertise to allow industries with traditionally low recycling rates to adopt recycled polypropylene material, and supporting zero-waste efforts by engaging third parties to utilize Co-Product 1 and CP2.
Current report
PCT has built a Feed PreP facility in Denver, Pennsylvania ("Denver Facility"), which began operating in October 2024, to provide the required mix and quality of feedstock necessary to meet its offtake requirements at the Ironton Facility.
Current report
On September 6, 2022, PCT received two separate notifications from the FDA with respect to the following two feedstock sources:
Current report
(i) Food grade post-industrial recycled feedstocks: an FDA LNO for approving Conditions of Use A – H and
Current report
(ii) Food-grade post-consumer recycled feedstock from stadiums: an FDA LNO for Conditions of Use E – G.
Current report
On June 11, 2024, the Company received an additional LNO from the FDA, which expands upon the previous LNO and allows use of PCT's PureFive™ resin (to the extent made from food grade post-consumer recycled material) in contact with all food types under FDA's Conditions of Use A through H.
Current report
$2.0 million, primarily as a result of the lease of the Denver PreP facility; and $0.6 million of other net increases partially offset by $3 million lower professional fees primarily related to engineering services related to the Ironton Facility in 2023.
Current report
The increase was attributable to $5.1 million of higher professional, legal, and public company expenses primarily related to the revenue bonds repurchase and subsequent resell and $1.5 million of increased insurance costs; partially offset by decreased employee costs of $3.1 million, primarily due to headcount reductions in 2023 and the related 2024 reduction in wages and bonuses; $0.5 million of decreased equity-based compensation, $0.8 million in reduced taxes and licensure expenses, and $0.5 million in other SG&A costs.
Current report
The decrease was attributable to fewer available-for-sale debt securities in 2024 as well as lower interest rates in the latter half of 2024.
Current report
Change in Loss on Debt Extinguishment
Current report
The increase is a result of the loss recorded on the repurchase of the Revenue Bonds in 2024. See additional discussion below under "Liquidity and Capital Resources".
Current report
During 2023 and 2024, PCT achieved mechanical completion of its Ironton facility and has focused on improving resin pellet production rates, overall reliability of the facility and product quality. Although we have commenced commercial operations, to date, we have only sold an immaterial amount of resin primarily for customer trials. PCT’s ongoing operations have, to date, been funded by a combination of equity financing through the issuance of units and debt financing through the issuance of various debt instruments.
Current report
The following is a summary of the components of our current liquidity. As of December 31, 2024, Restricted cash consisted primarily of certain amounts held in a restricted escrow account related to the Augusta purification facility project.
Current report
PCT has experienced intermittent mechanical challenges during the commissioning process including, but not limited to, limits in the rates at which certain contaminants can currently be removed from the purification process, as well as challenges with sustaining continuous operations. Recently, PCT has been focused on the recovery and removal of polyethylene and other solids (“CP2”), which impacts the ability to run higher volumes and produce consistent, high quality PureFive™ resin. PCT has modified the CP2 removal system to remove higher volumes of CP2 more quickly and continues to evaluate the facility’s production systems and their impact on overall production rates and product quality. PCT believes these and other changes will enable us to produce higher volumes of commercial-grade products.
Current report
On September 11, 2024, the Company entered into subscription agreements with certain investors pursuant to which it sold, in a private placement, approximately $90 million in the aggregate and before deducting fees and other estimated offering expenses of (i) Series A Preferred Stock, par value $0.001 per share ("Series A Preferred Stock"); (ii) Common Stock and (iii) Series C Warrants.
Current report
As of December 31, 2024, PCT has debt service and equipment finance payments of approximately $66.2 million due within one year after the date the consolidated financial statements are issued. Further, there are capital commitments of approximately $5.0 million related to final performance payments for the Ironton Facility. There are also other ongoing monthly costs associated with operating the Company and possible draws on the Revolving Credit Facility may be necessary.
Current report
In an effort to alleviate these conditions, PCT is currently performing certain operational enhancements that are expected to correct the production issues with the Ironton Facility. In addition, the Company is ramping up its commercialization efforts, which the Company believes should lead to meaningful sales going into 2025.
Current report
The $49.9 million increase in net cash used in operating activities for the year ending December 31, 2024 compared to the same period in 2023 was primarily attributable to higher cash payments for interest of $28.5 million(including $17.7 million paid for the green convertible notes and $5.9 million in outstanding interest paid in connection with the purchase of the Revenue Bonds in March 2024), an increase in cash payments related to operating expenses of$21.9 million primarily driven by increased operational site costs at the Ironton Facility, reflecting a full year of operations since becoming operational in 2023, as well as higher legal and professional consulting fees primarily related to the payout of legal settlements during 2024.
Current report
The $381.2 million decrease in net cash used in financing activities for the year ending December 31, 2024 compared to 2023 was primarily attributable to reductions in cash inflows of $225.0 million from debt offerings in 2023 and proceeds of $38.0 million from related party debt, and cash outflows of $253.2 million paid in 2024 to purchase the outstanding revenue bonds partially offset by $90 million in preferred transaction proceeds, $40 million from sale of revenue bonds to related parties, and $8.0 million from issuance of revenue bonds during 2024.
Current report
On March 5, 2024, PureCycle Technologies LLC, a Delaware limited liability company (the “Guarantor”), purchased $246.8 million in aggregate principal amount of Bonds Outstanding under the Indenture, of which $216.8 million in aggregate principal amount were Series 2020A Bonds, such that the Guarantor comprised the Majority Holders. The Purchase was determined to be an extinguishment of the underlying debt obligation due to PCO being a wholly owned subsidiary of the Guarantor. As of December 31, 2024, there were $117.6 million of outstanding Bonds that PCT intends to, and has the ability to, re-market based on the need for additional liquidity. The re-marketing process may require the addition of certain covenants to enhance the marketability of the purchased Bonds.
Current report
On October 25, 2024, SOPA, as Issuer, PCO, the Guarantor, PCTO Holdco and the Trustee entered into the Sixth Supplemental Indenture (the “Sixth Supplemental Indenture”) which amended certain provisions of the Indenture and Loan Agreements to include, among other things, certain financial covenants. The amendments were a requirement of the Bond Purchase Agreement. Amendments to the Indenture and Loan Agreement included, in relevant part, the following:
Current report
amending the definition of “Overall Coverage Requirement” to mean a ratio of at least 105% of (a) Net Income Available for Debt Service to (b) all obligations of PCO which are charges, liens, Indebtedness or encumbrances upon or payable from Gross Revenues, including but not limited to Senior Bonds, Parity Indebtedness and Subordinate Bonds, calculated at the end of each Fiscal Year, based upon Audited Financial Statements of the Guarantor;
Current report
amending the definition of “Senior Parity Coverage Requirement” to mean a Senior Debt Service Coverage Ratio equal to at least 125% for such Fiscal Year, calculated at the end of each Fiscal Year, based upon Audited Financial Statements of the Guarantor (Senior Debt Service Coverage Ratio means for any given period of time, the ratio of (a) Net Income Available for Debt Service to (b) the total of Maximum Annual
Current report
Debt Service of the Senior Bonds and any Senior Parity Indebtedness, all as determined in accordance with GAAP.);
Current report
amending the “Days Cash on Hand Requirement” to mean not less than 60 Days Cash on Hand for such Fiscal Year, to be tested commencing with the Fiscal Year ended December 31, 2026, and annually thereafter;
Current report
requiring PCO to produce sufficient annual Gross Revenues in order to meet the Senior Parity Coverage Requirement, the Overall Coverage Requirement, and the Days Cash on Hand Requirement for each Fiscal Year, beginning with the Fiscal Year ended December 31, 2026;
Current report
providing that an event of default shall not be deemed to have occurred should PCO fail to comply with the Senior Parity Coverage Requirement, the Overall Coverage Requirement, or the Days Cash on Hand Requirement, beginning with the Fiscal Year ended December 31, 2026, so long as PCO engages an Independent Consultant to make recommendations to PCO to meet those requirements and the Independent Consultant confirms that PCO has substantially complied with such recommendations; provided, however, an event of default will exist if (a) the Senior Parity Coverage Requirement ratio is less than 115% or if the Overall Coverage Requirement ratio is less than 100% for any Fiscal Year commencing with the Fiscal Year ended December 31, 2027, or (b) if PCO’s Days Cash on Hand is less than 30 Days Cash on Hand;
Current report
prohibiting PCO from making any distributions to its members prior to January 1, 2027, other than amounts due to the Company pursuant to the Shared Services Agreement, by and among the Company, PCT Managed Services LLC (a subsidiary of the Company), and PCO, and then made only if, among other things, the Senior Parity Coverage Requirement, the Overall Coverage Requirement and the Days Cash on Hand Requirement are each satisfied with respect to the Fiscal Year prior to the date on which the distribution is made, and there shall remain after such distribution no less than 60 Days Cash on Hand; and
Current report
including certain other customary default provisions.
Current report
Revenue Bonds Issued to Related Party
Current report
On May 7, 2024, PCT LLC and Pure Plastic LLC ("Pure Plastic") executed a bond purchase agreement (as subsequently amended and restated to reflect the appropriate denomination of bonds, the “Amended and Restated Bond Purchase Agreement”), whereby Pure Plastic purchased approximately $94.3 million in aggregate par amount of Bonds owned by PCT LLC (the “Related Party Bonds”), including (i) a portion of the Series 2020A Bonds, (ii) all of the Series 2020B Bonds, and (iii) all of the Series 2020C Bonds, at a purchase price of $800 per $1,000 principal amount of the Related Party Bonds. Affiliates of Pure Plastic are greater than 5% beneficial owners of the Company.
Current report
On May 10, 2024, Pure Plastic executed a Payoff and Release Letter (the “Payoff and Release Letter”), which memorialized the exchange of the Company’s obligations under the $40 million term loan provided to the Company pursuant to the Term Loan Credit Agreement (as defined below). The Company was also required to pay a 12% prepayment premium on the outstanding principal and interest paid in order to prepay the Term Loan Facility (the “Prepayment Premium”), plus certain expenses. The Company issued warrants (“Series B Warrants”) to Pure Plastic pursuant to the Series B Warrant Agreement to satisfy the Prepayment Premium (the “Series B Warrant Agreement”). Refer to Note 6 – Warrants for further discussion.
Current report
On May 28, 2024, PCT LLC and Pure Plastic executed the First Amendment to the Amended and Restated Bond Purchase Agreement (“First Amendment”) whereby Exhibit A to the Amended and Restated Bond Purchase Agreement was replaced with Exhibit A-3 to the First Amendment to facilitate the transfer by the Depository Trust Company of certain of the Related Party Bonds. The total amount of the Related Party Bonds and the cash due from Pure Plastic to PCT LLC remains the same. Except as summarized above and as set forth in the First Amendment, PCT LLC and Pure Plastic each acknowledged and reaffirmed the terms of the Amended and Restated Bond Purchase Agreement in the First Amendment.
Showing the first 40 of 68 passages. Open the source sections for the rest.
Removed paragraphs (55)
Previous report
PCT commenced commissioning activities at its first commercial-scale plant in Lawrence County, Ohio (referred to herein as the “Ironton Facility”), in April 2023, achieved mechanical completion of the plant and commenced pellet production from post-industrial and post-consumer materials later in 2023. On June 28, 2023, the independent construction monitor reviewing construction and commissioning of the Ironton Facility issued its certification confirming commencement of production of post-industrial recycled pellets, which was required to achieve a key milestone in connection with the Ironton Facility financing. The Ironton Facility leverages the existing infrastructure of PCT’s pilot facility known as the Feedstock Evaluation Unit (the “FEU”), which became operational in 2019, and the Ironton Facility is expected to have UPR resin capacity of approximately 107 million pounds/year when fully operational. PCT sold an immaterial amount of UPR resin in 2023 but has not yet reached significant continuous operational volumes. PCT has experienced intermittent mechanical challenges during the commissioning process including, but not limited to, limits in the rates at which certain contaminants can currently be removed from the purification process, as well as challenges with continuous operations of the pelletizing system for finished product. While these mechanical issues are not uncommon for first-of-its kind manufacturing facilities, the down-time needed to correct these issues is delaying the Ironton Facility reaching consistent sustainable production rates. We expect the Ironton Facility to be fully operational later in 2024.
Previous report
As of December 31, 2023, PCT anticipates that up to $12.5 million will be needed to complete the investment in the Ironton Facility, which relates to a performance guarantee payment due after successful completion of a performance testing milestone.
Previous report
The FDA confirmed receipt of the submission on September 13, 2021 and followed up with additional questions and requests for clarification in a letter received by PCT on January 7, 2022. PCT responded to the FDA’s questions on February 17, 2022.
Previous report
The increase was attributable to higher professional, legal, and public company expenses of $3.5 million primarily related to bondholder waiver negotiations and the AEDA transaction, higher insurance expenses of $1.4 million, and higher equity-based compensation of $0.7 million related to issuance of additional awards in 2023 and continued vesting of awards from previous years, offset by decreased employee costs of $3.6 million primarily due to reduction in bonus expense driven by lower expected attainment of organizational goals over the prior period, as well as a net $0.3 million decrease in other SG&A costs.
Previous report
The increase was attributable to higher interest earned on PCT’s investment portfolio and money market funds due to rising interest rates.
Previous report
In 2023, PCT commenced commercial operations and sold an immaterial amount of UPR resin but has not yet reached significant continuous operational volumes. PCT’s ongoing operations have, to date, been funded by a combination of equity financing through the issuance of units and debt financing through the issuance of various debt instruments. The following is a summary of the components of our current liquidity. The Debt Securities Available for Sale represent investment holdings in highly liquid debt securities and commercial paper with an average maturity of less than one year. The Restricted Cash is restricted in terms of use primarily based on the
Previous report
Loan Agreement and requires PureCycle: Ohio LLC, an Ohio limited liability company (“PCO”), to use the proceeds of the Revenue Bonds exclusively to construct and equip the Ironton Facility, fund a debt service reserve fund for the Series 2020A Bonds (as defined below), finance capitalized interest, and pay the costs of issuing the Revenue Bonds. On March 5, 2024, a subsidiary of the Company Purchased (as defined below) the majority of the outstanding Revenue Bonds. In connection with the Purchase, the Indenture (as defined below) was amended and supplemented and substantially all covenants and Events of Default (as defined below) contained in the Indenture, the Loan Agreement and certain of such other Financing Documents (as defined below) were eliminated. See “Management’s Discussion and Analysis of Financial Condition and Results of Operations – Liquidity and Capital Resources – Indebtedness – Revenue Bonds” for more information. Further, PCT placed funds in an escrow account to support certain initial construction commitments for the Augusta Facility. These funds are recorded in Restricted Cash below.
Previous report
PCT sold an immaterial amount of UPR resin in 2023. Due to intermittent mechanical challenges during the
Previous report
commissioning process of the Ironton Facility, the Ironton Facility has not yet reached the point of producing
Previous report
significant continuous operational volumes. While these mechanical issues are not uncommon for a first-of-its
Previous report
kind manufacturing facility, the downtime needed to correct these issues is a significant contributing factor to the delay of the Ironton Facility reaching the point of producing significant continuous operational volumes. We expect the Ironton Facility to be fully operational later in 2024.
Previous report
In 2023, PCT negotiated the Second Limited Waiver (as defined below) with the Revenue Bondholders to remedy the September Milestone Event of Default (as defined below) related to the Ironton Facility’s failure to meet the September Milestone – see Note 3 (“Notes Payable and Debt Instruments”) to the Notes to the Consolidated Financial Statements appearing elsewhere in this Annual Report on Form 10‑K for additional information. Pursuant to the Second Limited Waiver, the September Milestone Event of Default was waived, various Milestones were amended and extended and certain additional requirements were imposed upon PCT and its subsidiaries. PCO was unable to produce 4.45 million pounds of pellets from its feedstock for thirty consecutive days by December 31, 2023, and certain required performance testing of the Ironton Facility was not complete by February 28, 2024, each as required by the Second Limited Waiver, and therefore PCO entered a 90-day cure period after which point an Event of Default will be deemed to have occurred. Further, PCO expected to fail to meet certain annually calculated financial ratios as required. As described in further detail below, on March 5, 2024, a subsidiary of the Company Purchased the majority of the outstanding Revenue Bonds and, in connection with such Purchase substantially all covenants and Events of Default contained in the Indenture, including the potential Events of Defaults related to certain annually calculated financial ratios and missed milestones referenced herein, the Loan Agreement and certain of such other Financing Documents were eliminated. See “Management’s Discussion and Analysis of Financial Condition and Results of Operations - Liquidity and Capital Resources - Indebtedness - Revenue Bonds” for more information.
Previous report
As of December 31, 2023, PCT anticipates that up to $12.5 million will be needed to complete the investment in the Ironton Facility, which relates to a performance guarantee payment due after successful completion of a performance testing milestone. PCT also has other capital commitments of approximately $53.8 million related to long-lead equipment and pre-construction work for the Augusta Facility and $7.8 million for equipment and leases related to future Feed PreP and purification facilities, both in the U.S. and internationally. Moreover, there are interest payments of at least $38.0 million, as well as other ongoing monthly costs associated with managing the Company.
Previous report
The $29.4 million increase in net cash used in operating activities for the year ending December 31, 2023 compared to the same period in 2022 was primarily attributable to higher cash payments for production inventory of approximately $5.0 million, higher cash paid related to employee costs of approximately $4.5 million, increase in interest payments classified as operating cash flows of $9.1 million due to ceasing of interest capitalization on the Revenue Bonds in June 2023, $5.9 million in additional interest and security deposit payments related to an equipment financing liability, higher lease payments for operating facilities and equipment rentals of approximately $3.2 million, and an increase in cash payments related to operating expenses of $7.1 million primarily driven by an increase in operational site costs at the Ironton Facility, and $0.5 million other net operating cash outflows, partially offset by higher interest income of $5.9 million driven primarily by interest earned on the Company’s investment portfolio.
Previous report
The $24.5 million increase in net cash provided by financing activities for the year ending December 31, 2023 related to the same period in 2022 was primarily attributable to $285.1 million debt financing raised in 2023 compared to $250.0 million raised in 2022 related to proceeds from the 2022 PIPE Offering, lower share repurchase activity related to withholding on equity vesting of $0.3 million in 2023 compared to 2022, offset by $11.1 million in debt issuance costs and LOC fees related to new financing arrangements incurred in 2023 compared to equity issuance costs in 2022 of $0.8 million, as well as $0.6 million higher repayments on equipment financing in 2023 compared to 2022.
Previous report
On March 15, 2023, SOPA, the Trustee, PCT, PCTO Holdco LLC (the pledgor under an Equity Pledge and Security Agreement (as defined in the Indenture), pursuant to which the pledgor pledged certain interests to secure obligations of PCO under various Financing Documents relating to the Revenue Bonds and PCO (collectively, the “Company Parties”) entered into a Limited Waiver and First Supplemental Indenture (the “Limited Waiver”), supplementing the Indenture and amending the Loan Agreement and the amended and restated Guaranty (as defined in the Indenture), and pursuant to which the Holders (as defined in the Indenture) of a majority in aggregate principal amount of the Series 2020A Bonds outstanding (the “Majority Holders”) consented to the Limited Waiver, based on stated conditions, of a Specified Event of Default (as defined below) under the Indenture and the Loan Agreement.
Previous report
Under the terms of the Loan Agreement, PCO was required to cause the Ironton Facility to be completed by December 1, 2022. The Ironton Facility was not completed by that date due to a variety of challenges resulting from, among other things, the COVID-19 outbreak, the ongoing military conflict between Russia and Ukraine, and certain U.S. weather-related events (the “First Specified Event of Default”).
Previous report
Subject to the following conditions, the First Specified Event of Default is waived in exchange for PCO’s agreement to meet certain milestones toward completing the Ironton Facility, to deposit additional equity aggregating approximately $87.3 million with the Trustee for various purposes and to make certain other representations and warranties; provided, however, that any failure to comply with the terms of the Limited Waiver shall be an immediate Event of Default under the Indenture and Loan Agreement, which will be deemed to have occurred on January 2, 2023 with respect to any requirements to pay accrued and unpaid interest at the Default Rate.
Previous report
PCO has agreed to, among other things, achieve the following milestones (together, the “Milestones”): (i) closure by it or its direct or indirect parent entity of a financing transaction by March 31, 2023 that provides at least $150 million of working capital which may be used to support the Ironton Facility (which is satisfied by the closing of the Revolving Credit Facility); (ii) mechanical completion of the Ironton Facility by June 30, 2023; (iii) meet certain targeted production and performance targets during 2023; (iv) completion of the Ironton Facility by December 31, 2023; and (v) meet certain Ironton Facility pellet production targets by January 31, 2024 up to the Ironton Facility’s nameplate production capacity of 107 million pounds per year.
Previous report
The additional approximate $87.3 million of equity to be deposited with the Trustee is comprised of: (i) a deposit, by March 31, 2023, of $50 million in an account controlled by the Trustee; (ii) a deposit of approximately $25 million in the Equity Account of the Project Fund (as such terms are used in the Indenture) to fund remaining construction costs; (iii) an aggregate deposit of approximately $12.3 million into the Capitalized Interest Accounts (as defined in the Indenture) for the Bonds to pay capitalized interest on the Revenue Bonds through June 30, 2024. The Limited Waiver also requires that the Liquidity Reserve of approximately $50 million remain in the Liquidity Reserve Escrow Fund (as such term is used in the Indenture) for a period beyond the completion date of the Ironton Facility until certain production requirements have been met, and only thereafter may the balance in that fund be reduced based on certain conditions to $25 million, which must remain therein as long as Series 2020A Bonds remain outstanding. The Trustee also released $13.2 million from the Trustee account for the Revenue Bonds for use as part of the remaining investment in 2023 to complete the Ironton Facility in accordance with the Limited Waiver.
Previous report
As of September 30, 2023, the Ironton Facility failed to meet one such Milestone related to certain targeted production and performance targets, specifically, it failed to produce 4.45 million pounds of pellets from its feedstock in a single month by that date (“September Milestone”). This created an Event of Default under the Limited Waiver (the “September Milestone Event of Default”).
Previous report
As a result of the September Milestone Event of Default, on November 8, 2023, the Limited Waiver parties entered into a Limited Waiver and Second Supplemental Indenture (the “Second Limited Waiver”) pursuant to which the September Milestone Event of Default was waived, various Milestones were amended and extended and certain additional requirements were imposed upon PCT and its subsidiaries. The principal terms of the Second Limited Waiver, include, but are not limited to, the following:
Previous report
i. PCO will deposit an additional $50,000,000 (the “Trustee Account Deposit”) in the Trustee Account (as defined in the Limited Waiver), such that at least $100,000,000 (the “Aggregate Trustee Deposit”) shall be on deposit in the Trustee Account so long as any Revenue Bonds remain outstanding; provided, that if no Event of Default shall have occurred and be continuing, $50,000,000 of funds in the Trustee Account shall be released back to PCO upon satisfaction of the conditions set forth in Section 4.11(a) of the amended and restated Guaranty.
Previous report
ii. subject to there being no default or event of default and compliance with the other terms of the Second Limited Waiver, once per quarter, PCO (and the Guarantor, if applicable) may request the release to PCO (or the Guarantor, as applicable) of any investment income or earnings with respect to amounts in the Trustee Account and the Liquidity Reserve Escrow Fund that have been invested pursuant to the terms of the Indenture or the Liquidity Reserve Escrow Agreement (as applicable).
Previous report
iii. PCO shall have produced 4.45 million pounds of pellets from its feedstock for thirty consecutive days by December 31, 2023, which shall be evidenced by a certificate signed by an Authorized Representative of PCO and by the Construction Monitor certifying thereto and delivered to the Trustee;
Previous report
iv. performance testing of the Ironton Facility shall be complete by no later than February 28, 2024, which shall be evidenced by a certificate signed by an Authorized Representative of PCO and by the Construction Monitor certifying thereto and delivered to the Trustee;
Previous report
v. completion of the Project, including the acquisition, construction and equipping of the Ironton Facility, shall occur by no later than March 31, 2024, which shall be evidenced by a Certificate of Completion delivered to the Trustee;
Previous report
vi. PCO shall have produced 8.90 million pounds of pellets from its feedstock for thirty consecutive days by April 30, 2024, which shall be evidenced by a certificate signed by an Authorized Representative of PCO and by the Construction Monitor certifying thereto and delivered to the Trustee; and PCO shall have fully-ramped production at the Ironton Facility to nameplate capacity of 107 million pounds per year produced from its feedstock by no later than April 30, 2024, which shall be evidenced by a certificate signed by an Authorized Representative of PCO and by the Construction Monitor certifying thereto and delivered to the Trustee; and
Previous report
vii. the milestones referenced in (iii) – (vi) above (each, a “Revised Milestone”), shall replace the corresponding Milestones in the Limited Waiver. If PCO fails to meet any of the Revised Milestones, no Event of Default shall have occurred until PCO has failed to meet such Revised Milestone on the date that is ninety days after such Revised Milestone date; provided, however, that during such ninety-day period, PCO will pay interest from the date of the Revised Milestone requirement until the date that the Revised Milestone is satisfied at the Default Rate, and notwithstanding anything to the contrary in the Indenture, the Loan Agreement, the First Limited Waiver or the other Financing Documents or Bond documents (each as defined in the Indenture), PCO shall not have any access to any funds in the Trust Estate or otherwise held with the Trustee or a third-party (including, without limitation, funds in the Operating Revenue Escrow Fund and the Liquidity Reserve Escrow Fund (terms used as defined in the Indenture) pursuant to the Financing Documents until the date that such Milestone is satisfied.
Previous report
On February 10, 2024, PCO announced that it had agreed in principle with the Majority Holders that PCO or an affiliate of PCO would purchase (“Purchase”) from Holders for cash, upon the terms and subject to the conditions to be set forth in a definitive purchase agreement, by and among PCO and any Holder of Bonds that elects to be a party to the purchase agreement (each, a “Seller” and collectively, “Sellers”), any and all Bonds held by Sellers at a purchase price equal to $1,050 per $1,000 principal amount of the Bonds purchased, which amount is calculated in part to compensate the Sellers for default interest accruing from January 2, 2023 through December 31, 2023, as well as other accrued and unpaid interest from the last interest payment to, but not including, the Closing Date of the Purchase (as defined below) as consideration for consent to the Third Supplemental Indenture, by and among SOPA, PCO, the Guarantor, PCTO Holdco LLC and the Trustee (the “Third Supplemental Indenture”), which sets forth certain proposed amendments to the Bond Documents (“Proposed Amendments”) that will eliminate a substantial portion of the covenants, Events of Default, and other material terms and protections for the benefit of the Holders contained in the Indenture, the Loan Agreement, the Guaranty and other transaction documents that are permitted by the terms of the Indenture and/or the Loan Agreement to be eliminated with the consent of Majority Holders. The Purchase will occur only if Sellers include at least the Majority Holders and if Sellers consent to the Proposed Amendments. The Purchase Price shall not include any default or penalty interest accruing from January 1, 2024, that may otherwise be owed to Sellers, and each Seller will waive its respective right to such default or penalty interest as additional compensation for the Purchase.
Previous report
As of March 5, 2024, (the “Closing Date”) PCO and the Majority Holders closed on the Purchase Agreement and Consent (“Purchase Agreement”) comprising the definitive purchase agreement and, as additional consideration, the consent to the Third Supplemental Indenture, including the Proposed Amendments described therein. PureCycle Technologies LLC, an affiliate of PCO and the Guarantor under the Guaranty, will be the purchaser (“Purchaser”) of Bonds under the Purchase Agreement. The Purchase Agreement was executed by each Holder that elects to sell its Bonds to the Purchaser and by PCO and the Purchase was effective on the Closing Date.
Previous report
The Third Supplemental Indenture amended and supplemented the Indenture and certain of the other Financing Documents by, among other things and without limitation, eliminating substantially all covenants and Events of Default contained in the Indenture, the Loan Agreement and certain of such other financing documents including, but not limited, to the following changes:
Previous report
•elimination of the Milestones and Revised Milestones;
Previous report
•amendments to the definition of each of “Outstanding,” “Bonds Outstanding,” and “Outstanding Bonds” in the Indenture such that any Bonds owned by or on behalf of PureCycle or an affiliate of PureCycle or the Issuer or an affiliate of the Issuer will have the same approval voting or consent rights as other Holders;
Previous report
•elimination of the requirement to produce sufficient annual gross revenues in order to provide a Senior Debt Service Coverage Ratio (“DSCR”) equal to at least 150% for each fiscal year, and a ratio of at least 110% of net income available for debt service;
Previous report
•elimination of certain financial prerequisites that placed limitations on the issuance of additional senior parity indebtedness, subordinate indebtedness and non-parity indebtedness;
Previous report
•elimination of the DSCR requirement for certain equipment liens;
Previous report
•elimination of delivery of interim financial statements on a quarterly basis for PCO and the Guarantor;
Previous report
•elimination of requirement for an unqualified opinion of the independent certified public accountant for year-end financials for PCO;
Previous report
•elimination of quarterly operating statements and monthly reconciliation statements;
Showing the first 40 of 55 passages. Open the source sections for the rest.
Reworded paragraphs (47)
Previous wording
PureCycle Technologies, Inc. (“PCT” or “Company”) is a Florida-based corporation focused on commercializing a patented purification recycling technology (the “Technology”), originally developed by The Procter & Gamble Company (“P&G”), for restoring waste polypropylene into resin, called ultra-pure recycled (“UPR”) resin, which has nearly identical properties and applicability for reuse as virgin polypropylene. PCT has a global license for the Technology from P&G. PCT’s goal is to create an important new segment of the global polypropylene market that will assist multinational entities in meeting their sustainability goals, providing consumers with polypropylene-based products that are sustainable, and reducing overall polypropylene waste in the world’s landfills and oceans.
Current wording
PureCycle Technologies, Inc. (“PCT” or “Company”) is a Florida-based corporation focused on commercializing a patented dissolution recycling technology to physically separate the polymer from other plastics, color, and contaminants (the “Technology”), originally developed by The Procter & Gamble Company (“P&G”), for restoring waste polypropylene into resin, called PureFive™ resin, which has similar properties and applicability for reuse as virgin polypropylene. PCT has a global license for the Technology from P&G. In April 2023, we certified the Ironton Facility as mechanically complete. We expect to have capacity of approximately 107 million pounds per year when fully operational. Commissioning activities are ongoing, but the plant is not yet operating at the expected full capacity. PCT’s goal is to create an important new segment of the global polypropylene market that will assist multinational entities in meeting their sustainability goals, providing consumers with polypropylene-based products that are sustainable, and reducing overall polypropylene waste in the world’s landfills and oceans.
Previous wording
PCT’s process includes two steps: Feed Pre-Processing (“Feed PreP”) and the use of PCT’s recycling technology for purification. The Feed PreP step will collect, sort, and prepare polypropylene waste (“feedstock”) for purification. The purification step is a purification recycling process that uses a combination of solvent, temperature, and pressure to return the feedstock to near-virgin condition through a novel configuration of commercially available equipment and unit operations. The purification process puts the plastic through a physical extraction process using super critical fluids that both extract and filter out contaminants and purify the color, opacity, and odor of the plastic without changing the bonds of the polymer. By not altering the chemical makeup of the polymer, the Company is able to use significantly less energy and reduce production costs as compared to virgin resin.
Current wording
Purification is a dissolution recycling process that uses a combination of solvent, temperature, and pressure to return the feedstock to near-virgin condition through a novel configuration of commercially available equipment and unit operations. The purification process puts the plastic through a physical extraction process using supercritical fluids that both extract and filter out other plastics and additives to purify the color, opacity, and odor of the plastic without changing the bonds of the polymer. By not altering the chemical makeup of the polymer, the Company is able to use significantly less energy and reduce production costs as compared to virgin resin.
Previous wording
In July 2021, PCT reached an agreement with The Augusta Economic Development Authority (“AEDA”) to build its first U.S. facility with multiple lines for both Feed PreP and purification (“multi-line facility”) in Augusta, Georgia (the “Augusta Facility”). PCT expects the approximately 200-acre location to eventually include up to eight production lines, which are expected to collectively have UPR resin production capacity of approximately 1 billion pounds per year. When fully operational, each purification line at the Augusta Facility is expected to have annual production capacity of approximately 130 million pounds of PCT’s UPR resin. PureCycle has allocated 40% of the Augusta Facility output, for Lines 1 and 2, to existing customers and expects that additional offtake agreements will continue to be negotiated.
Current wording
In July 2021, PCT reached an agreement with the Augusta Economic Development Authority (“AEDA”) to build its first U.S. facility with multiple lines for both Feed PreP and purification (“multi-line facility”) in Augusta, Georgia (the “Augusta Facility”). PCT expects the approximately 200-acre location to eventually include up to eight production lines, which are expected to collectively have PureFive™ resin production capacity of approximately 1 billion pounds per year. When fully operational, each purification line at the Augusta Facility is expected to have annual production capacity of approximately 130 million pounds of PCT’s PureFive™ resin. PureCycle has allocated 40% of the Augusta Facility output for Lines 1 and 2 to existing customers and expects that additional offtake agreements will continue to be negotiated.
Previous wording
On June 30, 2023, PCT and the AEDA executed an Economic Development Agreement (“EDA”) related to the Company’s plans to construct the Augusta Facility. Pursuant to the EDA, PCT expects to receive certain property tax abatement benefits as well as certain other incentives, including site infrastructure development assistance (“Incentive Benefits”). In order to receive the Incentive Benefits under Phase One (as defined below) of the Augusta Project, PCT will be obligated to create 82 full-time jobs with investments of at least $440 million no later than December 31, 2026. Through December 31, 2023, PCT has invested approximately $84.9 million for pre-construction engineering and long-lead equipment for the benefit of Phase One investments. If PCT elects to activate the second phase of the Augusta Project, PCT will be required to create an additional 25 full-time jobs and investments of $295 million no later than December 31, 2028. To the extent PCT fails to achieve an average of 80% of the jobs and investment commitments in any year over the 20-years of each phase, PCT will be required to make a repayment to the AEDA of a pro rata portion of the total value of the Incentive Benefits received by PCT in such year.
Current wording
On June 30, 2023, PCT and the AEDA executed an Economic Development Agreement (“EDA”) related to the Company’s plans to construct the Augusta Facility. Pursuant to the AEDA, PCT expects to receive certain property tax abatement benefits as well as certain other incentives, including site infrastructure development assistance (“Incentive Benefits”). In order to receive the Incentive Benefits under Phase One (as defined below) of the Augusta Project, PCT will be obligated to create 82 full-time jobs with investments of at least $440 million no later than December 31, 2026. Through December 31, 2024, PCT has invested approximately $114.0 million for pre-construction engineering and long-lead equipment for the benefit of Phase One investments. If PCT elects to activate the second phase of the Augusta Project, PCT will be required to create an additional 25 full-time jobs and investments of $295 million no later than December 31, 2028. To the extent PCT fails to achieve an average of 80% of the jobs and investment commitments in any year over the 20-years of each phase, PCT will be required to make a repayment to the AEDA of a pro rata portion of the total value of the Incentive Benefits received by PCT in such year.
Previous wording
Also on June 30, 2023, PCT entered into a series of agreements with the AEDA to construct phase one (“Phase One”) of the Augusta Facility. PCT is leasing 150 acres of land (“Real Property”) owned by the AEDA and will construct buildings, building equipment, and other structures (the “Improvements”) on the land. PCT will also acquire and install the necessary processing, warehousing, and other equipment, as well as conveyors and pipelines (the “Equipment”, together with the Real Property and the Improvements, the “Augusta Project”). The Improvements and Equipment will be transferred to the AEDA and leased back by PCT. As noted above, PCT anticipates that the first portion of Phase One, will consist of one purification line and construction commenced prior to the end of 2023. Also as noted above, construction of the first purification line must be completed by December 31, 2026.
Current wording
Also on June 30, 2023, PCT entered into a series of agreements with the AEDA to construct phase one (“Phase One”) of the Augusta Facility. PCT is leasing 150 acres of land (“Real Property”) owned by the AEDA and will construct buildings, building equipment, and other structures (the “Improvements”) on the land. PCT will also acquire and install the necessary processing, warehousing, and other equipment, as well as conveyors and pipelines (the “Equipment”, together with the Real Property and the Improvements, the “Augusta Project”). The Improvements and Equipment will be transferred to the AEDA and leased back by PCT. As noted above, PCT anticipates that the first portion of Phase One will consist of one purification line. Also as noted above, construction of the first purification line must be completed by December 31, 2026.
Previous wording
At the end of 2023, the Company commenced site preparation activities, including debris removal and site stabilization activities, and continued with payments to vendors for certain long lead-time equipment. Pursuant to the EDA, PCT must also show continuous construction progress, with regard to the first purification line under the first phase of the Augusta Project during 2024 or risk losing certain future Incentive Benefits. Market conditions remain challenging and have created uncertainty as to the timing or likelihood of success of the currently anticipated project financing for the Augusta Facility. As a result, PCT is currently pursuing various structures for project financing of the Augusta Facility. While PCT remains confident in its ability to finance the Augusta Facility, it is limiting its expenses and adjusting its timeline in light of this uncertainty. If PCT is unable to raise additional debt or equity, when desired, or on terms favorable to PCT, PCT’s business, financial condition, and results of operations would be adversely affected.
Current wording
In November 2024, the Company commenced early works construction activities including site clearing and grading. When early works are successfully completed, expected next steps should include underground utility installation, piling, and foundations. Pursuant to the EDA, PCT must continue construction progress on the first purification line under the first phase of the Augusta Project during 2025 or risk losing certain future Incentive Benefits. While the Company believes it has satisfied the contractual obligations regarding financing and construction of Phase One to date, the AEDA believes that it could seek to terminate the lease if PCT does not demonstrate further progress on Phase One. Market conditions remain challenging and have created uncertainty as to the timing or likelihood of success of the currently anticipated project financing for the Augusta Facility. As a result, PCT is currently pursuing various structures for project financing of the Augusta Facility. While PCT remains confident in its ability to finance the Augusta Facility, it is limiting its expenses and adjusting its timeline in light of this uncertainty. If PCT is unable to raise additional debt or equity, when desired, or on terms favorable to PCT, PCT’s business, financial condition, and results of operations would be adversely affected.
Previous wording
PCT sees a robust pipeline of demand for its recycled polypropylene and PCT is seeing market acceptance of its “Feedstock+” pricing model for its UPR resin. The “Feedstock+” pricing model divides the market cost of feedstock by a set yield-loss and adds a fixed price, which effectively passes on the cost of feedstock and de-risks PCT’s operating margin volatility.
Current wording
PCT sees a robust pipeline of demand for its recycled polypropylene and PCT is seeing market acceptance of its “Feedstock+” pricing model for its PureFive™ resin. The Feedstock+ pricing model divides the market cost of feedstock by a set yield-loss and adds a fixed price, which effectively passes on the cost of feedstock and de-risks PCT’s operating margin volatility.
Previous wording
For the Ironton Facility, PCT’s feedstock price was linked, in part, to changes in the Chemical Market Analysis, the index for virgin polypropylene, in a price schedule that contained a fixed, collared price around an index price range, which was further adjusted based on the percentage of polypropylene in the feedstock supplied. For the Augusta Facility and future purification facilities, PCT plans to link the feedstock price, in part, to the price of a no. 5 plastic bale of polypropylene as reported by recyclingmarkets.net (“Feedstock Market Pricing”). PCT will procure both feedstock in line with Feedstock Market Pricing as well as low value feedstocks that can be processed by PCT, below Feedstock Market Pricing for the Augusta Facility.
Current wording
For the Ironton Facility, PCT’s feedstock price was linked, in part, to changes in the Chemical Market Analysis, the index for virgin polypropylene, a price schedule that contained a fixed, collared price around an index price range, which was further adjusted based on the percentage of polypropylene in the feedstock supplied. For the Augusta Facility and future purification facilities, PCT plans to link the feedstock price, in part, to the price of a #5 plastic bale of polypropylene as reported by recyclingmarkets.net (“Feedstock Market Pricing”). PCT will procure both feedstock in line with Feedstock Market Pricing as well as low value feedstocks that can be processed by PCT, below Feedstock Market Pricing for the Augusta Facility.
Previous wording
In conjunction with the Augusta Facility, PCT also plans to build and operate Feed PreP facilities in locations geographically near the feed sources to optimize PCT’s supply chain economics. During the third quarter of 2022, PCT experienced challenges obtaining the necessary water and sewer permits to construct its first planned Feed PreP facility in Central Florida. PCT is evaluating its available recourses to obtain these permits, as well as potential legal remedies with regard to its obligations for the remaining 8 years of its 11-year lease agreement for the Central Florida facility. PCT is also evaluating alternative preprocessing sites in other locations. Also, on August 24, 2022, PCT signed a lease for a future PreP facility in Denver, Pennsylvania, which is expected to be operationally ready in late 2024, provided we obtain the financing necessary for operational readiness. Throughout the second half of 2021, PCT developed a feedstock processing system with advanced sorting capabilities that can handle various types of plastics in addition to polypropylene (designated as no. 5 plastic). PCT’s enhanced sorting should allow PCT to process plastic bales between no. 1 and no. 7. PCT’s new Feed PreP facilities will extract polypropylene and ship it to PCT’s purification lines, while the non-polypropylene feed will be sorted, baled, and subsequently sold on the open market.
Current wording
PCT has installed a feedstock processing system with advanced sorting capabilities that can handle various types of plastics in addition to polypropylene (designated as #5 plastic). PCT’s enhanced sorting should allow PCT to process plastic bales between #1 and #7. PCT’s Feed PreP facilities extract polypropylene used in PCT’s purification process, while the non-polypropylene feed will be sorted, baled, and subsequently sold on the open market.
Previous wording
On September 10, 2021, PCT filed for a U.S. Food and Drug Administration (“FDA”) Letter of No Objection (“LNO”), for Conditions of Use A – H. Conditions of Use describe the temperature and duration at which a material should be tested to simulate the way the material is intended to be used. Conditions of Use C – H address many consumer product packaging requirements, including applications for hot filled and pasteurized, as well as room temperature, refrigerated and frozen applications. Generally speaking, Conditions of Use A and B relate to extreme temperature applications. The LNO submission also defines the feedstock sources for the Company’s planned commercial recycling process, and this LNO submission pertained to (i) food grade post-industrial recycled feedstocks and (ii) food grade curbside post-consumer recycled feedstocks.
Current wording
On September 10, 2021, PCT filed for a FDA LNO for Conditions of Use A – H. Conditions of Use describe the temperature and duration at which a material should be tested to simulate the way the material is intended to be used. Conditions of Use C – H address many consumer product packaging requirements, including applications for hot filled and pasteurized, as well as room temperature, refrigerated and frozen applications. Generally speaking, Conditions of Use A and B relate to extreme temperature applications. The LNO submission also defines the feedstock sources for the Company’s planned commercial recycling process, and this LNO submission pertained to (i) food grade post-industrial recycled feedstocks and (ii) food grade curbside post-consumer recycled feedstocks.
Previous wording
On January 17, 2023, the Company announced its first European purification facility will be in Antwerp, Belgium. On October 20, 2022, the Company executed a Joint Venture Agreement with SK geo centric Co., Ltd., to develop a UPR purification facility in Ulsan, South Korea. The parties will each hold an equal stake in the joint venture with completion of construction activities, pending necessary financing. The Company is also planning to expand its production capabilities into Asia through negotiation of joint ventures with Mitsui & Co. Ltd. in Japan for in-country production and sales. Future expansion is dependent on successful completion of project financing.
Current wording
On January 17, 2023, the Company announced its first European purification facility is planned to be in Antwerp, Belgium. The Company is also planning to expand its production capabilities into Asia through negotiation of joint ventures with Mitsui & Co. Ltd. in Japan for in-country production and sales. Future expansion is dependent on successful completion of project financing.
Previous wording
PCT generated an immaterial amount of revenue late in 2023 but has not yet reached significant continuous (i) operational volumes at the Ironton Facility or (ii) significant revenue generation. The Ironton Facility is expected to be fully operational later in 2024.
Current wording
PCT generated an immaterial amount of revenue during 2024 but has not yet reached significant continuous operational volumes at the Ironton Facility or significant revenue generation.
Previous wording
Selling, general and administrative expenses consist primarily of personnel-related expenses for our corporate, executive, finance and other administrative functions and professional services, including legal, audit and accounting services. We expect our selling, general, and administrative expenses to increase for the foreseeable future as we scale headcount with the growth of our business, and as a result of operating as a public company, including compliance with the rules and regulations of the SEC, legal, audit, additional insurance expenses, investor relations activities, and other administrative and professional services.
Current wording
Selling, general and administrative expenses consist primarily of personnel-related expenses for our corporate, executive, finance and other administrative functions and professional services, including legal, audit and accounting services. As our business grows, our selling, general, and administrative expenses may increase, and they may also increase as a result of operating as a public company, including compliance with the rules and regulations of the SEC, legal, audit, additional insurance expenses, investor relations activities, and other administrative and professional services.
Previous wording
The increase was attributable to higher depreciation expense related to assets supporting operations of $11.5 million due primarily to placing the Ironton Facility assets in service in the second quarter of 2023, increased operational site costs of $8.0 million related to commissioning and operating the Ironton Facility, higher employee costs of $5.5 million due primarily to increased headcount at the Ironton Facility, higher rent for operating facilities of $2.6 million, $0.5 million related to increased operational consulting due primarily to on-site third party assistance for Ironton Facility mechanical completion and commissioning activities, and $0.6 million of other net increases.
Current wording
The increase was attributable to higher depreciation expense related to assets supporting operations of $15.6 million due primarily to a full year of depreciation in 2024 after placing the Ironton Facility assets into service in the second quarter of 2023; increased operational site costs of $12.8 million related operating the Ironton Facility for a full year in 2024; increased employee costs of $2.3 million, increased rent for operating facilities of
Previous wording
The increase in research and development expenses was primarily due to $1.1 million increased employee costs related to higher headcount of employees aligned to research and development activities, $0.5 million increase in depreciation related to assets supporting research and development, and $0.6 million increase in operational site costs related to facilities used in research and development.
Current wording
The decrease in research and development expenses was primarily due to $0.3 million decreased research and development activities, $0.2 million decrease in operational site costs related to facilities used in research and development, partially offset by $0.2 million increase in rent and $0.1 million increase in employee costs related to higher headcount of employees aligned to research and development activities.
Previous wording
The increase was attributable to additional financing incurred in the second and third quarters of 2023, including closing of $250.0 million of green convertible senior notes in August 2023, as well as ceasing capitalization of interest on the Revenue Bonds beginning in June 2023 as the plant is now in service.
Current wording
The increase was attributable to additional financing incurred in the second and third quarters of 2023 and full year interest expense in 2024 related to these borrowings, including the closing of $250.0 million of green convertible senior notes in August 2023, as well as ceasing capitalization of interest on the Revenue Bonds beginning in June 2023 as the plant is now in service.
Previous wording
The increased benefit was attributable to the change in fair value of the Company’s liability-classified warrants, of which the primary drivers of the change in valuation related to changes in the underlying price of PCT’s common stock, as well as fluctuations in volatility and reduction in the warrant terms with the passage of time.
Current wording
The increased expense was attributable to the change in fair value of the Company’s liability-classified warrants, of which the primary drivers of the change in valuation related to changes in the underlying price of PCT’s common stock, as well as an increase in the number of warrants in 2024.
Previous wording
Refer to Item 7. “Management’s Discussion and Analysis of Financial Condition and Results of Operations” section contained in our Annual Report on Form 10-K for the fiscal year ended December 31, 2022 for the results of operations discussion for the fiscal year ended December 31, 2022 compared to the fiscal year ended December 31, 2021. This comparison was immaterially impacted by certain reclassificationsto conform with the report classifications for these prior periods.
Current wording
Refer to Item 7. “Management’s Discussion and Analysis of Financial Condition and Results of Operations” section contained in our Annual Report on Form 10-K for the fiscal year ended December 31, 2023 for the results of operations discussion for the fiscal year ended December 31, 2023 compared to the fiscal year ended
Previous wording
As of December 31, 2023, PCT had $121.6 million of Available Unrestricted Liquidity and had Restricted Cash of $229.1 million. On March 15, 2023, PCT entered into a $150.0 million revolving credit facility with Sylebra Capital (the “Revolving Credit Facility”). Borrowings under the Revolving Credit Agreement may be used for working capital, capital expenditures and other general corporate purposes. There are currently no borrowings under the Revolving Credit Facility.
Current wording
As of December 31, 2024, PCT had $15.7 million of Unrestricted Liquidity, and had Restricted Cash of $25.8 million. PCT also has a $200.0 million revolving credit facility with Sylebra Capital (the “Revolving Credit Facility”) that is currently unused and expires on March 31, 2026. Any future borrowings under the Revolving Credit Facility would accrue interest at 17.50%.
Previous wording
PCT believes that its current level of Unrestricted Available Liquidity is not sufficient to fund operations, outstanding commitments, and further its future growth plans. The conditions described above raise substantial doubt regarding PCT’s ability to continue as a going concern for a period of at least one year from the date of issuance of the consolidated financial statements included in this Annual Report on Form 10-K.
Current wording
PCT believes that its current level of unrestricted liquidity is not sufficient to fund operations, outstanding commitments, and further its future growth plans. The conditions described above raise substantial doubt regarding PCT’s ability to continue as a going concern for a period of at least one year from the date of issuance of the consolidated financial statements included in this Annual Report on Form 10-K.
Previous wording
In an effort to alleviate these conditions, PCT entered into two agreements. On March 5, 2024, a subsidiary of the Company Purchased 99% of the outstanding Revenue Bonds pursuant to the Purchase Agreement (as defined below). In connection with the Purchase, the Indenture was amended and supplemented and substantially all covenants and Events of Default contained in the Indenture, the Loan Agreement and certain of such other Financing Documents were eliminated. See “Management’s Discussion and Analysis of Financial Condition and Results of Operations – Liquidity and Capital Resources – Indebtedness – Revenue Bonds” for more information. The Purchase reduced unrestricted liquidity by $74.5 million and restricted liquidity by $184.6 million. Also, on March 1, 2024, PCT increased the Revolving Credit Facility from $150.0 million to $200.0 million, extended the maturity date to September 30, 2025, and obtained a carveout to permit the Company to purchase the Revenue Bonds, pursuant to an amendment to the Credit Agreement with the Company (the “Borrower”), PureCycle Technologies Holdings Corp. and PureCycle Technologies, LLC (the “Guarantors”), Sylebra Capital Partners Master Fund, LTD, Sylebra Capital Parc Master Fund, and Sylebra Capital Menlo Master Fund (collectively, the “Lenders”), and Madison Pacific Trust Limited (the “Administrative Agent” and “Security Agent”). Borrowings under the Revolving Credit Agreement may be used for working capital, capital expenditures and other general corporate purposes – see Note 3 (“Notes Payable and Debt Instruments”) to the Notes to the Consolidated Financial Statements appearing elsewhere in this Annual Report on Form 10-K for additional information. Further, PCT intends to and has the ability to re-market some or all of the Purchased Revenue Bonds based on the need for additional liquidity. The re-marketing process may require the addition of certain covenants to enhance the marketability of the Purchased Revenue Bonds. The ability to re-market the Purchased Revenue Bonds with any such additional new covenants would require a further amendment to, or waiver of, provisions included within the Revolving Credit Facility and Term Loan Credit Agreement. After considering management’s plans to mitigate these conditions, including adjustment of expenditure timing and execution of the amendment to the Sylebra Revolving Credit Facility, PCT believes this substantial doubt has been alleviated and it has sufficient liquidity to continue as a going concern for the next twelve months.
Current wording
Further, on March 5, 2024, PureCycle Technologies LLC ("PCT LLC") purchased 99% of the outstanding Revenue Bonds (as defined below). Since the purchase of the outstanding Bonds, PCT has, through a series of transactions described below, resold $116.8 million of Bonds at a purchase price of $800 per $1,000 principal amount. As of December 31, 2024, there were $117.6 million of outstanding Bonds that PCT intends to, and has the ability to, re-market based on the need for additional liquidity. The re-marketing process may require the addition of certain covenants to enhance the marketability of the purchased Bonds. The ability to re-market the purchased Bonds with any such additional new covenants would require a further amendment to, or waiver of, provisions included within the Revolving Credit Facility. Any borrowings under the Revolving Credit Facility would accrue interest at 17.50%.
Previous wording
PCT’s future capital requirements will depend on many factors, including the funding mechanism and construction schedule of the Augusta Facility and other anticipated facilities outside the United States, build-out of multiple Feed PreP facilities, funding needs to support other business opportunities, funding for general corporate purposes, and other challenges or unforeseen circumstances. As a low-revenue operating company, PCT continually reviews its cash outlays, pace of hiring, professional services and other spend, and capital commitments to proactively manage those needs in tandem with our Available Unrestricted Liquidity balance. For future growth and investment, PCT expects to seek additional debt or equity financing from outside sources, which it may not be able to raise on terms favorable to PCT, or at all. If PCT is unable to raise additional debt or sell additional equity when desired, or if PCT is unable to manage its cash outflows, PCT’s business, financial condition, and results of operations would be adversely affected. In addition, any financing arrangement may have potentially adverse effects on PCT and/or its stockholders. Debt financing (if available and undertaken) will increase expenses, must be repaid regardless of operating results and may involve restrictions limiting PCT’s operating flexibility. If PCT consummates an equity financing to raise additional funds, the percentage ownership of its existing stockholders will be reduced, and the new equity securities may have rights, preferences or privileges senior to those of the current holders of PCT’s common stock.
Current wording
PCT’s future capital requirements will depend on many factors, including the funding mechanism and construction schedule of the Augusta Facility and other anticipated facilities outside the United States, build-out of additional Feed PreP facilities, funding needs to support other business opportunities, funding for general corporate purposes, debt service, and other challenges or unforeseen circumstances. PCT continually reviews its cash outlays, pace of hiring, professional services and other expenses, and capital commitments to proactively manage those needs in tandem with our available unrestricted cash balance. For future growth and investment, PCT expects to seek additional debt or equity financing from outside sources, which it may not be able to raise on terms favorable to PCT, or at all. If PCT is unable to raise additional debt or sell additional equity when desired, or if PCT is unable to manage its cash outflows, PCT’s business, financial condition, and results of operations would be adversely affected. In addition, any financing arrangement may have potentially adverse effects on PCT and/or its stockholders. Debt financing (if available and undertaken) will increase expenses, must be repaid regardless of operating results and may involve restrictions limiting PCT’s operating flexibility. If PCT consummates an equity financing to raise additional funds, the percentage ownership of its existing stockholders will be reduced, and the new equity securities may have rights, preferences or privileges senior to those of the current holders of PCT’s Common Stock.
Previous wording
The $116.3 million decrease in net cash used in investing activities for the year ending December 31, 2023 compared to the same period in 2022 was attributable to $134.8 million lower investment purchases and $133.3 million lower capital expenditure payments, offset by $151.8 million of lower maturities and sales of investments.
Current wording
The $95.1 million decrease in net cash used in investing activities for the year ending December 31, 2024 compared to the same period in 2023 was attributable to $27.0 million lower held for sale investment purchases and $98.3 million lower capital expenditure payments, partially offset by $30.2 million of higher maturities and sales of investments.
Previous wording
On October 7, 2020, the Southern Ohio Port Authority (“SOPA”) issued certain revenue bonds (“Revenue Bonds”) pursuant to an Indenture of Trust dated as of October 1, 2020 (as amended, restated, supplemented or otherwise modified from time to time, the “Indenture”), between SOPA and UMB Bank, N.A., as Trustee (“Trustee”), and loaned the proceeds from their sale to PureCycle: Ohio LLC (“PCO”), an Ohio limited liability company and indirect wholly-owned subsidiary of PCT, pursuant to a Loan Agreement dated as of October 1, 2020, between SOPA and PCO (as amended, restated, supplemented or otherwise modified from time to time, the “Loan Agreement”), to be used to (i) acquire, construct and equip the Ironton Facility (referred to within the Loan Agreement as the “Ohio Phase II Facility” and, together with the FEU (referred to within the Loan Agreement as the “Phase I Facility”), the “Project”); (ii) fund a debt service reserve fund for the Series 2020A Bonds; (iii) finance capitalized interest; and (iv) pay the costs of issuing the Revenue Bonds. The Revenue Bonds were offered in three series, including (i) Exempt Facility Revenue Bonds (PureCycle Project), Tax-Exempt Series 2020A (“Series 2020A Bonds”); (ii) Subordinate Exempt Facility Revenue Bonds (PureCycle Project), Tax-Exempt Series 2020B (“Series 2020B Bonds”); and (iii) Subordinated Exempt Facility Revenue Bonds (PureCycle Project), Taxable Series 2020C (“Series 2020C Bonds”).
Current wording
On October 7, 2020, the Southern Ohio Port Authority (“SOPA”) issued certain revenue bonds (“Revenue Bonds”) pursuant to an Indenture of Trust dated as of October 1, 2020 (as amended, restated, supplemented or otherwise modified from time to time, the “Indenture”), between SOPA and UMB Bank, N.A., as Trustee (“Trustee”), and loaned the proceeds from their sale to PureCycle: Ohio LLC (“PCO”), an Ohio limited liability company and indirect wholly-owned subsidiary of PCT, pursuant to a Loan Agreement dated as of October 1, 2020, between SOPA and PCO (as amended, restated, supplemented or otherwise modified from time to time, the “Loan Agreement”), to be used to, among other things, acquire, construct and equip the Ironton Facility; fund a debt service reserve fund for the Series 2020A Bonds; finance capitalized interest; and pay the costs of issuing the Revenue Bonds.
Previous wording
•amendments extending the Outside Completion Date to December 31, 2030;
Current wording
amending the definition of “Outside Completion Date” to mean December 31, 2026;
Previous wording
On March 15, 2023, PCT entered into a $150 million revolving credit facility (the “Revolving Credit Facility”) pursuant to a Credit Agreement (the “Revolving Credit Agreement”) dated as of March 15, 2023, with PureCycle Technologies Holdings Corp. and PureCycle Technologies, LLC (the “Guarantors”), Sylebra Capital Partners Master Fund, LTD, Sylebra Capital Parc Master Fund, and Sylebra Capital Menlo Master Fund (collectively, the “Lenders”), and Madison Pacific Trust Limited (the “Administrative Agent” and “Security Agent”), which had an original maturity on June 30, 2024 and was subsequently extended. The Lenders and their affiliates are greater than 5% beneficial owners of PCT.
Current wording
On March 15, 2023, PCT entered into a $150 million revolving credit facility (the “Revolving Credit Facility”) pursuant to a Credit Agreement (as amended from time to time, the “Revolving Credit Agreement”) dated as of March 15, 2023, with PureCycle Technologies Holdings Corp. and PCT, LLC (the “Guarantors”), Sylebra Capital Partners Master Fund, LTD, Sylebra Capital Parc Master Fund, and Sylebra Capital Menlo Master Fund (collectively, the “Lenders”), and Madison Pacific Trust Limited (the “Administrative Agent” and “Security Agent”). The Lenders and their affiliates are greater than 5% beneficial owners of PCT.
Previous wording
On August 4, 2023, the Company entered into the Second Amendment to Credit Agreement, by and among the Company, as borrower, PureCycle Technologies, LLC and PureCycle Technologies Holdings Corp., as Guarantors, the lenders party thereto, and Madison Pacific Trust Limited, as administrative agent and as security agent (the “Second Amendment”), in connection with the Company’s $150 million Revolving Credit
Current wording
On August 4, 2023, the Company entered into the Second Amendment to Credit Agreement, by and among the Company, as borrower, PureCycle Technologies, LLC and PureCycle Technologies Holdings Corp., as Guarantors, the lenders party thereto, and Madison Pacific Trust Limited, as administrative agent and as security agent (the “Second Amendment”), in connection with the Company’s $150 million Revolving Credit Facility governed by the Revolving Credit Agreement, to extend the maturity date of the Revolving Credit Facility to March 31, 2025.
Previous wording
There were no funds drawn on the Revolving Credit Facility as of December 31, 2023. The up-front commitment fee and other related fees of $2.1 million are being amortized over the term of the contract. During 2023 there were $1.2 million and $0.9 million recorded in prepaid expenses and other current assets during March and September 2023, respectively.
Current wording
There were no funds drawn on the Revolving Credit Facility as of December 31, 2024. The up-front commitment fee and other related fees of $3.8 million are being amortized over the term of the contract.
Previous wording
In connection with the above, CSC has funded $19.8 million for purposes of procuring equipment from a Vendor, which had previously been ordered by the Company prior to entering into these agreements with CSC. CSC will lease this equipment back to the Company under a 36 month lease, which will commence when 1) the Company accepts delivery of the equipment at its operating location and 2) all final bills from Vendor are paid. The Company has determined that it did not relinquish control of the assets to the buyer-lessor under these arrangements. Therefore, the Company has accounted for this transaction as a failed sale-leaseback transaction whereby it has continued recording these assets in the consolidated balance sheet and also recorded a financing obligation for the consideration paid by the buyer-lessor. The Company currently expects the lease term to commence in 2024, and the repayment schedule below assumes payments under the 36 month term commence on December 1, 2024.
Current wording
In connection with the above, CSC has funded $20.3 million for purposes of procuring equipment from a Vendor, which had previously been ordered by the Company prior to entering into these agreements with CSC. CSC will lease this equipment back to the Company under a 36-month lease, which will commence when the Company accepts delivery of the equipment at its operating location and all final bills from Vendor are paid (the "Schedule Commencement Date"). The Company has determined that it did not relinquish control of the assets to the buyer-lessor under these arrangements. Therefore, the Company has accounted for this transaction as a failed sale-leaseback transaction whereby it has continued recording these assets in the Consolidated Balance Sheets and also recorded a financing obligation for the consideration paid by the buyer-lessor. The Company currently expects the lease term to commence in 2026 and the repayment schedule assumes payments under the 36-month commence on July 1, 2026.
Previous wording
On May 8, 2023, the Company entered into a $ 40.0 million Term Loan Facility pursuant to the Term Loan Credit Agreement dated as of May 8, 2023, among the Guarantors and Pure Plastic LLC (as Lender, Administrative Agent, and Security Agent), which matures on December 31, 2025. The Term Loan Credit Agreement was amended on August 21, 2023. Affiliates of the Lender are greater than 5% beneficial owners of the Company. Balances related to the Term Loan Credit Agreement are recorded within related party note payable in the consolidated balance sheets and, in certain instances, the Term Loan Credit Agreement is referred to as the “Related party note payable.”
Current wording
On May 8, 2023, the Company entered into a $40.0 million Term Loan Facility pursuant to the Term Loan Credit Agreement dated as of May 8, 2023, among the Guarantors and Pure Plastic LLC (as Lender, Administrative Agent, and Security Agent), which matures on December 31, 2025. The Term Loan Credit Agreement was amended on August 21, 2023. Affiliates of the Lender are greater than 5% beneficial owners of the Company. Balances related to the Term Loan Credit Agreement are recorded within related party note payable in the Consolidated Balance Sheets and, in certain instances, the Term Loan Credit Agreement is referred to as the “Related party note payable.”
Previous wording
The Term Loan Facility is structured as a single-draw, delayed draw term loan. The Lender funded the term loan on May 17, 2023 (the “Funding Date”). Amounts outstanding under the Term Loan Credit Agreement will bear interest at a variable annual rate equal to Term SOFR (as defined in the Term Loan Credit Agreement) in effect for such period plus an applicable margin. The applicable margin is equal to 7.5% and the interest rate for the outstanding term loan was 12.9% as of December 31, 2023. The Company is also required to pay, on the Funding Date, (i) a closing fee to the Lenders, equal to 2.00% times the aggregate principal amount of the term loans funded by the Lenders on the Funding Date, (ii) a commitment fee to the Lenders equal to 1.00% times the aggregate principal amount of each Lender’s commitments on the Funding Date, (iii) a syndication fee to the Administrative Agent equal to 0.50% times the aggregate commitments of the Lenders on the Funding Date and (iv) a monitoring fee equal to $200,000 to the Administrative Agent for the account of the Administrative Agent and the Security Agent on the Funding Date and each anniversary of the Funding Date until maturity of the term loan. Additionally, the term loan will be issued with a 5.00% original issue discount. Subject to timely prior written notice, payment of breakage fees, if any, and payment of a prepayment premium equal to (i) 12% if such prepayment occurs during the first year following the closing date or (ii) 8% thereafter, the Company may at any time and from time to time voluntarily prepay all or any portion of any outstanding borrowings. The Company incurred $3.4 million of interest cost during the year ended December 31, 2023. The interest due to date of $3.1 million was paid entirely in kind, which increased the principal amount of the Term Loan Facility by this amount (the “PIK Interest”). The Company has the contractual right to pay all interest payments in kind and may make this election for all interest payments for the duration of the Term Loan Facility. The repayment schedule presented in “Note 3 - Notes Payable and Debt Instruments” does not contemplate future PIK Interest.
Current wording
The Term Loan Facility was structured as a single-draw, delayed draw term loan. The Lender funded the term loan on May 17, 2023 (the “Funding Date”). Amounts outstanding under the Term Loan Credit Agreement will bear interest at a variable annual rate equal to Term SOFR (as defined in the Term Loan Credit Agreement) in effect for such period plus an applicable margin. The applicable margin is equal to 7.5% and the interest rate for the outstanding term loan was 12.9% as of December 31, 2023. The Company is also required to pay, on the Funding Date, (i) a closing fee to the Lenders, equal to 2.00% times the aggregate principal amount of the term loans funded by the Lenders on the Funding Date, (ii) a commitment fee to the Lenders equal to 1.00% times the aggregate principal amount of each Lender’s commitments on the Funding Date, (iii) a syndication fee to the Administrative Agent equal to 0.50% times the aggregate commitments of the Lenders on the Funding Date and (iv) a monitoring fee equal to $200,000 to the Administrative Agent for the account of the Administrative Agent and the Security Agent on the Funding Date and each anniversary of the Funding Date until maturity of the term loan. Additionally, the term loan will be issued with a 5.00% original issue discount. Subject to timely prior written notice, payment of breakage fees, if any, and payment of a prepayment premium equal to (i) 12% if such prepayment occurs during the first year following the closing date or (ii) 8% thereafter, the Company may at any time and from time to time voluntarily prepay all or any portion of any outstanding borrowings. The Company incurred $1.4 million of interest cost during the year ended December 31, 2024. The interest due through December 31, 2023 of $3.1 million was paid entirely in kind, which increased the principal amount of the Term Loan Facility by this amount (the “PIK Interest”). The Company has the contractual right to pay all interest payments in kind and may make this election for all interest payments for the duration of the Term Loan Facility. The repayment schedule presented in “Note 3 - Notes Payable and Debt Instruments” does not contemplate future PIK Interest.
Previous wording
On March 1, 2024, PCT amended the Term Loan Credit Agreement to (i) increase the amount available to the Company under the permitted indebtedness covenant basket for the Revolving Credit Facility from $150,000,000 to $200,000,000 and (ii) obtain a carve out to permit the Company to purchase the Revenue Bonds.
Current wording
On March 1, 2024, PCT increased the amount available under the Term Loan Credit Agreement's permitted indebtedness covenant basket for the Revolving Credit Facility from $150.0 million to $200.0 million and obtained a carveout to permit the Company to purchase the Revenue Bonds. Each of PureCycle Technologies Holdings Corp. and PCT LLC are subsidiaries of the Company.
Previous wording
On August 24, 2023, the Company completed the private offering of $250.0 million total aggregate principal amount of 7.25% Green Convertible Senior Notes due 2030 (the “Notes”). Each $1,000 principal amount at maturity of the Notes was issued at a price of $900. An amount equal to the difference between the issue price and the principal amount at maturity will accrete from the original issue date through August 15, 2027. The Notes are senior unsecured obligations of the Company. Entities affiliated with Sylebra Capital Management purchased $50.0 million aggregate principal amount at maturity of Notes.
Current wording
On August 24, 2023, the Company completed the private offering of $250.0 million total aggregate principal amount of 7.25% Green Convertible Senior Notes due 2030 (the “Initial Notes”). Each $1,000 principal amount at maturity of the Notes was issued at a price of $900. An amount equal to the difference between the issue price and the principal amount at maturity will accrete from the original issue date through August 15, 2027. The Notes are senior unsecured obligations of the Company. Entities affiliated with Sylebra Capital Management purchased $50.0 million aggregate principal amount at maturity of Notes.
Previous wording
The net proceeds from this offering, excluding any offering expenses, were approximately $218.5 million, after deducting the initial purchaser’s discounts and fees paid to our financial advisor. The Company intends to allocate an amount equal to the net proceeds from this offering to the financing and refinancing of recently completed and future Eligible Green Projects (as defined below) in the United States. In particular, the Company intends to allocate the net proceeds from this offering to make payments on certain long-lead items and fund initial outside battery limits engineering design work, both associated with a multi-line purification facility to be built in Augusta, Georgia. Pending such allocation, the Company intends to use the remaining net proceeds for general corporate purposes. As of December 31, 2023, the Company has allocated $209.0 million of the proceeds to Eligible Green Projects, which includes historical spend through December 31, 2023, related to Augusta purification lines 1 and 2, as well as the PreP facilities in process that will provide feedstock for the Augusta Facility. Funds remaining to allocate, as of December 31, 2023, are $9.5 million.
Current wording
The net proceeds from this offering, excluding any offering expenses, were approximately $218.5 million, after deducting the initial purchaser’s discounts and fees paid to our financial advisor. The Company intends to allocate an amount equal to the net proceeds from this offering to the financing and refinancing of recently completed and future Eligible Green Projects (as defined below) in the United States. In particular, the Company intends to allocate the net proceeds from this offering to (1) make payments on certain long-lead items (2) fund initial inside and outside battery limits engineering design work, all of which are associated with a multi-line purification facility to be built in Augusta, Georgia, (3) for certain feedstock preparation (“PreP”) equipment and (4) a research and development lab. Pending such allocation, the Company intends to use the remaining net proceeds for general corporate purposes.
Previous wording
“Eligible Green Projects” means: (i) investments in acquisitions of buildings; (ii) building developments or redevelopments; (iii) renovations in existing buildings; and (iv) tenant improvement projects, in each case, that have received, or are expected to receive, in the three years prior to the issuance of the Notes or during the term of the Notes, a Leadership in Energy and Environmental Design (LEED) Silver, Gold or Platinum certification (or environmentally equivalent successor standards).
Current wording
“Eligible Green Projects” means: investments in (i) acquisitions of buildings; (ii) building developments or redevelopments; (iii) renovations in existing buildings; and (iv) tenant improvement projects, in each case, that have received, or are expected to receive, in the three years prior to the issuance of the Notes or during the term of the Notes, a Leadership in Energy and Environmental Design (LEED) Silver, Gold or Platinum certification (or environmentally equivalent successor standards). Prior to issuing the Notes and as part of its overall business plan, the Company has focused on the value of the sustainability opportunities PureFive™ resin offers to support expanding a circular economy. To pursue those opportunities, the Company purchased equipment and commissioned design services for the Augusta Facility and PreP facilities that will enable the Company to advance circular economy adapted products, production technologies and processes, and/or research and development related to recycling waste polypropylene. We believe those legacy purchases and designs should complement the Company’s Eligible Green Projects development.
Previous wording
On March 14, 2023, PCT secured a surety bond in the amount of $25.0 million to provide financial assurance related to its performance under a certain vendor contract, which expires at the earlier of satisfaction of the obligation, termination of the related vendor contract, or one year from issuance (subject to renewal within one year). On February 14, 2024, PCT renewed the surety bond in the amount of $25.0 million and it will expire at the earlier of satisfaction of the obligation, termination of the related vendor contract, or one year from the renewal date, which is March 14, 2024.
Current wording
On March 14, 2023, PCT secured a surety bond in the amount of $25.0 million to provide financial assurance related to its performance under a certain vendor contract, which expires at the earlier of satisfaction of the obligation, termination of the related vendor contract, or one year from issuance (subject to renewal within one year). Effective March 14, 2024, PCT renewed the surety bond in the amount of $25.0 million. Effective July 1, 2024, the amount increased from $25.0 million to $45.9 million. Effective October 4, 2024, the amount decreased from $45.9 million to $8.1 million as a result of PCT funding a restricted escrow account. The surety bond will expire at the earlier of satisfaction of the obligation, termination of the related vendor contract, or December 31, 2025.
Previous wording
The Company evaluates the recoverability of long-lived assets when events and circumstances indicate that the assets may be impaired and the undiscounted net cash flows estimated to be generated by those assets are less than their carrying value. If the net carrying value exceeds the fair value, an impairment loss exists and is calculated based on either estimated salvage value or estimated orderly liquidation value.
Current wording
The Company evaluates the recoverability of long-lived assets when events and circumstances indicate that the assets may be impaired and the undiscounted net cash flows estimated to be generated by those assets are less than their carrying value. If the net carrying value exceeds the fair value, an impairment loss exists and is calculated as the amount by which the carrying amount of a long-lived asset or asset group exceeds its fair value.
Previous wording
During 2023, PCT identified certain impairment triggers relating to our asset group, but the undiscounted pre-tax cash flow analysis did not result in an impairment. Refer to Note 2 Summary of Significant Accounting Policies in the Consolidated Financial Statements. The undiscounted pre-tax cash flows were based on significant assumptions including management’s best estimates of the expected future cash flows, and the estimated useful lives of the asset group. These estimates required considerable judgment and are sensitive to changes in underlying assumptions such as future commodity prices, margins on UPR Resin, operating rates and capital expenditures including repairs and maintenance. As a result, there can be no assurance that the estimates and assumptions made for purposes of our impairment determination will prove to be an accurate prediction of the future.
Current wording
The assessment of impairment indicators and the recoverability of our capitalized assets require significant judgment including management's best estimates of the expected future cash flows and the estimated useful lives of the asset group. These estimates are sensitive to changes in underlying assumptions such as future commodity prices, margins on future resin sales, production rates, operating expenses, including repairs and maintenance, and capital expenditures. As a result, there can be no assurance that the estimates and assumptions made for purposes of our impairment determination will prove to be an accurate prediction of the future.
Previous wording
A summary of how each significant assumption was developed for our warrant liabilities is as follows:
Current wording
The risk-free interest rate over the warrant’s expected term. A summary of how each significant assumption was developed for our warrant liabilities is as follows:
Previous wording
The Company has determined that the Series A Warrants are a level 2 fair value measurement with the only input being the market price of its publicly-traded warrants.
Current wording
The Company has determined that the Series A Warrants are a level 2 fair value measurement with the only input being the market price of its publicly-traded warrants. The Company has determined that the RTI Warrants, Private Warrants, Series B Warrants, and Series C Warrants are a level 3 fair value measurement. Refer to Note 12 – Fair Value of Financial Instruments for further information.
Showing the first 40 of 47 pairs. Open the source sections for the rest.
Rearranged current paragraphs (7)
Current report — wording carried from elsewhere
Feed Pre-Processing (“Feed PreP”) collects, sorts, and prepare polypropylene waste (“feedstock”) for purification. The purification step is a dissolution process that uses a combination of solvent, temperature, and pressure to return the feedstock to near-virgin condition through a novel configuration of commercially available equipment and unit operations.
Current report — wording carried from elsewhere
In conjunction with the Denver Facility, PCT also plans to build and operate Feed PreP facilities in locations geographically near the feed sources to optimize PCT’s supply chain economics. During the third quarter of 2022, PCT experienced challenges obtaining the necessary water and sewer permits to construct its first planned Feed PreP facility in Central Florida. PCT is currently pursuing legal remedies with regard to its obligations for the remaining 8 years of its 11-year lease agreement for the Central Florida facility. PCT is also evaluating alternative preprocessing sites in other locations.
Current report — wording carried from elsewhere
December 31, 2022. This comparison was immaterially impacted by certain reclassificationsto conform with the report classifications for these prior periods.
Current report — wording carried from elsewhere
After considering management’s plans to mitigate these conditions, including operational progress and re-marketing of the Bonds, PCT believes this substantial doubt has been alleviated and it has sufficient liquidity to continue as a going concern for the next twelve months.
Current report — wording carried from elsewhere
The Revenue Bonds were offered in three series, including (i) Exempt Facility Revenue Bonds (PureCycle Project), Tax-Exempt Series 2020A (“Series 2020A Bonds” or "Senior Bonds"); (ii) Subordinate Exempt Facility Revenue Bonds (PureCycle Project), Tax-Exempt Series 2020B (“Series 2020B Bonds”); and (iii) Subordinated Exempt Facility Revenue Bonds (PureCycle Project), Taxable Series 2020C (“Series 2020C Bonds”).
Current report — wording carried from elsewhere
Borrowings under the Revolving Credit Agreement may be used for working capital, capital expenditures and other general corporate purposes.
Current report — wording carried from elsewhere
On March 1, 2024, PCT increased the Revolving Credit Facility from $150.0 million to $200.0 million, extended the maturity date to September 30, 2025 (which was further extended below), and obtained a carveout to permit the Company to purchase the Revenue Bonds, pursuant to an amendment to the Revolving Credit Agreement with PCT, the Guarantors, the Lenders, and Administrative Agent and Security Agent.
Rearranged previous paragraphs (7)
Previous report — wording carried elsewhere
Facility governed by the Revolving Credit Agreement, to extend the maturity date of the Revolving Credit Facility to March 31, 2025.
Previous report — wording carried elsewhere
On March 1, 2024, PCT increased the Revolving Credit Facility from $150.0 million to $200.0 million, extended the maturity date to September 30, 2025, and obtained a carveout to permit the Company to purchase the Revenue Bonds, pursuant to an amendment to the Credit Agreement with the Company (the “Borrower”), PureCycle Technologies Holdings Corp. and PureCycle Technologies, LLC (the “Guarantors”), Sylebra Capital Partners Master Fund, LTD, Sylebra Capital Parc Master Fund, and Sylebra Capital Menlo Master Fund (collectively, the “Lenders”), and Madison Pacific Trust Limited (the “Administrative Agent” and “Security Agent”). Borrowings under the Revolving Credit Agreement may be used for working capital, capital expenditures and other general corporate purposes – see Note 3 (“Notes Payable and Debt Instruments”) to the Notes to the Consolidated Financial Statements appearing elsewhere in this Annual Report on Form 10‑K for additional information.
Previous report — wording carried elsewhere
The Term Loan Credit Agreement contains representations, covenants and events of default that are customary for financing transactions of this nature. Events of default in the Term Loan Credit Agreement include, among others: (a) non-payment of principal, interest, fees or other amounts; (b) default of specific covenants; (c) breach of representations and warranties; (d) cross-defaults to other indebtedness in an amount greater than $1 million, subject to certain exceptions; (e) bankruptcy and insolvency proceedings; (f) inability to pay debts or attachment; (g) judgments; and (h) change of control. Upon the occurrence of an event of default, the Administrative Agent shall, at the request of, or may, with the consent of, the Required Lenders (as defined in the Term Loan Credit Agreement) accelerate all loans and exercise on behalf of itself and the Lenders all rights and remedies available to it and the Lenders under the Term Loan Credit Agreement and the other loan documents.
Previous report — wording carried elsewhere
Amounts outstanding under the Term Loan Credit Agreement are guaranteed by the Guarantors, and are secured by a security interest in substantially all of the assets of the Company. Subject to certain limited exceptions, any majority-owned direct or indirect subsidiaries of the Company formed after the closing date of the Term Loan Facility will also be required to guaranty the obligations under the Term Loan Credit Agreement and grant security interests in substantially all of their respective assets.
Previous report — wording carried elsewhere
On August 21, 2023, the Company amended the Term Loan Credit Agreement to (i) increase the amount available to the Company under the indebtedness covenant basket for offerings of unsecured convertible notes from $200,000,000 to $250,000,000 and (ii) make certain changes to the restricted payments definition and the restricted payments covenant in order to permit the Notes.
Previous report — wording carried elsewhere
d) The risk-free interest rate over the warrant’s expected term.
Previous report — wording carried elsewhere
For further information regarding PCT’s warrant liabilities, see Note 6 (“Warrants”) to the Notes to the Consolidated Financial Statements appearing elsewhere in this Annual Report on Form 10‑K.