Skip to main content

Contango ORE Inc

For the period ended Sep 30, 2024. Filed Nov 14, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2024 · Filed Nov 14, 2024

CTGO$15.55+4.5%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-06-30; filed 2024-08-13.

0000950170-24-096321

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2024-09-30; filed 2024-11-14.

0000950170-24-126724

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 91 previous paragraphs and 113 current paragraphs.

69 unchanged; 9 reworded; 34 added; 12 removed; 1 previous and 1 current paragraphs rearranged.

Tables are not compared: 0 previous and 1 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (34)

Current report

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report

Company announced that it had completed approximately 1,500 meters (5,000 ft.) of the planned 2024 surface drilling program at the Johnson Tract Project, which remained on budget and schedule.

Current report

On September 10, 2024,the Company received the approved “404” permit from the United States Army Core of Engineers authorizing proposed surface construction work in 2025-2029. This major permit was applied for and only covers work to establish a road form the Johnson Tract Camp to the proposed portal site and upgrades to the Johnson Tract Airfield.

Current report

Three Months Ended September 30, 2024 Compared to Three Months Ended September 30, 2023

Current report

Claim Rentals Expense. Claim rental expense primarily consists of State of Alaska rental payments and costs incurred to record annual labor documents. For the three months ended September 30, 2024 and 2023, claim rental expense were $0.2 million and $0.1 million respectively.

Current report

Exploration Expense. Exploration expense for the three months ended September 30, 2024 was $3.0 million compared to $1.1 million for the three months ended September 30, 2023. Current period exploration expense primarily relates to a 3,000 meter surface drill program at the Johnson Tract Project. The prior period exploration expense relates to care and maintenance work performed on the Lucky Shot Property.

Current report

General and Administrative Expense. General and administrative expense for the three months ended September 30, 2024 and 2023 was $2.6 million and $2.8 million, respectively. The Company’s general and administrative expense primarily relates to legal fees, regulatory fees, payroll and stock-based compensation expense.

Current report

Income / Loss from Equity Investment in the Peak Gold JV. The income from the Company’s equity investment in the Peak Gold JV for the three months ended September 30, 2024 was $28.5 million compared to a loss of $5.6 million for the same period in 2023. The Manh Choh project commenced production in July 2024, which generated income for the 2024 period. The capital contributions for the three months ended September 30, 2024 and 2023 were $4.0 million and $27.0 million, respectively. The capital contributions were higher for three months ended September 30, 2023 compared to September 30, 2024 as the Manh Choh project was in the development phase in 2023 and required capital for mine development and improvements as the Fort Knox mill facility. The Peak Gold JV issued a cash distribution of $19.5 million during the three month period ended September 30, 2024. No cash distributions were made for the same period in 2023. There were no suspended losses as of September 30, 2024.

Current report

Interest Expense. For the three months ended September 30, 2024 interest expense was $3.7 million related to the Queen's Road Capital Investment, Ltd. Debenture (the "Debenture") and interest expense related to the Company’s cumulative $58.0 million draw-down on the Facility. Prior year interest expense of $1.0 million included interest expense related to the Debenture and interest expense related to the Company's cumulative $20 million draw-down on the Facility. See Note 13 - Debt.

Current report

Metal Sales. For the three months ended September 30, 2024, the gain on metal sales was $0.9 million related to excess ounces that were purchased from the Peak Gold JV that were not delivered into the hedges and sold to the derivative counterparties. There were no metal sales for the three months ended September 30, 2023.

Current report

Loss on Derivative Contracts. Loss on derivative contracts for the three months ended September 30, 2024 was $28.8 million compared to $2.7 million for the three months ended September 30, 2023. The $28.8 million loss for the three month period of September 30, 2024 included a realized loss of $5.9 million as the Company delivered 14,826 gold ounces into the derivative contracts. The loss also included a non-cash unrealized loss of $22.9 million. The Company did not deliver gold ounces into the derivative contracts for the three month period ended September 30, 2023. Therefore, there was no realized loss for the period and the $2.7 million was a non-cash unrealized loss. The Company did not enter into any derivative contracts until July 2023 (see Note 14 - Derivative and Hedging Activities).

Current report

Nine Months Ended September 30, 2024 Compared to Nine Months Ended September 30, 2023

Current report

Claim Rentals Expense. Claim rental expense primarily consists of State of Alaska rental payments and costs incurred to record annual labor documents. For the nine months ended September 30, 2024 and 2023, claim rental expense was $0.4 million and $0.4 million respectively.

Current report

Exploration Expense. Exploration expense for the nine months ended September 30, 2024 was $3.1 million compared to $2.3 million for the nine months ended September 30, 2023. Current period exploration expense primarily relates to a 3,000 meter surface drill program at the Johnson Tract Project. The prior period exploration expense relates to care and maintenance work performed on our Lucky Shot Property.

Current report

General and Administrative Expense. General and administrative expense for the nine months ended September 30, 2024 and 2023 was $7.3 million and $7.3 million, respectively. The Company’s general and administrative expense primarily relates to legal fees, regulatory fees, payroll and stock-based compensation expense.

Current report

Income / Loss from Equity Investment in the Peak Gold JV. The income from the Company’s equity investment in the Peak Gold JV for the nine months ended September 30, 2024 was $27.7 million compared to a loss of $17.4 million for the same period in 2023. The Manh Choh project commenced production in July 2024, which generated income for the 2024 period. The capital contributions for the nine months ended September 30, 2024 and 2023 were $31.2 million and $38.8 million, respectively. The capital contributions were higher for nine months ended September 30, 2023 compared to September 30, 2024 as operations were ramping up at the Manh Choh project with ore and waste mining and a focus on capital improvements at the Fort Knox mill facility. The Peak Gold JV issued a cash distribution of $19.5 million for the nine month period ended September 30, 2024. No cash distributions were made for the same period in 2023. There were no suspended losses as of September 30, 2024.

Current report

Interest Expense. For the nine months ended September 30, 2024 interest expense was $8.6 million related to the Debenture and interest expense related to the Company’s cumulative $58.0 million draw-down on the Facility. Prior year interest expense of $1.9 million included interest expense related to the Debenture and interest expense related to the Company's cumulative $20 million draw-down on the Facility. See Note 13 - Debt.

Current report

Metal Sales. For the nine months ended September 30, 2024, the gain on metal sales was $0.9 million related to excess ounces that were purchased from the Peak Gold JV that were not delivered into the hedges and sold to the derivative counterparties. There were no metal sales for the nine months ended September 30, 2023.

Current report

Loss on Derivative Contracts. Loss on derivative contracts for the nine months ended September 30, 2024 was $57.0 million compared to $2.7 million for the nine months ended September 30, 2023. The $57.0 million loss for the nine month period of September 30, 2024 included a realized loss of $5.9 million as the Company delivered 14,826 gold ounces into the derivative contracts. The loss also included a non-cash unrealized loss of $51.1 million. The Company did not deliver gold ounces into the derivative contracts for the nine month period ended September 30, 2023. Therefore, there was no realized loss for the period and the $2.7 million was a non-cash unrealized loss. The Company did not enter into any derivative contracts until July 2023 (see Note 14 - Derivative and Hedging Activities).

Current report

The table below presents a reconciliation between the most comparable GAAP measure of total cost of sales to the non-GAAP measures of Cash Cost on a By-product Basis for the Peak Gold JV operations (Manh Choh) for the nine months ended September 30, 2024. There are no comparables provided as sales of gold at Manh Choh commenced in July 2024.

Current report

Cash Cost on a By-product Basis, per Ounce is a measure developed by precious metals companies (including the Silver Institute and the World Gold Council) in an effort to provide a uniform standard for comparison purposes. There can be no assurance, however, that this non-GAAP measure as we report is the same as that reported by other mining companies.

Current report

Cash Cost on a By-product Basis includes all direct and indirect operating cash costs related directly to the physical activities of producing gold, including mining, processing and other plant costs, third-party refining expense, on-site general and administrative costs, royalties and mining production taxes. The value of silver sold is deducted from the total production cost of sales as it is considered residual production, i.e. a by-product.

Current report

Cash Cost on a By-product Basis, per Ounce is an important operating statistic that the Company will utilize to measure a mine's operating performance. Cash Cost on a By-product Basis, per Ounce allows us to benchmark the performance of the Peak Gold JV versus those of our competitors. This statistic is useful in identifying acquisition and investment opportunities as they provide a common tool for measuring the financial performance of other mines with varying geologic, metallurgical and operating characteristics.

Current report

Cash Costs on a By-product Basis, per Ounce is calculated by adjusting production cost of sales, as reported on the interim condensed consolidated statements of operations, as follows:

Current report

As of September 30, 2024, the Company had approximately $36.2 million of cash.

Current report

The Company’s primary cash requirements have been for general and administrative expenses, capital calls from the Peak Gold JV for the Manh Choh Property, repayment of interest related to debt and exploration expenditures on the Johnson Tract Project and Lucky Shot Property. The Company’s sources of cash have been from common stock offerings, the issuance of the Debenture, distributions from the equity investment and the proceeds from the Facility (see Note 8 - Stockholders' Equity (Deficit) and Note 13 - Debt, for a discussion of the recent activity).

Current report

The Company’s cash needs going forward will primarily relate to exploration of the Contango Properties, repayment of debt and related interest and general and administrative expenses of the Company. Although there can be no guarantee that the Peak Gold JV will make distributions to the Company, the Company believes that distributions are probable and that it will maintain sufficient liquidity to meet its working capital requirements, including repayment obligations of approximately $34.9 million on the Facility, for the next twelve months from the date of this report. Failure to pay current debt obligations will result in an event of default and the Company's debt would be due immediately or callable (See Note 13).

Current report

Further financing by the Company may include issuances of equity, instruments convertible into equity (such as warrants) or various forms of debt. The Company has issued common stock and other instruments convertible into equity in the past and cannot predict the size or price of any future issuances of common stock or other instruments convertible into equity, and the effect, if any, that such future issuances and sales will have on the market price of the Company’s securities. Any additional issuances of common stock or securities convertible into, or exercisable or exchangeable for, common stock may ultimately result in dilution to the holders of common stock, dilution in any future earnings per share of the Company and may have a material adverse effect upon the market price of the common stock of the Company.

Current report

General information about the Company can be found on the Company’s website at www.contangoore.com. Our annual reports on Form 10-K, transition report on Form 10-KT, quarterly reports on Form 10-Q and current reports on Form 8-K, as well as any amendments and exhibits to those reports, are available free of charge through our website as soon as reasonably practicable after the Company files or furnishes them to the SEC.
Removed paragraphs (12)

Previous report

The Company engages in exploration and development for gold ore and associated minerals in Alaska. The Company conducts its business through three primary means:

Previous report

30.0% membership interest in Peak Gold, LLC (the “Peak Gold JV”), which leases approximately 675,000 acres from the Tetlin Tribal Council and holds approximately 13,000 additional acres of State of Alaska mining claims (such combined acreage, the “Peak Gold JV Property”) for exploration and development, including in connection with the Peak Gold JV’s plan to mine ore from the Main and North Manh Choh deposits within the Peak Gold JV Property (“Manh Choh” or the “Manh Choh Project”);

Previous report

its wholly-owned subsidiary, Contango Lucky Shot Alaska, LLC ("LSA") (formerly Alaska Gold Torrent, LLC), an Alaska limited liability company, which leases the mineral rights to approximately 8,600 acres of State of Alaska and patented mining claims Alaska Hard Rock, Inc. The property, located in the Willow Mining District about 75 miles north of Anchorage, Alaska, contains three former producing gold mines within the patented claims (“Lucky Shot”, or the “Lucky Shot Property”); and

Previous report

its wholly-owned subsidiary, Contango Minerals Alaska, LLC (“Contango Minerals”), which separately owns the mineral rights to approximately 145,280 acres of State of Alaska mining claims for exploration, including (i) approximately 69,780 acres located immediately northwest of the Peak Gold JV Property (the “Eagle/Hona Property”), (ii) approximately 14,800 acres located northeast of the Peak Gold JV Property (the “Triple Z Property”), (iii) approximately 52,700 acres of new property in the Richardson district of Alaska (the “Shamrock Property”) and (iv) approximately 8,000 acres located to the north and east of the Lucky Shot Property (the “Willow Property” and, together with the Eagle/Hona Property, the Triple Z Property, and the Shamrock Property, collectively the “Minerals Property”). The Company relinquished approximately 69,000 acres located on the Eagle/Hona Property in November 2022. The Company retained essentially all of the acreage where drilling was performed in 2019 and reconnaissance work in 2021, and used sampling data to determine which acreage should be released.

Previous report

The Lucky Shot Property and the Minerals Property are collectively referred to in this Quarterly Report on Form 10-Q as the “Contango Properties”.

Previous report

The Company has been involved, directly and through the Peak Gold JV, in the exploration of the Manh Choh Project since 2010, which has resulted in the identification of two mineral deposits (Main and North Manh Choh) and several other gold, silver, and copper prospects. The other 70.0% membership interest in the Peak Gold JV is owned by KG Mining (Alaska), Inc. (“KG Mining”), an indirect wholly-owned subsidiary of Kinross Gold Corporation (“Kinross”). Kinross is a large gold producer with a diverse global portfolio and extensive operating experience in Alaska. The Peak Gold JV will mine ore from the Main and North Manh Choh deposits and process the ore at the existing Fort Knox mining and milling complex located approximately 240 miles (400 km) away in Fairbanks, Alaska. The Peak Gold JV has entered into an Ore Haul Agreement with Black Gold Transport, located in North Pole, Alaska to transport the run-of-mine ore from the Manh Choh Project to the Fort Knox facilities. The use of the Fort Knox facilities is expected to accelerate the development of the Peak Gold JV Property and result in reduced upfront capital development costs, smaller environmental footprint, a shorter permitting and development timeline and less overall execution risk for the Peak Gold JV to advance the Main and North Manh Choh deposits to production. Peak Gold JV has also entered into a contract with Kiewit Mining Group to provide contract mining and site preparation work at the Manh Choh Project. The Peak Gold JV will be charged a toll for using the Fort Knox facilities pursuant to a toll milling agreement by and between the Peak Gold JV and Fairbanks Gold Mining, Inc., which was entered into and became effective on April 14, 2023.

Previous report

Kinross released a combined feasibility study for the Fort Knox mill and the Peak Gold JV in July 2022. Also, in July 2022, Kinross announced that its board of directors (the “Kinross Board”) made a decision to proceed with development of the Manh Choh Project. Effective December 31, 2022, CORE Alaska, LLC, a wholly-owned subsidiary of the Company (“CORE Alaska”), KG Mining, and the Peak Gold JV executed the First Amendment to the Amended and Restated Limited Liability Company Agreement of the Peak Gold JV (as amended, the “A&R JV LLCA”). The First Amendment to the A&R JV LLCA provides that, beginning in 2023, the Company may fund its quarterly scheduled cash calls on a monthly basis. The Peak Gold JV management committee (the “JV Management Committee”) has approved budgets for 2023 and 2024, with cash calls totaling approximately $248.1 million, of which the Company’s share is approximately $74.5 million. As of June 30, 2024, the Company has funded $74.5 million of the budgeted cash calls. On May 15, 2023, the Peak Gold JV received approval of its Waste Management Plan, Plan of Operations, and Reclamation and Closure Plan from the State of Alaska Departments of Environmental Conservation and Natural Resources. Construction is essentially complete, on budget and on schedule for production in the second half of 2024. Mining activities are well underway including the commencement of ore mining and stockpiling. Transportation of ore to Fort Knox, where it will be processed, has commenced and will gradually increase throughout the first half of the year. Modifications to the Fort Knox mill continue to progress on schedule and on budget. Construction of the conveyors and associated buildings are complete, along with interior piping and mechanical installations. Full commissioning of the modificaitons at the Fort Knox mill is expected in the third quarter of this year. Kinross, on behalf of the Peak Gold JV, is also continuing its comprehensive community programs and prioritizing local economic benefits as it develops the project. All permitting activities are completed with all major permits received from both Federal and State permitting agencies. Peak Gold JV production commenced at Manh Choh in the second half of 2024, with a mine plan that consists of two small, open pits that will be mined concurrently over 4.5 years.

Previous report

Work on the Lucky Shot Property has been ongoing since late 2021. Underground work includes rehabilitation of approximately 442 meters of existing drift and the addition of 612 meters of new drift and 3,816 meters of underground HQ core exploration drilling. In August 2023, the Company began executing a program to complete surface drilling on the Coleman segment of the Lucky Shot vein. The program was shut down in September 2023 due to challenging weather conditions.

Previous report

On the Shamrock and Eagle/Hona Properties, the Company conducted surface mapping and sampling programs during 2021.
Reworded paragraphs (9)

Previous wording

The Company’s Manh Choh Project continued ore mining and stockpiling at the Fort Knox facility during the quarter. On July 8, 2024, Manh Choh achieved a significant milestone and poured its first gold bar, on schedule.

Current wording

In July 2024, the Peak Gold JV commenced processing of the ore at the Fort Knox facility and on July 8, 2024, Manh Choh Project achieved a significant milestone and poured its first gold bar, on schedule. On September 9, 2024, the Company announced the start of a second campaign of gold production from the Manh Choh Project. On September 17, 2024, the Company announced the receipt of a $19.5 million cash distribution from the Peak Gold JV relating to production at Manh Choh. During the third quarter of 2024, ore transportation has ramped up to planned volumes, with full commissioning of modifications at the Fort Knox facility having been completed. The Manh Choh Project remains on track to deliver its planned production this year. The Peak Gold JV management committee approved budgets for 2023 and 2024, with cash calls totaling approximately to $248.1 million, of which the Company’s share was approximately $74.5 million. In July 2024, the Company had to contribute an unbudgeted additional cash call for $4.1 million. As of September 30, 2024, the Company has funded $78.6 million towards the cash calls.

Previous wording

On July 30, 2024 the Company announced the start of a surface drilling campaign at the Johnson Tract property. The 2024 surface exploration drilling targets 3,000 meters (~9,850 ft) across 20 drill holes and is designed to in-fill the upper one-third of the near vertical resource. In parallel with the in-fill drilling, selected holes will undergo hydrological testing and monitoring to characterize the overall surficial and deposit hydrology and water quality. In addition to assaying the core, selected drill core will undergo advanced metallurgical, geochemical, and specific gravity tests to assist in building a geometallurgical model for the deposit. Camp opened in mid-July and the drilling program is expected to last approximately three months.

Current wording

At the Johnson Tract Project the Company commenced a surface drilling campaign on July 30, 2024. The 2024 surface exploration drilling targeted 3,000 meters (approximately 9,850 ft) across 20 drill holes and was designed to in-fill the upper one-third of the near vertical resource. In parallel with the in-fill drilling, selected holes had hydrological testing and monitoring to characterize the overall surficial and deposit hydrology and water quality. In addition to assaying the core, selected drill core had advanced metallurgical, geochemical, and specific gravity tests to assist in building a geometallurgical model for the deposit. On September 9, 2024, the

Previous wording

On July 10, 2024, the Company completed the HighGold Acquisition and, as contemplated by the Arrangement Agreement, each HighGold share of common stock was exchanged for 0.019 shares of Contango common stock, par value $0.01 per share (the “common stock”). HighGold options were also exchanged, directly or indirectly, for Contango shares of common stock, based on the fair market value of the HighGold options prior to the closing date. Upon closing of the HighGold Acquisition, the Company issued an aggregate of 1,698,887 shares of Contango common stock, with a value of approximately $33.4 million, to HighGold shareholders in reliance upon an exemption from the registration requirements of the Securities Act, pursuant to Section 3(a)(10) of the Securities Act. Such exemption was based on the final order of the Supreme Court of British Columbia issued on July 2, 2024, approving the Acquisition following a hearing by the court which considered, among other things, the fairness of the Acquisition to the persons affected. Upon completion of the Acquisition, existing Contango shareholders own approximately 85.9% and HighGold shareholders own approximately 14.1% of the combined company.

Current wording

On July 10, 2024, the Company completed the HighGold Acquisition and, as contemplated by the Arrangement Agreement, each HighGold share of common stock was exchanged for 0.019 shares of Contango common stock, par value $0.01 per share (the “common stock”). HighGold options were also exchanged, directly or indirectly, for Contango shares of common stock, based on the fair market value of the HighGold options prior to the closing date. Upon closing of the HighGold Acquisition, the Company issued an aggregate of 1,698,887 shares of Contango common stock, with a value of $33.8 million, to HighGold shareholders in reliance upon an exemption from the registration requirements of the Securities Act, pursuant to Section 3(a)(10) of the Securities Act. Such exemption was based on the final order of the Supreme Court of British Columbia issued on July 2, 2024, approving the Acquisition following a hearing by the court which considered, among other things, the fairness of the Acquisition to the persons affected. Upon completion of the Acquisition, existing Contango shareholders own approximately 85.9% and HighGold shareholders own approximately 14.1% of the combined company.

Previous wording

On August 6, 2024, the Company completed the Avidian Alaska Acquisition. As contemplated by the stock purchase agreement entered into with Avidian, the initial purchase price of $2,400,000 consisted of (i) $400,000 in cash (the “Cash Consideration”) and (ii) $2,000,000 in shares of Contango common stock, with $250,000 of such shares withheld at closing and to be paid only upon settlement of a withholding contingency (the “Equity Consideration”). The Cash Consideration shall be paid in the following tranches: (i) a deposit of $50,000 (paid), (ii) $150,000 to be paid upon settlement of a withholding contingency and (iii) $200,000 of the Cash Consideration to be paid on or before the six-month anniversary of the closing date. The number of shares of common stock constituting the Equity Consideration, which were issued or will be issued in reliance upon an exemption from the registration requirements of the Securities Act, pursuant to Section 4(a)(2) of the Securities Act, was determined based on Contango’s 10-day VWAP on the NYSE American immediately prior to the closing date.

Current wording

On August 6, 2024, the Company completed the Avidian Alaska Acquisition. The total purchase price of $2,063,539 consisted of (i) $400,000 in cash (the “Cash Consideration”) and (ii) $1,663,539 in shares of Contango common stock, with $207,945 of such shares withheld at closing and to be paid only upon settlement of a withholding contingency (the “Equity Consideration”). The Cash Consideration shall be paid in the following tranches: (i) a deposit of $50,000 (paid), (ii) $150,000 to be paid upon settlement of a withholding contingency and (iii) $200,000 of the Cash Consideration to be paid on or before the six-month anniversary of the transaction closing date. The number of shares of common stock constituting the Equity Consideration, which were issued or will be issued in reliance upon an exemption from the registration requirements of the Securities Act, pursuant to Section 4(a)(2) of the Securities Act, was determined based on Contango’s 10-day VWAP on the NYSE American immediately prior to the closing date.

Previous wording

On October 20, 2023, the Committee for Safe Communities (“CSC”), an Alaskan non-profit corporation inclusive of certain vacation homeowners along the Manh Choh ore haul route and others, filed suit in the Superior Court for the State of Alaska in Fairbanks, Alaska (the “Superior Court”) against the State of Alaska, Department of Transportation and Public Facilities (the “DOT”), seeking injunctive relief with respect to CSC’s oversight of the Peak Gold JV’s ore haul plan. Ore from the Manh Choh mine is being trucked to the Fort Knox mill for processing via public roadways in state-of-the-art trucks carrying legal loads. The complaint alleges that the DOT has approved a haul route and trucking plan for the Manh Choh project that violates DOT regulations, DOT’s actions have created an unreasonable risk to public safety constituting an attractive public nuisance, and DOT has aided and abetted the offense of negligent driving. On November 2, 2023, CSC filed a motion for preliminary injunction. On November 9, 2023, the Peak Gold JV filed a motion to intervene in this lawsuit, which was granted on November 15, 2023. On January 15, 2024, Peak Gold and DOT jointly moved for judgment on the pleadings and to stay all discovery. On May 14, 2024, the Court issued an Order denying the plaintiff’s motion for preliminary injunction and staying discovery. On June 24, 2024, the Court issued an Order granting judgment on the pleadings as to three of the four claims for relief alleged in the Complaint and denying relief as to the claim for public nuisance. The Order further lifted the stay of discovery. On July 3, 2024, the DOT filed motion for reconsideration as to the Court’s Order on the motion for judgment on the pleadings, which Peak Gold joined. At a scheduling conference on July 16, 2024, the Court ordered plaintiff to respond to the motion for reconsideration and set a trial for August 11, 2025.

Current wording

Alaska Department of Transportation and Public Facilities ("DOT"). The Complaint seeks injunctive relief against the DOT with respect to its oversight of Peak Gold's ore haul plan. The Complaint alleges that the DOT has approved a haul route and trucking plan that violates DOT regulations, DOT's actions have created an unreasonable risk to public safety constituting an attractive public nuisance, and DOT has aided and abetted the offense of negligent driving. On November 2, 2023, the plaintiff filed a motion for a preliminary injunction against the DOT and sought expedited consideration of its motion. If granted, the motion could impact Peak Gold's ore haul plans. On November 9, 2023, the Court denied the plaintiff's motion for expedited consideration. On November 15, 2023, the Court granted Peak Gold, LLC's motion to intervene. On January 15, 2024, Peak Gold and DOT jointly moved for judgment on the pleadings and to stay all discovery. On May 14, 2024, the Court issued an Order denying the plaintiff's motion for preliminary injunction and staying discovery. On June 24, 2024, the Court issued an Order granting judgment on the pleadings as to three of the four claims for relief alleged in the Complaint and denying relief as to the claim for public nuisance. The Order further lifted the stay of discovery. On July 3, 2024, the DOT filed motion for reconsideration as to the Court's Order on the motion for judgment on the pleadings, which Peak Gold joined. On September 13, 2024, the Court entered an Order denying this motion. The case is set for trial on August 11, 2025.

Previous wording

On July 1, 2024, the Village of Dot Lake, a federally recognized Indian Tribe, located approximately 50 miles from the Manh Choh mine on the ore haul route along the Alaska Highway (“Dot Lake”), filed a complaint in the U.S District Court for the District of Alaska against U.S. Army Corps of Engineers (the “Corps”) and Lt. General Scott A. Spellmon, in his official capacity as Chief of Engineers and Commanding General of the Corps. The complaint seeks declaratory and injunctive relief based on the Corps’ alleged failure to consult with Dot Lake and to undertake an adequate environmental review with respect to the Corps’ issuance in September 2022 of a wetlands disturbance permit in connection with the overall permitting of the Manh Choh mine as to approximately 5 acres of wetlands located on Tetlin Village land. Peak Gold is not named as a defendant in the complaint and it is evaluating its options with respect to protecting its interests in continuing to operate the Manh Choh mine.

Current wording

On July 1, 2024, the Village of Dot Lake, a federally recognized Indian Tribe, located approximately 50 miles from the Manh Choh mine on the ore haul route along the Alaska Highway ("Dot Lake"), filed a Complaint in the U.S. District Court for the District of Alaska against U.S. Army Corps of Engineers (the "Corps") and Lt. General Scott A. Spellmon, in his official capacity as Chief of Engineers and Commanding General of the Corps. The Complaint seeks declaratory and injunctive relief based on the Corps' alleged failure to consult with Dot Lake and to undertake an adequate environmental review with respect to the Corps' issuance in September 2022 of a wetlands disturbance permit in connection with the overall permitting of the Manh Choh mine as to approximately 5 acres of wetlands located on Tetlin Village land. Peak Gold is not named as a defendant in the Complaint and, on August 20, 2024, Peak Gold moved to intervene in the action, which Dot Lake has opposed. On October 10, 2024, the Court granted intervention to Peak Gold.

Previous wording

Structuring Incentives to Drive Behavior. The Company believes that equity ownership aligns the interests of the Company’s executives and directors with those of its stockholders. The Company has implemented an equity compensation program for its executive officers and directors (and other persons) that provides an incentive for such officers to achieve the Company’s long-term business objectives. The Company’s equity compensation program includes two forms of long-term incentives: restricted stock and stock options. As of June 30, 2024, the Company’s directors and executives beneficially own approximately 13.9% of the Company’s common stock.

Current wording

Structuring Incentives to Drive Behavior. The Company believes that equity ownership aligns the interests of the Company’s executives and directors with those of its stockholders. The Company has implemented an equity compensation program for its executive officers and directors (and other persons) that provides an incentive for such officers to achieve the Company’s long-term business objectives. The Company’s equity compensation program includes two forms of long-term incentives: restricted stock and stock options. As of September 30, 2024, the Company’s directors and executives beneficially own approximately 13.7% of the Company’s common stock.

Previous wording

The Company’s Manh Choh Project achieved a significant milestone on July 8, 2024 and poured its first gold bar.The ore mining continues along with stockpiling ore at the Fort Knox facility. The Project is on schedule and full commissioning of the modifications at the Fort Knox mill is expected in the third quarter. The Project remains on track to deliver its planned production this year. All other projects are in the exploration stage.

Current wording

The JV Management Committee approved a significant budget to complete the required development to start the operations of the Manh Choh mine, which began production early in the third quarter of 2024 and remains on track to deliver its planned production this year. On July 8, 2024, the Peak Gold JV poured its first gold bar. The ore mining continues along with stockpiling ore at the Fort Knox facility. The Project is on schedule and full commissioning of the modifications at the Fort Knox mill was completed. As of September 30, 2024, the Company has funded $78.6 million of the fiscal 2023 and 2024 capital calls to the Peak Gold JV, $31.3 million of which was required in fiscal 2024 for the Peak Gold JV to reach production. $60.0 million of such amount was funded from the Facility. Operations commenced in July 2024 which has allowed the Peak Gold JV to operate from the cash flows generated from its operations and there are no future anticipated cash calls. If there are any unforeseen cash calls and if the Company elects to not fund a portion of its cashl calls to the Peak Gold JV, its membership interest in the Peak Gold JV would be diluted.
Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

On October 20, 2023, the Committee for Safe Communities, an Alaskan non-profit corporation inclusive of this same group of objectors and formed for the purpose of opposing the project, filed suit in the Superior Court in Fairbanks, Alaska against the State of
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

Ore transportation has ramped up to planned volumes, full commissioning of the modifications at the Fort Knox mill is expected in the third quarter and the project remains on track to deliver its planned production this year.