Skip to main content

Shimmick Corp

For the period ended Sep 27, 2024. Filed Nov 12, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 27, 2024 · Filed Nov 12, 2024

SHIM$2.32+1.3%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-06-28; filed 2024-08-16.

0000950170-24-098053

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2024-09-27; filed 2024-11-12.

0000950170-24-124597

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 177 previous paragraphs and 190 current paragraphs.

110 unchanged; 53 reworded; 25 added; 10 removed; 4 previous and 2 current paragraphs rearranged.

Tables are not compared: 13 previous and 12 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (25)

Current report

On October 31, 2024, the Company entered into a settlement agreement in its Golden Gate Bridge Project (the “GGB Project”). Under the terms of the settlement and through its consolidated joint venture with Danny’s Construction Co. LLC, Shimmick/Danny’s Joint

Current report

Venture (“SDJV”), SDJV will receive total settlement proceeds of $97 million, a contract change order for reduced scope of work of $6 million and a contract change order for extension of project completion and costs incurred on the GGB Project. The GGB Project owner is required to pay SDJV $25 million within 14 business days of the executed agreement and the remaining $72 million cash payment to SDJV on or before December 17, 2024. After paying subcontractor pass-through claims, Shimmick plans to use the remaining proceeds for ongoing operations, including completion of the GGB Project.

Current report

The settlement amount and reduction of outstanding scope of work are recorded in Contract assets, current and Contract liabilities, current within the condensed consolidated balance sheets.

Current report

As a result of the GGB Project settlement and after accounting for subcontractor, legal and other costs as well as previously recorded revenue, the Company recognized an increase in gross margin of $11 million on the project during the three months ended September 27, 2024 within the condensed consolidated statements of operations.

Current report

Additionally, on August 23, 2024, the Company received $33 million in cash as a result of the previously announced settlement of a claim with the United States Army Corps of Engineers for which the revenue and cost of revenue impact was recorded within the condensed consolidated statements of operations for the six months ended June 28, 2024.

Current report

ERP Pre-implementation Asset Impairment and Associated Costs

Current report

During the three months ended September 27, 2024, Shimmick made the strategic decision to enhance the Company’s current enterprise resource planning (ERP) system rather than implementing a new platform which, due to prior capitalized pre-implementation costs and remaining contractual obligations of $5 million included in accrued expenses in the accompanying condensed consolidated balance sheets, resulted in a one-time charge of $16 million recorded in the three months ended September 27, 2024. The write-off is recorded in ERP pre-implementation asset impairment and associated costs within the condensed consolidated statements of operations.

Current report

Gross margin was $8 million and $3 million for the three months ended September 27, 2024 and September 29, 2023, respectively. The increase in gross margin was primarily as a result of the GGB Project settlement which was partially offset by continued impacts of Legacy Projects winding down, as well as additional legal fees to pursue contract modifications and recoveries and additional cost overruns on other Legacy Loss Projects (as defined below).

Current report

Gain on sale of assets decreased by $13 million primarily due to the gain recognized on the sale of non-core business contracts for $30 million during the three months ended September 29, 2023 that did not reoccur during the nine months ended September 27, 2024, partially offset by the $17 million gain recognized on the transaction for the sale-leaseback of our equipment yard in Tracy, California during the three months ended September 27, 2024.

Current report

ERP pre-implementation asset impairment and associated costs

Current report

ERP pre-implementation asset impairment and associated costs increased by $16 million due to the strategic decision to enhance the Company’s current ERP system rather than implementing a new platform which, due to prior capitalized costs and remaining contractual obligations, resulted in a one-time charge of $16 million recorded in the three months ended September 27, 2024.

Current report

Other expense, net remained approximately flat period over period.

Current report

Nine Months Ended September 27, 2024 compared to the Nine Months Ended September 29, 2023

Current report

Gross margin was $(37) million, a decrease of $38 million as compared to the nine months ended September 29, 2023, primarily as a result of the Legacy Loss Project settlement during the second quarter of 2024, projects winding down and additional cost overruns on Legacy Loss Projects that have experienced additional increases in the cost to complete as well as additional legal fees to pursue contract modifications and recoveries, partially offset by the GGB Project settlement.

Current report

ERP pre-implementation asset impairment and associated costs

Current report

ERP pre-implementation asset impairment and associated costs increased by $16 million due to the strategic decision to enhance the Company’s current ERP system rather than implementing a new platform which, due to prior capitalized costs and remaining contractual obligations, resulted in a one-time charge of $16 million recorded in the nine months ended September 27, 2024.

Current report

(2) Reflects a strategic decision to enhance the Company’s current ERP system rather than implementing a new platform which, due to prior capitalized costs and remaining contractual obligations, resulted in a one-time charge of $16 million in the third quarter of fiscal 2024.
Removed paragraphs (10)

Previous report

On May 20, 2024, Shimmick Corporation, entered into a series of transactions (the “Transactions”) with AECOM, a Delaware corporation (“AECOM”) and Berkshire Hathaway Specialty Insurance Company (“BHSI”). A summary of the Transactions is included below.

Previous report

The transactions included, among other things, entry into the new $60 million Credit Agreement, a mutual release and settlement of certain claims with AECOM and a corresponding agreement to issue 7,745,000 shares of our common stock to AECOM, termination of the existing Project Financing Agreement with BHSI and amendments to the existing Revolving Credit Facility with MidCap. For a description of these transactions, see Note 6 - Debt to our condensed consolidated financial statements and the notes thereto included elsewhere in this Form 10-Q.

Previous report

In addition, we entered into an agreement for the sale of the assets of our foundation drilling business for total consideration of $17.5 million, consisting of $15 million in cash and a $2.5 million promissory note. The sale closed on May 23, 2024 and the net proceeds were used to repay borrowings under the Revolving Credit Facility. We will continue working on certain existing Foundations Projects, which are largely expected to be completed by the end of the year.

Previous report

On August 8, 2024, the Company entered into a settlement agreement involving change orders and additional compensation sought for a federal lock and dam project. Pursuant to the settlement agreement, the United States Army Corps of Engineers agreed to pay the Company $33 million, which is expected to be collected in fiscal year 2024. The settlement amount is recorded in contract assets within the condensed consolidated balance sheets. As a result of the settlement and previously estimated contract revenue, the Company recognized a net loss on the project of $30 million during the three months ended June 28, 2024, which includes a $23 million reduction to revenue and a $7 million adjustment to forward loss reserve, within the condensed consolidated statements of operations for the three and six months ended June 28, 2024

Previous report

As part of the AECOM Sale Transactions, we assumed the Legacy Projects and backlog that were started under AECOM. Legacy Projects revenue was $(2) million, a decline of $44 million as the Company works to complete these projects. As part of a settlement of a claim on a large Legacy Loss Project, we made a non-cash adjustment to revenue of $23 million to reflect the settlement amount. See Recent Developments for additional details. Gross margin was $(34) million, a decrease of $32 million as compared to the three months ended June 30, 2023, primarily as a result of the $30 million impact of the settlement, projects winding down and additional cost overruns on a subset of these projects ("Legacy Loss Projects") that have experienced significant cost overruns due to the COVID pandemic, design issues, legal costs and other factors.

Previous report

Six Months Ended June 28, 2024 compared to the Six Months Ended June 30, 2023
Reworded paragraphs (53)

Previous wording

We are a leading provider of water and other critical infrastructure solutions nationwide. We have a long history of successfully completing complex water projects, ranging from the world’s largest wastewater recycling and purification system in California to the iconic Hoover Dam. According to Engineering News Record, in 2023, Shimmick was nationally ranked as a top ten builder of water supply (#6), dams and reservoirs (#7), and water treatment and desalination plants (#7). Shimmick is led by industry veterans, many with over 20 years of experience, and works closely with its customers to deliver complete solutions, including long-term operations and maintenance.

Current wording

We are a leading provider of water and other critical infrastructure solutions nationwide. We have a long history of successfully completing complex water projects, ranging from the world’s largest wastewater recycling and purification system in California to the iconic Hoover Dam. According to Engineering News Record, in 2024, Shimmick was nationally ranked as a top ten builder of water supply (#8), dams and reservoirs (#6), and water treatment and desalination plants (#7). Shimmick is led by industry veterans, many with over 20 years of experience, and works closely with its customers to deliver complete solutions, including long-term operations and maintenance.

Previous wording

As of June 28, 2024, we had a backlog of projects of $923 million, with over half of that amount comprised of water projects. We believe we have the ability to self-perform many of these projects, enabling us to compete for complex projects and differentiating us from many of our competitors. Self-performance also enables us to better control the critical aspects of our projects, reducing the risk of cost and schedule overruns.

Current wording

As of September 27, 2024, we had a backlog of projects of $834 million, with over half of that amount comprised of water projects. We believe we have the ability to self-perform many of these projects, enabling us to compete for complex projects and differentiating us from many of our competitors. Self-performance also enables us to better control the critical aspects of our projects, reducing the risk of cost and schedule overruns.

Previous wording

On August 9, 2024, we completed the previously disclosed transaction for the sale-leaseback of our equipment yard in Tracy, California. The agreement consummated the sale of the equipment yard for $20.5 million and allows us to continue using the property pursuant to a separately executed seven-year lease. We received net proceeds of $17 million after adjustments for prepaid rent through February 2026 and related closing costs. The equipment yard had a net book value of approximately $3 million and the $17 million of net proceeds received from the transaction were used to repay borrowings under the Revolving Credit Facility.

Current wording

During the three months ended September 27, 2024, Shimmick completed the sale-leaseback of the Company's equipment yard in Tracy, California. The agreement consummated the sale of the equipment yard for $20.5 million and allows us to continue using the property pursuant to a separately executed seven-year lease. The Company received net proceeds of $17 million, after adjustments for prepaid rent through February 2026 and related closing costs, which were used to repay borrowings under the Revolving Credit Facility. As a result of the sale, the Company recorded a gain of $17 million in Gain on sale of assets within the condensed consolidated statements of operations.

Previous wording

Our Ability to Control Selling General and Administrative Costs. Because we now exist as a public company, we will incur significant expenses on an ongoing basis that we did not incur as a private company. Those costs include additional director and officer liability insurance expenses, stock exchange listing expenses, as well as third-party and internal resources related to accounting, auditing, Sarbanes-Oxley Act compliance, legal and investor and public relations expenses. These costs will generally be selling, general and administrative expenses. We have also implemented the 2023 Omnibus Incentive Plan to align our equity compensation program with public company plans and practices, which we expect will increase our stock-based compensation expense.

Current wording

Our Ability to Control Selling General and Administrative Costs. Because we now exist as a public company, we incur significant expenses on an ongoing basis that we did not incur as a private company. Those costs include additional director and officer liability insurance expenses, stock exchange listing expenses, as well as third-party and internal resources related to accounting, auditing, Sarbanes-Oxley Act compliance, legal and investor and public relations expenses. These costs are generally selling, general and administrative expenses. We have also implemented the 2023 Omnibus Incentive Plan to align our equity compensation program with public company plans and practices, which increases our stock-based compensation expense.

Previous wording

Equity in (loss) earnings of unconsolidated joint ventures includes our return on investment in unconsolidated joint ventures.

Current wording

Equity in earnings (loss) of unconsolidated joint ventures includes our return on investment in unconsolidated joint ventures.

Previous wording

Projects started after the AECOM Sale Transactions ("Shimmick Projects") have focused on water infrastructure and other critical infrastructure. Revenue recognized on Shimmick Projects was $84 million and $104 million for the three months ended June 28, 2024 and June 30, 2023, respectively. The $20 million decrease in revenue was primarily the result of a $29 million decrease from lower activity on existing jobs and jobs winding down partially offset by a $10 million increase in revenue driven by a new water infrastructure job.

Current wording

Projects started after the AECOM Sale Transactions ("Shimmick Projects") have focused on water infrastructure and other critical infrastructure. Revenue recognized on Shimmick Projects was $101 million and $110 million for the three months ended September 27, 2024 and September 29, 2023, respectively. The $9 million decrease in revenue was primarily the result of a $28 million decrease from lower activity on existing jobs and jobs winding down partially offset by $19 million of revenue from a new water infrastructure job.

Previous wording

Gross margin recognized on Shimmick Projects was $4 million and $14 million for the six months ended June 28, 2024 and June 30, 2023, respectively. The decline in the gross margin was primarily the result of a $13 million decrease driven by increased cost and schedule extensions partially offset by a $3 million increase in margin from a new water infrastructure job.

Current wording

Gross margin recognized on Shimmick Projects was $6 million and $15 million for the three months ended September 27, 2024 and September 29, 2023, respectively. The decline in the gross margin was primarily the result of a $12 million decrease in gross margin on existing jobs that are winding down and completing partially offset by a $3 million increase in margin from a new water infrastructure job.

Previous wording

The Company entered into an agreement to sell the assets of our non-core Foundations Projects in the second quarter of 2024 and will be winding down any remaining work during the remainder of the 2024 fiscal year. As a result, revenue from Foundations Projects will decline during the remainder of the 2024 fiscal year. Revenue recognized on Foundations Projects was $8 million and $9 million for the three months ended June 28, 2024 and June 30, 2023, respectively. The $1 million decline in revenue was the result of timing of jobs winding down.

Current wording

The Company entered into an agreement to sell the assets of our non-core Foundations Projects in the second quarter of 2024 and will be winding down any remaining work during the remainder of the 2024 fiscal year. As a result, revenue from Foundations Projects will decline during the remainder of the 2024 fiscal year. Revenue recognized on Foundations Projects was $11 million and $12 million for the three months ended September 27, 2024 and September 29, 2023, respectively. The decline in revenue was the result of timing of jobs winding down.

Previous wording

Gross margin recognized on Foundations Projects was $(2) million and $(7) million for the three months ended June 28, 2024 and June 30, 2023, respectively. The increase in the gross margin was the result of cost overruns incurred on two jobs during the three months ended June 30, 2023 which were substantially completed during the 2023 fiscal year.

Current wording

Gross margin recognized on Foundations Projects was $(2) million and $(1) million for the three months ended September 27, 2024 and September 29, 2023, respectively. The decline in gross margin was the result of cost overruns and jobs winding down.

Previous wording

Gross margin recognized on Foundations Projects was flat at $(6) million for each of the six months ended June 28, 2024 and June 30, 2023.

Current wording

As part of the AECOM Sale Transactions, we assumed the Legacy Projects and backlog that were started under AECOM. Legacy Projects revenue was flat at $54 million for each of the three months ended September 27, 2024 and September 29, 2023. As a result of the GGB Project settlement and after accounting for previously recorded revenue, we made an adjustment to revenue of $31 million to reflect the settlement amount (which is included in the $54 million of revenue for the three months ended September 27, 2024), which offset continued impacts of Legacy Projects winding down. See Recent Developments for additional details.

Previous wording

In the Legacy Loss Projects, we have recognized the estimated costs to complete and the loss expected from these projects. If the estimates of costs to complete fixed-price contracts indicate a further loss, the entire amount of the additional loss expected over the life of the project is recognized as a period cost in the cost of revenue. As these Legacy Loss Projects continue to wind down to completion, no further gross margin will be recognized and in some cases, there may be additional costs associated with these projects. Revenue recognized on these Legacy Loss Projects was $(7) million and $27 million for the three months ended June 28, 2024 and June 30, 2023, respectively, as a result of the settlement discussed above. Gross margin recognized on these Legacy Loss Projects was $(32) million and $(1) million for the three months ended June 28, 2024 and June 30, 2023, respectively, as a result of the settlement of the claim discussed above.

Current wording

A subset of Legacy Projects ("Legacy Loss Projects") have experienced significant cost overruns due to the COVID pandemic, design issues, legal costs and other factors. In the Legacy Loss Projects, we have recognized the estimated costs to complete and the loss expected from these projects. If the estimates of costs to complete fixed-price contracts indicate a further loss, the entire amount of the additional loss expected over the life of the project is recognized as a period cost in the cost of revenue. As these Legacy Loss Projects continue to wind down to completion, no further gross margin will be recognized and in some cases, there may be additional costs associated with these projects. Revenue recognized on these Legacy Loss Projects was $49 million and $27 million for the three months ended September 27, 2024 and September 29, 2023, respectively. The increase was primarily as a result of the GGB Project settlement discussed above, partially offset by continued impacts of other Legacy Loss Projects winding down. Gross margin recognized on these Legacy Loss Projects was $10 million and $(1) million for the three months ended September 27, 2024 and September 29, 2023, respectively, the increase of which is primarily as a result of the GGB Project settlement.

Previous wording

Equity in (loss) earnings of unconsolidated joint ventures was $(2) million, compared to earnings of $8 million in the prior year period, primarily due to a favorable subcontractor settlement during the three months ended June 30, 2023 that did not reoccur during the three months ended June 28, 2024. Equity in (loss) earnings of unconsolidated joint ventures of $(2) million in the three months ended June 28, 2024 was primarily driven by increased costs due to schedule extensions.

Current wording

Equity in earnings of unconsolidated joint ventures was $1 million, compared to earnings of $3 million in the prior year period. The decrease was primarily driven by increased costs due to schedule extensions experienced during the nine months ended September 27, 2024.

Previous wording

Interest expense increased by $1 million primarily due to interest charges on the Credit Facility which was not entered into until May 20, 2024.

Current wording

Interest expense increased by $2 million primarily due to interest charges on the Credit Facility which was not entered into until May 20, 2024.

Previous wording

Net loss increased by $41 million to a net loss of $51 million for the three months ended June 28, 2024, primarily due to the settlement of the claim on a large Legacy Loss Project, equity in loss of unconsolidated joint ventures of $9 million, as well as an increase in other expense of $4 million, partially offset by increases in the gain on the sale of assets of $4 million all as described above.

Current wording

Net (loss) income decreased by $36 million to a net loss of $2 million for the three months ended September 27, 2024, primarily due to an increase in ERP pre-implementation asset impairment and associated costs of $16 million, a decrease in gain on the sale of assets of $13 million, decrease in gross margin of $5 million, increase of interest expense of $2 million and decrease in equity in earnings of unconsolidated joint ventures of $2 million all as described above.

Previous wording

The following table sets forth selected financial data for the six months ended June 28, 2024 compared to the six months ended June 30, 2023:

Current wording

The following table sets forth selected financial data for the nine months ended September 27, 2024 compared to the nine months ended September 29, 2023:

Previous wording

The following table sets forth selected revenue and gross margin data for the six months ended June 28, 2024 compared to the six months ended June 30, 2023:

Current wording

The following table sets forth selected revenue and gross margin data for the nine months ended September 27, 2024 compared to the nine months ended September 29, 2023:

Previous wording

Shimmick Projects have focused on water infrastructure and other critical infrastructure. Revenue recognized on Shimmick Projects was $174 million and $192 million for the six months ended June 28, 2024 and June 30, 2023, respectively. The $18 million decrease in revenue was primarily the result of a $36 million decrease from lower activity on existing jobs and jobs winding down partially offset by a $21 million increase in revenue driven by a new water infrastructure job and ramp up of a dam project.

Current wording

Shimmick Projects have focused on water infrastructure and other critical infrastructure. Revenue recognized on Shimmick Projects was $275 million and $301 million for the nine months ended September 27, 2024 and September 29, 2023, respectively. The $26 million decrease in revenue was primarily the result of a $63 million decrease from lower activity on existing jobs and jobs winding down partially offset by $37 million of revenue from a new water infrastructure job and ramp up of a transportation project.

Previous wording

Gross margin recognized on Shimmick Projects was $5 million and $9 million for the three months ended June 28, 2024 and June 30, 2023, respectively. The decline in the gross margin was primarily the result of a $7 million decrease driven by increased cost, schedule extensions and jobs winding down and completing partially offset by a $2 million increase in margin from a new water infrastructure job.

Current wording

Gross margin recognized on Shimmick Projects was $10 million and $29 million for the nine months ended September 27, 2024 and September 29, 2023, respectively. The decline in the gross margin was primarily the result of a $23 million decrease driven by increased cost, schedule extensions and a decrease on existing jobs that are winding down, partially offset by $6 million of gross margin from a new water infrastructure job.

Previous wording

The Company entered into an agreement to sell the assets of our non-core Foundations Projects in the second quarter of 2024 and will be winding down any remaining work during the remainder of the 2024 fiscal year. As a result, revenue will decline during the remainder of the 2024 fiscal year. Revenue recognized on Foundations Projects was $15 million and $29 million for the six months ended June 28, 2024 and June 30, 2023, respectively. The $14 million decline in revenue was the result of timing of multiple jobs winding down.

Current wording

The Company entered into an agreement to sell the assets of our non-core Foundations Projects in the second quarter of 2024 and will be winding down any remaining work during the remainder of the 2024 fiscal year. As a result, revenue will decline during the remainder of the 2024 fiscal year. Revenue recognized on Foundations Projects was $26 million and $41 million for the nine months ended September 27, 2024 and September 29, 2023, respectively. The $15 million decline in revenue was the result of timing of multiple jobs winding down.

Previous wording

As part of the AECOM Sale Transactions, we assumed the Legacy Projects and backlog that were started under AECOM. Legacy Projects revenue was $22 million, a decline of $77 million as the Company works to complete these projects. As part of a settlement of a claim on a large Legacy Loss Project, we made a non-cash adjustment to revenue of $23 million to reflect the settlement amount. Gross margin was $(45) million, a decrease of $43 million as compared to the six months ended June 30, 2023, primarily as a result of the settlement, projects winding down and additional cost overruns on Legacy Loss Projects that have experienced significant cost overruns due to the COVID pandemic, design issues and other factors.

Current wording

As part of the AECOM Sale Transactions, we assumed the Legacy Projects and backlog that were started under AECOM. Legacy Projects revenue was $75 million, a decline of $77 million as the Company works to complete these projects. The decline in revenue was primarily driven by continued impacts of Legacy Projects winding down during fiscal 2024, the sale of non-core business contracts in the third quarter of 2023 as well as a non-cash adjustment to revenue on a Legacy Loss Project settlement recognized during the second quarter of 2024, partially offset by the GGB Project settlement. See Recent Developments for additional details associated with the GGB Project settlement.

Previous wording

In the Legacy Loss Projects, we have recognized the estimated costs to complete and the loss expected from these projects. If the estimates of costs to complete fixed-price contracts indicate a further loss, the entire amount of the additional loss expected over the life of the project is recognized as a period cost in the cost of revenue. As these Legacy Loss Projects continue to wind down to completion, no further gross margin will be recognized and in some cases, there may be additional costs associated with these projects. Revenue recognized on these Legacy Loss Projects was $8 million and $54 million for the six months ended June 28, 2024 and June 30, 2023, respectively, as a result of the settlement. Gross margin recognized on these Legacy Loss Projects was $(44) million and $(2) million for the six months ended June 28, 2024 and June 30, 2023, respectively. The decrease in gross margin was primarily the result of the settlement of the claim discussed above.

Current wording

In the Legacy Loss Projects, we have recognized the estimated costs to complete and the loss expected from these projects. If the estimates of costs to complete fixed-price contracts indicate a further loss, the entire amount of the additional loss expected over the life of the project is recognized as a period cost in the cost of revenue. As these Legacy Loss Projects continue to wind down to completion, no further gross margin will be recognized and in some cases, there may be additional costs associated with these projects. Revenue recognized on these Legacy Loss Projects was $57 million and $80 million for the nine months ended September 27, 2024 and September 29, 2023, respectively. Gross margin recognized on these Legacy Loss Projects was $(34) million and $(3) million for the nine months ended September 27, 2024 and September 29, 2023, respectively. The decrease in gross margin was primarily the result of the Legacy Loss Project settlement during the second quarter of 2024, additional increases in the cost to complete as well as additional legal fees to pursue contract modifications and recoveries, partially offset by the GGB Project settlement.

Previous wording

Equity in (loss) earnings of unconsolidated joint ventures was $(2) million, compared to $7 million in the prior year period, primarily due a favorable subcontractor settlement during the six months ended June 30, 2023 that did not reoccur during the six months ended June 28, 2024. Equity in (loss) earnings of unconsolidated joint ventures of $(2) million in the six months ended June 28, 2024 was primarily driven by increased costs due to schedule extensions.

Current wording

Equity in (loss) earnings of unconsolidated joint ventures was a loss of $1 million, compared to earnings of $10 million in the prior year period, primarily due a favorable subcontractor settlement during the nine months ended September 29, 2023 that did not reoccur during the nine months ended September 27, 2024 and increased costs due to schedule extensions.

Previous wording

Gain on sale of assets increased by $2 million primarily due to the gain recognized on the sale of the assets of our non-core Foundations Projects during the second quarter of 2024 partially offset by the gain on sale of property of $2 million in the prior year.

Current wording

Gain on sale of assets decreased by $11 million primarily due to the gain recognized on the sale of non-core business contracts for $30 million during the three months ended September 29, 2023 that did not reoccur during the nine months ended September 27, 2024, partially offset by the $17 million gain recognized on the transaction for the sale-leaseback of our equipment yard in Tracy, California and $2 million gain recognized on the sale of the assets of our non-core Foundations Projects during the nine months ended September 27, 2024.

Previous wording

Interest expense increased by $2 million primarily due to interest charges on the Credit Facility which was entered into on May 20, 2024 as well as interest charges on the Revolving Credit Facility which was not entered into until March 27, 2023.

Current wording

Interest expense increased by $3 million primarily due to interest charges on the Credit Facility which was entered into on May 20, 2024 as well as interest charges on the Revolving Credit Facility which was not entered into until March 27, 2023.

Previous wording

Other expense (income), net increased by $3 million for the six months ended June 28, 2024 primarily due to a $1 million loss recognized on the settlement of certain claims with AECOM as well as expenses recognized associated with the change in fair value of contingent consideration and other costs incurred during the six months ended June 28, 2024.

Current wording

Other expense, net increased by $3 million for the nine months ended September 27, 2024 primarily due to a $1 million loss recognized on the settlement of certain claims with AECOM as well as expenses recognized associated with the change in fair value of contingent consideration and other costs incurred during the nine months ended September 27, 2024.

Previous wording

Income tax expense was flat period over period. Due to an expected tax loss for fiscal year ending 2024, no taxable income or tax expense is anticipated for 2024, and no taxable income was recorded for the prior year six months ended June 30, 2023.

Current wording

Income tax expense was flat period over period. Due to an expected tax loss for fiscal year ending 2024, no taxable income or tax expense is anticipated for 2024, and no taxable income was recorded for the prior year nine months ended September 29, 2023.

Previous wording

Net loss increased by $65 million to a net loss of $85 million for the six months ended June 28, 2024, primarily due to the settlement, the equity in loss of unconsolidated joint ventures of $9 million, as well as an increase in other expense of $4 million, partially offset by increases in the gain on the sale of assets of $2 million, all as described above.

Current wording

Net loss increased by $101 million to a net loss of $86 million for the nine months ended September 27, 2024, primarily due to decreases in gross margin of $58 million, an increase in ERP pre-implementation asset impairment and associated costs of $16 million, decrease of gain on the sale of assets of $11 million, increase in equity in loss of unconsolidated joint ventures of $10 million, increase in other expense, net of $3 million as well as an increase in interest expense of $3 million all as described above.

Previous wording

We report our financial results in accordance with GAAP. However, management believes that certain non-GAAP financial measures provide investors with additional useful information in evaluating our performance. Therefore, to supplement our condensed consolidated financial statements, we provide investors with certain non-GAAP financial measures, including Adjusted net loss and Adjusted EBITDA.

Current wording

We report our financial results in accordance with GAAP. However, management believes that certain non-GAAP financial measures provide investors with additional useful information in evaluating our performance. Therefore, to supplement our condensed consolidated financial statements, we provide investors with certain non-GAAP financial measures, including Adjusted net income (loss) and Adjusted EBITDA.

Previous wording

Adjusted net loss represents Net loss attributable to Shimmick Corporation adjusted to eliminate stock-based compensation, legal fees and other costs for Legacy Projects and other costs. We have also made an adjustment for transformation costs we have and expect to incur including advisory costs as we settle outstanding claims, exit the Legacy Projects and transform the Company into a water-focused business.

Current wording

Adjusted net income (loss) represents Net income (loss) attributable to Shimmick Corporation adjusted to eliminate stock-based compensation, ERP pre-implementation asset impairment and associated costs, legal fees and other costs for Legacy Projects and transaction-related costs and changes in fair value of contingent consideration remaining after the impact of transactions with AECOM. We have also made an adjustment for transformation costs we have incurred including advisory costs as we settle outstanding claims, exit the Legacy Projects and transform the Company into a water-focused business.

Previous wording

We have included Adjusted net loss in this Form 10-Q because it is a key measure used by our management and board of directors to understand and evaluate our core operating performance and trends, to prepare and approve our annual budget and to develop short and long-term operational plans. In particular, we believe that the exclusion of the income and expenses eliminated in calculating Adjusted net loss can provide a useful measure for period-to-period comparisons of our core business. Accordingly, we believe that Adjusted net loss provides useful information to investors and others in understanding and evaluating our results of operations.

Current wording

We have included Adjusted net income (loss) in this Form 10-Q because it is a key measure used by our management and board of directors to understand and evaluate our core operating performance and trends, to prepare and approve our annual budget and to develop short and long-term operational plans. In particular, we believe that the exclusion of the income and expenses eliminated in calculating Adjusted net income (loss) can provide a useful measure for period-to-period comparisons of our core business. Accordingly, we believe that Adjusted net income (loss) provides useful information to investors and others in understanding and evaluating our results of operations.

Previous wording

Our use of Adjusted net loss as an analytical tool has limitations, and you should not consider it in isolation or as a substitute for analysis of our financial results as reported under GAAP. Some of these limitations are:

Current wording

Our use of Adjusted net income (loss) as an analytical tool has limitations, and you should not consider it in isolation or as a substitute for analysis of our financial results as reported under GAAP. Some of these limitations are:

Previous wording

Adjusted net loss does not reflect changes in, or cash requirements for, our working capital needs,

Current wording

Adjusted net income (loss) does not reflect changes in, or cash requirements for, our working capital needs,

Previous wording

Adjusted net loss does not reflect the potentially dilutive impact of stock-based compensation, and

Current wording

Adjusted net income (loss) does not reflect the potentially dilutive impact of stock-based compensation, and

Previous wording

other companies, including companies in our industry, might calculate Adjusted net loss or similarly titled measures differently, which reduces their usefulness as comparative measures.

Current wording

other companies, including companies in our industry, might calculate Adjusted net income (loss) or similarly titled measures differently, which reduces their usefulness as comparative measures.

Previous wording

Because of these and other limitations, you should consider Adjusted net loss alongside Net loss attributable to Shimmick Corporation, which is the most directly comparable GAAP measure.

Current wording

Because of these and other limitations, you should consider Adjusted net income (loss) alongside Net income (loss) attributable to Shimmick Corporation, which is the most directly comparable GAAP measure.

Previous wording

Adjusted EBITDA represents our Net loss attributable to Shimmick Corporation before interest expense, income tax expense and depreciation and amortization, adjusted to eliminate stock-based compensation, legal fees and other costs for Legacy Projects and other costs. We have also made an adjustment for transformation costs we have and expect to incur including advisory costs as we settle outstanding claims, exit the Legacy Projects and transform the Company into a water-focused business.

Current wording

Adjusted EBITDA represents our Net income (loss) attributable to Shimmick Corporation before interest expense, income tax expense and depreciation and amortization, adjusted to eliminate stock-based compensation, ERP pre-implementation asset impairment and associated costs, legal fees and other costs for Legacy Projects and other costs. We have also made an adjustment for transformation costs we have incurred including advisory costs as we settle outstanding claims, exit the Legacy Projects and transform the Company into a water-focused business.

Previous wording

Because of these and other limitations, you should consider Adjusted EBITDA alongside Net loss attributable to Shimmick Corporation, which is the most directly comparable GAAP measure.

Current wording

Because of these and other limitations, you should consider Adjusted EBITDA alongside Net income (loss) attributable to Shimmick Corporation, which is the most directly comparable GAAP measure.

Previous wording

(1) Consists of transformation-related costs we have and expect to incur including advisory costs as we settle outstanding claims, exit the Legacy Projects and transform the Company into a water-focused business.

Current wording

(1) Consists of transformation-related costs we have incurred including advisory costs as we settle outstanding claims, exit the Legacy Projects and transform the Company into a water-focused business.

Previous wording

During the six months ended June 28, 2024 our capital expenditures were approximately $8 million compared to $3 million for the six months ended June 30, 2023. Historically, we have had significant cash requirements in order to organically expand our business to undertake new projects. Our cash requirements include costs related to increased expenditures for equipment, facilities and information systems, purchase of materials and production of materials and cash to fund our organic expansion into new markets, including through joint ventures. Our working capital needs are driven by the seasonality and growth of our business, with our cash requirements greater in periods of growth. Additional cash requirements resulting from our growth include the costs of additional personnel, enhancing our information systems, our compliance with laws and rules applicable to being a public company and, in the future, our integration of any acquisitions. Unrestricted cash and cash equivalents at June 28, 2024 totaled $22 million and availability under the Revolving Credit Facility and Credit Facility totaled $7 million and $6 million, respectively, resulting in total liquidity of $35 million. In addition, we expect to receive approximately $33 million in the 2024 fiscal year as a result of the settlement of the claim on a large Legacy Loss Project discussed in Recent Developments.

Current wording

During the nine months ended September 27, 2024 our capital expenditures were approximately $10 million compared to $6 million for the nine months ended September 29, 2023. Historically, we have had significant cash requirements in order to organically expand our business to undertake new projects. Our cash requirements include costs related to increased expenditures for equipment, facilities and information systems, purchase of materials and production of materials and cash to fund our organic expansion into new markets, including through joint ventures. Our working capital needs are driven by the seasonality and growth of our business, with our cash requirements greater in periods of growth. Additional cash requirements resulting from our growth include the costs of additional personnel, enhancing our information systems, our compliance with laws and rules applicable to being a public company and, in the future, our integration of any acquisitions. Unrestricted cash and cash equivalents at September 27, 2024 totaled $26 million and availability under the Revolving Credit Facility and Credit Facility totaled $15 million and $18 million, respectively, resulting in total liquidity of $59 million. In addition, we expect to receive approximately $97 million in the 2024 fiscal year as a result of the settlement of the claim on the GGB Project as discussed in Recent Developments.

Previous wording

On March 27, 2023, we entered into the Revolving Credit Facility with MidCap Financial Services, LLC, which originally provided a total commitment of $30 million. The Revolving Credit Facility was subsequently amended on June 30, 2023, September 22, 2023, May 20, 2024 and August 14, 2024. As amended, the Revolving Credit Facility provides for a total commitment of $2.8 million and bears interest at an annual rate of adjusted term SOFR, subject to a 1.0% floor, plus 5.50%. Further, the Revolving Credit Facility is subject to an annual collateral management fee of 0.50% and an annual unused line fee of 0.50%. The Revolving Credit Facility includes certain financial operating covenants, including a minimum liquidity requirement of $7.5 million. As of June 28, 2024, we were not in compliance with the Permitted Investments covenant regarding investments in joint ventures set forth in the Revolving Credit Facility. As a result of the August 14, 2024 amendment, which redefined Permitted Investments, we are not aware of any instances of noncompliance with financial covenants. The Revolving Credit Facility matures on August 31, 2024. In the three months ended June 28, 2024, we repaid $17 million of the amount outstanding under the Revolving Credit Facility. As of June 28, 2024 and December 29, 2023, $15 million and $30 million was outstanding under the Revolving Credit Facility, respectively.

Current wording

On March 27, 2023, we entered into the Revolving Credit Facility with MidCap Financial Services, LLC, which originally provided a total commitment of $30 million. The Revolving Credit Facility has been subsequently amended, most recently on September 25, 2024. As amended, the Revolving Credit Facility provides for a total commitment of $15 million and bears interest at an annual rate of adjusted term SOFR, subject to a 1.0% floor, plus 5.50%. Further, the Revolving Credit Facility is subject to an annual collateral management fee of 0.50% and an annual unused line fee of 0.50%. The Revolving Credit Facility includes certain financial operating covenants, including a minimum liquidity requirement of $7.5 million. The Revolving Credit Facility matures on December 31, 2024. The Company is not aware of any instances of noncompliance with the key financial covenants as of September 27, 2024.

Showing the first 40 of 53 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

Gross margin recognized on Foundations Projects was $(8) million and $(7) million for the nine months ended September 27, 2024 and September 29, 2023, respectively. The decline in gross margin was the result of cost overruns and jobs winding down.

Current report — wording carried from elsewhere

In the three months ended September 27, 2024, we repaid $15 million of the amount outstanding under the Revolving Credit Facility. As of September 27, 2024, no borrowings were outstanding under the Revolving Credit Facility. As of December 29, 2023, $30 million was outstanding under the Revolving Credit Facility, respectively.
Rearranged previous paragraphs (4)

Previous report — wording carried elsewhere

Equity in (loss) earnings of unconsolidated joint ventures

Previous report — wording carried elsewhere

Gain on sale of assets increased by $4 million primarily due to the gain recognized on the sale of the assets of our non-core Foundations Projects during the second quarter of 2024.

Previous report — wording carried elsewhere

Other expense (income), net increased by $3 million for the three months ended June 28, 2024 primarily due to a $1 million loss recognized on the settlement of certain claims with AECOM as well as other expenses recognized associated with the change in fair value of contingent consideration and other costs incurred during the three months ended June 28, 2024.

Previous report — wording carried elsewhere

Equity in (loss) earnings of unconsolidated joint ventures