A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2024 · Filed Nov 7, 2024

AVIR$4.31+2.1%Stored close · as of Nov 6, 2026

What changed in Risk Factors?

Read the current filing

Previous report: 10-Q

Period ended 2024-06-30; filed 2024-08-07.

0000950170-24-092914

Item 1A. Risk FactorsUnregistered Sales of Equity Securities and Use of ProceedsOther Information

Current report: 10-Q

Period ended 2024-09-30; filed 2024-11-07.

0000950170-24-123447

Item 1A. Risk FactorsUnregistered Sales of Equity Securities and Use of ProceedsOther Information

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 567 previous paragraphs and 517 current paragraphs.

449 unchanged; 59 reworded; 5 added; 56 removed; 3 previous and 4 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (5)

Current report

In addition, we may encounter unforeseen expenses, difficulties, complications, delays and other known and unknown obstacles in developing or commercializing our products. For example in September 2024, we announced that the SUNRISE-3 Phase 3 clinical trial we conducted to evaluate bemnifosbuvir versus placebo for the treatment of COVID-19 did not meet the primary endpoint of a statistically significant reduction in all cause hospitalization or death through Day 29 in the monotherapy cohort of 2,221 high risk patients with mild to moderate COVID-19. We believe that the unfavorable results from this study were impacted by the constantly evolving variants of COVID-19 and rapidly changing natural history of the disease, which has trended toward a milder disease where it makes it difficult to demonstrate the impact of a direct acting antiviral. This has led us to discontinue efforts to develop bemnifosbuvir for the treatment of COVID-19.

Current report

For example, in September 2024 when the SUNRISE-3 clinical trial failed to meet the primary endpoint, we determined that the data collected from this clinical trial would not be sufficient to support the submission of an NDA or other submission for regulatory approval and therefore would not undertake further regulatory interaction with respect to that development program.

Current report

On October 22, 2024, the USPTO issued U.S. Patent No. 12,121,529 (“ ‘529 patent”) to Gilead Sciences with claims that also purport to cover bemnifosbuvir. While we believe these claims are also invalid and unenforceable, a trial court or an appellate court may disagree and uphold one or more claims of the '529 patent, which would require us to obtain a license from Gilead Sciences to the ‘529 patent. Such a license may not be available on reasonable terms or at all. If a license is required and we are unable to obtain such license, commercialization of approved product candidates, if any, using bemnifosbuvir may not be able to continue without infringement.

Current report

On October 22, 2024, Gilead Sciences obtained U.S. ‘529 patent with claims that also purport to cover bemnifosbuvir. While we believe these claims are also invalid and unenforceable, a trial court or an appellate court may disagree and uphold one or more claims of the '529 patent, which would require us to obtain a license from Gilead Sciences to the ‘529 patent. Such a license may not be available on reasonable terms or at all.

Current report

We may need to expand our organization, and we may experience difficulties in managing this growth, which could disrupt our operations.
Removed paragraphs (56)

Previous report

There is significant uncertainty around our development of bemnifosbuvir as a potential treatment for COVID-19.

Previous report

Since the start of the COVID-19 pandemic, we have focused substantive efforts on the development of bemnifosbuvir for the treatment of COVID-19. We may not succeed in developing, securing market authorization or approval, or commercializing bemnifosbuvir as a potential treatment for COVID-19.

Previous report

In October 2020, we entered into the Roche License Agreement with Roche under which we granted to Roche an exclusive license to development and commercialization rights related to certain of our compounds, including bemnifosbuvir, outside of the US (other than for certain HCV uses). In November 2021, Roche notified us that it was terminating the Roche License Agreement effective February 10, 2022. In December 2021, due to the changing COVID-19 treatment landscape, including the availability of new oral antiviral treatment regimens, and the termination of the collaboration with Roche, we determined to discontinue each of the Phase 3 MORNINGSKY and MEADOWSPRING clinical trials. We did not enroll a sufficient number of patients in either Phase 3 study to conduct prespecified statistical analyses. In January 2022 we determined to close out the Phase 2 clinical trial in hospitalized patients.

Previous report

Nonetheless, we are advancing the development of bemnifosbuvir for the treatment of COVID-19 in high-risk non-hospitalized patients pursuing both a mono- and combination therapy strategy. We do not know if either monotherapy or combination therapy approach will be successful.

Previous report

Currently, we are in the process of completing SUNRISE-3, a global Phase 3 clinical trial evaluating bemnifosbuvir for the treatment of Coronavirus disease 2019 ("COVID-19"). All patients in the SUNRISE-3 clinical trial, which is fully enrolled with 2,295 patients, have completed their last scheduled study visit. We are preparing for the analysis of the clinical trial data and subsequent reporting of the trial results. In parallel with the conduct of SUNRISE-3, we are also engaging in efforts to identify a proprietary protease inhibitor product candidate that could potentially be combined with bemnifosbuvir for the treatment of COVID-19. Our efforts to develop a potential protease inhibitor to evaluate in combination with bemnifosbuvir are at a very early stage and we do not know if such efforts will be successful, or if successful, when such a protease inhibitor product candidate we identify may be permitted to enter clinical development. Before we can begin clinical development of a newly identified protease inhibitor product candidate, or any other product candidate, we will need to complete extensive preclinical studies to support the submission of an IND to the FDA or CTA to a comparable regulatory authority outside the US.

Previous report

Alternatively, we may in-license or acquire the rights to develop and commercialize a protease inhibitor drug candidate from a third-party. Proposing, negotiating and implementing acquisition or in-license of a protease inhibitor or any other product candidate that may be combined with bemnifosbuvir for the potential treatment of COVID-19 may be a lengthy and complex process. Other companies, including those with substantially greater financial, marketing and sales resources, may compete with us for the acquisition of such product candidates. We may not be able to acquire the rights to additional product candidates on terms that we find acceptable, if at all.

Previous report

In addition, clinical trials evaluating combination regimens are subject to additional costs, time and risks, including the requirement to sufficiently demonstrate the effect, if any, of each constituent component of the combination regimen to the satisfaction of the FDA or other regulatory authorities. For example, we expect that we will be required to conduct early-stage clinical trials evaluating the safety of any newly discovered protease inhibitor candidate before we can conduct later stage clinical trials evaluating the combination of bemnifosbuvir with such protease inhibitor.

Previous report

We have committed and plan to continue to commit significant financial and personnel resources to the development of bemnifosbuvir as a monotherapy, to the discovery of a protease inhibitor candidate to combine with bemnifosbuvir and to the combination of bemnifosbuvir and a protease inhibitor candidate for the treatment for COVID-19 (each, a “bemnifosbuvir COV19 product candidate”). If we are unable to successfully develop one or more bemnifosbuvir COV19 product candidates, we will have taken resources away from other development programs and may not be able to recuperate the resources dedicated to developing bemnifosbuvir COV19 product candidates, which could have a material adverse impact on our business.

Previous report

If we are unable to complete the assimilation and analysis of the SUNRISE-3 clinical trial data in the manner or on the timeline we anticipate or if data from our Phase 3 SUNRISE-3 clinical trial and other clinical trials are not supportive of further development or commercialization of one or more bemnifosbuvir COV19 product candidates, or the investor community otherwise has a negative reaction to any of the design of our clinical trials, expected time to complete our clinical trials or the clinical trial results, the demand for our common stock could decrease significantly, and the price of our common stock could decline substantially, which could result in significant losses for our stockholders.

Previous report

Further, while we believe there is currently an urgent need for additional oral antiviral treatments for COVID-19, the longevity and extent of future market demand for new oral antiviral treatments is uncertain. If the serious health consequences associated with COVID-19 and infection with SARS-CoV-2 variants or subvariants were to dissipate for all persons, including those currently at high-risk for severe disease, the need for new treatments could decrease significantly. This reduction in incidence of serious health consequences could occur as a result of multiple factors including a significant and sustained decrease in the number or severity of new infections, an increase in the uptake and effectiveness of current and future vaccines and the introduction of other treatment options. If the need for a new treatment decreases before or soon after commercialization of a bemnifosbuvir COV19 product candidate, if successfully developed and approved, our business would be adversely impacted.

Previous report

A bemnifosbuvir COV19 product candidate, even if successfully developed and approved, is expected to face significant competition from other treatments and vaccines for COVID-19 which have been authorized or approved for use or are in development.

Previous report

Many biotechnology and pharmaceutical companies have and are continuing to develop treatments for COVID-19 or vaccines against SARS-CoV-2, the virus that causes COVID-19. Many of these companies, which include large pharmaceutical companies, have greater resources for development and established commercialization capabilities.

Previous report

Currently in the US and elsewhere, there are therapeutics available for the treatment of COVID-19 including two oral antiviral therapies, Paxlovid™ developed by Pfizer Inc. (“Pfizer”), which has been approved by the FDA, and Lagevrio™ developed by Merck & Co., Inc. and Ridgeback Biotherapeutics, Inc., which is authorized by FDA for emergency use for the treatment of high-risk COVID-19 patients. Additionally, Veklury®, a nucleotide prodrug developed by Gilead Sciences, is approved for the treatment of COVID-19 in adults and pediatric patients who are hospitalized or if not hospitalized have mild to moderate COVID-19 and are at high-risk for progression to severe COVID-19, including hospitalization and death. In Japan and Singapore, the oral protease inhibitor, ensitrelvir, branded Xocova®, developed and marketed by Shionogi, has been granted approval for use in patients with mild to moderate SARS-CoV-2 infection. In May 2024, Shionogi announced results from a global Phase 3 clinical trial evaluating ensitrelvir for the treatment of non-hospitalized COVID-19 patients, in which approximately 30% of the patients enrolled had risk factors for severe disease. While failing to meet the primary endpoint in the study, Shionogi announced that it remains committed to making ensitrelvir available to patients worldwide. Shionogi further announced that it will pursue discussions with regulatory bodies, including the FDA, regarding regulatory pathways while initiating submission of regulatory marketing authorization applications outside the US seeking the approval of ensitrelvir for the treatment of COVID-19.

Previous report

In the US and elsewhere, Pfizer is conducting development of a second generation oral protease inhibitor. Other companies developing oral direct acting antivirals for treatment of COVID-19 include Cocrystal Pharma, Inc., RedHill Biopharma Ltd., Junshi Biosciences, and SyneuRx. In addition to oral therapeutics, efforts to develop and commercialize new mAbs for the prevention or treatment of COVID-19 are also ongoing and being conducted by Regeneron Pharmaceuticals Inc. and Invivyd, Inc. ("Invivyd") among others. In March 2024, Invivyd received authorization from the US FDA for emergency use of Pemgarda™, a monoclonal antibody for pre-exposure prophylaxis of COVID-19 in certain adults and adolescents with moderate-to-severe immune compromise.

Previous report

In addition to therapeutics, in the US and elsewhere, vaccines indicated for active immunization to prevent COVID-19 and associated vaccine updates which are intended to extend the immunizing effect initiated with the administration of the initial vaccine have been approved or authorized for emergency use. Vaccine manufacturers, including Pfizer and BioNTech SE, Moderna, Inc. and Novavax, Inc. are continuing to develop new vaccines and vaccine updates that may have greater and longer immunizing effects against current and future variants of SARS-CoV-2.

Previous report

In 2023, the US federal government announced the Project NextGen initiative with the purpose to accelerate and streamline the rapid development of the next generation of vaccines and treatments through public-private collaborations. Based at HHS and seeded with an initial investment of $5 billion, Project NextGen is coordinating across the US federal government and the private sector to fund and advance a pipeline of new, innovative vaccines and mAbs into clinical trials and potential review by the FDA. Project NextGen is focusing on mucosal vaccines, vaccines that provide broader protection against variants of concern and a longer duration of protection, pan-coronavirus vaccines, new mAbs that are more durable and resilient against new variants, and advancing new technologies that will improve access and enable faster, cheaper, rapid and more flexible production of vaccines and therapeutics.

Previous report

Given the products currently approved or authorized for use as well as those in development by others, any treatment we may develop could face significant competition. If we are unable to develop a treatment that can be distinguished based on efficacy, safety, cost or other factors from the growing number of treatments for COVID-19 or if any treatment becomes the standard of care, can be administered more conveniently or at a lower cost, or any entity is more successful at commercializing an authorized or approved treatment, even if a bemnifosbuvir COV19 product candidate is approved, we may not be able to successfully commercialize such a product for the treatment of COVID-19, or compete with other treatments or vaccines, which would adversely impact our business and operations.

Previous report

Our business, operations and financial results may be adversely affected by the continuing evolution of COVID-19.

Previous report

The evolving and constantly changing impact of COVID-19, which was declared a global pandemic by the WHO in March 2020, will directly affect the potential commercial prospects of our product candidates for the treatment of COVID-19. In May 2023, three years into the pandemic, the WHO determined that COVID-19 no longer fit the definition of the public health emergency of international concern. While noting that this determination did not mean that the pandemic itself is ended, the WHO concluded that the global emergency COVID-19 has caused is ended for the time being. In reaching this conclusion, the WHO considered evidence of reducing risks to human health driven mainly by high population-level immunity from infection, vaccination or both; consistent virulence of currently circulating SARS-CoV-2 Omicron sub-lineages and improved clinical case management. Further, the WHO considered that these factors have contributed to a decline in the weekly number of COVID-19 related deaths and hospitalizations since the beginning of the pandemic and that while SARS-CoV-2 continues to evolve, the currently circulating variants do not appear to be associated with increased severity. The WHO currently classifies COVID-19 as an established and ongoing health issue.

Previous report

The rates of infection, severity of the disease, the availability, administration and acceptance of vaccines, monoclonal antibodies, antiviral agents and other therapies, potential vaccine mandate policies, and “herd immunity” by the global population if achieved and sustained may materially affect the design and enrollment of any future clinical trials and will impact the potential regulatory authorization or approval and, if authorized or approved, the potential commercialization of our bemnifosbuvir COV19 product candidates.

Previous report

Pandemics, epidemics or outbreaks of an infectious disease may materially and adversely impact our business, including our preclinical studies and clinical trials.

Previous report

If other pandemics, epidemics or outbreaks of infectious disease occur in the future, we may experience disruptions that could severely impact our business, preclinical studies and clinical trials, including:

Previous report

delays or difficulties in enrolling patients in our clinical trials;

Previous report

diversion of health care resources away from the conduct of clinical trials, including the diversion of hospitals serving as our clinical trial sites and hospital staff supporting the conduct of our clinical trials;

Previous report

interruption of key clinical trial activities, such as clinical trial site data monitoring, due to limitations on travel imposed or recommended by governments, employers and others or interruption of clinical trial subject visits and study procedures, or other difficulties in the conduct of the study in accordance with the clinical trial protocol, which may impact the integrity of subject data and clinical study endpoints;

Previous report

interruption or delays in the operations of the FDA or other regulatory authorities, which may impact review and approval timelines;

Previous report

interruption of, or delays in receiving, supplies of our product candidates from our contract manufacturing organizations due to staffing shortages, production slowdowns or stoppages and disruptions in delivery systems;

Previous report

interruptions in preclinical studies due to restricted or limited operations resulting from restrictions on our on-site activities;

Previous report

limitations on employee resources that would otherwise be focused on the conduct of our preclinical studies and clinical trials, including because of sickness of employees or their families or the desire of employees to avoid contact with large groups of people; and

Previous report

interruption or delays to activities we outsource to third parties.

Previous report

If we or any of the third parties with whom we engage were to experience shutdowns or other business disruptions due to pandemics, epidemics or outbreaks of infectious disease, our ability to conduct our business in the manner and on the timelines presently planned could be materially and negatively impacted.

Previous report

In addition, we may encounter unforeseen expenses, difficulties, complications, delays and other known and unknown obstacles in developing or commercializing our products. For example, since the initiation of our the SUNRISE-3 Phase 3 clinical trial, there has been a significant decline in the observed rate of hospitalization and death associated with COVID-19. The primary endpoint of the SUNRISE-3 clinical trial is all cause hospitalization or death through Day 29 post-treatment. With the 2,221 patients in the supportive care monotherapy population cohort having now completed the study, we believe that the study is adequately powered for target rates of hospitalization and death of approximately 2 to 3% in patients who are at high-risk for disease progression. If the actual rate of hospitalization and death in the placebo cohort of patients is less, we may have completed the study but failed to reach the primary endpoint.

Previous report

advance the clinical development of the combination of bemnifosbuvir and ruzasvir for the treatment of HCV;

Previous report

During the near term we expect that a substantial portion of our efforts and expenditures will continue to be devoted to developing a potential bemnifosbuvir COV19 product candidate. Among other things, this effort will require the successful completion of our Phase 3 SUNRISE-3 clinical trial for the treatment of high-risk outpatients with mild to moderate COVID-19 and additional nonclinical and clinical development and the incurrence of expenses related to discovering, acquiring or in-licensing and then developing a drug or drug candidate to combine with bemnifosbuvir for the treatment of COVID-19.

Previous report

There have been a large number of programs developing therapeutics for COVID-19 that have not succeeded. This includes the development of obeldesivir (GS-5245), an oral nucleoside prodrug, that was being developed by Gilead Sciences in two Phase 3 clinical trials. In February 2024, Gilead Sciences announced that its Phase 3 clinical trial of obeldesivir which had enrolled standard risk patients failed to meet its primary endpoint of alleviation of symptoms. Previously, in September 2023, Gilead Sciences announced that, based upon lower-than-expected COVID-19 incidence rates and related hospitalizations or all cause deaths, it was discontinuing enrollment in its Phase 3 clinical trial in non-hospitalized patients at high-risk of progression. The factors that adversely affected these trials, may also adversely impact our SUNRISE-3 Phase 3 clinical trial, our ability to submit an NDA or other marketing authorization application for or obtain marketing approval of bemnifosbuvir for the treatment of high-risk patients with COVID-19 or any other bemnifosbuvir COV19 product candidate.

Previous report

COVID-19 is unpredictable and therapies, including any bemnifosbuvir COV19 product candidate, may be adversely impacted up to the point of obsolescence by the emergence of new variants or subvariants as well as by the development and authorization and approval of new vaccines, vaccine updates and therapeutics.

Previous report

In the early stages of the COVID-19 pandemic when there were no available countermeasures, initial COVID-19 vaccines, therapeutic antibodies and other therapeutics that demonstrated positive clinical trial results moved rapidly through the regulatory review and EUA process of the FDA and regulatory authorities in other jurisdictions, including the EU. The speed at which all parties acted to create, develop and review these countermeasures, including therapeutics for COVID-19, was exceptional. With COVID-19 countermeasures, including oral antivirals, now available and COVID-19 moving from pandemic to endemic status, these exceptional and extraordinary dynamics have lessened and evolving priorities within the FDA and the regulatory authorities in other jurisdictions, including changes based on new data regarding potential therapeutics of others, new variants of the virus, preferred clinical development pathways and clinical trial endpoints may significantly affect the regulatory timeline for further authorizations or approvals for additional COVID-19 therapeutics including bemnifosbuvir. Even with Fast Track designation, and the conduct of SUNRISE-3 under a US IND, uncertainty remains regarding the timelines and regulatory processes required for the authorization or approval of new treatments for COVID-19, including bemnifosbuvir.

Previous report

In addition, events, occurrences and disruptions caused by the continuing evolution of COVID-19 may increase the likelihood that we encounter difficulties or delays in initiating, enrolling, conducting or completing our planned and ongoing clinical trials. In particular, the rate of incidence, testing and diagnosis of COVID-19, rates of hospitalization and death, changes in the SOC for the treatment of COVID-19, which continues to evolve due to the mutation of the virus and increasing knowledge being obtained by healthcare providers, rates and durability of vaccines and population immunity, and availability of therapeutic options, may impact the successful completion of our Phase 3 SUNRISE-3 clinical trial and other COVID-19-related clinical trials we may initiate.

Previous report

For example, with respect to our COVID-19 clinical trials and most notably with respect to SUNRISE-3, the rate of enrollment was significantly impacted by the emergence of variants and the occurrence of varying low and high rates of infection with the result that we enrolled fewer patients in the SUNRISE-3 clinical trial when rates of infection were low and a greater number of patients when rates of infection were high. If the rates of infection had remained low, completion of SUNRISE-3 trial would have been delayed.

Previous report

We may seek an EUA from the FDA or comparable emergency use authorizations from foreign regulatory authorities with respect to our bemnifosbuvir COV19 product candidates in development for the treatment of COVID-19, and if we fail to obtain or maintain such authorizations, we may be required to pursue a more lengthy clinical development process than we expect, and our business may be harmed.

Showing the first 40 of 56 passages. Open the source sections for the rest.

Reworded paragraphs (59)

Previous wording

We are a clinical-stage biopharmaceutical company. Our operations to date have been limited to financing and staffing our company, developing our technology, and identifying and developing our product candidates. Our prospects must be considered in light of the uncertainties, risks, expenses and difficulties frequently encountered by biopharmaceutical companies in their early stages of operations. We have not yet demonstrated an ability to complete any late-stage or pivotal clinical trials, obtain marketing approval, manufacture a product at commercial-scale, or conduct sales and marketing activities necessary for successful product commercialization, or have third parties to do these activities on our behalf. Consequently, predictions about our future success or viability may not be as accurate as they could be if we had a longer operating history or a history of successfully developing, obtaining marketing approval for and commercializing antiviral therapies.

Current wording

We are a clinical-stage biopharmaceutical company. Our operations to date have been limited to financing and staffing our company, developing our technology, and identifying and developing our product candidates. Our prospects must be considered in light of the uncertainties, risks, expenses and difficulties frequently encountered by biopharmaceutical companies in their early stages of operations. We have not yet demonstrated an ability to successfully develop, obtain marketing approval, manufacture a product at commercial-scale, or conduct sales and marketing activities necessary for successful product commercialization, or have third parties to do these activities on our behalf. Consequently, predictions about our future success or viability may not be as accurate as they could be if we had a longer operating history or a history of successfully developing, obtaining marketing approval for and commercializing antiviral therapies.

Previous wording

We have incurred significant operating expenses since our inception. For the six months ended June 30, 2024 and year ended December 31, 2023, our operating expenses were $116.7 million and $164.2 million, respectively. As of June 30, 2024, we had an accumulated deficit of $299.5 million.

Current wording

We have incurred significant operating expenses since our inception. For the nine months ended September 30, 2024 and year ended December 31, 2023, our operating expenses were $153.9 million and $164.2 million, respectively. As of September 30, 2024, we had an accumulated deficit of $330.7 million.

Previous wording

We have not commercialized any products and have never generated any revenue from product sales. We have devoted almost all of our financial resources to research and development, including our clinical trials and preclinical development and manufacturing activities. We expect to continue to incur significant additional operating expenses and to incur operating losses for the foreseeable future as we seek to advance product candidates through clinical development, continue preclinical development, expand our research and development activities, discover or acquire and develop product candidates, including any product candidate we may seek to combine with bemnifosbuvir for the potential treatment of COVID-19, complete preclinical studies and clinical trials, scale up and complete manufacturing and supply chain activities, seek regulatory approval and, if we receive regulatory approval, commercialize our products.

Current wording

We have not commercialized any products and have never generated any revenue from product sales. We have devoted almost all of our financial resources to research and development, including our clinical trials and preclinical development and manufacturing activities. We expect to continue to incur significant additional operating expenses and to incur operating losses for the foreseeable future as we seek to advance product candidates through clinical development, continue preclinical development, pursue research and development activities, discover or acquire and develop product candidates, complete preclinical studies and clinical trials, scale up and complete manufacturing and supply chain activities, seek regulatory approval and, if we receive regulatory approval, commercialize our products.

Previous wording

In order to obtain the FDA’s or a foreign regulatory authority’s approval to market any product candidate in the US or abroad, respectively, we must submit to the FDA an NDA or similar application to the foreign regulatory authority demonstrating to the FDA’s or foreign regulatory authority’s satisfaction that the product candidate is safe and effective for its intended use(s). This demonstration requires significant research and extensive data from animal tests, which are referred to as nonclinical or preclinical studies, as well as human tests, which are referred to as clinical trials.

Current wording

In order to obtain the FDA’s or a foreign regulatory authority’s approval to market any product candidate in the US or abroad, respectively, we must submit to the FDA a New Drug Application (“NDA”) or similar application to the foreign regulatory authority demonstrating to the FDA’s or foreign regulatory authority’s satisfaction that the product candidate is safe and effective for its intended use(s). This demonstration requires significant research and extensive data from animal tests, which are referred to as nonclinical or preclinical studies, as well as human tests, which are referred to as clinical trials.

Previous wording

Furthermore, the costs of advancing product candidates into each succeeding clinical phase tend to increase substantially over time. Because of the numerous risks and uncertainties associated with the development of drug products, we are unable to accurately predict the timing or amount of increased expenses or when, or if, we will be able to begin generating revenue from the commercialization of products or again achieve profitability. As we advanced clinical development activities, particularly our Phase 3 SUNRISE-3 clinical trial for the treatment of high-risk outpatients with mild or moderate COVID-19 and our Phase 2 clinical trial evaluating the combination of bemnifosbuvir and ruzasvir for the treatment of HCV, our operating expenses have increased. While we anticipate variability quarter to quarter, we expect we will continue to incur substantial operating expenses if or as we:

Current wording

Furthermore, the costs of advancing product candidates into each succeeding clinical phase tend to increase substantially over time. For example, as we advanced and completed the enrollment of our COVID-19 Phase 3 SUNRISE-3 clinical trial, our operating expenses increased. We anticipate that operating expenses will also increase in the future if and as we undertake and complete any additional late stage clinical trials, including the planned Phase 3 clinical trials evaluating the combination of bemnifosbuvir and ruzasvir for the treatment of HCV. Because of the numerous risks and uncertainties associated with the development of drug products, we are unable to accurately predict the timing or amount of increased expenses or when, or if, we will be able to begin generating revenue from the commercialization of products or again achieve profitability.

Previous wording

Furthermore, our ability to successfully develop, commercialize and license any products and generate product revenue is subject to substantial additional risks and uncertainties. Each of our product candidates and any future product candidate we may discover, license or otherwise acquire, will require regulatory approval in not less than one jurisdiction, the securing of manufacturing supply, capacity, distribution channels and expertise, the use of external vendors, the building of or other access to a commercial organization, substantial investment and significant marketing efforts before we generate any revenue from product sales. Additionally, all product candidates, with potentially the limited exception of bemnifosbuvir as a monotherapy for the treatment of COVID-19, will require additional preclinical and clinical development. As a result, we expect to continue to use cash for operating activities and incur operating expenses and operating losses for the foreseeable future. The use of cash and incurrence of operating expenses and operating losses has had, and we expect will continue to have, an adverse effect on our working capital.

Current wording

Furthermore, our ability to successfully develop, commercialize and license any products and generate product revenue is subject to substantial additional risks and uncertainties. Each of our product candidates and any future product candidate we may discover, license or otherwise acquire, will require regulatory approval in not less than one jurisdiction, the securing of manufacturing supply, capacity, distribution channels and expertise, the use of external vendors, the building of or other access to a commercial organization, substantial investment and significant marketing efforts before we generate any revenue from product sales. Additionally, all product candidates, will require additional preclinical and clinical development. As a result, we expect to continue to use cash for operating activities and incur operating expenses and operating losses for the foreseeable future. The use of cash and incurrence of operating expenses and operating losses has had, and we expect will continue to have, an adverse effect on our working capital.

Previous wording

The amount of future expenses or losses and our ability to achieve or maintain profitability in future years, if ever, are uncertain. We have no products that have generated any commercial revenue, do not expect to generate revenues from the commercial sale of products in the near term, and might never generate revenues from the sale of products. Our ability to generate product revenue and maintain profitability will depend on, among other things, successful completion of the clinical development of our product candidates; obtaining necessary regulatory approvals from the FDA and foreign regulatory authorities; establishing manufacturing and sales capabilities; market acceptance of our products, if approved, and establishing marketing infrastructure or otherwise arranging to commercialize our product candidates for which we obtain approval; and raising sufficient funds to finance our activities. We might not succeed at any of these undertakings. If we are unsuccessful at some or all of these undertakings, our business, prospects, and results of operations may be materially adversely affected.

Current wording

The amount of future expenses or losses and our ability to achieve or maintain profitability in future years, if ever, are uncertain. We have no products that have generated any commercial revenue, do not expect to generate revenues from the commercial sale of products in the near term, and might never generate revenues from the sale of products. Our ability to generate product revenue and maintain profitability will depend on, among other things, successful completion of the clinical development of our product candidates; obtaining necessary regulatory approvals from the FDA and foreign regulatory authorities; establishing manufacturing and sales capabilities; market acceptance of our products, if approved, and establishing marketing infrastructure or otherwise arranging to commercialize our product candidates for which we obtain approval; and raising sufficient funds to finance our activities. We might not succeed at any of these undertakings. If we are unsuccessful at some or all of these undertakings in the future, our business, prospects, and results of operations may be materially adversely affected.

Previous wording

Since inception, we have incurred substantial operating expenses. We expect to incur substantial expenses in connection with our current and planned business activities, particularly the completion of the Phase 3 SUNRISE-3 clinical trial, and if the SUNRISE-3 clinical trial is successful, seeking regulatory approval of bemnifosbuvir as a monotherapy for the treatment of high-risk outpatients with mild or moderate COVID-19, the completion of our Phase 2 clinical trial evaluating the combination of bemnifosbuvir and ruzasvir for the treatment of HCV, and if the Phase 2 clinical trial is successful, Phase 3 clinical development of this HCV combination product candidate. Additionally, we anticipate that we will incur substantial expenses in connection with the discovery, license or other acquisition and potential development of a combination bemnifosbuvir COV19 product candidate or other product candidates, and, if we successfully develop one or more product candidates, in connection with the establishment of sales, marketing, internal systems and distribution infrastructure to commercialize any products for which we may obtain regulatory approval.

Current wording

Since inception, we have incurred substantial operating expenses. We expect to incur substantial expenses in connection with our current and planned business activities, particularly the Phase 3 clinical development of the combination of bemnifosbuvir and ruzasvir if the Phase 2 clinical trial that we are conducting of this combination is successful. Additionally, while completed, we will also continue to incur expenses with the wind down and close out of our COVID-19 Phase 3 SUNRISE-3 clinical trial. Also, we anticipate that we will incur substantial expenses in connection with the discovery, license or other acquisition and potential development of other product candidates, and, if we successfully develop one or more product candidates, in connection with the establishment of sales, marketing, internal systems and distribution infrastructure to commercialize any products for which we may obtain regulatory approval.

Previous wording

the timing of and costs associated with discovery, license or acquisition of a protease inhibitor or another direct acting antiviral product candidate to combine with bemnifosbuvir and develop for the treatment of patients with COVID-19;

Current wording

the timing of and costs associated with discovery, license or acquisition of a protease inhibitor for the treatment of respiratory or other diseases resulting from infection with single stranded RNA viruses;

Previous wording

the continued growth of our headcount and associated costs as we expand our research and development capabilities and establish a commercial infrastructure;

Current wording

growth of our headcount and associated costs if and as we establish a commercial infrastructure;

Previous wording

Currently, we do not have any committed external source of funds or other support and we cannot be certain that additional funding will be available on acceptable terms, or at all. Our ability to access potential sources of future liquidity and raise funds will depend upon financial, economic and geopolitical conditions and other factors, many of which are beyond our control. These external factors, including high rates of interest and inflation, will also impact and may increase substantially costs we incur in connection with any potential fundraising. If we are unable to raise additional capital in sufficient amounts, on terms acceptable to us, or on a timely basis, we may have to significantly delay, scale back or discontinue the development or commercialization of our product candidates or other research and development initiatives.

Current wording

Currently, we do not have any committed external source of funds or other support and we cannot be certain that additional funding will be available on acceptable terms, or at all. Our ability to access potential sources of future liquidity and raise funds will depend upon financial, economic and geopolitical conditions and other factors, many of which are beyond our control. These external factors, including rates of interest and inflation, will also impact and may increase substantially costs we incur in connection with any potential fundraising. If we are unable to raise additional capital in sufficient amounts, on terms acceptable to us, or on a timely basis, we may have to significantly delay, scale back or discontinue the development or commercialization of our product candidates or other research and development initiatives.

Previous wording

We incurred a net loss of $103.7 million for the six months ended June 30, 2024. Our ability to achieve and sustain future profitability depends upon our ability to generate revenue from product sales. We have not generated product revenue and we do not expect to generate product revenue unless or until we successfully complete clinical development and obtain regulatory approval of, and then successfully commercialize, at least one of our product candidates. Our product candidates are in varying stages of development, which is expected to necessitate additional preclinical and clinical development in some cases and in all cases will require regulatory review and approval, substantial investment in and access to sufficient commercial manufacturing capacity and significant marketing efforts before we can generate any revenue from product sales. Currently, we do not anticipate generating revenue from product sales for at least the next few years. Our ability to generate revenue depends on a number of factors, including, but not limited to:

Current wording

We incurred a net loss of $134.8 million for the nine months ended September 30, 2024. Our ability to achieve and sustain future profitability depends upon our ability to generate revenue from product sales. We have not generated product revenue and we do not expect to generate product revenue unless or until we successfully complete clinical development and obtain regulatory approval of, and then successfully commercialize, at least one of our product candidates. Our product candidates are in varying stages of development, which is expected to necessitate additional preclinical and clinical development in some cases and in all cases will require regulatory review and approval, substantial investment in and access to sufficient commercial manufacturing capacity and significant marketing efforts before we can generate any revenue from product sales. Currently, we do not anticipate generating revenue from product sales for at least the next few years. Our ability to generate revenue depends on a number of factors, including, but not limited to:

Previous wording

timely completion of our clinical trials, including the readout of data from Phase 3 SUNRISE-3 clinical trial for the treatment of high risk outpatients with mild to moderate COVID-19, the ongoing Phase 2 trial, and any subsequent Phase 3 trial evaluating the combination of bemnifosbuvir and ruzasvir for the treatment of HCV, potential clinical trials evaluating a bemnifosbuvir combination regimen for the treatment of COVID-19, preclinical studies and other future clinical trials of other product candidates, each of which may be significantly slower or more costly than we currently anticipate and will depend substantially upon the performance of third-party contractors;

Current wording

timely completion of our clinical trials, including the ongoing Phase 2 clinical trial and any subsequent Phase 3 clinical trial evaluating the combination of bemnifosbuvir and ruzasvir for the treatment of HCV, as well as our preclinical studies and other future clinical trials of other product candidates, each of which may be significantly slower or more costly than we currently anticipate and will depend substantially upon the performance of third-party contractors;

Previous wording

our ability to complete additional IND enabling studies and successfully submit INDs, CTAs or comparable applications to allow us to initiate clinical trials for any other product candidates;

Current wording

our ability to complete additional investigational drug application (“IND”) enabling studies and successfully submit INDs, clinical trial application (“CTAs”) or comparable applications to allow us to initiate clinical trials for any other product candidates;

Previous wording

the availability, actual and perceived advantages and relative cost, convenience, safety and efficacy of any bemnifosbuvir COV19 product candidate or HCV product candidate we may be able to commercialize, compared to other COVID-19 and HCV therapies, as well as the accuracy and sufficiency of clinical evidence supporting any such advantages of our product candidates;

Current wording

the availability, actual and perceived advantages and relative cost, convenience, safety and efficacy of our HCV product candidate or other product candidates we may be able to commercialize, compared to other commercially available therapies for the targeted indications, as well as the accuracy and sufficiency of clinical evidence supporting any such advantages of our product candidates;

Previous wording

Our business is highly dependent on our ability to develop one or more bemnifosbuvir COV19 product candidates. If we are not successful in developing a bemnifosbuvir COV19 product candidate, our business will be harmed. Our business is also highly dependent on the success of our other most advanced product candidates, including the combination of bemnifosbuvir and ruzasvir for the treatment of HCV, which will require significant additional clinical testing, including Phase 3 clinical testing, before we can seek regulatory approval and potentially launch commercial sales. If these product candidates fail in clinical development, do not receive regulatory approval or are not successfully commercialized, or are significantly delayed in doing so, our business will be harmed.

Current wording

Our business is highly dependent on the success of our most advanced product candidate, the combination of bemnifosbuvir and ruzasvir for the treatment of HCV, which will require significant additional clinical testing, including successful Phase 3 clinical testing, before we can seek regulatory approval and potentially launch commercial sales. If this product candidate fails in clinical development, does not receive regulatory approval or is not successfully commercialized, or are significantly delayed in doing so, our business will be harmed.

Previous wording

A substantial portion of our business and future success depends on our ability to develop, obtain regulatory approval for and successfully commercialize one or more bemnifosbuvir COV19 product candidates and the combination of bemnifosbuvir and ruzasvir for the treatment of HCV. We currently have no products that are approved for commercial sale and have not completed the development of any of our product candidates, and we may never be able to develop marketable products.

Current wording

A substantial portion of our business and future success depends on our ability to develop, obtain regulatory approval for and successfully commercialize the combination of bemnifosbuvir and ruzasvir for the treatment of HCV. We currently have no products that are approved for commercial sale and have not successfully completed the development of any of our product candidates, and we may never be able to develop marketable products.

Previous wording

Additionally, we expect that a substantial portion of our efforts and expenditures over the next few years will be devoted to developing the combination of bemnifosbuvir and ruzasvir for the treatment of HCV which will require additional clinical development, management of clinical, medical affairs and manufacturing activities, obtaining regulatory approvals in multiple jurisdictions, securing of manufacturing supply, building of or otherwise accessing a commercial organization, substantial investment and significant marketing efforts.

Current wording

During the near term we expect that a substantial portion of our efforts and expenditures will be devoted to developing the combination of bemnifosbuvir and ruzasvir for the treatment of HCV which will require additional clinical development, management of clinical, medical affairs and manufacturing activities, obtaining regulatory approvals in multiple jurisdictions, securing of manufacturing supply, building of or otherwise accessing a commercial organization, substantial investment and significant marketing efforts.

Previous wording

We cannot be certain that any of our current or future product candidates will be successful in clinical trials, receive regulatory approval or be successfully commercialized even if we receive regulatory approval. Further, our development of any product candidate may be delayed or suspended, which may affect our ability to successfully commercialize such product candidate. Additionally, our ability to successfully commercialize a product will also be dependent upon our ability to timely manufacture at commercial scale the quantities of product that will satisfy market demand.

Current wording

We cannot be certain that our HCV product candidate or any future product candidates will be successful in clinical trials, receive regulatory approval or be successfully commercialized even if we receive regulatory approval. Further, our development of any product candidate may be delayed or suspended, which may affect our ability to successfully commercialize such product candidate. Additionally, our ability to successfully commercialize a product will also be dependent upon our ability to timely manufacture at commercial scale the quantities of product that will satisfy market demand.

Previous wording

If our competitors develop products to treat diseases and, if applicable, specified patient populations which our current or future product candidates are being developed to treat, before we are able to successfully develop a product candidate, or if our competitors develop any products that are superior to our product candidates, our potential market share could become smaller or non-existent. Even if we receive approval to market any product candidate, we cannot be certain that our product candidates will be as or more effective than other commercially available alternatives, successfully commercialized or widely accepted in the marketplace. For each of COVID-19 and HCV, there are currently approved and marketed oral antiviral products against which we would be required to compete.

Current wording

Even if we receive approval to market our HCV product candidate or any other product candidate, we cannot be certain that such product candidate will be as or more effective than commercially available alternatives successfully commercialized or widely accepted in the marketplace. There are currently approved and well established oral antiviral HCV products against which we would be required to compete.

Previous wording

We cannot be certain that, if approved, the safety and efficacy profile of any product will be consistent with the results observed in clinical trials, or in the case of a bemnifosbuvir COV19 product candidate, that it will demonstrate efficacy against continuing mutations of the SARS-COV-2 virus, the causative agent of COVID-19. If we are not successful in the clinical development of a bemnifosbuvir COV19 product candidate or our other most advanced product candidates, the required regulatory approvals for these product candidates are not obtained, there are significant delays in the development or approval of these product candidates or supplying on an uninterrupted basis commercial quantities of approved products or for any other reason approved products, if any, are otherwise not commercially successful, our business, financial condition and results of operations may be materially harmed.

Current wording

We cannot be certain that, if approved, the safety and efficacy profile of the combination of bemnifosbuvir and ruzasvir will be consistent with the results observed in clinical trials. If we are not successful in the clinical development of the combination of bemnifosbuvir and ruzasvir for the treatment of HCV, if the required regulatory approvals for this product candidate are not obtained, if there are significant delays in the development or approval of this product candidate or in supplying commercial quantities of any approved products on an uninterrupted basis, or if we are otherwise not commercially successful, our business, financial condition and results of operations may be materially harmed.

Previous wording

In addition, approval policies, regulations or the type and amount of clinical data necessary to gain approval may change during the course of a product candidate’s clinical development particularly with respect to COVID-19, which continues to evolve rapidly, and may vary among jurisdictions, which may cause delays in the approval or the decision not to approve an application.

Current wording

In addition, approval policies, regulations or the type and amount of clinical data necessary to gain approval may change during the course of a product candidate’s clinical development, and may vary among jurisdictions, which may cause delays in the approval or the decision not to approve an application.

Previous wording

This lengthy approval process, as well as the unpredictability of the results of clinical trials, may result in our failing to obtain regulatory approval to market any of our product candidates, which would seriously harm our business. In addition, even if we were to obtain approval, regulatory authorities may approve any of our product candidates for fewer or more limited indications than we request, may impose significant limitations in the form of narrow indications, warnings, or a Risk Evaluation and Mitigation Strategy (“REMS”) or similar risk management measures. Regulatory authorities may not approve the price we intend to charge for products we may develop, may grant approval contingent on the performance of costly post-marketing clinical trials, or may approve a product candidate with a label that does not include the labeling claims necessary or desirable for the successful commercialization of that product candidate. Any of the foregoing scenarios could seriously harm our business.

Current wording

The lengthy regulatory process, as well as the unpredictability of the results of clinical trials, may result in our failing to obtain regulatory approval to market any of our product candidates, which may seriously harm our business. In addition, even if we were to obtain approval, regulatory authorities may approve any of our product candidates for fewer or more limited indications than we request, may impose significant limitations in the form of narrow indications, warnings, or a Risk Evaluation and Mitigation Strategy (“REMS”) or similar risk management measures. Regulatory authorities may not approve the price we intend to charge for products we may develop, may grant approval contingent on the performance of costly post-marketing clinical trials, or may approve a product candidate with a label that does not include the labeling claims necessary or desirable for the successful commercialization of that product candidate. Any of the foregoing scenarios could seriously harm our business.

Previous wording

Before obtaining marketing approval from the FDA or other comparable foreign regulatory authorities for the sale of our product candidates, we must complete preclinical development and extensive clinical trials to demonstrate the safety and efficacy of our product candidates. Clinical testing is expensive, time-consuming and subject to uncertainty. A failure of one or more clinical trials can occur at any stage of the process, such as the failure in October 2021 of bemnifosbuvir to meet the primary endpoint in the overall patient population in the Phase 2 MOONSONG clinical trial. The outcome of preclinical studies and early-stage clinical trials may not be predictive of the success of later clinical trials. This may be particularly true in the development of therapeutics for the treatment of COVID-19, including our development of bemnifosbuvir COV19 product candidates, where the evolution of the virus and disease have occurred at such a rapid rate that product candidates in development have the potential to become obsolete before clinical development is completed. Moreover, preclinical and clinical data, particularly the analysis of exploratory endpoints and analysis of data derived from patient subgroups, such as the data from the MORNINGSKY study upon which we relied to initiate the Phase 3 SUNRISE-3 clinical trial and continue clinical development of bemnifosbuvir for the treatment of COVID-19, as well as the data from the lead-in cohort in our HCV Phase 2 clinical trial of the combination of bemnifosbuvir and ruzasvir, are often susceptible to varying interpretations, and many companies that have believed their product candidates performed satisfactorily in preclinical studies and clinical trials have nonetheless failed to obtain marketing approval of their drugs.

Current wording

Before obtaining marketing approval from the FDA or other comparable foreign regulatory authorities for the sale of our product candidates, we must complete preclinical development and extensive clinical trials to demonstrate the safety and efficacy of our product candidates. Clinical testing is expensive, time-consuming and subject to uncertainty. A failure of one or more clinical trials can occur at any stage of the process, such as the failure in September 2024 of bemnifosbuvir to meet the primary endpoint in the COVID-19 Phase 3 SUNRISE-3 clinical trial. The outcome of preclinical studies and early-stage clinical trials may not be predictive of the success of later clinical trials. Moreover, preclinical and clinical data, particularly the analysis of exploratory endpoints and analysis of data derived from patient subgroups, such as the data from the lead-in cohort in our HCV Phase 2 clinical trial of the combination of bemnifosbuvir and ruzasvir, are often susceptible to varying interpretations, and many companies that have believed their product candidates performed satisfactorily in preclinical studies and varying stages of clinical trials have nonetheless failed to obtain marketing approval of their drugs.

Previous wording

To date, we have not completed any late-stage or pivotal clinical trials for any of our product candidates. We cannot guarantee that any of our planned or ongoing clinical trials will be initiated or conducted as planned or completed on schedule, if at all. We also cannot be sure that submission of any future IND or similar application will result in the FDA or other regulatory authority, as applicable, allowing future clinical trials to begin in a timely manner, if at all. Moreover, even if these trials begin, issues may arise that could cause regulatory authorities to suspend or terminate such clinical trials. A failure of one or more clinical trials can occur at any stage of testing, and our future clinical trials may not be successful.

Current wording

To date, we have not successfully concluded any late-stage or pivotal clinical trials for any of our product candidates. We cannot guarantee that any of our planned or ongoing clinical trials will be initiated or conducted as planned or completed on schedule, if at all. We also cannot be sure that submission of any future IND or similar application will result in the FDA or other regulatory authority, as applicable, allowing future clinical trials to begin in a timely manner, if at all. Moreover, even if these trials begin, issues may arise that could cause regulatory authorities to suspend or terminate such clinical trials.

Previous wording

Any inability to successfully complete our Phase 3 SUNRISE-3 clinical trial, our Phase 2 clinical trial evaluating the combination of bemnifosbuvir and ruzasvir for the treatment of HCV or the completion of any other planned clinical trials we may initiate could result in additional costs to us or impair our ability to generate revenue from product sales. In addition, if we make manufacturing or formulation changes to our product candidates, we may be required to or we may elect to conduct additional studies to bridge our modified product candidates to earlier versions. Clinical trial delays could also shorten any periods during which any approved products have patent protection and may allow our competitors to further strengthen the market position of their current products or bring new products to market before we do, which could impair our ability to successfully commercialize our product candidates and may seriously harm our business.

Current wording

Any inability to successfully complete our Phase 2 clinical trial and initiate a Phase 3 clinical trial evaluating the combination of bemnifosbuvir and ruzasvir for the treatment of HCV or the completion of any other planned clinical trials we may initiate could result in additional costs to us or impair our ability to seek approval for our product candidates and ultimately generate revenue from product sales. In addition, if we make manufacturing or formulation changes to our product candidates, we may be required to or we may elect to conduct additional studies to bridge our modified product candidates to earlier versions. Clinical trial delays could also shorten any periods during which any approved products have patent protection and may allow our competitors to further strengthen the market position of their current products or bring new products to market before we do, which could impair our ability to successfully commercialize our product candidates and may seriously harm our business.

Previous wording

Such authorities may suspend or terminate a clinical trial due to a number of factors, including failure to conduct the clinical trial in accordance with regulatory requirements or our clinical protocols, inspection of the clinical trial operations or trial site by the FDA or other regulatory authorities resulting in the imposition of a clinical hold, unforeseen safety issues or adverse side effects, failure to demonstrate a benefit from using a product candidate, changes in governmental regulations or administrative actions or lack of adequate funding to continue the clinical trial.

Current wording

We could also encounter delays if a clinical trial is suspended or terminated by us, by the DSMB for such trial, or by the FDA or any other regulatory authority, or if the IRBs of the institutions at which such trials are being conducted suspend or terminate the participation of their clinical investigators and sites subject to their review. Such authorities may suspend or terminate a clinical trial due to a number of factors, including failure to conduct the clinical trial in accordance with regulatory requirements or our clinical protocols, inspection of the clinical trial operations or trial site by the FDA or other regulatory authorities resulting in the imposition of a clinical hold, unforeseen safety issues or adverse side effects, failure to demonstrate a benefit from using a product candidate, changes in governmental regulations or administrative actions or lack of adequate funding to continue the clinical trial.

Previous wording

In addition, our clinical trials will compete with other clinical trials sponsored by third parties, including potential competitors, that are in the same or substantially similar therapeutic areas as our product candidates, and this competition may reduce the number and types of patients available to us because some patients who might have opted to enroll in our trials may instead opt to enroll in a trial being conducted by one of our competitors. Since the number of qualified clinical investigators is limited, it is possible that we will conduct some of our clinical trials at the same clinical trial sites that some of our competitors use, which will reduce the number of patients who are available for our clinical trials at such clinical trial sites.

Current wording

In addition, our clinical trials may compete with other clinical trials sponsored by third parties, including potential competitors, that are in the same or substantially similar therapeutic areas as our product candidates, and this competition may reduce the number and types of patients available to us because some patients who might have opted to enroll in our trials may instead opt to enroll in a trial being conducted by one of our competitors. Since the number of qualified clinical investigators is limited, it is possible that we will conduct some of our clinical trials at the same clinical trial sites that some of our competitors use, which will reduce the number of patients who are available for our clinical trials at such clinical trial sites.

Previous wording

Patients failing to adhere to the protocol, whether as a result of failing to take the drug as directed or otherwise, may adversely impact the clinical trial results if the lack of adherence or other failure to follow the protocol contributes to or results in the patient failing to meet the clinical trial primary endpoint. For example, in our HCV Phase 2 clinical trial of the combination of bemnifosbuvir and ruzasvir, it has been determined that two patients in the lead cohort of 60 patients who failed to achieve the primary endpoint of sustained virologic response at week 12 post-treatment were not adherent to the clinical trial protocol schedule of eight weeks administration of the combination.

Current wording

Patients failing to adhere to the protocol, whether as a result of failing to take the drug as directed or otherwise, may adversely impact the clinical trial results if the lack of adherence or other failure to follow the protocol contributes to or results in the patient failing to meet the clinical trial primary endpoint.

Previous wording

If a product candidate is intended for the treatment of a serious or life-threatening condition and the product candidate demonstrates the potential to address unmet medical needs for such condition, the product candidate sponsor may apply for Fast Track designation. In April 2023, the FDA granted Fast Track designation for the investigation of bemnifosbuvir for the treatment of COVID-19. As the sponsor of a product candidate that has received Fast Track designation, we may have opportunities for more frequent interactions with the FDA review team during product development and, once a NDA is submitted, the NDA may be eligible for priority review. An NDA for a Fast Track designated product candidate may also be eligible for rolling review, where the FDA may consider review of sections of the NDA on a rolling basis before the complete NDA is submitted.

Current wording

If a product candidate is intended for the treatment of a serious or life-threatening condition and the product candidate demonstrates the potential to address unmet medical needs for such condition, the product candidate sponsor may apply for Fast Track designation. For example, in April 2023, the FDA granted Fast Track designation for the investigation of bemnifosbuvir for the treatment of COVID-19. The sponsor of a product candidate that has received Fast Track designation may have opportunities for more frequent interactions with the FDA review team during product development and, once a NDA is submitted, the NDA may be eligible for priority review. An NDA for a Fast Track designated product candidate may also be eligible for rolling review, where the FDA may consider review of sections of the NDA on a rolling basis before the complete NDA is submitted.

Previous wording

The FDA has broad discretion whether or not to grant Fast Track designation to any particular product candidate. As a result, we may seek such Fast Track designation for other product candidates, but cannot assure you that the FDA would decide to grant it. Even though a Fast Track designation has been received for the investigation of bemnifosbuvir to treat COVID-19, we may not experience a faster development process, review or approval compared to conventional FDA procedures. The FDA may withdraw Fast Track designation if it believes that the designation is no longer supported by data from our clinical development program. Many product candidates that have received Fast Track designation have nevertheless failed to obtain approval.

Current wording

The FDA has broad discretion whether or not to grant Fast Track designation to any particular product candidate. As a result, we may seek such Fast Track designation for other product candidates, but cannot assure you that the FDA would decide to grant it. Even if a Fast Track designation has been received, the sponsor may not experience a faster development process, review or approval compared to conventional FDA procedures. The FDA may withdraw Fast Track designation if it believes that the designation is no longer supported by data from our clinical development program. Many product candidates that have received Fast Track designation have nevertheless failed to obtain approval.

Previous wording

From time to time, we may publicly disclose preliminary or top-line data from our preclinical studies and clinical trials, which is based on a preliminary analysis of then-available data. For example, in January and February 2024, and more recently in June 2024, we announced preliminary, then-available data from the 60 patients lead-in cohort in our Phase 2 clinical trial evaluating the combination of bemnifosbuvir and ruzasvir for the treatment of HCV. Similar to all preliminary and then-available data, these results and related findings and conclusions are subject to change as additional data becomes available or following a more comprehensive review of the data related to the particular study or trial. We also make assumptions, estimations, calculations and conclusions as part of our analyses of data, and we may not have received or had the opportunity to fully and carefully evaluate all data. Consequently, the top-line or preliminary data that we report may differ from final results reported from the same studies, or different conclusions or considerations may qualify such preliminary or topline data, once additional data have been received and fully evaluated. Top-line and preliminary data also remain subject to audit and verification procedures that may result in the final results being materially different from the preliminary or topline data we previously published. As a result, top-line data should be viewed with caution until the final data are available.

Current wording

From time to time, we may publicly disclose preliminary or top-line data from our preclinical studies and clinical trials, which is based on a preliminary analysis of then-available data. For example, in January and February 2024, and more recently in June 2024, we announced preliminary, then-available data from the 60 patients lead-in cohort in our Phase 2 clinical trial evaluating the combination of bemnifosbuvir and ruzasvir for the treatment of HCV. Similar to all preliminary and then-available data, these results and related findings and conclusions are subject to change as additional data becomes available or following a more comprehensive review of the data related to the particular study or trial. We also make assumptions, estimations, calculations and conclusions as part of our analyses of data, and we may not have received or had the opportunity to fully and carefully evaluate all data. Consequently, the top-line or preliminary data that we report may differ from final results reported from the same studies, or different conclusions or considerations may qualify such preliminary or topline data, once additional data have been received and fully evaluated. Top-line and preliminary data also remain subject to audit and verification procedures that may result in the final results being materially different from the preliminary or topline data we previously published. As a result, top-line and preliminary data should be viewed with caution until the final data are available.

Previous wording

Part of our strategy involves identifying novel product candidates. For example, we are currently engaged in internal efforts to identify a protease inhibitor product candidate that we may be able to combine with bemnifosbuvir for the treatment of COVID-19. These efforts and any subsequent discovery efforts we initiate to identify other novel product candidates may fail to yield product candidates for clinical development for a number of reasons, including those discussed in these risk factors and also:

Current wording

Our efforts to discover a protease inhibitor product candidate and any subsequent discovery efforts we initiate to identify other novel product candidates may fail to yield product candidates for clinical development for a number of reasons, including those discussed in these risk factors and also:

Previous wording

We may choose to focus our efforts and resources on one or more potential product candidates that ultimately prove to be unsuccessful, or to license or purchase a marketed product that does not meet our financial expectations. As a result, we may fail to capitalize on viable commercial products or profitable market opportunities, be required to forego or delay pursuit of opportunities with other product candidates or other diseases that may later prove to have greater commercial potential.

Current wording

COVID-19 Phase 3 SUNRISE-3 clinical trial. Further, we may license or purchase a marketed product that does not meet our financial expectations. As a result, we may fail to capitalize on viable commercial products or profitable market opportunities, be required to forego or delay pursuit of opportunities with other product candidates or other diseases that may later prove to have greater commercial potential.

Previous wording

Furthermore, we have limited financial and personnel resources and are placing significant focus on the development of our lead product candidates, particularly our bemnifosbuvir COV19 product candidate and bemnifosbuvir in combination with ruzasvir for the treatment of HCV, and as such, we may forgo or delay pursuit of opportunities with other future product candidates that later prove to have greater commercial potential. Our resource allocation decisions may cause us to fail to capitalize on viable commercial products or profitable market opportunities. Our spending on current and future research and development programs and other future product candidates for specific indications may not yield any commercially viable future product candidates. If we do not accurately evaluate the commercial potential or target market for a particular future product candidate, we may relinquish valuable rights to those future product candidates through collaboration, licensing or other royalty arrangements in cases in which it would have been more advantageous for us to retain sole development and commercialization rights to such future product candidates.

Current wording

Furthermore, we have limited financial and personnel resources and are placing significant focus on the development of our lead product candidate, the combination of bemnifosbuvir and ruzasvir for the treatment of HCV, and as such, we may forgo or delay pursuit of opportunities with other future product candidates that later prove to have greater commercial potential. Our resource allocation decisions may cause us to fail to capitalize on viable commercial products or profitable market opportunities. Our spending on current and future research and development programs and other future product candidates for specific indications may not yield any commercially viable future product candidates. If we do not accurately evaluate the commercial potential or target market for a particular future product candidate, we may relinquish valuable rights to those future product candidates through collaboration, licensing or other royalty arrangements in cases in which it would have been more advantageous for us to retain sole development and commercialization rights to such future product candidates.

Previous wording

If any current or future product candidate we develop receives marketing approval, whether as a single agent or in combination with other therapies, it may nonetheless fail to gain sufficient market acceptance by physicians, patients, third-party payors and others in the medical community. For example, current approved antiviral products are well established in the medical community for the treatment of HCV and in the US, two oral antivirals, Paxlovid and Lagevrio, are currently approved and authorized, respectively, for the treatment of COVID-19, and doctors may continue to rely on these therapies.

Current wording

If any current or future product candidate we develop receives marketing approval, whether as a single agent or in combination with other therapies, it may nonetheless fail to gain sufficient market acceptance by physicians, patients, third-party payors and others in the medical community. For example, current approved antiviral products are well established in the medical community for the treatment of HCV and doctors may continue to rely on these therapies.

Previous wording

Separately, in response to the COVID-19 pandemic, the FDA postponed most inspections of domestic and foreign manufacturing facilities at various points. Even though the FDA has since resumed standard inspection operations of domestic facilities where feasible, any reoccurrence of a public health emergency may lead to further administrative or inspectional delays.

Current wording

Separately, in response to the COVID-19 pandemic, the FDA postponed most inspections of domestic and foreign manufacturing facilities at various points.

Previous wording

In addition, since January 1, 2021, after the end of the transition period following the UK’s departure from the EU, we are also subject to the UK data protection regime (the UK GDPR and UK Data Protection Act 2018), which imposes separate but similar obligations to those under the GDPR and comparable penalties, including fines of up to £17.5 million or 4% of a noncompliant company’s global annual revenue for the preceding financial year, whichever is greater. On October 12, 2023, the UK Extension to the DPF came into effect (as approved by the UK Government), as a data transfer mechanism from the UK to US entities self-certified under the DPF. As we

Current wording

In addition, since January 1, 2021, after the end of the transition period following the UK’s departure from the EU, we are also subject to the UK data protection regime (the UK GDPR and UK Data Protection Act 2018), which imposes separate but similar obligations to those under the GDPR and comparable penalties, including fines of up to £17.5 million or 4% of a noncompliant company’s global annual revenue for the preceding financial year, whichever is greater. On October 12, 2023, the UK Extension to the DPF came into effect (as approved by the UK Government), as a data transfer mechanism from the UK to US entities self-certified under the DPF. As we continue to expand into other foreign countries and jurisdictions, we may be subject to additional laws and regulations that may affect how we conduct business.

Previous wording

For the diseases that we are targeting, significant competition exists from approved and authorized oral treatments as well as other treatments in development. The approved drugs, particularly for HCV and increasingly for COVID-19, are well-established products and are widely accepted by physicians, patients and third-party payors.

Current wording

For the diseases that we are targeting, significant competition exists from approved and authorized oral treatments as well as other treatments in development. The approved drugs, particularly for HCV, are well-established products and are widely accepted by physicians, patients and third-party payors.

Previous wording

Many of our competitors have substantially greater capital resources, access to larger pools of capital, robust product candidate pipelines, established presence in the market, deep and broad commercial infrastructures and greater expertise in research and development, manufacturing, preclinical and clinical testing, obtaining regulatory approvals and reimbursement and marketing approved products than we do. As a result, our competitors may achieve product commercialization or patent or other intellectual property protection earlier than we can. For example, in May 2023, Gilead Sciences was granted a patent in the US that may cover our compound bemnifosbuvir. If Gilead Sciences asserts this patent, we may not be successful in invalidating it. If we are not successful, we will need to obtain a license from Gilead, which may not be available on reasonable terms, if at all.

Current wording

Many of our competitors have substantially greater capital resources, access to larger pools of capital, robust product candidate pipelines, established presence in the market, deep and broad commercial infrastructures and greater expertise in research and development, manufacturing, preclinical and clinical testing, obtaining regulatory approvals and reimbursement and marketing approved products than we do. As a result, our competitors may achieve product commercialization or patent or other intellectual property protection earlier than we can. For example, in each of May 2023 and October 2024, the US Patent and Trademark Office (“USPTO”) granted Gilead Sciences patents in the US that may cover our compound bemnifosbuvir. If Gilead Sciences asserts either of these patents in an infringement suit, we may not be successful in convincing a trial court that the patent is invalid and unenforceable. In that circumstance, we would need to obtain a license from Gilead Sciences, which may not be available on reasonable terms, if at all. If a license is required and we are unable to obtain such license, commercialization of approved product candidates, if any, using bemnifosbuvir may not be able to continue without infringement.

Showing the first 40 of 59 pairs. Open the source sections for the rest.

Rearranged current paragraphs (4)

Current report — wording carried from elsewhere

Further, we expect we will continue to incur substantial operating expenses if or as we:

Current report — wording carried from elsewhere

Part of our strategy involves identifying novel product candidates. For example, we are currently engaged in internal efforts to identify a protease inhibitor product candidate for the treatment of respiratory and other diseases resulting from infection with single stranded RNA viruses.

Current report — wording carried from elsewhere

We may choose to focus our efforts and resources on one or more potential product candidates that ultimately prove to be unsuccessful as was the case with the failure of bemnifosbuvir to meet the primary endpoint in the

Current report — wording carried from elsewhere

Leahy-Smith Act, on March 16, 2013, an interference proceeding in the US can be initiated by a third-party to determine if it was the first to invent any of the subject matter covered by the claims of our patent applications. We may also be subject to a third-party preissuance submission of prior art to the USPTO.
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

Risks Related to the Development of Product Candidates for the Treatment of COVID-19

Previous report — wording carried elsewhere

We could also encounter delays if a clinical trial is suspended or terminated by us, by the DSMB for such trial, or by the FDA or any other regulatory authority, or if the IRBs of the institutions at which such trials are being conducted suspend or terminate the participation of their clinical investigators and sites subject to their review.

Previous report — wording carried elsewhere

Our independent registered public accounting firm may issue a report that is adverse in the event material weaknesses have been identified in our internal control over financial reporting.